You are on page 1of 43

Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No.

6 - Piping Hydro Test M210 Package 1


Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

MPFCS-CKL-HTQC-025-rOO.docx Hydrostatic Test QA Checklist


December 2010 Canadian Facility Construction Services e.ENBRIDGE

Contractor: Worle~Parsons Cord Date: A~ril 14,2014


Project: EAE Test No.: TEST 15
Location: Worle~Parsons Cord Mod~ard AFE#: 1141001884 (LHH & LGQ}
CWP#: CWP - 1.04.M.01 & l.Ol.M.Ot

This checklist must be completed and attached to the hydrostatic test records prior to turnover. The following information
must be completed prior to the hydrostatic tests as per Operations and Maintenance Manual Book 3: Pipeline Facilities,
Section 07-02-01:
Task Yes I No Date NOTES
Notifications YES Apr.14,2014 N/A

DWG#
D-21 0-3.01-SK122C-0-1 OLHH
D-21 0-3.01-SK123C-0-1 OLHH
Test Section Drawing YES Apr.14,2014 D-205-3.01-SK017C-0-1 OLHH
D-204-3. 04-SKO 1OC-0-1 OLH H
D-204-3.01-SK006C-0-1 OLHH
E-200-4.013-73060-0-1 OLGQ
D-204-3.01-SK002C-0-1 OLHH
Review Materials Documentation YES Apr.14,2014 N/A

Establishing intended maximum operating


pressure (MOP), and for deviations to YES Apr.14,2014 1900 kPa
existing MOP approval by Engineering

All NDE Reviewed N/A Apr.14,20 14 Approved by Enbridge

Equipment List YES Apr.14,2014 Certifications in Hydro package

Pre Hydro-Package Approvals YES Apr.14,2014 Approved By Enbridge

Environmental Concerns I Issues NO Apr.14,2014 Testing with Water/Glycol - outdoors

Safety precautions specific to the


Test area flagged off for hydro. Workers to sign
circumstances, including setback YES Apr.14,2014
off on FLRA. Workers to wear faceshields.
distances for workers and the public
-
Pre-job Meeting with Workers YES Apr.14,2014 Reviewed test, read and signed FLRA

Calibration of Test Instruments YES Apr.14,2014 AMS instruments and Berja

Pressure Recorder Set YES Apr.14,2014 12 Hour Clock Setting- 24 hour chart
1--
2090 kPa (Leak Test)
Test Acceptance Criteria YES Apr.14,2014 2964 kPa (Strength test MAX)
2850 kPa jStren_gth test MIN)

Page 1 of 2
Confidential and proprietary information of En bridge Pipelines Inc. and its affiliates. Not for distribution or circulation by any Contractor

Page 1 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

:'")
MPFCS-CKL-HTQC-025-rOO.docx Hydrostatic Test QA Checklist
December 2010 Canadian Facility Construction Services --EN BRIDGE

Contractor Representative: Company Representative:

Name (Print): ___..,L._.'/""L~_,.,


l; ()ccl<~f<'-.!.4
. ..!.-L.:.LN
-=-;::.C::...:T:.......=
Z._ _ __
Signature: _ _ _ _ _ . .k
:. . . ~
; ::..-.=-"'==------
Date: ---"""J_o.. .l.:. . .lf_
.:. . ~ .O.
:. . l/_
. :. - .1'/
:. . .L-·- - - -
If the contractor has their own form that meets all information on this form the Contractor's form may be used.

Page 2 of 2
Confidential and proprietary information of Enbridge Pipelines Inc. and its affiliates. Not for distribution or circulation by any Contractor

Page 2 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

1 8

Page 3 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

Page 4 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

Pressure Test Data Report


Canadian Facilities Construction Services
F-1 NSP-066-FPTDR-Rl. DOT

CONTRACTOR NAME: WorleyParsons Cord

LOCATION: EDMY

PROJECT I AFE: EAE I 1141001884 (LHH & LGQ) Page 2 of 2

TEST NO.: TEST 15 TEST DATE: April14,2014


D-21 0-3.01-SK122C-0-10LHH
D-21 0-3.01-SKf23C-0-1 OLHH
D-205-3.01-SK017C-0-1 OLHH
DRAWING NO.: D-204-3.04-SK010C-0-10LHH CWP NO.: CWP- 1.04.M.Ol & I.OI.M.Ol
D-204-3. 0 1-SK006C-0-1 OLH H
E-200-4.013-73060-0-1 OLGQ
D-204-3. 0 1-SK002C-0-1 OLH H

DEADWEIGHT
PRESSURE TEMPERATURE°C/°F REMARKS
TIME kpa I psi (Weather, Volumes Added/Bled Off)
AMBIENT PIPE MEDIUM GROUND
(Thermometer) (Recorder) Thermocouple)
End 75% Strength test pressure - check
10:49 2340 4°C 6.5°C N/A
for leaks.

soc 100% Strength Test pressure -


10:55 2S90 6.5°C N/A 2910 (kPa)
11 :10 2901 6°C soc N/A No Leaks Detected (15min)

11 :25 2902 6°C soc N/A No Leaks Detected (30min)

11 :40 2900 rc 9.5°C N/A No Leaks Detected (45min)


No Leaks Detected (65min) waterlglycol
12:00 2901 rc 10.5°C N/A
bled off-4731 ml
12:16 2090 rc 12°C N/A Begin Leak test (2090 kPa)

12:30 2454 9oC 13.5oC N/A End Leak Test- VT on Pipe (2090 kPa)

12:44 14S2 9oC 15°C N/A Begin 50% Strength test (1482 kPa)

12:54 1743 9oC 1rc N/A End 50% Strength test

1:03 740 10°C 1S°C N/A Begin 25% Strength test (741 kPa)

1:09 S70 10°C 19°C N/A End 25% Strength test


0% Strength test pressure complete -
1:22 0 11°C 20oc N/A
run out chart
1:54 0 12oc 21°C N/A Chart run out and Taken off

Contractor Representative /eY L£ Q/(Rfi


1
A) t::T2... Company Representative ,/'1/.~""'.#'~~

~
Print

Sign

Date Date

Page 5 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

Pressure Test Data Report


Canadian Facilities Construction Services
F-INSP-066-FPTDR-Rl.DOT

CONTRACTOR NAME: WorleyParsons Cord

LOCATION: EDMY

PROJECT I AFE: EAE I 1141001884 (LHH & LGQ) Page 1 of 2

TEST NO .: TEST 15 TEST DATE: April14,2014


D-21 0-3.01-SK 122C-0-1 OLHH
D-21 0-3.01-SK123C-0-1 OLHH
D-205-3 .01-SKO 17C-0-1 OLH H
DRAWING NO.: D-204-3. 04-SKO 1OC-0-1 OLHH CWP NO.: CWP -1.04.M.Ol & I.OI.M.Ol
D-204-3.01-SK006C-0-1 OLHH
E-200-4.013-73060-0-1 OLGQ
D-204-3.01-SK002C-0-1 OLHH

DEADWEIGHT
TEMPERATURE°C/°F REMARKS
PRESSURE
TIME kpa I psi (Weather, Volumes Added/Bled Off)
AMBIENT PIPE MEDIUM GROUND
(Thermometer) (Recorder) Thermocouple)
ooc Equilibrium - Stabilization before
8:30 0 1°C N/A
test

ooc Equilibrium - Stabilization before


8:4S 0 1°C N/A
test

9:00 0 1°C ooc N/A Equilibrium - Stabilization before


test
9:1S 0 2aC 1°C N/A Equilibrium - Stabilization before
test
0% Strength test pressure
9:30 0 2°C 2°C N/A

0% Test pressure- Begin Test


9:S8 0 2°C 3°C N/A

Begin 25% strength test pressure -


10:0S 741.S 2°C 3aC N/A
(741 kPa)
End 25% Strength test pressure - check
10:1S 880 3°C 4aC N/A
for leaks.
Begin 50% strength test pressure -
10:23 1482.3 3°C soc N/A
(1482 kPa)
End 50% Strength test pressure - check
10:33 1632 3°C soc N/A
for leaks.
Begin 75% strength test pressure -
10:39 2223.8 3°C 6°C N/A 2223 kPa)

Contractor Representative Company Representative ~~,.~


Print

Sign
.2DI'f- olf-1'/
c;:r Print

Date Date

Page 6 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

~
PRESSURE TESTING ·FAClrfY PPING
FACILITY CONSTRUCTION SPECIFCATON FCS014 •2011 ENBRIDGETM
Pressure Test Report
Canadian Facilities Construction Services
F-INSP-065-FPTR-R1 .DOT PageLof_1

Contractor Worleyparsons Cord Test Date April14,2014


Project EAE Test No. 15
Location Edmonton Modyard AFE 1141001884 (LHH & LGQ)

Drawing No. D-21 0-3.01-SK122C-0-1 OLHH CWP# CWP - 1.04.M.Ol & l.Ol.M.Ol
D-21 0-3.01 -SK123C-0-1 OLHH
D-205-3.01-SK017C-0-1 OLHH
D-204-3.04-SK01 OC-0-1 OLHH
D-204-3.01 -SK006C-0-1 OLHH
E-200-4.013-73060-0-1 OLGQ
D-204-3.01-SK002C-0-1 OLHH

PIPE DATA
NPS/OD WT Grade Len2:th Manufacture• · Tvne
20" 9.52 GR.290 CAT I 3.2 meters SeAH Steel PIPE
24" 9.52 GR.290CAT I 12.1 meters SeAH Steel PIPE
16" 9.52 GR.290 CAT I 12.1 meters Nippon Steel PIPE
12" "9.52 GR.290 CAT I 11.3 meters SeAH Steel PIPE

TEST DATA
Test Medium Fill Volume
WATER/GLYCOL 6.47m 3

REFERENCE INSTRUMENTS TEST EQUIPMENT


Liquid in Glass
Deadweight Pressure Pressure Recorder Pressure Gauge Temperature Recorder
Thermometer
Make nVision Durac AMS N/A AMS
Range 0-1,000 (PSI) -35 to 50"C 0-5000 (kPa) N/A -30 to 50"C
Serial No. 357253 P14439 AMS-5004 N/A AMS-5049

CALIBRATION VERIFICATION BEFORE TEST CALIBRATION VERIFICATION AFTER TEST


25%Test 50% 75% 100% 100% 50% 25%
Pressure (T. P) T.P. T.P. T.P. T.P. Leak. T.P. T.P.
Deadweight 741.5 1482.3 2223.8 2890 2901 2090 1482 740
Pressure Recorder 745 1500 2240 2920 2900 2130 1500 760
Pressure Gauge N/A N/A N/A N/A N/A N/A N/A N/A
Test Aim Test Pressure Minimum Maximum Duration
Strength 2910kPa 2890kPa 2903kPa 65MIN
Leak 2090kPa 2090kPa 2454kPa 14M IN
See Accompanying Pages for Pressure and Temperature Records

Contractor Representative: Company Representative:

(Print)

(Sign)

Date:

REVISION3 .3, JANUARY 11,2011 UNCO


COPYRIGKT©2011 ENBRIDGEPIPELINES NC ALL RIGHTS RESERVED NTRO

Page 7 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

AlBERTA MEASUREMENT SERVICES 1m.


