349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP5662...

Page 1 of 19

Shutdown SIS

Previous Screen  
 
Product: EXCAVATOR
Model: 349D L EXCAVATOR JGB00259
Configuration: 349D L Excavators JGB00001-UP (MACHINE) POWERED BY
C13 Engine
 
Systems Operation 
345D, 349D and 349D2 Excavators Hydraulic System 
Media Number -KENR6774-14 Publication Date -01/04/2014 Date Updated -09/04/2014

   
i04084609

Boom Hydraulic System


SMCS - 5050-BM 

Boom Raise (High Speed)


 

Illustration 1 g01583655
Hydraulic schematic for BOOM RAISE (high speed)  

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP5662... Page 2 of 19

(1) Boom cylinders  

(2) Line (oil flow from boom cylinder rod end)  

(3) Line (oil flow to boom cylinder head end)  

(4) Line  

(5) Pilot line  

(6) Main control valve  

(7) Port  

(8) Check valve  

(9) Boom drift reduction / regeneration valve  

(10) Pilot line  

(11) Pilot line  

(12) Port  

(13) Spring  

(14) Line  

(15) Port  

(16) Check valve  

(17) Boom II control valve  

(18) Pilot control valve (boom and bucket)  

(19) Return line  

(20) Spring  

(21) Load check valve  

(22) Parallel feeder passage  

(23) Return passage  

(24) Parallel feeder passage  

(25) Return passage  

(26) Boom I control valve  

(27) Pilot line  

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP5662... Page 3 of 19

(28) Pressure reducing valve for boom priority  

(29) Drive pump  

(30) Idler pump  

(31) Pilot pump   

A high speed BOOM RAISE operation is accomplished when oil delivery from both drive pump (29) 
and idler pump (30) is supplied to the head end of boom cylinders (1). Boom I control valve (26) and 
boom II control valve (17) operate during the high speed operation. A BOOM RAISE operation at low 
speed is accomplished when the oil delivery from only idler pump (30) is supplied to the head end of 
boom cylinders (1). During the low speed operation, boom I control valve (26) operates alone. 
 

Illustration 2 g01472075
Main control valve compartment  

(17) Boom II control valve  

(26) Boom I control valve  

The oil delivery from idler pump (30) flows through parallel feeder passage (24) in main control valve 

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP5662... Page 4 of 19

(6) to boom I control valve (26). The oil delivery from drive pump (29) flows through parallel feeder 
passage (22) in main control valve (6) to boom II control valve (17) .  

When the joystick for the boom is moved to the full BOOM RAISE position, the pilot oil flows from 
pilot control valve (18) through pilot line (10). The pilot oil flow then divides into two flow paths. Part 
of the pilot oil flows through pilot line (11) to port (12) of main control valve (6). The remainder of the 
pilot oil flows through pilot line (5) to port (7) of the main control valve.  

A portion of the oil in pilot line (5) also flows through pilot line (27) to the pressure reducing valve for 
boom priority (28). During a combined operation of BOOM RAISE and STICK IN, the pilot oil flow to 
the pressure reducing valve for boom priority (28) causes the boom circuit to receive oil flow priority. 
This action allows the boom to raise at a high speed. 
 

Illustration 3 g01457736

Boom I control valve  

(7) Port  

(13) Spring  

(21) Load check valve  

(24) Parallel feeder passage  

(25) Return passage  

(32) Port  

(33) Passage  

(34) Passage  

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP5662... Page 5 of 19

(35) Passage  

(36) Port  

(38) Spool  

(39) Passage  

(40) Passage   

The pilot oil flow from port (7) moves spool (38) of control valve (26) to the left against the force of 
spring (13). The drive pump oil in parallel feeder passage (24) flows through load check valve (21), and 
passages (33), (39) and (34). The oil then flows through passage (35) to port (36). 
 

Illustration 4 g02296254
Boom II control valve  

(12) Port  

(15) Port  

(16) Check valve  

(20) Spring  

(22) Parallel feeder passage  

(41) Passage  

(42) Spool  

(43) Passage   

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP5662... Page 6 of 19

The pilot oil in port (12) of control valve (17) moves spool (42) to the left against the force of spring 
(20). Idler pump oil from parallel feeder passage (22) now flows through passage (41), passage (43), 
check valve (16) and flows out of port (15) to line (4) .  

