You are on page 1of 26

TIME STUDY SHEET

Segment/Cell :- Wing RH Name of Person :- Asha Operator Name :- Patel Skill Level :- New Joinee Shift :-General
Remarks
S. No Date MIS No Operation No Operation / Activity No of holes drilled / rivetted Start Finish
Delta

1 13-Feb-17 Morning meeting 9:00 9:15 0:15

2 13-Feb-17 2031 Rib 16-20 cleaning with sealant 9:15 10:00 0:45

3 13-Feb-17 2031 Hold the MIS thriugh Bar code device 10:01 10:05 0:04

4 13-Feb-17 2033 Start New MIS through bar code device 10:05 10:07 0:02

5 13-Feb-17 2033 Cleaning stringer with solvant from Station no. 16 to 20 10:07 10:22 0:15

6 13-Feb-17 Waiting for instruction 10:22 10:24 0:02

7 13-Feb-17 Locating the rivet to the holes & providing tools to other operator 10:24 10:27 0:03

8 13-Feb-17 searching of drill bit 10:27 10:28 0:01

9 13-Feb-17 Adjusting dill bit to 90 Gun 10:28 10:29 0:01

10 13-Feb-17 Drilling on stringer 16 to 20 4 10:29 10:30 0:01

11 13-Feb-17 Cleco locking 1 10:30 10:30 0:00

12 13-Feb-17 Cleco removal & drilling 4 10:30 10:32 0:02

13 13-Feb-17 Cleaning hand with cotton 10:32 10:32 0:00

14 13-Feb-17 Tea break 10:32 10:45 0:13

15 13-Feb-17 Reveiving instrcution from supervisor 10:45 10:46 0:01

16 13-Feb-17 Ideal 10:46 10:47 0:01

17 13-Feb-17 2034 Station 14 Rib & stringer cleaning with cleaning slovant 10:47 10:55 0:08

18 13-Feb-17 Station 13 Rib & stringer cleaning with cleaning slovant 10:55 10:56 0:01

19 13-Feb-17 Station 12 Rib & stringer cleaning with cleaning slovant 10:56 10:58 0:02

20 13-Feb-17 Station 13 Rib & stringer cleaning with cleaning slovant 10:58 11:00 0:02

21 13-Feb-17 Station 15 Rib & stringer cleaning with cleaning slovant 11:00 11:01 0:01

22 13-Feb-17 Station 13 Rib & stringer cleaning with cleaning slovant 11:01 11:02 0:01

23 13-Feb-17 Station 14 Rib & stringer cleaning with cleaning slovant 11:02 11:04 0:02

24 13-Feb-17 Station 16 Rib & stringer cleaning with cleaning slovant 11:04 11:06 0:02

25 13-Feb-17 Filling sealant bottle 11:06 11:07 0:01

26 13-Feb-17 Station 15 & 16 stringer cleaning with cleaning slovant 11:07 11:09 0:02

27 13-Feb-17 Ideal 11:09 11:09 0:00

28 13-Feb-17 Station 16 Rib & stringer cleaning with cleaning solvant 11:09 11:12 0:03

29 13-Feb-17 Cleaning cover Rib 11:12 11:12 0:00

30 13-Feb-17 Station 16 Rib & stringer cleaning with cleaning solvant 11:12 11:16 0:04

31 13-Feb-17 Went for collecting rivet 11:16 11:16 0:00

32 13-Feb-17 Keeping rivet in Sta 16 to 20 rib 4 11:17 11:18 0:01

33 13-Feb-17 Removal of cleco in Sta 17- 19 mid rib stringer 11:19 11:21 0:02

34 13-Feb-17 Went for keeping rivet in two bin 11:21 11:21 0:00

35 13-Feb-17 Keeping Cleco in bin 11:21 11:22 0:01

36 13-Feb-17 Seeing squeeze gun riviting process of other operator 11:22 11:24 0:02

37 13-Feb-17 Cleaning mid rib stringer of rib 16 11:24 11:25 0:01

38 13-Feb-17 Collection of squeezer gun 11:25 11:25 0:00

39 13-Feb-17 ideal 11:26 11:26 0:00

40 13-Feb-17 Supporting Squeezer gun operator 11:26 11:27 0:01

41 13-Feb-17 Cleaning the holes 11:27 11:27 0:00

42 13-Feb-17 Supporting Squeezer gun operator in riveting the holes 11:28 11:29 0:01

43 13-Feb-17 Application of masking tape to squeezer button 11:29 11:29 0:00


44 13-Feb-17 Ideal - Holding Squeezer gun 11:29 11:32 0:03

45 13-Feb-17 Supporting Squeezer gun operator in riveting the holes in rib 17 & 18 11:32 11:33 0:01

46 13-Feb-17 Ideal - Holding Squeezer gun 11:33 11:34 0:01

47 13-Feb-17 Supporting Squeezer gun operator in riveting the holes in rib 17 11:34 11:38 0:04

48 13-Feb-17 Adjusting of Steps 11:38 11:38 0:00

49 13-Feb-17 Keeping cleco to bins 11:38 11:38 0:00

50 13-Feb-17 Supporting Squeezer gun operator in riveting the holes in rib 18 11:39 11:40 0:01

51 13-Feb-17 Keeping rivet to the holes in Sta 18 11:40 11:42 0:02

52 13-Feb-17 Ideal 11:43 11:45 0:02

53 13-Feb-17 Wearing gloves 11:46 11:46 0:00

54 13-Feb-17 searching of rivet button 11:46 11:47 0:01

55 13-Feb-17 Cleaning Sta 20 stringer 11:47 11:49 Operator not wearing mask while cleaning 0:02

56 13-Feb-17 Collection & wearing of mask 11:49 11:51 0:02

57 13-Feb-17 Cleaning Sta 16, 17, 18, 19 & 20 stringer 11:51 12:00 0:09

58 13-Feb-17 Holding the locator for removal 12:00 12:01 0:01

59 13-Feb-17 Cleaning Sta 16, 17, 18, 19 & 20 stringer 12:01 12:05 0:04

60 13-Feb-17 Locking cleco pin to sta 16 3 12:05 12:06 0:01

61 13-Feb-17 Cleaning Sta 16, 17, 18, 19 & 20 stringer 12:06 12:10 0:04

62 13-Feb-17 Holding String in Sta 16 12:10 12:10 0:00

63 13-Feb-17 Collection of loactor 12:11 12:11 0:00

64 13-Feb-17 Laoding the loactor 1 locator 12:11 12:13 0:02

65 13-Feb-17 Locating Hilock pin in Sta 18 1 12:13 12:13 0:00

66 13-Feb-17 Searching tool 12:15 12:16 0:01

67 13-Feb-17 Ideal 12:16 12:21 0:05

68 13-Feb-17 Went for loacting pin to loactor 12:21 12:22 0:01

69 13-Feb-17 Return to place 12:22 12:22 0:00

70 13-Feb-17 Removing chips for the surface 12:23 12:25 0:02

71 13-Feb-17 2040 Went for collecting 15-20 skin 12:26 12:26 0:00

72 13-Feb-17 2040 Loading of skin 12:26 12:26 0:00

73 13-Feb-17 2040 Searching of C-Clamps 12:26 12:29 0:03

74 13-Feb-17 2040 Locating of C-clamp on skin 12:29 12:30 0:01

75 13-Feb-17 2040 Barcode scanning for holding 12:33 12:34 0:01

76 13-Feb-17 Barcode scanning for starting new MIS 12:34 12:34 0:00

77 13-Feb-17 Ideal 12:34 12:36 0:02

78 13-Feb-17 Receiving instruction from Supervisor for proceeding further 12:36 12:36 0:00

79 13-Feb-17 Lunch 12:37 13:10 0:33

80 13-Feb-17 16-20 Drawing reading 13:10 13:13 0:03

81 13-Feb-17 20 Skin setting 13:13 13:28 0:15

82 13-Feb-17 20 Waiting for quality inspection 13:28 13:50 0:22

83 13-Feb-17 20 Quality isnpection 13:50 14:00 0:10

84 13-Feb-17 Preparation tools 14:00 14:05 0:05

85 13-Feb-17 30 Index hole drilling Sta 16:20 70 14:05 14:34 0:29

86 13-Feb-17 30 Stringer pilot hole transfer 20+20 14:34 14:47 0:13

87 13-Feb-17 30 Rear spar index hole drilling 20 14:47 15:00 0:13

88 13-Feb-17 40 Transfer pilot hole of #40 drill bit 15:00 15:30 0:30
89 13-Feb-17 Tea break 15:30 15:49 0:19

