Proper design and execution can make compaction


grouting a reliable method for densifying loose soils
and raising settled structures
BY SAMSON W. BANDIMERE

structure is only as good as the rheology, specialized drilling techniques

A ground supporting it. Dense, sta-


ble soil prevents foundations from
settling. On the other hand,
poorly compacted soils can turn
the best-built building into an owner’s
nightmare.
In many cases, compaction grouting can
and pumping technology. Today, com-
paction grouting can best be described as
an art based on scientific principles.
Despite its many advances, compaction
grouting remains poorly understood, even
by many civil engineers. This article, based
on my 25 years as a contractor in the in-
solve soil density problems. In compaction dustry, highlights what works and what
grouting, a stiff mortar-like grout is doesn’t, and describes how owners, engi-
pumped into the soil. Rather than flowing neers and contractors can pool their re-
through the soil, the grout forms an ex- spective talents to successfully complete
panding bulb, displacing the soil while compaction grouting projects.
forcing out air and water. The resulting
denser soil has a higher load-bearing ca- Performance specs and
pacity, thus stopping or preventing settle- technical proposals
ment. Compaction grouting can also be To greatly increase the chances of a suc-
used to lift settled structures. cessful project, it’s crucial for the engineer
Invented in the early 1950s, compaction to develop proper specifications and for
grouting has undergone a slow transforma- the owner to select a qualified contractor.
tion from an ill-defined art form to a scien- The most common mistake is to select a
tific method with known engineering pa- contractor based on price alone (low bid)
rameters. Although it is a relatively simple and to pay items on a “per-unit” basis (for
concept, compaction grouting involves all example, volume of grout pumped). A far
the complexities of forensic engineering, better way is to write performance specifi-
soil mechanics, mix proportioning, grout cations that require the contractor to meet

