UNITED CARAVAN TRADING & CONTRACTING a al OIL & GAS DIVISION eS ON-SITE INSPECTION REPORT ‘SUPERVISOR NAME MR.AROON KUMAR TECHNICIANNAME —_MR.ROLDAN DATE OF ARRIVI AAD DATE OF DEPARTURE (21-H=(9 INSPECTION DETAILS C_UERVATION BEFORE REPAIRISERVICE: 1.Leakage found from 2nos,8-1/2" fluid end, [2.Leaking from PRV 3300psi,from fitting. [3.And leaking from some joints like union and close nipple, [CORRECTIVE ACTION TAKEN: }1. Change the repair kit of 8-1/2" fluid end. 2. Remove PRV and clean the thread and use loctite activator and loctite 542,and re installed. 13. Remove leaking joints clean threads and use loctite activator and loctite 642 and re installed. |RESULT: Pressurised the bop closing unit upto 3000psi and hold the pressure for 30min,and no any leaking [found from repair points and 3000psi pressure stable on one point of bop closing unit,now ready for operation. MSEC eRe) ‘Doc. No.; UCTOFM/QGNG, Rev.:01, Dt? TAOTROTE