Professional Documents
Culture Documents
PROYECTO DE INVESTIGACÓN
AUTORES:
ASESOR:
Pimentel-Perú
2019
Contenido
MEMORIA DESCRIPTIVA ................................................................................... 5
1. Introducción................................................................................................ 6
2. Alcances .................................................................................................... 6
5.4. Relieve............................................................................................... 12
6. MARCO TEORICO................................................................................... 14
2
____________________________________________Ingeniería Civil
| Hidráulica
11.1. Granulometría................................................................................. 41
3
____________________________________________Ingeniería Civil
| Hidráulica
4
____________________________________________Ingeniería Civil
| Hidráulica
MEMORIA
DESCRIPTIVA
5
____________________________________________Ingeniería Civil
| Hidráulica
1. Introducción
El presente trabajo tiene como objetivo fundamental el diseño de la defensa
ribereña en la margen izquierda y parte del margen derecho del Río Mantaro,
en el tramo comprendido entre el puente colgante y 970 m y 670
respectivamente aguas arriba del puente (quebrada Tinyas). Es necesario
dentro de la investigación realizar en primer término el estudio hidrológico, de
la cuenca del Río Mantaro desde la presa Tabla chaca, lugar donde se ubica
central hidroeléctrica del Mantaro hasta el punto de aforo: Inicio de la defensa
ribereña para la Comunidad de Chaipará, lugar donde debe iniciarse los
estudios topográficos y el posterior transito hidráulico a partir del caudal de
máximas avenidas obtenido en la etapa hidrológica que permitirá realizar el
diseño de la defensa ribereña de la Comunidad de Chaipará, así como el
análisis a nivel de Hidráulica Fluvial para finalmente diseñar la estructura
hidráulica para la protección de las avenidas en la margen izquierda del Río
Mantaro.
2. Alcances
Dentro del presente trabajo, se realizarán los estudios correspondientes a
Hidrología, Hidráulica y diseño de la defensa ribereña.
El análisis hidrológico e hidráulico se desarrollarán a través del programa HEC-
HMS-4.03 y HEC-RAS 5.05 respectivamente, en el que se ingresará los
hietogramas unitarios, las 51 secciones transversales obtenidas luego del
levantamiento topográfico del cauce principal, con sus respectivos coeficientes
de rugosidad de manning, divididos en tres partes de la sección transversal:
banco de inundación izquierdo y canal.
3. Problemática que resolverá el proyecto
La actual situación de los pobladores, es de peligro latente, puesto que
repentinamente se han presentado inundaciones y erosiones en donde residen,
lo que ocasiona la necesidad de migrar a zonas más seguras. No obstante,
cabe mencionar que existen familias que carente de recursos y posibilidades
se han visto en la necesidad de permanecer en el lugar, poniendo sus vidas en
6
____________________________________________Ingeniería Civil
| Hidráulica
Región : HUANCAVELICA
Provincia : CHURCAMPA
Distrito : LA MERCED
Localidad : CHAYPARÁ
7
____________________________________________Ingeniería Civil
| Hidráulica
Las coordenadas UTM y los niveles referidos al nivel medio del mar del tramo
de la Defensa Ribereña es el siguiente:
Este: 570501.91 Norte: 8581666.30 Cota 2170 m.s.n.m
Este: 571317.22 Norte: 8581181.72 Cota 2166 m.s.n.m
8
____________________________________________Ingeniería Civil
| Hidráulica
9
____________________________________________Ingeniería Civil
| Hidráulica
10
____________________________________________Ingeniería Civil
| Hidráulica
5.2. Geografía
La Subuenca del río Mantaro está ubicada en el centro del Perú y
tiene un área de 1 040.08 km2.
El río Mantaro nace del lago Junín (4.090 msnm) y corre con dirección sureste
hasta el pueblo de Mayoc, desde donde se dirige hacia el noreste por unos 90
km, antes de curvar hacia el SE, hasta su confluencia con el río Apurímac. El
desnivel total del río excede los 3.600msnm. En la mayor parte de su trayecto,
el río queda encajonado en un valle profundo, limitado por cadenas
11
____________________________________________Ingeniería Civil
| Hidráulica
5.4. Relieve
El río Mantaro es uno de los ríos más importantes de los Andes Centrales
Peruanos; su caudal depende de las precipitaciones en toda la cuenca, del nivel
del Lago Junín, y de las lagunas ubicadas al pie de los nevados de la cordillera
occidental y del nevado Huaytapallana.
5.5. Clima
De la información hidrometereológica disponible en la zona se tiene que la
precipitación multianual en el área de Proyecto es de alrededor de 2,250 mm.
Con temperaturas promedio de 24ºC que llegan como máximo hasta 31ºC
(Octubre a Febrero) y con mínimas hasta 10ºC (mayo a Julio) El clima de la
zona corresponde al del denominado Clima tropical, donde se tiene la
ocurrencia de altas precipitaciones y temperaturas muy cálidas.
12
____________________________________________Ingeniería Civil
| Hidráulica
MARCO
TEÓRICO
13
____________________________________________Ingeniería Civil
| Hidráulica
6. MARCO TEORICO
14
____________________________________________Ingeniería Civil
| Hidráulica
15
____________________________________________Ingeniería Civil
| Hidráulica
Es así que una obra de defensa ribereña en una comunidad, no sólo protege
del impacto de las aguas a dicho población, también evita que la erosión e
inundación se extienda hacia terrenos contiguos, puentes y terrenos agrícolas.
7. BASES TEORICAS
7.1. Estudio Hidrológico
La zona de estudio que contempla la cuenca del Río Mantaro, hasta el punto
de aforo: inicio de la defensa ribereña para la Comunidad de Chaipará ubicada
a margen izquierda del Río Apurimac, no cuenta con ninguna estación de
registro de precipitación, a nivel pluviométrico ni mucho menos pluviográfico,
tampoco registro de caudales en alguna estación hidrométrica en el Río
Mantaro, por lo que se optó por la utilización de la técnica del IILA – SENAMHI
– UNI, a partir del cual podrá obtenerse los hietogramas de precipitación total,
mediante el método de bloques alternos, considerando para ello los parámetros
regionales de la zona de estudio para cada una de las 18 sub cuencas de
drenaje consideradas dentro de la cuenca de estudio. Así mismo será necesario
el cálculo de las abstracciones mediante la metodología del número de curva
para finalmente obtener el hietograma de precipitación de exceso, el mismo que
combinado con el hidrograma unitario obtenido mediante la metodología del
USDA NRCS, mediante el método de convolución directa nos permitirá obtener
16
____________________________________________Ingeniería Civil
| Hidráulica
El área de la cuenca está definida por el espacio delimitado por la curva del
perímetro (P). Esta línea se traza normalmente mediante fotointerpretación de
fotografías aéreas en las que se aprecia el relieve (y por lo tanto las divisoras
de agua) o sobre un mapa topográfico en función a las curvas de nivel
representadas. Probablemente sea el factor más importante en la relación
escorrentía – características morfológicas. (Ibáñez S, 2005, pp. 6).
17
____________________________________________Ingeniería Civil
| Hidráulica
Perímetro de la Cuenca
Razón de Circularidad
18
____________________________________________Ingeniería Civil
| Hidráulica
Se expresa mediante
Por otra parte, en la siguiente tabla se muestra la forma que puede adoptar una
cuenca según rangos aproximados del Factor de Forma (ver Tabla 12).
19
____________________________________________Ingeniería Civil
| Hidráulica
20
____________________________________________Ingeniería Civil
| Hidráulica
Rectángulo Equivalente
Supone la transformación geométrica de la cuenca real en una superficie
rectangular de lados L y l del mismo perímetro de tal forma que las curvas de
nivel se convierten en rectas paralelas a los lados menores del rectángulo (l).
Esta cuenca teórica tendrá el mismo Coeficiente de Gravelius y la
misma distribución actitudinal de la cuenca original. (Ibáñez S,
2005, pp. 7).
Coeficiente de Masividad
Este parámetro resulta de la relación entre la altitud media de la cuenca, que
se calcula por medio de la curva hipsométrica, y el área de la misma (Martonne,
1940). Su resultado es alto para cuencas de cumbres altas y bajo en cuencas
donde predominan terrenos planos que presentan áreas similares.
Su relación es la siguiente:
21
____________________________________________Ingeniería Civil
| Hidráulica
Densidad de Drenaje
22
____________________________________________Ingeniería Civil
| Hidráulica
Centro de Gravedad
23
____________________________________________Ingeniería Civil
| Hidráulica
Curva Hipsométrica
24
____________________________________________Ingeniería Civil
| Hidráulica
(Máximo Villón Béjar) Promedio de tiempo en años, dentro del cual un evento
de magnitud X pueda ser igualado o excedido, por lo menos una vez en
promedio.
El tiempo de retorno se determinó a partir de la ecuación. (Ven Te
Chow, 1993).
25
____________________________________________Ingeniería Civil
| Hidráulica
8.3. Intensidad
Según Fattorelli y Fernández (2011), se entiende por intensidad a la tasa de la
precipitación caída en un intervalo de tiempo (L/D) expresada generalmente en
milímetros por hora (mm/hora). Es un valor importante en el diseño hidrológico,
por ejemplo una lluvia de intensidad de 60 mm/día tiene efectos y
consecuencias muy diferentes a una de 60 mm/hora. La lluvia en función de su
intensidad, puede ser identificada como: suave (valores hasta 3 mm/h),
moderada (mayor de 3 y hasta 10 mm/h) y fuerte (mayor de 10 mm/h).
