Affordable

Housing H ousing
Prefabricated Manufacturing in India

Toshiki Imai K S Madhavan Rahul Madhavan


Team
Vision
Timeline
Design
Financials
Marketing
Team: Japan and India
K S Madhavan
Design & Project Management Expert
 Presently Chairman, Shingo Institute of Japanese
Management & Principal Consultant, KSM Associates
 Has assisted in OT (Organisational Transformation),
Implementation of 5S/ TQM/ TPM/ Creativity
Development etc. turning around more than SIX
Toshiki Imai MAJOR ORGANISATIONS including Gujarat Electricity
Board, NFCL, ITS Bhadrachalam, MCF, Tribi etc and
Bachelor of Arts in East Asian Studies, assists companies like DRL, NTPC, BFW wtc.
Akita International University (AIU)  Recognised for his work as Man of the Millennium
 Exchange program at University of Macau, China.
from AP by Economic Times (2000) & Indian Express
 Intern at Shingo Institute of Japanese Management, (2000) and received Rajiv Gandhi Sadbhavana Award.
Bangalore, under sponsorship of Ministry of Economy, Trade
and Industry of Japan
 Founder and Captain of AIU Handball Team
 Leader of Liaison Bureau (2009-2010), President (2010-2011)
of Northeast Asian Student Round Table (SRT), a conference
by students from six countries and regions
 2nd Place at Trilateral Cooperation Secretariat (TCS) Group
Presentation Contest, Tokyo
Rahul Madhavan
Entrepreneur
 Former Investment Banker, Barclays Capital, Nomura
 MBA, IIM Ahmedabad
 Bachelor of Technology, Material Science, IIT Madras
 Awarded by President of India for excellence in school
 Consulted on several projects including small scale
wind energy, tetrapak waste management
 Studied Low Cost Housing In 2011 with inputs from
the government of Gujarat, India and several NGOs
Founding Vision
Indian Context
 Size of Economy : 3rd Largest Economy by PPP, $2trillion nominal GDP, Stated
Vision
Target – $4Trillion in 10 years  To Create Mass Scale Housing for the majority of Indian Population
 Fastest Growing: Fastest growing economy among major nations (8% expected in a sustainable, profitable and quality oriented manner
growth rate for next year)
 To be a major organized player in the affordable housing segment
 New Government and Increased Public Investment : Growth Focussed
Government under Prime Minister Narendra Modi  To not just construct houses but to develop communities for people
 Sectors for Growth : “Make in India” Plan – Manufacturing, Construction, Heavy  To enable access to employment through provision of wifi and
Industry, Consumer Durables other amenities in the community
 Timing : Inflection point in growth of Indian Economy  To create standardization as the norm rather than the exception in
 Demographics : government based rural housing projects
 Rural – Urban Shift – Cities/suburbs expanding
 To increase awareness about prefabrication, and advantages of
 Wage Inflation – More consumption Power
 Aspirational Population – Dreams of lifestyle/House standardization in the Indian Market

Housing Market: Need and Size Mission


 Shortfall of Houses: 14.95 mio houses shortfall in India  To leverage the best technologies available to construct exceptional
 Government Plan : Construction of 8 mio houses by 2022 quality houses at affordable cost
 Upgradation of living Standards: 60 mio toilets, Access to health, livelihood for all
 To develop 5,000 houses in the first year of commencement of
 Model villages: Construction of micro health centres and Schools in every village
 Government Planned Schemes: business
 Indira Awas Yojana (IAY)  To reach a) rural customers directly, b) rural customers indirectly
 Valmiki Ambedkar Awaas Yojana (VAMBAY) through government scheme and c) industrial customers in the first
 Rajiv Gruh Kalpa year of business
 Indiramma Housing Scheme  To establish supply chains of companies with similar quality
 Basic Services to the Urban Poor (BSUP)
orientation: 120% customer satisfaction
 Integrated Housing and Slum Development Programme (IHSDP)
 Scaling Solution for Construction - Prefabrication: Standardization of Solution,
 To be able to adapt to customer needs of different consumer
speed of delivery segments by creating differential standardization
 To reach operational breakeven in 3-5 years
Timeline for Execution
Home Design
Figure on the Left:
Plan layout of the
Proposed
Construction.