1 • CONCRETE CONSTRUCTION / JANUARY 1999


a certain desired end result (for ex- ods that we have found to produce n Larger and longer casings require
ample, to increase the density or excellent results. not only more room overhead,
penetration resistance of the soil at but bigger—and more cumber-
various depths) and then pay a Grout casings serve a dual some—drill rigs or driving tools.
lump-sum for verified results. Over- purpose n Longer casings require crew mem-
run and underrun unit costs should A proper grout casing serves two bers to be lifted high off the
seldom be allowed. Mobilization important purposes: It acts as the ground to disconnect grout hose
should be limited to a percentage of drill stem that drills the hole and headers and read pressure gauges.
the total bid or eliminated entirely. then becomes the grout casing that Contractors have used cranes
To ensure selection of a compe- delivers the grout to its destination which allow them to pull out the
tent contractor, the owner and engi- in the ground. This allows a one- grout casing sections in one long
neer should require all bidders to pass insertion and withdrawal sys- pull. It may look very impressive
submit technical proposals that veri- tem which minimizes hole cave-in (and seem logical) to use “big iron,”
fies their understanding of the pro- problems and maintains intimate such as large drills capable of han-
ject challenges and how they will soil-to-casing contact. dling 20-foot casings, cranes, high-
meet the end-result specifications. The casing must be able to with-
The engineer then reviews the pro- stand the rigors of the drilling, dri-
posals and eliminates those that do ving and withdrawal forces. The drill Compaction grouting vs.
not demonstrate sufficient knowl- bits and driving points must be dis-
edge of the technical needs of the posable so there are no restrictions
concrete pumping
project. Finally, the owner examines to the grout exiting the tip. The cas-
Each year, numerous concrete
the eligible proposals (with legal ing connections also should have
pumping contractors add com-
counsel if necessary) for contractual flush joints both inside and outside.
paction grouting to their list of
commitments and selects the con- This requires the sectional threads to
services as a way to keep their
tractor. be within the wall of the casing.
pumps busy. To many of them,
Such a system places responsibil- We have found the most effective
compaction grouting appears to
ity for expertise where it should be— casing segments to be 3 feet long
be little more than pumping
on the contractor. As a result, con- with an inside diameter of 2 inches.
concrete into the ground.
tractors are paid for results, rather Larger and longer drill casings may
Nothing could be further
than for pumping services. If the be used, but they have many disad-
from the truth.
owner and engineer consider techni- vantages:
The name of the game in the
cal merits instead of price alone, n Workers have trouble lifting and
concrete pumping industry is vol-
change orders are minimized and handling them, especially when
ume. How fast can a yard of con-
projects are completed on time and they’re full of grout.
crete be moved from point A to
on budget. n Commercial drill/grout casings
point B? In compaction grouting,
To make such a system work, the typically have very expensive dis-
however, high pumping rates are
owner must be willing to pay the en- posable bits or require drill rigs ca-
typically counterproductive.
gineer to perform a thorough inves- pable of handling duplex drilling
The average pumping rate for
tigation to identify and quantify the methods. These are usually cum-
effective compaction grouting is
soil deficiencies. Three ASTM test bersome and require casing sizes
about 2 cubic feet per minute at
methods that engineers commonly larger than 4 inches in diameter.
sustained pressures up to 1,500
use to measure the density or pene- n A casing larger than 4 inches in
psi. Almost all commercial con-
tration resistance of soil are shown diameter may be hard to hold
crete pumps are designed to
in the box on page 108. The engi- down when you start grouting be-
pump larger volumes at sus-
neer should then perform the same cause the grout tends to push the
tained lower pressures. Therefore,
tests after grouting and throughout casing back out of the ground be-
they are not capable of perform-
the project to make sure the contrac- fore a grout take initiates at the
ing true compaction grouting.
tor achieves the desired improve- bottom casing.
There is plenty of room in the
ments. n Due to their larger surface area,
compaction grouting industry
This way, the engineer’s responsi- casings larger than 4 inches in di-
for newcomers that are up to the
bilities are limited to investigation ameter may be hard to withdraw
unique challenges these projects
and verification, rather than to when grout surrounds the bottom
demand. But success in the com-
telling contractors how to do their section.
paction grouting industry re-
work. Contractors are free to apply n Engineers become nervous about
quires more than simply provid-
their skills to meet the objectives of drilling large-diameter holes
ing concrete pumping services.
the project. The following describes through structural elements such
the equipment, materials and meth- as footings, slabs and caissons.
such as wet clays, the grout can’t be pumped. Figure 3
should not have shows the aggregate gradations that
additional water produce acceptable grouts.
added to them. In Early compaction grout mixes did
All photos by Denver Grouting: A Division of Hayward Baker Inc.