26
____________________________________________Ingeniería Civil
| Hidráulica
8.4. Frecuencia
Es una medida de la probabilidad que tiene un evento de ocurrir, definiéndose
como el número de veces en un tiempo relativamente largo en que ocurre un
evento. (Ramírez, 2003).
27
____________________________________________Ingeniería Civil
| Hidráulica
8.6. Hietograma
En ocasiones no es suficiente el dato de que (por ejemplo) la precipitación
máxima para las 5 horas más lluviosas es de 100 mm. Es posible que
necesitemos conocer la evolución de esos 100 mm. a lo largo de esas 5 horas.
Los métodos hidrológicos más modernos requieren no sólo del valor de lluvia o
intensidad de diseño, sino de una distribución temporal (tormenta), es decir el
método estudia la distribución en el tiempo, de las tormentas observadas.
Una de las maneras de obtenerlo es a partir de las curvas IDF, dentro de ellas
el Método del Bloque Alterno, es una manera sencilla. (alternating block
method, Chow et al).
28
____________________________________________Ingeniería Civil
| Hidráulica
29
____________________________________________Ingeniería Civil
| Hidráulica
30
____________________________________________Ingeniería Civil
| Hidráulica
31
____________________________________________Ingeniería Civil
| Hidráulica
Los números de curva han sido tabulados por el Soil Conservation Service con
base en el tipo de suelo y el uso de la tierra. Se definen cuatro grupos de suelos:
Grupo A: Arena profunda, suelos profundos depositados por el viento, limos
agregados.
Grupo B: Suelos pocos profundos depositados por el viento, marga arenosa.
Grupo C: Margas arcillosas, margas arenosas poco profundas, suelos con bajo
contenido orgánico y suelos con altos contenidos de arcilla.
Grupo D: Suelos que se expanden significativamente cuando se mojan, arcillas
altamente plásticas y ciertos suelos salinos.
32
____________________________________________Ingeniería Civil
| Hidráulica
33
____________________________________________Ingeniería Civil
| Hidráulica
34
____________________________________________Ingeniería Civil
| Hidráulica
35
____________________________________________Ingeniería Civil
| Hidráulica
Cuando se usa el HEC – HMS uno debe juntar los elementos que componen el
sistema.
La cuenca se crea “seleccionando” los elementos de la columna izquierda,
arrastrándolos al centro de la “zona de trabajo”. Los elementos se unen por
medio de “tramos” (Reach, en la lista). Estos a su vez se adhieren a los
elementos colocando sus extremos dentro de los mismos. Para poder editar los
elementos, se presiona rápidamente dos veces sobre ellos hasta que aparezca
la caja de diálogo en la que se deben incluir los datos respectivos. Los datos
que se requieren para la cuenca, además del área (en km2) son tres:
a) Función de infiltración y los parámetros correspondientes. La función de
infiltración debe escogerse de la siguiente lista:
i. Servicio de Conservación de Suelos (SCS)
ii. Green y Ampt
iii. Inicial / Constante
iv. Inicial / déficit.
v. No hay pérdida
b) Función del hidrograma unitario y los parámetros correspondientes. La
función del diagrama unitario debe ser escogerse de la siguiente lista:
I. Clark.
36
____________________________________________Ingeniería Civil
| Hidráulica
II. Snyder.
III. SCS.
IV. Clark modificado.
V. Definido por el usuario.
VI. Onda cinemática.
c) Función de recesión de las avenidas y los parámetros y variables
correspondientes.
i. Recesión.
ii. Flujo constante mensual.
iii. No hay flujo base.
37
____________________________________________Ingeniería Civil
| Hidráulica
38
____________________________________________Ingeniería Civil
| Hidráulica
39
____________________________________________Ingeniería Civil
| Hidráulica
del agua en los extremos del tramo a ser modelado (aguas arriba y aguas
0.0007 m/m.
40
____________________________________________Ingeniería Civil
| Hidráulica
11.1. Granulometría
Los lechos de ríos pueden ser granulares o cohesivos. En el primer caso, el
lecho está constituido por partículas sueltas de distintos tamaños. Los ríos
aluviales son aquellos que discurren sobre materiales transportados por el
propio río en el pasado geológico y por ello sus lechos suelen ser granulares.
Un río puede tener también un cauce abierto en roca o materiales cohesivos; no
por eso su contorno es fijo o inamovible pero las modificaciones del cauce serán
muy lentas debido a la mayor resistencia a la erosión. Tras una erosión del
fondo, un lecho cohesivo se puede restablecer en su fondo original, pero ya no
como cohesivo sino como granular, y en esto se diferencia de los lechos
granulares. La propiedad individual de las partículas de un lecho granular, que
más importancia tiene en la hidráulica fluvial es el peso. Los cauces naturales
están formados por partículas de rocas y minerales cuyo peso especifico tiene
poca variación. El valor medio es ya = 2.65 TIm3 o bien el peso especifico
relativo es ysty= 2.65. Gracias a ello, la propiedad de mas importancia pasa a
ser el tamaño, como representación de volumen de la partícula. La manera más
común de analizar la distribución de tamaños en el lecho (o granulometría) es
tamizar una muestra y pesar la fracción que pasa de cada tamiz pero es retenido
en el siguiente. Las partículas menores que 0.004 mm se llaman arcillas. Entre
0.004 mm y 0.062 mm se llaman limos. Entre 0.062 mm y 2.0 mm se llaman
arenas. Entre 2.0 mm y 64 mm se llaman gravas. De ahi en adelante, la
terminología castellana no parece completamente establecida, pero podría
llamarse cantos a los elementos hasta 25.6 cm y boloneria de ahí en adelante.
41
____________________________________________Ingeniería Civil
| Hidráulica
42
____________________________________________Ingeniería Civil
| Hidráulica
43
____________________________________________Ingeniería Civil
| Hidráulica
44
____________________________________________Ingeniería Civil
| Hidráulica
45
____________________________________________Ingeniería Civil
| Hidráulica
46
____________________________________________Ingeniería Civil
| Hidráulica
El colchón de alambre consiste en cestos del alambre llanos. Las secciones del
colchón individual se ponen con el fin de estar al lado de la cama del cauce,
preparado para formar un colchón continuo. Las unidades de cesto individuales
se atan unos a otros y andados al material del cauce
47
____________________________________________Ingeniería Civil
| Hidráulica
48
____________________________________________Ingeniería Civil
| Hidráulica
49
____________________________________________Ingeniería Civil
| Hidráulica
50
____________________________________________Ingeniería Civil
| Hidráulica
51
____________________________________________Ingeniería Civil
| Hidráulica
52
____________________________________________Ingeniería Civil
| Hidráulica
53
____________________________________________Ingeniería Civil
| Hidráulica
MEMORIA DE
CÁLCULO
54
____________________________________________Ingeniería Civil
| Hidráulica
55
____________________________________________Ingeniería Civil
| Hidráulica
56
____________________________________________Ingeniería Civil
| Hidráulica
DATOS OBTENIDOS
Cuenca DE LOS PLANOS DE LA CUENCA
Principal
COTA
DESCRIPCIÓN ÁREA (M^2) ÁREA (KM^2) PERÍMETRO(M) PERÍMETRO(KM)
MÁXIMA MÍNIMA
57
____________________________________________Ingeniería Civil
| Hidráulica
F= Factor de forma
A = área de la cuenca
Lmx2=cuadrado de la longitud máxima del cauce
La = Índice de alargamiento
Lm = longitud Máxima de la cuenca
l = ancho máximo de la cuenca
L1 = 80.42 KM
L2 = 12.93 KM
H = desnivel total
L = long mayor del rectangulo equiv.
