DAILY PROGRESS REPORT OF (ALL AREA)

SILVER PROJECT
Wednesday 30 - 04 - 2019
DETAIL SCHEDULE OF SILVER PROJECT PT.UNILEVER INDONESIA (PERIMETER, STAIR,MOSQUE & R&D ROOM)
DATE ISUED = 30-04-2019

Jan-19 Feb-19 Mar-19 Apr-19


NO DESCRIPTION PROGRES STATUS

15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
I ICE AREA
I ROAD
1 FRONT ROAD
Site Clearing
100% DONE
Excavation
100% DONE
Backfill

Compaction
100% DONE
Pouring Concrete
100% DONE

2 MIDDLE ROAD
Site Clearing
100% DONE
Excavation
100% DONE
Backfill
100% DONE
Compaction
100% DONE
Pouring Concrete
100% DONE

3 BACK ROAD
Site Clearing
100% DONE
Excavation
100% DONE
Backfill
100% DONE
Compaction
100% DONE
Pouring Concrete
100% DONE

II FENCE
1 BACK UTILITY BUILDING
100% DONE

III BUILDING
1 STAIR
Demolition of Existing Stair
100% DONE
Modification of Existing Stair
100% DONE

2 IT BUILDING
Site Clearing 100% DONE

Excavation 100% DONE

Back Fill 100% DONE

Compaction 100% DONE

Foundation 100% DONE

Tie Beam 100% DONE

Column 100% DONE

Beam 100% DONE

Slab 100% DONE

Beam and Top Slab Formwork


100% DONE

Beam, Top Slab & Faschia (Until Curing time & Minimum
concrete grade reached for formwork reshoring)
100% DONE
Floor (Related with reshoring time)
100% DONE
Wall
100% DONE
Door & Window (Related with reshoring time) FABRIKASI INSTALL
100% DONE
Lighting (Related with reshoring time)
100% DONE ` ;/

Finishing (Rendering, Rendering curing time, painting, dak


Finishing, Ceiling painting, Related with reshoring time)
90% ON PROCESS

II SCC AREA
I ROAD
1 BACK ROAD (Trash Building Area)
Site Clearing
100% DONE
Excavation
100% DONE
Backfill
100% DONE
Compaction
100% DONE
Pouring Concrete
100% DONE

II FENCE
1 ICE - SCC
100% DONE
2 TRASH BUILDING AREA
100% DONE
3 CARD BOARD BOX AREA
100% DONE
4 SCC - TBB
100% DONE

5 ICE (Between Utility Room & ICE Area)


100% DONE

III FOOT PATH


1 SCC FOOT PATH
Drilling 100% DONE

Strauss Pile 100% DONE

Excavation 100% DONE

Compaction 100% DONE

Demolition of Existing Railing 100% DONE

Install Paving 100% DONE FINISHING REMAINING

Install Roof Frame 100% DONE

Kanstin 100% DONE


FINISHING REMAINING
Install Metal Sheet Roof 100% DONE

III BUILDING
1 MOSQUE ROOM
Inner Wall
100% DONE
Outter Wall
100% DONE
Doors & Windows
100% DONE
Ceiling
100% DONE
Floor
100% DONE OFF AUDIT
Lighting
100% DONE
Inner Stair & Platform Railing
100% DONE
Outter Platform
100% DONE
Canopy
100% DONE
Sanitary
100% DONE

2 R&D ROOM (Excluded LPG & Storage room)


Protection Partition
100% DONE
Demolition
100% DONE
Wall (Plastering, rendering, glass partition istln, painting. Wall i
ceramic tile)
100% DONE OFF OFF AUDIT OFF
Floor (Ceramic Tile)
100% DONE OFF OFF AUDIT OFF
Ceiling
100% DONE OFF OFF AUDIT OFF
Doors & Windows
100% DONE OFF OFF AUDIT OFF
Lighting
100% DONE OFF OFF AUDIT OFF
Sanitary & Plumbing
100% DONE OFF OFF AUDIT OFF

3 LPG & Storage

Sloof 100% DONE

Practice column 100% DONE

Heble 100% DONE

Beams 100% DONE

Plaster & rendering 100% DONE

Painting 80% ON PROCESS

Floor (Ceramic Tile) 85% ON PROCESS

Ceiling 100% DONE

Doors & Windows 90% ON PROCESS

Lighting 80% ON PROCESS

Roof 100% DONE

Stair 100% DONE


4 TRASH ROOM
Site Clearing
100% DONE
Excavation
100% DONE
Back Fill
100% DONE
Compaction
100% DONE
Foundation
100% DONE
Tie Beam
100% DONE
Column
100% DONE
Beam
100% DONE
Slab
100% DONE
Wall (Plastering, rendering, painting)
100% DONE PAINTING REMAINING
OFF AUDIT
Ramp finish trowel
100% DONE

