You are on page 1of 8

PHILIPPINE PRODUCTIVITY RATIOS

DESCRIPTION
1.STRUCTURAL EXCAVATION
Common excavation
Hand
Machine
Rock excavation
Hauling of spoils
2.STRUCTURAL BACKFILL
By hand
By machine
3.TRENCHING
By hand
By machine
EXCAVATION- MANUAL
Common earth
Loam of sand
Clay or heavy soil
Rock
EXCAVATION- MECHANICAL
Common earth
Rock with jack hammer
BACKFILLING
Common manual
Gravel fill manual
TRENCHING & BACFILLING OF UNDERGROUND PIPING USING EXCAVATION MATLS MANUAL FROM:
0 – 2m Depth
2 – 3m Depth
3 – 4m Depth
4 – 5m Depth
Placing binder gravel
Escombro backfilling
Spreading,tamping & grading
Mechanical compaction, plate compaction
MANUAL CLEARING & GRUBBING
Clearing under growth & trees – 12″
Clearing under growth & shrubs
Disposal of soil
Hauling of soil
Gravel fill
EXCAVATION – CRANE & CLAMPSHELL
With 8 men & 2 carpenters
5.ROOFING AND SIDING
Roofing
Metallic
Non-Metallic
Siding
Metallic
Non-Metallic
CONCRETE WORKS
4.CONCRETE WORKS
Grade members
Formworks
Concreting
Rebar
Finishing
Suspended members
Formworks
Concreting
Rebar
Finishing
Embeded metal
Water proofing
Joint filler
PLACING CONCRETE
Slab on Fill
Slip Form
Floor Finish Unhardened
Concrete finished hardened
REBAR WORKS
Ground floor installation
Upper floor installation
Fabrication
Mixing manual
Mixing machine
MORE THAN 1.8 M3 POUR
Chute from truck
Crane & bucket
Wheeling
Finishing
FORMWORKS & CARPENTRY WORKS
FORM WORKS INSTALLATION
Wall on ground
Wall above ground
Beams
Columns
Suspended slab
Suspended slab 0 – 18″
Suspended slab 10 – 36″ up
Elevated & shored slab forming
Forming only
Forming & Shoring
Wood wall & Partition
FORM WORKS FABRICATION
Form works fabrication
STRIPPING OF FORMS
Wall on ground
Wall above 10″
Beams
Columns
Suspended slab
Suspended slab 0 – 18″
Suspended slab 10 – 36″ up
Elevated & shored slab forming – strip of forms
Floor slab at grade – strip of forms
INSTALLATION OF CARPENTRY WORKS
Plywood partition
T & G Flooring and Siding
Ceiling & frame work
Siding frame work
Flooring framing
Wooden post errection
Truss Fabrication
Truss Installation
Girt Installation
Plates Installation
Purlins Installation
Fascia board Installation
1/4″ or 3/4″ thk. plywood
Cutting by manual
Assembly
ARCHITECTURAL SPECIALTIES
DOORS
Wooden
Steel
Aluminum
Cyclone wire
WINDOWS
Glass
Louver
Steel
PARTITIONS
single wall
Wooden wall
Wooden Louver
cyclone Louver
PAINTING ( 3 coats )
Equipment
Pipes
Miscillaneous
STRUCTURAL STEEL WORKS
7. STRUCTURAL STEEL
Fabrication
Light
Heavy
Errection
Light
Heavy
WELDING ( one pass only )
1- Welder and 1- Helper ( 16 total mh )
G.1 STRUCTURAL STEEL
Fabrication
Heavy weight
Light weight
Grating 1 1/4″ x 3/16″
Star threat grating
Errection
Heavy Structural teel
Light Structural steel
Stacks ( Inc. full welding )
Tanks ( Inc. full welding )

FINISHING AND MASONRY WORKS


H. CHB
4” CHB
Laying
Tooling
Plastering
6” CHB
Laying
Tooling
Plastering
8” CHB
Laying
Tooling
Plastering
MANHOUR/UNIT UNIT

6 MH/M3
0.5 MH/M3
8 MH/M3
1 MH/M3

5 MH/M3
2 MH/M3

6 MH/M3
0.5 MH/M3

8 MH/M3
1.31 MH/M3
1.64 MH/M3
2.63 MH/M3

6.67 MH/M3
16.67 MH/M3

0.82 MH/M3
5 MH/M3

1.25 MH/LM
1.67 MH/LM
2.5 MH/LM
3.33 MH/LM
0.11 MH/M3
0.21 MH/M3
0.48 MH/M2
0.06 MH/M3

0.05 MH/M2
0.03 MH/M2
1.69 MH/M3
1 MH/M3
2.07 MH/M3

1.07 MH/M3

0.97 MH/m2
1.51 MH/m2

1.29 MH/m2
1.51 MH/m2

2.54 MH/M2
8.54 MH/M3
0.07 MH/kg
0.4 MH/M2

3.28 MH/M2
16.7 MH/M3
0.08 MH/kg
0.8 MH/M2
0.27 MH/kg
1.82 MH/M2
0.3 MH/lLm

5 MH/M3
25 MH/M3
1 MH/M3
1.43 MH/M3

0.07 MH/M3
0.08 MH/M3
0.1 MH/M3
16 MH/M3
1.8 MH/M3

7 MH/M3
14 MH/M3
27 MH/M3
2.8 MH/M3

2 MH/M2
2.35 MH/M2
3.08 MH/M2
2.35 MH/M2

1.67 MH/M2
3.33 MH/M2

8.6 MH/M2
11 MH/M2
0.5 MH/M2

1 MH/M2
0.25 MH/M2
1.29 MH/M2
1.03 MH/M2
0.85 MH/M2

0.83 MH/M2
1.08 MH/M2
3.5 MH/M2
2.8 MH/M2

1 MH/PC
0.14 MH/B.F.
0.36 MH/B.F.
0.27 MH/B.F.
0.97 MH/B.F.
0.43 MH/B.F.
0.35 MH/B.F.
0.8 MH/B.F.
0.21 MH/B.F.
0.13 MH/B.F.
0.27 MH/B.F.
0.46 MH/B.F.

1 MH/PC
0.42 MH/M2

2.37 MH/M2
7.64 MH/M2
8.07 MH/M2
7.64 MH/M2

3.23 MH/M2
4.63 MH/M2
32.29 MH/M2

2.48 MH/M2
3.44 MH/M2
3.44 MH/M2
5.38 MH/M2

0.24 MH/f2
0.3 MH/f2
0.24 MH/f2

110-130 MH/MT
60-90 MH/MT

70-100 MH/MT
40-60 MH/MT

40-50 Lf/day

50-90 MH/MT
100-125 MH/MT
3.0 – 3.5 MH/SF
4.0 – 5.0 MH/SF

30 – 60 MH/MT
60- 90 MH/MT
250 – 300 MH/MT
200 – 275 MH/MT

8.0 – 10 m2/day
11 – 14 m2/day
8.0 – 10 m2/day

7.0 – 9.0 m2/day


11 – 14 m2/day
8.0 – 10 m2/day

6.0 – 8.0 m2/day


11 – 14 m2/day
8.0 – 10 m2/day