H= 0.50 KM
S= 0.62%
58
____________________________________________Ingeniería Civil
| Hidráulica
PROGRESIVA COTA
0+000.00 2650.00 PERFIL LONGITUDINAL DE LA CUENCA
6+000.00 2600.00
3000.00
14+000.00 2550.00
2500.00
25+000.00 2500.00
34+000.00 2450.00 2000.00
COTA
41+000.00 2400.00 1500.00
52+000.00 2350.00 1000.00
61+000.00 2300.00 500.00
69+000.00 2250.00 0.00
75+000.00 2200.00 0+000.00 10+000.00 20+000.00 30+000.00 40+000.00 50+000.00 60+000.00 70+000.00 80+000.00 90+000.00
83+000.00 2150.00 PROGRESIVA
84+856.88 2148.00
TRAMO Li Hi Si Li/(Si)^.5
1 6000 50 0.008 65726.7069
2 8000 50 0.006 101192.8851
3 11000 50 0.005 163156.3667
4 9000 50 0.006 120747.6708
5 7000 50 0.007 82825.11696
6 11000 50 0.005 163156.3667
7 9000 50 0.006 120747.6708
8 8000 50 0.006 101192.8851
9 6000 50 0.008 65726.7069
10 8000 50 0.006 101192.8851
11 1856.88 2 0.001 56579.71559
84856.88 1142244.977
S= 0.552%
7. Densidad de drenaje
L= 642.57 KM
S= 0.62
59
____________________________________________Ingeniería Civil
| Hidráulica
60
____________________________________________Ingeniería Civil
| Hidráulica
R= 25%
n= 40 años
Tr = 139.54
Tr = 140
ZONA = 123 3
ESCRIPCIÓN Y(msnm) a k n
SC-1 2475.00 17.308 0.553 0.405
SC-2 3075.00 12.328 0.553 0.405
SC-3 3050.00 12.535 0.553 0.405
SC-4 2925.00 13.573 0.553 0.405
SC-5 3100.00 12.120 0.553 0.405
SC-6 3175.00 11.498 0.553 0.405
SC-7 2550.00 16.685 0.553 0.405
SC-8 3325.00 10.253 0.553 0.405
SC-9 2950.00 13.365 0.553 0.405
SC-10 3275.00 10.668 0.553 0.405
SC-11 3350.00 10.045 0.553 0.405
SC-12 3450.00 9.215 0.553 0.405
SC-13 3550.00 8.385 0.553 0.405
SC-14 3475.00 9.008 0.553 0.405
SC-15 3650.00 7.555 0.553 0.405
SC-16 3575.00 8.178 0.553 0.405
SC-17 3500.00 8.800 0.553 0.405
SC-18 3650.00 7.555 0.553 0.405
61
____________________________________________Ingeniería Civil
| Hidráulica
62
Tr (año)= 140 años
t(hr) SC-1 SC-2 SC-3 SC-4 SC-5 SC-6 SC-7 SC-8 SC-9 SC-10 SC-11 SC-12 SC-13 SC-14 SC-15 SC-16 SC-17 SC-18
0.50 57.17 40.72 41.40 44.83 40.03 37.98 55.11 33.87 44.15 35.24 33.18 30.44 27.70 29.75 24.96 27.01 29.07 24.96
1.00 37.85 26.96 27.41 29.68 26.50 25.14 36.49 22.42 29.23 23.33 21.97 20.15 18.34 19.70 16.52 17.88 19.24 16.52
1.50 29.74 21.18 21.54 23.32 20.82 19.75 28.67 17.61 22.96 18.33 17.26 15.83 14.41 15.48 12.98 14.05 15.12 12.98
2.00 25.06 17.85 18.15 19.65 17.55 16.65 24.16 14.84 19.35 15.44 14.54 13.34 12.14 13.04 10.94 11.84 12.74 10.94
2.50 21.94 15.63 15.89 17.21 15.37 14.58 21.15 13.00 16.94 13.52 12.73 11.68 10.63 11.42 9.58 10.37 11.16 9.58
3.00 19.69 14.02 14.26 15.44 13.79 13.08 18.98 11.66 15.20 12.13 11.43 10.48 9.54 10.25 8.59 9.30 10.01 8.59
3.50 17.96 12.79 13.01 14.08 12.58 11.93 17.31 10.64 13.87 11.07 10.42 9.56 8.70 9.35 7.84 8.49 9.13 7.84
4.00 16.59 11.82 12.01 13.01 11.62 11.02 15.99 9.83 12.81 10.22 9.63 8.83 8.04 8.63 7.24 7.84 8.43 7.24
4.50 15.47 11.02 11.20 12.13 10.83 10.27 14.91 9.16 11.94 9.53 8.98 8.23 7.49 8.05 6.75 7.31 7.86 6.75
5.00 14.53 10.35 10.52 11.39 10.17 9.65 14.00 8.61 11.22 8.95 8.43 7.73 7.04 7.56 6.34 6.86 7.39 6.34
5.50 13.73 9.78 9.94 10.76 9.61 9.12 13.23 8.13 10.60 8.46 7.97 7.31 6.65 7.14 5.99 6.49 6.98 5.99
6.00 13.03 9.28 9.44 10.22 9.13 8.66 12.56 7.72 10.06 8.03 7.56 6.94 6.31 6.78 5.69 6.16 6.63 5.69
6.50 12.43 8.85 9.00 9.75 8.70 8.26 11.98 7.36 9.60 7.66 7.21 6.62 6.02 6.47 5.42 5.87 6.32 5.42
7.00 11.89 8.47 8.61 9.32 8.33 7.90 11.46 7.04 9.18 7.33 6.90 6.33 5.76 6.19 5.19 5.62 6.05 5.19
7.50 11.41 8.13 8.27 8.95 7.99 7.58 11.00 6.76 8.81 7.03 6.62 6.08 5.53 5.94 4.98 5.39 5.80 4.98
8.00 10.98 7.82 7.95 8.61 7.69 7.30 10.59 6.51 8.48 6.77 6.37 5.85 5.32 5.72 4.79 5.19 5.58 4.79
8.50 10.59 7.55 7.67 8.31 7.42 7.04 10.21 6.28 8.18 6.53 6.15 5.64 5.13 5.51 4.62 5.01 5.39 4.62
9.00 10.24 7.29 7.42 8.03 7.17 6.80 9.87 6.07 7.91 6.31 5.94 5.45 4.96 5.33 4.47 4.84 5.21 4.47
9.50 9.92 7.06 7.18 7.78 6.94 6.59 9.56 5.87 7.66 6.11 5.75 5.28 4.80 5.16 4.33 4.68 5.04 4.33
10.00 9.62 6.85 6.97 7.54 6.73 6.39 9.27 5.70 7.43 5.93 5.58 5.12 4.66 5.01 4.20 4.54 4.89 4.20
10.50 9.34 6.65 6.77 7.33 6.54 6.21 9.01 5.53 7.21 5.76 5.42 4.97 4.53 4.86 4.08 4.41 4.75 4.08
11.00 9.09 6.47 6.58 7.13 6.36 6.04 8.76 5.38 7.02 5.60 5.27 4.84 4.40 4.73 3.97 4.29 4.62 3.97
11.50 8.85 6.30 6.41 6.94 6.20 5.88 8.53 5.24 6.83 5.45 5.14 4.71 4.29 4.61 3.86 4.18 4.50 3.86
12.00 8.63 6.15 6.25 6.77 6.04 5.73 8.32 5.11 6.66 5.32 5.01 4.59 4.18 4.49 3.77 4.08 4.39 3.77
63
____________________________________________Ingeniería Civil | Hidráulica
64
Cálculos para la determinación del hietogramas de precipitación total, obtenido
mediante el método del bloque alterno para el periodo de retorno de 140 años.
HIETOGRAMA DE PRECIPITACIÓN TOTAL PARA LA SUB CUENCA 1
INTENSIDAD INTENSIDAD
DURACIÓN INTENSIDAD
ACUMULADA INCREMENTADA ORDEN PRECIPITACIÓN (mm)
(hr) (mm/hr)
(mm) (mm)
0.50 57.17 28.58 28.58 22 1.87
1.00 37.85 37.85 9.26 20 1.98 HIETOGRAMA DE PRECIPITACIONES TOTAL DE
1.50 29.74 44.60 6.75 18 2.11 DISEÑO - SC 1
2.00 25.06 50.11 5.51 16 2.27
2.50 21.94 54.85 4.74 14 2.46 30.00
3.00 19.69 59.06 4.20 12 2.71
3.50 17.96 62.86 3.80 10 3.03 25.00
4.00 16.59 66.36 3.49 8 3.49
4.50 15.47 69.60 3.24 6 4.20
PRECIPITACIÓN (mm)
20.00
5.00 14.53 72.63 3.03 4 5.51
5.50 13.73 75.49 2.86 2 9.26
6.00 13.03 78.20 2.71 1 28.58 15.00
6.50 12.43 80.77 2.58 3 6.75
7.00 11.89 83.24 2.46 5 4.74
10.00
7.50 11.41 85.59 2.36 7 3.80
8.00 10.98 87.86 2.27 9 3.24
8.50 10.59 90.05 2.18 11 2.86 5.00
9.00 10.24 92.15 2.11 13 2.58
9.50 9.92 94.19 2.04 15 2.36
0.00
10.00 9.62 96.17 1.98 17 2.18
10.0
10.5
11.0
11.5
12.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.50 9.34 98.09 1.92 19 2.04
11.00 9.09 99.96 1.87 21 1.92 DURACIÓN (hr)
11.50 8.85 101.77 1.82 23 1.82
12.00 8.63 103.54 1.77 24 1.77
65
____________________________________________Ingeniería Civil |
Hidráulica
PRECIPITACIÓN (mm)
5.00 11.39 56.96 2.38 4 4.32
5.50 10.76 59.20 2.24 2 7.26 15.00
6.00 10.22 61.32 2.12 1 22.42
6.50 9.75 63.34 2.02 3 5.30
7.00 9.32 65.27 1.93 5 3.72 10.00
10.0
10.5
11.0
11.5
12.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.50 7.33 76.92 1.51 19 1.60
11.00 7.13 78.39 1.46 21 1.51 DURACIÓN (hr)
11.50 6.94 79.81 1.42 23 1.42
12.00 6.77 81.20 1.39 24 1.39
10.0
10.5
11.0
11.5
12.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.00 6.73 67.35 1.38 17 1.53
10.50 6.54 68.69 1.34 19 1.43 DURACIÓN (hr)
11.00 6.36 70.00 1.31 21 1.34
11.50 6.20 71.27 1.27 23 1.27
12.00 6.04 72.51 1.24 24 1.24
66
____________________________________________Ingeniería Civil |
Hidráulica
PRECIPITACIÓN (mm)
20.00
5.50 13.23 72.78 2.76 2 8.93
6.00 12.56 75.39 2.61 1 27.56
6.50 11.98 77.87 2.48 3 6.51 15.00
7.00 11.46 80.24 2.37 5 4.57
7.50 11.00 82.52 2.27 7 3.67
10.00
8.00 10.59 84.70 2.19 9 3.13
8.50 10.21 86.81 2.11 11 2.76
9.00 9.87 88.84 2.03 13 2.48 5.00
9.50 9.56 90.81 1.97 15 2.27
