ANEXO CUADRO DE COMPARACION POR COMPONENTE

PIP: MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA INICIAL SANTA ROSA DE HUAYLLATA DISTRITO DE ILAVE, PROVINCIA DEL COLLAO – PUNO
COD. SNIP:221943

PIP VIABLE EXPEDIENTE BASE EXPEDIENTE TECNICO REFORMULADO


METRADO PIP
ITEM COMPONENTE SEGUN SNIP UND.
VIABLE
03 S/. DESCRIPCION UND. METRADO MONTO BASE DESCRIPCION UND. METRADO MONTO BASE

01.00.00 RESULTADO 1 181,487.25 M2 138.0 RESULTADO 1 M2 125.50 381,783.28 RESULTADO 1 M2 0.00 273,119.82
CONSTRUCCION DE 02 AULAS, 01 S.U.M., CONSTRUCCION MODULO ADM., SUM. Y INFRAESTRUCTURA
181,487.25 138.0 01 AULA
125.5 381,783.28 PEDAGÓGICA
273,119.82
01 SSHH NIÑOS
02.00.00 RESULTADO 2 81,259.33 M2 35.0 RESULTADO 2 M2 0.00 99,031.49 RESULTADO 2 M2 0.00 67,446.88
CONSTRUCCION DE 01 DIRECCION, 01 INFRAESTRUCTURA
TOPICO, 01 SSHH DOCENTES 81,259.33 35.0 CONSTRUCCION MODULO 01 AULA 99,031.49 ADMINISTRATIVA
67,446.88
ADMINISTRATIVOS
03.00.00 RESULTADO 3 21,998.52 M2 9.0 RESULTADO 3 M2 116.00 142,817.69 RESULTADO 3 M2 0.00 141,432.24
CONSTRUCCION DE PATIO DURO Y
CONSTRUCCION DE 01 COCINA, 01 BLANDO, CONSTRUCCION TANQUE INFRAESTRUCTURA
DEPOSITO DE ALIMENTOS
21,998.52 9.0 SEPTICO, CONSTRUCCION TANQUE
116.0 142,817.69 COMPLEMENTARIA
141,432.24
ELEVADO
04.00.00 RESULTADO 4 225,062.88 M2 480.0 RESULTADO 4 M2 116.00 158,883.63 RESULTADO 4 M2 0.00 115,862.07
CONSTRUCCION DE 01 AREA DE JUEGOS,
CERCO PERIMETRICO 225,062.88 480.0 CONSTRUCCION DE DE CERCO PERIMETRICO 116.0 158,883.63 OBRAS EXTERIORES 115,862.07
05.00.00 RESULTADO 5 31,085.00 MOD. 8.0 RESULTADO 5 MOD. 0.00 90,170.00 RESULTADO 5
EQUIPAMIENTO DE
MOD. 0.00 29,383.00
IMPLEMENTACION DE EQUIPOS, MOBILIARIO Y MATERIAL
MOBILIARIO Y EQUIPAMIENTO 31,085.00 8.0 90,170.00 29,383.00
MOBILIARIO Y JUEGOS RECREATIVOS EDUCATIVO
06.00.00 RESULTADO 6 8,411.00 UND. 2.0 RESULTADO 6 UND. 0.00 7,000.00 RESULTADO 6 UND. 0.00 6,111.50
CAPACITACIÓN A LOS
CAPACITACION DE PADRES DE FAMILIA Y PADRES DE FAMILIA Y
DOCENTES
8,411.00 2.0 CAPACITACION DOCENTE 6,111.50
7,000.00 DOCENTES

COSTO DIRECTO 549,303.98 879,686.09 633,355.51


GASTOS GENERALES : 54,930.41 GLB 1.00 709.00 75,369.31
SUB TOTAL 604,234.39 880,395.09 708,724.82
SUPERVISION: 37,430.00 GLB 1.00 38,830.17 22,167.44
LIQUIDACION: 8,293.67 7,283.59
EXPEDIENTE TECNICO : 16,479.12 EST. 1.00 17,908.55 7,600.27
GASTOS DE GESTION DE PROYECTO : 14,275.33 0.00
SEGUIMIENTO Y MONITOREO : 8,105.42 0.00
TOTAL COSTO: 658,143.505 967,808.23 745,776.12
100% 147.05% 113.32%
RESUMEN
PIP VIABLE 658,143.51
PIP A VERIFICAR 745,776.12
ENCIA PIP VIABLE - PIP A VERIFICAR 87,632.61
13.32%
ON POR COMPONENTE