90 13-Feb-17 Adjustment of 3.3 drill bit to drill gun 15:50 15:52 0:02

91 13-Feb-17 Main spar final size drilling with bush 65 15:55 16:06 0:11

92 13-Feb-17 Locking of threaded cleco main spar 2 16:06 16:08 0:02

93 13-Feb-17 Stringer num 15+8 final size drilling 51 16:07 16:14 0:07

94 13-Feb-17 ideal 16:14 16:15 0:01

95 13-Feb-17 Locking of threaded cleco main spar 4 16:15 16:16 0:01

96 13-Feb-17 Went for collection of threaded clecos 16:16 16:18 0:02

97 13-Feb-17 Removal of threaded cleco of 2.4 mm from skin & application of cleco 3.3 mm to the skin 30 16:18 16:28 0:10

98 13-Feb-17 Drilling on rib 19 4 16:28 16:30 0:02

99 13-Feb-17 Went for collecting 3.3 threaded cleco 16:30 16:31 0:01

100 13-Feb-17 Return to his place 16:31 16:31 0:00

101 13-Feb-17 Locking of threaded cleco 3.3 to rib 16 to 18 28 16:32 16:42 0:10

102 13-Feb-17 Stringer final size drilling 3.3 mm Sta 16-18 20 16:42 16:45 0:03

103 13-Feb-17 3.3 mm threaded cleco installation 23 16:45 16:57 0:12

104 13-Feb-17 Drilling 3.3 mm final size hole on Sta 16-18 21 16:57 17:06 0:09

105 13-Feb-17 3.3 mm threaded cleco installation 10 17:06 $0.71 0:03

106 13-Feb-17 Drilling 3.3 mm final size hole on Sta 16-18 15 17:09 17:14 0:05

107 13-Feb-17 Ideal 17:14 17:15 0:01

108 13-Feb-17 Drilling 3.3 mm final size hole on Sta 16-18 3 17:15 17:16 0:01

109 13-Feb-17 Went for keeping rivet guide in tool trolley 17:16 17:17 0:01

110 13-Feb-17 FOD & 5S Activity 17:17 17:30 0:13

111 13-Feb-17 Barcode device hold on Employee wellfare & celebration 17:30 17:30 0:00

14-Feb-17 2040 Barcode scanning 9:00 9:01 0:01

14-Feb-17 2040 Morning meeting 9:01 9:16 0:15

14-Feb-17 2040 Tools collecting 9:16 9:26 0:10

14-Feb-17 2040 Pilot drill bit changing 9:26 9:30 0:04

14-Feb-17 2040 Pilot drilling 9:30 9:36 0:06

14-Feb-17 2040 Installation of pilot thread cleco 10 9:36 9:45 0:09

14-Feb-17 2040 Final size drilling Sta 14 with drill bit 3.3 6 9:45 9:48 0:03

14-Feb-17 2040 Collection of bush for drill gun 9:48 9:48 0:00

14-Feb-17 2040 Installation of bush to drill gun 9:49 9:49 0:00

14-Feb-17 2040 Collection of boelube paste from consumable rack 9:49 9:49 0:00

14-Feb-17 2040 Application of boelube paste to drill bit 9:50 9:50 0:00

14-Feb-17 2040 Removal of Size 2.4 cleco, drilling final size and installation of Size 3.3 cleco from sta 18-13 41 9:50 10:25 0:35

14-Feb-17 2040 Reading drawing 10:25 10:26 0:01

14-Feb-17 2040 Removal of Size 2.4 cleco, drilling final size and installation of Size 3.3 cleco from sta 18-13 2 10:26 10:27 0:01

14-Feb-17 2040 Reading drawing 10:27 10:30 0:03

14-Feb-17 2040 Removal of Size 2.4 cleco, drilling final size and installation of Size 3.3 cleco from sta 18-13 10:30 10:32 0:02

14-Feb-17 2040 Tea break 10:33 10:45 0:12

14-Feb-17 2040 Removal of Size 2.4 cleco, drilling final size and installation of Size 3.3 cleco from sta 18-13 10:45 11:04 0:19

14-Feb-17 2040 Bush removal from drill gun & drilling 75 11:04 11:15 0:11

14-Feb-17 2040 Collection of 3.3 cleco 11:15 11:15 0:00

14-Feb-17 2040 Installation of cleco 4 11:15 11:16 0:01

14-Feb-17 2040 Cleco removal of 2.2 size 4 11:16 11:17 0:01


14-Feb-17 2040 Removal of cleco 2.3 size & Installation of cleco of size 3.3 5 11:17 11:19 0:02

14-Feb-17 2040 Drilling final size 11:19 11:21 0:02

14-Feb-17 2040 Removal of cleco 2.3 size 4 11:21 11:23 0:02

14-Feb-17 2040 Ideal 11:23 11:24 0:01

14-Feb-17 2040 Installation of 3.3 cleco 3 11:24 11:25 0:01

14-Feb-17 2040 Size 2.2 cleco removal 2 11:25 11:25 0:00

14-Feb-17 2040 Drilling final size 22 11:25 11:36 0:11

14-Feb-17 2040 Arrangement of stair 11:36 11:37 0:01

14-Feb-17 2040 Drilling final size 6 11:37 11:38 0:01

14-Feb-17 2040 Ideal 11:38 11:38 0:00

14-Feb-17 2040 Drilling final size 13 11:38 11:42 0:04

14-Feb-17 2040 Ideal 11:42 11:43 0:01

14-Feb-17 2040 Reading drawing 11:43 11:52 0:09

14-Feb-17 2040 Observation 11:52 11:54 0:02

14-Feb-17 2040 Ideal 11:54 11:55 0:01

14-Feb-17 2040 Collection of 3.3 size cleco 11:55 11:55 0:00

14-Feb-17 2040 Installation of 3.3 size cleco & removal of 2.2 size cleco 5 11:55 11:56 0:01

14-Feb-17 2040 Adjustment of stair 11:56 11:56 0:00

14-Feb-17 2040 Checking operation 11:56 11:57 0:01

14-Feb-17 2040 Installation of 3.3 size cleco & removal of 2.2 size cleco 7 11:57 12:00 0:03

14-Feb-17 2040 Collection of rivet gun 12:00 12:00 0:00

14-Feb-17 2040 Drilling for final size sta 13-16 12 12:00 12:03 0:03

14-Feb-17 2040 Reading drawing 12:03 12:04 0:01

14-Feb-17 2040 Ideal 12:04 12:11 0:07

14-Feb-17 2040 Drilling for final size sta 13-16 7 12:11 12:13 0:02

14-Feb-17 2040 Holding scale for marking 12:13 12:13 0:00

14-Feb-17 2040 Drilling final size 18 12:13 12:16 0:03

14-Feb-17 2040 Ideal 12:16 12:17 0:01

14-Feb-17 2040 Removal of hose pipe from drill gun 12:17 12:17 0:00

14-Feb-17 2040 Ideal 12:17 12:18 0:01

14-Feb-17 2040 Keeping hose pipe at its location 12:18 12:18 0:00

14-Feb-17 2040 Ideal 12:18 12:18 0:00

14-Feb-17 2040 Hose pipe install to rivet gun 12:19 12:20 0:01

14-Feb-17 2040 Driling final size 12:20 12:20 0:00

14-Feb-17 2040 Ideal 12:20 12:22 0:02

14-Feb-17 2040 Driling final size 1 12:22 12:23 0:01

14-Feb-17 2040 Installation of 3.3 size cleco & removal of 2.2 size cleco 25 12:23 12:29 0:06

14-Feb-17 2040 Drilling final size 9 12:29 12:31 0:02

14-Feb-17 2040 Arranging the stair 12:31 12:31 0:00

14-Feb-17 2040 Collection of 3.3 size cleco 12:31 12:32 0:01

14-Feb-17 2040 Final size drilling & installation of 3.3 cleco 9 12:33 12:36 0:03

14-Feb-17 2040 Ideal 12:36 12:38 0:02

14-Feb-17 2040 Collection of 3.3 size cleco 12:38 12:38 0:00

14-Feb-17 2040 Removal of 2.3 size cleco & installation of 3.3 size cleco 5 12:38 12:41 0:03