5327-91 STREET- EDMONTON, ALBERTA, T6E 2E6- CANADA
Phone {780} 468- 6387- Fax {780} 462-9387

CALIBRATION CERTIFICATE

CUSTOMER: WorleyParsonsCord
MODEL: nVision
CHASSIS SERIAL NUMBER: 158623
RTD MODULE SERIAL NUMBER: 362755
1K PRESSURE MODULE SERIAL NUMBER: 357253
DATE: Aprilll, 2014

MASTER INSTRUMENT INSTRUMENT ALLOWABLE


READING READING TOLERANCE

49.9989 n 50.01 n 0.027

99.99422 n 100.01 n 0.035

2oo.oo271 n 200.02 n 0.050

400.00117 n 400.02 n 0.080

MASTER DEADWEIGHT INSTRUMENT ALLOWABLE


READING READING TOLERANCE

0 PSI 0 PSI 0.15 PSI

250 PSI 250.0 PSI 0.15 PSI

500 PSI 500.0 PSI 0.25 PSI

750 PSI 750.0 PSI 0.37 PSI

1000 PSI 1000.0 PSI 0.50 PSI

REMARK: DO NOT EXCEED 1000 PSI.


THE ABOVE INSTRUMENT WAS FOUND TO BE ACCURATE WITHIN THE MANUFACTURER'S
SPECIFICATIONS FOR NON IMPROVED ACCURACY.

THE ABOVE EQUIPMENT HAS BEEN COMPARED TO A RUSKA MODEL 5000 SIN 12342
DEADWEIGHT TESTER TRACEABLE TO THE NATIONAL INSTITUTE OF STANDARDS AND
TECHNOLOGY (NIST).

THE ABOVE EQUIPMENT HAS BEEN COMPARED TO A CADDOCK USF340-50-0.0J%,


USF340-100-0.0l%, USF340-200-0.0l%, USF340-400-0.0l% TRACEABLE TO THE NATIONAL
INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST).

WITNESSEDBY: ~ SIGNATURE:_~
---=~;;======--

Page 8 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

AlBERTA MEASUREMENT SERVICES lTD


5327-91 STREET- EDMONTON , ALBERTA, T6E 6E2
Phone {780} 468- 6387 - Fax {780} 462-9387

RECORDER CALIBRATION CERTIFICATE

CUSTOMER: WorleyParsonsCord AMBIENT TEMP: 20C


MODEL: AMS ACCURACY: ±1% F.S.
RANGE: 0 - 5000 kPa x -30 to 50°C STATIC ZERO AS FOUND: N/A
SERIAL #: AMS-5004 STATIC ZERO AS LEFT: 0 kPa
DATE: Aprilll, 2014 TECHNICIAN: Jason Olszewski

MASTER DEADWEIGHT PRESSURE PRESSURE


READING AS FOUND AS LEFT

0 kPa N/A 0 kPa

1250 kPa 1250 kPa

2500 kPa 2500 kPa

3750 kPa 3750 kPa

5000 kPa 5000 kPa

MASTER INSTRUMENT TEMPERATURE TEMPERATURE


READING AS FOUND AS LEFT

N/A

REMARKS: THE ABOVE EQUIPMENT HAS BEEN COMPARED TO A RUSICA MODEL 5000
SIN 12342 DEADWEIGHT TESTER TRACEABLE TO THE NATIONAL INSTITUTE OF
STANDARDS AND TECHNOLOGY (NIST).

THE ABOVE EQUIPMENT HAS BEEN COMPARED TO FLUKE MODEL 51 SIN 17610133
TRACEABLE TO THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST).

WITNESSED BY~SIGNATURE: _ _CJ.


_- __ ~_._2_1· _ _____

Page 9 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

AlBERTA MEASUREMENT SERVICES lTD


5327-91 STREET- EDMONTON, ALBERTA, T6E 6E2
Phone {780} 468- 6387 - Fax {780} 462-9387

RECORDER CALIBRATION CERTIFICATE

CUSTOMER: WorleyParsonsCord AMBIENT TEMP: 20C


MODEL: AMS ACCURACY: ±1% F.S.
RANGE: -30 to 50°C TECHNICIAN: Jason Olszewski
SERIAL #: AMS-5049
DATE: Aprilll, 2014

MASTER INSTRUMENT RED PEN RED PEN


READING AS FOUND AS LEFT

N/A

MASTER INSTRUMENT GREEN PEN GREEN PEN


READING AS FOUND AS LEFT

N/A

REMARKS: THE ABOVE EQUIPMENT HAS BEEN COMPARED TO FLUKE MODEL 51


S/Nl7610133 TRACEABLE TO THE NATIONAL INSTITUTE OF STANDARDS AND
TECHNOLOGY (NIST).

WITNESSED B~~NATURE: --~


-- -· --------

Page 10 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

IIIEIITA MEISUIEMEIIT SEIIVICES LTD


5327- 91 STREET- EDMONTON , ALBERTA, T6E 6E2- CANADA
Phone {780} 468-6387 - Fax {780} 462-9387

THERMOMETER CALffiRATION CERTIFICATE

CUSTOMER: Worely Parsons Cord


MODEL: Durac
SERIAL #: P14439
RANGE: -35 TO 50°C
DATE: November 12,2013

MASTER THERMOMETER CUSTOMER THERMOMETER


READING AS FOUND AS LEFT

)l

REMARKS: THE ABOVE EQUIPMENT HAS BEEN COMPARED TO FLUKE MODEL 151 TRACEABLE TO
NATIONAL STANDARDS SIN 6565100

THE ABOVE INSTRUMENT WAS FOUND TO BE ACCURATE WITHIN THE MANUFACTURER'S


SPECIFICATIONS FOR NON IMPROVED ACCURACY.

WITNESSEDB

Page 11 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

!!ill!:
l.AIO'CEYIATICIIIFJIIITIIEIIYDlOTtsTPUJIIIISTBE
loPPIIMD 8l' D11RIDiE Olm&I:DC BEFORE Da'TIA1'DII;
CON ' T ON
Q121CI0-211-3 . 11-SK12lt:-- 11LHH
""""""'·
2. lfYDIOSTi\TIC ruT P~ Slf.liJ.. IE Dl i\CCO!ai&IU
lfiTlt EBIDGE SPEt:IFtc.tTICtl Fcs-tl.. (2111 ED.)
UllCSAZ&Ii2DU.i\IGWPIPEI..DESYS1'IMS
LAT£ST EDITION.
3 • .W.HYDROTESTI'IATEWLSTDISESLFPl..liDBY
IDITRACTDII:.
II. ISOUTE M..1. INSTIIUI'EJfTS AMD YALYES PIWJA TO
IIYDROTEST.
s. t(- lllltlU.tiS u,an rs li'Jllll:lttn ~

'o\lo,..,~Oioa....Cgod ~~~~

RECEIVED
ATMODYARO
.lanuary27,2J114

2B12 CONSTRUCTION
"'"'~ I ~Oio! fMt) lU1WW.
i l l I CDMNECTIYOY (EAE_TC2)
~':- UllllMLJt'l WfO , b ll'

111'1-"'/D-21t-3.11~-1101t IUTDIAL ISOI£'TRlC


REFERENCE DRAWINGS

COH' T OH
EXISTING JP..TK-1&1

tJ••••, ••
PRESSURE TEST DETAILS ~~"" U.l) U!JIIIDI4L.
J.-IU-t-too-rlllll::_
::-_::-:-:,..=,r-...,.,
-::"""""=-,rur=r-,...:-:I'IW-:OI'W11lC::
.:-""::·,;,;..IUJ:::_:=l-::U:=::-:KIID::::J:-::~=-=,::-tr---l'EST-DUili-Tllll--<lltS-J---j :::~~~i!~~C28fi TlE-IH TO TAHK lllli!E

·-· 275,.1

....... D-210-3. 01-SK122C- 0-1BLHH


... 0122C

Page 12 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

~ -·
~
1. ANY DEYUTION FR01t THE IITDIIOTEST PL.AN fWST IE

CON ' T OH
11121CID-211-3. 11·S1C121C-1111..Jti /
/' AI'PROWEII l'f D111ID1E ENmiEEIDC IEFQII£ :narnn.
IITliOOrtST.
l . HYUIOSTATICTESTPII:XtDI.IIESSHIU.IEII~
WITMEJIIRIDIESPECIFlt.ITltlllfCS-.:111(2111ED .l
NCDtsAZ6Q:OD..AIIIWPIP£lDECT1iTEIIt
L.ITEST miTION,
3. Nl. H'DAOTBT IIATEIUALS TO liE SIJIPLIED 8T
IXIIfTRACTM.
.. ~
~- ISOlATE .W. IHSTRUIENTS NIO VaLVES PRIOII TO

li . """"""'·
cr liiiiCATOL.DIITCIFIIYIIIIDTEST •
•r
.......,/ ' ·1·1.
Wart.o,P•rou,..Cordllod,
RECEIVED
AT MOD YARD
.bnuary%1, 201 •

r.PPIIi!Dl. - - -
OIW)( rt
EL. "7. 39

21112 CONSTRUCTION
& I EDitDHTDH<ABlTERIII NAL
COHNECUVITY (fAE_TC2)

-
' f 11111:' II

-
I UU" l.IM (u.Q
i '"
"'
~~
.. Sl.UtaOl ~VUli:Jit
'"'"'
H
I 1---:1 RI!C!IV!D
AT HOME OfRCI:
J.UIII&Ift'lJ', -.,.

lif-22~-;IXAl·t• • -

~- P€RW: TD pP.~I: I;.a& ..1


ar~ ~
~-~
... ..;
,~,tz-:"'!0
~
...' .
.
i ;_~•r~.{.·
-~
a..:Ji!IH;;>
.. -"
·•.. I
~{..~ ~
·---

"
.

