You are on page 1of 259

DAFTAR HARGA SATUAN UPAH DAN BAHAN

CADANGAN ARSIP SURVEY

HARGA HG. PASAR/


NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
2012 SMT I
A UPAH
1 Kepala Tukang Oh 90,000.00 90000-100000/ Oh
2 Tukang Oh 75,000.00 75000-75000/ Oh
3 Mandor Oh 90,000.00 90000-100000/ Oh
4 Pekerja Tidak Terlatih Oh 50,000.00 45000-50000/ Oh
5 Pekerja Terlatih Oh 60,000.00 50000-60000/ Oh

B BAHAN/MATERIAL
1 Aluminium Foil m2 15,000.00 15.000/M2
2 Alcubond m2 500,000.00 500.000-525.000/M2
3 Amplas Biasa Lbr 3,500.00 3.500 / Lbr
4 Amplas Niken Lbr 5,000.00 5.000-5.500 / Lbr
5 Atap Aluminium Zink Coated (seng) tebal 0,25 mm Lbr 40,000.00 40.000/Lbr
6 Atap Aluminium Zink Coated (seng) tebal 0,3 mm Lbr 50,000.00 50.000/Lbr
7 Atap Aluminium Zink Coated (seng) tebal 0,4 mm Lbr 76,000.00 76.000/Lbr
8 Atap Aluminium Zincalume, tebal 0,25 mm Lbr 56,000.00 56.000/Lbr
9 Atap Aluminium Zincalume, tebal 0,3 mm Lbr 78,000.00 78.000/Lbr
10 Atap Aluminium Zincalume, tebal 0,4 mm Lbr 88,000.00 88.000/Lbr
11 Atap Aluminium Gelombang tebal 0,5 mm Lbr 105,000.00 105.000/Lbr
12 Atap Fiber warna"Polycarbonat" tbl. 4-5 mm m2 65,000.00 65.000-65.500/M2
13 Atap Genteng Beton Lokal buah 3,000.00 3000/ buah
14 Atap Genteng Beton buah 3,900.00 3900-4000/ buah
15 Atap Genteng Beton Cisangkan buah 6,000.00 5500-6500/ buah
16 Atap Genteng Buleleng buah 1,700.00 1700/ buah
17 Atap Genteng Keramik biasa berglazur buah 7,300.00 7300/ buah
18 Atap Genteng Keramik Berglazur Natural buah 9,000.00 9000-9250/ buah
19 Atap Genteng Keramik sejenis Berglazur warna buah 13,500.00 12000-15000/ buah
20 Atap Genteng Metal Biasa (88 cm X 77 cm) m2 30,000.00 27.000-32.000/M2
21 Atap Genteng Metal Warna (120 cm X 76 cm) m2 72,000.00 72.000/M2
22 Atap Genteng Metal Zincalume 2x4 (38,5 cm X 80cm) m2 138,000.00 138.000/M2
23 Atap Genteng Metal Zincalume berpasir (77cmX100cm) m2 78,000.00 78.000/M2
24 Atap Genteng Metal Zincalume berpasir biasa m2 67,000.00 67.000/M2
25 Atap Genteng Kodok buah 700.00 700-750/ Buah
26 Atap Onduline m2 80,000.00 80.000/ M2
27 Asbes polos 100 x 100 tbl = 4 mm Lbr 18,500.00 18.000-19.000 / Lbr
28 Asbes Gelombang Kecil, lebar 80 cm m2 29,500.00 29.500/M2
29 Asbes Gelombang Kecil, lebar 105 cm m2 30,500.00 30.500/M2
30 Asbes Gelombang Besar, lebar 105 cm m2 33,500.00 33.500/M2
31 Asbes Gelombang motif genteng m2 24,250.00 24.250/M2
32 Aquaproof kg 43,000.00 42.000-47.000/ Kg
33 Bak Cuci Stainless Steel buah 180,000.00 180.000-270.000/ Buah
34 Bak Cuci Teraso buah 100,000.00 100.000/ Buah
35 Bak Fibreglass buah 310,000.00 310.000-325.00/ Buah
36 Bak Teraso buah 180,000.00 180.000/ Buah
37 Bambu dia. 6-8 cm/6m Btg 45,000.00 45.000/ Btg
38 Batako buah 2,500.00 2200-2500/ Buah
39 Batu Andesit hitam kecoklatan m2 250,000.00 250.000/ M2
40 Batu alam kecoklatan (Sangarong) m2 185,000.00 180.000-190.000/ M2
41 Batu Bata lobang m3 441,830.00 430.100-453.560/M3
42 Batu Bata Kecil buah 700.00 600-800/ Buah
43 Batu Bata Lobang buah 600.00 560-600/ Buah
44 Batu Candi hitam m2 200,000.00 200.000-250.000/ M2
45 Batu Kali m3 360,000.00 360.000/ M3
46 Batu Kali tempel m2 62,500.00 60.000-65.000/ M2
47 Batu Karang Pilang m2 500,000.00 500.000/ M2
48 Batu Kerikil m3 350,000.00 350.000/ M3
49 Batu Koral beton m3 310,000.00 300.000-350.000/ M3
50 Batu Koral Jagung m3 350,000.00 260.000-320.000/ M3
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
51 Batu Krokos m3 350,000.00 350.000/ M3
52 Batu Palimanan kuning/hijau m2 130,000.00 130.000-150.000/ M2
53 Batu Palimanan kuning/hijau + bevel m2 150,000.00 150.000/ M2
54 Batu Pecah 0.5 - 1 (screen) m3 275,000.00 265.000-285.000/ M3
55 Batu Abu 0.00 - 0.5 (filler) m3 275,000.00 265.000-285.000/ M3
56 Batu Pecah 1.3 - 1.9 (spilt) m3 380,000.00 380.000-400.000/ M3
57 Batu Pecah 2/3 m3 400,000.00 400.000-415.000/ M3
58 Batu Pecah 3/5 m3 390,000.00 390.000/ M3
59 Batu Pecah 5/7 m3 390,000.00 390.000/ M3
60 Batu Marmer m2 258,000.00 258.000/ M2
61 Batu Roster / Terawang biasa buah 2,500.00 2.500/ Buah
62 Besi dia. 5 mm Batang 14,000.00 14.000-16.500/ Batan
63 Besi dia. 6 mm KS Batang 18,000.00 18.000-25.000/ Batang
64 Besi dia. 8 mm KS TI Batang 41,000.00 41.000-42.000/ Batang
65 Besi dia. 10 mm KS TI Batang 63,000.00 61.000-64.000/ Batang
66 Besi dia. 12 mm KS TI Batang 91,000.00 90.000-94.000/ Batang
67 Besi dia. 14 mm KS TI Batang 100,000.00 100.000/ Batang
68 Besi dia. 16 mm KS TI Batang 162,000.00 162.000/ Batang
69 Besi dia. 19 mm KS TI Batang 228,000.00 228.000/ Batang
70 Besi Beton Polos kg 11,200.00 11.200/ kg
71 Besi Baja Profil WF, I dan H kg 12,000.00 12.000/ kg
72 Besi Baja Konstruksi ( CNP, INP,dan besi L) kg 12,500.00 12.000-13.000/ kg
73 Besi Beam Clamp dan Plat Siku m2 22,500.00 21.000-24.000/ kg
74 Besi Hollow baja 20 X 40, tb. 2mm Batang 107,000.00 94.000-107.000/ Btg
75 Besi Hollow baja 40 X 40, tb. 2mm Batang 138,000.00 125.000-138.000/ Btg
76 Besi Hollow baja 30 X 60, tb. 2mm Batang 195,000.00 160.000-200.000/ Btg
77 Besi Hollow Plafond 2 X 4 Batang 22,000.00 21.000-22.500/ Btg
78 Besi Strip kg 7,500.00 7.000-8.000/ kg
79 Besi Strip 2 X 3 M' 3,250.00 3.250/ M'
80 Beton Ready Mix K - 125 m3 650,000.00 640.000-660.000/ M3
81 Beton Ready Mix K - 175 m3 690,000.00 680.000-700.000/ M3
82 Beton Ready Mix K - 225 m3 705,000.00 700.000-710.000/ M3
83 Beton Ready Mix K - 250 m3 745,000.00 740.000-750.000/ M3
84 Beton Ready Mix K - 275 m3 770,000.00 770.000-780.000/ M3
85 Beton Ready Mix K - 300 m3 785,000.00 780.000-790.000/ M3
86 Beton Ready Mix K - 350 m3 810,000.00 800.000-810.000/ M3
87 Beton Ready Mix K - 400 m3 855,000.00 850.000-860.000/ M4
88 Bubungan Asbes Gelombang Besar m' 22,750.00 22.750/M2
89 Bubungan Asbes Gelombang Kecil m' 21,000.00 21.000/M2
90 Bubungan/Nok Genteng Beton Buah 5,500.00 5.500/Buah
91 Bubungan Genteng Buleleng Buah 2,500.00 2500-2500/ buah
92 Bubungan/ Nok genteng Keramik biasa berglazur Buah 6,500.00 6.000-7.000/Buah
93 Bubungan/Nok genteng Keramik sejenis berglazur Buah 12,500.00 12.000-13.000/Buah
94 Bubungan gtg Keramik sejenis warna berglazur Buah 17,500.00 17.000-18.000/Buah
95 Bubungan/Nok Genteng Metal/aluminium M' 23,500.00 21.000-26.000/M'
96 Bubungan Genteng Kodok Buah 1,875.00 1.750-2.000/Buah
97 Cat Dasar kg 24,000.00 24.000/ Kg
98 Cat Antara kg 19,000.00 18.000-20.000/ Kg
99 Cat Kayu dan Besi Anti Rayap kg 23,000.00 22.000-24.000/ Kg
100 Cat Khusus Glossy dan Quick Drying kg 20,500.00 20.000-21.000/ Kg
101 Cat Minyak warna (biasa) mutu C kg 29,000.00 29.000/ Kg
102 Cat Minyak mutu B kg 40,000.00 56.000/ Kg
103 Cat Minyak Semprot kg 50,000.00 50.000/ Kg
104 Cat Meni Besi kg 37,000.00 37.000/ Kg
105 Cat Meni Besi /kayu/ Flincote kg 32,250.00 40.000/ Kg
106 Cat Penutup kg 72,500.00 70.000-75.000/ Kg
107 Cat Tembok mutu C (Vinotex,Q-Luc, dan sejenis) kg 9,500.00 9.500/ Kg
108 Cat Tembok mutu B (Catylax,vinilex, dan sejenis) kg 15,000.00 15.280-16.000/ Kg
109 Cat Tembok mutu B, Anti Lumut dan Jamur kg 17,500.00 17.000/ Kg
110 Cat Tembok mutu A (Mowilex,Kemtone,Dulux,dll) kg 70,000.00 70.000/ Kg
111 Closed Duduk Setara (sejenis standar KIA) unit 1,250,000.00 1250.000-1250.000/ Unit
112 Closed Duduk Standar (sejenis Ex.TOTOC721FV1) unit 2,100,000.00 2.100.000/ Unit
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
113 Closed Duduk Halmar unit 3,062,000.00 3.062.000/ Unit
114 Closed Duduk mutu C unit 1,715,000.00 1.715.000/Unit
115 Closed Duduk mutu A unit 4,270,000.00 4.270.000/ Unit
116 Closed Duduk mutu B unit 2,593,000.00 2.593.000/ Unit
117 Closed Duduk standar unit 2,151,000.00 2.151.000/ Unit
118 Closet Duduk / Monoblok bh 400,000.00 400.000/ Buah
119 Closet Jongkok Porselen / biasa buah 80,000.00 75.000-85.000/ Buah
120 Closet Jongkok Teraso buah 25,000.00 25.000/ Buah
121 Closed Jongkok Standart / sejenis (mutu B) unit 145,000.00 145.000/ Unit
122 Closed Jongkok sejenis ( mutu A) Unit 200,000.00 200.000/ Unit
123 Shower Spray TX 403 SV 3 buah 325,000.00 325.000/ Buah
124 Coneblock biasa tebal 6 cm buah 1,300.00 1.300/ Buah
125 Coneblock warna tebal 6 cm buah 1,500.00 1.500/ Buah
126 Coneblock biasa tebal 8 cm buah 1,800.00 1.800/ Buah
127 Coneblock warna tebal 8 cm buah 2,000.00 2.000/ Buah
128 Cornice (bubuk Semen putih utk gypsum) kg 5,000.00 5.000/ Kg
129 Dempul Jadi kg 12,500.00 12000-12500/ Kg
130 Dempul Ross Polac kg 21,250.00 85000/ 4 Kg
131 Dempul Isamu kg 40,000.00 40.000/Kg
132 Dolken Kayu dia. 8 - 10/400 cm m3 275,000.00 275.000/M3
133 Door Closer buah 380,000.00 380.000/ Buah
134 Door Holder buah 30,000.00 20.000-40.000/ Buah
135 Door Stoper buah 300,000.00 300.000/ Buah
136 Door Stop buah 22,000.00 22.000/ Buah
137 Ember hitam buah 5,000.00 3.500-5.000/ Buah
138 Engsel Biasa buah 6,000.00 5.000-6.000/ Buah
139 Engsel Kuningan 4" buah 10,000.00 10.000-22.000/ Buah
140 Engsel Pintu buah 10,000.00 10.000-22.000/ Buah
141 Epoxi kg 42,500.00 40.000-45.000/ Kg
142 Eternit 100 x 100 tebal 2,7 mm Lbr 12,000.00 11.000-12.000/ Lbr
143 Eternit 100 x 100 tebal 3,5 mm Lbr 14,000.00 14.000/ Lbr
144 Filler m3 172,500.00 170.000-175.000/M3
145 Fitting plafond listrik buah 5,000.00 5000/Buah
146 Glass Block buah 17,000.00 17.000/Buah
147 Grendel/Slot Tanam 4" buah 72,500.00 70.000-75.000/Buah
148 Grendel biasa buah 13,500.00 12.000-15.000/Buah
149 Gypsum Board ( 120 x 240 x 9 ) mm lbr 60,000.00 57.000-60.000/ Lbr
150 Hordeng Horizontal Blind (aluminium) m2 87,500.00 85000-90000/ M2
151 Hordeng Vertikal Blind m3 90,000.00 85000-90000/ M2
152 Ijuk Kg 7,000.00 7000/ Kg
153 Jendela Aluminium + Kaca Reyband 5 mm m2 675,000.00 675.000/ M2
154 Jendela Besi m2 250,000.00 200.000-300.000/ M2
155 Jendela Bingkai Nako 100 cm X 70 cm Unit 75,000.00 75.000/ M2
156 Jendela Bingkai Nako m2 95,000.00 95.000/ M2
157 Kabel NYA 1,5 mm m' 3,500.00 3.500/ M'
158 Kabel NYA 2,5 mm m' 3,000.00 4.000/ M'
159 Kabel NYA 4.0 mm m' 4,500.00 4.500/ M'
160 Kabel NYM 2 X 1,5 mm m' 4,500.00 4.000-5.000/ M'
161 Kabel NYM 2 X 2,5 mm m' 7,250.00 6.000-8.000/ M'
162 Kabel NYM 2 X 4,0 mm m' 14,500.00 14.000-15.000/ M'
163 Kaca Cermin 3 mm m2 120,000.00 120.000-120.000/ M2
164 Kaca Cermin 5 mm m2 3,400,000.00 325.000-350.000/ M2
165 Kaca Patri m2 1,200,000.00 1.150.000-1.250.000/ M2
166 Kaca Bening 3 mm m2 65,000.00 62.500-65.000/ M2
167 Kaca Bening 4 mm m2 95,000.00 75.000-90.000/ M2
168 Kaca Bening 5 mm m2 122,500.00 120.000-125.000/ M2
169 Kaca Bening 8 mm m2 165,000.00 165.000-170.000/ M2
170 Kaca Bening 10 mm m2 200,000.00 200.000/ M3
171 Kaca Buram 12 mm m2 350,000.00 350.000/ M2
172 Kaca Rayband 5 mm m2 142,500.00 140.000-145.000/ M2
173 Kaca Buram/Es 5 mm m2 90,000.00 90.000/ M2
174 Bingkai Kaca Nako Set 25,000.00 25.000/ M2
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
175 Kaca Naco 6 daun Set 127,500.00 125.000-130.000/ Set
176 Kaca Naco 8 daun Set 142,500.00 140.000-145.000/Set
177 Kaca Naco Rayben 5 mm, 6 daun Set 167,500.00 165.000-170.000/Set
178 Kaca Naco Rayben 5 mm, 8 daun Set 177,500.00 175.000-180.000/Set
179 Kait angin Jendela Buah 12,500.00 12500
180 Kalsiboard 3,5 mm (120 cm X 240 cm) Kpg 49,000.00 49.000/ Kpg
181 Kalsiboard 4,5 mm (120 cm X 240 cm) Kpg 53,000.00 53.000/ Kpg
182 Kapur kg 4,000.00 3.000-3.000/ Kg
183 Karpet tebal 6 mm m2 68,750.00 250.000-300.000/ Roll
184 Kawat Beton kg 20,000.00 16.000-20.000/ Kg
185 Kawat Burung m2 20,000.00 20.000/ M2
186 Kawat Duri m' 13,000.00 13.000/ M'
187 Kawat Harmonika m2 35,000.00 35.000/ M2
188 Kawat Jaring pagar lbr 25,000.00 25.000/ lbr
189 Kawat Kassa m2 10,000.00 10.000/ M2
190 Kawat Las Dos 100,000.00 100.000/ Dos
191 Kawat Nyamuk m2 22,000.00 22.000/ M2
192 Kawat Seng Polos kg 15,500.00 15.000 - 16.000/ Kg
193 Kayu Gelam dia. 6-8 btg 15,000.00 15.000-16.00/ Batang
194 Kayu Gelam dia. 10-12 btg 17,000.00 17.000-18.000/ Batang
195 Kayu Hek btg 12,500.00 12.500/ Batang
196 Kayu Lis 1/3 m' 4,000.00 4.000-5.000/ Btg
197 Kayu Lis 1/4 m' 5,000.00 5.000-6.000/ Btg
198 Kayu Lis Profil kecil m' 1,500.00 5.000-7.000/ Btg
199 Kayu Lis Profil sedang m' 3,000.00 9.000-15.000/ Btg
200 Kayu Lis Profil besar m' 6,500.00 25.000-27.000/ Btg
201 Kayu Mosaik 30 x 30 cm Buah 5,500.00 5.000-6.000/Buah
202 Kayu Kaso 5/7 kelas III (Meranti dan sejenis) Btg 55,000.00 55.000/Btg
203 Kayu Kelas I (Unglen, Jati) m3 7,500,000.00 7.500.000-8.500.000/ M3
204 Kayu Kelas II (Petanang dan sejenis) m3 5,000,000.00 5.500.000-6.500.000/ M3
205 Kayu Kelas III (Meranti dan sejenis) m3 2,500,000.00 2.500.000-3.000.000/ M3
