You are on page 1of 11

PETER SCHUBERT

iC Consulenten
Ziviltechniker GmbH
Bergheim, Austria

CURRICULUM VITAE

1. Family name: Schubert

2. First names: Peter Alexander

3. Date of birth: July 1st, 1956

4. Nationality: Austrian

5. Civil status: Married, one child

6. Education: Dipl.-Ing.Dr.mont.

Institution Technical University Graz


Date: from (month/year): 1974
to (month/year): 1981
Degree(s) or Diploma(s) obtained: Diplomingenieur (Dipl.-Ing.)
Institution Mining University Leoben
Date: from (month/year): 1981
to (month/year): 1985
Degree(s) or Diploma(s) obtained: PhD in Tunnelling (Dr.mont.)

7. Language skills: (Mark 1 to 5 for competence) 5 = best


1 = worst

Language Reading Speaking Writing


German 5 5 5
English 5 5 4
French 2 2 2

8. Membership of professional bodies:


Österreichische Gesellschaft für Geomechanik
International Society of Rock Mechanics (ISRM)
International Tunnelling Association (ITA) member of shotcrete working group
9. Other skills: Registered Mediator

10. Present position: Partner, Geotechnical and Tunnelling Expert

11. Years within the firm: since March 2000

12. Key qualifications: Tunnelling, Rock Mechanics, Geotechnical Engineering, Project Management
(design projects), Quality Assurance (design projects), Monitoring, Sprayed
Concrete

13. Specific Eastern Countries experience:

Country Date: from (month/year) to (month/year)


Slovenia 1987 / 88 Design and Consultancy for
Karawankentunnel
Croatia 1998 / 99 Mix Design for Shotcrete of Tunnel Sveti
Marko

14. Professional Experience Record:

Date: from (month/year) to (month/year) since 01/2000


Location Salzburg, Austria
Company iC consulenten ZT GesmbH
Position Geotechnical and Tunnelling Expert
Professional Engineer CE
Description Consultant for underground projects and geotechnical
engineering
Date: from (month/year) to (month/year) 11/1997 – 12/1999
Location Salzburg, Austria
Company MBT Austria GmbH
Position Area Manager
Description Manager for underground construction for Austria
and Eastern European Countries
Consultant for different underground projects, e.g.
Malmö PTT Caverns Sweden, Bolu Tunnel Turkey
Date: from (month/year) to (month/year) 1992 – 11/1997
Location Salzburg
Company Geoconsult ZT GmbH
Position Head of Geotechnics and Tunnelling Department
Description Project management, technical and commercial
leadership
Date: from (month/year) to (month/year) 1989 – 1991
Location Saudi Arabia
Company SSSP Project
Position Project manager for Geoconsult’s team
Description Rock engineering, test programs, design
implementation during consutruction
Date: from (month/year) to (month/year) 1987 – 1989
Location Salzburg
Company Geoconsult
Position Project engineer
Description Project engineer for execution design for two road
tunnels and consultancy during construction
Date: from (month/year) to (month/year) 1985 – 1987
Location Taiwan
Company Geoconsult Taiwan
Position Project engineer for underground cavern project
Description Special tasks in shotcrete testing, geotechnical
monitoring program, prestressed anchors
Date: from (month/year) to (month/year) 1981 – 1985
Location Leoben, Austria
Company Mining University Leoben
Position Assistant Professor
Description Assistant Professor at the Institute for Underground
Construction (Prof. Feder, Prof. Golser)

15. Others: Detailed knowledge on sprayed concrete, mix Design, specification, technology, testing

15a. Academic Teaching: in Leoben 1981 - 85

15b. Publications, Lectures, Seminars: (see Appendix B)

15c. Selected References: (see Appendix A)

15d. Involvement in major cavern Design and Execution: (see Appendix C)

Update February 2007


Appendix A

SELECTED PROJECT REFERENCES

Project: Sentvid Motorway Tunnel and Caverns


Client: DDC Slovenian Road Authority
Country: Slovenia
Period: 2005 - 2007
Services: Tunnel Consultant during Design and Contruction