'~
I
ltliii/0·211-3 . 11~Z'tl-l1Utt IIATERIALISOlElltlC
REFERENCE ORAMIMGS

CON'T ON
EXI STING 313-TIC-31 . """"" OAlEII'f ~

1110.--r

~ ....... ---
~ ::;:~· ::..:: !:'~o";'!,::,.!;-~:: ~. = :..-:..~.~

a.JIIEI"DQJaJll&.

Ellllllhl...,......

-..... --It
! EDNINTI:* (A8) TERfiiNAL

.. ttcn-:w~
~ ""~en ..._
PftESSW£ TEST DETAILS
. . . <O<UTl)C iUJillMTU'J

,
flu., ...... TUT DURATIOM CHitS)
~NIFOlD 211J AREA
NPS 2~ TO "ANIFOLD 216 TIE- IN TO TAMK 31 LINE
HYORDTEST IsottETRIC
.,.....0«1,..,
/£sl PK~ # I~
ucm: caADE - ~ mccr.,tp1.(1.1; ~ a: ~.tJ,--ttW

·-· ....... ....... ....... -.uann


11-Upaf .lt2!p•J 275,.1
1.5 .~
IEL.I:* IWE- $_. i«<~~']gl ~lUI "l'JJIC'IU E1IU MT1 ~ ~

IQ123C
~
21Mir:Pt nu.olrtj)ftll •• ~ D- 2U-3. 91-SK123C·9-19LHH

- ~> l"o.f..,..~U4 1.:... 11A)M • U W i, iiU lf"Ci lt """"

Page 13 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

MPFCS-CKL-HTQC-025-rOO.docx Hydrostatic Test QA Checklist


December 2010 Canadian Facility Construction Services NBRIDGE
,
' Contractor: Worle;r Parsons Cord Date: July 7,2014
Project: EAE Test No.: TEST 21
Location: Worle;rParsons Cord Mod;rard AFE#: 1141001884 (LHH & LGQ)
CWP#: 1.01.M.01,1.04.M.01, 98

This checklist must be completed and attached to the hydrostatic test records prior to turnover. The following information
must be completed Qrior to the hydrostatic tests as per Operations and Maintenance Manual Book 3: Pipeline Facilities,
Section 07-02-01:
Task Yes I No Date NOTES
Notifications YES July7,2014 N/A
D-203-3.01-SK4586-0-1 OLGQ
D-203-3.01-SK4598-0-10LGQ
D-203-3.01-SK4602-0-10LGQ
D-203-3. 01-SK4622-0-1 OLGQ
D-21 0-3.01-SK111 C-0-1 OLHH
D-210-3.01-SK112C-0-10LHH
D-21 0-3.01-SK122C-0-1 OLHH
D-21 0-3.01-SK123C-0-1 OLHH
D-210-3.01-SK124C-0-1 OLHH
D-204-3.01-SK002C-0-10LHH
Test Section Drawing YES July7,2014 D-204-3.0 1-SK003C-0-1 OLHH
D-204-3.01-SK008C-0-10LHH
D-204-3.01-SK009C-0-1 OLHH
D-204-3.01-SK010C-0-10LHH
D-204-3.01-SK013C-0-10LHH
D-21 0-3.01-SK116C-0-1 OLHH
D-210-3.01-SK118C-0-10LHH
D-21 0-3.01-SK120C-0-1 OLHH

Review Materials Documentation YES July7,2014 N/A

Establishing intended maximum operating


pressure (MOP), and for deviations to YES July 7,2014 1900 kPa
existing MOP approval by Engineering
-
All NDE Reviewed YES July7,2014 Approved by Enbridge

Equipment List YES July 7,2014 Certifications in Hydro package

Pre Hydro-Package Approvals YES July7,2014 Approved By Enbridge

Environmental Concerns I Issues NO July 7,2014 Testing with Water- outdoors

Page 1 of 2
Confidential and proprietary information of En bridge Pipelines Inc. and its affiliates. Not for distribution or circulation by any Contractor

Page 14 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

MPFCS·CKL·HTQC-025-rOO.docx Hydrostatic Test QA Checklist


December 2010 Canadian Facility Construction Services NBRIDGE

Safety precautions specific to the


Test area flagged off for hydro. Workers to sign
circumstances, including setback YES July7,2014
off on FLRA. Workers to wear faceshields .
distances for workers and the public

Pre-job Meeting with Workers YES July7,2014 Reviewed test, read and signed FLRA

Calibration of Test Instruments YES July7,2014 AMS instruments and Berja

Pressure Recorder Set YES July7,2014 12 Hour Clock Setting- 24 hour chart
2090 kPa (Leak Test)
Test Acceptance Criteria YES July7,2014 2964 kPa (Strength test MAX)
2850 kPa (Strength test MIN)

Contractor Representative: Company Representative:

Name (Print): LiL£ OK,IZA I JIJE;;T'Z. Name (Print): ~~#""'"~

Signature: ~ Signatur~------------­
Date: ~ t.JL~ I 0 1 d.o P·l• Date~· /tl. ~t:7/{
If the contractor has their own form that meets all information on this form the Contractor's form may be used.

Page 2 of 2
Confidential and proprietary information of En bridge Pipelines Inc. and its affiliates. Not for distribution or circulation by any Contractor

Page 15 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

Pressure Recorder Chart Identification Stamp EN BRIDGE

Enbridge Test # or License#: ___.a.d~'~-------


~
A location : l:ZD tv\'\
Project:
AFE #:
~~E
~ \Do l
t..iPco&D

B~A ( u tH~L4J Q)
0 Test Date: _ _ .JLi 1, ;l_ !) 1§:
~
.c;.. Piping Service & Flange#: Sc:;e PRessuaE IB'r ((eeop:r
~ Maximum Operating Pressure:
Strength Test Pressure : :-=-_.::;
Min: ~¥~0 Max: l¥<\'\ Duration :
I 9 OD K.pa...
2~~;....~<6~.:::0::......__~---:---
{,~m i n .
-
1
Time On & Initial (Enbridge): \ t ·. DD AM !lfJi.
Time Off & Initial (Enbridge}: \~ ~oL. PM.· t7JJI
Leak Test Pressure : d.o9 0 . Is, J<pg..
_ Min: J.o9 o.1.. K..:2Q. -Duration : 9 m ;(\ ·
- Time On & lnitial( fnbridge): l.t. ·. Jo P M · /17.11
Time Off & Initial (Enbridge}: l l '.J"\ PM . /JJ/1
WATt:!?
Test Medium:
Pressure Element Range : o- SoDo \koo... - (Blue pen color)
., 0 c f
J
Temperature Element Range:- > 0 o "'.JDc:. 2 (Red pen color)
Drawing Numbers: Sfc: A1itlo+ED 'Tc:s-r PI<.Gt.
Contractor Job Number: YD1 DJ.1 - QooYY.
Contractor Test Number: ----"'~~~'-------:::---
CONTRACTOR REPRESENTATIVE p fJ
(Print/Sign) Li Lt Dl<t€8 11\JE:"T l.. ~
ENBRIDGE REPRESENTATIVE ~~
(Prin t/Sign) ./"&·~~

v
g
Page 16 of 43

Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

EP-CSG-02-F-0046 RO

Pressure Recorder Chart Identification Stamp EN BRIDGE


En bridge Test # or License #: --:~ =:.....
1 --------
Location: e
0 M "t W P c.oR.D
Project: ).;. A E:
AFE #: IILilDOI B 8'i ( l-11H ~ LGQ) Graphic Controls
Test Date: O"UL't 1, ;to I~
Piping Service & Flange #: <,;ee: eee:ss~.H2.€ -res-r
Maximum Operating Pressure: lqOO K.pc... • NO. MC MT-30-0-SOC
Strength Test Pressure: __ _,!il; d.:....~~
Ul:!:
iC~.._.,.-.,-----
C/1
Min: J.~D Max: d-~19 Duration : lo/o 00 j n · 0 z
Time On & Initial (Enbridge): I l: bO AM /l2tL 0
0
Time Off & Initial (Enbridge.): I l: olo .=> M. n;,t,L CHART PUT ON z
Leak Test Pressure: ~D<tO · ~ !Lfa.. ( :'fofiN
Min: ~oCfo . to l{;tt. Duration: q m / "1 · e. D M 'I wPcof<.D
Time On & Initial (Enbridge): /:2.'. .Jo PM "Tt;ST ~d.. I
Time Off & Initial (Enbridge): I J. ·. .;l3 P n1
Test Medium : we.u R
o-
Pressure Element Range: Sooo KpQ.. {Blue pen color)
Temperature Element Range: · 3t>0 <- ±o 5ob-. {Red pen color)
Drawing Numbers: See ArrAC. HfP T E S T PI<.~ ·
Contractor Job Number: 'tol oJ.1 - ooo'-1-'-{
-
Contractor Test Number :--~~..-.-_ _ _ _ _ __
CONTRACTOR REPRESENTATIVE
(Print/Sign) L'l Lt DKRA I 1\.le/ 7:-
ENBRIDGE REPRESENTATIVE ~
(Print/Sign) 6??'~//.f"~