10.00 9.27 92.71 1.91 17 2.11 0.00
10.50 9.01 94.56 1.85 19 1.97
10.0
10.5
11.0
11.5
12.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
11.00 8.76 96.36 1.80 21 1.85
11.50 8.53 98.11 1.75 23 1.75 DURACIÓN (hr)
12.00 8.32 99.82 1.71 24 1.71
14.00
5.00 8.61 43.03 1.80 4 3.26
5.50 8.13 44.72 1.69 2 5.49 12.00
6.00 7.72 46.32 1.60 1 16.93
10.00
6.50 7.36 47.85 1.53 3 4.00
7.00 7.04 49.31 1.46 5 2.81 8.00
7.50 6.76 50.70 1.40 7 2.25 6.00
8.00 6.51 52.05 1.34 9 1.92
8.50 6.28 53.34 1.29 11 1.69 4.00
9.00 6.07 54.59 1.25 13 1.53 2.00
9.50 5.87 55.80 1.21 15 1.40
10.00 5.70 56.97 1.17 17 1.29 0.00
10.0
10.5
11.0
11.5
12.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.50 5.53 58.11 1.14 19 1.21
11.00 5.38 59.21 1.11 21 1.14 DURACIÓN (hr)
11.50 5.24 60.29 1.08 23 1.08
12.00 5.11 61.34 1.05 24 1.05
67
____________________________________________Ingeniería Civil |
Hidráulica
PRECIPITACIÓN (mm)
5.00 8.95 44.77 1.87 4 3.40 14.00
5.50 8.46 46.53 1.76 2 5.71 12.00
6.00 8.03 48.20 1.67 1 17.62
6.50 7.66 49.79 1.59 3 4.16 10.00
7.00 7.33 51.30 1.52 5 2.92 8.00
7.50 7.03 52.76 1.45 7 2.34
6.00
8.00 6.77 54.15 1.40 9 2.00
8.50 6.53 55.50 1.35 11 1.76 4.00
9.00 6.31 56.80 1.30 13 1.59
2.00
9.50 6.11 58.06 1.26 15 1.45
10.00 5.93 59.28 1.22 17 1.35 0.00
10.0
10.5
11.0
11.5
12.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.50 5.76 60.46 1.18 19 1.26
11.00 5.60 61.61 1.15 21 1.18
DURACIÓN (hr)
11.50 5.45 62.73 1.12 23 1.12
12.00 5.32 63.82 1.09 24 1.09
10.0
10.5
11.0
11.5
12.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.50 5.42 56.93 1.11 19 1.18
11.00 5.27 58.01 1.08 21 1.11 DURACIÓN (hr)
11.50 5.14 59.07 1.05 23 1.05
12.00 5.01 60.09 1.03 24 1.03
14.00
5.00 7.73 38.67 1.62 4 2.93
12.00
5.50 7.31 40.19 1.52 2 4.93
6.00 6.94 41.63 1.44 1 15.22 10.00
6.50 6.62 43.01 1.37 3 3.60
8.00
7.00 6.33 44.32 1.31 5 2.52
7.50 6.08 45.57 1.26 7 2.03 6.00
8.00 5.85 46.78 1.21 9 1.73
4.00
8.50 5.64 47.94 1.16 11 1.52
9.00 5.45 49.07 1.12 13 1.37 2.00
9.50 5.28 50.15 1.09 15 1.26
0.00
10.00 5.12 51.20 1.05 17 1.16
10.0
10.5
11.0
11.5
12.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
68
____________________________________________Ingeniería Civil |
Hidráulica
PRECIPITACIÓN (mm)
5.50 6.65 36.57 1.38 2 4.49 10.00
6.00 6.31 37.88 1.31 1 13.85
6.50 6.02 39.13 1.25 3 3.27 8.00
7.00 5.76 40.33 1.19 5 2.30
7.50 5.53 41.47 1.14 7 1.84 6.00
8.00 5.32 42.57 1.10 9 1.57
8.50 5.13 43.62 1.06 11 1.38 4.00
9.00 4.96 44.65 1.02 13 1.25
9.50 4.80 45.63 0.99 15 1.14 2.00
10.00 4.66 46.59 0.96 17 1.06
0.00
10.50 4.53 47.52 0.93 19 0.99
10.5
11.0
11.5
10.0
12.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
11.00 4.40 48.43 0.90 21 0.93
11.50 4.29 49.31 0.88 23 0.88 DURACIÓN (hr)
12.00 4.18 50.16 0.86 24 0.86
10.0
10.5
11.0
11.5
12.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.50 4.86 51.05 1.00 19 1.06
11.00 4.73 52.02 0.97 21 1.00
DURACIÓN (hr)
11.50 4.61 52.97 0.95 23 0.95
12.00 4.49 53.89 0.92 24 0.92
69
____________________________________________Ingeniería Civil |
Hidráulica
PRECIPITACIÓN (mm)
5.00 6.86 34.32 1.43 4 2.60
5.50 6.49 35.67 1.35 2 4.38
8.00
6.00 6.16 36.95 1.28 1 13.51
6.50 5.87 38.16 1.22 3 3.19
7.00 5.62 39.33 1.16 5 2.24 6.00
7.50 5.39 40.44 1.11 7 1.80
8.00 5.19 41.51 1.07 9 1.53 4.00
8.50 5.01 42.54 1.03 11 1.35
9.00 4.84 43.54 1.00 13 1.22 2.00
9.50 4.68 44.51 0.96 15 1.11
10.00 4.54 45.44 0.93 17 1.03 0.00
10.0
10.5
11.0
11.5
12.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
10.50 4.41 46.35 0.91 19 0.96
11.00 4.29 47.23 0.88 21 0.91
DURACIÓN (hr)
11.50 4.18 48.09 0.86 23 0.86
12.00 4.08 48.92 0.84 24 0.84
11.0
11.5
12.0
10.0
10.5
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
7.5
8.0
8.5
9.0
9.5
-1.00
10.50 4.75 49.87 0.98 19 1.04
DURACIÓN (hr)
11.00 4.62 50.82 0.95 21 0.98
11.50 4.50 51.75 0.92 23 0.92
12.00 4.39 52.65 0.90 24 0.90
70
71
Para la determinación de los hietogramas de precipitación efectiva, se hará uso
del método del SCS.
Para la cuenca del Río Mantaro, el mismo que se ha subdividido en 18 sub
cuencas se tiene la siguiente tabla, donde se presenta el resumen para la
elección del número de curva, teniendo en cuenta el tipo de suelo, donde se ha
superpuesto la fisiografía de la cuenca del Río Mantaro, con la fotografía aérea
obtenida del programa Google Earth.
CONDICIÓN DE
USO DE LA CONDICIÓN GRUPO NÚMERO
DESCRIPCIÓN HUMEDAD
TIERRA HIDROLÓGICA HIDROLOGICO DE CURVA
ANTECEDENTE
SC-1 Cultivos Pobre C Tipo II 88
SC-2 Cultivos Pobre C Tipo II 88
SC-3 Cultivos Pobre C Tipo II 88
SC-4 Cultivos Pobre C Tipo II 88
SC-5 Cultivos Pobre C Tipo II 88
SC-6 Cultivos Pobre C Tipo II 88
SC-7 Cultivos Pobre C Tipo II 88
SC-8 Cultivos Pobre C Tipo II 88
SC-9 Cultivos Pobre C Tipo II 88
SC-10 Cultivos Pobre C Tipo II 88
SC-11 Cultivos Pobre C Tipo II 88
SC-12 Cultivos Pobre C Tipo II 88
SC-13 Cultivos Pobre C Tipo II 88
SC-14 Cultivos Pobre C Tipo II 88
SC-15 Cultivos Pobre C Tipo II 88
SC-16 Cultivos Pobre C Tipo II 88
SC-17 Cultivos Pobre C Tipo II 88
SC-18 Cultivos Pobre C Tipo II 88
72
____________________________________________Ingeniería Civil |
Hidráulica
73
____________________________________________Ingeniería Civil |
Hidráulica
74
____________________________________________Ingeniería Civil |
Hidráulica
75
____________________________________________Ingeniería Civil |
Hidráulica
76
____________________________________________Ingeniería Civil |
Hidráulica
77
____________________________________________Ingeniería Civil |
Hidráulica
78
____________________________________________Ingeniería Civil |
Hidráulica
79
____________________________________________Ingeniería Civil |
Hidráulica
80
____________________________________________Ingeniería Civil |
Hidráulica
81
____________________________________________Ingeniería Civil |
Hidráulica
82
____________________________________________Ingeniería Civil |
Hidráulica
83
____________________________________________Ingeniería Civil |
Hidráulica
84
____________________________________________Ingeniería Civil |
Hidráulica
85
____________________________________________Ingeniería Civil |
Hidráulica
86
____________________________________________Ingeniería Civil |
Hidráulica
87
____________________________________________Ingeniería Civil |
Hidráulica
88
____________________________________________Ingeniería Civil |
Hidráulica
89
____________________________________________Ingeniería Civil |
Hidráulica
90
____________________________________________Ingeniería Civil |
Hidráulica
91
____________________________________________Ingeniería Civil |
Hidráulica
92
____________________________________________Ingeniería Civil |
Hidráulica
32
O
31
30.250*
29.250*
28.250*
27.250*
26
25
23.250* 20.500*
18.750*
16.500* 8.2500* 6 5.5000* 3.2500* 1.2500*
14.250*
10.500*
93
schematic data outside default extents (see View/Set Schematic Plot Extents...)