206 Kayu Papan 3/20 Kls. III m3 2,500,000.00 2.500.000/ M3
207 Kayu Kelas IV (Racuk dan sejenis) m3 1,500,000.00 1.500.000/ M3
208 Kayu Papan kelas IV keping 30,000.00 30.000-35.000/ Kpg
209 Kayu Racuk m3 1,500,000.00 1.500.000/ M3
210 Kayu Reng btg 20,000.00 20.000/ Batang
211 Keramik lantai/dinding 20 x 20/25 cm putih polos Kotak 40,000.00 40.000/ ktk
Keramik lantai/dinding 20 x 20/25 cm putih polos buah 1,840.00 1.200-1.400/ Buah
212 Keramik lantai 20 x 20 cm warna, mutu C Kotak 35,000.00 35.000/ ktk
Keramik lantai 20 x 20 cm warna, mutu C buah 1,400.00 1.400-1.600/ Buah
213 Keramik lantai 20 x 20 cm warna, mutu B Kotak 50,000.00 38.000-60.000/ ktk
Keramik lantai 20 x 20 cm warna, mutu B buah 2,000.00 1.400-1.600/ Buah
214 Keramik dinding 20 x 25 cm warna Kotak 45,000.00 40.000-50.000/ ktk
Keramik dinding 20 x 25 cm warna buah 2,250.00 2.250/ Buah
215 Keramik lantai 20 x 25 cm warna, mutu B Kotak 50,000.00 40.000-50.000/ ktk
Keramik lantai 20 x 25 cm warna, mutu B buah 2,500.00 2.500/ Buah
216 Keramik lantai 30 x 30 cm warna Kotak 45,000.00 40.000-50.000/ ktk
Keramik lantai 30 x 30 cm warna buah 5,000.00 5.000/ Buah
217 Keramik lantai 30 x 30 cm putih polos Kotak 32,000.00 33.000-35.000/ ktk
Keramik lantai 30 x 30 cm putih polos buah 4,000.00 3.600/ Buah
218 Keramik lantai 40 x 40 cm warna mutu C Kotak 51,000.00 51.000/ ktk
Keramik lantai 40 x 40 cm warna mutu C buah 8,500.00 8.500/ Buah
219 Keramik lantai 40 x 40 cm warna mutu B Kotak 93,000.00 93.000/ ktk
Keramik lantai 40 x 40 cm warna mutu B buah 15,500.00 15.500/ Buah
220 Keramik lantai motif kayu (kasar) mutu A Kotak 54,000.00 54.000-115.000/ ktk
221 Klem Talang Paralon Buah 2,500.00 2.000 - 2.500/ Buah
222 Klem kabel listrik biasa Buah 75.00 50 - 100/ Buah
223 Klem kabel listrik Buah 2,750.00 2.500 - 3.000/ Buah
224 Korosin Ltr 2,000.00 2.000 - 2.000/ Ltr
225 Kran Air buah 8,500.00 7.000 - 10.000/ Buah
226 Kuas 3"-4" buah 8,000.00 8.000/ Buah
227 Kunci Gembok buah 7,000.00 7.000/ Buah
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
228 Kunci Lemari buah 7,000.00 12.000/ Buah
229 Kunci Pintu Kamar Tidur (Hotel) buah 450,000.00 450.000/ Buah
230 Kunci Pintu KM/WC (lux) buah 360,000.00 360.000/ Buah
231 Kunci Selot buah 12,500.00 12.500/ Buah
232 Kunci Tanam biasa mutu C buah 25,000.00 20.000-25.000/ Buah
233 Kunci Tanam 2 slaag biasa buah 50,000.00 70.000-75.000/ Buah
234 Kunci Tanam 2 slaag mutu B buah 85,000.00 90.000/ Buah
235 Kunci Tanam Kamar Mandi buah 22,500.00 20.000-25.000/ Buah
236 L.bow listrik buah 2,500.00 2.500/ Buah
237 Lampu Down Light buah 37,500.00 25.000-50.000/ Buah
238 Lampu Hologen 50 watt buah 9,000.00 8.000-10.000/ Buah
239 Lampu Hologen 150 watt buah 37,500.00 35.000-40.000/ Buah
240 Lampu Hologen Box buah 30,000.00 25.000-35.000/ Buah
241 Lampu TL 10 Watt buah 45,000.00 45.000-45.000/ Buah
242 Lampu TL 20 Watt buah 65,000.00 60.000-70.000/ Buah
243 Lampu TL 40 Watt (bambu) buah 75,000.00 70.000-80.000/ Buah
244 Lampu Pijar 25 Watt Putih buah 11,000.00 10.000-12.000/ Buah
245 Lampu Pijar 40 Watt Putih buah 12,000.00 12.000/ Buah
246 Lantai Granit 30/30 Buah 17,100.00 180.000-200.000/ M2
247 Lantai Granit 40/40 Buah 36,800.00 225.000-235.000/ M2
248 Lantai Granit 60/60 Buah 104,400.00 285.000-295.000/ M2
249 Lantai Kayu Panil Gracewood m2 352,500.00 350.000-355.000/ M2
250 Las dop listrik Buah 1,000.00 1.000/ buah
251 Lem Kayu ltr 12,000.00 12.000/ Buah
252 Lem Vinyl Kg 7,000.00 7.000/ Kg
253 List Gypsum Besar m' 19,000.00 18.000-20.000/ Buah
254 List Gypsum Kecil m' 14,000.00 13.000-15.000/ Buah
255 Mangkok Saklar listrik Buah 900.00 800 - 1.000/ buah
256 MCB Buah 15,000.00 15.000-15.000/ Buah
257 MCB Box isi 4 grup Buah 17,500.00 15.000-20.000/ Buah
258 MCB Box isi 8 grup Buah 32,500.00 30.000-35.000/ Buah
259 Melamic Clear kg 52,500.00 52.500/Kg
260 Melamic Gloss/dop (Finishing) kg 52,500.00 52.500/Kg
261 Mill kg 29,500.00 29.000-30.000/Kg
262 Minyak Bekisting liter 10,000.00 9.000-10.000/ Ltr
263 Minyak Cat liter 5,000.00 5.000/ Ltr
264 Minyak solar untuk industri / Minyak aspal liter 4,200.00 4.200/Ltr
265 Minyak Gardan liter 15,500.00 15.000-16.000/Ltr
266 Minyak Hidrolik liter 23,500.00 23.000-24.000/Ltr
267 Minyak Selinder liter 15,500.00 15.000-16.000/Ltr
268 Mozaik kayu lantai Uk. 30 x 30 cm buah 7,500.00 7.000-8.000/Buah
269 Pagar BRC, uk. 240 cm X 120 cm, dia. 5,5 mm Unit 310,000.00 310.000-310.000/Unit
270 Pagar BRC, uk. 240 cm X 90 cm, dia. 6 mm Unit 340,000.00 310.000-310.000/Unit
271 Paku Biasa bermacam ukuran 2" - 5" kg 15,000.00 13.000-15.000/Kg
272 Paku Biasa 1/2" - 1" kg 18,000.00 13.000-19.000/Kg
273 Paku Sumbat buah 475.00 450-500/Buah
274 Paku Beton buah 550.00 400-600/Buah
275 Paku Gypsum kg 25,000.00 25.000/Kg
276 Paku Seng,Asbes kg 20,000.00 17.500-25.000/Kg
277 Paku Asbes buah 475.00 25000-45000/Kg
278 Paku Sekrup 3,5" Kg 45,000.00 44.000-46.000/Kg
279 Paku Sekrup 3,5" buah 450.00 440-460/Buah
280 Parquet Jati m2 385,000.00 375.000-395.000/M2
281 Pasir Beton / Pasang m3 85,000.00 80.000-85.000/M3
282 Pasir Urug m3 75,000.00 75.000-80.000/M3
283 Pewarna nat Bks 8,500.00 8.500-9.000/Bks
284 Pintu Alluminium m2 575,000.00 575.000/M2
285 Pintu Besi Baja m2 1,750,000.00 1.500.000-2.000.000/M2
286 Pintu Lipat m2 337,500.00 275.000-400.000/M2
287 Pintu PVC lengkap Unit 185,000.00 185.000- 187.000/Unit
288 Pipa besi medium 2 mm & 1/2", pjg 6 m M' 11,250.00 11.250/m'
289 Pipa besi medium 2 mm & 3/4", pjg 6 m M' 14,583.33 14.583,33/m'
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
290 Pipa besi medium 2 mm & 1", pjg 6 m M' 17,833.33 17.833,33/m'
291 Pipa besi medium 2 mm & 1,5", pjg 6 m M' 24,833.33 24.833,33/m'
292 Pipa besi medium 2 mm & 2", pjg 6 m M' 31,666.67 31.666,67/m'
293 Pipa besi medium 2 mm & 2,5", pjg 6 m M' 31,666.67 31.666,67/m'
294 Pipa besi medium 2 mm & 3", pjg 6 m M' 49,250.00 49.250/m'
295 Pipa besi medium 2 mm & 4", pjg 6 m M' 65,500.00 65.500/m'
296 Pipa paralon listrik 5/8" Btg 4,500.00 10.000/Btg
297 Pipa PVC & 1/2" mutu A (Wavin dan sejenis) Btg 3,750.00 12.000-15.000/Btg
298 Pipa PVC biasa & 1/2" mutu B Btg 2,000.00 8.000/Btg
299 Pipa PVC & 3/4" mutu A (Wavin dan sejenis) Btg 5,375.00 21.500/Btg
300 Pipa PVC & 3/4" mutu B Btg 3,000.00 18.000/Btg
301 Pipa PVC & 1" mutu A (Wavin dan sejenis) Btg 7,375.00 29.500/Btg
302 Pipa PVC & 1" mutu B Btg 3,750.00 15.000/Btg
303 Pipa PVC & 1.5" mutu A (Wavin dan sejenis) Btg 12,750.00 51.000/Btg
304 Pipa PVC & 1.5" mutu B Btg 7,750.00 31.000-33.000/Btg
305 Pipa PVC & 2" mutu A ( Wavin dan sejenis) Btg 16,000.00 64.000-66.000/Btg
306 Pipa PVC & 2" mutu B Btg 10,000.00 40.000-42.000/Btg
307 Pipa PVC & 3" mutu A (Wavin dan sejenis) Btg 31,500.00 126.000-128.000/Btg
308 Pipa PVC & 3" mutu B Btg 17,000.00 68.000-70.000/Btg
309 Pipa PVC & 4" mutu A ( Wavin dan sejenis) Btg 52,250.00 209.000-211.000/Btg
310 Pipa PVC & 4" mutu B Btg 26,750.00 107.000-109.000/Btg
311 Pipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis) Btg 121,500.00 486.000-488.000/Btg
312 Pipa Stainless 2", tebal 1 mm M' 75,000.00 75.000/Btg
313 Pipa Stainless 2", tebal 0.8 mm M' 60,000.00 60.000/Btg
314 Pipa Stainless 2,5", tebal 1 mm M' 85,000.00 85.000/Btg
315 Pipa Stainless 2,5", tebal 1.2 mm M' 75,000.00 75.000/Btg
316 Plamir Tembok kg 27,500.00 27.000- 28.000/Kg
317 Plamir Kayu kg 22,000.00 23.000- 25.000/Kg
318 Plat stainless, tebal 1 mm, uk. 244 cm X 122 cm Lbr 1,550,000.00 1.550.000/Lbr
319 Plint keramik 10 x 30 cm warna buah 3,500.00 3.500/Buah
320 Plint keramik 10 x 40 cm warna buah 11,000.00 11.000/Buah
321 Plint Ubin PC Abu-abu 15 x 20 cm buah 725.00 700-750/Buah
322 Plint Ubin PC Abu-abu 10 x 30 cm buah 775.00 750-800/Buah
323 Plint Ubin PC Abu-abu 10 x 40 cm buah 825.00 800-850/Buah
324 Plywood warna/Jabarwood Lbr 85,000.00 80.000-90.000/Lbr
325 Plywood Jati 3 mm Lbr 110,000.00 100.000-110.000/Lbr
326 Plywood Sungkay 3 mm/ megatick Lbr 110,000.00 110.000/Lbr
327 Plywood 3 mm Lbr 42,000.00 39.000-45.000/Lbr
328 Plywood 4 mm Lbr 55,000.00 49.000-56.000/Lbr
329 Plywood 6 mm Lbr 85,000.00 70.000-87.500/Lbr
330 Plywood 9 mm Lbr 110,000.00 110.000-145.000/Lbr
331 Plywood 12 mm Lbr 147,500.00 145.000-150.000/Lbr
332 Plywood 20 mm Lbr 177,500.00 175.000-180.000/Lbr
333 Politur dasar ltr 27,000.00 26.000-28.000/Ltr
334 Politur Jadi ltr 45,000.00 45.000/Ltr
335 Porselin Putih Uk. 10 x 10 cm buah 400.00 300-500/Buah
336 Porselin Warna Uk. 10 x 10 cm buah 775.00 750-800/Buah
337 Rangka Atap baja ringan untuk atap genteng, genteng m2 195,000.00 195.000-200.000/M2
keramik, beton, dll + pemasangan
338 Rangka Atap baja ringan untuk atap seng metal, atap m2 165,000.00 165.000-180.000/M2
asbes, aluminium, sirap, dll + pemasangan
339 Rangka Atap baja ringan bentuk joglo/bertumpuk/ m2 215,000.00 200.000-230.000/M2
khusus + pemasangan
340 Rangka Atap baja ringan "Pryda" untuk atap Pelana, m2 195,000.00 195.000-200.00/M2
Metal dan keramik + pemasangan
341 Rangka Atap baja ringan "Pryda" untuk atap Perisai, m2 215,000.00 200.000-230.000/M2
Metal dan keramik + pemasangan
342 Rangka Atap baja ringan "Pryda" untuk atap Joglo, m2 250,000.00 250.000-270.000/M2
Metal dan keramik + pemasangan
343 Rel Pintu Dorong Unit 195,000.00 190.000-200.000/M2
344 Rolling Door Standar, t=4 mm, (minimal pas. 7 M2) m2 540,000.00 540.000/M2
345 Rolling Door Standar, t=5 mm, (minimal pas. 7 M2) m2 595,000.00 595.000/M2
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
346 Sanding Sealer Impra (Cat dasar) Kg 35,000.00 35.000-35.000/Kg
347 Seal Tape buah 3,000.00 3.000/Buah
348 Semen ( 50 kg ) Zak 65,000.00 62.000-66.000 / Zak
349 Semen Portland ( PC ) kg 1,300.00 1.500 /Kg
350 Semen Putih (40 kg) Zak 85,000.00 85.000-110.000 / Zak
351 Semen Putih Kg 2,125.00 1.750-1.875 /Kg
352 Semen Merah m3 35,000.00 35.000 / M3
353 Semen Nat Bks 9,000.00 9.000 / Bks
354 Seng Gelombang, lebar 70 cm m2 6,750.00 6.500 - 7.000 / kaki
355 Seng Plat 120 cm X 240 cm lbr 87,500.00 85.000 - 90.000 / Lbr
356 Seng Plat 33 cm M' 12,000.00 12.000 / M'
357 Seng Plat 38 cm M' 12,500.00 12.000 - 13.000 / M'
358 Seng Plat 45 cm M' 16,000.00 16.000 - 16.000 / M'
359 Seng Plat 55 cm M' 18,250.00 18.000 - 18.250 / M'
360 Seng Plat 88 cm M' 28,000.00 28.000 / M'
361 Seng Plat 92 cm M' 28,000.00 28.000 - 30.000 / M'
362 Sabun Kg 10,000.00 10.000 - 10.000 / Kg
363 Soda Api Kg 29,000.00 29.000-30.000 / Kg
364 Soft Board ( 120 x 240 ) mm lbr 65,000.00 65.000/ Lbr
365 Saklar Tunggal biasa Buah 5,500.00 5.000-6.000/ Buah
366 Saklar Ganda biasa Buah 8,000.00 7.000-9.000/ Buah
367 Saklar Tunggal National Buah 17,000.00 16.000-18.000/ Buah
368 Saklar Ganda National Buah 34,000.00 32.000-35.000/ Buah
369 Scafolding tg 1,77 m X 1,77 m Unit 650,000.00 650.000/Unit
370 Roda Scafolding 4 buah Unit 350,000.00 350.000/Unit
371 Smartruss/baja ringan sejenis Aluminium Magnesium
- Lysaght Smartruss/sejenis C 75.100 M' 18,000.00 18.000/M'
- Lysaght Smartruss/sejenis C 75.75 M' 15,000.00 15.000/M'
- Reng U T S 40 M' 13,000.00 13.000/M'
- Screw / Dynabolt Buah 1,500.00 1.500/Buah
- Valery Gutter Talang Jurai M' 100,000.00 100.000/M'
- Strap Bracing M' 10,000.00 10.000/M'
372 Stop Kontak biasa Buah 6,000.00 5.000-7.000/ Buah
373 Stop kontak AC Buah 47,500.00 45.000-50.000/ Buah
374 Sunscreen Aluminium M2 325,000.00 300.000-350.000/ M2
375 T.Duss listrik Buah 750.00 750 /buah
376 Talang Paralon, pjg 4 m btg 41,500.00 41.000 - 42.000 /btg
377 Tali Ijuk Kg 10,000.00 10.000 /Kg
378 Ijuk m3 21,000.00 21.000 /M3
379 Tanah Liat/Urug m3 50,000.00 250.000 / 5 M3
380 Tanah Puru m3 51,600.00 255.000-258.000 / 5 M3
381 Tanah Sirtu m3 60,000.00 65.000 / M3
382 Taekwood 3 mm m2 29,100.00 29.100 / M2
383 Taekwood 4 mm biasa m2 31,500.00 31.000 - 32.000 / M2
384 Ter / Residu liter 3,600.00 18.000 / 5 Ltr
385 Textil Tape roll 6,000.00 6.000 - 6.000 /roll
386 Thinner biasa Liter 13,250.00 53.000 /4 Ltr
387 Thinner Cat Glossy (Cobra dan sejenis) Liter 17,600.00 88.000 /5 Ltr
388 Urinoir buah 1,217,000.00 1.217.000 /Unit
389 Urinoir mutu A unit 1,400,000.00 1.400.000 /Unit
390 Vernis ltr 35,000.00 35.000 /Ltr
391 Vernis Batu Kg 95,000.00 95.000 /Kg
392 Wallpaper m2 50,000.00 250.000-300.000 /roll
393 Wastafel biasa buah 210,000.00 210.000-400.000 /Buah
394 Wastafel Halmar unit 250,000.00 250.000 /Buah
395 Wastafel mutu A unit 450,000.00 450.000 /Buah
396 Wood Filler Impra (dempul) Klg 25,000.00 22.000-25.000 /Klg
397 Wood Stain Impra (cat pewarna) Klg 50,000.00 50.000/Klg

