CRONOGRAMA VALORIZADO DE EJECUCION

PROY.: INSTALACION DE RIEGO TECNIFICADO CUNCASHCA - JANGAS - HUARAZ


LOCALIDAD: CUNCASHCA - JANGAS DISTRITO: JANGAS HUARAZ -ANCASH
ITEM DESCRIPCION Und. Metrado Precio (S/.) Parcial (S/.) MES 1 MES 2

01 OBRAS PROVISIONALES 1,872.20 1,872.20 0.00


01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40 X 3.60 m u 1.00 787.50 787.50 787.50 0.00
01.02 CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO glb 1.00 1,084.70 1,084.70 1,084.70 0.00
02 CAPTACION DE LADERA 5,580.98 5,580.98 0.00
02.01 OBRAS PRELIMINARES 72.00 72.00 0.00
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 60.00 0.08 4.80 4.80 0.00
02.01.02 TRAZO Y REPLANTEO m2 60.00 1.12 67.20 67.20 0.00
02.02 MOVIMIENTO DE TIERRAS 1,258.33 1,258.33 0.00
02.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 13.96 30.60 427.18 427.18 0.00
02.02.02 RELLENO CON MATERIAL PROPIO ZARANDEADO (CAMA DE APOYO) m3 0.68 27.35 18.60 18.60 0.00
02.02.03 RELLENO CON MATERIAL GRAVA Ø 1/2" m3 6.49 92.48 600.20 600.20 0.00
02.02.04 RELLENO CON MATERIAL PROPIO m3 1.58 12.48 19.72 19.72 0.00
02.02.05 ELIMINACION MATERIAL EXCEDENTE m3 14.05 13.71 192.63 192.63 0.00
02.03 SUMINISTRO E INSTALACION DE TUBERIAS 523.94 523.94 0.00
02.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC DRENALOC Ø 6" m 17.00 30.82 523.94 523.94 0.00
02.04 OBRAS DE CONCRETO SIMPLE 774.44 774.44 0.00
02.04.01 CONCRETO CICLOPEO f'c=175 kg/cm2 + 25 % PM. m3 2.08 279.33 581.01 581.01 0.00
02.04.02 CONCRETO f'c=175 kg/cm2 m3 0.31 330.45 102.44 102.44 0.00
02.04.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (OBRAS DE m2 3.26 27.91 90.99 90.99 0.00
02.05 OBRAS DE CONCRETO ARMADO 1,667.49 1,667.49 0.00
02.05.01 CONCRETO f'c=175 kg/cm2 m3 2.21 330.45 730.29 730.29 0.00
02.05.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (OBRAS DE m2 20.46 27.91 571.04 571.04 0.00
02.05.03 ACERO ESTRUCTURAL fy=4200 KG/CM2 kg 83.79 4.37 366.16 366.16 0.00
02.06 REVOQUES Y ENLUCIDOS 218.91 218.91 0.00
02.06.01 TARRAJEO CON IMPERMEABILIZANTE MORTERO 1:3 m2 7.94 27.57 218.91 218.91 0.00
02.07 INSTALACION DE ACCESORIOS 1,065.87 1,065.87 0.00
02.07.01 INSTALACION DE ACCESORIOS EN CAPTACION DE LADERA glb 1.00 724.99 724.99 724.99 0.00
CRONOGRAMA VALORIZADO DE EJECUCION
PROY.: INSTALACION DE RIEGO TECNIFICADO CUNCASHCA - JANGAS - HUARAZ
LOCALIDAD: CUNCASHCA - JANGAS DISTRITO: JANGAS HUARAZ -ANCASH
ITEM DESCRIPCION Und. Metrado Precio (S/.) Parcial (S/.) MES 1 MES 2