Project: Koralm line, extended exploration phase


3 exploration tunnels for the main 32 km Koralm tunnel
Client: ÖBB Infrastruktur Bau AG
Country: Austria
Period: 2004 - 2010
Services: Independent Tunnel Consultant

Project: Arlberg connection tunnels


Escape tunnels between road and railway tunnels
Client: Asfinag, Alpen Strassen AG
Country: Austria
Period: 2003 - 2004
Services: Consultancy for the Contractor, design ofn alternative solutions

Project: Rehabilitation Ofenauer - Hieflertunnel


Reconstruction of inner lining and niches
Client: Asfinag, County Salzburg
Country: Austria
Period: 2004-2005
Services: Project Manager for final design

Project: Wiental Reservoir


Rehabilitation works at retaining walls and dam
Client: Magistrat der Stadt Wien, Wiener Wasserwerke
Country: Austria
2003 - 2004
Services: project manager for the design and tender of rehabilitation works including grouting of dam

Project: Rigips Austria


Stabilization and backfill of an old mine
Client: Rigips Austria GesmbH
Country: Austria
Period: 2003 - 2004
Services: Final Design, Tender Documents, Project Management, Site Supervision

Project: Nollinger Berg Road Tunnel 2nd tube


1.5 km road tunnel adjacent to an existing tube
Client: Hinteregger / Östu-Stettin JV
Country: Germany
Period: 2003 - 2004
Services: Final Design

Project: Light Rail Linz, Main Railway Station Interchange


Underground light rail system, underpassing the main railway station of Linz and several sensitive
buildings. Turnout structures and underground turning loops.
Client: Hinteregger / Östu-Stettin /Wayss Freitag JV
Country: Austria
Period: 2001 - 2003
Services: Independent Checking Engineer for Contractor
Project: Naintsch Mineralwerke, talkum mine, Austria
Country: Austria
Period: 2001
Tasks: Expert opinion on mine stability, support design

Project: Trojane Tunnel, Slovenia


twin tube road tunnel in very weak ground conditions
Client: DDC, Slovenian Road Authority
Country: Slovenia
Period: 2000 - 2002
Tasks: Consultant for stability monitoring of tunnel and construction methods

Project: Lainzer Tunnel construction lot LT 22


Tunnel construction underneath main Austrian railway line
Client: Eisenbahn- Hochleistungsstrecken AG
Country: Austria
Period: 2000 - 2002
Tasks: Consultant for stability assessment of all underground openings under very critical (third party)
boundary conditions

Project: Lärchstein- und Wettersteintunnel


water tunnel of the Vienna Main Water line
Client: Magistrat Wien MA 31, Wiener Wasserwerke
Country: Austria
Period: 2000
Tasks: Assessment of damage from squeezing rocks and aggressive mountain water, development of a repair
strategy.

Project: Felbertauerntunnel
Client: Felbertauern AG
Country: Austria
Period: 2000
Tasks: Expert opinion for the construction of escape ways into the fresh air ventilation duct; tender design;
vibration study

Project: Lainzer Tunnel construction lot LT 21


Cut and cover Wiental crossing
Client: Eisenbahn- Hochleistungsstrecken AG
Country: Austria
Period: 2000
Tasks: Development of a risk management plan for a deep open cut in close vicinity to the main railway line
Vienna - Salzburg

Project: Malmö PTT Cavern


two underground caverns for housing PTT infrastructure in Limestone
Client: Swedish Post and Telecom
Country: Sweden
Period: 1997 -98
Services: Excavation and Support Design, Tender Documents

Project: Bolu Mountains Tunnel, Motorway tunnels


3-lane motorway tunnels in extremely poor rock conditions
Client: Astaldi S.p.A.
Country: Turkey
Period: 1995 - 1997
Services: Redesign during Construction, Consultancy

Project: CERN, Lot 5


Underground caverns for new Hadron colliders in molasse rocks
Client: CERN
Country: Switzerland
Period: 1995 - 1997
Services: Review of geotechnical investigations, cavern tender Design, numerical analyses
Project: Ertan Hydropower Plant
Underground Powerhouse complex in basaltic rocks with major rock stress problems
Client: Philipp Holzmann AG
Country: China
Period: 1995 - 1996
Services: Consultancy for Contractor