C PERALATAN
1 Compresor jam 156,000.00 156,000.00
HARGA HG. PASAR/
NO URAIAN SATUAN
DASAR (Rp) AKTUAL (Rp)
2 Concrete Mixer jam 43,750.00 350.000/8 Jam
3 Concrete Pump jam 285,714.29 2.000.000/hari/ 7 jam
4 Concrete Vibrator jam 24,200.00 24,200.00
5 Dump Truck jam 319,000.00 319,000.00
6 Excavator jam 654,500.00 654,500.00
7 Filter jam 44,000.00 44,000.00
8 Genset jam 11,000.00 11,000.00
9 Grader jam 517,000.00 517,000.00
10 Loader jam 412,500.00 412,500.00
11 Pneumatic Tired Roller jam 401,500.00 401,500.00
12 Tandem Roller jam 264,000.00 264,000.00
13 Flatbed Truck 3,5 ton jam 247,500.00 247,500.00
14 Water Tank Truck jam 330,000.00 330,000.00
15 Generator jam 38,500.00 38,500.00
16 Alat Bantu jam 90,000.00 90.000-100.000/jam
17 Roller 3 roda jam 181,500.00 181,500.00
18 Sprayer, Selfprof jam 154,000.00 154,000.00
19 Buldozer jam 709,500.00 709,500.00
20 Scaffolding 177cm X 177 cm, Tg. 177 cm Set/Bulan 75000-100.000 75000-100.000
21 Stone Crusher (Pemecah batu) jam 858,000.00 858,000.00
22 Pengaduk beton jam 120,000.00 120,000.00
23 Stemper jam 31,250.00 250.000/8 jam
24 Roller, Vibrator Pneu jam 99,000.00 99,000.00
25 Water Pump jam 23,650.00 23,650.00

D SERVICE
1 AC Window/Split/Multi Ls 60,000.00 60,000.00
2 Dispenser Ls 50,000.00 50,000.00
3 Kulkas/Freezer Ls 50,000.00 50,000.00
4 Kompor Gas 2T Ls 50,000.00 50,000.00
5 Kompor Gas 4T Ls 75,000.00 75,000.00
6 Mesin Cuci Ls 50,000.00 50,000.00
7 Pompa Air Ls 50,000.00 50,000.00
8 Instalasi listrik Ls 60,000.00 60,000.00

Palembang, Februari 2012

Tim Survey,

Nama Tanda tangan

1. Poppy Augustina L, ST., MT ………………………………

2. Ferry Gustiawan, S.Kom ………………………………


Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I

DAFTAR HARGA SATUAN UPAH, BAHAN BANGUNAN DAN PERALATAN


TAHUN 2017 SEMESTER I
HARGA HARGA SATUAN HARGA
NO URAIAN SATUAN
Swakelola (Rp) SATUAN Rp.) DASAR (Rp)

A UPAH
1 Kepala Tukang Oh 110,000.00 137,500.00 110,000.00
2 Tukang Oh 90,000.00 112,500.00 90,000.00
3 Mandor Oh 110,000.00 137,500.00 110,000.00
4 Pekerja Tidak Terlatih Oh 65,000.00 81,250.00 65,000.00
5 Pekerja Terlatih Oh 75,000.00 93,750.00 75,000.00

B BAHAN/MATERIAL
1 Aluminium Foil m2 18,500.00 23,125.00 18,500.00
2 Alcubond m2 650,000.00 812,500.00 650,000.00
3 Amplas Biasa Lbr 3,500.00 4,375.00 3,500.00
4 Amplas Niken Lbr 6,500.00 8,125.00 6,500.00
5 Atap Aluminium Zink Coated (seng) tebal 0,25 mm Lbr 43,000.00 53,750.00 43,000.00
6 Atap Aluminium Zink Coated (seng) tebal 0,3 mm Lbr 60,000.00 75,000.00 60,000.00
7 Atap Aluminium Zink Coated (seng) tebal 0,4 mm Lbr 83,000.00 103,750.00 83,000.00
8 Atap Aluminium Zincalume, tebal 0,25 mm Lbr 62,000.00 77,500.00 62,000.00
9 Atap Aluminium Zincalume, tebal 0,3 mm Lbr 62,500.00 78,125.00 62,500.00
10 Atap Aluminium Zincalume, tebal 0,4 mm Lbr 76,000.00 95,000.00 76,000.00
11 Atap Aluminium Gelombang tebal 0,5 mm Lbr 100,000.00 125,000.00 100,000.00
12 Atap Fiber warna"Polycarbonat" tbl. 4-5 mm m2 80,000.00 100,000.00 80,000.00
13 Atap Genteng Beton Lokal buah 4,200.00 5,250.00 4,200.00
14 Atap Genteng Beton buah 5,700.00 7,125.00 5,700.00
15 Atap Genteng Beton Cisangkan buah 7,500.00 9,375.00 7,500.00
16 Atap Genteng Buleleng buah 2,300.00 2,875.00 2,300.00
17 Atap Genteng Keramik biasa berglazur buah 8,000.00 10,000.00 8,000.00
18 Atap Genteng Keramik Berglazur Natural buah 12,000.00 15,000.00 12,000.00
19 Atap Genteng Keramik sejenis Berglazur warna buah 17,000.00 21,250.00 17,000.00
20 Atap Genteng Metal Biasa (88 cm X 77 cm) m2 32,000.00 40,000.00 32,000.00
21 Atap Genteng Metal Warna (120 cm X 76 cm) m2 40,000.00 50,000.00 40,000.00
22 Atap Genteng Metal Zincalume 2x4 (38,5 cm X 80cm) m2 160,000.00 200,000.00 160,000.00
23 Atap Genteng Metal Zincalume berpasir (77cmX100cm) m2 85,000.00 106,250.00 85,000.00
24 Atap Genteng Metal Zincalume berpasir biasa m2 60,000.00 75,000.00 60,000.00
25 Atap Genteng Kodok buah 1,000.00 1,250.00 1,000.00
26 Atap Onduline m2 58,500.00 73,125.00 58,500.00
27 Asbes polos 100 x 100 tbl = 4 mm Lbr 24,000.00 30,000.00 24,000.00
28 Asbes Gelombang Kecil, lebar 80 cm m2 25,000.00 31,250.00 25,000.00
29 Asbes Gelombang Kecil, lebar 105 cm m2 32,000.00 40,000.00 32,000.00
30 Asbes Gelombang Besar, lebar 105 cm m2 35,000.00 43,750.00 35,000.00
31 Asbes Gelombang motif genteng m2 33,500.00 41,875.00 33,500.00
32 Aquaproof kg 260,000.00 325,000.00 260,000.00
33 Bak Cuci Stainless Steel buah 193,000.00 241,250.00 193,000.00
34 Bak Cuci Teraso buah 325,000.00 406,250.00 325,000.00
35 Bak Fibreglass buah 180,000.00 225,000.00 180,000.00
36 Bak Teraso buah 180,000.00 225,000.00 180,000.00
37 Bambu dia. 6-8 cm/6m Btg 50,000.00 62,500.00 50,000.00
38 Batako buah 2,600.00 3,250.00 2,600.00
39 Batu Andesit hitam kecoklatan m2 190,000.00 237,500.00 190,000.00
40 Batu alam kecoklatan (Sangarong) m2 185,000.00 231,250.00 185,000.00
41 Batu Bata lobang m3 512,000.00 640,000.00 512,000.00
42 Batu Bata Kecil buah 1,250.00 1,562.50 1,250.00
43 Batu Bata Lobang buah 725.00 906.25 725.00
44 Batu Candi hitam m2 225,000.00 281,250.00 225,000.00
45 Batu Kali m3 350,000.00 437,500.00 350,000.00
46 Batu Kali tempel m2 93,000.00 116,250.00 93,000.00
47 Batu Karang Pilang m2 594,000.00 742,500.00 594,000.00
48 Batu Kerikil m3 400,000.00 500,000.00 400,000.00
49 Batu Koral beton pecah split 0 s/d 5 mm m3 421,683.00 589,603.75 471,683.00
50 Batu Koral Jagung m3 400,000.00 500,000.00 400,000.00
51 Batu Krokos m3 375,000.00 468,750.00 375,000.00
52 Batu Palimanan kuning/hijau m2 168,000.00 210,000.00 168,000.00
53 Batu Palimanan kuning/hijau + bevel m2 168,000.00 210,000.00 168,000.00
54 Batu Pecah 0.5 - 1 (screen) m3 330,000.00 412,500.00 330,000.00
55 Batu Abu 0.00 - 0.5 (filler) m3 330,000.00 412,500.00 330,000.00

