PARTIDA DE CONCRETO EN COLUMNAS F´c= 210 Kg/cm2

RENDIMIENTO= 2.1168 m3/dia

DESCRIPCIÓN UNID CUADRILLA CANT. PRECIO


CAPATAZ H.H 0.00 S/20.00
OPERARIO H.H 2 7.56 S/18.00
OFICIAL H.H 0.00 S/16.00
PEON H.H 4 15.12 S/14.00
MATERIALES POR COLUMNA (4 TROMPOS)
CEMENTO PORTLANd TIPO I Bol 4 S/18.22
AGREGADO GRUESO m3 0.06 S/59.32
AGREGADO FINO m3 0.06 S/50.85
AGUA m3 0.24 S/1.70
EQUIPOS Y HERRAMIENTAS
H.MANUALES %mo 5% S/347.69
MESCLADORA DE TIPO TROMPO DE 9 pies 3 H.H 0.50 1.88964475 S/8.48
VIBRADORA DE 4HP H.H 1 3.78 S/16.95

TOTAL:

PARTIDA DE CONCRETO EN VIGA CIMENTACIÓN F´c= 210 Kg/cm2

RENDIMIENTO= 16.8 m3/dia

DESCRIPCIÓN UNID CUADRILLA CANT. PRECIO


CAPATAZ H.H 0.00 S/20.00
OPERARIO H.H 4 1.90 S/18.00
OFICIAL H.H 0.00 S/16.00
PEON H.H 1 0.48 S/14.00
MATERIALES
Concreto premezclado f´c 210 kg/cm2 m3 1.05

H.MANUALES %mo 3% S/40.95


Bomba H.H 1 0.48
VIBRADORA DE 4HP H.H 1 0.48 S/16.95

TOTAL:

PARTIDA DE MURO DE LADRILLO K.K DE ARCILLA SOGA

RENDIMIENTO= 7.5 m2/dia

DESCRIPCIÓN UNID CUADRILLA CANT. PRECIO


CAPATAZ H.H 0.00 S/20.00
OPERARIO H.H 1 1.07 S/18.00
PEON H.H 1 1.07 S/14.00
MATERIALES (8.4 M2)
CEMENTO PORTLANd TIPO I Bol 2.5 S/18.22
ARENA AREGRAS m3 0.3
LADRILLO 24x14x9 cm Pz 336
EQUIPOS Y HERRAMIENTAS
H.MANUALES %mo 3% S/34.13
ANDAMIO DE MADERA H.H 0

TOTAL:
0 Kg/cm2

DIMENSIONES VOLUMEN(M3) COLUMNAS RENDIMIENTO

0.42 0.2646 m3/h


0.36 0.42336 5
2.1168 m3/d
PARCILA I.V 2.8
S/0.00
S/136.05
S/347.69
S/0.00 240 0.24
S/211.64

S/72.88
S/3.56
S/79.90
S/3.05
S/0.41

S/17.38
S/16.01 S/97.45
S/64.06

TOTAL: S/525.05

= 210 Kg/cm2

30
DIMENSIONES VOLUMEN(M3) VIGA RENDIMIENTO

0.3 2.1 m3/h


0.5 1.05 1
16.8 m3/d
PARCILA I.V 7
S/0.00
S/34.29
S/40.95
S/0.00 240 0.24
S/6.67
S/0.00 S/0.00

S/1.23
S/0.00 S/9.30
S/8.07

TOTAL: S/50.25

LA SOGA

DIMENSIONES VOLUMEN(M2) LADRILLOS/DIA RENDIMIENTO

LADRILLOS/
3.5 40 M2
8.4 300
2.4
7.5 m2/d
PARCILA I.V
S/0.00
S/19.20 S/34.13
S/14.93 300

S/45.55
S/0.00 S/45.55 1 BUGGUI 0.06 M3
S/0.00

S/1.02
S/1.02
S/0.00

TOTAL: S/80.71