Page 17 of 43


Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

Pressure Test Data Report


Canadian Facilities Construction Services EN BRIDGE
F-INSP-066-FPTDR-Rl.DOT

CONTRACTOR NAME: WorleyParsons Cord

LOCATION: EDMY

PROJECT I AFE: EAE I I 141001884 (LHH & LGQ) Page 1 of 3

TEST NO.: TEST 21 TEST DATE: July7,2014


D-203-3.01-SK4586-0-1 OLGQ
D-203-3.01-SK4598-0-1 OLGQ
D-203-3.01-SK4602-0-1 OLGQ
D-203-3.01-SK4622-0-1 OLGQ
D-210-3.01-SK111C-0-10LHH
D-210-3.01-SK112C-0-10LHH
D-21 0-3.01-SK 122C-0-1 OLHH
D-210-3.01-SK123C-0-1 OLHH
1.01.M.01
D-21 0-3.01-SK124C-0-1 OLHH
DRAWING NO. :
D-204-3.01-SK002C-0-10LHH
CWP NO.: 1.04.M.01
9B
D-204-3.01-SK003C-0-1 OLHH
D-204-3.01-SKOOBC-0-1 OLHH
D-204-3.0 1-SK009C-0-1 OLH H
D-204-3.01-SK01 OC-0-1 OLHH
D-204-3.01-SK013C-0-1 OLHH
D-21 0-3.01-SK116C-0-1 OLHH
D-210-3.01-SK11BC-0-10LHH
D-21 0-3.01-SK120C-0-1 OLHH

DEADWEIGHT
PRESSURE TEMPERATURE°C REMARKS
TIME kpa I psi (Weather, Volumes Added/Bled Off)
AMBIENT PIPE MEDIUM GROUND
(Thermometer) (Recorder) Thermocouple)
Equilibrium - Stabilization before
8:45 0 20 20 N/A
test
Equilibrium - Stabilization before
8:55 0 20 20 N/A
test

9:05 0 20 20 N/A Equilibrium - Stabilization before


test
9:15 0 20 20 N/A Equilibrium -Stabilization before
test
0% Strength test pressure
9:30 0 20 21 N/A

0% Test pressure - Begin Test


9:50 0 21 22 N/A

Begin 25% strength test pressure -


10:02 741.1 21 22 N/A
(741 kPa)
End 25% Strength test pressure - check
10:11 760.2 22 22 N/A
for leaks.
Begin 50% strength test pressure -
10:23 1482.4 22 22 N/A
(1482 kPa)
End 50% Strength test pressure - check
10:33 1515 22 22 N/A
for leaks.
Begin 75% strength test pressure -
10:43 2223.5 22 22 N/A 2223 kPa)

Page 18 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

Pressure Test Data Report


Canadian Facilities Construction Services EN BRIDGE
F-INSP-066-FPTDR-Rl.DOT

CONTRACTOR NAME: WorleyParsons Cord

LOCATION: EDMY

PROJECT I AFE: EAE I 1141001884 (LHH & LGQ) Page 2 of 3

TEST NO.: TEST 21 TEST DATE: July7,2014


D-203-3.01-SK4586-0-1 OLGQ
D-203-3.0 1-SK4598-0-1 OLGQ
D-203-3.01-SK4602-0-1 OLGQ
D-203-3.01-SK4622-0-10LGQ
D-21 0-3.01-SK111 C-0-1 OLHH
D-21 0-3.01-SK112C-0-10LHH
D-21 0-3 .01-SK122C-0-1 OLHH
D-21 0-3.01-SK123C-0-10LHH
CWP-1.01 .M.01
D-21 0-3 .01-SK124C-0-1 OLHH
DRAWING NO.:
D-204-3.01-SK002C-0-1 OLHH
CWP NO.: 1.04.M.01
D-204-3.01-SK003C-0-1 OLHH
98
D-204-3.01-SKOOSC-0-1 OLHH
D-204-3"01-SK009C-0-1 OLHH
D-204-3.01-SK01 OC-0-1 OLHH
D-204-3 .01-SK013C-0-1 OLHH
D-21 0-3.01-SK116C-0-10LHH
D-210-3.01-SK118C-0-10LHH
D-21 0-3.01-SK120C-0-1 OLHH

DEADWEIGHT
J PRESSURE TEMPERATURE°C REMARKS
TIME kpa I psi (Weather, Volumes Added/Bled Off)
AMBIENT PIPE MEDIUM GROUND
(Thermometer) (Recorder) Thermocouple)
End 75% Strength test pressure - check
10:52 2257 .3 23 22 N/A
for leaks.
100% Strength Test pressure-
11 :00 2880 .6 22 22 N/A
2880 (kPa)
11 :15 2898 24 22 N/A No Leaks Detected (15min)

11:30 2899 24 22 .5 N/A No Leaks Detected (30min)


11 :45 2899 24 23 N/A No Leaks Detected (45min)
No Leaks Detected (66min) Total volume
12:06 2899 25 23 N/A
bled off- 3400 ml
12:20 2090.6 24 23.5 N/A Begin Leak test (2090 kPa)

12:29 2139 23.5 24 N/A End Leak Test - VT on Pipe (2094 kPa)

12:38 1482.4 24 24 N/A Begin 50% Strength test (1482 kPa)

12:48 1536.6 25 24 N/A End 50% Strength test

12:58 741 .1 25 24 N/A Begin 25% Strength test (741 kPa)

1:08 785 25 25 N/A End 25% Strength test


0% Strength test pressure complete -
1:28 0 25 25 N/A
..,) run out chart
1:38 0 25 25 N/A Chart run out and Taken off

Page 19 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

Pressure Test Data Report


Canadian Facilities Construction Services NBIIIDGE
F-INSP-066-FPTDR-Rl.DOT
PAc..,t' ~o~ 3
Contractor Representative Company Representative
Print

/u~
Sign &90
71/Y. /I) . ? OP'I
Date Date

Page 20 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

~
PRESSURE TEST ING FAC ILfTY PIPING
FAC ILITY CONSTRUCTION SPEC IFCATION FCS014 • 2011 ENBRIDGETM
Pressure Test Report
Canadian Facilities Construction Services
F-INSP-065-FPTR-R1 DOT Page 1of _1

Contractor Worleyparsons Cord Test July7,2014


Date
Project EAE Test No. 21
Location Edmonton Modyard AFE 1141001884 (LHH & LGQ)
Drawing No. D-203-3.01 -SK4586-0-1.0LGQ CWP-1 .01 .M.01
D-203-3 .01-SK4598-0-1 OLGQ 1.04.M.01
D-203-3.01-SK4602-0-1 OLGQ 98
D-203-3.01-SK4622-0-1 OLGQ
D-210-3 01-SK111C-0-10LHH
D-21 0-3,01-SK112C-0-10LHH
D-21 0-3.01-SK122C-0-1 OLHH
D-21 0-3.01-SK123C-0-1 OLHH
D-21 0-3.01-SK124C-0-1 OLHH
D-204-3.01-SK002C-0-1 OLHH
D-204-3.01-SK003C-0-1 OLHH
D-204-3.01-SKOOSC-0-1 OLHH
D-204-3.01-SK009C-0-1 OLHH
D-204-3.01-SK01 OC-0-1 OLHH
D-204-3.01-SK013C-0-1 OLHH
D-21 0-3.01-SK116C-0-1 OLHH
D-21 0-3.01-SK118C-0-1 OLHH
D-21 0-3.01-SK120C-0-1 OLHH

PIPE DATA
NPS/0 0 WT Grade Length Mon,fortnrP• • _I _Tvoe.
30" 9.52 Gr.290 Cat I .6 meters SeAH pipe
24" 9.52 Gr.290 Cat I 10.7 meters SeAH pipe
20 9.52 Gr.290 Cat I 5.6 meters SeAH pipe

16 9.52 Gr.290 Cat I 10.1 meters SeAH pipe


12 9.52 Gr.290 Cat I 4.95 meters SeAH pipe
TEST DATA
Test Medium Fill Volume
WATER 12.4m3

REFERENCE INSTRUMENTS TEST EQUIPMENT

Liquid in Glass
Deadweight Pressure Pressure Recorder Pressure Gauge Temperature Recorder
Thermometer
Make nVision Durac Barton N/A Barton
Range 0-1,000 (PSI) -35 to 50°C 0-5000 (kPa) N/A -30 to 50°C
Serial No. 462145 P14439 AMS-280 N/A AMS-054

CALI BRA T!ON VERIFICATION BEFORE TEST CALIBRATION VERIFICATION AFTER TEST
25%Test 50% 75% 100% 100% LEAK 50% 25%
Pressure (T. P) TP T.P. T.P. T.P. T,P. T.P.
Deadweight 741.1 1482.4 2223.5 2880 2899 2090.62 1482.4 741.1
Pressure Recorder 730 1465 2225 2890 2920 2115 1500 760
Pressure Gauge N/A N/A N/A N/A N/A N/A N/A N/A
Test Aim Test Pressure Minimum Maximum Duration
Strength 2880kPa 2880.6kPa 2899kPa 66MIN
Leak 2090 kPa 2090.6 kPa 2139kPa 9MIN

Page 21 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

See Accompanying Pages for Pressure and Temperature Records

Contractor Representative: Company Representative:

(Print) (Print)

(Sign)
_ __ __2
"P
~~·0
~~·~
- ~-
C
~--
Date :