these cases, use dri- not contain coarse aggregates be-


ving tools, such as cause of pump limitations. Advances
small sheet-pile dri- in pumping equipment have al-
vers, backhoe- lowed the use of bigger aggregates.
mounted breakers This, in turn, has allowed the use of
or “hole-hog” units more silt particles without sacrificing
(Fig. 2) to drive the the grout’s internal friction. Today,
grout casings with- the maximum aggregate size is lim-
out wetting the ited only by the inside diameter of
soil. These powerful the delivery system.
driving units re- Aggregates from different sources
quire a mounting will produce different grout
adapter on the cas- strengths and grout control even
Figure 1. This hand-held drill injects water into the soil as it ing, and the casing though the sieve analyses and ce-
advances the casing. Some soils, such as dry Loess silts, re- itself must be able ment contents are the same. Con-
quire added moisture to be compacted effectively. to withstand the tractors must be prepared to alter
driving forces. mix designs based on aggregate
Engineers should sources, suppliers and soil types. It
capacity concrete pumps and ready- be aware that there has been found that limestone re-
mix trucks. But true compaction is no need to compromise the site’s quires far less silt in the mix than
grouting takes time because of the required grout casing locations be- other aggregate types. Unfortu-
way the soil behaves in the ground. cause of a contractor’s equipment nately, limestone may not be readily
The average grout injection rate is limitations. Whether drilling available in certain areas of the
usually less than 2 cubic feet per through a footing, slab or caisson, in country.
minute, which makes high-produc- a crawl space, closet or tank—even Portland cement is required only
tion equipment too expensive. Con- among an industrial plant’s maze of when the injected grout column will
tractors who become impatient and pipes and plumbing—a true com- be used as an independent structural
begin injecting grout too quickly paction grouting specialist should be element and, therefore, must de-
will cause hydro-fracturing or high able to drill at the required locations velop a designed compressive
pore pressure build-up in the at competitive rates. The contractor strength. However, for ground im-
ground, and usually do more harm should also be responsible for any provement applications (where the
than good. damage caused by gaining access for grout is used only as the medium to
the drilling equipment. densify the soil), the grout does not
Drilling and driving necessarily need to develop a com-
equipment Mix proportions: pressive strength.
Because most soils to receive com- Balancing pumpability There is currently a great need for
paction grouting are soft or loose (or and grout control an additive that could replace the
you wouldn’t be grouting them), A compaction grouting mix must minus-200 particles as the pumping
grout casings can usually be drilled have two qualities: high internal aid in compaction grouting mixes.
or driven with hand-held equipment friction (to limit its travel in the Finding sources of silt with a low
to depths of over 100 feet. If a site ground) and pumpability. Improving plasticity index can be a real chal-
has soil that is very difficult to drill, one of these qualities, however, usu- lenge. In addition, moisture in silts
truck- or track-mounted rigs may be ally means compromising the other. can create problems in cold weather
required, assuming there is room for Internal friction and pumpability as they tend to frost up, creating
them. But in most cases, small hand- are greatly influenced by the chunks that can plug mixers and
held equipment usually outperforms amount and plasticity index (ASTM hoses.
the large equipment. D 4318) of the finest particles in the
Some soils, such as dry Loess silts, mix—those passing the #200 sieve Ready-mix delivery
require added moisture to be com- (often called “silt”). If the grout has is impractical
pacted effectively. In these cases, ro- too much silt with too high a plas- Delivery of grout to the jobsite by
tary drills with through-the-body ticity index (greater than 20), it will ready-mix truck is usually not practi-
water injection capability are effec- pump easily, but it will lose its inter- cal. Compaction grouting mixes do
tive (Fig. 1). However, other soils, nal friction. If too little silt is used, not contain enough water to allow
the “flopping action” of the rotating
drum to mix the grout effectively.
Also, because the stiff grout is hard
to discharge from the drum, workers
tend to add too much water to the
mix. In addition, compaction grout-
ing ties up the ready-mix trucks too
long because of the slow grout injec-
tion rate.
An effective way to batch and mix
the grout is to use a mobile volumet-
ric mixing truck (Fig. 4). The truck
carries all the materials in bins and
mixes them with an auger on an as-
needed basis. This method allows for
the staging of bulk materials and
loading equipment offsite, thereby
minimizing onsite disruptions. Mix-
ing rates can be coordinated with in- Figure 2. This percussive casing advancer, or “hole hog,” drives the grout casings
jection rates, and mix proportions without wetting the soil.
can be adjusted as needed. Although
this method has low labor costs, it
has high equipment costs and re- ity is reduced, but its line-pressure blowouts, and they reduce line pres-
quires crew members to carry CDL capacity is almost doubled. This sure, especially if they’re allowed to
licenses. high pressure requires that addi- curl or wind.
The other mixing option is to tional reinforcement be built into Some contractors use large drill
store and batch materials at the job- the delivery system, including the rigs to insert the grout casing, then
site and have workers load them hoppers, outlet flanges and cou- inject the grout through the drill
into small mortar-type mixers. This plings. Also, because compaction head while withdrawing the casing.
