PROCESS CONTROL
CONTENTS
2.0 DEFINITIONS
3.0 FLOWCHART
5.0 REFERENCES
6.0 ATTACHMENTS
Copyright. This document is the property of PT Thiess Contractors Indonesia and all rights are
reserved in respect of it. This document may not be reproduced or disclosed in any manner
whatsoever, in whole or in part, without the prior written consent of PT Thiess Contractors Indonesia.
PT Thiess Contractors Indonesia expressly disclaims any responsibility for or liability arising from the
use of this document by any third party. Copies printed from the Thiess Management Systems are
UNCONTROLLED.
Revision Status
2.0 DEFINITIONS
System Procedures (SP) Procedures describing the
operating system (ie. the Rule book) by which
PT. Thiess Contractors Indonesia carries out
its business.
System
Procedures are produced by each Business
Unit for their individual Business Unit/Project
use.
3.0 FLOWCHART
3.0 FLOWCHART
TCI-OPS-SP003-FC3.1/A1 TCI-QUC-SF001
TCI-QUC-SF012 TCI-QUC-SF013
Process Control INCOMING INSPECTION
CHECKLIST
VERIFICATION PROCEDURAL
CHECKLIST CHECKLIST
TCI-OPS-SP005
PROCESS CONTROL
ENSURE INCOMING
PP
MATERIALS / PRODUCTS
COMPLY WITH SPECIFIC
FILE SUITE OF MANAGEMENT PLANS PM/QAE REQUIREMENTS, PRIOR TO USE
DETERMINED AT THE CONTRACT / INSTALLATION
HANDOVER MEETING IN PMS TCI-QUC-SF001
FOLDER(S) INSPECTION & TEST
PLAN
IMPLEMENT THE APPROVED PP
TCI-TEN-SP001 WORK PROCEDURE /
TENDER AND SUBCONTRACT PACKAGE QAE/PE
CONTRACT REVIEW REINSURE WP IF NECESSARY AND
CONTINUE MONITORING OF PROCESS
DETERMINE IF ANY SPECIFIC PPR's PM/QAE
OR MODIFICATIONS TO SP's ARE
REQUIRED IDENTIFY, ORGANISE AND QAE/PE
CONDUCT AUDITS PP
COMPLETE WORK / SUBCONTRACT
INSPECTIONS AND TESTS
WITHIN THE WORK CYCLE PACKAGE
IAW THE ITP
PM
BREAKDOWN THE PROJECT INTO
SEPARABLE PARTS OR ELEMENTS
OF WORK / TRADES QAE/PE
COLLATE ALL DATA FROM AUDITS,
COMPLETE PROCEDURAL QAE/PE PROCESS CONTROL INSPECTIONS,
CHECKS / SURVEILLANCE AS PRODUCT INSPECTION AND TESTS ETC
THE WORKS PROCEED AND DETERMINE IF WORK IS IN
CONFORMANCE WITH SPECIFICATION
QAE REQUIREMENTS
DETERMINE TRACEABILITY
REQUIREMENTS - BOTH CLIENT
AND THIESS
QAE/PE
MONITOR THE PERFORMANCE
TCI-PRO-SP001 OF THE PROCESS. MONITOR
PROCUREMENT OF SUBCONTRACTOR
PRODUCTS AND SERVICES PERFORMANCE BY
SURVEILLANCE AND AUDIT DOES THE WORK
NO
CONFORM?
PM/PP
DEVELOP AND DOCUMENT AS A
PPR, A UNIQUE LOT NUMBERING
SYSTEM AND APPLY TO PROJECT YES
TCI-OPS-SF006 TCI-OPS-SF016
DOCUMENTATION COMPLIANCE
PROCESS CONTROL
CHECKLIST AUDIT CHECKLIST
QAE
TCI-OHS-SP019
FILE RECORDS IAW PROJECT
RISK MANAGEMENT
FILING INDEX
PM PROJECT MANAGER
QAE QUALITY ASSURANCE ENGINEER
PP PE PROJECT ENGINEER
COORDINATE NECESSARY
PP PROJECT PERSONNEL
DOCUMENTATION AND CONDUCT PMS PROJECT MANAGEMENT SYSTEM
WAB's AS APPROPRIATE. RECORD QP SPECIFIC WORK PROCEDURES
ISSUE OF CONTROLLED DOCUMENTS IAW IN ACCORDANCE WITH
SP SYSTEM PROCEDURES
PPR PROJECT PROCEDURES
WP WORK PROCEDURES
ITP INSPECTION AND TEST PLANS
TCI-ADM-SF001 WAB WORK ACTIVITY BRIEFING
DOCUMENT TCI-OPS-SF007 CAR CORRECTIVE ACTION REQUEST
DISTRIBUTION WAB CHECKLIST PROCEDURE REFERENCE
REGISTER FORM REFERENCE
4.1.2 All projects as a minimum shall develop, implement and maintain a Project
Management (Quality) Plan The Project Management (Quality) Plan
requirements are identified and acknowledged by the Project Manager
during a Contract Handover Meeting conducted in accordance with TCI-
TEN-SP001 "Tender and Contract Review".
4.1.3 As the key document providing a systematic and controlled mechanism for
process control the Project Management (Quality) Plan makes reference to
the project sub-plans, project procedures, work procedures and inspection
and test plans applicable to the project.
4.2.1 The Project Manager shall ensure that the requirements for Project
Procedures (PP's) are identified in section 3.4 "Procedure Index" of the
Project Management (Quality) Plan.
4.2.2 The Quality Assurance Engineer (QAE) shall prepare Project Procedures in
accordance with the format requirements of TCI-QUA-SP002 "Preparation
and Control of Procedures".
4.3.1 The Project Manager shall identify those processes which affect the quality
of the product and for which a Work Procedure (WP) shall be prepared.
ii.) (ii) The Purchasing Officer shall ensure that procurement documents
prepared in accordance with TCI-PRO-SP001 - "Procurement of
Products and Services", reflect appropriate requirements for process
control.
(v) materials;
(viii) to whom authority and responsibility for inspection, test and control
points has been delegated;
PT Thiess Contractors Indonesia Page 6 of 78 TCI-OPS-SP003/A5
(ix) any handling and storage packaging and shipping requirements. The
Project Manager shall review and approve the work procedures.
4.3.5 The Site Engineer shall issue the approved work procedures to all relevant
project personnel, controlling the distribution by implementing TCI-ADM-
SF001 - "Document Register", or equivalent computer based register.
4.3.6 The QAE and/or the Project Engineer, shall evaluate the implementation of
the work procedures during the manufacture/ construction/installation
process or whenever unsatisfactory results are obtained, to ensure
compliance with the specified requirements, in accordance with form TCI-
OPS-SF006 - "Process Control Checklist". The frequency of the evaluations
shall be determined by the Project Manager.
The QAE shall ensure all related quality documents, ITP, Checklists etc.
reflect, where appropriate, changes to work procedures.
system and for remote location work whereby the Project Manager may
accept previous work history and/or referral by other purchasers as proof of
acceptability of facilities.
5.0 REFERENCES
TCI-OPS-SP001 - Preparation of Project Management (Quality)
Plans
TCI-OPS-SP002 - Preparation of Inspection and Test Plan
TCI-TEN-SP001 - Tender and Contract Review
TCI-QUA-SP003 - Numbering & Identification of Quality System
Documents
TCI-ADM-SF001 - Document Register
TCI-OPS-SF006 - Process Control Checklist
TCI-OPS-SF007 - Work Activity Briefing Checklist
TCI-OPS-SF008 - Action Plan
6.0 ATTACHMENTS
Not Applicable to this procedure