02.07.02 TAPA METALICA 0.60x0.60m e=3/16" u 1.00 183.99 183.99 183.99 0.00
02.07.03 TAPA METALICA 0.40x0.40m e=3/16" u 1.00 156.89 156.89 156.89 0.00
03 RESERVORIO (58 m3) 45,240.76 34,130.32 11,110.44
03.01 OBRAS PRELIMINARES 120.00 120.00 0.00
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 100.00 0.08 8.00 8.00 0.00
03.01.02 TRAZO Y REPLANTEO m2 100.00 1.12 112.00 112.00 0.00
03.02 MOVIMIENTO DE TIERRAS 8,080.59 6,635.06 1,445.54
03.02.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 188.31 30.60 5,762.29 5,762.29 0.00
03.02.02 COMPACTACION MANUAL DE TERRENO m2 52.81 2.23 117.77 117.77 0.00
03.02.03 RELLENO CON MATERIAL PROPIO m3 25.33 12.48 316.12 189.67 126.45
03.02.04 RELLENO CON MATERIAL DE PRESTAMO m3 44.36 42.48 1,884.41 565.32 1,319.09
03.03 OBRAS DE CONCRETO SIMPLE 1,008.28 1,008.28 0.00
03.03.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=4" m2 47.11 15.85 746.69 746.69 0.00
03.03.02 CONCRETO f'c=175 kg/cm2 m3 0.42 330.45 138.79 138.79 0.00
03.03.03 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (OBRAS DE m2 4.40 27.91 122.80 122.80 0.00
03.04 OBRAS DE CONCRETO ARMADO 25,179.54 25,179.54 0.00
03.04.01 CONCRETO f 'c=210 kg/cm2 m3 39.40 357.00 14,065.80 14,065.80 0.00
03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (OBRAS DE m2 102.32 27.91 2,855.75 2,855.75 0.00
03.04.03 ACERO ESTRUCTURAL fy=4200 KG/CM2 kg 1,889.70 4.37 8,257.99 8,257.99 0.00
03.05 REVOQUES Y ENLUCIDOS 3,206.41 1,187.45 2,018.96
03.05.01 TARRAJEO EN EXTERIORES m2 59.60 18.92 1,127.63 563.82 563.82
03.05.02 TARRAJEO CON IMPERMEABILIZANTE MORTERO 1:3 m2 75.40 27.57 2,078.78 623.63 1,455.15
03.06 JUNTAS DE DILATACION 615.60 0.00 615.60
03.06.01 JUNTAS DE DILATACION m 27.00 22.80 615.60 0.00 615.60
03.07 VEREDA PERIMETRAL 1,229.05 0.00 1,229.05
03.07.01 CONCRETO CICLOPEO f'c=175 kg/cm2 + 25 % PM. m3 4.40 279.33 1,229.05 0.00 1,229.05
03.08 INSTALACION DE ACCESORIOS 1,026.16 0.00 1,026.16
CRONOGRAMA VALORIZADO DE EJECUCION
PROY.: INSTALACION DE RIEGO TECNIFICADO CUNCASHCA - JANGAS - HUARAZ
LOCALIDAD: CUNCASHCA - JANGAS DISTRITO: JANGAS HUARAZ -ANCASH
ITEM DESCRIPCION Und. Metrado Precio (S/.) Parcial (S/.) MES 1 MES 2

03.08.01 INSTALACION DE ACCESORIOS PARA RESERVORIO glb 1.00 550.18 550.18 0.00 550.18
03.08.02 ESCALERA METALICA TIPO GATO u 1.00 291.99 291.99 0.00 291.99
03.08.03 TAPA METALICA 0.60x0.60m e=3/16" u 1.00 183.99 183.99 0.00 183.99
03.09 CERCO PERIMETRICO 4,775.13 0.00 4,775.13
03.09.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 1.04 30.60 31.82 0.00 31.82
03.09.02 SUMINISTRO Y COLOCACION DE TUBO NEGRO 3" u 13.00 91.20 1,185.60 0.00 1,185.60
03.09.03 MALLA CRIPADA GALVANIZADA Nº 10 m2 79.20 37.79 2,992.97 0.00 2,992.97
03.09.04 CONCRETO CICLOPEO f'c=175 kg/cm2 + 25 % PM. m3 1.04 279.33 290.50 0.00 290.50
03.09.05 INSTALACION DE PUERTA DE MALLA CRIPADA GALVANIZADA u 1.00 274.24 274.24 0.00 274.24
CRONOGRAMA VALORIZADO DE EJECUCION
PROY.: INSTALACION DE RIEGO TECNIFICADO CUNCASHCA - JANGAS - HUARAZ
LOCALIDAD: CUNCASHCA - JANGAS DISTRITO: JANGAS HUARAZ -ANCASH
ITEM DESCRIPCION Und. Metrado Precio (S/.) Parcial (S/.) MES 1 MES 2