The oil flow in line (4) then combines with the drive pump oil in port (36). The combined pump oil 
flows through line (14) to boom drift reduction / regeneration valve (9). The combined pump oil shifts 
check valve (8) upward. The pump oil then flows through line (3) to the head end of boom cylinders 
(1) .  

Return oil from the rod end of boom cylinders (1) flows through line (2) to control valve (26). The oil 
enters port (32) and flows to passage (40). The oil then flows to return passage (25) and to return line 
(19) back to the hydraulic tank. The cylinder rods extend and the boom raises.  

ReferenceFor more information regarding boom drift reduction / regeneration valve (9), refer to 
Systems Operation, "Boom Drift Reduction Valve".  

Boom Raise (Low Speed)

When the joystick for the boom is moved less than half of the travel distance for BOOM RAISE, low 
pilot oil pressure is supplied to boom I control valve (26) and boom II control valve (17) .  

When the boom is raised at a low speed, boom I control valve (26) opens and boom II control valve (17) 
remains closed. The force of spring (13) in boom I control valve (26) is less than the force of spring (20) 
in boom II control valve (17). Because of the low pilot oil pressure, boom I control valve (26) will open 
and boom II control valve (17) will remain closed.  

The oil delivery from drive pump (29) flows to the head end of boom cylinders (1). Oil delivery from 
idler pump (30) is not supplied to the head end of boom cylinders (1). Without the oil delivery from 
idler pump (30), the cylinder movement is slower when the boom is raised. The low speed operation of 
the boom is performed.  

Boom Priority
 

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP5662... Page 7 of 19

Illustration 5 g02296256
Hydraulic schematic for BOOM RAISE and STICK IN  

(1) Boom cylinders  

(18) Pilot control valve (boom and bucket)  

(28) Pressure reducing valve for boom priority  

(44) Stick I control valve  

(45) Stick II control valve  

(46) Pilot control valve (stick and swing)  

During combined operations of BOOM RAISE and STICK IN, the pilot oil pressure from pilot control 
valve (18) activates pressure reducing valve for boom priority (28). Pressure reducing valve for boom 
priority (28) causes oil flow priority to the head end of the boom cylinders (1) during this combined 
hydraulic operation. The force required to perform a BOOM RAISE operation is much higher than the 
force required to perform a STICK IN operation. Without boom priority, the STICK IN operation would 
move at a higher speed than the BOOM RAISE operation.  

When the joystick for the stick is moved to the STICK IN position, pilot oil from pilot control valve (46) 
flows to stick I control valve (44) and through pressure reducing valve for the boom priority (28) to stick 
II control valve (45). As the joystick for the boom is moved farther from the NEUTRAL position during 
a BOOM RAISE operation, pilot oil pressure from pilot control valve (18) increases. This gradual 

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP5662... Page 8 of 19

increase in pilot oil pressure causes the spool in pressure reducing valve for the boom priority (28) to 
shift.  

Pilot oil that flows to stick II control valve (45) from pressure reducing valve (28) is routed to the 
hydraulic tank. The pilot oil pressure that acts on stick II control valve (45) decreases. Stick II control 
valve (45) shifts toward the NEUTRAL position. The amount of oil flow from the main pumps to the 
stick hydraulic circuit decreases. This condition causes a greater portion of the oil flow from the main 
pumps to flow to the head end of the boom cylinders (1) .  

Since the pilot oil pressure from pilot control valve (18) directly corresponds to the amount of 
movement or position of the joystick, a gradual change to boom priority occurs. Thus, boom priority is 
controlled by the position of the boom joystick. Boom priority automatically activates when the joystick 
reaches a certain position during a BOOM RAISE operation.  

Boom Lower (Without Regeneration)


 

Illustration 6 g02301434

Hydraulic schematic for BOOM LOWER without regeneration  

(1) Boom cylinders  

(2) Line (oil flow from boom cylinder rod end)  

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP5662... Page 9 of 19

(3) Line (oil flow to boom cylinder head end)  

(8) Valve  

(9) Boom drift reduction / regeneration valve  

(14) Line  

(18) Pilot control valve  

(21) Load check valve  

(24) Parallel feeder passage  

(25) Return passage  

(26) Boom I control valve  

(29) Drive pump  

(30) Idler pump  

(31) Pilot pump  

(47) Port  

(48) Pilot line  
 

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP56... Page 10 of 19

Illustration 7 g02301536

Boom drift reduction / regeneration valve partial schematic  

(1) Boom cylinders  

(2) Line (oil flow from boom cylinder rod end)  

(3) Line (oil flow to boom cylinder head end)  

(8) Check valve  

(9) Boom drift reduction / regeneration valve  

(26) Boom I control valve  

(47) Port  

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP56... Page 11 of 19

(48) Pilot line  

(49) Passage  

(50) Spool  

(51) Return line  

When the boom is lowered, oil from drive pump (29) is supplied to the head end of boom cylinders (1) 
through control valve (26). The boom II control valve is not used during a BOOM LOWER operation.  