method tends to be more disruptive grouting injection rates may be re- Engineers should be wary of this
to jobsite operations. It has higher duced to as low as 1⁄4 cubic foot per practice because properly propor-
labor costs but lower equipment minute, the hydraulic systems must tioned compaction grouting mixes
costs. be built so that they do not overheat usually can’t be pumped through
Compaction grout mixes are abra- when sustaining these low output the swivels and abrupt turns of drill
sive, especially those containing an- volumes with back pressures up to heads. If a contractor insists it’s pos-
gular aggregates. Contractors must 1,500 psi. sible, have the contractor do an on-
be prepared to maintain mixers and site demonstration by injecting sev-
their components, because they Delivery eral holes. Then dig up the grout to
wear out quickly, regardless of the system should allow verify that the grout remains in a
type used. smooth grout flow homogenous mass. Unless there is
The delivery system includes all some reason for compromising the
Use a low-volume, the equipment it takes to deliver the travel index of the grout, the in-
high-pressure pump grout from the pump hopper to its jected masses should not have wings
Using the right pump and operat- destination in the ground, such as or hydraulic fractures that extend
ing it correctly are crucial parts of the pump valve system, slick lines, more than 20% farther than the av-
compaction grouting. We use the hoses, clamps, headers and casings. erage distance the homogeneous
Putzmeister DGS 2015, a pump built Compaction grouting mixes are mass expanded from the point of in-
specifically for compaction grouting very harsh and stiff, and are pumped jection.
(Fig. 5). It differs from the normal at low flow rates. Therefore, the Even if there were a drill head that
concrete pump in that its output ca- pumping line must not have abrupt could accommodate the injection of
pacity is restricted by smaller mater- elbows or turns to obstruct the flow a compaction grout mix that appears
ial cylinders and pistons. The of grout. To minimize line blockages, to perform adequately, make sure
pump’s 4-inch-inside-diameter mate- use short lines (position the pump the injection rate is carefully moni-
rial cylinders are still driven by the close to the work), use long sweep- tored during the project. Contractors
same hydraulic rams that normally ing elbows for turns and use steel usually can’t afford to have drill rigs
drive 6-inch-diameter cylinders. slickline wherever possible. Rubber sitting over a hole where grout is
Therefore, its volume output capac- hoses are more susceptible to being injected at less than 2 cubic
feet per minute. It may be easy for grout casing, shove a tightly wound
the contractor to use a slow injec- sponge down the casing several feet, Commonly used soil
tion rate for the test, only to speed then pour a cement slurry or slicken-
up the process later, which can com- ing agent on top of it before hook-
density and penetration
pletely change the grout control in ing up the grout line to the casing. resistance tests
the ground. If the pump is stopped during
Because compaction grouts bleed grouting, the grout at the end of the Below are three ASTM stan-
their mix water easily, the entire de- casing will slowly lose water, which dard test methods that are
livery system, including the pump can cause a blockage when pumping commonly used to measure the
valves, hose/line connections and is resumed. Therefore, activate the density or penetration resis-
casing joints must be watertight to pump for one or two strokes every tance of soils. They can all be
prevent water loss from the grout. To five minutes or so during any breaks found in Volume 4.08 of the
test for leaks, plug the end of the de- to keep fresh grout at the casing tip. Annual Book of ASTM Standards.
livery line and fill the entire system n D 1586-84, “Penetration Test
with water. Then pressurize the sys- Placement sequence and Split-Barrel Sampling of
Soils”
tem by stroking the grout pump. Because every site is different, it is
The system should suffer minimal impossible to standardize com- n D 2937-94, “Density of Soil
water loss at a pressure of 1,000 psi. paction grouting probe spacing, in Place by the Drive-Cylinder
Method”
A leaky system is more susceptible to placement procedures and se-
clogging during pumping. Adding quences. Many factors, including n D 3441-94, “Deep, Quasi-Sta-
more water to the mix to offset this soil types, site conditions, and the tic, Cone and Friction-Cone
Penetration Tests of Soil”
water loss is a “hit-or-miss” proposi- results of soil tests influence the
tion that can be difficult for the probe spacing, grout volumes,
grout crew to handle. pumping pressures, and injection
Open grout lines must be primed rates and sequence needed to correct top-downs typically work best for
before you pump grout through the soil deficiencies. improving the ground at depths of 3
them. One way is to break the line The grout can be injected from to 15 feet and when incremental re-
into small sections until grout flow the “bottom up” or “top down,” de- leveling of a structure is required.
slickens each section’s wall before pending on the desired result. Bottom-up placement is faster
connecting the next section. This Grouting from the top down is more (due to continuous pumping) and,
method works fine for surface hoses expensive because of the additional therefore, cheaper. It works very well
and slick lines but not for the grout time required to drill through previ- to stabilize structures that require
casing in the ground. To prime the ously placed grout stages. However, very little, if any, re-leveling. But it
doesn’t compact soils less than 15
feet deep as well as top-downs.
Hydrometer Sieve Sizes The two systems can be com-
3/ " bined. Say a structure with a shallow
50 min 200 50 16 4 4 3" 8"
foundation has settled and the soil is
90 10 very soft to depths greater than 15
its