04 LINEA PRINCIPAL (1046 ml) 29,317.13 23,141.95 6,175.18


04.01 OBRAS PRELIMINARES 1,265.61 1,265.61 0.00
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,045.96 0.08 83.68 83.68 0.00
04.01.02 TRAZO, NIVELACION Y REPLANTEO m 1,045.96 1.13 1,181.93 1,181.93 0.00
04.02 MOVIMIENTO DE TIERRAS 15,171.21 10,816.22 4,354.99
04.02.01 EXCAVACION MANUAL EN ZANJAS EN MATERIAL SUELTO m3 206.91 34.28 7,092.87 7,092.87 0.00
04.02.02 EXCAVACION MANUAL EN MATERIAL CONGLOMERADO m3 37.48 38.95 1,459.85 1,459.85 0.00
04.02.03 REFINE Y NIVELACION ZANJA PARA TUBERIA 1"-4" m 1,045.96 1.07 1,119.18 1,119.18 0.00
04.02.04 RELLENO CON MATERIAL PROPIO ZARANDEADO (CAMA DE APOYO) m3 41.84 27.35 1,144.32 1,144.32 0.00
04.02.05 RELLENO Y COMP DE ZANJA CON MATERIAL PROPIO m3 209.19 18.05 3,775.88 0.00 3,775.88
04.02.06 ELIMINACION MATERIAL EXCEDENTE m3 42.24 13.71 579.11 0.00 579.11
04.03 SUMINISTRO E INSTALACION DE TUBERIAS 11,060.12 11,060.12 0.00
04.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP Ø 2" C-10 m 152.43 7.53 1,147.80 1,147.80 0.00
04.03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP Ø 2 1/2" C-10 m 342.00 8.74 2,989.08 2,989.08 0.00
04.03.03 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP Ø 3" C-10 m 235.00 10.59 2,488.65 2,488.65 0.00
04.03.04 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP Ø 4" C-7.5 m 316.53 14.01 4,434.59 4,434.59 0.00
04.04 PRUEBA HIDRAULICA 920.44 0.00 920.44
04.04.01 PRUEBA HIDRAULICA m 1,045.96 0.88 920.44 0.00 920.44
04.05 INSTALACION DE ACCESORIOS 899.75 0.00 899.75
04.05.01 INSTALACION DE ACCESORIOS EN LINEA PRINCIPAL u 1.00 899.75 899.75 0.00 899.75
05 CAJA DE REUNION 692.15 0.00 692.15
05.01 MOVIMIENTO DE TIERRAS 34.27 0.00 34.27
05.01.01 EXCAVACION MANUAL EN MATERIAL SUELTO m3 0.73 30.60 22.34 0.00 22.34
05.01.02 ELIMINACION MATERIAL EXCEDENTE m3 0.87 13.71 11.93 0.00 11.93
05.02 OBRAS DE CONCRETO SIMPLE 189.70 0.00 189.70
05.02.01 CONCRETO f'c=175 kg/cm2 m3 0.27 330.45 89.22 0.00 89.22
05.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA ESTRUCTURAS DE CONCRETO (OBRAS DE m2 3.60 27.91 100.48 0.00 100.48
CRONOGRAMA VALORIZADO DE EJECUCION
PROY.: INSTALACION DE RIEGO TECNIFICADO CUNCASHCA - JANGAS - HUARAZ
LOCALIDAD: CUNCASHCA - JANGAS DISTRITO: JANGAS HUARAZ -ANCASH
ITEM DESCRIPCION Und. Metrado Precio (S/.) Parcial (S/.) MES 1 MES 2