-9-
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I

HARGA HARGA SATUAN HARGA


NO URAIAN SATUAN
Swakelola (Rp) SATUAN Rp.) DASAR (Rp)
56 Batu Pecah 1.3 - 1.9 (spilt) m3 468,000.00 585,000.00 468,000.00
57 Batu Pecah 2/3 m3 471,683.00 589,603.75 471,683.00
58 Batu Pecah 3/5 m3 468,000.00 585,000.00 468,000.00
59 Batu Pecah 5/7 m3 468,000.00 585,000.00 468,000.00
60 Batu Marmer m2 300,000.00 375,000.00 300,000.00
61 Batu Roster / Terawang biasa buah 4,250.00 5,312.50 4,250.00
62 Besi dia. 5 mm Batang 22,000.00 27,500.00 22,000.00
63 Besi dia. 6 mm KS Batang 25,000.00 31,250.00 25,000.00
64 Besi dia. 8 mm KS TI Batang 51,000.00 63,750.00 51,000.00
65 Besi dia. 10 mm KS TI Batang 80,000.00 100,000.00 80,000.00
66 Besi dia. 12 mm KS TI Batang 110,000.00 137,500.00 110,000.00
67 Besi dia. 14 mm KS TI Batang 185,000.00 231,250.00 185,000.00
68 Besi dia. 16 mm KS TI Batang 195,000.00 243,750.00 195,000.00
69 Besi dia. 19 mm KS TI Batang 275,000.00 343,750.00 275,000.00
70 Besi Beton Polos kg 19,000.00 23,750.00 19,000.00
71 Besi Baja Profil WF, I dan H kg 17,000.00 21,250.00 17,000.00
72 Besi Baja Konstruksi ( CNP, INP,dan besi L) kg 15,000.00 18,750.00 15,000.00
73 Besi Beam Clamp dan Plat Siku m2 22,500.00 28,125.00 22,500.00
74 Besi Hollow baja 20 X 40, tb. 2mm Batang 140,000.00 175,000.00 140,000.00
75 Besi Hollow baja 40 X 40, tb. 2mm Batang 160,000.00 200,000.00 160,000.00
76 Besi Hollow baja 30 X 60, tb. 2mm Batang 190,000.00 237,500.00 190,000.00
77 Besi Hollow Plafond 2 X 4 Batang 25,000.00 31,250.00 25,000.00
78 Besi Strip kg 10,000.00 12,500.00 10,000.00
79 Besi Strip 2 X 3 M' 5,000.00 6,250.00 5,000.00
80 Beton Ready Mix K - 125 m3 800,000.00 1,000,000.00 800,000.00
81 Beton Ready Mix K - 175 m3 850,000.00 1,062,500.00 850,000.00
82 Beton Ready Mix K - 225 m3 900,000.00 1,125,000.00 900,000.00
83 Beton Ready Mix K - 250 m3 950,000.00 1,187,500.00 950,000.00
84 Beton Ready Mix K - 275 m3 1,000,000.00 1,250,000.00 1,000,000.00
85 Beton Ready Mix K - 300 m3 1,050,000.00 1,312,500.00 1,050,000.00
86 Beton Ready Mix K - 350 m3 1,100,000.00 1,375,000.00 1,100,000.00
87 Beton Ready Mix K - 400 m4 1,150,000.00 1,437,500.00 1,150,000.00
88 Bubungan Asbes Gelombang Besar m' 24,000.00 30,000.00 24,000.00
89 Bubungan Asbes Gelombang Kecil m' 23,500.00 29,375.00 23,500.00
90 Bubungan/Nok Genteng Beton Buah 6,000.00 7,500.00 6,000.00
91 Bubungan Genteng Buleleng Buah 5,200.00 6,500.00 5,200.00
92 Bubungan/ Nok genteng Keramik biasa berglazur Buah 10,000.00 12,500.00 10,000.00
93 Bubungan/Nok genteng Keramik sejenis berglazur Buah 20,000.00 25,000.00 20,000.00
94 Bubungan gtg Keramik sejenis warna berglazur Buah 25,000.00 31,250.00 25,000.00
95 Bubungan/Nok Genteng Metal/aluminium M' 30,000.00 37,500.00 30,000.00
96 Bubungan Genteng Kodok Buah 4,000.00 5,000.00 4,000.00
97 Cat Dasar kg 32,000.00 40,000.00 32,000.00
98 Cat Antara kg 25,000.00 31,250.00 25,000.00
99 Cat Kayu dan Besi Anti Rayap kg 45,000.00 56,250.00 45,000.00
100 Cat Khusus Glossy dan Quick Drying kg 30,000.00 37,500.00 30,000.00
101 Cat Minyak warna (biasa) mutu C kg 40,000.00 50,000.00 40,000.00
102 Cat Minyak mutu B kg 48,000.00 60,000.00 48,000.00
103 Cat Minyak Semprot kg 42,000.00 52,500.00 42,000.00
104 Cat Meni Besi kg 37,000.00 46,250.00 37,000.00
105 Cat Meni Besi /kayu/ Flincote kg 42,000.00 52,500.00 42,000.00
106 Cat Penutup kg 82,000.00 102,500.00 82,000.00
107 Cat Tembok mutu C (Vinotex,Q-Luc, dan sejenis) kg 12,500.00 15,625.00 12,500.00
108 Cat Tembok mutu B (Catylax,vinilex, dan sejenis) kg 26,000.00 32,500.00 26,000.00
109 Cat Tembok mutu B, Anti Lumut dan Jamur kg 27,500.00 34,375.00 27,500.00
110 Cat Tembok mutu A (Mowilex,Kemtone,Dulux,dll) kg 95,000.00 118,750.00 95,000.00
111 Closed Duduk Setara (sejenis standar KIA) unit 550,000.00 687,500.00 550,000.00
112 Closed Duduk Standar (sejenis Ex.TOTOC721FV1) unit 2,250,000.00 2,812,500.00 2,250,000.00
113 Closed Duduk Halmar unit 3,200,000.00 4,000,000.00 3,200,000.00
114 Closed Duduk mutu C unit 1,875,000.00 2,343,750.00 1,875,000.00
115 Closed Duduk mutu A unit 4,400,000.00 5,500,000.00 4,400,000.00
116 Closed Duduk mutu B unit 2,720,000.00 3,400,000.00 2,720,000.00
117 Closed Duduk standar unit 2,300,000.00 2,875,000.00 2,300,000.00
118 Closet Duduk / Monoblok bh 540,000.00 675,000.00 540,000.00
119 Closet Jongkok Porselen / biasa buah 160,000.00 200,000.00 160,000.00
120 Closet Jongkok Teraso buah 32,000.00 40,000.00 32,000.00

- 10 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I

HARGA HARGA SATUAN HARGA


NO URAIAN SATUAN
Swakelola (Rp) SATUAN Rp.) DASAR (Rp)
121 Closed Jongkok Standart / sejenis (mutu B) unit 180,000.00 225,000.00 180,000.00
122 Closed Jongkok sejenis ( mutu A) Unit 270,000.00 337,500.00 270,000.00
123 Shower Spray TX 403 SV 3 buah 325,000.00 406,250.00 325,000.00
124 Coneblock biasa tebal 6 cm buah 1,800.00 2,250.00 1,800.00
125 Coneblock warna tebal 6 cm buah 2,400.00 3,000.00 2,400.00
126 Coneblock biasa tebal 8 cm buah 2,450.00 3,062.50 2,450.00
127 Coneblock warna tebal 8 cm buah 3,000.00 3,750.00 3,000.00
128 Cornice (bubuk Semen putih utk gypsum) kg 7,000.00 8,750.00 7,000.00
129 Dempul Jadi kg 20,000.00 25,000.00 20,000.00
130 Dempul Ross Polac kg 28,000.00 35,000.00 28,000.00
131 Dempul Isamu kg 48,000.00 52,800.00 48,000.00
132 Dolken Kayu dia. 8 - 10/400 cm m3 290,000.00 319,000.00 290,000.00
133 Door Closer buah 240,000.00 264,000.00 240,000.00
134 Door Holder buah 30,000.00 33,000.00 30,000.00
135 Door Stoper buah 300,000.00 330,000.00 300,000.00
136 Door Stop buah 22,000.00 24,200.00 22,000.00
137 Ember hitam buah 6,500.00 7,150.00 6,500.00
138 Engsel Biasa buah 18,000.00 19,800.00 18,000.00
139 Engsel Kuningan 4" buah 30,000.00 33,000.00 30,000.00
140 Engsel Pintu buah 18,000.00 19,800.00 18,000.00
141 Epoxi kg 50,000.00 55,000.00 50,000.00
142 Eternit 100 x 100 tebal 2,7 mm Lbr 23,000.00 25,300.00 23,000.00
143 Eternit 100 x 100 tebal 3,5 mm Lbr 27,000.00 29,700.00 27,000.00
144 Filler m2 1,250.00 1,375.00 1,250.00
145 Fitting plafond listrik buah 9,000.00 9,900.00 9,000.00
146 Glass Block buah 24,000.00 26,400.00 24,000.00
147 Grendel/Slot Tanam 4" buah 75,000.00 82,500.00 75,000.00
148 Grendel biasa buah 16,000.00 17,600.00 16,000.00
149 Gypsum Board ( 120 x 240 x 9 ) mm lbr 63,000.00 69,300.00 63,000.00
150 Hordeng Horizontal Blind (aluminium) m2 92,000.00 101,200.00 92,000.00
151 Hordeng Vertikal Blind m3 95,000.00 104,500.00 95,000.00
152 Ijuk Kg 9,000.00 9,900.00 9,000.00
153 Jendela Aluminium + Kaca Reyband 5 mm m2 820,000.00 902,000.00 820,000.00
154 Jendela Aluminium + Kaca Reyband 8 mm m2 924,000.00 1,016,400.00 924,000.00
155 Jendela Besi m2 300,000.00 330,000.00 300,000.00
156 Jendela Bingkai Nako 100 cm X 70 cm Unit 90,000.00 99,000.00 90,000.00
157 Jendela Bingkai Nako m2 135,000.00 148,500.00 135,000.00
158 Kabel NYA 1,5 mm m' 3,900.00 4,290.00 3,900.00
159 Kabel NYA 2,5 mm m' 5,200.00 5,720.00 5,200.00
160 Kabel NYA 4.0 mm m' 6,000.00 6,600.00 6,000.00
161 Kabel NYM 2 X 1,5 mm m' 10,000.00 11,000.00 10,000.00
162 Kabel NYM 2 X 2,5 mm m' 13,000.00 14,300.00 13,000.00
163 Kabel NYM 2 X 4,0 mm m' 18,000.00 19,800.00 18,000.00
164 Kaca Cermin 3 mm m2 124,000.00 136,400.00 124,000.00
165 Kaca Cermin 5 mm m2 325,000.00 357,500.00 325,000.00
166 Kaca Patri m2 1,600,000.00 1,760,000.00 1,600,000.00
167 Kaca Bening 3 mm m2 65,000.00 71,500.00 65,000.00
168 Kaca Bening 4 mm m2 75,000.00 82,500.00 75,000.00
169 Kaca Bening 5 mm m2 110,000.00 121,000.00 110,000.00
170 Kaca Bening 8 mm m2 200,000.00 220,000.00 200,000.00
171 Kaca Bening 10 mm m2 232,000.00 255,200.00 232,000.00
172 Kaca Buram 12 mm m2 390,000.00 429,000.00 390,000.00
173 Kaca Rayband 5 mm m2 141,000.00 155,100.00 141,000.00
174 Kaca Buram/Es 5 mm m2 108,000.00 118,800.00 108,000.00
175 Bingkai Kaca Nako Set 14,000.00 15,400.00 14,000.00
176 Kaca Naco 6 daun Set 54,000.00 59,400.00 54,000.00
177 Kaca Naco 8 daun Set 62,000.00 68,200.00 62,000.00
178 Kaca Naco Rayben 5 mm, 6 daun Set 54,000.00 59,400.00 54,000.00
179 Kaca Naco Rayben 5 mm, 8 daun Set 61,000.00 67,100.00 61,000.00
180 Kait angin Jendela Buah 15,000.00 16,500.00 15,000.00
181 Kalsiboard 3,5 mm (120 cm X 240 cm) Kpg 55,000.00 60,500.00 55,000.00
182 Kalsiboard 4,5 mm (120 cm X 240 cm) Kpg 58,000.00 63,800.00 58,000.00
183 Kapur kg 6,500.00 7,150.00 6,500.00
184 Karpet tebal 6 mm m2 75,000.00 82,500.00 75,000.00
185 Kawat Beton kg 18,000.00 19,800.00 18,000.00
186 Kawat Burung m2 20,000.00 22,000.00 20,000.00

- 11 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I

HARGA HARGA SATUAN HARGA


NO URAIAN SATUAN
Swakelola (Rp) SATUAN Rp.) DASAR (Rp)
187 Kawat Duri m' 15,000.00 16,500.00 15,000.00
188 Kawat Harmonika m2 39,000.00 42,900.00 39,000.00
189 Kawat Jaring pagar lbr 28,000.00 30,800.00 28,000.00
190 Kawat Kassa m2 15,000.00 16,500.00 15,000.00
191 Kawat Las Dos 100,000.00 110,000.00 100,000.00
192 Kawat Nyamuk m2 18,000.00 19,800.00 18,000.00
193 Kawat Seng Polos kg 19,000.00 20,900.00 19,000.00
194 Kayu Gelam dia. 6-8 btg 8,000.00 8,800.00 8,000.00
195 Kayu Gelam dia. 10-12 btg 9,000.00 9,900.00 9,000.00
196 Kayu Hek btg 9,000.00 9,900.00 9,000.00
197 Kayu Lis 1/3 m' 10,500.00 11,550.00 10,500.00
198 Kayu Lis 1/4 m' 11,500.00 12,650.00 11,500.00
199 Kayu Lis Profil kecil m' 2,500.00 2,750.00 2,500.00
200 Kayu Lis Profil sedang m' 3,500.00 3,850.00 3,500.00
201 Kayu Lis Profil besar m' 7,500.00 8,250.00 7,500.00
202 Kayu Mosaik 30 x 30 cm Buah 6,750.00 7,425.00 6,750.00
203 Kayu Kaso 5/7 kelas III (Meranti dan sejenis) Btg 55,000.00 60,500.00 55,000.00
204 Kayu Kelas I (Unglen, Jati) m3 8,250,000.00 9,075,000.00 8,250,000.00
205 Kayu Kelas II (Petanang dan sejenis) m3 6,500,000.00 7,150,000.00 6,500,000.00
206 Kayu Kelas III (Meranti dan sejenis) m3 3,300,000.00 3,630,000.00 3,300,000.00
207 Kayu Papan 3/20 Kls. III m3 3,300,000.00 3,630,000.00 3,300,000.00
208 Kayu Kelas IV (Racuk dan sejenis) m3 1,500,000.00 1,650,000.00 1,500,000.00
209 Kayu Papan kelas IV keping 16,500.00 18,150.00 16,500.00
210 Kayu Racuk m3 1,650,000.00 1,815,000.00 1,650,000.00
211 Kayu Reng btg 30,000.00 33,000.00 30,000.00
212 Keramik lantai/dinding 20 x 20/25 cm putih polos Kotak 58,080.00 63,888.00 58,080.00
Keramik lantai/dinding 20 x 20/25 cm putih polos buah 2,320.00 2,552.00 2,320.00
213 Keramik lantai 20 x 20 cm warna, mutu C Kotak 52,000.00 57,200.00 52,000.00
Keramik lantai 20 x 20 cm warna, mutu C buah 2,080.00 2,288.00 2,080.00
214 Keramik lantai 20 x 20 cm warna, mutu B Kotak 62,000.00 68,200.00 62,000.00
Keramik lantai 20 x 20 cm warna, mutu B buah 2,480.00 2,728.00 2,480.00
215 Keramik dinding 20 x 25 cm warna Kotak 68,000.00 74,800.00 68,000.00
Keramik dinding 20 x 25 cm warna buah 3,400.00 3,740.00 3,400.00
216 Keramik lantai 20 x 25 cm warna, mutu B Kotak 46,600.00 51,260.00 46,600.00
Keramik lantai 20 x 25 cm warna, mutu B buah 2,330.00 2,563.00 2,330.00
217 Keramik lantai 30 x 30 cm warna Kotak 48,000.00 52,800.00 48,000.00
Keramik lantai 30 x 30 cm warna buah 4,320.00 4,752.00 4,320.00
218 Keramik lantai 30 x 30 cm putih polos Kotak 48,000.00 52,800.00 48,000.00
Keramik lantai 30 x 30 cm putih polos buah 4,320.00 4,752.00 4,320.00
219 Keramik lantai 40 x 40 cm warna mutu C Kotak 52,000.00 57,200.00 52,000.00
Keramik lantai 40 x 40 cm warna mutu C buah 8,320.00 9,152.00 8,320.00
220 Keramik lantai 40 x 40 cm warna mutu B Kotak 65,000.00 71,500.00 65,000.00
Keramik lantai 40 x 40 cm warna mutu B buah 10,400.00 11,440.00 10,400.00
221 Keramik lantai motif kayu (kasar) mutu A Kotak 50,000.00 55,000.00 50,000.00
222 Klem Talang Paralon Buah 2,750.00 3,025.00 2,750.00
223 Klem kabel listrik biasa Buah 140.00 154.00 140.00
224 Klem kabel listrik Buah 3,000.00 3,300.00 3,000.00
225 Korosin Ltr 2,000.00 2,200.00 2,000.00
226 Kran Air buah 10,000.00 11,000.00 10,000.00
227 Kuas 3"-4" buah 12,500.00 13,750.00 12,500.00
228 Kunci Gembok buah 8,500.00 9,350.00 8,500.00
229 Kunci Lemari buah 8,000.00 8,800.00 8,000.00
230 Kunci Pintu Kamar Tidur (Hotel) buah 400,000.00 440,000.00 400,000.00
231 Kunci Pintu KM/WC (lux) buah 350,000.00 385,000.00 350,000.00
232 Kunci Selot buah 13,000.00 14,300.00 13,000.00
233 Kunci Tanam biasa mutu C buah 25,000.00 27,500.00 25,000.00
234 Kunci Tanam 2 slaag biasa buah 65,000.00 71,500.00 65,000.00
235 Kunci Tanam 2 slaag mutu B buah 90,000.00 99,000.00 90,000.00
236 Kunci Tanam Kamar Mandi buah 27,000.00 29,700.00 27,000.00
237 L.bow listrik buah 2,500.00 2,750.00 2,500.00
238 Lampu Down Light buah 42,500.00 46,750.00 42,500.00
239 Lampu Hologen 50 watt buah 12,500.00 13,750.00 12,500.00
240 Lampu Hologen 150 watt buah 25,000.00 27,500.00 25,000.00
241 Lampu Hologen Box buah 100,000.00 110,000.00 100,000.00
242 Lampu TL 10 Watt buah 45,000.00 49,500.00 45,000.00
243 Lampu TL 20 Watt buah 70,000.00 77,000.00 70,000.00

