Professional Documents
Culture Documents
G1T1 G1T2
X Y Z X Y Z
0 0 -1.275 0 0 -1.5
1 0 -1.3 1 0 -1.5
2 0 -1.35 2 0 -1.525
3 0 -1.375 3 0 -1.55
4 0 -1.4 4 0 -1.575
5 0 -1.425 5 0 -1.6
5.4 0 -1.45 5.4 0 -1.625
6.4 0 -1.475 6.4 0 -1.65
7.4 0 -1.5 7.4 0 -1.675
8.4 0 -1.525 8.4 0 -1.7
8.9 0 -1.55 8.9 0 -1.725
9.4 0 -1.575 9.4 0 -1.75
10.4 0 -1.58 10.4 0 -1.775
11.15 0 -1.6 11.15 0 -1.8
11.4 0 -1.6 11.4 0 -1.8
Span 1
Edge Girder G3T1 G3T2 G3T3-L G3T3-R G3T1-Copy
Span 2
G3T1-Copy G3T2-Copy G3T3-L-Copy G3T3-R-Copy
Structure
CS3 21
Boundary
Load
Structure
CS 4 21 Boundary
Load
Structure
CS 5 21 Load
CS 6 10000
Details
1) Pier and Pier Cap are activated at the age of 28 days
2) Substructure Supports are activated
3) Self Weight of the Structure would be applied
1) Girder of Span 1 are activated
2) Girders of Span 1 are supported on Temporary Support
3) Girders of the Span 1 are Stressed in Sequence
1) Diaphragm of Span 1 are activated at age of 14 days
2) Girders for span 2 are launched
1) Temporary Supports of Span 1 are deactivated
2) Girders of Span 1 are shifted to Permanent Bearings
3) Girders of span 2 are supported on Temporary Support
1) Casting of Slab for span 1 begins at the 14th day of CS3, hence wet concrete load of
the slab would be acting
2) Girders of the Span 2 are Stressed in Sequence
1)Deck slab of Span 1 is activated at age of 14 days
2)Diaphragm of Span 2 are activated at age of 14 days
1)Temporary Supports of Span 2 are deactivated Girders of Span 2 are shifted to
Permanent Bearings
1) Wet concrete load of Span 1 would be deactivated
2) Casting of Slab for Span 2 begins at the 14th day of CS4, hence wet concrete
load of the slab would be acting
1) Deck slab for Span 2 is activated at the age of 14 days
1) Wet concrete load of Span 2 would be deactivated