REVISION3.3,JANUARY 11,2011 PAGEI4


COPYRIGHT©2011 EN BRIDGE PIPELINESNC. ALL RIGHTS RESERVED
UNCONTROLLED COPY

Page 22 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

~
1 A~T UEVU.TIDN ,rRQI1 THE HYDADTE5T PLAN IIUST 8E
APPROVEDBYENBIII.CG£ENCINEEIIINtiEFOIIEINITUTIN~jj
HlDROTEST.
2 !frllltOSTATIC TESl PI!OCEDI)RES SHALL BE IH AtCOIID'-HCE
WITH ENI!IRIDGE: SPECIFICATION FCS~IJq (2JU ED.)
ANDCSAZ662DILANJ;ASPIPELINESYSTEPIS
I..AU$TEDITION.
3 ALL HYDROl!STMUEIUALS TO BE:M'PLIEDBY
CONTRACTOR.
~ ISOlATE All INSTIIUtiEHT$ 00 ~o\I,.V[S PRIOR TO
lf'I'DROTEST ,
5 ~INDICATESLliiiTDf'HYDROTEST.

w... ..,l'........c:....
RECEIVED
t.w

ATMODVARO

2~12 CONSTRUCTION
IE JL1 POR. A-R. '-1 H ~ D Qo :-.:6. I EDmJNTON (AS) TERMINAL
/~ \_! CONNECTIVITY CEAE_TCC)

\4'luRO flU)~- ll''lU~ ..,, n a u


&J

--
H.lft)

---

I
l
"" iiE<<<V<o·'"~
AT KDME OFFICE
.JANWIJI.YH ~1•

!tn7/D-Z11-l. ll-~~~l9--11LH11 !tATERU.L ~!tETRIC

REFERENCE DR"WINGS

..
•...,..
RE'IISIDN IBATEIIY ~ff
("'"""' (i) ......
......,. _
..,.,
.....,,. ..
,,, .......
_ _ . ... .........
. '"",. ...
..... ...
.. , "" .....
. ... , ... _ , • '""'"'
• i._ •..
.,..

~
PRESSURE TEST DETAILS t:DHONTON CAB) TERPIINAL

~,.-,-,-coo::"::::i,:::~:-;;:l:::SlTI\AX::P::l:"':::s:;-""::TESE::TTIIAX=cPREC: P:-": IOI[: Tl tO:;: :I I::::'....,:.,LUIC:::_:_:T:,ES~T~:"~Il=....... :~~I~~L~O ~!N~~~D 286 TIE-I N TO TANK
2
l ::,._=,_:TEE: r-- - ,-..-,_OU_AI_TJ_OM_T_"_s>---l 1'1 LIME
,,.,..,....,0\C. ...., HYDROTEST ISWIETRIC

Page 23 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

(_ )

~
1. ANY DEVIUIDN FROM 11£ HVDIIOTEST PUN NUST II£
APPRQ¥E11 BY E'IISII105E EHGOIEERINC 8EFURf INITIATDG
HYOitOU:ST.
CON'T O'- t.lf'I'OR0$1'ATlCTE3TPitOCENt£SSHAI.l.IIED""W:IWtCE
GL21C/0-'211-l ll-SIC121C--18t.HH 11lTHEN&IIID8ESf'ECIFICATlONFCS-tlq(2111ED.)
ANDCSf.Z6620U.AIIlWPIPELDESYSTEIIS
LATESTEDITIOH.
2 o\LLHYDAOfESTIUolUV.I..STDIIEstFPI.ltDIT
CONTRACTOR.
II. ISOUTE ALL IHSTRUIENTS oUID VALVES PRIOR TO

5. i
H'l'DitOT'EST.
liWCATESLIIUTDfHY!lROTitT.

WorloyPoJoaJ>OO::••~LIL

\t.JG...DED 10 RECENED
A.TJtODYAR.D

Ct--J t4 9D~ S
~~ ~~/10 tJ,It}J....,.

2~12 CONSTRUCTION
•ll'b I EJMOHTDN UB) fEME~
e , 1COHH£cTIVITY (O t,.. rCl)

\NEL D~D C...~ l!


41
• IH! N Jmtl.Nft • v~ tl

Th
_Fb L Hv(;Jifi'(J

)l
"•~· at~ •:a tfl~· · lll.llli 1\J ftJIJ~:~AJl;
REFERENCE DRAWINGS

. .

CDN'T ON

•...,..
EXISTIHG 31i13-TK•31
""'"'"" ® r,,,,..,,,.,.,,,.. .,.,_., ,,t.,,,.,. .,oonollnot N•..,._._,
.. ........r. .. ..... . "" ' '''""" '~ ;.,.. .. ,,,.., , ....... . . i._,...

~
(~10'0&) 1011\lN&L
:,:E;:,ST::D:;E..:TAoOIL=S==r- -- -- -- - --4 :::l~~L~o 2 !:N~~~D 286
f--===== =====PRE,:;.SS;;,U..:RE-:T TIE-IN TO TANK liJ UME
"-~ 1011 ~ST ~~T~MU~IM; la~EST ~~ti: TUT OORATlOk (lti) HYlliiDTEST ISD~TRIC
:t. ~ c-//~~ IIJ
uJ,.r

D-2Je-3. Bl-SK123C-B-1BLHH QI23C

Page 24 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

NOTES:
l oUjfOEYIIoTIOHFI!OMT HEHTMOTEST PLAIIIWJSTi£
~VEU tl EICUtiOOE E~DIE[IWC &Ef!lllf OOT1U1MG
MI'OIIOTEST.
i! HYDAOSTATitTESTPROCEDliRfSSHAI.LIEDACC~CE
WITH EMI!RIDIIE$l'ECIFICAJI~Jtj FI:S-1111 (i!IUED.J
ANDC$Al6i2DILA I'Il6ASPIPELIH£SYSTEI'tS
UTESTEOrTION.
l f.I.L HI'PUnEST MATERIALS TO &E SI.Ht.IED In'
CONTRACTOR.
'I lSI1ATEALLINSTRllftENTSANDVALVESPRIOR10
HYOROTEST .
5 cf lltOICATES LIIUT Of HfOIIOTE$1

w... ~r,p.,.~••t ~ •dUoL


RECEIVED
AT MOO VARO

WELD E: b TD cJ a 9oa1
,FP~ ~P..2o tt'NJ...Y-
2012 CONSTRUCTION
'·\ I EDNGNTON (U) TERIIIU l
!\ I C~NECTIVITY C£i\LTC2)

rrr.-.., "' . . ~·r.:: I


I .,'~(lgjz.J:Il. ,_'
!. . ..
,__ -- -
1\"foi<!D

CO~ ' T ON
Nl~t/D-2llil-31 1-61hi!U--l lill.tli llHERIAL ISOIE TRIC
EXISTING li8'3•1 ..:zi
REFERENCE ORANlNGS

~13 psi 112:9psl 275p' i Jnpsl


;
••~ ! .1 •l
BELOI/ 'II:ADE
INS~CTION/IlETECTION
~.1 HRS STrtENGTH TEST
lin ;zs s;, lJ I:LI •n ........._
l
::JAJ4

.•. .
p

~-~·~~-~~~oo·~-·~.L~~--~-~-~.~-~-~ ~.-------------------------------------------------------------------------l---J__"_"_'_''_l_,_~_"_"_'_l__"_"_~_•_J__~_"_'_"__L_____J_______~r~~,~~~~,~~,'-'-"-'-~-'--~D-~2~1~9--J~.S~l--~SK~l~2~q~c-~a~-~~~0L~H~H~_J~Q~12~~~c

Page 25 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

AlBERTA MEASUREMENT SERVICES LTD. resr l-1


5327 -91 STREET- EDMONTON, ALBERTA, T6E 2E6- CANADA
Phone {780} 468- 6387- Fax {780} 462-9387

CALIDRATION CERTIFIC TE

CUSTOMER: WorleyParsonsCord TEMPERATURE: 20C


MODEL: nVision CHASSIS SERIAL NUMBER: 351924
RTD MODULE SERIAL NUMBER: 363272 1K MODULE SERIAL NUMBER: 462145
DATE: May 21, 2014 TECHNICIAN: Shane Snider

MASTER INSTRUMENT INSTRUMENT ALLOWABLE


READING READING TOLERANCE

49.9989 n 50.01 n 0.027

99.99422 n 100.Dl Q 0.035

2oo.oon1 n 200.o1 n 0.050

400.00117 n 40o.oo n 0.080

MASTER DEADWEIGHT INSTRUMENT ALLOWABLE


READING READING TOLERANCE

0 PSI 0 PSI 0.15PSI

250 PSI 250.0 PSI 0.15 PSI

500 PSI 500.0 PSI 0.25 PSI

750 PSI 750.0 PSI 0.37 PSI

1000 PSI 1000.0 PSI 0.50 PSI

REMARK: DO NOT EXCEED 1000 PSI.


THE ABOVE INSTRUMENT WAS FOUND TO BE ACCURATE WITHIN THE MANUFACTURER' S
SPECIFICATIONS FOR NON IMPROVED ACCURACY.

THE ABOVE EQUIPMENT HAS BEEN COMPARED TO A RUSIU MODEL 5000 SIN12342
DEADWEIGHT TESTER TRACEABLE TO THE NATIONAL INSTITUTE OF STANDARDS AND
TECHNOLOGY (NIST).

THE ABOVE EQUIPMENT HAS BEEN COMPARED TO A CADDOCI( USF340-50-0.0l%,


USF340-100-0.0l%, USF340-200-0.0J%, USF340-400-0.0J% TRACEABLE TO THE NATIONAL
INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST).