- 12 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I

HARGA HARGA SATUAN HARGA


NO URAIAN SATUAN
Swakelola (Rp) SATUAN Rp.) DASAR (Rp)
244 Lampu TL 40 Watt (bambu) buah 105,000.00 115,500.00 105,000.00
245 Lampu Pijar 25 Watt Putih buah 12,000.00 13,200.00 12,000.00
246 Lampu Pijar 40 Watt Putih buah 12,000.00 13,200.00 12,000.00
247 Lantai Granit 30/30 Buah 20,500.00 22,550.00 20,500.00
248 Lantai Granit 40/40 Buah 44,000.00 48,400.00 44,000.00
249 Lantai Granit 60/60 Buah 117,000.00 128,700.00 117,000.00
250 Lantai Kayu Panil Gracewood m2 352,500.00 387,750.00 352,500.00
251 Las dop listrik Buah 500.00 550.00 500.00
252 Lem Kayu ltr 20,000.00 22,000.00 20,000.00
253 Lem Vinyl Kg 8,500.00 9,350.00 8,500.00
254 List Gypsum Besar m' 22,000.00 24,200.00 22,000.00
255 List Gypsum Kecil m' 12,000.00 13,200.00 12,000.00
256 Mangkok Saklar listrik Buah 1,800.00 1,980.00 1,800.00
257 MCB Buah 44,000.00 48,400.00 44,000.00
258 MCB Box isi 4 grup Buah 25,000.00 27,500.00 25,000.00
259 MCB Box isi 8 grup Buah 55,000.00 60,500.00 55,000.00
260 Melamic Clear kg 60,000.00 66,000.00 60,000.00
261 Melamic Gloss/dop (Finishing) kg 60,000.00 66,000.00 60,000.00
262 Mill kg 33,000.00 36,300.00 33,000.00
263 Minyak Bekisting liter 12,000.00 13,200.00 12,000.00
264 Minyak Cat liter 6,000.00 6,600.00 6,000.00
265 Minyak solar untuk industri / Minyak aspal liter 5,500.00 6,050.00 5,500.00
266 Minyak Gardan liter 16,500.00 18,150.00 16,500.00
267 Minyak Hidrolik liter 25,500.00 28,050.00 25,500.00
268 Minyak Selinder liter 19,750.00 21,725.00 19,750.00
269 Mozaik kayu lantai Uk. 30 x 30 cm buah 7,500.00 8,250.00 7,500.00
270 Pagar BRC, uk. 240 cm X 120 cm, dia. 5,5 mm Unit 345,000.00 379,500.00 345,000.00
271 Pagar BRC, uk. 240 cm X 90 cm, dia. 6 mm Unit 375,000.00 412,500.00 375,000.00
272 Paku Biasa bermacam ukuran 2" - 5" kg 15,000.00 16,500.00 15,000.00
273 Paku Biasa 1/2" - 1" kg 18,000.00 19,800.00 18,000.00
274 Paku Sumbat buah 600.00 660.00 600.00
275 Paku Beton buah 700.00 770.00 700.00
276 Paku Gypsum kg 25,000.00 27,500.00 25,000.00
277 Paku Seng,Asbes kg 22,000.00 24,200.00 22,000.00
278 Paku Asbes buah 600.00 660.00 600.00
279 Paku Sekrup 3,5" Kg 45,000.00 49,500.00 45,000.00
280 Paku Sekrup 3,5" buah 450.00 495.00 450.00
281 Parquet Jati m2 385,000.00 423,500.00 385,000.00
282 Pasir Beton / Pasang m3 92,500.00 101,750.00 92,500.00
283 Pasir Urug m3 65,000.00 71,500.00 65,000.00
284 Pewarna nat Bks 10,000.00 11,000.00 10,000.00
285 Pintu Alluminium m2 640,000.00 704,000.00 640,000.00
286 Pintu Besi Baja m2 1,950,000.00 2,145,000.00 1,950,000.00
287 Pintu Lipat m2 380,000.00 418,000.00 380,000.00
288 Pintu PVC lengkap + pemasangan Unit 210,000.00 231,000.00 210,000.00
289 Pipa besi medium 2 mm & 1/2", pjg 6 m M' 18,500.00 20,350.00 18,500.00
290 Pipa besi medium 2 mm & 3/4", pjg 6 m M' 23,400.00 25,740.00 23,400.00
291 Pipa besi medium 2 mm & 1", pjg 6 m M' 29,175.00 32,092.50 29,175.00
292 Pipa besi medium 2 mm & 1,5", pjg 6 m M' 41,700.00 45,870.00 41,700.00
293 Pipa besi medium 2 mm & 2", pjg 6 m M' 52,500.00 57,750.00 52,500.00
294 Pipa besi medium 2 mm & 2,5", pjg 6 m M' 68,500.00 75,350.00 68,500.00
295 Pipa besi medium 2 mm & 3", pjg 6 m M' 108,500.00 119,350.00 108,500.00
296 Pipa besi medium 2 mm & 4", pjg 6 m M' 141,400.00 155,540.00 141,400.00
297 Pipa paralon listrik 5/8" Btg 6,000.00 6,600.00 6,000.00
298 Pipa PVC & 1/2" mutu A (Wavin dan sejenis) M' 4,000.00 4,400.00 4,000.00
299 Pipa PVC biasa & 1/2" mutu B M' 3,750.00
300 Pipa PVC & 3/4" mutu A (Wavin dan sejenis) M' 5,500.00 6,050.00 5,500.00
301 Pipa PVC & 3/4" mutu B M' 4,600.00
302 Pipa PVC & 1" mutu A (Wavin dan sejenis) M' 7,500.00 8,250.00 7,500.00
303 Pipa PVC & 1" mutu B M' 4,750.00
304 Pipa PVC & 1.5" mutu A (Wavin dan sejenis) M' 13,000.00 14,300.00 13,000.00
305 Pipa PVC & 1.5" mutu B M' 8,000.00
306 Pipa PVC & 2" mutu A ( Wavin dan sejenis) M' 16,375.00 18,012.50 16,375.00
307 Pipa PVC & 2" mutu B M' 10,500.00
308 Pipa PVC & 3" mutu A (Wavin dan sejenis) M' 32,125.00 35,337.50 32,125.00

- 13 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I

HARGA HARGA SATUAN HARGA


NO URAIAN SATUAN
Swakelola (Rp) SATUAN Rp.) DASAR (Rp)
309 Pipa PVC & 3" mutu B M' 17,500.00
310 Pipa PVC & 4" mutu A ( Wavin dan sejenis) M' 52,000.00 57,200.00 52,000.00
311 Pipa PVC & 4" mutu B M' 30,000.00
312 Pipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis) M' 123,750.00 136,125.00 123,750.00
313 Pipa Stainless 2", tebal 1 mm M' 75,000.00 82,500.00 75,000.00
314 Pipa Stainless 2", tebal 0.8 mm M' 67,200.00 73,920.00 67,200.00
315 Pipa Stainless 2,5", tebal 1 mm M' 95,200.00 104,720.00 95,200.00
316 Pipa Stainless 2,5", tebal 1.2 mm M' 84,000.00 92,400.00 84,000.00
317 Plamir Tembok kg 8,000.00 8,800.00 8,000.00
318 Plamir Kayu kg 17,000.00 18,700.00 17,000.00
319 Plat stainless, tebal 1 mm, uk. 244 cm X 122 cm Lbr 1,700,000.00 1,870,000.00 1,700,000.00
320 Plint keramik 10 x 30 cm warna buah 4,000.00 4,400.00 4,000.00
321 Plint keramik 10 x 40 cm warna buah 13,200.00 14,520.00 13,200.00
322 Plint Ubin PC Abu-abu 15 x 20 cm buah 800.00 880.00 800.00
323 Plint Ubin PC Abu-abu 10 x 30 cm buah 850.00 935.00 850.00
324 Plint Ubin PC Abu-abu 10 x 40 cm buah 875.00 962.50 875.00
325 Plywood warna/Jabarwood Lbr 110,000.00 121,000.00 110,000.00
326 Plywood Jati 3 mm Lbr 110,000.00 121,000.00 110,000.00
327 Plywood Sungkay 3 mm/ megatick Lbr 110,000.00 121,000.00 110,000.00
328 Plywood 3 mm Lbr 42,000.00 46,200.00 42,000.00
329 Plywood 4 mm Lbr 68,000.00 74,800.00 68,000.00
330 Plywood 6 mm Lbr 88,000.00 96,800.00 88,000.00
331 Plywood 9 mm Lbr 125,000.00 137,500.00 125,000.00
332 Plywood 12 mm Lbr 160,000.00 176,000.00 160,000.00
333 Plywood 20 mm Lbr 210,000.00 231,000.00 210,000.00
334 Politur dasar ltr 49,000.00 53,900.00 49,000.00
335 Politur Jadi ltr 53,000.00 58,300.00 53,000.00
336 Porselin Putih Uk. 10 x 10 cm buah 700.00 770.00 700.00
337 Porselin Warna Uk. 10 x 10 cm buah 1,000.00 1,100.00 1,000.00
338 Rangka Atap baja ringan untuk atap genteng, genteng m2 285,000.00 313,500.00 285,000.00
keramik, beton, dll + pemasangan - -
339 Rangka Atap baja ringan untuk atap seng metal, atap m2 216,200.00 237,820.00 216,200.00
asbes, aluminium, sirap, dll + pemasangan - -
340 Rangka Atap baja ringan bentuk joglo/bertumpuk/ m2 281,700.00 309,870.00 281,700.00
khusus + pemasangan - -
341 Rangka Atap baja ringan "Pryda" untuk atap Pelana, m2 255,500.00 281,050.00 255,500.00
Metal dan keramik + pemasangan - -
342 Rangka Atap baja ringan "Pryda" untuk atap Perisai, m2 281,700.00 309,870.00 281,700.00
Metal dan keramik + pemasangan -
343 Rangka Atap baja ringan "Pryda" untuk atap Joglo, m2 327,600.00 360,360.00 327,600.00
Metal dan keramik + pemasangan -
344 Rel Pintu Dorong Unit 240,000.00 264,000.00 240,000.00
345 Rolling Door Standar, t=4 mm, (minimal pas. 7 M2) m2 585,000.00 643,500.00 585,000.00
346 Rolling Door Standar, t=5 mm, (minimal pas. 7 M2) m2 630,000.00 693,000.00 630,000.00
347 Sanding Sealer Impra (Cat dasar) Kg 38,000.00 41,800.00 38,000.00
348 Seal Tape buah 3,500.00 3,850.00 3,500.00
349 Semen ( 50 kg ) Zak 62,000.00 68,200.00 62,000.00
350 Semen Portland ( PC ) kg 1,250.00 1,375.00 1,250.00
351 Semen Putih (40 kg) Zak 85,000.00 93,500.00 85,000.00
352 Semen Putih Kg 2,000.00 2,200.00 2,000.00
353 Semen Merah m3 38,000.00 41,800.00 38,000.00
354 Semen Nat kg 12,000.00 13,200.00 12,000.00
355 Seng Gelombang, lebar 70 cm m2 7,425.00 8,167.50 7,425.00
356 Seng Plat 120 cm X 240 cm lbr 106,000.00 116,600.00 106,000.00
357 Seng Plat 33 cm M' 13,200.00 14,520.00 13,200.00
358 Seng Plat 38 cm M' 18,500.00 20,350.00 18,500.00
359 Seng Plat 45 cm M' 20,000.00 22,000.00 20,000.00
360 Seng Plat 55 cm M' 26,000.00 28,600.00 26,000.00
361 Seng Plat 88 cm M' 33,000.00 36,300.00 33,000.00
362 Seng Plat 92 cm M' 35,000.00 38,500.00 35,000.00
363 Sabun Kg 11,200.00 12,320.00 11,200.00
364 Soda Api Kg 30,000.00 33,000.00 30,000.00
365 Soft Board ( 120 x 240 ) mm lbr 67,500.00 74,250.00 67,500.00
366 Saklar Tunggal biasa Buah 6,000.00 6,600.00 6,000.00
367 Saklar Ganda biasa Buah 13,500.00 14,850.00 13,500.00

- 14 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I

HARGA HARGA SATUAN HARGA


NO URAIAN SATUAN
Swakelola (Rp) SATUAN Rp.) DASAR (Rp)
368 Saklar Tunggal National Buah 17,400.00 19,140.00 17,400.00
369 Saklar Ganda National Buah 30,000.00 33,000.00 30,000.00
370 Scafolding tg 1,77 m X 1,77 m Unit 800,000.00 880,000.00 800,000.00
371 Roda Scafolding 4 buah Unit 350,000.00 385,000.00 350,000.00
372 RANGKA ATAP Gigasteel
- Hot dipped Galvalume Steel G550-75x33 Z75 (T.075) M' 22,500.00 24,750.00 22,500.00
- Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) M' 18,800.00 20,680.00 18,800.00
- Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) M' 16,300.00 17,930.00 16,300.00
- Screw / Dynabolt Buah 1,900.00 2,090.00 1,900.00
- Valery Gutter Talang Jurai M' 125,400.00 137,940.00 125,400.00
- Strap Bracing M' 12,500.00 13,750.00 12,500.00
373 Stop Kontak biasa Buah 17,000.00 18,700.00 17,000.00
374 Stop kontak AC Buah 75,000.00 82,500.00 75,000.00
375 Sunscreen Aluminium M2 375,000.00 412,500.00 375,000.00
376 T.Duss listrik Buah 1,200.00 1,320.00 1,200.00
377 Talang Paralon, pjg 4 m btg 48,000.00 52,800.00 48,000.00
378 Tali Ijuk Kg 11,400.00 12,540.00 11,400.00
379 Ijuk m3 24,000.00 26,400.00 24,000.00
380 Tanah Liat/Urug m3 50,000.00 55,000.00 50,000.00
381 Tanah Puru m3 55,000.00 60,500.00 55,000.00
382 Tanah Sirtu m3 80,000.00 88,000.00 80,000.00
383 Taekwood 3 mm m2 36,000.00 39,600.00 36,000.00
384 Taekwood 4 mm biasa m2 40,000.00 44,000.00 40,000.00
385 Ter / Residu liter 45,000.00 49,500.00 45,000.00
386 Textil Tape roll 6,850.00 7,535.00 6,850.00
387 Thinner biasa Liter 12,000.00 13,200.00 12,000.00
388 Thinner Cat Glossy (Cobra dan sejenis) Liter 35,000.00 38,500.00 35,000.00
389 Urinoir buah 1,400,000.00 1,540,000.00 1,400,000.00
390 Urinoir mutu A unit 1,650,000.00 1,815,000.00 1,650,000.00
391 Vernis ltr 25,000.00 27,500.00 25,000.00
392 Vernis Batu Kg 65,000.00 71,500.00 65,000.00
393 Wallpaper m2 280,000.00 308,000.00 280,000.00
394 Wastafel biasa buah 265,000.00 291,500.00 265,000.00
395 Wastafel Halmar unit 280,000.00 308,000.00 280,000.00
396 Wastafel mutu A unit 450,000.00 495,000.00 450,000.00
397 Wood Filler Impra (dempul) Klg 32,000.00 35,200.00 32,000.00
398 Wood Stain Impra (cat pewarna) Klg 60,000.00 66,000.00 60,000.00