When the joystick for the boom is moved to the BOOM LOWER position, pilot oil pressure from pilot 
control valve (18) flows to port (47). Pilot oil pressure shifts control valve (26). Pilot oil pressure in port 
(47) also flows through line (48) to boom drift reduction / regeneration valve (9). The pilot oil pressure 
in valve (9) shifts spool (50) to the left. Passage (49) is open to drain line (51). 
 

Illustration 8 g02309233
Boom I control valve  

(13) Spring  

(21) Load check valve  

(24) Parallel feeder passage  

(25) Return passage  

(32) Port  

(33) Passage  

(36) Port  

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP56... Page 12 of 19

(38) Spool  

(39) Passage  

(40) Passage  

(47) Port  

The pilot oil flow from port (47) shifts spool (38) in control valve (26) against the force of spring (13). 
The oil delivery from the drive pump in parallel feeder passage (24) flows through load check valve 
(21), passage (33), passage (40) and port (32). The oil delivery from the drive pump then flows through 
line (2) to the rod end of boom cylinders (1) .  

Return oil flow from the head end of boom cylinder (1) flows through line (3) to boom drift reduction / 
regeneration valve (9). Since spool (51) is shifted to the left by pilot pressure from pilot line (48), return 
oil in line (3) forces check valve (8) to open. Return oil then flows to line (14) and to port (36) of control 
valve (26). The return oil flows from port (36) to passage (39) and to return passage (25). Oil flows from 
return passage (25) to the return hydraulic system. The boom lowers.  

Boom Lower (With Regeneration)


When the boom is lowered and the work tool is not touching the ground, the boom hydraulic system will 
regenerate. The mass of the boom, stick, and work tool cause the head end of the boom cylinders to be 
pressurized. The pressure in the head end of the boom cylinders is higher than the pump output in the 
rod end of the boom cylinders.  

Because the pressure in the head end of the boom cylinders is higher than the rod end, the excessive 
pressure is cycled back to the rod end of the cylinders. Cycling the pressure oil back to the rod end of the 
boom cylinders reduces the load on the main pumps. Regeneration also prevents cavitation conditions in 
the rod end of the boom cylinders. 
 

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP56... Page 13 of 19

Illustration 9 g02302473

Hydraulic schematic for BOOM LOWER with regeneration  

(1) Boom cylinders  

(2) Line (oil flow from boom cylinder rod end)  

(3) Line (oil flow to boom cylinder head end)  

(8) Valve  

(9) Boom drift reduction / regeneration valve  

(14) Line  

(18) Pilot control valve  

(25) Return passage  

(26) Boom I control valve  

(29) Drive pump  

(30) Idler pump  

(31) Pilot pump  

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP56... Page 14 of 19

(47) Port  

(48) Pilot line  
 

Illustration 10 g02301554

Boom drift reduction / regeneration valve partial schematic  

(1) Boom cylinders  

(2) Line (oil flow from boom cylinder rod end)  

(3) Line (oil flow to boom cylinder head end)  

(8) Check valve  

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP56... Page 15 of 19

(9) Boom drift reduction / regeneration valve  

(14) Line  

(26) Boom I control valve  

(47) Port  

(48) Pilot line  

(49) Passage  

(50) Spool  

(51) Return line  

(52) Pressure sensor  

(53) Line  

(54) Check valve  

(55) Passage  

(56) Proportional reducing valve  

(57) Orifice  

(58) Pressure sensor   

Pressure sensor (52) in line (3) sends an electrical signal to the machine ECM. Pressure sensor (58) in 
pilot line (48) sends an electrical signal to the machine ECM as well. The machine ECM uses the inputs 
from sensor (52) and sensor (58) to determine the electrical signal needed for proportional reducing 
valve (56). The electrical signal sent from the machine ECM is variable. Proportional reducing valve 
(56) controls the pilot oil pressure that shifts spool (50). Full pilot oil pressure from pilot line (48) flows 
to spool (50) when the machine ECM DE-ENERGIZES valve (56). When the machine ECM 
ENERGIZES valve (56), a reduced pilot oil pressure from pilot line (48) flows to spool (50) .  