Trench cover webforge 100% DONE

Steel framework (include column, rafter, and roof frame)


100% DONE
Roof cover, lisplank, & faschia
100% DONE OFF AUDIT
Doors and windows
100% DONE
MEP works
100% DONE
OFF AUDIT
III TBB AREA
I FENCE
BACK MOSQUE BUILDING
100% DONE

II ROAD
Site Clearing
100% DONE
Excavation
100% DONE
Backfill
100% DONE
Compaction
100% DONE
Pouring Concrete
100% DONE

III BUILDING
1 CHRUSER
Site Clearing
100% DONE
Excavation
100% DONE
Back Fill
100% DONE
Compaction
100% DONE
Foundation
100% DONE
Tie Beam
100% DONE
Column
100% DONE
Beam
100% DONE
Slab
100% DONE

Wall (Plastering, rendering, painting)

100% DONE PAINTING REMAINING

Steel framework (include column, rafter, and roof frame)


100% DONE
Roof cover, lisplank, & faschia 100% DONE

BRC Hot Dip


100% DONE

MEP works
100% DONE
2 BEDENG ASET & NON ASET
Site Clearing
100% DONE
Excavation
100% DONE
Back Fill
100% DONE
Compaction
100% DONE
Foundation
100% DONE
Tie Beam
100% DONE
Column
100% DONE
Beam
100% DONE
Slab
100% DONE

Wall (Plastering, rendering, glass partition istln, painting)


100% DONE PAINTING REMAINING

Steel framework (include column, rafter, and roof frame)


100% DONE

Roof cover, lisplank, & faschia


100% DONE

BRC Hot Dip


100% DONE

Punchlist 100% DONE

MEP works
100% DONE
3 DRIVER SHELTER
Site Clearing
100% DONE
Excavation
100% DONE
Back Fill
100% DONE
Compaction
100% DONE
Foundation
100% DONE
Tie Beam
100% DONE
Column
100% DONE
Beam
100% DONE
Slab
100% DONE
Driver table plate
100% DONE

Wall (Plastering, rendering, glass partition istln, painting)

100% DONE PAINTING REMAINING

Steel framework (include column, rafter, and roof frame)

100% DONE

Roof cover, lisplank, & faschia


100% DONE
Doors
100% DONE
MEP works
100% DONE
Finishing (Wall and floor)
100% DONE
Ramp/Stair
100% DONE
Punchlist

NOTE/ISSUE :
NOTE :
- Stair ICE will be executed after Middel Road Ice was done
PLAN = - Fence of back utility building was waiting for instruction

ACTUAL =

EXTEND SCH. =
No. Dok. : FM/19-01/CONS
No. Rev. :
DOCUMENTATION OF CONSTRUCTION PROGRESS Tgl Rev. :

REPORT PROGRESS

Project Name : Silver Project (ICE AREA) Period :

Project Address : Jababeka 1 - Cikarang Date : Wednesday, 30-04-2019

Consultant : PT.Deserco Development Service Contractor : PT.Citra karsa Dinamika

Client : PT. Unilever Indonesia, Tbk Project Manager : Heri Trias S

FRONT ROAD MIDDLE ROAD & EMERGENCY STAIR MIDDLE ROAD

BACK ROAD BACK ROAD BACK ROAD

BACK ROAD BACK ROAD BACK UTILITY FENCE

POURING CONCRETE FINISH STAIR MODIFICATION WORK AT IC-WALLS AREA PAINTING OF IT ROOM INTERNAL WALL

WATERPROOFING IT ROOM BUILDING BASE PAINTING OF IT ROOM EXTERNAL WALL IT BUILDING RAMP

FINISHING BRICK AT IT BUILDING DUCT INSTALL WINDOWS AT IT BUILDING INSTALL DOORS AT IT BUILDING
FLOOR WORK AT IT BUILDING PAINTING OF IT ROOM EXTERNAL FLASHING PLASTER WORK AT IT BUIDING

INSULATION WORK AT IT BUILDING DUCT FINISH TO PAINT EXTERNAL WALL OF IT BUILDING ROOF SCREED OF IT ROOM

PAINTING EXTERNAL WALL AT IT BUILDING PAINTING EXTERNAL WALL AT IT BUILDING DOORS INSTALLATION AT IT ROOM

INSTALL BRC FENCE AT THE BACK OF UTILITY BUILDING INSTALL HEBLE AT THE BACK OF UTILITY BUILDING INSTALL BRC FENCE AT THE BACK OF UTILITY BUILDING
No. Dok. : FM/19-01/CONS
No. Rev. :
DOCUMENTATION OF CONSTRUCTION PROGRESS Tgl Rev. :

REPORT PROGRESS

Project Name : Silver Project (TBB AREA) Period :