C PERALATAN
1 Compresor jam 112,015.00 123,216.50 112,015.00
2 Concrete Mixer jam 178,710.00 196,581.00 178,710.00
3 Concrete Pump jam 114,560.00 126,016.00 114,560.00
4 Concrete Vibrator jam 40,000.00 44,000.00 40,000.00
5 Dump Truck 3,5 ton jam 312,000.00 343,200.00 312,000.00
6 Excavator jam 865,555.00 952,110.50 865,555.00
7 Filter jam
8 Genset jam 350,000.00 385,000.00 350,000.00
9 Grader jam
10 Loader jam
11 Pneumatic Tired Roller jam
12 Tandem Roller jam
13 Flatbed Truck 3,5 ton jam 225,000.00 247,500.00 225,000.00
14 Water Tank Truck jam
15 Generator jam
16 Alat Bantu jam 75,000.00 82,500.00 75,000.00
17 Roller 3 roda jam
18 Sprayer, Selfprof jam 140,000.00 154,000.00 140,000.00
19 Buldozer jam
20 Scaffolding 177cm X 177 cm, Tg. 177 cm Set/Bulan 95,000.00 104,500.00 95,000.00
21 Stone Crusher (Pemecah batu) jam
22 Pengaduk beton/Molen jam 100,000.00 110,000.00 100,000.00
23 Stemper jam 150,000.00 165,000.00 150,000.00
24 Roller, Vibrator Pneu jam
25 Water Pump jam 250,000.00 275,000.00 250,000.00

- 15 -
Daftar Harga Satuan Upah, Bahan Bangunan dan Peralatan Tahun 2014 Semester I

HARGA HARGA SATUAN HARGA


NO URAIAN SATUAN
Swakelola (Rp) SATUAN Rp.) DASAR (Rp)

D SERVICE
1 AC Window/Split/Multi Ls 60,000.00 66,000.00 60,000.00
2 Dispenser Ls 50,000.00 55,000.00 50,000.00
3 Kulkas/Freezer Ls 50,000.00 55,000.00 50,000.00
4 Kompor Gas 2T Ls 50,000.00 55,000.00 50,000.00
5 Kompor Gas 4T Ls 75,000.00 82,500.00 75,000.00
6 Mesin Cuci Ls 50,000.00 55,000.00 50,000.00
7 Pompa Air Ls 50,000.00 55,000.00 50,000.00
8 Instalasi listrik Ls 85,000.00 93,500.00 85,000.00

- 16 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

DAFTAR ANALISA PEKERJAAN KOTA PALEMBANG


TAHUN ANGGARAN 2017 SEMESTER I
SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1.1 1 M' Pagar Sementara dari Kayu Tinggi 2 Meter
a. Bahan
1.250 Btg Kayu Gelam dia. 6-8 8,000.00 10,000.00 10,000.00
2.500 Kg Semen Portland 1,250.00 3,125.00 3,125.00
0.005 M3 Pasir Beton 92,500.00 462.50 462.50
0.009 M3 Koral Beton 421,683.00 3,795.15 3,795.15
0.072 M3 Kayu 5/7 kelas IV 1,500,000.00 108,000.00 108,000.00
0.060 Kg Paku Biasa 2"-5" 15,000.00 900.00 900.00
0.400 Lt Teer/Residu 45,000.00 18,000.00 18,000.00
144,282.65 144,282.65

b. Tenaga
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.020 Oh Mandor 110,000.00 2,200.00 2,200.00
48,400.00 48,400.00

Jumlah 144,282.65 48,400.00 192,682.65

1.2 1 M' Pagar Sementara dari Seng Gelombang Tinggi 2 Meter


a. Bahan
1.250 Btg Kayu Gelam dia. 6-8 8,000.00 10,000.00 10,000.00
2.500 Kg Semen Portland 1,250.00 3,125.00 3,125.00
1.200 Lbr Seng Gelombang 3"-5" 7,425.00 8,910.00 8,910.00
0.005 M3 Pasir Beton 92,500.00 462.50 462.50
0.009 M3 Koral Beton 421,683.00 3,795.15 3,795.15
0.072 M3 Kayu 5/7 kelas IV 1,500,000.00 108,000.00 108,000.00
0.060 Kg Paku Biasa 2"-5" 15,000.00 900.00 900.00
0.450 Kg Meni Besi 37,000.00 16,650.00 16,650.00
151,842.65 151,842.65

b. Tenaga
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.020 Oh Mandor 110,000.00 2,200.00 2,200.00
48,400.00 48,400.00

Jumlah 151,842.65 48,400.00 200,242.65

1.3 1 M' Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter
a. Bahan
1.000 Btg Kayu Gelam dia. 6-8 8,000.00 8,000.00 8,000.00
2.000 Kg Semen Portland 1,250.00 2,500.00 2,500.00
25.000 Kg Kawat Duri 15,000.00 375,000.00 375,000.00
0.005 M3 Pasir Beton 92,500.00 462.50 462.50
0.009 M3 Koral Beton 421,683.00 3,795.15 3,795.15
0.060 Kg Paku Biasa 2"-5" 15,000.00 900.00 900.00
390,657.65 390,657.65

b. Tenaga
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.020 Oh Mandor 110,000.00 2,200.00 2,200.00
41,900.00 41,900.00

Jumlah 390,657.65 41,900.00 432,557.65

1.4 1 M' Pengukuran dan Pemasangan Bouwplank


a. Bahan
0.012 M3 Kayu 5/7 kelas IV 1,500,000.00 18,000.00 18,000.00
0.020 Kg Paku Biasa 2" - 5" 15,000.00 300.00 300.00
0.007 M3 Kayu Papan 3/20 3,300,000.00 23,100.00 23,100.00
41,400.00 41,400.00

b. Tenaga
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.005 Oh Mandor 110,000.00 550.00 550.00
17,150.00 17,150.00

Jumlah 41,400.00 17,150.00 58,550.00

- 17 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

1.5 1 M2 Pembuatan Kantor Sementara, Dengan Lantai Plesteran


a. Bahan
1.250 Btg Kayu Gelam dia. 6-8 8,000.00 10,000.00 10,000.00
0.180 M3 Kayu 1,500,000.00 270,000.00 270,000.00
0.850 Kg Paku Biasa 15,000.00 12,750.00 12,750.00
1.100 Kg Besi Strip 10,000.00 11,000.00 11,000.00
35.000 Kg Semen Portland 1,250.00 43,750.00 43,750.00
0.150 M3 Pasir Pasang 92,500.00 13,875.00 13,875.00
0.100 M3 Pasir Beton 92,500.00 9,250.00 9,250.00
0.150 M3 Koral Beton 421,683.00 63,252.45 63,252.45
30.000 Bh Bata Merah 1,250.00 37,500.00 37,500.00
0.250 Lbr Seng Plat 106,000.00 26,500.00 26,500.00
2.000 Bh Jendela Nako 90,000.00 180,000.00 180,000.00
0.080 M2 Kaca Polos 65,000.00 5,200.00 5,200.00
0.150 Bh Kunci Tanam 25,000.00 3,750.00 3,750.00
0.060 Lbr Plywood 4 mm 68,000.00 4,080.00 4,080.00
690,907.45 690,907.45
b. Tenaga
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
1.000 Oh Tukang Batu 90,000.00 90,000.00 90,000.00
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.300 Oh Kepala Tukang 110,000.00 33,000.00 33,000.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
438,500.00 438,500.00

Jumlah 690,907.45 438,500.00 1,129,407.45

1.6 1 M Pembuatan Gudang Semen dan Alat - Alat


2

a. Bahan
1.700 Btg Kayu Gelam dia. 6-8 8,000.00 13,600.00 13,600.00
0.210 M3 Kayu 1,500,000.00 315,000.00 315,000.00
0.300 Kg Paku Biasa 15,000.00 4,500.00 4,500.00
10.500 Kg Semen Portland 1,250.00 13,125.00 13,125.00
0.030 M3 Pasir Beton 92,500.00 2,775.00 2,775.00
0.050 M3 Koral Beton 421,683.00 21,084.15 21,084.15
1.500 Lbr Seng Gelombang BJLS 7,425.00 11,137.50 11,137.50
381,221.65 381,221.65
b. Tenaga
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
272,500.00 272,500.00
Jumlah 381,221.65 272,500.00 653,721.65

1.7 1 M2 Pembuatan Rumah Jaga/Konstruksi Kayu


a. Bahan
3.000 Btg Kayu Gelam dia. 6-8 8,000.00 24,000.00 24,000.00
0.276 M3 Kayu 1,500,000.00 414,000.00 414,000.00
0.700 Kg Paku Biasa 15,000.00 10,500.00 10,500.00
1.000 M2 Seng Gelombang BJLS 7,425.00 7,425.00 7,425.00
455,925.00 455,925.00

b. Tenaga
1.500 Oh Tukang Kayu 90,000.00 135,000.00 135,000.00
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
0.150 Oh Kepala Tukang 110,000.00 16,500.00 16,500.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
222,000.00 222,000.00
Jumlah 455,925.00 222,000.00 677,925.00

1.8 1 M2 Membersihkan Lapangan dan Perataan


a. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
12,000.00 12,000.00
Jumlah 12,000.00 12,000.00

1.9 1 M2 Pembuatan Bedeng Buruh


a. Bahan
1.250 Btg Kayu Gelam dia. 6-8 8,000.00 10,000.00 10,000.00
0.186 M3 Kayu 1,500,000.00 279,000.00 279,000.00
0.300 Kg Paku Biasa 15,000.00 4,500.00 4,500.00
18.000 Kg Semen Portland 1,250.00 22,500.00 22,500.00
0.030 M3 Pasir Beton 92,500.00 2,775.00 2,775.00
0.050 M3 Koral Beton 421,683.00 21,084.15 21,084.15
1.000 M2 Seng Gelombang BJLS 7,425.00 7,425.00 7,425.00
1.350 Lbr Plywood 4 mm 68,000.00 91,800.00 91,800.00
439,084.15 439,084.15

- 18 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
272,500.00 272,500.00
Jumlah 439,084.15 272,500.00 711,584.15

1.10 1 M2 Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm


a. Bahan
0.036 M3 Kayu Kls. IV 1,500,000.00 54,000.00 54,000.00
0.080 Kg Paku Biasa 15,000.00 1,200.00 1,200.00
1.000 Btg Kaso 5/7 55,000.00 55,000.00 55,000.00
110,200.00 110,200.00

b. Tenaga
0.300 Oh Tukang Kayu 90,000.00 27,000.00 27,000.00
0.002 Oh Mandor 110,000.00 165.00 165.00
27,165.00 27,165.00

Jumlah 110,200.00 27,165.00 137,365.00

1.11 1 M2 Pembuatan Stegger dari Bambu, Ukuran (40 x 50 x 20) cm


a. Bahan
1.000 Btg Bambu & 6 - 8 /600 cm 50,000.00 50,000.00 50,000.00
0.250 Kg Tali Ijuk 11,400.00 2,850.00 2,850.00
52,850.00 52,850.00

b. Tenaga
0.017 Oh Tukang Kayu 90,000.00 1,530.00 1,530.00
0.002 Oh Kepala Tukang 110,000.00 220.00 220.00
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
19,430.00 19,430.00

Jumlah 52,850.00 19,430.00 72,280.00

1.12 1 M2 Pembuatan Jalan Sementara


a. Bahan
0.150 M3 Batu Belah 15/20/Batu Kali 350,000.00 52,500.00 52,500.00
0.090 M3 Batu Pecah 5/7 468,000.00 42,120.00 42,120.00
0.010 M3 Pasir Pasang 92,500.00 925.00 925.00
95,545.00 95,545.00

b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
70,500.00 70,500.00

Jumlah 95,545.00 70,500.00 166,045.00

1.13 1 M3 Bongkaran Beton Bertulang


a. Tenaga
6.667 Oh Pekerja 65,000.00 433,355.00 433,355.00
0.333 Oh Mandor 110,000.00 36,630.00 36,630.00
469,985.00 469,985.00

Jumlah 469,985.00 469,985.00

1.14 1 M3 Bongkaran Dinding Tembok Bata Merah /Bata lobang


a. Tenaga
6.667 Oh Pekerja 65,000.00 433,355.00 433,355.00
0.033 Oh Mandor 110,000.00 3,630.00 3,630.00
436,985.00 436,985.00
Jumlah 436,985.00 436,985.00

1.15 1 M' Pasang Pagar Kawat Jaring Galvanis Tinggi 1 Meter


a. Bahan
0.434 Lbr Pagar Kawat Jaring 28,000.00 12,152.00 12,152.00
12,152.00 12,152.00

b. Tenaga
0.042 Oh Pekerja 65,000.00 2,730.00 2,730.00
0.004 Oh Kepala Tukang 110,000.00 440.00 440.00
0.042 Oh Tukang 90,000.00 3,780.00 3,780.00
0.002 Oh Mandor 110,000.00 220.00 220.00
7,170.00 7,170.00

Jumlah 12,152.00 7,170.00 19,322.00

- 19 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

1.16 10 M2 Pembersihan Akhir Lapangan


a. Tenaga
0.750 Oh Pekerja 65,000.00 48,750.00 48,750.00
0.038 Oh Mandor 110,000.00 4,125.00 4,125.00
52,875.00 52,875.00
Jumlah 52,875.00 52,875.00
Untuk 1 M2 Jumlah 5,287.50 5,287.50

1.17 10 M2 Bongkaran Rangka Atap


a. Tenaga
0.250 Oh Tukang 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
90,250.00 90,250.00
Jumlah 90,250.00 90,250.00
Untuk 1 M2 Jumlah 9,025.00 9,025.00

1.18 1 M3 Bongkaran Kuda-kuda Kayu


a. Tenaga
6.000 Oh Tukang 90,000.00 540,000.00 540,000.00
0.600 Oh Kepala Tukang 110,000.00 66,000.00 66,000.00
4.000 Oh Pekerja 65,000.00 260,000.00 260,000.00
866,000.00 866,000.00
Jumlah 866,000.00 866,000.00
Untuk tidak dipakai lagi = 0,5 x Jumlah 433,000.00 433,000.00

1.19 10 M2 Bongkaran Plafond + Rangka


a. Tenaga
0.600 Oh Tukang 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
190,600.00 190,600.00

Jumlah 190,600.00 190,600.00


Untuk 1 M2 Jumlah 19,060.00 19,060.00

1.20 1 M2 Pasang Cerucup Gelam


a. Bahan
16.000 Btg Gelam dia. 6 - 8 cm 8,000.00 128,000.00 128,000.00
16.000 Btg Gelam dia. 10 - 12 cm 9,000.00 144,000.00 144,000.00
128,000.00 128,000.00
144,000.00 144,000.00
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.019 Oh Mandor 110,000.00 2,090.00 2,090.00
22,890.00 22,890.00

1 M2 Pasang Cerucup Gelam dia. 6-8 cm 128,000.00 22,890.00 150,890.00


1 M2 Pasang Cerucup Gelam dia. 10-12 cm 144,000.00 22,890.00 166,890.00

1.21 1 M' Pasang Turap Gelam


a. Bahan
14.000 Btg Gelam dia. 6 - 8 cm 8,000.00 112,000.00 112,000.00
112,000.00 112,000.00
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.019 Oh Mandor 110,000.00 2,090.00 2,090.00
22,890.00 22,890.00
1 M' Pasang Turap Gelam dia. 6-8 cm 112,000.00 22,890.00 134,890.00

1.22 1 M2 Pasang Kisdam


a. Bahan
1.250 Kpg Papan Kayu kls IV 16,500.00 20,625.00 20,625.00
0.100 Kg Paku biasa 2"- 5" 15,000.00 1,500.00 1,500.00
2.000 Btg Gelam dia. 10 - 12 cm 8,000.00 16,000.00 16,000.00
38,125.00 38,125.00
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.019 Oh Mandor 110,000.00 2,090.00 2,090.00
22,890.00 22,890.00
1 M2 Pasang Kisdam Gelam dia. 6-8 cm 38,125.00 22,890.00 61,015.00

1.23 1 Unit Papan Nama biasa


a. Bahan
1.000 Kpg Papan Kayu kls IV 16,500.00 16,500.00 16,500.00
0.050 Kg Paku biasa 1/2"- 1" 18,000.00 900.00 900.00
1.000 Lbr Plywood 4 mm 68,000.00 68,000.00 68,000.00
0.800 Kg Cat Minyak Mutu C 40,000.00 32,000.00 32,000.00
117,400.00 117,400.00