VARIACION EXP. TEC. REFORMULADO VARIACION EXP. TEC. REFORMULADO


RESPECTO AL EXP. TEC. APROBADO RESPECTO AL PIP VIABLE

UND. METRADO MONTO BASE UND. METRADO MONTO BASE

M2 -125.5 -108,663.46 M2 -138.00 -290,150.71

M2 0.0 -31,584.61 M2 -35.00 -112,843.94

M2 -116.0 -1,385.45 M2 -9.00 -23,383.97

M2 -116.0 -43,021.56 M2 -480.00 -268,084.44

MOD. 0.0 -60,787.00 MOD. -8.00 -91,872.00

UND. 0.0 -888.50 UND. -2.00 -9,299.50

-246,330.58 -795,634.56
74,660.31 19,729.90
-171,670.27 -775,904.66
-16,662.73 -54,092.73
-1,010.08 -1,010.08
-10,308.28 -26,787.40
-14,275.33 -14,275.33
-8,105.42 -8,105.42
-222,032.11 -880,175.62
CUADRO DE RESUMEN ANEXO B - 5
EXPEDIENTE TECNICO O
PIP VIABLE EXPEDIENTE TECNICO/ESTUDIO DEFINITIVO 1 ESTUDIO DEFINITIVO
COMPONENTES/METAS ASOCIADAS A LA MODIFICADO 2
ITEM CAPACIDAD DE PRODUCCION DEL
SERVICIO
UNIDAD DE UNIDAD DE % AVANCE META ADICIONAL META A UNIDAD DE
CANTIDAD CANTIDAD (A)
MEDIDA MEDIDA FISICO (B) DEDUCIR ( C ) MEDIDA

01.00.00 RESULTADO 1 M2 138.00 M2 0.00 Err:509 0.00 0.00 M2


CONSTRUCCION DE 02 AULAS, 01 S.U.M., 01 S - 0.00 Err:509 0.00 0.00 0.00
02.00.00 RESULTADO 2 M2 35.00 M2 0.00 Err:509 0.00 0.00 M2
CONSTRUCCION DE 01 DIRECCION, 01 TOPICO, - 0.00 Err:509 0.00 0.00 0.00
03.00.00 RESULTADO 3 M2 9.00 M2 0.00 Err:509 0.00 0.00 M2
CONSTRUCCION DE 01 COCINA, 01 DEPOSITO - 0.00 Err:509 0.00 0.00 0.00
04.00.00 RESULTADO 4 M2 480.00 M2 0.00 Err:509 0.00 0.00 M2
CONSTRUCCION DE 01 AREA DE JUEGOS, CER - 0.00 Err:509 0.00 0.00 0.00
05.00.00 RESULTADO 5 MOD. 8.00 MOD. 0.00 Err:509 0.00 0.00 MOD.
MOBILIARIO Y EQUIPAMIENTO - 0.00 Err:509 0.00 0.00 0.00
06.00.00 RESULTADO 6 UND. 2.00 UND. 0.00 Err:509 0.00 0.00 UND.
CAPACITACION DE PADRES DE FAMILIA Y DOC - 0.00 Err:509 0.00 0.00 0.00
0.00 Err:509 0.00 0.00 0.00
COSTO DIRECTO - 0.00 Err:509 0.00 0.00 0.00
GASTOS GENERALES : GLB 1.00 0.00 Err:509 0.00 0.00 0.00
SUB TOTAL - 0.00 Err:509 0.00 0.00 0.00
SUPERVISION: GLB 1.00 0.00 Err:509 0.00 0.00 0.00
LIQUIDACION: - 0.00 Err:509 0.00 0.00 0.00
EXPEDIENTE TECNICO : EST. 1.00 0.00 Err:509 0.00 0.00 0.00
GASTOS DE GESTION DE PROYECTO : - 0.00 Err:509 0.00 0.00 0.00
SEGUIMIENTO Y MONITOREO : - 0.00 Err:509 0.00 0.00 0.00
TOTAL COSTO: - 0.00 Err:509 0.00 0.00 0.00
PEDIENTE TECNICO O
STUDIO DEFINITIVO
MODIFICADO 2