14-Feb-17 2040 Final size drilling 16 12:41 12:50 0:09


14-Feb-17 2040 FOD & 5S Activity 12:50 13:00 0:10

14-Feb-17 2040 Observation 13:30 13:50 0:20

14-Feb-17 2040 Bar code scanning 13:50 13:52 0:02

14-Feb-17 2040 Discussion with supervisor 13:52 14:00 0:08

14-Feb-17 2040 Document reviewing 14:00 14:05 0:05

14-Feb-17 2042 20 Middle rib cleco installation 34 14:05 14:15 0:10

14-Feb-17 2042 20 Supporting wooden installation cleco 60 14:15 14:36 0:21

14-Feb-17 2042 20 Wood support & threaded cleco 150 14:36 15:10 0:34

14-Feb-17 2042 20 Observation 15:10 15:18 0:08

14-Feb-17 2042 20 Tiral size drilling 18 15:18 15:30 0:12

14-Feb-17 Tea break 15:30 15:37 0:07

14-Feb-17 2042 20 Tiral size drilling 20 15:37 16:04 0:27

14-Feb-17 2042 20 Rib nose thread drilling 30 16:04 16:26 0:22

14-Feb-17 2042 20 Middle rib thread drilling 28 16:26 16:57 0:31

14-Feb-17 2042 20 Middle rib pilot hole thread opening 20 16:57 17:17 0:20

14-Feb-17 2042 20 Removing belt attached to the skin 17:17 17:19 0:02

14-Feb-17 2042 20 Middle rib pilot hole thread opening 35 17:19 17:51 0:32

14-Feb-17 2042 20 Removing threaded cleco 5 17:51 18:05 0:14

14-Feb-17 2042 20 Collection of parts 18:05 18:15 0:10

14-Feb-17 2042 20 FOD & 5S Activity 18:15 18:30 0:15

15-Feb-17 2042 Barcode scanning 9:00 9:01 0:01

15-Feb-17 2042 Morning meeting 9:01 9:14 0:13

15-Feb-17 2042 Arrange tools 9:14 9:22 0:08

15-Feb-17 2042 40 A Removing cleco of size 3.3 & drilling Rib 6 to 11 20 9:22 9:38 0:16

15-Feb-17 2042 40 A Drilling & installation of cleco of size 4.1 mm 55 9:38 10:32 0:54

15-Feb-17 2042 40 A Kept drill gun aside 10:32 10:32 0:00

15-Feb-17 2042 40 A Removal of gloves 10:32 10:32 0:00

15-Feb-17 2042 40 A Came from tea break 10:32 10:46 0:14

15-Feb-17 2042 40 A Wearing gloves & lift the drill gun 10:46 10:46 0:00

15-Feb-17 2042 40 A Drilling & installation of cleco of size 4.1 mm 32 10:46 11:05 #REF!

15-Feb-17 2042 40 F Changing of drill bit from 4.1 to 3.3 mm 11:05 11:09 0:04

15-Feb-17 2042 40 F Installing hose pipe to drill gun 11:09 11:10 0:01

15-Feb-17 2042 40 F Drilling rear spar with 3.3 mm drill bit & installation of 3.3 mm cleco 8 11:11 11:12 0:01

15-Feb-17 2042 40 F Searching for cleco plior 11:12 11:12 0:00

15-Feb-17 2042 40 F Drilling rear spar with 3.3 mm drill bit & installation of 3.3 mm cleco 7 11:13 11:14 0:01

15-Feb-17 2042 40 F Searching for cleco plior 11:14 11:15 0:01

15-Feb-17 2042 40 F Removal of cleco 1 11:15 11:15 0:00

15-Feb-17 2042 40 F Drilling rear spar with 3.3 mm drill bit & installation of 3.3 mm cleco 24 11:15 11:22 0:07

15-Feb-17 2042 40 F Checking part 11:22 11:23 0:01

15-Feb-17 2042 40 F Searching of cleco 11:23 11:23 0:00

15-Feb-17 2042 40 F Drilling rear spar with 3.3 mm drill bit & installation of 3.3 mm cleco 19 11:23 11:29 0:06

15-Feb-17 2042 40 F Arranging hose pipe 11:29 11:29 0:00

15-Feb-17 2042 40 F Drilling rear spar with 3.3 mm drill bit & installation of 3.3 mm cleco 22 11:29 11:35 0:06

15-Feb-17 2042 40 F Searching for Bush 11:35 11:35 0:00

15-Feb-17 2042 40 F Application of masking tape to bush 11:35 11:37 0:02


15-Feb-17 2042 40 F Application of bush to drill gun 11:37 11:37 0:00

15-Feb-17 2042 40 F Drilling rear spar with 3.3 mm drill bit & installation of 3.3 mm cleco 7 11:38 11:39 0:01

15-Feb-17 2042 40 F Installation of hose pipe to new drill gun 11:39 11:39 0:00

15-Feb-17 2042 40 F Drilling rear spar with 3.3 mm drill bit & installation of 3.3 mm cleco 43 11:40 11:49 0:09

15-Feb-17 2042 40 F Drill gun kep asaid & installation of 3.3 mm cleco 2 11:49 11:50 0:01

15-Feb-17 2042 40 F Took drill gun & install bush to it 11:50 11:50 0:00

15-Feb-17 2042 40 F Drilling rear spar with 3.3 mm drill bit & installation of 3.3 mm cleco 33 11:50 11:57 0:07

15-Feb-17 2042 40 F Collection & Installation of 3.3 mm cleco 11:57 11:57 0:00

15-Feb-17 2042 40 F Took drill gun & install bush to it 11:57 11:57 0:00

15-Feb-17 2042 40 F Drilling rear spar with 4.1 mm drill bit & installation of 4.1 mm cleco 4 11:57 11:58 0:01

15-Feb-17 2042 40 F Collection & Installation of 3.3 mm cleco & removal of 2.1 mm cleco simultaneously 11:58 11:58 0:00

15-Feb-17 2042 40 F Drilling rear spar with 4.1 mm drill bit & installation of 4.1 mm cleco 5 11:58 11:59 0:01

15-Feb-17 2042 40 F Searching for 3.3 mm cleco 11:59 12:00 0:01

15-Feb-17 2042 40 F Drilling rear spar with 4.1 mm drill bit & installation of 4.1 mm cleco 10 12:00 12:01 0:01

15-Feb-17 2042 40 F Collection of 3.3 mm cleco 12:01 12:02 0:01

15-Feb-17 2042 40 F Installation of 3.3 mm cleco & out 2.2 cleco 2 12:02 12:02 0:00

15-Feb-17 2042 40 F Drilling rear spar with 4.1 mm drill bit & installation of 4.1 mm cleco 8 12:02 12:04 0:02

15-Feb-17 2042 40 F Changing of rivet gun with 4.1 mm drill bit for final size 12:04 12:06 0:02

15-Feb-17 2042 40 F Wearing gloves 12:06 12:06 0:00

15-Feb-17 2042 40 F Application of boelube paste to drill bit 12:06 12:07 0:01

15-Feb-17 2042 40 F Drilling rear spar with 4.1 mm drill bit & installation of 4.1 mm cleco 22 12:07 12:13 0:06

15-Feb-17 2042 40 F Collection of boelube 12:13 12:13 0:00

15-Feb-17 2042 40 F Drilling rear spar with 4.1 mm drill bit & installation of 4.1 mm cleco 1 12:13 12:14 0:01

15-Feb-17 2042 40 F Ideal 12:14 12:14 0:00

15-Feb-17 2042 40 F Drilling rear spar with 4.1 mm drill bit & installation of 4.1 mm cleco 3 12:15 12:16 0:01

15-Feb-17 2042 40 F Reading drawing 12:16 12:22 0:06

15-Feb-17 2042 40 F Drilling rear spar with 4.1 mm drill bit & installation of 4.1 mm cleco 64 12:22 12:43 0:21

15-Feb-17 2042 40 F Kept drill gun aside 12:43 12:43 0:00

15-Feb-17 2042 40 F Installation of 4.1 cleco & removal of 3.3 mm cleco 4 12:43 12:44 0:01

15-Feb-17 2042 40 F Drilling rear spar with 4.1 mm drill bit 8 12:44 12:46 0:02

15-Feb-17 2042 40 F Kept drill gun aside 12:46 12:46 0:00

15-Feb-17 2042 40 F Searching for 4. 1 cleco 12:46 12:46 0:00

15-Feb-17 2042 40 F Installation of 4.1 cleco 2 12:46 12:47 0:01

15-Feb-17 2042 40 F Drilling rear spar with 4.1 mm drill bit 6 12:47 12:48 0:01

15-Feb-17 2042 40 F Searching for 4. 1 cleco 12:48 12:49 0:01

15-Feb-17 2042 40 F Installation of 4.1 cleco 1 12:49 12:50 0:01

15-Feb-17 2042 40 F Kept drill gun aside 12:50 12:50 0:00

15-Feb-17 2042 40 F FOD & 5S Activity 12:51 13:00 0:09

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17
15-Feb-17

15-Feb-17
TIME STUDY SHEET
Segment/Cell :- Wing RH Name of Person :- B Rathan Reddy Operator Name :- Lakan Skill Level :- Associate Shift :-General
Remarks
S. No Date MIS No Operation No Operation / Activity No of holes drilled / rivetted Start Finish
Delta

waiting for barcode scanner


1 13-Feb-17 9:00 9:01 0:01

Barcode scanning
2 13-Feb-17 9:01 9:02 0:01

Morning meeting
3 13-Feb-17 9:02 9:09 0:07

Arrange tools
4 13-Feb-17 9:09 9:15 0:06

2034 130 Rivetting


5 13-Feb-17 9:15 9:43 0:28

Stringer 5 Sealant application


6 13-Feb-17 9:43 9:50 0:07

Stringer 15 Sealant application


7 13-Feb-17 9:50 9:53 0:03

Stringer 8 Sealant application


8 13-Feb-17 9:53 9:56 0:03

Stringer 9 Sealant application


9 13-Feb-17 9:56 10:05 0:09

Waiting for sealant


10 13-Feb-17 4 10:05 10:15 0:10

Fillet sealing filling


11 13-Feb-17 1 10:15 10:28 0:13

Stringer locking
12 13-Feb-17 4 10:28 10:30 0:02

Clearing
13 13-Feb-17 10:30 10:33 0:03

Tea Break
14 13-Feb-17 10:33 10:46 0:13

Stringer Cleaning
15 13-Feb-17 10:46 11:09 0:23

Fillet sealing filling


16 13-Feb-17 11:09 11:11 0:02

Stringer Cleaning ( 6 & 7)