Percent retained

feet. In those areas where the struc-


Percent passing

lim

e
70 lin 30 ture requires re-leveling, do bottom-
r

it s

ups from bedrock up to about 10


we

lim

feet below the structural element.


Lo

50 50
eal e r Then do top-downs until you en-
Id pp counter the bottom-up grout. With
30 U 70
t this sequence, the bottom-ups pro-
mi
t li vide a stabilized base for the top-
10 Sil 90
downs to push against. The top-
Clay to silt Sand Gravel downs can then lift the structure in
increments. This system works well
Early designs Current designs because, in some cases, if the bottom
is not stabilized first, the top-down
Figure 3. This graph shows the aggregate gradations that produce acceptable stages will add weight to the site and
grouts. Because of pump limitations, early mixes did not contain the coarse induce further settlement.
aggregates we now use. Pump improvements now allow the use of bigger Probes are typically spaced on 8-
aggregates which, in turn, allows the use of more silt particles without sacrificing foot centers along foundation struc-
the grout’s internal friction. tural elements. However, the actual
spacing should be calculated based Monitoring and proposal, the contractor should re-
on the spanning capabilities of the investigation are crucial quire that the same operator and
structure’s foundation system. Because of the importance of con- drill rig be used throughout the pro-
When the total soil volume is sta- trolling the pumping rate, volume ject.
bilized beneath an entire building and pressure, the contractor must Monitoring and investigating is,
footprint, a triangular grid on 8-foot have accurate means to monitor without a doubt, the most difficult
spacings often works best. Also, it these crucial factors. Contractors part of any compaction grouting
may be advisable to grout beyond must carefully log all the pertinent project to get owners, engineers and
the building’s perimeter to improve information and submit it to the en- contractors to appreciate. Yet they
soil conditions for future additions, gineer. are the basis for all the decisions, ac-
sidewalks, underground utilities and Today, sophisticated monitoring tions and conclusions made during
adjacent ancillary structures to mini- equipment, including computerized the project. Unfortunately, owners
mize future differential movements. systems, is available. The informa- tend to like pieces of paper with
When a grout casing has been tion gained from these systems is “Guarantee Statements” because
drilled or driven to its appropriate truly phenomenal. But engineers they perceive that approach to be
depth, grout is pumped at that loca- must not allow this sophistication to cheaper. However, they invariably
tion until: (1) a predetermined grout replace common-sense engineering find out that such an approach only
volume has been pumped, (2) a pre- judgments. makes lawyers rich and complicates
determined pumping pressure has By the same token, contractors everyone’s life long after the project
been reached, or (3) undesired should be aware of the limitations of is completed. To avoid these prob-
ground or structural movement is the engineer’s investigative tech- lems, compaction grouting demands
occurring. In most cases, the grout niques. ASTM test methods have a partnering approach from the
casing is then moved up, and pump- many potential shortcomings. For owner, engineer and contractor.
ing is resumed. Grout stage lengths example, the results of ASTM D
may vary from site to site, but most 1586, a popular standard penetra- Samson W. Bandimere is technical
work is pumped in 1-foot vertical in- tion test (SPT), are highly dependent director of Denver Grouting: A Divi-
crements. on the consistency of the operator sion of Hayward Baker, Broomfield,
and drill rig used. In its technical Colo.
Publication #C99A100
Copyright© 1999, The Aberdeen Group
a division of Hanley-Wood, Inc.
All rights reserved