Surrounding
Images:
3d View of the
Layout post
Completion

Main House Features


 Floor Space: 300 Sq Ft
 Wall Height: 9 Ft
 Net Exterior Wall Surface Area: 630 Sq Ft
 Net Interior Wall Surface Area: 900 Sq Ft
 Structure – Beams and Columns: Steel Frame
 Roofing, Walls: Sandwich Panels
 Flooring, Foundation: RCC/Precast Concrete
Project Financials: Unit Cost
No
Cost
No. Sub of Net
Head Item per Unit Comments
Units Total Sub Cost
Unit
Units
Roof Panel Metal Wool Sandwich Panel (50mm) $9.50 per sq mt 28 $266 1 $266
Flooring Plywood/Particle Board (15mm) $7.50 per sq mt 28 $210 1 $210
Flooring Laminate Plywood/Particle Board (15mm) $2.50 per sq mt 28 $70 1 $70 Unit House
Wall Panel Metal Wool Sandwich Panel (75mm) $5.00 per sq mt 85 $425 1 $425
Column Steel Frame/Reinforced Precast $0.60 per kg 25 $15 7 $105
Cost based
o Number of Holder Beams: 4,
on
Corner Beams 8, Floor Calculations
Beam Steel Frame/Reinforced Precast $0.60 per kg 25 $15 22 $330 Foundation Beams 5 (2 Cross, 3
Parallel), Roof Beams 5 (2
Cross, 3 Parallel)

Door EPS Door/Steel Door $30.00 per door 2 $60 1 $60


Window UPVC window/Aluminium frame (Small) $30.00 per sq mt 0.5 $15 2 $30 USD
UPVC window/Aluminium frame (Large) $30.00 per sq mt 1 $30 2 $60
Décor Outer Wall: Imitation Brick Texture $4.00 per sq mt 58.5 $234 1 $234 2,304
Inner Wall: Paint/ Wallpaper $1.00 per sq mt 84 $84 1 $84
Gutter 1mm PVC Gutter Pipes $2.00 per m 6 $12 1 $12
Rain Pipe and Internal Pipes PVC rain pipe $0.50 per m 20 $10 1 $10
Bathroom and Toilet fittings Shower Set: 1 set $5.00 per set 1 $5 1 $5
Basin and Pipe: 1 set
Commode: 1 set
$10.00
$30.00
per set
per set
1
1
$10
$30
1
1
$10
$30
INR
Electrical Wiring Switch and Socket (CE Standard)
Wiring
$2.00
$0.15
per set
per m
4
30
$8
$5
1
1
$8
$5
1,45,121
Electrical Equipment Fans: Small $40.00 per Fan 2 $80 1 $80
Fans: Large $15.00 per Fan 2 $30 1 $30
Light Bulb plus sockets $3.00 Per Set 5 $15 1 $15
Miscelaneous $15.00 Per Home 5 $75 1 $75
Per
Labour Contractors $10.00 15 $150 1 $150
ManDay
Project Financials: Overall Project
Head SubHead Item Amt in Rupees Heads /Year 2015 2016 2017 2018 2019 2020 2021

Unit Sales 0 5,000 6,000 7,200 8,640 10,368 10,368


Assets
Capital Assets Unit Cost Price (All Prices in Rs. '000s) ₹ 150 ₹ 165 ₹ 182 ₹ 200 ₹ 220 ₹ 242 ₹ 266

Land ₹ 10,000,000 Unit Sales Price ₹ 161 ₹ 177 ₹ 195 ₹ 215 ₹ 236 ₹ 260 ₹ 286
₹ ₹ ₹ ₹ ₹ ₹
Sandwich Panel Machine Line ₹ 25,000,000 Gross Profits 61,875 81,675 107,811 142,311 187,850 206,635
₹ ₹ ₹ ₹ ₹ ₹
Precast Concrete Mixer ₹ 3,000,000 ₹ 3,000
Salaries 20,000 22,000 24,200 26,620 29,282 32,210
Drilling Machine ₹ 1,500,000
Depreciation ₹ 9,300 ₹ 9,300 ₹ 9,300 ₹ 9,300 ₹ 9,300 ₹ 9,300
Boring CNC Machine ₹ 1,000,000 ₹ ₹ ₹ ₹ ₹ ₹
Punching Machine ₹ 1,000,000 Op Ex ₹ 1,000 20,000 22,000 24,200 26,620 29,282 32,210