17 13-Feb-17 11:11 11:20 0:09

Hand Sqeezer waiting


18 13-Feb-17 11:20 11:22 0:02

cleaning
19 13-Feb-17 11:22 11:25 0:03

Wash room
20 13-Feb-17 11:25 11:30 0:05

cleaning
21 13-Feb-17 11:30 11:35 0:05

140 Rib 8 sqeezer riveting


22 13-Feb-17 11:35 11:37 0:02

Bucking
23 13-Feb-17 11:37 11:41 0:04

Rivet Installation
24 13-Feb-17 11:41 11:45 0:04

Wash room
25 13-Feb-17 11:45 11:47 0:02

Rivet Installation and cleaning


26 13-Feb-17 11:47 12:04 6,7,8,9,10,11 0:17

Engaged Rivets
27 13-Feb-17 12:04 12:06 0:02

2034 Rivet Installation and cleaning


28 13-Feb-17 12:06 12:40 0:34

FOD check
29 13-Feb-17 12:40 12:46 0:06

cleaning
30 13-Feb-17 12:46 12:47 0:01

FOD bag not available - searching


31 13-Feb-17 12:47 12:48 0:01

lunch
32 13-Feb-17 12:48 13:30 0:42

Sealant cleaning
33 13-Feb-17 13:30 15:30 6 - 15 2:00

Tea Break
34 13-Feb-17 15:30 15:45 0:15

Belt Setting 13 - 16
35 13-Feb-17 15:45 15:57 0:12

Belt locking and adjustment


36 13-Feb-17 15:57 16:08 0:11

Waiting for Quality Inspection


37 13-Feb-17 16:08 16:25 0:17

Opening of pilot holes


38 13-Feb-17 16:25 16:43 0:18

Threading cleos
39 13-Feb-17 16:43 16:55 0:12

2042 MIS 42 skin loading (6-13)


40 13-Feb-17 16:55 17:07 0:12

2042 Cutting excess material


41 13-Feb-17 17:07 17:09 0:02

MIS 42 skin loading (6-13)


42 13-Feb-17 17:09 17:11 0:02

Unlaoding Skin and quality check


43 13-Feb-17 17:11 17:13 0:02
Drilling Nose Rivet 13-16
44 13-Feb-17 17:13 17:15 0:02

Changing drill bit


45 13-Feb-17 17:15 17:17 0:02

Getting tools
46 13-Feb-17 17:17 17:19 0:02

Segment/Cell :- Wing RH Name of Person :- B Rathan Reddy Operator Name :- Manoj Skill Level :- Associate Shift :-General

13-Feb-17 Barcode scanning


47 9:00 9:01 0:01

13-Feb-17 Morning meeting


48 9:01 9:09 0:08

13-Feb-17 Arrange tools


49 9:09 9:15 0:06

13-Feb-17 Riveting
50 9:15 9:43 0:28

13-Feb-17 2034 130 Stringer 5 Sealant application


51 9:43 9:50 0:07

13-Feb-17 Stringer 15 Sealant application


52 9:50 9:53 0:03

13-Feb-17 Stringer 8 Sealant application


53 9:53 9:56 0:03

13-Feb-17 Stringer 9 Sealant application


54 9:56 10:05 0:09

13-Feb-17 Waiting for sealing


55 10:05 10:15 0:10

13-Feb-17 Jig setting joining and loading


56 10:15 10:28 0:13

13-Feb-17 Stringer locking


57 10:28 10:33 0:05

13-Feb-17 Tea Break


58 10:33 10:46 0:13

13-Feb-17 Stringer locking


59 10:46 10:55 0:09

13-Feb-17 Nose rib and parts loading


60 10:55 10:58 0:03

13-Feb-17 10 parts loading


61 10:58 11:02 0:04

13-Feb-17 cleaning
62 11:02 11:09 7,8,9, & 10 0:07

13-Feb-17 Riviting rib 9


63 6 11:09 11:15 0:06

13-Feb-17 140 Web rib 9 wi th squeezer riveting


64 11:15 11:16 0:01

13-Feb-17 Discussion with supervisor


65 11:16 11:18 0:02

13-Feb-17 Squeezer not working


66 11:18 11:19 0:01

13-Feb-17 Rib 8 riveting


67 11:19 11:20 0:01

13-Feb-17 Squeezer inspection by PEM


68 11:20 11:21 0:01

13-Feb-17 Web rib 10 squeezer riveting


69 11:21 11:23 0:02

13-Feb-17 Taking washers


70 11:23 11:24 0:01

13-Feb-17 changing washers


71 11:24 11:25 0:01

13-Feb-17 Web rib 9squeezer riveting


72 11:25 11:27 0:02

13-Feb-17 Squeezer washer changing


73 11:27 11:29 0:02

13-Feb-17 Web rib 8 & 9 squeezer riveting


74 3 11:29 11:35 0:06

13-Feb-17 Went to supervisor


75 11:35 11:37 0:02

13-Feb-17 Wash room


76 11:37 11:39 0:02

13-Feb-17 De-riveting rib 9


77 3 11:39 11:41 0:02

13-Feb-17 Bucking
78 3 11:41 11:46 0:05

13-Feb-17 Rib 9 riveting


79 3 11:46 11:49 0:03

13-Feb-17 Rib 12 riveting


80 1 11:49 11:51 0:02

13-Feb-17 Squeezer setting


81 11:51 11:53 0:02

13-Feb-17 Squeezing
82 11:53 11:55 0:02

13-Feb-17 Squeezer washer changing


83 11:55 11:56 0:01

13-Feb-17 Riveting
84 27 11:56 12:01 0:05

13-Feb-17 mid rib STR rivet squeezing


85 15 12:01 12:08 0:07

13-Feb-17 changing clecos


86 12:08 12:09 0:01

13-Feb-17 Mid rib 14 STR squeezing


87 12:09 12:10 0:01
13-Feb-17 Mid rib + STR rivet with squeezer
88 27 12:10 12:18 0:08

13-Feb-17 Nose rivet STR riviet squeezing


89 21 12:18 12:25 0:07

13-Feb-17 Engaged Rivets


90 12:25 12:26 0:01

13-Feb-17 Nose rib 6-13 + STR


91 27 12:26 12:34 0:08

13-Feb-17 Rib 6 joining angle riveting


92 3 12:34 12:36 0:02

13-Feb-17 Rib 6 joining fitters


93 5 12:36 12:40 0:04

13-Feb-17 Mid rib 8 riveting


94 12:40 12:46 0:06

13-Feb-17 FOD check


95 12:46 12:48 0:02

13-Feb-17 FOD bag not available - searching


96 12:48 13:00 0:12

13-Feb-17 Lunch
97 13:00 13:30 0:30

13-Feb-17 Rib 6- 13 rivet with squeezer


98 13:30 13:58 0:28

13-Feb-17 Rib 15 clip loading


99 13:58 14:14 0:16

13-Feb-17 2041 10 MIS scanning start


100 14:14 14:16 0:02

13-Feb-17 10 RIB 13 Riveting


101 14:16 14:19 0:03

13-Feb-17 Collecting tools


102 14:19 14:20 0:01

13-Feb-17 Rib 13 clip loading


103 14:20 14:21 0:01

13-Feb-17 Locator 24 R removal


104 1 tool 14:21 14:23 0:02

13-Feb-17 Locator 38 R removal


105 1 tool 14:23 14:25 0:02

13-Feb-17 Locator 25 R removal


106 1 tool 14:25 14:27 0:02

13-Feb-17 Locator 18 R removal


107 14:27 14:30 0:03

13-Feb-17 Locator 13 R removal


108 14:30 14:33 0:03

13-Feb-17 Rib 15 TOP riveting


109 4 14:33 14:36 0:03

13-Feb-17 Rib 15 Angle drilling


110 14:36 14:50 0:14

13-Feb-17 MIS stamping


111 14:50 14:55 0:05

13-Feb-17 Searching for Doubler


14:55 15:00 0:05

13-Feb-17 Doubler part fitting


15:00 15:10 0:10

13-Feb-17 Waiting for detail parts


15:10 15:15 0:05

13-Feb-17 Tool changing


15:15 15:30 0:15

13-Feb-17 Tea Break


15:30 15:45 0:15

13-Feb-17 Belt Setting 13 - 16


15:45 15:57 0:12

13-Feb-17 Belt locking and skin adjustment


15:57 16:08 0:11

13-Feb-17 Waiting for Quality Inspection


16:08 16:25 0:17

13-Feb-17 Doing work in LH


16:25 16:37 0:12

13-Feb-17 Bottom skin 1-6 Loading


16:37 16:43 0:06

13-Feb-17 Removing belt


16:43 16:46 0:03

13-Feb-17 Opening of pilot holes


16:46 16:48 0:02

13-Feb-17 2041 10 Threded cleos


16:48 16:55 0:07

13-Feb-17 2042 MIS 42 skin loading (6-13)