____________________________________________Ingeniería Civil |
Hidráulica
94
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
2175 WS TR = 140 AÑOS
Crit TR = 140 AÑOS
2174 Ground
Bank Sta
Elevation (m)
2173
2172
2171
2170
2169
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
Crit TR = 140 AÑOS
2174
WS TR = 140 AÑOS
Ground
2173 Bank Sta
Elevation (m)
2172
2171
2170
2169
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
2174 Crit TR = 140 AÑOS
WS TR = 140 AÑOS
2173 Ground
Bank Sta
Elevation (m)
2172
2171
2170
2169
2168
0 20 40 60 80 100 120 140 160
Station (m)
95
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
2175
WS TR = 140 AÑOS
Crit TR = 140 AÑOS
2174
Ground
Bank Sta
2173
Elevation (m)
2172
2171
2170
2169
2168
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
2175
WS TR = 140 AÑOS
Ground
2174
Bank Sta
2173
Elevation (m)
2172
2171
2170
2169
2168
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
2175
WS TR = 140 AÑOS
Ground
2174
Bank Sta
2173
Elevation (m)
2172
2171
2170
2169
2168
0 20 40 60 80 100 120 140 160
Station (m)
96
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
2174 WS TR = 140 AÑOS
Ground
2172
2171
2170
2169
2168
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
2174 WS TR = 140 AÑOS
Ground
2172
2171
2170
2169
2168
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
2174 WS TR = 140 AÑOS
Crit TR = 140 AÑOS
2173 Ground
Bank Sta
Elevation (m)
2172
2171
2170
2169
2168
0 20 40 60 80 100 120 140 160
Station (m)
97
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2173
Crit TR = 140 AÑOS
Ground
2172 Bank Sta
Elevation (m)
2171
2170
2169
2168
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2173
Ground
Bank Sta
2172
Elevation (m)
2171
2170
2169
2168
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2172 Ground
Bank Sta
2171
Elevation (m)
2170
2169
2168
0 20 40 60 80 100 120 140 160
Station (m)
98
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2172 Ground
Bank Sta
2171
Elevation (m)
2170
2169
2168
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2172
Ground
Bank Sta
2171
Elevation (m)
2170
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2172
Ground
Bank Sta
2171
Elevation (m)
2170
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
99
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
100
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
101
____________________________________________Ingeniería Civil |
Hidráulica
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
102
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
103
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171 Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
104
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
105
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
106
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
107
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
108
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140 160
Station (m)
109
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2171
Ground
Bank Sta
2170
Elevation (m)
2169
2168
2167
2166
0 20 40 60 80 100 120 140
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2170 Ground
Bank Sta
2169
Elevation (m)
2168
2167
2166
0 20 40 60 80 100 120 140
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2170 Ground
Bank Sta
2169
Elevation (m)
2168
2167
2166
0 20 40 60 80 100 120 140
Station (m)
110
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2170 Ground
Bank Sta
2169
Elevation (m)
2168
2167
2166
0 20 40 60 80 100 120 140
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2170 Ground
Bank Sta
2169
Elevation (m)
2168
2167
2166
0 20 40 60 80 100 120 140
Station (m)
EG TR = 140 AÑOS
WS TR = 140 AÑOS
2170
Crit TR = 140 AÑOS
Ground
2169 Bank Sta
Elevation (m)
2168
2167
2166
2165
0 20 40 60 80 100 120 140
Station (m)
111
____________________________________________Ingeniería Civil |
Hidráulica
EG TR = 140 AÑOS
WS TR = 140 AÑOS
Crit TR = 140 AÑOS
Ground
2172
2170
Elevation (m)
2168
2166
2164
0 200 400 600 800 1000
Main Channel Distance (m)
PERFIL DE VELOCIDADES
5
Vel Left (m/s), Vel Chnl (m/s), V el Right (m/s)
0
0 200 400 600 800 1000
Main Channel Distance (m)
112
____________________________________________Ingeniería Civil |
Hidráulica
Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev Vel Chnl Top Width Froude #
PROGRESIVA River Sta Y (m) E.G. Slope Flow Area
(m3/s) (m) (m) (m) (m) (m/s) (m) Chl
0+000 51 1133.47 2169.60 2172.77 3.17 2172.77 2173.76 0.00607 4.52 266.59 137.87 0.95
0+020 50 1133.47 2169.00 2171.62 2.62 2172.23 2173.65 0.01804 6.50 186.99 133.10 1.57
0+040 49 1133.47 2168.60 2171.10 2.50 2171.75 2173.27 0.01857 6.82 184.23 134.00 1.61
0+060 48 1133.47 2168.40 2172.03 3.63 2171.72 2172.75 0.00367 3.94 313.55 139.68 0.76
0+080 47 1133.47 2168.25 2171.96 3.71 2171.72 2172.67 0.00344 3.95 315.72 133.93 0.74
0+100 46 1133.47 2168.45 2171.83 3.38 2171.72 2172.60 0.00375 4.12 302.18 126.79 0.78
0+120 45 1133.47 2168.40 2171.82 3.42 2171.72 2172.51 0.00306 3.90 319.39 126.52 0.71
0+140 44 1133.47 2168.30 2171.60 3.30 2171.72 2172.43 0.00397 4.23 292.16 123.24 0.80
0+160 43 1133.47 2168.30 2171.40 3.10 2171.26 2172.34 0.00483 4.53 273.55 120.03 0.87
0+180 42 1133.47 2168.20 2171.37 3.17 2171.11 2172.23 0.00420 4.36 288.42 124.42 0.82
0+200 41 1133.47 2168.20 2171.33 3.13 2171.11 2172.12 0.00390 4.17 298.83 128.91 0.79
0+220 40 1133.47 2168.20 2171.26 3.06 2171.11 2172.03 0.00388 4.10 304.93 135.64 0.79
0+240 39 1133.47 2168.05 2171.30 3.25 2171.11 2171.92 0.00301 3.67 337.88 143.81 0.70
0+260 38 1133.47 2167.80 2171.33 3.53 2171.11 2171.83 0.00212 3.26 376.07 144.98 0.59
0+280 37 1133.47 2167.64 2171.33 3.69 2171.11 2171.78 0.00179 3.11 396.95 146.23 0.55
0+300 36 1133.47 2167.50 2171.33 3.83 2171.11 2171.73 0.00150 2.97 419.55 149.99 0.51
0+320 35 1133.47 2167.36 2171.33 3.97 2171.11 2171.69 0.00126 2.79 449.42 159.16 0.47
0+340 34 1133.47 2167.25 2171.36 4.11 2171.11 2171.65 0.00098 2.50 494.91 160.00 0.41
0+360 33 1133.47 2167.10 2171.37 4.27 2171.11 2171.62 0.00083 2.32 525.79 160.00 0.38
0+380 32 1133.47 2167.10 2171.36 4.26 2171.11 2171.60 0.00081 2.28 534.36 160.00 0.38
0+400 31 1133.47 2167.10 2171.34 4.24 2171.11 2171.58 0.00083 2.26 533.01 160.00 0.38
0+420 30 1133.47 2167.11 2171.33 4.22 2171.11 2171.56 0.00081 2.20 534.67 160.00 0.37
0+440 29 1133.47 2167.14 2171.30 4.16 2171.11 2171.55 0.00084 2.25 527.75 160.00 0.38
0+460 28 1133.47 2167.20 2171.29 4.09 2171.11 2171.53 0.00078 2.23 537.69 160.00 0.37
0+480 27 1133.47 2167.20 2171.29 4.09 2171.11 2171.51 0.00067 2.14 561.74 160.00 0.35
0+500 26 1133.47 2167.23 2171.28 4.05 2171.11 2171.49 0.00064 2.11 570.68 160.00 0.34
0+520 25 1133.47 2167.20 2171.26 4.06 2171.11 2171.48 0.00066 2.15 562.13 160.00 0.34
0+540 24 1133.47 2167.05 2171.24 4.19 2171.11 2171.46 0.00066 2.16 558.87 160.00 0.34
0+560 23 1133.47 2167.07 2171.23 4.16 2171.11 2171.45 0.00066 2.16 560.67 160.00 0.35
0+580 22 1133.47 2166.80 2171.23 4.43 2171.11 2171.43 0.00057 2.01 588.51 160.00 0.32
