shifts per day [number] : 3 No. of Labour required/shift [no.] 1 Total Wearparts cost/ yr. [₹ ] : 4,191,763
workdays per year [days] : 300 5.2 Wearparts calc.(set of straighening rolls) : Total Maintenance cost/ yr. [₹ ]: 1,002,000
efficiency [%] : 85% Lifespan of one set [h] 12,000 Total elec. Power cost/ yr. [₹ ]: 29,734,714
Nominal operating hours / year [h]: 6,120 Freqency of change/year [no.] 0.49 Total Auxiliary cost/ yr. [₹ ]: 75,000
Downtime (Let, 3%) per year [h] 190 Cost of one set [₹ ] : 2,300,000 Packaging cost/ yr. [₹ ]: 10,364,952
Effective operating hours / year [h]: 5,930 time for exchange [min] 600 Other Direct cost/ yr. [₹ ]: 50,000
5.3 Remachining calc.(set of straighening rolls) : 7. INDIRECT COST CALCULATION PER YEAR :
2. ANNUAL CAPACITY CALCULATION : Lifespan of one set [h] 2,000 Apportioned Overhead Cost [₹ ]: 1,375,513
Average Product diameter [mm] : 30 Freqency of change/year [no.] 2.97 Other Related Cost [₹ ]: 500,000
Average Line speed [m/min] : 35 Cost of remachining one set [₹ ] : 30,000
Average Annual Capacity [TPY] : 69,100 time for exchange [min] 600
5.4 Remachining calc.(Hardened Guides) :
3. MATERIAL LOSS DURING THE PROCESS : Lifespan of one set [h] 8
Process loss per Ton of Input [Kg] : 0 Freqency of change/year [no.] 741.25
Mat. loss per Ton as rejection [Kg] : 1 Cost of weld hardened surface [₹ ] : 2,000
Total Material loss per year [TPY] : 69 time for exchange [min] 15
5.5 Wearparts cost calc.(Hardened Guides) :
4. ASSUMED PER UNIT COST SCENARIO : Lifespan of one set [h] 3,000
Direct Labour cost per hr. [₹ ] : 60 Freqency of change/year [no.] 1.98
Cost of Electricity (KW) per hr. [₹ ] : 9 Cost of one set [₹ ] : 750,000
Cost of emulsion per litre [₹ ] : 150 time for exchange [min] 15
Cost of industrial water per M³ [₹ ] : 150 5.6 Emulsion requirement calculation :
Freqency of change/year [no.] 1.0
⓿ IF GREENFIELD PROJECT THEN COST : Emulsion tank capacity [Litre] 500
Approx. Shade Area [Sq. Ft ] : 1,500 Total emulsion Cost per year [₹ ] : 75,000
Shade construction cost [₹ ] : 2,400,000 5.7 Electric Power requirement calculation :
Land Cost with auxiliaries [₹ ] : 20,000,000 No. of Main drive [no.] 2
Erection cost of the shade [₹ ] : 20,000,000 Main drive motor power [KW] 170
Other costs like contingency ( [₹ ] : 10,000,000 Auxiliary drive motor power [KW] 20
Total Greenfield related cost [₹ ] : 52,400,000 Bar handling motor power [KW] 30
Green Field
Brown Field
↓ ITEMS YEAR = > 2012 2013 2014 2015 2016 2017 2018
5 Profit Before Tax (PBT) [ Million ₹ ] : -1.88 32.69 78.80 78.80 78.80 78.80 78.80
6 Less Depriciation (3.2) [ Million ₹ ] : 14.42 12.26 10.42 8.86 7.53 6.40 5.44
7 Taxable Profit [ Million ₹ ] : -16.30 20.44 68.38 69.94 71.27 72.40 73.36
8 Tax on above [ Million ₹ ] : 0.00 6.13 20.51 20.98 21.38 21.72 22.01
9 CASH FLOW [ Million ₹ ] : -78.79 7.33 58.28 57.82 57.42 57.08 56.79
10 Net Present Value (NPV) [ Million ₹ ] : -78.79 6.52 46.05 40.61 35.85 31.67 28.01
Customer : Sunflag Iron & Steel Co. Ltd. Disc. Payback Period (in Years) : within - 4 Years
500.00
Cum. Cash
400.00 Flow
Cum. NPV
Investment
300.00
200.00
100.00
0.00
2013
2014
2015
2016
2017
2018
2019
2020
2021
2012
-100.00
-200.00