- 20 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
130,800.00 130,800.00

1 Unit Papan Nama Biasa 117,400.00 130,800.00 248,200.00

1.24 1 Unit Sewa Scafolding


a. Bahan
1.000 bln Scafolding tg. 1,77 m X 1,77 m 95,000.00 95,000.00 95,000.00
95,000.00 95,000.00
b. Upah Bongkar pasang
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
110,000.00 110,000.00
1 Unit Sewa Scafolding per bulan 95,000.00 110,000.00 205,000.00

II PEKERJAAN TANAH

2.1 1 M3 Galian Tanah Biasa Sedalam 1 Meter


a. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.040 Oh Mandor 110,000.00 4,400.00 4,400.00
30,400.00 30,400.00

Jumlah 30,400.00 30,400.00


2.2 1 M3 Galian Tanah Biasa Sedalam 2 Meter
a. Tenaga
0.526 Oh Pekerja 65,000.00 34,190.00 34,190.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.052 Oh Mandor 110,000.00 5,720.00 5,720.00
39,910.00 39,910.00
Jumlah 39,910.00 39,910.00

2.3 1 M Galian Tanah Biasa Sedalam 3 Meter


3

a. Tenaga
0.735 Oh Pekerja 65,000.00 47,775.00 47,775.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.073 Oh Mandor 110,000.00 8,030.00 8,030.00
55,805.00 55,805.00
Jumlah 55,805.00 55,805.00
2.4 1 M3 Galian Tanah Keras Sedalam 1 Meter
a. Tenaga
0.625 Oh Pekerja 65,000.00 40,625.00 40,625.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.062 Oh Mandor 110,000.00 6,820.00 6,820.00
47,445.00 47,445.00

Jumlah 47,445.00 47,445.00


2.5 1 M3 Galian Tanah Cadas Sedalam 1 Meter
a. Tenaga
1.250 Oh Pekerja 65,000.00 81,250.00 81,250.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.125 Oh Mandor 110,000.00 13,750.00 13,750.00
95,000.00 95,000.00
Jumlah 95,000.00 95,000.00

2.6 1 M3 Galian Tanah Lumpur Sedalam 1 Meter


a. Tenaga
0.823 Oh Pekerja 65,000.00 53,495.00 53,495.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.083 Oh Mandor 110,000.00 9,130.00 9,130.00
62,625.00 62,625.00
Jumlah 62,625.00 62,625.00

2.7 1 M2 Pekerjaan Stripping Setinggi 1 Meter


a. Tenaga
0.050 Oh Pekerja 65,000.00 3,250.00 3,250.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.005 Oh Mandor 110,000.00 550.00 550.00
3,800.00 3,800.00

Jumlah 3,800.00 3,800.00

- 21 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

2.8 1 M3 Pembuangan Tanah Sejauh 150 meter


a. Tenaga
0.516 Oh Pekerja 65,000.00 33,540.00 33,540.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
39,040.00 39,040.00
Jumlah 39,040.00 39,040.00
2.9 1 M3 Urugan Kembali
a. Tenaga
0.192 Oh Pekerja 65,000.00 12,480.00 12,480.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.019 Oh Mandor 110,000.00 2,090.00 2,090.00
14,570.00 14,570.00
Jumlah 14,570.00 14,570.00

2.10 1 M Pemadatan Tanah


3

a. Tenaga
0.500 Oh Pekerja 65,000.00 32,500.00 32,500.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
38,000.00 38,000.00
Jumlah 38,000.00 38,000.00

2.11 1 M Urugan Pasir


3

a. Bahan
1.200 M3 Pasir Urug 65,000.00 78,000.00 78,000.00
78,000.00 78,000.00

b. Tenaga
0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00
- - Tukang Gali - - -
- - Kepala Tukang - - -
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
20,600.00 20,600.00

Jumlah 78,000.00 20,600.00 98,600.00


2.12 1 M3 Urugan Sirtu
a. Bahan
1.200 M3 Sirtu 80,000.00 96,000.00 96,000.00
96,000.00 96,000.00
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
- Oh Tukang Gali - - -
- Oh Kepala Tukang - - -
0.025 Oh Mandor 110,000.00 2,750.00 2,750.00
19,000.00 19,000.00
Jumlah 96,000.00 19,000.00 115,000.00

2.13 1 M3 Urugan Koral


a. Bahan
1.200 M3 Koral 421,683.00 506,019.60 506,019.60
506,019.60 506,019.60

b. Tenaga
1.000 M3 Upah dan Pemadatan 6,600.00 6,600.00 6,600.00
6,600.00 6,600.00
Jumlah 506,019.60 6,600.00 512,619.60

2.14 1 M3 Urugan Tanah


a. Bahan
1.200 M3 Tanah Urug 55,000.00 66,000.00 66,000.00
66,000.00 66,000.00
b. Tenaga
0.300 Pekerja 65,000.00 19,500.00 19,500.00
0.033 Mandor 110,000.00 3,630.00 3,630.00
23,130.00 23,130.00
Jumlah 66,000.00 23,130.00 89,130.00

III PEKERJAAN PONDASI


3.1 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 1 Ps
a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali 350,000.00 385,000.00 385,000.00
392.000 Kg Semen Portland 1,250.00 490,000.00 490,000.00
0.314 M3 Pasir Pasang 92,500.00 29,045.00 29,045.00
904,045.00 904,045.00

- 22 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 904,045.00 166,350.00 1,070,395.00

3.2 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 2 Ps


a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali 350,000.00 385,000.00 385,000.00
267.000 Kg Semen Portland 1,250.00 333,750.00 333,750.00
0.427 M3 Pasir Pasang 92,500.00 39,497.50 39,497.50
758,247.50 758,247.50

b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 758,247.50 166,350.00 924,597.50

3.3 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 2,5 Ps


a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali 350,000.00 385,000.00 385,000.00
392.000 Kg Semen Portland 1,250.00 490,000.00 490,000.00
0.314 M3 Pasir Pasang 92,500.00 29,045.00 29,045.00
904,045.00 904,045.00
b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00

Jumlah 904,045.00 166,350.00 1,070,395.00

3.4 1 M Pasang Pondasi Batu Kali, 1 Pc : 3 Ps


3

a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali 350,000.00 385,000.00 385,000.00
202.000 Kg Semen Portland 1,250.00 252,500.00 252,500.00
0.485 M3 Pasir Pasang 92,500.00 44,862.50 44,862.50
682,362.50 682,362.50
b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00

Jumlah 682,362.50 166,350.00 848,712.50


3.5 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 4 Ps
a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali 350,000.00 385,000.00 385,000.00
163.000 Kg Semen Portland 1,250.00 203,750.00 203,750.00
0.520 M3 Pasir Pasang 92,500.00 48,100.00 48,100.00
636,850.00 636,850.00
b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 636,850.00 166,350.00 803,200.00
3.6 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps
a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali 350,000.00 385,000.00 385,000.00
136.000 Kg Semen Portland 1,250.00 170,000.00 170,000.00
0.544 M3 Pasir Pasang 92,500.00 50,320.00 50,320.00
605,320.00 605,320.00
b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 605,320.00 166,350.00 771,670.00

- 23 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

3.7 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 6 Ps


a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali 350,000.00 385,000.00 385,000.00
117.000 Kg Semen Portland 1,250.00 146,250.00 146,250.00
0.561 M3 Pasir Pasang 92,500.00 51,892.50 51,892.50
583,142.50 583,142.50

b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 583,142.50 166,350.00 749,492.50
3.8 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 8 Ps
a. Bahan
1.100 M3 Batu Belah 15/20 cm / batu kali 350,000.00 385,000.00 385,000.00
91.000 Kg Semen Portland 1,250.00 113,750.00 113,750.00
0.561 M3 Pasir Pasang 92,500.00 51,892.50 51,892.50
550,642.50 550,642.50

b. Tenaga
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 550,642.50 166,350.00 716,992.50

3.9 1 M Pasang Pondasi Sumuran & 100 cm


3

a. Bahan
0.450 M3 Batu Belah 15/20 cm / batu kali 350,000.00 157,500.00 157,500.00
280.000 Kg Semen Portland 1,250.00 350,000.00 350,000.00
0.450 M3 Pasir Beton 92,500.00 41,625.00 41,625.00
0.670 M3 Koral Beton 421,683.00 282,527.61 282,527.61
831,652.61 831,652.61
b. Tenaga
2.380 Oh Pekerja 65,000.00 154,700.00 154,700.00
0.300 Oh Tukang Batu 90,000.00 27,000.00 27,000.00
0.030 Oh Kepala Tukang 110,000.00 3,300.00 3,300.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
193,800.00 193,800.00
Jumlah 831,652.61 193,800.00 1,025,452.61

3.10 1 M' Pembuatan Tiang Pancang (40 x 40) cm, Beton Bertulang
a. Bahan
0.019 M3 Pasir Urug 65,000.00 1,235.00 1,235.00
0.094 M3 Pasir Beton 92,500.00 8,695.00 8,695.00
0.150 M3 Koral Beton 421,683.00 63,252.45 63,252.45
60.500 Kg Semen Portland 1,250.00 75,625.00 75,625.00
45.000 Kg Besi Beton 19,000.00 855,000.00 855,000.00
0.900 Kg Kawat Beton 18,000.00 16,200.00 16,200.00
0.032 M3 Kayu Kaso 5/7 1,500,000.00 48,000.00 48,000.00
0.120 Kg Paku 15,000.00 1,800.00 1,800.00
0.090 Ltr Minyak Bekisting 12,000.00 1,080.00 1,080.00
0.240 Kg Plamir Tembok 8,000.00 1,920.00 1,920.00
1,072,807.45 1,072,807.45
b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
0.670 Oh Tukang Batu 90,000.00 60,300.00 60,300.00
0.067 Oh Kepala Tukang 110,000.00 7,370.00 7,370.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
138,170.00 138,170.00
21.228
Jumlah 1,072,807.45 138,170.00 1,210,977.45

3.11 1 M Pembuatan Tiang Pancang (25x25) cm/ Dia 30, Beton Bertulang
a. Bahan
0.011 M3 Pasir Urug Darat 65,000.00 715.00 715.00
0.037 M3 Pasir Beton 92,500.00 3,422.50 3,422.50
0.085 M3 Koral Beton 421,683.00 35,843.06 35,843.06
21.250 Kg Semen Portland 1,250.00 26,562.50 26,562.50
11.500 Kg Besi Beton 19,000.00 218,500.00 218,500.00
0.375 Kg Kawat Beton 18,000.00 6,750.00 6,750.00
0.017 M3 Kayu Kaso 5/7 1,500,000.00 25,500.00 25,500.00
0.042 Kg Paku 15,000.00 622.50 622.50
0.040 Ltr Minyak Bekisting 12,000.00 480.00 480.00
0.105 Kg Plamir Tembok 8,000.00 840.00 840.00
319,235.56 319,235.56

- 24 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.445 Oh Pekerja 65,000.00 28,925.00 28,925.00
0.298 Oh Tukang Batu 90,000.00 26,775.00 26,775.00
0.028 Oh Kepala Tukang 110,000.00 3,025.00 3,025.00
0.021 Oh Mandor 110,000.00 2,310.00 2,310.00
61,035.00 61,035.00
Jumlah 319,235.56 61,035.00 380,270.56

3.12 1 M3 Pas. Pondasi Batu Bata Ad. 1 : 4


a. Bahan
782.000 Bh Batu Bata Lobang 725.00 566,950.00 566,950.00
2.024 Zak Semen Portland 62,000.00 125,488.00 125,488.00
0.406 M3 Pasir Pasang 92,500.00 37,555.00 37,555.00
729,993.00 729,993.00
b. Tenaga
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 729,993.00 166,350.00 896,343.00

3.13 1 M3 Pas. Pondasi Batu Bata Ad. 1 : 2


a. Bahan
782.000 Bh Batu Bata Lobang 725.00 566,950.00 566,950.00
3.296 Zak Semen Portland 62,000.00 204,352.00 204,352.00
0.333 M3 Pasir Pasang 92,500.00 30,802.50 30,802.50
802,104.50 802,104.50
b. Tenaga
0.600 Oh Tukang Batu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
1.500 Oh Pekerja 65,000.00 97,500.00 97,500.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
166,350.00 166,350.00
Jumlah 802,104.50 166,350.00 968,454.50

IV PEKERJAAN DINDING
4.1 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 1 Ps
a. Bahan
140.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 175,000.00
64.030 Kg Semen Portland 1,250.00 80,037.50 80,037.50
0.059 M3 Pasir Pasang 92,500.00 5,457.50 5,457.50
260,495.00 260,495.00

b. Tenaga
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
65,750.00 65,750.00

Jumlah 260,495.00 65,750.00 326,245.00


4.2 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 2 Ps
a. Bahan
140.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 175,000.00
43.500 Kg Semen Portland 1,250.00 54,375.00 54,375.00
0.080 M3 Pasir Pasang 92,500.00 7,400.00 7,400.00
236,775.00 236,775.00

b. Tenaga
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
65,750.00 65,750.00
Jumlah 236,775.00 65,750.00 302,525.00

4.3 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 3 Ps


a. Bahan
140.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 175,000.00
32.950 Kg Semen Portland 1,250.00 41,187.50 41,187.50
0.091 M3 Pasir Pasang 92,500.00 8,417.50 8,417.50
224,605.00 224,605.00
b. Tenaga
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
65,750.00 65,750.00
Jumlah 224,605.00 65,750.00 290,355.00

- 25 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

4.4 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 4 Ps


a. Bahan
140.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 175,000.00
26.550 Kg Semen Portland 1,250.00 33,187.50 33,187.50
0.093 M3 Pasir Pasang 92,500.00 8,602.50 8,602.50
216,790.00 216,790.00
b. Tenaga
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
65,750.00 65,750.00

Jumlah 216,790.00 65,750.00 282,540.00

4.5 1 M2 Pasangan Bata Lobang Tebal 1 Bata, 1 Pc : 4 Ps


a. Bahan
117.000 Bh Bata Lobang 9 x 9 x 19 cm 725.00 84,825.00 84,825.00
26.550 Kg Semen Portland 1,250.00 33,187.50 33,187.50
0.093 M3 Pasir Pasang 92,500.00 8,602.50 8,602.50
126,615.00 126,615.00
b. Tenaga
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
65,750.00 65,750.00

Jumlah 126,615.00 65,750.00 192,365.00

4.6 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 5 Ps


a. Bahan
140.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 175,000.00
22.200 Kg Semen Portland 1,250.00 27,750.00 27,750.00
0.102 M3 Pasir Pasang 92,500.00 9,435.00 9,435.00
212,185.00 212,185.00
b. Tenaga
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
65,750.00 65,750.00
Jumlah 212,185.00 65,750.00 277,935.00

4.7 1 M2 Pasangan Bata Merah Tebal 1 Bata, 1 Pc : 6 Ps


a. Bahan
140.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 175,000.00 175,000.00
22.200 Kg Semen Portland 1,250.00 27,750.00 27,750.00
0.102 M3 Pasir Pasang 92,500.00 9,435.00 9,435.00
212,185.00 212,185.00
b. Tenaga
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
65,750.00 65,750.00
Jumlah 212,185.00 65,750.00 277,935.00

4.8 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 1 Ps


a. Bahan
70.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 87,500.00
27.800 Kg Semen Portland 1,250.00 34,750.00 34,750.00
0.028 M3 Pasir Pasang 92,500.00 2,590.00 2,590.00
124,840.00 124,840.00
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00
Jumlah 124,840.00 32,550.00 157,390.00

4.9 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps


a. Bahan
70.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 87,500.00
18.950 Kg Semen Portland 1,250.00 23,687.50 23,687.50
0.038 M3 Pasir Pasang 92,500.00 3,515.00 3,515.00
114,702.50 114,702.50

- 26 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00
Jumlah 114,702.50 32,550.00 147,252.50

4.10 1 M2 Pasangan Bata Lobang Tebal 1/2 Bata, 1 Pc : 2 Ps


a. Bahan
58.500 Bh Bata Lobang 9 x 9 x 19 cm 725.00 42,412.50 42,412.50
18.950 Kg Semen Portland 1,250.00 23,687.50 23,687.50
0.038 M3 Pasir Pasang 92,500.00 3,515.00 3,515.00
69,615.00 69,615.00

b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00
Jumlah 69,615.00 32,550.00 102,165.00