Miscellanous ₹ 5,000,000 R and D and Capex ₹ 5,000 ₹ 5,500 ₹ 6,050 ₹ 6,655 ₹ 7,321 ₹ 8,053
₹ ₹ ₹ ₹ ₹ ₹
Total Capital
₹ 46,500,000 Marketing 10,000 11,000 12,100 13,310 14,641 16,105
Assets
Interest Expense ₹ 4,769 ₹ 4,769 ₹ 4,769 ₹ 4,769 ₹ 4,769 ₹ 4,769
Current Assets
Cash ₹ 1,000,000
₹ ₹ ₹ ₹
Working Capital ₹ 7,000,000 EBT ₹ -4,000 ₹ -7,194 ₹ 7,106 27,192 55,037 93,256 103,988
Total Current ₹ ₹ ₹ ₹
₹ 8,000,000 ₹ -4,000 ₹ -5,036 ₹ 4,974
Assets Earnings After Tax 19,035 38,526 65,279 72,792
Total Assets ₹ 54,500,000
Liabilities
Equity
Key Financial Metrics
Founders Equity (25% Equity) ₹ 4,087,500
Financed Equity (75% Equity) ₹ 12,262,500
Assumptions
Total Equity ₹ 16,350,000
Expected Rate of Return 25% 1 Growth of sales at 10% per annum until 2020
Payback Period 3-5 years 2 Stagnation of growth post 2020
Debt
Valuation at Expected RoR ₹ 161,881,630 3 Wage inflation and cost inflation at 10%
Bank/Financed Debt ₹ 38,150,000
4 Profit Margin at 7.5%
Total Debt ₹ 38,150,000
5 Depreciation of Machines over 5 years
Total
₹ 54,500,000
Liabilities
Marketing Plan Market Targeting
1. Building the ecosystem:
o We not just make houses but build customer spaces
o Awareness Campaigns to each buyer segment as described below
2. Marketing to Consumers of the house
Cost Segmentation o Message- Quality at Affordable Price: The look and feel of the
house should be far superior to that obtainable in that segment
i. Low Cost (EWS) : Rs 50,000 - Rs 200,000 – Maximum Need, minimum developer
interest T o First hand Viewing: Building few model homes for viewing and
getting an experience of living in the house
ii. Affordable Housing : Rs 200,000 – Rs 1,000,000 – No Organized Players
o Building support network:
iii. Middle Income Group : Rs 1,000,000 – Rs 2,500,000 – Interest in rural
areas/tier 2 cities
A i. Videos and training guides for building contractors
iv. High Income Group : Rs 2,500,000 – Rs 7,500,000 – Some of the larger players ii. Maintain contractors to service houses
starting to enter this market R o Post Sales Service:
v. Luxury : Rs 7,500,000 and above – Market currently oversupplied i. Strong Warranty clauses to ensure trust of customer
G ii. Put together buyer protection clauses and continuous
improvement procedures
Type Segmentation E iii. Ensure ecosystem is able to service customer for small needs
both in online and offline space
i. Kuccha Houses (Huts/Tenements): Most prevalent in lower income group –
fall under category to undergo upgradation. No organized player interest
T 3. Marketing to Government
o Involve and Engage Government: Maintain contacts with
ii. Cluster Houses: Found in industrial belts/suburbs and older government government officials at all stages of project planning
constructions o Scheme Requirements: Keep their requirements foremost as per
iii. Independent Houses/Villas: Quality expected to be good. Organized and
above mentioned government schemes
unorganized developer interest.
o Work top down in government: impressing the efficiency of
iv. Flats: Majority of new Tier 1 city urban construction. Most development
activity and supply
P production and environment friendly nature of housing
o Work to build communities: Focus on making entire community
R more productive. Ensure all stake holders are happy
o Post Sales service: maintain warranty and support facilities for
Competitors in India E houses/other buildings built
4. Marketing to Industrial Segments
i. Small scale developers
o Unorganized Sector – not taking up large contracts
F o Push Marketing: B2B sales to large scale industrial clients who are
taking up infrastructure projects
o Poor Quality of Construction
ii. Importers from China for prefab A o Mobile Marketing: Keep in mind worker requirements and
temporary/mobile nature of housing
o Good for prefab homes for private sector (factory homes/cabins)

iii.
o Prefab used in specific parts of house rather than for structure
Local Manufacturers of Prefab
B o Leasing/ financing support: Work out scheme for leasing of
temporary structures for smaller clients
o Cater to prefab doors windows toilets rather than whole house 5. Marketing to All segments
o Quality for entire house construction poor o Permanent Housing Exhibition nearby our Factory