0+600 21 1133.47 2166.55 2171.23 4.68 2171.11 2171.41 0.00050 1.93 614.01 160.00 0.30
0+620 20 1133.47 2166.50 2171.23 4.73 2171.11 2171.40 0.00045 1.89 635.14 160.00 0.29
0+640 19 1133.47 2166.45 2171.22 4.77 2171.11 2171.39 0.00043 1.88 646.32 160.00 0.28
0+660 18 1133.47 2166.45 2171.20 4.75 2171.11 2171.38 0.00046 1.96 628.66 160.00 0.29
0+680 17 1133.47 2166.35 2171.18 4.83 2171.11 2171.37 0.00050 2.06 607.86 160.00 0.31
0+700 16 1133.47 2166.30 2171.10 4.80 2171.11 2171.35 0.00066 2.30 543.52 160.00 0.35
0+720 15 1133.47 2166.30 2171.06 4.76 2171.11 2171.33 0.00076 2.41 511.35 160.00 0.37
0+740 14 1133.47 2166.30 2170.92 4.62 2171.11 2171.31 0.00110 2.81 439.27 149.19 0.44
0+760 13 1133.47 2166.20 2170.73 4.53 2171.11 2171.26 0.00162 3.32 377.78 143.85 0.53
0+780 12 1133.47 2166.10 2170.79 4.69 2171.11 2171.20 0.00120 3.00 435.75 160.00 0.47
0+800 11 1133.47 2166.05 2170.78 4.73 2171.11 2171.17 0.00115 2.96 445.32 160.00 0.46
0+820 10 1133.47 2166.10 2170.78 4.68 2171.11 2171.13 0.00104 2.83 467.29 160.00 0.43
0+840 9 1133.47 2166.05 2170.77 4.72 2171.11 2171.11 0.00098 2.79 476.25 160.00 0.43
0+860 8 1133.47 2166.10 2170.72 4.62 2171.11 2171.08 0.00111 2.80 455.88 160.00 0.44
0+880 7 1133.47 2166.10 2170.70 4.60 2171.11 2171.06 0.00104 2.78 459.76 156.64 0.43
0+900 6 1133.47 2166.10 2170.55 4.45 2171.11 2171.02 0.00134 3.12 393.66 128.17 0.49
0+920 5 1133.47 2166.10 2170.52 4.42 2171.11 2171.00 0.00136 3.16 392.17 124.25 0.50
0+940 4 1133.47 2166.10 2170.55 4.45 2171.11 2170.95 0.00114 2.90 419.86 126.86 0.45
0+960 3 1133.47 2166.10 2170.55 4.45 2171.11 2170.92 0.00102 2.79 443.42 140.00 0.43
0+980 2 1133.47 2166.05 2170.57 4.52 2171.11 2170.88 0.00085 2.58 480.02 140.00 0.40
0+989.74 1 1133.47 2165.50 2170.57 5.07 2168.42 2170.86 0.00070 2.49 499.12 130.00 0.36
113
____________________________________________Ingeniería Civil |
Hidráulica
esfuerzo de corte en él, área del flujo, ancho del espejo de agua, numero de
fraude y tipo de flujo.
Así mismo también se muestra las secciones transversales a cada 20 metros,
luego de transitado el caudal de máximas avenidas para el periodo de diseño,
realizado en el programa HEC-RAS 5.0.5, en el que se puede observar
claramente que la margen izquierda y parte del margen derecho del Río
Mantaro, queda inundada cuando se transita el caudal de diseño, considerando
necesario la instalación de una defensa ribereña en una longitud de 1810 ml,
como se observa la distribución de estructuras hidráulicas en el plano PL-01.
H= 6.59 m
H= 6.09 m
H= 6.10 m
114
____________________________________________Ingeniería Civil |
Hidráulica
115
____________________________________________Ingeniería Civil |
Hidráulica
116
____________________________________________Ingeniería Civil |
Hidráulica
117
____________________________________________Ingeniería Civil |
Hidráulica
119
____________________________________________Ingeniería Civil |
Hidráulica
120
____________________________________________Ingeniería Civil |
Hidráulica
121
____________________________________________Ingeniería Civil |
Hidráulica
122
____________________________________________Ingeniería Civil |
Hidráulica
123
____________________________________________Ingeniería Civil |
Hidráulica
124
____________________________________________Ingeniería Civil |
Hidráulica
125
____________________________________________Ingeniería Civil |
Hidráulica
126
____________________________________________Ingeniería Civil |
Hidráulica
127
____________________________________________Ingeniería Civil |
Hidráulica
128
____________________________________________Ingeniería Civil |
Hidráulica
129
____________________________________________Ingeniería Civil |
Hidráulica
130
____________________________________________Ingeniería Civil |
Hidráulica
131
____________________________________________Ingeniería Civil |
Hidráulica
132
____________________________________________Ingeniería Civil |
Hidráulica
133
____________________________________________Ingeniería Civil |
Hidráulica
134
____________________________________________Ingeniería Civil |
Hidráulica
135
____________________________________________Ingeniería Civil |
Hidráulica
136
____________________________________________Ingeniería Civil |
Hidráulica
137
____________________________________________Ingeniería Civil |
Hidráulica
138
____________________________________________Ingeniería Civil |
Hidráulica
139
____________________________________________Ingeniería Civil |
Hidráulica
140
____________________________________________Ingeniería Civil |
Hidráulica
141
____________________________________________Ingeniería Civil |
Hidráulica
142
____________________________________________Ingeniería Civil |
Hidráulica
143
____________________________________________Ingeniería Civil |
Hidráulica
144
____________________________________________Ingeniería Civil |
Hidráulica
145
____________________________________________Ingeniería Civil |
Hidráulica
146
____________________________________________Ingeniería Civil |
Hidráulica
147
____________________________________________Ingeniería Civil |
Hidráulica
148
____________________________________________Ingeniería Civil |
Hidráulica
D = 100 mm
Shear LOB Shear Chan Shear ROB CONDICIÓN CONDICIÓN
Sta Prog. (Km)
(N/m2) (N/m2) (N/m2) (IZQ) (DER.)
1 0+000.00 9.18 32.51 25.93 OK OK
2 0+020.00 12.67 35.93 13.48 OK OK
3 0+040.00 14.36 42.51 9.51 OK OK
4 0+060.00 14.00 46.30 18.41 OK OK
5 0+080.00 19.06 55.08 16.25 OK OK
6 0+100.00 14.82 53.80 14.34 OK OK
7 0+120.00 12.76 42.38 15.19 OK OK
8 0+140.00 13.50 43.51 15.71 OK OK
9 0+160.00 11.50 41.97 22.17 OK OK
10 0+180.00 12.21 43.55 21.63 OK OK
11 0+200.00 12.31 47.84 19.84 OK OK
12 0+220.00 11.71 49.21 18.63 OK OK
13 0+240.00 13.41 61.80 16.04 OK OK
14 0+260.00 9.76 43.59 13.49 OK OK
15 0+280.00 12.50 31.71 7.02 OK OK
16 0+300.00 11.99 28.49 10.14 OK OK
17 0+320.00 14.22 22.53 11.10 OK OK
18 0+340.00 12.24 20.45 12.64 OK OK
19 0+360.00 11.01 18.87 12.67 OK OK
20 0+380.00 11.19 19.40 13.02 OK OK
21 0+400.00 11.32 20.53 10.89 OK OK
22 0+420.00 11.91 22.43 10.21 OK OK
23 0+440.00 15.25 26.03 13.62 OK OK
24 0+460.00 16.03 26.02 11.92 OK OK
25 0+480.00 15.54 25.73 13.34 OK OK
26 0+500.00 16.27 24.72 12.54 OK OK
27 0+520.00 16.19 25.67 13.53 OK OK
28 0+540.00 17.42 28.30 15.22 OK OK
29 0+560.00 17.98 29.33 16.92 OK OK
30 0+580.00 14.83 28.13 16.90 OK OK
31 0+600.00 18.71 29.42 21.70 OK OK
32 0+620.00 19.16 29.68 20.54 OK OK
33 0+640.00 19.81 30.60 16.18 OK OK
34 0+660.00 20.64 35.55 17.00 OK OK
35 0+680.00 30.04 44.66 17.01 OK OK
36 0+700.00 34.82 51.26 20.76 OK OK
37 0+720.00 39.99 57.54 25.71 OK OK
38 0+740.00 40.36 64.43 28.62 OK OK
39 0+760.00 58.29 84.04 39.99 OK OK
40 0+780.00 75.50 105.60 48.41 OK OK
41 0+800.00 76.92 108.32 49.59 OK OK
42 0+820.00 82.69 118.21 56.87 OK OK
43 0+840.00 90.29 129.66 63.06 OK OK
44 0+860.00 68.78 111.15 51.43 OK OK
45 0+880.00 70.79 92.20 39.82 OK OK
46 0+900.00 73.51 105.49 52.11 OK OK
47 0+920.00 60.45 96.71 46.10 OK OK
48 0+940.00 59.68 98.08 43.39 OK OK