16:55 17:07 0:12

13-Feb-17 MIS Skin Excess material cutting


17:07 17:09 0:02

13-Feb-17 MIS 42 skin loading (6-13)


17:09 17:11 0:02

13-Feb-17 Unload skin for quality check


17:11 17:13 0:02

13-Feb-17 Drilling Nose Rivet 13-16


17:13 17:16 0:03

13-Feb-17 Wash room


17:16 17:19 0:03

13-Feb-17 Collecting tools and FOD check


17:19 18:00 0:41

18:00 6:00
0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00
0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

#REF!

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00
0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00

0:00
TIME STUDY SHEET
Segment/Cell :- Wing RH Name of Person :- B Rathan Reddy Operator Name :- Lakan Skill Level :- Associate Shift :-General
Remarks
S. No Date MIS No Operation No Operation / Activity No of holes drilled / rivetted Start Finish
Delta

1 15-Feb-17 2042 40 Morning Meeting


9:00 9:14 0:14

2 15-Feb-17 Arranging for tools


9:14 9:21 0:07

3 15-Feb-17 Wood support pilot drilling


9:21 9:49 0:28

4 15-Feb-17 Rib 16- 13 wood support pilot hole drilling


15 9:49 9:56 0:07

5 15-Feb-17 Changing drill bit3.3


9:56 9:58 0:02

6 15-Feb-17 Drilling and installation of clecos of 3.3


8 9:58 10:03 0:05

7 15-Feb-17 Nose rib drilling 6-14 and installation of clecos


18 10:03 10:17 0:14

8 15-Feb-17 Drilling and installation of clecos of 4.1 mm final


50 10:17 10:30 0:13

9 15-Feb-17 Tea Break


10:30 10:50 0:20

10 15-Feb-17 Reading drawing


10:50 10:52 0:02

11 15-Feb-17 Drilling and supporting to Nanaji


10:52 10:56 0:04

12 15-Feb-17 Drilling and installation of clecos of 4.1 mm final


30 10:56 11:16 0:20

13 15-Feb-17 Changing drill bit3.3


11:16 11:17 0:01

14 15-Feb-17 Drilling and installation of clecos of 3.3


15 11:17 11:30 0:13

15 15-Feb-17 Drilling rare space with 3.3mm


346 11:30 12:24 0:54

16 15-Feb-17 Rib 8 drilling rare space with 3.3mm


10 12:24 12:30 0:06

17 15-Feb-17 Discussion with supervisor


12:30 12:35 0:05

18 15-Feb-17 Cutting clecos


12:35 12:36 0:01

19 15-Feb-17 Installing clecos at 3.3 rib


12:36 12:45 0:09

20 15-Feb-17 FOD Cleaning


12:45 13:00 0:15

21 15-Feb-17 lunch
13:00 13:30 0:30

22 15-Feb-17 Removing clecos


30 13:30 13:48 0:18

23 15-Feb-17 Skin reloading


13:48 13:54 0:06

24 15-Feb-17 Installing clecos at 3.3 rib


13:54 14:05 0:11

25 15-Feb-17 Removing clecos and unloading skin


14:05 14:22 0:17

26 15-Feb-17 Work quality meeting


14:22 14:32 0:10

27 15-Feb-17 Discussion with supervisor


14:32 14:35 0:03

28 15-Feb-17 Removing clecos


14:35 14:41 0:06

29 15-Feb-17 Deburring
14:41 15:00 0:19

30 15-Feb-17 Drawing study


15:00 15:02 0:02

31 15-Feb-17 Removing clecos


15:02 15:04 0:02

32 15-Feb-17 Deburring
15:04 15:12 0:08

33 15-Feb-17 Drawing study


15:12 15:22 6 - 15 0:10

34 15-Feb-17 Removing Clecos


15:22 15:24 0:02

35 15-Feb-17 Drawing study


15:24 15:30 0:06

36 15-Feb-17 Tea Break


15:30 15:45 0:15

37 15-Feb-17 Supporting Prabhu


15:45 16:59 1:14

38 15-Feb-17 Removing Clecos


16:59 17:05 0:06

39 15-Feb-17 Removing Skin


17:05 17:07 0:02

40 15-Feb-17 Washroom
17:07 17:12 0:05

41 15-Feb-17 Supporting Prabhu


17:12 17:22 0:10

42 15-Feb-17 Apply Sealant


17:22 17:36 0:14

43 15-Feb-17 Installing skin door (13-16)


17:36 17:40 0:04

44 15-Feb-17 Installing clecos at 13-16


17:40 17:45 0:05
45 15-Feb-17 Locking clecos (16-20)
17:45 18:15 0:30

46 15-Feb-17 FOD Cleaning


18:15 18:30 0:15

Segment/Cell :- Wing RH Name of Person :- TR Abhishek Sagar Operator Name :- Yesu Babu Skill Level :- Associate Shift :-General

47 2037 Morning Meeting


15-Feb-17 9:00 9:10 0:10

48 Removing clecos 3.3


15-Feb-17 9:10 9:20 0:10

49 Part Setting
15-Feb-17 9:20 9:30 0:10

50 Installation of celcos
15-Feb-17 9:30 9:35 0:05

51 de-rivet place
15-Feb-17 9:35 9:36 0:01

52 Quality inspection
15-Feb-17 9:36 9:38 0:02

53 Drilling of holes
15-Feb-17 10 9:38 9:50 0:12

54 De-rivet at place
15-Feb-17 9:50 9:51 0:01

55 Drilling of holes
15-Feb-17 9:51 9:59 0:08

56 TOP skin loading


15-Feb-17 9:59 10:07 0:08

57 collecting detail parts


15-Feb-17 10:07 10:08 0:01

58 Quality inspection
15-Feb-17 10:08 10:10 0:02

59 Installation of celcos
15-Feb-17 10:10 10:16 0:06

60 Drilling of holes
15-Feb-17 26 10:16 10:30 0:14

61 Tea Break
15-Feb-17 10:30 10:45 0:15

62 Drilling of holes
15-Feb-17 204 10:45 12:08 1:23

63 Removing clecos and drilling


15-Feb-17 16 12:08 12:25 0:17

64 Review drawing
15-Feb-17 12:25 12:26 0:01

65 drilling of holes 3.3mm


15-Feb-17 60 12:26 12:45 0:19

66 Removing of clecos and drilling


15-Feb-17 12:45 13:00 0:15

67 lunch
15-Feb-17 13:00 13:30 0:30

68 Drilling of holes and clecos


15-Feb-17 15 13:30 13:45 0:15

69 Skin loading lower side re-loading


15-Feb-17 13:45 13:52 0:07

70 Loading of clecos 3.3mm


15-Feb-17 13:52 14:05 0:13

71 loading of parts and setting clecos


15-Feb-17 14:05 14:23 0:18

72 Discussion with supervisor


15-Feb-17 14:23 14:32 0:09

73 Removing of clecos
15-Feb-17 14:32 14:36 0:04

74 Unloading of lower skin


15-Feb-17 14:36 14:41 0:05

75 Installing 3.3. clecos


15-Feb-17 14:41 14:49 0:08

76 Installing clecos
15-Feb-17 14:49 14:55 0:06

77 Deburring
15-Feb-17 14:55 15:30 0:35

78 Tea Break
15-Feb-17 15:30 15:45 0:15

79 panel drilling and wood holding


15-Feb-17 15:45 16:10 0:25

80 Removing tools
15-Feb-17 16:10 16:15 0:05

81 Reloading tool
15-Feb-17 16:15 16:54 0:39

82 Removal of bottom skin clecos


15-Feb-17 16:54 17:05 0:11

83 Removal of botton skin


15-Feb-17 17:05 17:07 0:02

84 De-rivet doubler
15-Feb-17 17:07 17:30 0:23

85 Sealant application
15-Feb-17 17:30 17:36 0:06

86 Loading rivet squeezer


15-Feb-17 17:36 17:39 0:03

87 Loading of rivet squeezer


15-Feb-17 9 17:39 17:46 0:07

88 Stringer joining
15-Feb-17 17:46 18:08 0:22

89 Review drawing
15-Feb-17 18:08 18:10 0:02
90 FOD Cleaning
15-Feb-17 18:10 18:30 0:20

Segment/Cell :- Wing RH Name of Person :- Abhishek Sagar Operator Name :- Naveen Skill Level :- Associate Shift :-General

91 2037 Morning Meeting


15-Feb-17 9:00 9:10 0:10

92 Removal of clecos 3.3mm


15-Feb-17 9:10 9:20 0:10

93 Part Setting
15-Feb-17 9:20 9:30 0:10

94 installing clecos 3.3.