WITNESSED BY: --~


-~
--~
- _ _ __ SIGNATU~ --=:?s:~
-------
-=::::~--====---

Page 26 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

AlBERTA MU.SUREMENT SERVICES lTD


5327 - 91 STREET- EDMONTON, ALBERTA, T6E 6E2
Phone {780} 468- 6387 - Fax {780} 462-9387

RECORDER CALffiRATION CERTIFICATE

CUSTOMER: WorleyParsonsCord AMBIENT TEMP: 20C


MODEL: Barton ACCURACY: ±1 % F.S.
RANGE: 0-5000 kPa x -30 to 50°C SERIAL NUMBER: AMS-280
DATE: May 21, 2014 TECHNICIAN: Jason Olszewski

MASTER DEADWEIGHT PRESSURE PRESSURE


READING AS FOUND AS LEFT

0 kPa NIA 0 kPa

1250 kPa 1250 kPa

2500 kPa 2500 kPa

3750 kPa 3750 kPa

5000 kPa 5000 kPa

MASTER INSTRUMENT TEMPERATURE Ti!:MPERATURE


READING AS FOUND AS LEFT

NIA

REMARKS: THE ABOVE EQUIPMENT HAS BEEN COMPARED TO A RUSKA MODEL 5000
SIN 12342 DEADWEIGHT TESTER TRACEABLE TO THE NATIONAL INSTITUTE OF
STANDARDS AND TECHNOLOGY (NIST).

THE ABOVE EQUIPMENT HAS BEEN COMPARED TO FLUKE M~ODEL 51 SIN 17610133
TRACEABLE TO THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST).

WITNESSEDB~ SIGNATURE: --~


----------

Page 27 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

AUERTA MUSUREMENT SERVICES Lm


5327- 91 STREET- EDMONTON, ALBERTA, T6E 6E2
Phone {780} 468- 6387- Fax {780} 462-9387

RECORDER CALIBRATION CERT IFICATE

CUSTOMER: WorleyParsonsCord AMBIENT TEMP: 20C


MODEL: Barton ACCURACY: ±1% F.S.
RANGE: -30 to 50°C SERIAL NUMBER: AMS-054
DATE: May 21, 2014 TECHNICIAN: Jason Olszewski

MASTER INSTRUMENT RED PEN RED PEN


READING AS FOUND AS LEFT

-30°C N/A -30°C

-l0°C -l0°C

l0°C 10°C

30°C 30°C

50°C 50°C

MASTER JNS'l'RUl\'IENT GREEN PRN GREEN PEN


) READING AS FOUND AS LEFT

-30°C N/A -30°C

-l0°C -looc

l0°C 10°C

30°C 30°C

50°C 50°C

REMARKS: THE ABOVE EQUIPJl'/ENT HAS BEEN COMPARED TO FLUKE MODEL 51


SIN17610133 TRACEABLE TO THE NATIONAL INSTITUTE OF STANDARDS AND

TECHNOLOGY(N% - ,---,- ~
WITNESSED BY: ~ SIGNATURE: _ _ ...__.,
_·~ ---------

Page 28 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

ICR lTI

TH:ER.?.-IOM:ETER CALlBR..<\TlON CERTIFICA1'E

CUSTOMER: Worely Parsons Cord


MODEL: Durae
SERIAL#: P14439
RA_NGE: -35 TO 50°C
DATE: November 12,2013

MASTER THERMOMETER CUSTOMER THERMOMETER


READING AS FOUND AS LEFT

O"C

REN!.A..~KS: THE ABOVE EQU1PMENT HAS BEEN COMPARED TO FLUKE MODEL 151 TRACEABLE TO
NATIONAL STM'DARDS SIN 6565100

THE ABOVE INSTRUN[E1\IT WAS FOUND TO BE ACCURATE WITHIN THE MA!'-i'lJFACTlJRER'S


SPECIF1CAT10NS FOR NON IlVIPROVED ACCURACY.

Page 29 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

MPFCS-CKL-HTQC-025-rOO.docx Hydrostatic Test QA Checklist


December 2010 Canadian Facility Construction Services EN BRIDGE

Contractor: Worle ~ Parsons Cord Date: December 19,2013


Project: En bridge Test No.: TEST 12
Location: Worlel:Parsons Cord Modl:ard AFE#: 1141001884
CWP - 1.05.M.01 & CWP-2 &
CWP#: CWP- 1.04.M.Ol (PLM SPOOLS}

This checklist must be completed and attached to the hydrostatic test records prior to turnover. The following information
must be completf prior to the hydrostatic tests as per Operations and Maintenance Manual Book 3: Pipeline Facilities,
Section 07-02-01 ;
Task Yes I No Date NOTES
DEC
Notifications YES N/A
18,2013

DWG#
D-217-3.01-SK153C-0-10LHH
D-217 -3.01-SK152C-0-1 OLHH
DEC D-203-3 .0 1-SK0526-0-1 OLGQ
Test Section Drawing YES
18,2013 D-203-3.01-SK0530-0-1 OLGQ
D-21 0-3.01-SK125C-0-1 OLHH
(TIE POINT# 157)
D-21 0-3.01-SK124C-0-1 OLHH
(TI E POINT# 155)
DEC
Review Materials Documentation YES N/A
18,2013
Establishing intended maximum operating
DEC
pressure (MOP), and for deviations to YES 1900 kPa
18,2013
existing MOP approval by Engineering
DEC
All NDE Reviewed YES Approved by Enbridge
18,2013
DEC
Equipment List YES Certifications in Hydro package
18,2013
DEC
Pre Hydro-Package Approvals YES Approved By Enbridge
18,2013

DEC
Environmental Concerns I Issues NO Testing with Water/Glycol - outdoors
18,2013

Safety precautions specific to the


DEC Test area flagged off for hydro. Workers to sign
circumstances, including setback YES
18,2013 off on FLRA. Workers to wear faceshields .
distances for workers and the public

DEC
Pre-job Meeting with Workers YES Reviewed test, read and signed FLRA
18,2013
DEC
Calibration of Test Instruments YES AMS instruments and Berja
18,2013
DEC
Pressure Recorder Set YES 12 Hour Clock Setting - 24 hour chart
18,2013

Page 1 of 2
Confidential and proprietary information of En bridge Pipelines Inc. and its affiliates. Not for distribution or circulation by any Contractor

Page 30 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

MPFCS-CKL·HTQC-025-rOO.docx Hydrostatic Test QA Checklist


December 2010 Canadian Facility Construction Services

2090 kPa (Leak Test)


DEC
Test Acceptance Criteria YES 2964 kPa (Strength test MAX)
18,2013
2850 kPa (Strength test MIN)

Contractor Representative: Company Representative:

Name (Print): _ _ _s=-·~L.c::o:....o%....:....::::r--"G,"-'-.,'--'I::l.-----


,( Name (Print) : _,_L::....:..cL!:.9...,W!=~~""""':......£.
1/. .61:nt~<:LII!:r..'-CLWA
-=-..L.
,.,.E!I!F"Y
;.z...;:S
..___ __ _
Signature: _ _ __ ___,.f~"'~
2vu.a:IEf---Y'noc
A f.A"----- Signature: ........t.~
==--~\=::::....::=----------­
Date: ----={).«4!..,.c......_~l='1-~;----r,.....M>
"""'-'~;....~~--- Date: ----~P.~r,:.....,,-
....._.,_c....
L ..c..,.....
. -.2.""10""'/'--';"'--=-.-
' - -- --

If the contractor has their own form that meets all information on this form the Contractor's form may be used.

Page 2 of 2
Confidential and proprietary information of En bridge Pipelines Inc. and its affiliates. Not for distribution or circulation by any Contractor

Page 31 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

ressure Recorder Chart Identification Stamp EN BRIDGE


En bridge Test #or License #: __;.l_\.~-------­
Location: EbttY Coed-Lve
Project: EA ~
AFE #: \ \ !d I oo l ~8 Y
Test Date: Dc< c. t c, 1 :\. o, "'

A
_
,
Piping Service & Flange#: ('?r· Mo fAr S
Maximum Operating Pressure: ..JI~'1uo£Ja:L-.I!OkLI>~e.-_ _ __
Strength Test Pressure: -..!!~M:C1:1.-'kR..::t4-k.~~""!:L..- - - - --
Min: ). "~>o Max: Mll i Duration : _....(p"".l~ml!-':o.,_.__ __
Time On & Initial (Enbridge): __ ,~ :=...:...
: .=o...:S':...._.tP=..:"l3.___~At t:LL.."-fl!:::::..__
Time Off & Initial (Enbridge) : _:_l..:..:..!::o:..s8L..I:P:...:.;"'1.
~----'m. =~=-­ Graphic Controls
leak Test Pressure: _ _..A....,O~D1~0.J..-~IG=~~&-.
- =---------
Mi n: ), o; l Duration :__..., _~ --'- ; -'-
"".::...__ _ _ __ NO. MC MT -30-0-500
Time On & Initial ( Enbridge) : _\'-:_._l-"'1.?4~~<-=~ =-----Lil1 .=.:~/~
. ­ \~ \-\2.
METE~:) !I~
C/1
Time Off & Init ial (Enbridge): _:l!..!;.....:A.:lo-3~~!...:.""~----LJ/Jta:"'-:=::..._ C\v..,lr-
0 z
0
TestMedium : \.,&J-o-J £21.,co'
Pressure Element Range : 6-
Srlc:>o lc ~&s (Blue pen color)
t 1
R...o~\c-.~o~ 0
z
c "-----' TAKEN OFF
If Temperature Element Range: (Red pen color) P...M __ : ~{) ~ M
\ Drawing Numbers: ~&. '· A.~ ..c.-\.uJ.. ~ ~ !>rv.,.Y __j.v~- ~or~
Contractor Job Number : 4
Ql o :q • C>oO(.t '-1
(>:~e. ­
\(..""~(.<"C.,\-v> £...
o"l)