49 0+960.00 128.48 335.33 122.74 ARRASTRE ARRASTRE
50 0+980.00 111.39 309.26 104.25 ARRASTRE ARRASTRE
51 0+989.74 64.58 136.83 47.58 OK OK
149
____________________________________________Ingeniería Civil |
Hidráulica
150
____________________________________________Ingeniería Civil |
Hidráulica
CALCULOS
BLOQUE 6 10080 Kg
BLOQUE 5 8960 Kg
BLOQUE 4 7840 Kg
BLOQUE 3 6720 Kg
BLOQUE 2 5600 Kg
BLOQUE 1 4480 Kg
S= 43,680.00 Kg
151
____________________________________________Ingeniería Civil |
Hidráulica
MOMENTOS ESTABILIZANTES
M6 22680 Kg* m
M5 22400 Kg* m
M4 21560 Kg* m
M3 20160 Kg* m
M2 18200 Kg* m
M1 15680 Kg* m
S= 120680 Kg* m
Fs=(Mesta/Mvolca) >1.5
Fs 6.06 >1.5 OK
X*N=Me-Mo
X= 2.31 m
CALCULO DE EXCENRICIDAD
ssuelo 2 Kg/cm2 CAPACIDAD PORTANTE
B(base del gavion) 4.5 m
e= (B/2)-X < B/6
e= -0.06 < 0.75 ok
s1=
𝐴
s1= 10483.2 Kg/m2
s1= 1.04832 kg/cm2 < ssuelo ok
s2=
𝐴
BLOQUE 1
E a=0.50*g*H2*K a
Ka= tan(45-Ø/2)^2
Ka= 0.307258525
Ea= 276.5326721 Kg
Mo 92.17755736 kg*m
BLOQUE 1 4480 Kg
Me = 4480 kg*m
152
____________________________________________Ingeniería Civil |
Hidráulica
BLOQUE 1 y 2
Ka= tan(45-Ø/2)^2
Ka= 0.307258525
Ea= 1106.130688 Kg
Mo 737.4204589 kg*m
BLOQUE 1 4480 Kg
BLOQUE 2 5600 Kg
Me = 13720 kg*m
BLOQUE 1 ,2,3
Ka= tan(45-Ø/2)^2
Ka= 0.307258525
Ea= 2488.794049 Kg
Mo 2488.794049 kg*m
BLOQUE 1 4480 Kg
BLOQUE 2 5,600.00 Kg
BLOQUE 3 6720 Kg
Me = 28840 kg*m
FACTOR DE SEGURIDAD POR VOLCAMIENTO
Fsv= 11.58794156 > 1.5
FACTOR DE SEGURIDAD AL DESLIZAMIENTO
Fsd= 4.218028855 > 1.5
BLOQUE 1 ,2,3Y 4
Ka= tan(45-Ø/2)^2
Ka= 0.307258525
Ea= 4424.522753 Kg
Mo 5899.363671 kg*m
BLOQUE 1 4480 Kg
BLOQUE 2 5600 Kg
BLOQUE 3 6720 Kg
BLOQUE 4 7840 Kg
Me = 50960 kg*m
FACTOR DE SEGURIDAD POR VOLCAMIENTO
Fsv= 8.638219788 > 1.5
FACTOR DE SEGURIDAD AL DESLIZAMIENTO
Fsd= 3.479873806 > 1.5
153
____________________________________________Ingeniería Civil |
Hidráulica
BLOQUE 1 ,2,3,4 Y 5
Ka= tan(45-Ø/2)^2
Ka= 0.307258525
Ea= 6913.316802 Kg
Mo 11522.19467 kg*m
BLOQUE 1 4480 Kg
BLOQUE 2 5600 Kg
BLOQUE 3 6720 Kg
BLOQUE 4 7840 Kg
BLOQUE 5 8960 Kg
Me = 81200 kg*m
FACTOR DE SEGURIDAD POR VOLCAMIENTO
Fsv= 7.047268539 > 1.5
FACTOR DE SEGURIDAD AL DESLIZAMIENTO
Fsd= 3.036980776 > 1.5
DATOS DE ENTRADA
154
____________________________________________Ingeniería Civil |
Hidráulica
155
____________________________________________Ingeniería Civil |
Hidráulica
156
____________________________________________Ingeniería Civil |
Hidráulica
RESULTADOS
157
____________________________________________Ingeniería Civil |
Hidráulica
158
____________________________________________Ingeniería Civil |
Hidráulica
159
____________________________________________Ingeniería Civil |
Hidráulica
160
____________________________________________Ingeniería Civil |
Hidráulica
161
____________________________________________Ingeniería Civil |
Hidráulica
162
____________________________________________Ingeniería Civil |
Hidráulica
GAVIONES
Los gaviones de protección son prismas rectangulares muy flexibles, fabricados con mallas de alambre
de acero fuertemente galvanizado, tejidos mediante una doble torsión o electro soldada y rellenados con
piedra, de las dimensiones y características específicas detalladas en las presentes especificaciones
y/o en los planos correspondientes.
15.01 SUMINISTRO E INSTALACION GAVION CAJA TIPO “A” 1.5X1.0X1.0M.
15.02 SUMINISTRO E INSTALACION GAVION CAJA TIPO “B” 1.0X1.0X1.5M.
15.03 SUMINISTRO E INSTALACION GAVION CAJA TIPO “C” 2.0X1.0X1.0M.
15.04 SUMINISTRO E INSTALACION GAVION CAJA TIPO “D” 3.0X1.0X1.0M.
15.05 SUMINISTRO E INSTALACION GAVIÓN CAJA TIPO "CF" 2.0X1.0X1.0M.
15.06 SUMINISTRO E INSTALACION GAVIÓN CAJA TIPO "Y".
Descripción
Las características de los gaviones están dadas por la abertura de la malla o
cocada, el calibre de los alambres de la malla, de borde, para el amarre o
atirantamiento y el tipo de recubrimiento que estos tienen. Todos los gaviones
estarán provistos dedos diafragmas y de templadores para su adecuado
funcionamiento.
Serán colocados en las ubicaciones mostradas en los planos o conforme lo
estipule el Supervisor.
Tipos de gaviones
1.1 Gaviones tipo caja.
Son prismas rectangulares constituidos por mallas que forman una base con paredes verticales y
una tapa, que eventualmente puede ser formada por separado. Son denominados tipo caja porque
la altura de una unidad fluctúa entre 0.5 - 1.0m
Las paredes verticales de los extremos que completan una unidad, deben ser unidas a la base de
la malla mediante procesos mecánicos de torsión a través de un alambre retorcido continuo (tortol),
o electrosoldado, de manera que garantice la perfecta unión y articulación del gavión.
Cada gavión debe ser dividido por diafragmas, conformando celdas cuya largura no deberá ser
superior a una vez y media el ancho del gavión, esta separación es de 1m. Los diafragmas están
unidos a la malla de base, y deben ser atados a las paredes verticales del gavión.
1.2 Gaviones tipo colchón
Están conformados de la misma manera que los gaviones tipo caja con la única diferencia que sus
paredes verticales son de pequeña dimensión teniendo alturas que fluctúan de 0.20 - 0.50m.
Un colchón está dividido por diafragmas colocados a cada metro conformando celdas a cada metro,
estos diafragmas están unidos a la base .La tapa es generalmente suministrada de forma separada.
163
____________________________________________Ingeniería Civil |
Hidráulica
a x b (mm)
Donde el valor de “a” será la media de las distancias (se refiere a la distancia entre dos uniones
paralelas de la misma abertura) tomadas sobre dos aberturas consecutivas dispuestas
transversalmente a la textura de la malla y el valor de “b” será el que corresponda a la distancia
entre dos uniones de la misma abertura que se encuentren sobre el mismo eje.
Las mallas deberán tener un acabado en todos sus bordes, con la finalidad de evitar que estas se
desarmen y dar mayor estabilidad a la estructura. Este acabado consiste en dar un doblez no menor
de una cocada sobre el alambre de borde (el alambre de borde se coloca en todos los bordes libres
del gavión y será de mayor calibre que el de la malla).
Dimensiones de la malla
De manera general podrían, los gaviones fabricarse en diferentes dimensiones, sin embargo
dimensiones estándar se muestran a continuación:
CAJA
Peso aprox. (kg) Peso aprox. (kg) Peso aprox. (kg)
Largo (m) Ancho (m) Alto (m) N° Diafragmas
2.70 x 3.40 3.00 x 3.90 3.50 x 4.10 PVC
2.0 1.0 1.0 1 18 22.2 17.3
3.0 1.0 1.0 2 26.1 32.3 25.3
4.0 1.0 1.0 3 34.3 42.4 33.2
5.0 1.0 1.0 4 42.5 52.5 41.1
5.0 1.5 1.0 4 55.02 68.68 53.75
164
____________________________________________Ingeniería Civil |
Hidráulica
COLCHON
Peso aprox. (kg) Peso aprox. (kg) Peso aprox. (kg)
Largo (m) Ancho (m) Alto (m) N° Diafragmas
2.70 x 3.40 3.00 x 3.90 3.50 x 4.10 PVC
5.0 2.0 0.2 4 39.9 49.2 38.5
5.0 2.0 0.3 4 43.5 53.7 42
5.0 2.0 0.5 4 50.7 62.6 49
6.0 2.0 0.5 5 60.5 74.7 58.5
Los Pesos corresponden a gaviones con alambre de malla x alambre de borde, respectivamente
(Ver cuadro de calibre de alambres).