15-Feb-17 9:30 9:35 0:05

95 De-rivet at place
15-Feb-17 9:35 9:36 0:01

96 Quality inspection
15-Feb-17 9:36 9:38 0:02

97 drilling of holes
15-Feb-17 10 9:38 9:51 0:13

98 Installation of celcos 3.3


15-Feb-17 9:51 9:53 0:02

99 drilling of holes
15-Feb-17 9:53 9:59 0:06

100 Installing of clecos 3.3


15-Feb-17 9:59 10:07 0:08

101 Quality inspection


15-Feb-17 10:07 10:10 0:03

102 Installation of clecos 2.4


15-Feb-17 10:10 10:16 0:06

103 DR at place
15-Feb-17 10:16 10:17 0:01

104 Installing celcos and drilling


15-Feb-17 26 10:17 10:30 0:13

105 Tea Break


15-Feb-17 10:30 10:45 0:15

106 Drilling of holes and loading clecos


15-Feb-17 300 10:45 12:45 2:00

107 FOD Cleaning


15-Feb-17 12:45 13:00 0:15

108 Lunch
15-Feb-17 13:00 13:30 0:30

109 Drilling of holes


15-Feb-17 20 13:30 13:40 0:10

110 Removing clecos


15-Feb-17 13:40 13:45 0:05

111 Lower Skin loading


15-Feb-17 13:45 13:52 0:07

Loading of clecos 3.3mm


15-Feb-17 13:52 14:05 0:13

loading of parts and setting clecos


15-Feb-17 14:05 14:11 0:06

Drilling holes
15-Feb-17 51 14:11 14:20 0:09

Removing clecos
15-Feb-17 14:20 14:23 0:03

Discussion with supervisor


15-Feb-17 14:23 14:32 0:09

Removing of clecos
15-Feb-17 14:32 14:38 0:06

Unloading of lower skin


15-Feb-17 14:38 14:41 0:03

Deburring
15-Feb-17 14:41 14:49 0:08

Discussion with supervisor


15-Feb-17 14:49 14:51 0:02

Deburring
15-Feb-17 14:51 15:00 0:09

Applying masking tape


15-Feb-17 15:00 15:20 0:20

Sealant application
15-Feb-17 15:20 15:30 0:10

Tea Break
15-Feb-17 15:30 15:45 0:15

Sealant application
15-Feb-17 15:45 16:30 0:45

panel final size drilling


15-Feb-17 16:30 16:55 0:25

Removal of bottom skin clecos


15-Feb-17 16:55 17:05 0:10

Removal of bottom skin


15-Feb-17 17:05 17:07 0:02

Doubler de-rivet
15-Feb-17 17:07 17:30 0:23

Removing packer and clecos


15-Feb-17 17:30 17:35 0:05

Loading of top skin 13-16


15-Feb-17 17:35 17:37 0:02

Loading of clecos 13-16


15-Feb-17 17:37 18:15 0:38

FOD Cleaning
15-Feb-17 18:15 18:30 0:15

Segment/Cell :- Wing RH Name of Person :- Naidu Operator Name :- Topendra Skill Level :- Associate Shift :-General
#VALUE!
Morning Meeting
15-Feb-17 9:00 9:14 0:14

Tools arranged
15-Feb-17 9:14 9:22 0:08

Nose rib final size drilling


15-Feb-17 16 9:22 9:40 0:18

Packer hole drilling


15-Feb-17 23 9:40 10:31 0:51

Tea Break
15-Feb-17 10:31 10:46 0:15

Packer hole drilling


15-Feb-17 15 10:46 11:46 1:00

Packer loading
15-Feb-17 11:46 11:47 0:01

Open all pilot holes drilling


15-Feb-17 97 11:47 12:00 0:13

Cleco locking
15-Feb-17 12:00 12:10 0:10

50 Nose rib final size drilling


15-Feb-17 36 12:10 12:25 0:15

50 Backside holding sim


15-Feb-17 12:25 12:40 0:15

Cleaning of chips
15-Feb-17 12:40 12:48 0:08

FOD Cleaning
15-Feb-17 12:48 13:00 0:12

Lunch
15-Feb-17 13:00 13:30 0:30

50 4.1 holes locking, threaded


15-Feb-17 13:30 14:22 0:52

Meeting
15-Feb-17 14:22 14:32 0:10

Discussion with supervisor


15-Feb-17 14:32 14:36 0:04

Drawing study
15-Feb-17 14:36 14:40 0:04

Supporting tool
15-Feb-17 14:40 14:50 0:10

Tool locking
15-Feb-17 14:50 14:51 0:01

2042 Arranged drawing


15-Feb-17 14:51 14:53 0:02

Marking hole size


15-Feb-17 14:53 14:55 0:02

Hole drilling 6-13


15-Feb-17 14:55 15:15 0:20

Rib-6 final drilling


15-Feb-17 15:15 15:23 0:08

Threaded cleco locking


15-Feb-17 15:23 15:28 0:05

Panel drilling
15-Feb-17 15:28 15:30 0:02

Tea Break
15-Feb-17 15:30 15:45 0:15

Rib-6 final drilling


15-Feb-17 15:45 16:10 0:25

Panel cleco locking


15-Feb-17 16:10 16:50 0:40

6-13 skin cleco removal


15-Feb-17 28 16:50 17:05 0:15

Removing skin
15-Feb-17 13 17:05 17:07 0:02

Removing cutouts
15-Feb-17 17:07 17:09 0:02

Locking two skins


15-Feb-17 17:09 17:10 0:01

Removal of clecos
15-Feb-17 17:10 17:22 0:12

Cleaning of chips
15-Feb-17 17:22 17:24 0:02

MIS Holding & Scanning


15-Feb-17 17:24 17:25 0:01

MIS Scanning
15-Feb-17 17:25 17:36 0:11

Joining clips sealent


15-Feb-17 17:36 17:40 0:04

Locking clips
15-Feb-17 17:40 17:45 0:05

Searching for buttons


15-Feb-17 17:45 17:50 0:05

Squeezer setting
15-Feb-17 12 17:50 18:04 0:14

Segment/Cell :- Wing RH Name of Person :- Srujan Operator Name :- Prabhu Skill Level :- Associate Shift :-General
#VALUE!

2035 Bar code scanning


15-Feb-17 8:58 8:59 0:01

Waiting for meeting


15-Feb-17 8:59 9:00 0:01

Morning Meeting
15-Feb-17 9:00 9:14 0:14

Top skin final


15-Feb-17 9:14 9:25 0:11
Bottom skin reloading
15-Feb-17 9:25 9:30 0:05

Cleco locking of bottom skin


15-Feb-17 32 9:30 9:42 0:12

Cleco locking of top skin


15-Feb-17 11 9:42 9:48 0:06

Pilot hole drilling of top skin


15-Feb-17 9:48 9:58 0:10

Final size drilling of top skin


15-Feb-17 99 9:58 10:07 0:09

Removing of cleco top skin


15-Feb-17 30 10:07 10:16 0:09

Unloading of top skin


15-Feb-17 10:16 10:17 0:01

Pilot-1 hole,Final size 2 holes


15-Feb-17 3 10:17 10:25 0:08

Removing clecos for bottom skin


15-Feb-17 30 10:25 10:28 0:03

Unloading of bottom skin


15-Feb-17 10:28 10:31 STA 16-20 0:03

Tea Break
15-Feb-17 10:31 10:45 STA 13-16 0:14

Placing clecos at top skin


15-Feb-17 20 10:45 10:55 0:10

Pilot hole drilling of top skin


15-Feb-17 6 10:55 10:58 STA 13-16 0:03

Collecting drill bits


15-Feb-17 10:58 11:00 0:02

Pilot hole drilling of top skin


15-Feb-17 41 11:00 11:15 STA 13-16 0:15

Waiting for drill bit


15-Feb-17 11:15 11:25 0:10

Joining drilling-16
15-Feb-17 11:25 11:35 0:10

Rework
15-Feb-17 11:35 11:50 0:15

16 Joining final drilling


15-Feb-17 88 11:50 12:01 0:11

Marking at clip
15-Feb-17 12:01 12:15 0:14

Final size drilling of top skin


15-Feb-17 12:15 12:20 STA 13-16 0:05

Unloading of top skin 16-20


15-Feb-17 12:20 12:22 0:02

2035 Deburring of stringers


15-Feb-17 12:22 12:40 0:18

Deburring of bottom skins


15-Feb-17 12:40 12:53 0:13

FOD Cleaning
15-Feb-17 12:53 13:00 0:07

Lunch
15-Feb-17 13:00 13:30 0:30

Clip install
15-Feb-17 13:30 13:40 0:00

Preparation of lower skinlocking


15-Feb-17 13:40 13:48 #REF!