Project: Semmering Basistunnel, Pilottunnel


Investigation tunnel for 22 km basis tunnel
Client: Eisenbahn-Hochleistungsstrecken AG (HLAG)
Country: Austria
Period: 1994 - 1997
Services: Detailed Design during construction, Management of geotechnical programme, Special Solutions

Project: Seremban Tunnel, Widening of old railway tunnel


Client: IRCON, India
Country: Malaysia
Period: 1994
Services: Design for tunnel reconstruction

Project: Metro Athens


Underground stations in poor rock conditions
Client: Contractor's Consortium
Country: Greece
Period: 1992 - 1994
Services: Geotechnical assessment, monitoring programme, site consultancy

Project: Semmering Basistunnel (22km)


Client: HLAG
Country: Austria
Period: 1992
Services: Geotechnical Assessment Study

Project: Saudi Strategic Storage Program (SSSP)


Multi-cavern project at 4 different sites, sedimentary and granitic rocks
Client: ABV Rock Group
Country: Saudi Arabia
Period: 1989 - 1991
Services: Design and execution of large scale rock mechanics test program, Design of cavern excavation and
support, site consultancy

Project: Alte Wacht Tunnel


Provincial road tunnel
Client: Amt der Salzburger Landesregierung
Country: Austria
Period: 1988
Services: Detailed Design

Project: Trattenbach Tunnel


Road tunnel, difficult portal solutions, slope retaining measures
Client: Amt der Salzburger Landesregierung
Country: Austria
Period: 1988
Services: Detailed Design

Project: Karawankentunnel
Client: Slovenian Road Administration
Country: Slovenia
Period: 1987 - 1988
Services: Interpretation of monitoring data, Design of support, Consultancy during construction
Project: Izmit Bypass Tunnel
Motorway tunnels in limestone
Client: Impregilo S.p.A.
Country: Turkey
Period: 1987
Services: Detailed Design

Project: Multipurpose Underground Storage Project


complex of large tunnels and caverns in very poor rock conditions
Client: RSEA
Country: Taiwan
Period: 1985 - 1987
Services: detailed Design, interpretation of monitoring data, shotcrete quality improvement, specifications and
tender evaluation for prestressed anchors
Appendix B

PUBLICATIONS, LECTURES, SEMINARS

P. Schubert
Das Tragevermögen des Mörtelversetzten Ankers unter aufgezwungener Kluftverschiebung (Behaviour of grouted
rock bolts in shearing joints)
Ph.D.-thesis: Technical University Leoben, Austria, March 1984

G. Feder, H. Zitter, P. Schubert, K. Kohlbach


Verhalten von vollvermörtelten Felsankern in Bereichen vollständiger Mörtelumhüllung (Behaviour of steel tendons in
case of perfect and non perfect cement grouting)
Berg- u. Hüttenmännische Monatshefte, Sonderdruck aus Jg. 129, Heft 5, 1984

P. Schubert
Das Langzeitverhalten von SN-Ankern im Untertageeinsatz (The longterm behaviour of SN rock bolts in underground
construction)
Felsbau 2 (1984), Nr.4
Lecture at the 33rd Geomechanic Colloquy, October 1984, Salzburg, Austria

P. Schubert, K. Mussger, G.W. Rhodes


Early property measurements in shotcrete
Lecture at the 67th Annual Meeting National Research Council, Transportation Research Board, January 1988, Washington
D.C., USA

P. Schubert
Beitrag zum rheologischen Verhalten von Spritzbeton (Rheological behaviour of shotcrete)
Felsbau 6 (1988), Nr.3

P. Schubert
Support element requirements to cope with large deformations
Lecture at the Austrian tunneling seminar, Nottingham University
September 1988 Nottingham, U.K.