Tolerancias de las dimensiones de los gaviones.
Las tolerancias en el largo, ancho y alto del gavión será de +-3%.
Los pesos están sujetos a una tolerancia de +-5% (que corresponden a una tolerancia
menor que la de 2.5% admitida para el diámetro del alambre).
Características del alambre
Los alambres que se usan para la fabricación, armado e instalación de gaviones debe ser hecho de
acero “dulce recocido” y deberán cumplir las siguientes especificaciones.
Material Base:
%C 0,06 – 0,10
%P máx. 0,04
%S máx. 0,05
Tipos de gaviones
1. Alambre de malla
Es aquel que compone la malla hexagonal tejida a doble torsión o electrosoldada.
2. Alambre de borde
Todos los bordes libres del gavión, inclusive el lado superior de los diafragmas deben ser de mayor
calibre que la malla para que adquiera mayor resistencia y consistencia.
3. Alambre de amarre y atirantamiento
El alambre de amarre es aquel que será utilizado para coser las mallas hexagonales que formarán
el gavión así como la unión ellos mismos para componer la estructura deseada y el alambre de
atirantamiento es aquel que se usa para evitar deformaciones del mismo. Será de calibre menor al
del alambre de malla. Para los gaviones tipo caja corresponderá al 8% del peso total y 6% del peso
total para el tipo colchón.
165
____________________________________________Ingeniería Civil |
Hidráulica
Nota: El calibre mínimo del alambre de malla será de 2.70 mm; experiencias de campo han
demostrado que estructuras construidas con calibres menores o más bajos han colapsado muy
rápidamente.
Normas y Tolerancias.
El estiramiento del alambre no deberá ser inferior al 12%. Para ello se debe realizar el
ensayo sobre un alambre de 30cm de largo.
Norma: ASTM A- 641 - BSS443
Resistencia a la tracción de 40 - 50 kg/mm²
Modulo de elasticidad: 19180 kg/mm²
Tolerancia en el diámetro del alambre galvanizado: +-2.5%
166
____________________________________________Ingeniería Civil |
Hidráulica
Carga de ruptura: mayor que 210kg/cm² de acuerdo con la A.S.T.M. D 412 – 75.
Estiramiento: mayor que 200% y menor que 280%, de acuerdo con la A.S.T.M. D 412 -75.
Modulo de elasticidad al 100% del estiramiento: mayor que 190kg/cm², de acuerdo con la
A.S.T.M. D 412 - 75.
Abrasión: pérdida de peso menor que 190mg., de acuerdo con la A.S.T.M. D 1242 - 56(75).
Temperatura de fragilidad: Cold Bend Temperature menor que 30°C, de acuerdo con la
BSS 2782 - 104 A (1970) y Cold Flex Temperatura menor que +15°C de acuerdo con la
BSS 2782/150 B (1976)
Corrosión: la máxima penetración de la corrosión desde una extremidad del hilo cortado,
deberá ser menor de 25mm cuando la muestra fuera sumergida por 2 horas en una solución
con 50% de HCI (ácido clorhídrico 112 Be).
La muestra de P.V.C. deberá ser sometida a los siguientes ensayos de envejecimiento acelerado.
Salt Spray Test: 1500 horas en niebla salina, de acuerdo con la A.S.T.M. B 117 - 73 (79)
Accelerated Aging Test: 2000 horas de envejecimiento acelerado con exposición a los
rayos ultravioletas, de acuerdo con la A.S.T.M. D 1499 - 64 (77), A.S.T.M. G23 - 69 (75)
apparatus type E.
Exposure at High Temperature: 240 horas a 105°C, de acuerdo con la A.S.T.M. D 1203 -
67 (74), (ISO 176 - 1976) y A.S.T.M. D 2287 - 78.
Después de ejecutar los ensayos de envejecimiento acelerado, la muestra deberá presentar las
siguientes características:
Aspecto: no mostrar grietas, escoriaciones o ampollas de aire ni diferencias significativas
en su color.
Peso específico: variaciones no superiores al 10% del valor inicial.
Carga de ruptura: variaciones no superiores a 25% del valor inicial.
Estiramiento: variaciones no superiores a 25% del valor inicial.
Módulo de elasticidad: variaciones no superiores a 25% del valor inicial.
Abrasión: variaciones no superiores a 10% del valor inicial.
Temperatura de fragilidad: Cold Bend Temperature no superior a 20°C e Cold Flex
Temperatura no superior a +18°C.
Método de construcción
La plataforma deberá ser preparada de manera de presentar una superficie plana y uniforme,
previamente a la colocación de los gaviones.
Los gaviones serán armados fuera del área a proteger y trasladados posteriormente a su ubicación final.
Colocados sobre la superficie, los gaviones deberán ser sólidamente unidos entre sí mediante amarres
de alambre, asegurando su continuidad estructural.
El relleno de piedra será realizado cuidadosamente, logrando el menor volumen de vacíos posible y
considerando un ligero sobre volumen para permitir el acomodo posterior del relleno.
Medición
167
____________________________________________Ingeniería Civil |
Hidráulica
Para efectos de medición se considerarán por pieza (Pza.) de gaviones instalados, entre los límites
previstos conforme a los planos o según especifique el Supervisor.
Pago
El total de metros cúbicos de gaviones colocados será pagado al Ejecutor y/o Contratista, al precio
unitario por pieza del contrato por (Pza.). Este pago constituirá la compensación total por toda la mano
de obra, leyes sociales, materiales, equipo, herramientas e imprevistos necesarios para completar la
partida (incluido transporte de agregados), el armado y el llenado de los gaviones.
El precio unitario deberá cubrir todos los costos por concepto de construcción o adecuación de las vías
de acceso a las fuentes de materiales, la extracción, preparación y suministro de los materiales, así
como su carga, transporte, descarga, almacenamiento, colocación, y, en general, todo costo relacionado
con la correcta construcción de los gaviones, de acuerdo con los planos del proyecto, esta especificación
y las instrucciones del Supervisor.
15.07 GEOTEXTIL NO TEJIDO MACTEX MT200
Descripción
Esta especificación comprende los requisitos para el uso de geotextiles en trabajos de drenaje,
separación, estabilización, control permanente de erosión, defensas temporales de finos; en
pavimentación para atenuar la reflexión de grietas y en refuerzo.
Materiales
Los materiales propósito de esta especificación pueden estar fabricados por polímeros sintéticos, tejidos
o no tejidos, de las características que se van a solicitar en este documento para cada una de las
aplicaciones.
Los geotextiles tejidos podrán ser fabricados con cintas planas o con cintas fibriladas, para obtener en
estos últimos geotextiles de alto módulo.
Los geotextiles no tejidos podrán ser fabricados con fibras largas o fibras cortas punzonadas o termo
fundidas, dependiendo del uso requerido.
Todos los parámetros exigidos en esta norma corresponden a valores mínimos promedios del rollo
(MARV). Su uso es de carácter obligatorio. Por lo tanto no se permite el uso de valores promedios o
típicos. De acuerdo con lo anterior, el Contratista se obliga a presentarle al Supervisor para su
aprobación los resultados suministrados por el proveedor, quedando en potestad de la Supervisión
ordenarle su verificación.
Requerimientos Generales de Resistencia para asegurar Supervivencia de los Geotextiles
Los geotextiles usados en los trabajos especificados en este artículo deben cumplir los requerimientos
que se presentan en la Tabla de Requerimientos de Supervivencia.
Estos requerimientos están dados en valores mínimos promedios del rollo (MARV) y no en valores
típicos o promedios.
Tabla de Requerimientos de Supervivencia
168
____________________________________________Ingeniería Civil |
Hidráulica
E = Elongación
Geotextiles usados en Subdrenaje
Los geotextiles usados en subdrenaje deben cumplir las exigencias mostradas en la Tabla de
Requerimientos de Geotextiles para Subdrenaje.
Requerimientos de Geotextiles para Subdrenaje
Requerimiento ( MARV ** )
Porcentaje de suelo a retener que pasa la
Propiedad Ensayo Unidad
malla 0.075 min. (N° 200)
< 15 15 – 50 > 50
Clase de Geotextil Clase 2 de la tabla 650-1
Permitividad ASTM D4491 seg –1 0.5 0.2 0.1
Abertura aparente (AOS*) ASTM D4751 Mm 0.43 0.25 0.22
Resistencia retenida UV ASTM D4355 % 50% después de 500 horas de exposición
Método de medición
Para todas las aplicaciones de geotextiles mencionados en esta sección la unidad de medida será el metro
cuadrado (M2). Los traslapes no se diferenciarán en la medida y estarán incluidos en ella.
Pago
169
____________________________________________Ingeniería Civil |
Hidráulica
Las cantidades aceptadas de geotextil deberán ser pagadas al precio unitario por metro cuadrado indicado en el
contrato. También incluye el costo de traslapes y costuras que se requieran para el cumplimiento de las
especificaciones.
Este precio y pago será compensación total por todos los materiales, mano de obra, leyes sociales, equipos,
herramientas é imprevistos necesarios para la correcta ejecución de todos los trabajos según lo especificado.
170
____________________________________________Ingeniería Civil |
Hidráulica
Referencias Bibliográficas
171
____________________________________________Ingeniería Civil |
Hidráulica
PLANOS
172