Doubler deburring
15-Feb-17 13:48 14:23 0:35

Meeting
15-Feb-17 14:23 14:32 0:09

13-16 Bottom skin removing


15-Feb-17 14:32 14:40 0:08

13-16,16-20 lowerskin locking


15-Feb-17 14:40 14:54 0:14

Final size drilling of bottom skin


15-Feb-17 14:54 14:57 0:03

Removing of clecos
15-Feb-17 14:57 14:59 0:02

Loading of template
15-Feb-17 14:59 15:05 With placing of clecos 0:06

Marking of bottom skin hole


15-Feb-17 15:05 15:30 0:25

Tea Break
15-Feb-17 15:30 15:47 0:17

Support trimming of skin 16-20


15-Feb-17 15:47 16:02 0:15

Filing
15-Feb-17 16:02 17:10 1:08

MIS Studying
15-Feb-17 17:10 17:15 0:05

Waiting for sealent C-12


15-Feb-17 17:15 17:22 0:07

Bar code scanning


15-Feb-17 17:22 17:23 0:01

Applying sealent C-12


15-Feb-17 17:23 17:47 0:24

Loading of bottom skin


15-Feb-17 17:47 17:49 STA 16-20 0:02

Placing clecos at bottom skin


15-Feb-17 17:49 17:49 STA 16-20 0:00

Segment/Cell :- Wing RH Name of Person :- Srujan Operator Name :- Ganesh Skill Level :- Associate Shift :-General
#VALUE!
15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17
TIME STUDY SHEET
Segment/Cell :- Wing RH Name of Person :- Naidu Operator Name :- Ganesh Skill Level :- Associate Shift :-General
Remarks
S. No Date MIS No Operation No Operation / Activity No of holes drilled / rivetted Start Finish
Delta

1 16-Feb-17 2040.1 Morning Meeting


9:00 9:15 0:15

2 16-Feb-17 Arranging for tools


9:15 9:25 0:10

3 16-Feb-17 CSK Setting


9:25 9:30 0:05

4 16-Feb-17 Engaging Clecos


9:30 9:50 0:20

5 16-Feb-17 220 Main Spar riveting


42 9:50 10:30 0:40

6 16-Feb-17 Tea Break


10:30 10:45 0:15

7 16-Feb-17 Arranging riveting


10:45 10:46 0:01

8 16-Feb-17 Main Spar riveting


101 10:46 11:37 0:51

9 16-Feb-17 Cleaning
11:37 11:39 0:02

10 16-Feb-17 RIB 20 riveting


11:39 11:49 0:10

11 16-Feb-17 De-Riveting
1 11:49 11:50 0:01

12 16-Feb-17 Re-Install
1 11:50 11:51 0:01

13 16-Feb-17 Rear Spar riveting 20-19


29 11:51 12:05 0:14

14 16-Feb-17 Stringer riveting 20-19


19 12:05 12:16 0:11

15 16-Feb-17 Rear Spar riveting 19-18


32 12:16 12:26 0:10

16 16-Feb-17 De-Riveting
1 12:26 12:27 0:01

17 16-Feb-17 Reinstall
1 12:27 12:28 0:01

18 16-Feb-17 STR 8-9-18 riveting


24 12:28 12:34 0:06

19 16-Feb-17 Cleaning
12:34 12:38 0:04

20 16-Feb-17 STR 8-18-17 riveting


17 12:38 12:53 0:15

21 16-Feb-17 FOD cleaning


12:53 13:00 0:07

22 16-Feb-17 Lunch
13:00 13:30 0:30

23 16-Feb-17 STR riveting 18-16


15 13:30 13:47 0:17

24 16-Feb-17 Cleaning
13:47 13:51 0:04

25 16-Feb-17 Riveting rear spar


13:51 13:59 0:08

26 16-Feb-17 Collecting sealant


13:59 14:05 0:06

27 16-Feb-17 Riveting rear spar 16-18


15 14:05 14:22 0:17

28 16-Feb-17 STR riveting


9 14:22 14:28 0:06

29 16-Feb-17 CSK
14:28 14:29 0:01

30 16-Feb-17 Cleaning
14:29 14:30 0:01

31 16-Feb-17 Applying sealant


14:30 14:40 0:10

32 16-Feb-17 Cleaning
14:40 14:44 0:04

33 16-Feb-17 STR Riveting


13 14:44 14:58 0:14

34 16-Feb-17 STR Riveting


30 14:58 15:12 0:14

35 16-Feb-17 Rib 19-20 STR riveting


10 15:12 15:21 0:09

36 16-Feb-17 Rib 18 STR riveting


15:21 15:30 0:09

37 16-Feb-17 Tea Break


15:30 15:45 0:15

38 16-Feb-17 CSK
15:45 15:55 0:10

39 16-Feb-17 Rib 17 STR riveting


23 15:55 16:25 0:30

40 16-Feb-17 Rib 18 STR riveting


11 16:25 16:40 0:15

41 16-Feb-17 Rib 19 STR riveting


9 16:40 16:49 0:09

42 16-Feb-17 Nose Rib 20 StR riveting


4 16:49 17:02 0:13

43 16-Feb-17 Collecting new uniform


17:02 17:17 0:15

44 16-Feb-17 Nose Rib 20 StR riveting


10 17:17 17:46 0:29
45 16-Feb-17 Nose Rib 19 StR riveting
7 17:46 18:00 0:14

16-Feb-17 Nose Rib 18 StR riveting


7 18:00 18:10 0:10

16-Feb-17 Nose Rib 17 StR riveting


4 18:10 18:15 0:05

46 16-Feb-17 FOD cleaning


18:00 18:30 0:30

Segment/Cell :- Wing RH Name of Person :- Naidu Operator Name :- Prabhu Skill Level :- Associate Shift :-General

47 16-Feb-17 2040.1 Morning Meeting


9:00 9:15 0:15

48 16-Feb-17 Arranging Tools


9:15 9:25 0:10

49 16-Feb-17 CSK Main Spar


9:25 9:35 0:10

50 16-Feb-17 Wet installation + cleaning


9:35 9:50 0:15

51 16-Feb-17 220 Main Spar Bucking


42 9:50 10:30 0:40

52 16-Feb-17 Tea Break


10:30 10:45 0:15

53 16-Feb-17 Arranged lights


10:45 10:46 0:01

54 16-Feb-17 Main Spar Bukcing


101 10:46 11:37 0:51

55 16-Feb-17 Cleaning
11:37 11:39 0:02

56 16-Feb-17 Rib 20 riveting main spar down


20 11:39 11:49 0:10

57 16-Feb-17 Cleaning
11:49 11:50 0:01

58 16-Feb-17 Re-Install
1 11:50 11:51 0:01

59 16-Feb-17 Rear Spar Riveting 20+9


18 11:51 12:05 0:14

60 16-Feb-17 STR S riveting


18 12:05 12:16 0:11

61 16-Feb-17 Rear Spar Bucking 19-18


22 12:16 12:26 0:10

62 16-Feb-17 De-Riveting
1 12:26 12:28 0:02

63 16-Feb-17 STR - 8 19-18 Riveting


24 12:28 12:34 0:06

64 16-Feb-17 Cleaning
12:34 12:38 0:04

65 16-Feb-17 STR - 8 18-17 Riveting


12:38 12:53 0:15

66 16-Feb-17 FOD cleaning


12:53 13:00 0:07

67 16-Feb-17 Lunch
13:00 13:30 0:30

68 16-Feb-17 STR Riveting


15 13:30 13:47 0:17

69 16-Feb-17 Rear Spar CSK


13:47 13:51 0:04

70 16-Feb-17 Riveting Rear Spar


13:51 13:54 0:03

71 16-Feb-17 Cleaning
13:54 14:05 0:11

72 16-Feb-17 Riveting rear spar


15 14:05 14:22 0:17

73 16-Feb-17 STR Riveting


14:22 14:28 0:06

74 16-Feb-17 Cleaning
14:28 14:30 0:02

75 16-Feb-17 CSK
14:30 14:39 0:09

76 16-Feb-17 Wash Room


14:39 14:46 0:07

77 16-Feb-17 STR Riveting


13 14:46 14:56 0:10

78 16-Feb-17 Cleaning
14:56 14:58 0:02

79 16-Feb-17 STR Riveting


30 14:58 15:12 0:14

80 16-Feb-17 Rib 19-20 STR riveting


10 15:12 15:21 0:09

81 16-Feb-17 Rib 18 STR riveting


28 15:21 15:30 0:09

82 16-Feb-17 Tea Break


15:30 15:45 0:15

83 16-Feb-17 Cleaning rib 16


15:45 15:55 0:10

84 16-Feb-17 Rib 17 STR riveting


23 15:55 16:25 0:30

85 16-Feb-17 Rib 18 STR riveting


11 16:25 16:40 0:15

86 16-Feb-17 Rib 19 STR riveting


10 16:40 16:49 0:09

87 16-Feb-17 Nose rib 20 SR riveting


9 16:49 17:02 0:13
88 16-Feb-17 Uniform collecion
17:02 17:17 0:15

89 16-Feb-17 Nose rib 20 STR riveting


10 17:17 17:46 0:29

90 16-Feb-17 Nose rib 19 STR riveting


7 17:46 18:05 0:19

91 16-Feb-17 Nose rib 18 STR riveting


7 18:05 18:10 0:05

92 16-Feb-17 Nose rib 17 STR riveting


18:10 18:15 0:05

93 16-Feb-17 FOD cleaning


18:15 18:30 0:15

Segment/Cell :- Wing RH Name of Person :- Operator Name :- Naveen Skill Level :- Associate Shift :-General