P. Schubert, T. Marinko
Vortrieb Karawankentunnel im stark beanspruchten Südabschnitt (Excavation of Karawankentunnel in formations
heavily stressed by tectonics)
Sonderdruck "Felsbau 7" (1989), No.2, Lecture at the 37th Geomechanic Colloquy
October 1988 Salzburg, Austria

W. Mayrhauser, P. Schubert, W. Karpellus


Karawankentunnel Süd – Vortrieb in druckhaftem Gebirge mit der NATM unter Anwendung neuer Deformations-
Anker-Köpfe (Karawanken tunnel south – application of the NATM in pressure exerting rock and development of new
yielding anchor heads)
Sonderdruck MAYREDER-Zeitschrift, 34. Jg., June 1989

J. Golser, P. Schubert, K. Rabensteiner


A new concept for evaluation of loading in shotcrete linings
International Congress on Progress and Innovation in Tunnelling, 9/1989, Toronto, Canada

P. Schubert, T. Marinko
Karawankentunnel Süd – Bauerfahrungen (construction experiences)
Lecture at the Geomechanics Collquium 1991 Salzburg, to be published Felsbau 1992

P. Schubert
Die Ungewissheit bei der Standsicherheitsanalyse von Felsbauwerken (the uncertainty at the stability analysis of
structures in rock)
Lecture at the Geomechanics Colloquium 1991 Salzburg, Felsbau 10 (1992) Nr.4
G. Riedmüller, J. Golser, P. Schubert, H. Zojer
Geologische, Geotechnische und Hydrogeologischer Erkundungen für den Semmering Basistunnel (geological,
geotechnical and hydrogeological investigations for the Semmering Basistunnel)
Berg- und Hüttenmännische Monatshefte BHM, 137. Jg (1992) Heft 12

W. Schubert, P. Schubert
Tunnels in squeezing rocks: failure Phenomena and counteractions
ISRM Symposium on Assessment and Prevention of Failure Phenomena in Rock Engineering, April 1993 Istanbul

P. Schubert, G. M. Vavrovsky
Geomechanics interpretation of modern tunnel monitoring results
2nd International Symposium on Tunnelling and Underground Structures, 28.-30.9.1994 Ljubljana, Slovenia

P. Schubert, G. M. Vavrovsky
Advanced interpretation of tunnel monitoring results
World Tunnelling Nov. 1994

P. Schubert, O. Sigl
Dealing with large geological structures in cavern design and construction
South East Asian Symposium on Tunnelling and Underground Space Development, Japan Tunnelling Association, Bangkok
Jan. 1995

P. Schubert
Funktion und Grenzen der Geotechnischen Messungen im Tunnelbau
Salzburger Geomechanik Kolloquium 1995, Felsbau 6/95

P. Schubert, L. Zeisel
Experience with large underground caverns under high primary stress at the Ertan Hydropower Plant
World Tunnel Congress Vienna 97 "Tunnels for People" Balkema 1997

P. Schubert, U. Lindblom
Tunneling in hard rock and soft ground
Swedish Bridge Builder's day, 19.Jan.1996, Gothenburg, Sweden

P. Schubert
Bergschlagprobleme bei großen Kavernen in China
Lecture at the "Österreichischen Bergbautag 1996" 7./8.5.1996 Leoben

P. Schubert, M. Moggioli, J. Brandl, J. Golser


Extraordinary difficulties driving the motorway tunnels through Bolu mountains, Turkey
Felsbau 6/97

P. Schubert
Comparison of different shotcrete technologies, logistics, health and safety environmental impact and cost
Proceedings of the first intenational fair and symposium on underground constructions, 2.-5.6.1998 in Zilina, Slovakia

M. Sachs, W. Aldrian, P. Schubert


Construction Austria’s Siebergtunnel
Tunnels and Tunnelling September 1998

P. Schubert
Innovative products and solutions for underground construction
Lecture at the International Symposium on Underground Construction, Ljubljana,23./24.9.1998

P. Schubert, W. Aldrian
Wet against dry systems – a dynamic development in German speaking countries
Proceeding of the third international sysmposium on sprayed concrete, Gol, Norway 26 - 29 Sep. 1999
P. Schubert, Z. Potocnjak
Performance requirements of sprayed concrete in tunnelling
Proceedings of the Scientific Symposium on Rock Mechanics and Tunnelling, Zagreb Croatia, Sept.30 - Oct.2, 1999

Vavrovsky G.M., Ayaydin N., Schubert P.