CANTIDAD
D = A+B-C

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
CUADRO DE RESUMEN ANEXO B - 5

EXP. TEC. DEFINITIVO EXPEDIENTE


% DE INCREMENTO
COMPONENTES/METAS ASOCIADAS A LA PRESUPUESTO PRESUPUESTO TEC./ESTUDIO
O DECREMENTO DE
ITEM CAPACIDAD DE PRODUCCION DEL PIP VIABLE S/. MONTO DE ADICIONAL (B) DEDUCTIVO (C) DEFINITIVO
EJECUTADO "D" RESPECTO AL
SERVICIO INVERSION (A) S/. S/. MODIFICADO 2/
S/. PIP VIABLE
S/. (D)=(A)+(B)-(C) S/.
01.00.00 RESULTADO 1 181,487.25 273,119.82 Err:509 0.00 0.00 273,119.82 91,632.57 50.49%
CONSTRUCCION DE 02 AULAS, 01 S.U.M., 01 SSHH NI 181,487.25 273,119.82 Err:509 0.00 0.00 273,119.82 91,632.57 50.49%
02.00.00 RESULTADO 2 81,259.33 67,446.88 Err:509 0.00 0.00 67,446.88 -13,812.45 -17.00%
CONSTRUCCION DE 01 DIRECCION, 01 TOPICO, 01 81,259.33 67,446.88 Err:509 0.00 0.00 67,446.88 -13,812.45 -17.00%
03.00.00 RESULTADO 3 21,998.52 141,432.24 Err:509 0.00 0.00 141,432.24 119,433.72 542.92%
CONSTRUCCION DE 01 COCINA, 01 DEPOSITO DE AL 21,998.52 141,432.24 Err:509 0.00 0.00 141,432.24 119,433.72 542.92%
04.00.00 RESULTADO 4 225,062.88 115,862.07 Err:509 0.00 0.00 115,862.07 -109,200.81 -48.52%
CONSTRUCCION DE 01 AREA DE JUEGOS, CERCO PE 225,062.88 115,862.07 Err:509 0.00 0.00 115,862.07 -109,200.81 -48.52%
05.00.00 RESULTADO 5 31,085.00 29,383.00 Err:509 0.00 0.00 29,383.00 -1,702.00 -5.48%
MOBILIARIO Y EQUIPAMIENTO 31,085.00 29,383.00 Err:509 0.00 0.00 29,383.00 -1,702.00 -5.48%
06.00.00 RESULTADO 6 8,411.00 6,111.50 Err:509 0.00 0.00 6,111.50 -2,299.50 -27.34%
CAPACITACION DE PADRES DE FAMILIA Y DOCENTES 8,411.00 6,111.50 Err:509 0.00 0.00 6,111.50 -2,299.50 -27.34%

COSTO DIRECTO 549,303.98 633,355.51 Err:509 0.00 0.00 633,355.51 84,051.54 15.30%
GASTOS GENERALES : 54,930.41 75,369.31 Err:509 0.00 0.00 75,369.31 20,438.90 37.21%
SUB TOTAL 604,234.39 708,724.82 Err:509 0.00 0.00 708,724.82 104,490.44 17.29%
SUPERVISION: 37,430.00 22,167.44 Err:509 0.00 0.00 22,167.44 -15,262.56 -40.78%
LIQUIDACION: 0.00 7,283.59 Err:509 0.00 0.00 7,283.59 7,283.59 100.00%
EXPEDIENTE TECNICO : 16,479.12 7,600.27 Err:509 0.00 0.00 7,600.27 -8,878.85 -53.88%
GASTOS DE GESTION DE PROYECTO :
SEGUIMIENTO Y MONITOREO :
TOTAL COSTO: 658,143.51 745,776.12 Err:509 0.00 0.00 745,776.12 87,632.61 13.32%