91
15-Feb-17 9:00 9:10 0:10

92
15-Feb-17 9:10 9:20 0:10

93
15-Feb-17 9:20 9:30 0:10

94
15-Feb-17 9:30 9:35 0:05

95
15-Feb-17 9:35 9:36 0:01

96
15-Feb-17 9:36 9:38 0:02

97
15-Feb-17 10 9:38 9:51 0:13

98
15-Feb-17 9:51 9:53 0:02

99
15-Feb-17 9:53 9:59 0:06

100
15-Feb-17 9:59 10:07 0:08

101
15-Feb-17 10:07 10:10 0:03

102
15-Feb-17 10:10 10:16 0:06

103
15-Feb-17 10:16 10:17 0:01

104
15-Feb-17 26 10:17 10:30 0:13

105
15-Feb-17 10:30 10:45 0:15

106
15-Feb-17 300 10:45 12:45 2:00

107
15-Feb-17 12:45 13:00 0:15

108
15-Feb-17 13:00 13:30 0:30

109
15-Feb-17 20 13:30 13:40 0:10

110
15-Feb-17 13:40 13:45 0:05

111
15-Feb-17 13:45 13:52 0:07

15-Feb-17 13:52 14:05 0:13

15-Feb-17 14:05 14:11 0:06

15-Feb-17 51 14:11 14:20 0:09

15-Feb-17 14:20 14:23 0:03

15-Feb-17 14:23 14:32 0:09

15-Feb-17 14:32 14:38 0:06

15-Feb-17 14:38 14:41 0:03

15-Feb-17 14:41 14:49 0:08

15-Feb-17 14:49 14:51 0:02

15-Feb-17 14:51 15:00 0:09

15-Feb-17 15:00 15:20 0:20

15-Feb-17 15:20 15:30 0:10

15-Feb-17 15:30 15:45 0:15

15-Feb-17 15:45 16:30 0:45

15-Feb-17 16:30 16:55 0:25

15-Feb-17 16:55 17:05 0:10

15-Feb-17 17:05 17:07 0:02

15-Feb-17 17:07 17:30 0:23


15-Feb-17 17:30 17:35 0:05

15-Feb-17 17:35 17:37 0:02

15-Feb-17 17:37 18:15 0:38

15-Feb-17 18:15 18:30 0:15

Segment/Cell :- Wing RH Name of Person :- Operator Name :- Topendra Skill Level :- Associate Shift :-General
#VALUE!

15-Feb-17 9:00 9:14 0:14

15-Feb-17 9:14 9:22 0:08

15-Feb-17 16 9:22 9:40 0:18

15-Feb-17 23 9:40 10:31 0:51

15-Feb-17 10:31 10:46 0:15

15-Feb-17 15 10:46 11:46 1:00

15-Feb-17 11:46 11:47 0:01

15-Feb-17 97 11:47 12:00 0:13

15-Feb-17 12:00 12:10 0:10

50
15-Feb-17 36 12:10 12:25 0:15

50
15-Feb-17 12:25 12:40 0:15

15-Feb-17 12:40 12:48 0:08

15-Feb-17 12:48 13:00 0:12

15-Feb-17 13:00 13:30 0:30

50
15-Feb-17 13:30 14:22 0:52

15-Feb-17 14:22 14:32 0:10

15-Feb-17 14:32 14:36 0:04

15-Feb-17 14:36 14:40 0:04

15-Feb-17 14:40 14:50 0:10

15-Feb-17 14:50 14:51 0:01

2042
15-Feb-17 14:51 14:53 0:02

15-Feb-17 14:53 14:55 0:02

15-Feb-17 14:55 15:15 0:20

15-Feb-17 15:15 15:23 0:08

15-Feb-17 15:23 15:28 0:05

15-Feb-17 15:28 15:30 0:02

15-Feb-17 15:30 15:45 0:15

15-Feb-17 15:45 16:10 0:25

15-Feb-17 16:10 16:50 0:40

15-Feb-17 28 16:50 17:05 0:15

15-Feb-17 13 17:05 17:07 0:02

15-Feb-17 17:07 17:09 0:02

15-Feb-17 17:09 17:10 0:01

15-Feb-17 17:10 17:22 0:12

15-Feb-17 17:22 17:24 0:02

15-Feb-17 17:24 17:25 0:01

15-Feb-17 17:25 17:36 0:11

15-Feb-17 17:36 17:40 0:04

15-Feb-17 17:40 17:45 0:05

15-Feb-17 17:45 17:50 0:05

15-Feb-17 12 17:50 18:04 0:14


Segment/Cell :- Wing RH Name of Person :- Operator Name :- Prabhu Skill Level :- Associate Shift :-General
#VALUE!

2035
15-Feb-17 8:58 8:59 0:01

15-Feb-17 8:59 9:00 0:01

15-Feb-17 9:00 9:14 0:14

15-Feb-17 9:14 9:25 0:11

15-Feb-17 9:25 9:30 0:05

15-Feb-17 32 9:30 9:42 0:12

15-Feb-17 11 9:42 9:48 0:06

15-Feb-17 9:48 9:58 0:10

15-Feb-17 99 9:58 10:07 0:09

15-Feb-17 30 10:07 10:16 0:09

15-Feb-17 10:16 10:17 0:01

15-Feb-17 3 10:17 10:25 0:08

15-Feb-17 30 10:25 10:28 0:03

15-Feb-17 10:28 10:31 STA 16-20 0:03

15-Feb-17 10:31 10:45 STA 13-16 0:14

15-Feb-17 20 10:45 10:55 0:10

15-Feb-17 6 10:55 10:58 STA 13-16 0:03

15-Feb-17 10:58 11:00 0:02

15-Feb-17 41 11:00 11:15 STA 13-16 0:15

15-Feb-17 11:15 11:25 0:10

15-Feb-17 11:25 11:35 0:10

15-Feb-17 11:35 11:50 0:15

15-Feb-17 88 11:50 12:01 0:11

15-Feb-17 12:01 12:15 0:14

15-Feb-17 12:15 12:20 STA 13-16 0:05

15-Feb-17 12:20 12:22 0:02

2035
15-Feb-17 12:22 12:40 0:18

15-Feb-17 12:40 12:53 0:13

15-Feb-17 12:53 13:00 0:07

15-Feb-17 13:00 13:30 0:30

15-Feb-17 13:30 13:40 0:00

15-Feb-17 13:40 13:48 #REF!

15-Feb-17 13:48 14:23 0:35

15-Feb-17 14:23 14:32 0:09

15-Feb-17 14:32 14:40 0:08

15-Feb-17 14:40 14:54 0:14

15-Feb-17 14:54 14:57 0:03

15-Feb-17 14:57 14:59 0:02

15-Feb-17 14:59 15:05 With placing of clecos 0:06

15-Feb-17 15:05 15:30 0:25

15-Feb-17 15:30 15:47 0:17

15-Feb-17 15:47 16:02 0:15

15-Feb-17 16:02 17:10 1:08

15-Feb-17 17:10 17:15 0:05

15-Feb-17 17:15 17:22 0:07


15-Feb-17 17:22 17:23 0:01

15-Feb-17 17:23 17:47 0:24

15-Feb-17 17:47 17:49 STA 16-20 0:02

15-Feb-17 17:49 17:49 STA 16-20 0:00

Segment/Cell :- Wing RH Name of Person :- Srujan Operator Name :- Ganesh Skill Level :- Associate Shift :-General
#VALUE!

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17 0:00

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17

15-Feb-17
15-Feb-17

15-Feb-17

15-Feb-17

You might also like