Annual global in-plane irradiation: 1907 kWh/m2 Annual average electricity production: 875.4 MWh
Annual air temperature at 2 m: 22.8 °C Average performance ratio: 76.3%
3. Geographic position
Left: Path of the Sun over a year. Terrain horizon (drawn by grey filling) and module horizon (blue filling) may have
shading effect on solar radiation. Black dots show True Solar Time. Blue labels show Local Clock Time.
Right: Change of the day length and solar zenith angle during a year. The local day length (time when the Sun is above the
horizon) is shorter compared to the astronomical day length, if obstructed by higher terrain horizon.
Gim Monthly sum of global irradiation [kWh/m2] Shloss Losses of global irradiation by terrain shading [%]
Gid Daily sum of global irradiation [kWh/m2]
Did Daily sum of diffuse irradiation [kWh/m2]
Rid Daily sum of reflected irradiation [kWh/m2]
© 2019 Solargis Report number: PV-55956-1901-780 Issued: 11 January 2019 17:52 (UTC) page 2 of 4
Site: Baddi, India, lat/lon: 30.9578°/76.7914°
PV system: 600.0 kWp, crystalline silicon, fixed free, azim. 180° (south), inclination 25°
Esm Monthly sum of specific electricity prod. [kWh/kWp] Eshare Percentual share of monthly electricity prod. [%]
Esd Daily sum of specific electricity prod. [kWh/kWp] PR Performance ratio [%]
Etm Monthly sum of total electricity prod. [MWh]
Energy conversion step Energy output Energy loss Energy loss Performance ratio
[kWh/kWp] [kWh/kWp] [%] [partial %] [cumul. %]
1. Global in-plane irradiation (input) 1913 - - 100.0 100.0
2. Global irradiation reduced by terrain shading 1907 -7 -0.3 99.7 99.7
3. Global irradiation reduced by reflectivity 1851 -56 -2.9 97.1 96.8
4. Conversion to DC in the modules 1624 -227 -12.3 87.7 84.9
5. Other DC losses 1535 -89 -5.5 94.5 80.2
6. Inverters (DC/AC conversion) 1496 -38 -2.5 97.5 78.2
7. Transformer and AC cabling losses 1474 -22 -1.5 98.5 77.0
8. Reduced availability 1459 -15 -1.0 99.0 76.3
Total system performance 1459 -454 -23.7 - 76.3
Losses at steps 2 to 4 are numerically modeled by pvPlanner. Losses at steps 5 to 8 are to be assessed by a user. The simulation
models have inherent uncertainties that are not discussed in this report. Read more about simulation methods and related uncertainties
to evaluate possible risks at http://solargis.com/products/pvplanner/.
© 2019 Solargis Report number: PV-55956-1901-780 Issued: 11 January 2019 17:52 (UTC) page 3 of 4
Site: Baddi, India, lat/lon: 30.9578°/76.7914°
PV system: 600.0 kWp, crystalline silicon, fixed free, azim. 180° (south), inclination 25°
Solargis is high-resolution climate database operated by Solargis s.r.o. Primary data layers include solar radiation, air temperature and
terrain (elevation, horizon).
Air temperature at 2 m: developed from the CFSR data (© NOAA NCEP, USA); years: 1994 - 2011; recalculated to 15-minute values.
The data are spatially enhanced to 1 km resolution to reflect variability induced by high resolution terrain.
This estimation assumes year having 365 days. Occasional deviations in calculations may occur as a result of mathematical rounding
and cannot be considered as a defect of algorithms. More information about the applied data, algorithms and uncertainty can be found
at: http://solargis.com/products/pvplanner/.
Solargis s.r.o. , Milana Marečka 3, 84108 Bratislava, Slovakia; Registration ID: 45 354 766, VAT Number: SK2022962766; Registration:
Business register, District Court Bratislava I, Section Sro, File 62765/B
This report shows solar power estimation in the start-up phase of a PV system. The estimates are accurate enough for small and
medium-size PV systems. For suntracking simulations, only theoretical options are shown without considering backtracking and shading.
For large projects planning and financing, more information is needed:
1. Statistical distribution and uncertainty of solar radiation
2. Detailed specification of a PV system
3. Interannual variability and P90 uncertainty of PV production
4. Lifetime energy production considering performance degradation of PV components.
More information about full PV yield assessment can be found at: http://solargis.com/products/pv-yield-assessment-study/.
Considering the nature of climate fluctuations, interannual and long-term changes, as well as the uncertainty of measurements and
calculations, Solargis s.r.o. cannot take full guarantee of the accuracy of estimates. The maximum possible has been done for the
assessment of climate conditions based on the best available data, software and knowledge. Solargis s.r.o. shall not be liable for any
direct, incidental, consequential, indirect or punitive damages arising or alleged to have arisen out of use of the provided report.
This report has been generated for Indiago solar,mohan estate,New Delhi.
This document is electronically signed by Solargis s.r.o..
© 2019 Solargis Report number: PV-55956-1901-780 Issued: 11 January 2019 17:52 (UTC) page 4 of 4