You are on page 1of 1

AAV AAV

AAV AAV IV
QIBL
A

8
IV IV IV

8 8

FCU-E-FF-02 FCU-E-FF-01 FCU-E-AG-31


0.3.24
0.3.23 MEP
PRESSURISATION ROOM 2 CORRIDOR 4 1. HIGH LEVEL SERVICES SHALL NOT BE INSTALLED ANY LOWER THAN
FCU-E-AG-23 FCU-E-AG-24 FCU-E-AG-25 FCU-E-AG-34 FCU-E-AG-21 FCU-E-AG-22 FCU-E-AG-33 FCU-E-AG-32
BACKUP 3000mm ABOVE FINISHED FLOOR LEVEL.
0.3.34 0.3.32
0.3.35 0.2.3 0.3.37 2. MINOR BUILDERS-WORK REQUIREMENTS AND FINAL CO-ORDINATION
MEP IRRIGATION
PRESSURISATION ROOM 3 WASTE 3 TEL IT STREET LEVEL TO BE CARRIED OUT BY THE CONTRACTOR.
CORRIDOR 7 TANK 2
3. SERVICES TO BE CO-ORDINATED WITH THE CEILING AND ALL
IV SUPPORT SYSTEMS.
8 8
8 4. FINAL LOCATION OF ALL EQUIPMENT TO BE CO-ORDINATED BY THE
IV CONTRACTOR.
5. AIR VENTS SHALL BE PROVIDED AT ALL HIGH POINTS OF THE
SYSTEM AND DRAIN POINTS AT ALL LOW POINTS OF THE SYSTEM.
7 6. EXPANSION AND SUPPORT TO BE DETAILED BY THE CONTRACTOR.
FCU-E-AG-35 FCU-E-CL-17
FCU-E-AG-36
1.3.35
1.EE.15 AHU 11
1.EE.14 VENTILATION
T.B.D 0.EE.9
T.B.D PLANTROOM
TOP ROOF LEVEL REPEATER FIRE
PANEL ROOM FCU-E-AG-02
FCU-E-AG-28 FCU-E-AG-29 0.3.21
FCU-E-AG-03
OMITTED OMITTED MEP
0.3.15 AAV AAV OFFSET AT
MEP ACCESS AREA CORRIDOR 2
BOTTOM
STREET LEVEL ROOF LEVEL
8 TOP ROOF LEVEL

IV
8 OFFSET AT BOTTOM ROOF LEVEL
IV

9 9
FCU-E-CL-29 FCU-E-CL-30 FCU-E-CL-32A FCU-E-CL-22 FCU-E-CL-26 FCU-E-CL-21 FCU-E-CL-25
2.3.70 2.3.69 2.1.19 2.3.20 2.1.17 2.1.20 BOTTOM ROOF LEVEL
SMOKE VENTILATION MEP RETAIL 2.2.21 INFORMATION TRAVEL RETAIL
PLANTROOM CORRIDOR 9 AREA 2 TICKET OFFICE DESK CENTER AREA 1

7
FCU-E-CL-96 CRAC-016-CHW CRAC-021-CHW FCU-E-CL-33 FCU-E-CL-34 FCU-E-CL-35
2.2.22 2.3.40 2.3.72
9 BOH SPS MV 2.3.37 MEP 2.3.73 AHU 10
CORRIDOR 5 ROOM 2 TEL/IT 2 CORRIDOR 10 VENTILATION PLANTROOM
FCU-E-CL-31A FCU-E-CL-31B FCU-E-CL-31C
2.1.21
2.3.71 RETAIL
VENTILATION PLANTROOM AREA 4
IV

10
FCU-E-CL-16B FCU-E-CL-94 FCU-E-CL-95 CRAC-015-CHW FCU-E-CL-19 FCU-E-CL-23 FCU-E-CL-24C FCU-E-CL-24B FCU-E-CL-24A FCU-E-CL-28 CRAC-043-CHW
2.3.42 2.2.21 2.3.40
ELECTRICAL 2.2.17 BOH SPS LV 2.3.43 2.3.46 2.3.35 TCP AHU 02 2.3.34 CRAC-020-CHW FCU-E-PL-73
ROOM 4 STORAGE CORRIDOR 4 ROOM 2 ACBS 2 WASTE 2 7 6 6 AHU TCP 2 MCR 3/4 4.3.10
8 EAST TUNNEL 4.3.9 ELECTRICAL
COOLING AHU TEL/IT 2 ROOM 2
AHU 04 AHU 06 AHU 02 (BY OTHERS) UPPER PLATFORM LEVEL

2.3.44
HVAC 2a

9
FCU-E-CL-16C FCU-E-CL-16D
2.1.18
2.2.16 RETAIL
STATION CONTROL ROOM AREA 3
CONCOURSE LEVEL
FCU-W-UL-97 FCU-E-UL-74 CRAC-023-CHW FCU-E-UL-75 FCU-E-UL-76 FCU-E-UL-77 FCU-E-UL-98 FCU-E-UL-99
5.3.13 5.3.14
5.3.8 5.3.9 5.3.10 5.3.11 5.3.12 5.3.16 ELECTRICAL ELECTRICAL
T.B.D 1 T.B.D 2 TEL/IT T.B.D 3 T.B.D 4 T.B.D 5 ROOM 3 ROOM 4

UNDER PLATFORM LEVEL


8

REFER TO
AVV
DD2 (DETAILED)
DISTRICT FCP01 A B C ACP01 A B C TCP01 A B C
FCU-E-TL-85 FCU-E-TL-84a FCU-E-TL-84b COOLING FCU CHW AHU CHW
TUNNEL STATION - THE WHITE PALACE
6.3.29 WORK CIRCUIT COOLING
CIRCUIT
ELECTRICAL 6.3.34
WASTE 2
PACKAGE FOR CIRCUIT CHILLED WATER SYSTEMS
ROOM 3 ETS DETAILS IV IV
DC SCHEMATIC (EAST)
DIRT AIR IV CS IV CS IV CS
SEPARATOR 1

HM HM HM

T T T T T T
T T T T T T

FCU-E-TL-83 FCU-E-TL-82 FCU-E-TL-81 FCU-E-TL-90 FCU-E-TL-89 FCU-E-TL-88 FCU-E-TL-91 FCU-E-TL-92 FCU-E-TL-93 FCU-E-TL-87 FCU-E-TL-86

6.3.33
FIRE FIGHTING TANK ROOM 1
6.3.32
ETS/CHW PUMP ROOM
6.3.31
T.B.D 2
6.3.30
T.B.D 1 P8
TRANSFER LEVEL DC DC DC DC DC DC DC DC DC DC 7/19/2017 12:27:34 PM