Project Address : Jababeka 1 - Cikarang Date : Wednesday, 30-04-2019

Consultant : PT.Deserco Development Service Contractor : PT.Citra karsa Dinamika

Client : PT. Unilever Indonesia, Tbk Project Manager : Heri Trias S

TBB BACK FENCE TBB BACK FENCE TBB BACK FENCE

ELECTRICAL WORK AT BEDENG ASET BUILDING ELECTRICAL WORK AT BEDENG ASET BUILDING FINISH RENDERING BEDENG ASET WALL

CHRUSSER ROOF TOP FINISH RENDERING CHRUSSER WALL TABLE PLATE WORK OF DRIVER SHELTER

BRC HOT DIP WORK OF BEDENG ASET BUILDING FINISH TBB RAMP FINISHING DRIVER SHELTER

FENCE BACKFILL FENCE BACKFILL SANITARY AT DRIVER SHELTER


INSTALL BRC HOT DIP AREA CHRUSSER BEDENG ASET BUILDING CHRUSSER BUILDING

TOILET AT DRIVER SHELTE SANITARY WORK AT BEDENG ASET MEP WORK AT DRIVER SHELTER

DRIVER SHELTER TOILET DOOR SANITARY WORK AT DRIVER SHELTER CEILING AND WALL OF DRIVER SHELTERS TOILET

BRC HOT DIP AT BEDENG ASET NON ASET BUILDING BRC HOT DIP AT TRASH DOMESTIC BUILDING
No. Dok. : FM/19-01/CONS
No. Rev. :
DOCUMENTATION OF CONSTRUCTION PROGRESS Tgl Rev. :

REPORT PROGRESS

Project Name : Silver Project (SCC AREA) Period :

Project Address : Jababeka 1 - Cikarang Date : Wednesday, 30-04-2019

Consultant : PT.Deserco Development Service Contractor : PT.Citra karsa Dinamika

Client : PT. Unilever Indonesia, Tbk Project Manager : Heri Trias S

Wednesday 30 - 04 - 2019

FENCE OF ICE - SCC AREA FENCE OF ICE - SCC AREA FENCE OF ICE - SCC AREA

FENCE OF ICE - SCC AREA FENCE OF TRASH BULDING AREA ROOF OF TRASH BULDING AREA

FENCE OF SCC - TBB AREA FENCE OF SCC - TBB AREA FENCE OF SCC - TBB AREA

INNER STAIR AND RAILING WALL OF OUTTER MOSQUE BUILDING WINDOWS AND DOOR OF MOSQUE ROOM

WALL OF OUTTER MOSQUE BUILDING DOORS OF MOSQUE ROOM WINDOWS AND DOOR OF MOSQUE ROOM

SANITARY OF MOSQUE BUILDING FENCE OF CARD BOARD BOX AREA FENCE OF CARD BOARD BOX AREA
FENCE OF CARD BOARD BOX AREA FINISH SCC FOOT PATH FINISH SCC FOOT PATH

PAINTING SCC TRASH ROOM EXTERIOR WALL RND ROOM PLAFOND PAINTING RND TOILET ROOM TILE WORK

PABRICATION AND INSTALL GUTTER AT SCC TRASH ROOM INSTALL FLASHING TRASH ROOM SCC TRASH ROOM GATE

TRASH ROOM STEEL HOLLOW DOOR PAINTING SCC TRASH ROOM WALL PAINTING SCC TRASH ROOM WALL

ELECTRICAL WORK AT TRASH ROOM PAINTING SCC TRASH ROOM EXTERNAL WALL WALL FINISHING SCC R&D ROOM

TILE WORK AT RND TOILET PAINTING OF RND EXTERNAL WALL GLASS DOORS OF RND ROOM

TRASH ROOM BUILDING EXTERIOR WALL PAINTING FLOOR WORK AT RND TOILET ROOM EMERGENCY DOOR INSTALLATIONS AT RND
FLOOR WORK AT RND TOILET ROOM PLASTR WORK AT RND ROOM RND ROOM

INCREASING BRC FENCE OF SCC FOOT PATH BUNDWALL WORK AT TRASH ROOM SCC MEP WORK AT RND TOILET

RND BUILDING INSTALL RND STAIR POLYCARBONATE INSTALL RND STAIR POLYCARBONATE

RENDERING AT LPG STORAGE ROOM MOSQUE STAIR PAINTING FINISH STAIR WORK AT RND BUILDING

FINISHING MOSQUE COLUMN PAINTING MOSQUE PLATFORM RENDERING AT LPG STORAGE ROOM

INSTALL DOORS FRAME AT LPG STORAGE ROOM INSTALL WASTAFLE INSTALL ROOF FRAME OF LPG STORAGE ROOM

INSTALL DOORS AT LPG STORAGE ROOM FINISHING EXTERNAL WALL OF RND BUILDING FINISHING FLOOR WORK AT LPG STORAGE
ELECTRICAL WORK AT LPG ROOM INSTALL CEILING FRAME AT LPG ROOM PAINTING OF LPG STORAGE ROOM CEILING