Page 32 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

Pressure Recorder Chart Identification Stamp

Enbridge Test #or License # :_\.:...'X


~--------
Location: Cl\1=1 Y \.t +> (eu-- cA.
c
A
Project: EA
AFE#: Ill! IOOI§\"S?I:f
Test Date: ~u< lq t ~01?.
- Piping Service & Flange#: ft, . ~tlo LA-I 1-
Maximum Operating Pressure: --!.I...J: "'OO~..!llt....tPs.
~---­
Strength Test Pressure: --~~fiG.~a.'-1 ::1.....-'k!:>c:-P.~~'------­
/~ Min: ~<:tOo Max: ~j3 ~ Duration : b 3 ~: "'
' Time On & Initial (Enbridge): lA: o $" ~"" /JJI). /CHART NO. MC MP-5000
I Time Off & Initial (Enbridge): ( : 1> g P""' /IN) l':t \.\~
1 leak Test Pressure: __MSMo!.."'~O
.! ~k....:"..::J~.....__ _ _ _ _ _
I
.,'11 Min: 'O..(? "'H Duration : I C'!-~ Q
METEHN'\S ' 0 <II
l.'lt.c.. \q \~c:o1.1
I C."-c.v \-
'.' Time On & Initial (Enbridge): l : 14 4»"" /7111.. TAK E !~ OFF
CHART PUT ON
I • Time Off~ Initial (Enbridge): i · ~?. f M /Jl/1. \\ : 00 t\ 1·1
1
1\'l Test Medtum: Y.,~:<k.c.J (p (.,co\
1
Pressure Element Range: 0 - $"0@ ~
'I Temperature Element Range : _ _ _ __
Drawing Numbers: ~&,, Af:h;,(\..,.c<J-
ContractorJobNumber: 4o"lo:::t..7 -Oookt~
\

I
Page 33 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

~
L ""llEYUnoM f!OI litE lf1'tlfi01EST I'I..M IIU518(
~&YEIIIR:IDII£ENSIMEEIUJC!IEFDRElliiinATD5
Hl'liUJTiST •

./~ z. ttromk~~~ ~1~(:1~NC{


MD c•' :~ott. oo w I'D'tl.IHE mmm:
u rcnmTlGit.
3. ALLHTCIROlUT".UERIAL.S TO IE Sli'PLIED8Y
COtmi.AC:TOII.
ll . ISOLJ.TE ALL DISTIUIENTS oUil YlLYES PRIOfl TO
tm:IIIOTUT.
5. "'INDICATESLIJilT Of HYDROTEST.

wo,-.,P.'"...:OI'IILJL
RECfNED
AT MOO YARD
~r1,21D14

2012 CONSTRUCTION
1')\ EDIDITON (All) TUJI~L
L!..l COHCTIYilY {UE ... fe<' )
,.. . . u•t• stM mtu ~ • n iC'I' u
~
~
........., ......... !lil t/ In I ..,.,..

F£Rl&IT TO iilM;TICf. I
[
sr..... r~l

"'"'"
1"""-2~ -~- - - ·I
1~~E;;:~-~~~· ~%~ j

M1ilt91D-lli-3.11~U- 111Jfi UTERlAL ISOtEl'RIC


REFERENCE DRAWINGS

... ll.'l'llJOI IU.Itltr]~

-lOti ® ::;-.:::~ ~ ;---:,-::.=-;-: ~.::.;::~

t:J•••••••
~I"JKK,JJIESJII:.

1IZID .».ftt • - . :
_,......,.~

EDifONTON UB) TER11IHAL


PRESSURE TEST DETIIll.S ltANIFOLD 211 AREA
NPS 24 TO PIAHIFOLD 286 TIE-IN TO T.WC 29 LINE
~ IRtlO..I ~r ~ ~~~MXP~ ~ IWI~Sl ~~t!f
..
TEST DlltATn* UI!S)
HYOROlEST lSOI!ETRIC

... ll-13psl ... ,., 2l5p•l 313psl


!.:.!..-' AJCI:=~"':- n
~
.,.. _ ....,
~ 0/I{Tllil!fA/) tiJ

Z85111PII Hi4tp.t 19.1CP. zt,.tp• """"""" D-21B-3. 01-SK12'1C-0-10LHH I Q12'1C


• '-' ~. m• frV;t

Page 34 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

Pressure Test Data Report <

Canadian Facilities Construction Services ·E N BRIDGE


F-INSP-066-FPTDR-Rl.DOT

CONTRACTOR NAME: WorleyParsons Cord

LOCATION : EDMY

PROJECT I AFE: EAE /1141001B84 Page 1 of 2

TEST NO.: TEST 12 TEST DATE: December 19, 2013


D-217-3.01-SK153C-0-1 OLHH
D-217 -3.01 -SK152C-0-1 OLHH CWP- 1.05.M.01
D-203-3.01-SK0526-0-1 OLGQ CWP-2
DRAWING NO.: D-203-3.01-SK0530-0-1 OLGQ
CWP NO.: CWP- 1.04.M.01 (PLM
D-210-3.01 -SK125C-0-1 0LHH (TIE POINT# 157) SPOOLS)
D-210-3.01-SK124C-0-10LHH (TIE POINT# 155)

DEADWEIGHT
PRESSURE TEMPERATURE°C/°F REMARKS
TIME kpa I psi (Weather, Volumes Added/Bled Off)
AMBIENT PIPE MEDIUM GROUND
(Thermometer) (Recorder) Thermocouple)
Equilibrium - Stabilization before
9:00 0 -16 -18.5 N/A
test
Equilibrium - Stabilization before
9:1 5 0 -16 -18.5 N/A
test

9:30 0 -16 -18.5 N/A Equilibrium - Stabilization before


test
9:45 0 -16 -18.5 N/A Equilibrium - Stabilization before
test
0% Strength test pressure
10:00 0 -16 -18.5 N/A

0% Test pressure - Begin Test


11 :00 0 -17 -18 N/A

Begin 25% strength test pressure -


11 :19 741 -17 -17 N/A
(741 kPa)
End 25% Strength test pressure - check
11 :28 776 -17 -17 N/A
for leaks.
Begin 50% strength test pressure -
11 :36 1482 -17 -17 N/A
(1482 kPa)
End 50% Strength test pressure - check
11 :46 1502 -16 -17 N/A
for leaks.
Begin 75% strength test pressure -
11 :51 2224 -16 -17 N/A
2223 kPa)

Contractor Representative

Sign

Date Date

Page 35 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

.
Pressure Test Data Report
Canadian Facilities Construction Services .2: ~EN BRIDGE
F-INSP-066-FPTDR-Rl. DOT

CONTRACTOR NAME: WorleyParsons Cord

LOCATION : EDMY

PROJECT I AFE: EAE /1141001884 Page 2 of 2

TEST NO.: TEST 12 TEST DATE: December 19,2013


D-217-3.01-SK153C-0-1OLHH
D-217-3.01-SK152C-0-1 OLHH CWP- 1.05.M.01
D-203-3.01-SK0526-0-1 OLGQ CWP-2
DRAWING NO.: D-203-3.01-SK0530-0-1 OLGQ
CWP NO.: CWP- 1.04.M.01 (PLM
D-210-3.01-SK125C-0-10LHH (TIE POINT# 157) SPOOLS)
D-210-3.01-SK124C-0-10LHH (TIE POINT# 155)

DEADWEIGHT
TEMPERATURE°C/°F REMARKS
PRESSURE
TIME kpa I psi (Weather, Volumes Added/Bled Off)
AMBIENT PIPE MEDIUM GROUND
(Thermometer) (Recorder) Thermocouple)
End 75% Strength test pressure - check
11:59 2267 -16 -17 N/A
for leaks.
100% Strength Test pressure-
12:05 2900 -16 -17 N/A
2910 (kPa)
No Leaks Detected (15min) (Bled off
12:20 2938 -15 -17 N/A
118ml)
No Leaks Detected (30min) (Bled off
12:35 2921 -15 -17 N/A
236m I)
No Leaks Detected (45min) (Bled off
12:50 2920 -14 -16 N/A
236m I)
1:08 2937 -14 -15.5 N/A No Leaks Detected (63min)

1:16 2091 -14 -15 N/A Begin Leak test (2090 kPa)

1:23 2125 -14 -15 N/A End Leak Test - VT on Pipe (2090 kPa)

1:30 1482 -14 -15 N/A Begin 50% Strength test (1482 kPa)

1:39 1515 -14 -15 N/A End 50% Strength test

1:45 741 -14 -14.5 N/A Begin 25% Strength test (741 kPa)

1:54 763 -14 -14.5 N/A End 25% Strength test


0% Strength test pressure complete -
2:08 0 -14 -14.5 N/A
run out chart
2:20 0 -14 -14.5 N/A Chart run out and Taken off

Contractor Representative Company Representative


Print

Sign

Date Date

Page 36 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

PRESSURE TESTING ·FACILITY PPING


FACILITY CONSTRUCTION SPECIFICATION FCS014 • 2011

Pressure Test Report


Canadian Facilities Construction Services
F-INSP-065-FPTR-R1 .DOT Page__L__of__L___

Contractor Worleyparsons Cord Test Date December 19, 2013


Project EAE Test No. 12
Location Edmonton Modyard AFE 1141001884
Drawing No. D-217-3.01-SK153C-0-1 OLHH CWP# CWP - 1.05.M.01
D-217-3.01-SK152C-0-1 OLHH CWP-2
D-203-3.01-SK0526-0-1 OLGQ CWP- 1.04.M.01 (PLM SPOOLS)
D-203-3.01-SK0530-0-1 OLGQ
D-21 0-3.01-SK125C-0-1 OLHH
(TIE POINT# 157)
D-21 0-3.01-SK124C-0-1 OLHH
(TIE POINT# 155)

PIPE DATA
NPS/OD WT Gmcle I enllth Manufactu re• · Tvne
24" 9.52 GR.241 / GR.290 CAT I 12,000mm SEAH STEEL PIPE

TEST DATA
Test Medium Fill Volume
WATER/GLYCOL 3.29m 3

REFERENCE INSTRUMENTS TEST EQUIPMENT

Liquid in Glass
Deadweight Pressure Pressure Recorder Pressure Gauge Temperature Recorder
Thermometer
Make Crystal Durac Barton N/A Barton
Range 0-5,000 (PSI) -35 to 50°C 0-5000 (kPa) N/A -30 to 50°C
Serial No. BK-523 P14439 AMS-091 N/A AMS-332