Geotechnisches Sicherheitsmanagement im obenflächennahen Tunnelbau
Felsbau 19 (2001) Nr.5

Moritz B., Vergeiner R., Schubert P.


Experience gained at Monitoring of a Shallow Tunnel under a Main Railway Line
Felsbau 20 (2002) No.2

Schubert P.
Key Elements of Geotechnical Risk Management at Shallow Tunnels
United Engineering Foundation, Probabilistics in GeoTechnics: Technical and Economic Risk Estimation, Sep.15-19 2002
Graz

Schubert P., Vergeiner R., Moritz B.


Experience with Shallow Tunnelling in Weak Rocks under a Strategic Railway Line
YTMK / ITA International Conference & Exhibition on Tunnelling & Underground Space Use, 15-^8 October 2002
Istanbul Türkei

Schubert P., Bergmair, M.


Geotechnische Risikobewertung und Risikomanagement – Methodologie und Fallbeispiele
51.Geomechanik Kolloquium 2002 Salzburg, Felsbau 20 (2002) No.5

Schubert P., Schweiger H.F, Zur Standsicherheit der Ortsbrust in Lockerböden, Eurock 2004 & 53rd
Geomechanics Colloquium Schubert (ed.) 2004 VGE

Schubert P., Klopcic J., Stimulak A., Ajdic I., Logar J. Analysis of Characteristic Deformation Patterns at the
Trojane Tunnel in Slovenia, Felsbau 23 (2005) Nr.5

Moritz B., Goldberger H., Schubert P. Application of the Observational Method on Heterogeneous Rock Mass with
Low Overburden, Felsbau 24 (2006) Nr.1

Schubert P., Zigon A., Vergeiner R., Entscheidungskriterien für die Planung von zwei 360m² Kavernen in
Slowenien, Felsbau 24 (2006) Nr.5
Appendix C

INVOLVEMENT IN MAJOR CAVERN DESIGN AND EXECUTION

Multipurpose Underground Storage Complex, Taiwan


Complex of tunnels and caverns in weak, tectonised rock conditions, data confidential,
Responsible for geotechnical monitoring programme, shotcrete testing and improvement, specificaiton
and tender evaluation for prestressed anchors

SSSP Project Saudi Arabia 1989 / 91


1. Design and execution (as subcontractor) of a large scale rock mechanics test program for site 1.
This site is characterised by medium hard limestones with clay layers in bedding planes and distinct
subvertical faults. The test program comprised large scale compression tests, shear tests and plate
load tests plus a laboratory test program. In a later stage co-ordinator for a test program on dynamic
properties of the rock mass (as a basis for weapon-load Design)
2. Lead Engineer for rock excavation and support Design for site 1 including static and dynamic
loads. Guidance of 2D and 3D static and dynamic numerical analyses.
3. Design reviewer and responsible engineer for Design implementation and verification for all sites
(including sandstones and granites)

Pergau HEP Malaysia


Assistance to the lead Design company at the orientation of the cavern complex, assessment of cavern
stability and Design of the support for a large wedge created by a fault intersection the Powerhouse
cavern.

Ertan HEP China


Review of cavern complex stability for the Contractor during execution (because of major problems
with rock burst and stability). Performance of 3-D stress analysis of the whole complex to predict
further critical zones during progressive execution. Expert opinions of stability and remedial measures.

CERN package 2, Switzerland / France


Design leader for 2 large caverns separated by a concrete pillar. Total span about 50m. Rock mass is
molasse (sequence of marls, partly weak and tectonised and sandstones). Rock mass cover above
caverns 20m plus 50m moraine, water table near surface. Guidance of various 2D and 3D numerical
analyses, partly complex simulations of rock structures, water conditions (effective stress), swelling and
creep of marl layers, etc.

Malmö PTT Caverns / Sweden


Two 15m wide caverns in soft limestone, excavated by roadheader
Review of geotechnical investigations, detailed Design of excavation and support, Design of monitoring
programme, tender documents, consultancy during construction.

Sentvid Motoway Caverns / Slovenia


Two 26m wide caverns in tectonized siltstones and sandstones
Design Reviewer, Member of Expert council