05.03 INSTALACION DE ACCESORIOS 468.18 0.00 468.18


05.03.01 ACCESORIOS EN CAJA DE REUNION glb 1.00 284.19 284.19 0.00 284.19
05.03.02 TAPA METALICA 0.60x0.60m e=3/16" u 1.00 183.99 183.99 0.00 183.99
06 RED DE DISTRIBUCION (1149 ml) 67,658.22 1,828.84 9,558.98
06.01 OBRAS PRELIMINARES 1,390.45 1,390.45 0.00
06.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,149.13 0.08 91.93 91.93 0.00
06.01.02 TRAZO, NIVELACION Y REPLANTEO m 1,149.13 1.13 1,298.52 1,298.52 0.00
06.02 MOVIMIENTO DE TIERRAS 15,403.08 438.39 9,558.98
06.02.01 EXCAVACION MANUAL EN ZANJAS EN MATERIAL SUELTO m3 255.77 34.28 8,767.80 438.39 8,329.41
06.02.02 REFINE Y NIVELACION ZANJA PARA TUBERIA 1"-4" m 1,149.13 1.07 1,229.57 0.00 1,229.57
06.02.03 RELLENO CON MATERIAL PROPIO ZARANDEADO (CAMA DE APOYO) m3 45.97 27.35 1,257.28 0.00 0.00
06.02.04 RELLENO Y COMP DE ZANJA CON MATERIAL PROPIO m3 229.83 18.05 4,148.43 0.00 0.00
06.03 SUMINISTRO E INSTALACION DE TUBERIAS 9,274.95 0.00 0.00
06.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP Ø 2" C-10 m 635.08 7.53 4,782.15 0.00 0.00
06.03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP Ø 2 1/2" C-10 m 514.05 8.74 4,492.80 0.00 0.00
06.04 PRUEBA HIDRAULICA 1,011.23 0.00 0.00
06.04.01 PRUEBA HIDRAULICA m 1,149.13 0.88 1,011.23 0.00 0.00
06.05 INSTALACION DE ACCESORIOS 40,578.51 0.00 0.00
06.05.01 INSTALACION DE ACCESORIOS PARA VALVULA REDUCTORA DE PRESION Ø 2" u 2.00 972.14 1,944.28 0.00 0.00
06.05.02 INSTALACION DE ACCESORIOS PARA CASETA DE ARCO DE RIEGO Ø 2" u 15.00 1,085.66 16,284.90 0.00 0.00
06.05.03 INSTALACION DE ACCESORIOS PARA CASETA DE ARCO DE RIEGO Ø 2 1/2" u 13.00 1,085.66 14,113.58 0.00 0.00
06.05.04 INSTALACION DE ACCESORIOS PARA CASETA DE ARCO DE RIEGO Ø 2 1/2" PARA TURNO 3 u 5.00 600.66 3,003.30 0.00 0.00
06.05.05 INSTALACION DE ACCESORIOS PARA VALVULA DE AIRE Ø 2 1/2" u 1.00 379.73 379.73 0.00 0.00
06.05.06 INSTALACION DE ACCESORIOS PARA VALVULA DE AIRE Ø 3" u 1.00 382.73 382.73 0.00 0.00
06.05.07 INSTALACION DE ACCESORIOS PARA VALVULA DE AIRE Ø 4" u 1.00 386.23 386.23 0.00 0.00
06.05.08 INSTALACION DE ACCESORIOS PARA VALVULA DE CONTROL Ø 2" u 3.00 358.68 1,076.04 0.00 0.00
06.05.09 INSTALACION DE ACCESORIOS PARA VALVULA DE CONTROL Ø 2 1/2" u 4.00 381.68 1,526.72 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION
PROY.: INSTALACION DE RIEGO TECNIFICADO CUNCASHCA - JANGAS - HUARAZ
LOCALIDAD: CUNCASHCA - JANGAS DISTRITO: JANGAS HUARAZ -ANCASH
ITEM DESCRIPCION Und. Metrado Precio (S/.) Parcial (S/.) MES 1 MES 2