The machine ECM energizes proportional reducing valve for boom regeneration (56) in order to throttle 
the rate of regeneration during a BOOM LOWER operation. With a low electrical signal, the boom 
lowers fast. With a high electrical signal, the boom lowers slow. The rate of speed of the BOOM 
LOWER operation during regeneration is related to the amount of joystick movement.  

The BOOM LOWER with regeneration operation is like the BOOM LOWER without regeneration 
operation.  

When the joystick for the boom is operated, pilot pressure from pilot control valve (18) flows to port 
(47) at boom I control valve (26). Pilot oil pressure shifts control valve (26) upward. Pilot oil pressure 
also flows through line (48) to boom drift reduction / regeneration valve (9). Pilot oil pressure shifts 
spool (50) to the left. The oil in the spring cavity of check valve (8) flows through passage (49) and 
spool (50) to return line (51) .  

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP56... Page 16 of 19

Oil from the boom cylinder head end in line (3) shifts check valve (8) upward. The oil now flows to line 
(14) and passage (55) .  

Orifice (57) restricts the flow of oil in line (14) to the return system. The restriction of orifice (57) 
causes the return oil from the boom cylinder head end to increase. The higher pressure oil then flows 
through passage (55) and spool (50) to check valve (54). The oil in passage (55) opens check valve (54). 
The oil then flows through line (53) to line (2). The oil in the head end of the boom cylinders flows to 
the rod end of the boom cylinders.  

Oil that is not needed to cycle from the head end of the boom cylinders to the rod end of the boom 
cylinders flows to return passage (25). The oil in return passage (25) then flows to the return hydraulic 
system and the hydraulic tank. The boom cylinder rods retract and the boom lowers.  

Note: Once the work tool is on the ground, regeneration is no longer needed. Back pressure is no longer 
created by the mass of the implements in the head end of the boom cylinders. The pressure in passage 
(55) is less than the pressure in line (53). Check valve (54) closes. Check valve (54) prevents the higher 
pressure in passage (53) from flowing to passage (55). The oil in the head end of boom cylinders (1) 
returns to boom I control valve (26) and to return passage (25). The pump output pressure is used to 
retract the boom cylinders.  

Manual Boom Lower


 

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP56... Page 17 of 19

Illustration 11 g02316573
Manual lowering valve  

(9) Boom drift reduction / regeneration valve  

(59) Manual lowering valve  

(60) Locknut  

(61) Adjustment screw  

(62) Return passage  

(63) Passage  

(64) Check ball  

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP56... Page 18 of 19

Illustration 12 g02316574
Manual boom lower partial schematic  

(3) Line (oil flow to boom cylinder head end)  

(8) Check valve  

(9) Boom drift reduction / regeneration valve  

(51) Return line  

(59) Manual lowering valve  

(62) Return passage  

(63) Passage   

Check valve (8) prevents oil pressure in line (3) from flowing to the return system when the boom is 
suspended from the ground. The mass of the boom, stick, and work tool creates pressure in the head end 
of the boom cylinders. In case the boom cannot be lowered because of engine problems or hydraulic 
system problems, the boom can be lowered by opening manual lowering valve (59). Opening manual 
lowering valve (59) causes the pressurized oil in line (3) to be routed to return line (51). The boom 

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013
349D L Excavators JGB00001-UP (MACHINE) POWERED BY C13 Engine(SEBP56... Page 19 of 19

lowers when the pressure in line (3) flows to return line (51) .  

In order to lower the boom manually, loosen locknut (60) and turn adjustment screw (61) 
counterclockwise. Turning adjustment screw (61) countercolockwise allows check ball (64) to open. 
Once check ball (64) opens, the high-pressure oil in passage (63) can flow to return passage (62). The oil 
in return passage (62) flows to return line (51) and to the hydraulic tank. The boom lowers.  

Once the boom is on the ground, oil pressure that was created in the head end of the boom cylinders is 
now equal to the return system. Turn adjustment screw (61) clockwise until check ball (64) is seated. 
Tighten locknut (60) .   

Copyright 1993 - 2013 Caterpillar Inc.   Wed Aug 14 09:46:17 UTC+0400 2013
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb/... 8/14/2013

You might also like