CALIBRATION VERIFICATION BEFORE TEST CALIBRATION VERJFICA TION AFTER TEST


25%Test 50% 75% 100% 100% 75% 50% 25%
Pressure (T.P) TP. T.P . T.P. T.P. T.P. T.P. T.P.
Deadweight 741 1482 2224 2900 2937 2091 1482 741
Pressure Recorder 750 1450 2190 2860 2900 2090 1490 760
Pressure Gauge N/A N/A N/A N/A N/A N/A N/A N/A

Test Aim Test Pressure Minimum Maximum Duration


Strength 2910 kPa 2900 kPa 2938 kPa 63 MIN
Leak 2090 kPa 2091 kPa 2125 kPa 7 MIN
See Accompanying Pages for Pressure and Temperature Records

Contractor Representative: Company Representative:

(Print)

(Sign)

Date:

COPYRIGH
REVISION 3.3, JANUARY 11,2011

Page 37 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

BERJA Meter & Controls Ltd. Telephone: (780) 440-1234


831-77 1n Avenue Facsimile: (780) 440-4775
Edmonton, AB
Canada, T6P 1S9 E-mail : shop@berjameters.com

CERTIFICATE OF CAUBRATION
DEAD WEIGHT TESTER

CUSTOMER: Cord Worle~ Parsons LOCATION: Edmonton, AB


MANUJI'ACTUREII: Crtstar (SIN: 262247} MO~L•: Cr~sta l XP2i
UNIT•: BK-523 RANGE: 0 - 5,000 PSI
TDINIIATUIU:: 20°C WORK ncKKT: 2251 2
DATIE CAUBIIATIED: 09-Jun-13 DUKDATIE: 08-Jun-14
TacHNICIAN: Mike Wells PONUIIIID: Credit Card

MASTER DEAD WEIGHT CUSTOMER DEAD %ERROR OF % ERROR OF FULL


READING WEIGHT READING READING SCALE
0 PSI 0.0 0.000 0.000
500 PSI 500.2 0.040 0.004
1000 PSI 1000.1 0.010 0.002
1500 PSI 1500.2 0.013 0.004
2000 PSI 2000.0 0.000 0.000
2500 PSI 2500.2 0.008 0.004
3000 PSI 3000.2 0.007 0.004
3500 PSI 3500.0 0.000 0.000
4000 PSI 3999.4 -0.015 -0.012
4500 PSI 4499.1 -0.020 -0.018
5000 PSI 4999.2 -0.016 -0.016

THE ABOVE UNIT WAS COMPARED TO A PRESSMAN MASTER DEAD WEIGHT SERIAL# 4571-86 WHICH WAS
VERIFIED TO AN AMETEK MASTER DEAD WEIGHT SERIAL# 91363 TRACEABLE TO NIST REPORT# 7067 AND
212.32/ 1 8094. CALIBRATIONS ARE IN ACCORDANCE WITH API 6A, 17TH EDITION, SECTION 7.3

~~
TECHNICIAN
r- _ ~
WITNESS

Quality, Service & Integrity Since 1975

Page 38 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

lliEITI MUSUIEMEIIT SEIIVICES LTD


5327- 91 STREET- EDMONTON , ALBERTA. T6E 6E2
Phone {780} 468- 6387- Fax {780} 462-9387

RECORDER CALIBRATION CERTIFICATE

CUSTOMER: Worley Parsons Cord AMBIENT TEMP: 20C


MODEL: Barton ACCURACY: ±1% F.S.
RANGE: -30 to 50°C MECHANIC: Jason Olszewski
SERIAL #: AMS-332
DATE: December 11,2013

MASTER INSTRUMENT RED PEN RED PEN


READING AS FOUND AS LEFT

N/A

MASTER INSTRUMENT GREEN PEN GREEN PEN


READING AS FOUND AS LEFT

NIA

REMARKS: THE ABOVE EQUIPMENT HAS Bh"'l!.'N COMPARED TO FLUKE MODEL 51


S/Nl7610133 TRACEABLE TO THE NATIONAL INSTITUTE OF STANDARDS AND
TECHNOLOGY (NIST).

WITNESSED BY: ~ SIGNA;;E: _ _ _._.J_=~=:;_ ;_-C)= =-------

Page 39 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

IIIEITI MUSUIEMEIIT SERVICES llD


5327- 91 STREET- EDMONTON, ALBERTA, T6E 6E2
Phone {780} 468- 6387- Fax {780} 462-9387

RECORDER CALIBRATION CERTIFICATE

CUSTOMER: Worley Parsons Cord AMBIENT TEMP: 20C


MODEL: Barton ACCURACY: ±1% F.S.
RANGE: 0 - 5000 kPa x -30 to 50°C STATIC ZERO AS FOUND: N/A
SERIAL #: AMS-091 STATIC ZERO AS LEFT: 0 kPa
DATE: December 11, 2013 MECHANIC: Jason Olszewski

MASTER DEADWEIGHT PRESSURE PRESSURE


READING AS FOUND AS LEFT

OkPa N/A 0 kPa

1250 kPa 1250 kPa

2500 kPa 2500 kPa

3750 kPa 3750 kPa

5000 kPa 5000 kPa

MASTER INSTRUMENT TEMPERATURE TEMPERATURE


READING AS FOUND AS LEFT

N/A

REMARKS: 1'HE ABOVE EQUIPMENT HAS BEEN COMPARED TO A RUSJ(A MODEL 5000
SIN 12342 DEADWEIGHT TESTER WHICH WAS CALIBRATED AGAINST A DHI MODEL RPM-
4 SIN 489 TRACEABLE TO THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
(NIST).

THE ABOVE EQUIPMENT HAS BEEN COMPARED TO FLUKE MODEL 51 SIN 17610133
TRACEABLE TO THE NATIONriL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST).

WITNESSEDBY: ~ SIGNATURE: ~- Z2

Page 40 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

IUERTA MEISURE.NT SERVICES lTD


5327- 91 STREET- EDMONTON, ALBERTA, T6E 6E2
Phone {780} 468- 6387 - Fax {780} 462-9387

RECORDER CALIBRATION CERTIFICATE

CUSTOMER: Worley Parsons Cord AMBIENT TEMP: 20C


MODEL: Barton ACCURACY: ±1% F.S.
RANGE: 0-5000 kPa x -30 to 50°C STATIC ZERO AS FOUND: N/A
SERIAL #: AMS-275 STATIC ZERO AS LEFT: 0 kPa
DATE: December 11, 2013 MECHANIC: Jason Olszewski

MASTER DEADWEIGHT PRESSURE PRESSURE


READING AS FOUND AS LEFT

OkPa N/A OkPa

1250 kPa 1250 kPa

2500 kPa 2500 kPa

3750 kPa 3750 kPa

5000 kPa 5000 kPa

MASTER INSTRUMENT TEMPERATURE TEMPERATURE


READING AS FOUND AS LEFT

N/A

l0°C

REMARKS: THE ABOVE EQUIPMENT HAS BEEN COMPARED TO A RUSIC4 MODEL 5000
SIN 12342 DEADWEIGHT TESTER WHICH WAS CALIBRATED AGAINST A DHI MODEL RPM-
4 SIN 489 TRACEABLE 1'0 THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
(NIST).

THE ABOVE EQUIPMENT HAS BEEN COMPARED TO FLUKE MODEL 51 SIN 17610133
TRACEABLE TO THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOlOGY (NIST).

c:~,
~ ATURI~: _ . . ,sc...:z;...__o=a
-----·
WITNESSED BY: SIG =•'--"'..c::.:/
=--- -- - --

Page 41 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

lliEIITI MEISUIIEMEIT SEIIVICES 111


5327- 91 STREET- EDMONTON. ALBERTA, T6E 6E2
Phone {780} 468- 6387- Fax {780} 462-9387

RECORDER CAUBRATION CERTIFICATE

CUSTOMER: Worley Parsons Cord AMBIENT TEMP: 20C


MODEL: Barton ACCURACY: ±1% F.S.
RANGE: -30 to 50°C MECHANIC: Jason Olszewski
SERIAL #: AMS-394
DATE: December 11, 2013

MASTER INSTRUMENT RED PEN RED PEN


READING AS FOUND AS LEFT

N/A

MASTER INSTRUMENT GREEN PEN GREEN PEN


READING AS FOUND AS LEFT

N/A

REMARKS: THE ABOVE EQUIPMENT HAS BEEN COMPARED TO FLUKE MODEL 51


S/N17610133 TRACEABLE TO THE NATIONAL INSTITUTE OF STANDARDS AND
TECHNOLOGY (NIST).

WITNESSED BY: -{-rt-_=___g;=-J------- -_ -


SIGNATURE:
-- --bo~...,...~'-'?)~-----

Page 42 of 43
Eastern Access EdmontonTerminal Connectivity Phase 2 ( TC2) Attachment No. 6 - Piping Hydro Test M210 Package 1
Facilities Approved Pursuant to NEB Order and Amending Order October 3, 2014
XO-E101-014-2013 and AO-001-XO-E101-014-2013

II.IIITI MIISIIUIIII SERVICES lll


5327 - 91 STREET- EDMONTON. ALBERTA, T6E 6E2 ~CANADA
Phone {780} 488-6387 - Fax {180} 462-9387

THERMOMETER CALIBRATION CERTIFICATE

CUSTOMER: Worely Parsons Cord


MODEL: Durac
SERIAL#: P14439
RANGE: -35 TO 50°C
DATE: November 12, 2013

MASTER THERMOMETER CUSTOMER THERMOMETER


READING AS FOUND AS LEFT

REMARKS: THE ABOVE EQUIPMENT HAS BEEN COMPARED TO FLUKE MODEL 151 TRACEABLE TO
NATIONAL STANDARDS SIN 6565100

THE ABOVE INSTRUMENT WAS FOUND TO BE ACCURATE WITHIN THE MANUFACTURER'S


SPECIFICATIONS FOR NON IMPROVED ACCURACY.

Page 43 of 43

You might also like