06.05.10 INSTALACION DE ACCESORIOS PARA VALVULA DE CONTROL Ø 3" u 1.00 580.68 580.68 0.00 0.00
06.05.11 INSTALACION DE ACCESORIOS PARA VALVULA DE PURGA Ø 2" u 4.00 225.08 900.32 0.00 0.00
07 SUB UNIDAD DE RIEGO PARA ASPERSORES VYR 50 AG 15,080.22 0.00 0.00
07.01 MOVIMIENTO DE TIERRAS 3,645.52 0.00 0.00
07.01.01 EXCAVACION MANUAL EN ZANJAS EN MATERIAL SUELTO m3 70.20 34.28 2,406.46 0.00 0.00
07.01.02 RELLENO Y COMP DE ZANJA CON MATERIAL PROPIO m3 52.65 18.05 950.33 0.00 0.00
07.01.03 ELIMINACION MATERIAL EXCEDENTE m3 21.06 13.71 288.73 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION
PROY.: INSTALACION DE RIEGO TECNIFICADO CUNCASHCA - JANGAS - HUARAZ
LOCALIDAD: CUNCASHCA - JANGAS DISTRITO: JANGAS HUARAZ -ANCASH
ITEM DESCRIPCION Und. Metrado Precio (S/.) Parcial (S/.) MES 1 MES 2

07.02 LINEA FIJA 11,434.70 0.00 0.00


07.02.01 SUM. E INST. DE LINEA FIJA PARA ASPERSORES VYR 50 AG u 10.00 1,096.05 10,960.50 0.00 0.00
07.02.02 SUM. E INST. DE 5 ASPERSORES VYR 50 AG DE 1/2" u 5.00 94.84 474.20 0.00 0.00
08 SUB UNIDAD DE RIEGO PARA ASPERSORES VYR 70 V 43,748.38 0.00 0.00
08.01 MOVIMIENTO DE TIERRAS 14,301.66 0.00 0.00
08.01.01 EXCAVACION MANUAL EN ZANJAS EN MATERIAL SUELTO m3 275.40 34.28 9,440.71 0.00 0.00
08.01.02 RELLENO Y COMP DE ZANJA CON MATERIAL PROPIO m3 206.55 18.05 3,728.23 0.00 0.00
08.01.03 ELIMINACION MATERIAL EXCEDENTE m3 82.62 13.71 1,132.72 0.00 0.00
08.02 LINEA FIJA 29,446.72 0.00 0.00
08.02.01 SUM. E INST. DE LINEA FIJA PARA ASPERSORES VYR 70 V u 51.00 541.92 27,637.92 0.00 0.00
08.02.02 SUM. E INST. DE 2 ASPERSORES VYR 70 V DE 1" u 10.00 180.88 1,808.80 0.00 0.00
09 FLETE 25,596.39 25,596.39 0.00
09.01 FLETE TERRESTRE glb 1.00 15,481.54 15,481.54 15,481.54 0.00
09.02 FLETE RURAL glb 1.00 10,114.85 10,114.85 10,114.85 0.00
10 CAPACITACION 7,500.00 2,500.00 2,500.00
10.01 CAPACITACION DE SISTEMA DE RIEGO POR ASPERSION glb 1.00 7,500.00 7,500.00 2,500.00 2,500.00
11 ENSAYOS DE LABORATORIO 400.00 400.00 0.00
11.01 DISEÑO DE MEZCLA glb 1.00 250.00 250.00 250.00 0.00
11.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) u 1.00 150.00 150.00 150.00 0.00
12 SEGURIDAD INDUSTRIAL 9,600.00 3,200.00 3,200.00
12.01 EQUIPOS DE PROTECCION PERSONAL mes 3.00 1,800.00 5,400.00 1,800.00 1,800.00
12.02 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 4,200.00 4,200.00 1,400.00 1,400.00
TOTAL 252,286.43 98,250.68 33,236.75
MES 3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MES 3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MES 3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MES 3

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MES 3

0.00
0.00
0.00
56,270.40
0.00
0.00
0.00
5,405.71
0.00
0.00
1,257.28
4,148.43
9,274.95
4,782.15
4,492.80
1,011.23
1,011.23
40,578.51
1,944.28
16,284.90
14,113.58
3,003.30
379.73
382.73
386.23
1,076.04
1,526.72
MES 3

580.68
900.32
15,080.22
3,645.52
2,406.46
950.33
288.73
MES 3

11,434.70
10,960.50
474.20
43,748.38
14,301.66
9,440.71
3,728.23
1,132.72
29,446.72
27,637.92
1,808.80
0.00
0.00
0.00
2,500.00
2,500.00
0.00
0.00
0.00
3,200.00
1,800.00
1,400.00
120,799.00