4.11 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps


a. Bahan
70.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 87,500.00
14.370 Kg Semen Portland 1,250.00 17,962.50 17,962.50
0.040 M3 Pasir Pasang 92,500.00 3,700.00 3,700.00
109,162.50 109,162.50
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00

Jumlah 109,162.50 32,550.00 141,712.50

4.12 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps


a. Bahan
70.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 87,500.00
11.500 Kg Semen Portland 1,250.00 14,375.00 14,375.00
0.043 M3 Pasir Pasang 92,500.00 3,977.50 3,977.50
105,852.50 105,852.50
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00
Jumlah 105,852.50 32,550.00 138,402.50

4.13 1 M2 Pasangan Bata Lobang Tebal 1/2 Bata, 1 Pc : 4 Ps


a. Bahan
58.500 Bh Bata Lobang 9 x 9 x 19 cm 725.00 42,412.50 42,412.50
11.500 Kg Semen Portland 1,250.00 14,375.00 14,375.00
0.043 M3 Pasir Pasang 92,500.00 3,977.50 3,977.50
60,765.00 60,765.00
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00

Jumlah 60,765.00 32,550.00 93,315.00

4.14 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 5 Ps


a. Bahan
70.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 87,500.00
9.680 Kg Semen Portland 1,250.00 12,100.00 12,100.00
0.045 M3 Pasir Pasang 92,500.00 4,162.50 4,162.50
103,762.50 103,762.50
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00
Jumlah 103,762.50 32,550.00 136,312.50

- 27 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

4.15 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 6 Ps


a. Bahan
70.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 87,500.00
8.320 Kg Semen Portland 1,250.00 10,400.00 10,400.00
0.049 M3 Pasir Pasang 92,500.00 4,532.50 4,532.50
102,432.50 102,432.50
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00

Jumlah 102,432.50 32,550.00 134,982.50

4.16 1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 8 Ps


a. Bahan
70.000 Bh Bata Merah 5 x 11 x 22 cm 1,250.00 87,500.00 87,500.00
6.500 Kg Semen Portland 1,250.00 8,125.00 8,125.00
0.050 M3 Pasir Pasang 92,500.00 4,625.00 4,625.00
100,250.00 100,250.00

b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
32,550.00 32,550.00

Jumlah 100,250.00 32,550.00 132,800.00

4.17 1 M2 Pasang Dinding Roster / Terawang ( 12 x 11 x 24 ) cm


a. Bahan
36.000 Bh Roster / Terawang 4,250.00 153,000.00 153,000.00
12.800 Kg Semen Portland 1,250.00 16,000.00 16,000.00
0.035 M3 Pasir Pasang 92,500.00 3,237.50 3,237.50
172,237.50 172,237.50

b. Tenaga
0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
31,250.00 31,250.00

Jumlah 172,237.50 31,250.00 203,487.50

4.18 1 M Pasangan Bataco


2

a. Bahan
12.500 Bh Bataco 10 X 20 X 40 2,600.00 32,500.00 32,500.00
0.019 Zak Semen Portland (PC) 62,000.00 1,202.80 1,202.80
0.023 M3 Pasir Pasang 92,500.00 2,081.25 2,081.25
35,784.05 35,784.05

b. Tenaga
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.450 Oh Pekerja 65,000.00 29,250.00 29,250.00
44,400.00 44,400.00
Jumlah 35,784.05 44,400.00 80,184.05

V PEKERJAAN PLESTERAN
5.1 1 M2 Plesteran 1 Pc : 1 Ps, Tebal 15 mm
a. Bahan
12.920 Kg Semen Portland 1,250.00 16,150.00 16,150.00
0.013 M3 Pasir Pasang 92,500.00 1,202.50 1,202.50
17,352.50 17,352.50
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 17,352.50 29,250.00 46,602.50

5.2 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm


a. Bahan
8.520 Kg Semen Portland 1,250.00 10,650.00 10,650.00
0.017 M3 Pasir Pasang 92,500.00 1,572.50 1,572.50
12,222.50 12,222.50

- 28 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00

Jumlah 12,222.50 29,250.00 41,472.50


5.3 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm
a. Bahan
6.480 Kg Semen Portland 1,250.00 8,100.00 8,100.00
0.019 M3 Pasir Pasang 92,500.00 1,757.50 1,757.50
9,857.50 9,857.50
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 9,857.50 29,250.00 39,107.50

5.4 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm


a. Bahan
5.200 Kg Semen Portland 1,250.00 6,500.00 6,500.00
0.020 M3 Pasir Pasang 92,500.00 1,850.00 1,850.00
8,350.00 8,350.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 8,350.00 29,250.00 37,600.00

5.5 1 M Plesteran 1 Pc : 5 Ps, Tebal 15 mm


2

a. Bahan
4.320 Kg Semen Portland 1,250.00 5,400.00 5,400.00
0.022 M3 Pasir Pasang 92,500.00 2,035.00 2,035.00
7,435.00 7,435.00

b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 7,435.00 29,250.00 36,685.00

5.6 1 M Plesteran 1 Pc : 6 Ps, Tebal 15 mm


2

a. Bahan
3.680 Kg Semen Portland 1,250.00 4,600.00 4,600.00
0.023 M3 Pasir Pasang 92,500.00 2,127.50 2,127.50
6,727.50 6,727.50
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 6,727.50 29,250.00 35,977.50

5.7 1 M2 Plesteran 1 Pc : 8 Ps, Tebal 15 mm


a. Bahan
2.880 Kg Semen Portland 1,250.00 3,600.00 3,600.00
0.024 M3 Pasir Pasang 92,500.00 2,220.00 2,220.00
5,820.00 5,820.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 5,820.00 29,250.00 35,070.00

5.8 1 M2 Plesteran 1 Pc : 0,5 Kp : 3 Ps, Tebal 15 mm


a. Bahan
5.760 Kg Semen Portland 1,250.00 7,200.00 7,200.00
0.013 M3 Pasir Pasang 92,500.00 1,202.50 1,202.50
8,402.50 8,402.50

- 29 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 8,402.50 29,250.00 37,652.50

5.9 1 M2 Plesteran 1 Pc : 3 Kp : 10 Ps, Tebal 15 mm


a. Bahan
1.840 Kg Semen Portland 1,250.00 2,300.00 2,300.00
0.014 M3 Pasir Pasang 92,500.00 1,295.00 1,295.00
3,595.00 3,595.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 3,595.00 29,250.00 32,845.00

5.10 1 M2 Plesteran 0,5 Pc : 1 Kp : 4 Ps, Tebal 15 mm


a. Bahan
3.000 Kg Semen Portland 1,250.00 3,750.00 3,750.00
0.019 M3 Pasir Pasang 92,500.00 1,757.50 1,757.50
5,507.50 5,507.50
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 5,507.50 29,250.00 34,757.50

5.11 1 M Plesteran 1 Kp : 1 Sm : 1 Ps, Tebal 15 mm


2

a. Bahan
0.009 M3 Semen Merah 38,000.00 342.00 342.00
0.009 M3 Pasir Pasang 92,500.00 832.50 832.50
1,174.50 1,174.50
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 1,174.50 29,250.00 30,424.50

5.12 1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 15 mm


a. Bahan
0.007 M3 Semen Merah 38,000.00 266.00 266.00
0.015 M3 Pasir Pasang 92,500.00 1,387.50 1,387.50
1,653.50 1,653.50
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.150 Oh Tukang Batu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
29,250.00 29,250.00
Jumlah 1,653.50 29,250.00 30,903.50

5.13 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 20 mm


a. Bahan
14.280 Kg Semen Portland 1,250.00 17,850.00 17,850.00
0.023 M3 Pasir Pasang 92,500.00 2,127.50 2,127.50
19,977.50 19,977.50
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
37,825.00 37,825.00
Jumlah 19,977.50 37,825.00 57,802.50

5.14 1 M Plesteran 1 Pc : 3 Ps, Tebal 20 mm


2

a. Bahan
10.800 Kg Semen Portland 1,250.00 13,500.00 13,500.00
0.026 M3 Pasir Pasang 92,500.00 2,405.00 2,405.00
15,905.00 15,905.00

- 30 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
37,825.00 37,825.00
Jumlah 15,905.00 37,825.00 53,730.00

5.15 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm


a. Bahan
8.680 Kg Semen Portland 1,250.00 10,850.00 10,850.00
0.028 M3 Pasir Pasang 92,500.00 2,590.00 2,590.00
13,440.00 13,440.00

b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
37,825.00 37,825.00
Jumlah 13,440.00 37,825.00 51,265.00

5.16 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm


a. Bahan
7.290 Kg Semen Portland 1,250.00 9,112.50 9,112.50
0.028 M3 Pasir Pasang 92,500.00 2,590.00 2,590.00
11,702.50 11,702.50
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
37,825.00 37,825.00

Jumlah 11,702.50 37,825.00 49,527.50

5.17 1 M2 Plesteran 1 Pc : 6 Ps, Tebal 20 mm


a. Bahan
6.240 Kg Semen Portland 1,250.00 7,800.00 7,800.00
0.030 M3 Pasir Pasang 92,500.00 2,775.00 2,775.00
10,575.00 10,575.00
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
37,825.00 37,825.00
Jumlah 10,575.00 37,825.00 48,400.00

5.18 1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, Tebal 20 mm


a. Bahan
0.009 M3 Semen Merah 38,000.00 342.00 342.00
0.018 M3 Pasir Pasang 92,500.00 1,665.00 1,665.00
2,007.00 2,007.00

b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
37,825.00 37,825.00
Jumlah 2,007.00 37,825.00 39,832.00
5.19 1 M2 Berapen 1 Pc : 5 Ps, Tebal 15 mm
a. Bahan
5.670 Kg Semen Portland 1,250.00 7,087.50 7,087.50
0.023 M3 Pasir Pasang 92,500.00 2,127.50 2,127.50
9,215.00 9,215.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.070 Oh Tukang Batu 90,000.00 6,300.00 6,300.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.008 Oh Mandor 110,000.00 880.00 880.00
17,700.00 17,700.00
Jumlah 9,215.00 17,700.00 26,915.00

5.20 1 M Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm


2

a. Bahan
9.300 Kg Semen Portland 1,250.00 11,625.00 11,625.00
0.018 M3 Pasir Pasang 92,500.00 1,665.00 1,665.00
13,290.00 13,290.00

- 31 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.260 Oh Pekerja 65,000.00 16,900.00 16,900.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
38,530.00 38,530.00
Jumlah 13,290.00 38,530.00 51,820.00

5.21 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm


a. Bahan
7.070 Kg Semen Portland 1,250.00 8,837.50 8,837.50
0.021 M3 Pasir Pasang 92,500.00 1,942.50 1,942.50
10,780.00 10,780.00
b. Tenaga
0.260 Oh Pekerja 65,000.00 16,900.00 16,900.00
0.200 Oh Tukang Batu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
38,530.00 38,530.00
Jumlah 10,780.00 38,530.00 49,310.00

5.22 1 M2 Plesteran Ciprat 1 Pc : 2 Ps


a. Bahan
4.320 Kg Semen Portland 1,250.00 5,400.00 5,400.00
0.016 M3 Pasir Pasang 92,500.00 1,480.00 1,480.00
6,880.00 6,880.00
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.015 Oh Mandor 110,000.00 1,650.00 1,650.00
28,000.00 28,000.00
Jumlah 6,880.00 28,000.00 34,880.00

5.23 1 M Plesteran Siar Adukan 1 Pc : 2 Ps


2

a. Bahan
4.320 Kg Semen Portland 1,250.00 5,400.00 5,400.00
0.016 M3 Pasir Pasang 92,500.00 1,480.00 1,480.00
6,880.00 6,880.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.070 Oh Tukang Batu 90,000.00 6,300.00 6,300.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.008 Oh Mandor 110,000.00 880.00 880.00
17,700.00 17,700.00
Jumlah 6,880.00 17,700.00 24,580.00
5.24 1 M3 Perekat
a. Bahan
10.588 Zak Semen Portland 62,000.00 656,456.00 656,456.00
1.080 M3 Pasir Pasang 92,500.00 99,900.00 99,900.00
756,356.00 756,356.00
Jumlah 756,356.00 756,356.00

5.25 1 M Plesteran dibentuk Profil uk. 10 x 10 cm


'

a. Bahan
0.060 Kg Semen Portland 62,000.00 3,720.00 3,720.00
0.024 M3 Pasir Pasang 92,500.00 2,220.00 2,220.00
5,940.00 5,940.00
b. Tenaga
1.200 Oh Tukang Batu 90,000.00 108,000.00 108,000.00
0.120 Oh Kepala Tukang 110,000.00 13,200.00 13,200.00
0.600 Oh Pekerja 65,000.00 39,000.00 39,000.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
163,500.00 163,500.00
Jumlah 5,940.00 163,500.00 169,440.00

VI PEKERJAAN KAYU

6.1 1 M3 Pasang Kusen Pintu dan Jendela K.kls. I (Kayu Jati, Unglen)
a. Bahan
1.100 M3 Kayu Jati, Balok ( Kayu kelas I) 8,250,000.00 9,075,000.00 9,075,000.00
9,075,000.00 9,075,000.00
b. Tenaga
6.000 Oh Pekerja 65,000.00 390,000.00 390,000.00
20.000 Oh Tukang Kayu 90,000.00 1,800,000.00 1,800,000.00
2.000 Oh Kepala Tukang 110,000.00 220,000.00 220,000.00
0.300 Oh Mandor 110,000.00 33,000.00 33,000.00
2,443,000.00 2,443,000.00

Jumlah 9,075,000.00 2,443,000.00 11,518,000.00

- 32 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6.2 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kls. II


a. Bahan
1.200 M3 Kayu Kelas II+C1434 6,500,000.00 7,800,000.00 7,800,000.00
7,800,000.00 7,800,000.00

b. Tenaga
6.000 Oh Pekerja 65,000.00 390,000.00 390,000.00
18.000 Oh Tukang Kayu 90,000.00 1,620,000.00 1,620,000.00
2.000 Oh Kepala Tukang 110,000.00 220,000.00 220,000.00
0.300 Oh Mandor 110,000.00 33,000.00 33,000.00
2,263,000.00 2,263,000.00
Jumlah 7,800,000.00 2,263,000.00 10,063,000.00

6.3 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelas III 6,943,470.00
a. Bahan
1.200 M3 Kayu Kls. III 3,300,000.00 3,960,000.00 3,960,000.00
3,960,000.00 10,903,470.00

b. Tenaga
6.000 Oh Pekerja 65,000.00 390,000.00 390,000.00
18.000 Oh Tukang Kayu 90,000.00 1,620,000.00 1,620,000.00
2.000 Oh Kepala Tukang 110,000.00 220,000.00 220,000.00
0.300 Oh Mandor 110,000.00 33,000.00 33,000.00
2,263,000.00 2,263,000.00
Jumlah 3,960,000.00 2,263,000.00 6,223,000.00

6.4 1 M2 Pasang Pintu Klam Kayu Kls. III


a. Bahan
0.036 M3 Kayu Kls. III 3,300,000.00 118,800.00 118,800.00
0.050 Kg Paku Biasa 2" - 5" 15,000.00 750.00 750.00
119,550.00 119,550.00

b. Tenaga
0.350 Oh Pekerja 65,000.00 22,750.00 22,750.00
1.050 Oh Tukang Kayu 90,000.00 94,500.00 94,500.00
0.105 Oh Kepala Tukang 110,000.00 11,550.00 11,550.00
0.018 Oh Mandor 110,000.00 1,980.00 1,980.00
130,780.00 130,780.00

Jumlah 119,550.00 130,780.00 250,330.00


6.5 1 M2 Pasang Pintu Klam Kayu Kls. IV
a. Bahan
0.036 M3 Kayu Kls. IV 1,500,000.00 54,000.00 54,000.00
0.050 Kg Paku Biasa 2" - 5" 15,000.00 750.00 750.00
54,750.00 54,750.00

b. Tenaga
0.350 Oh Pekerja 65,000.00 22,750.00 22,750.00
1.050 Oh Tukang Kayu 90,000.00 94,500.00 94,500.00
0.105 Oh Kepala Tukang 110,000.00 11,550.00 11,550.00
0.018 Oh Mandor 110,000.00 1,980.00 1,980.00
130,780.00 130,780.00
Jumlah 54,750.00 130,780.00 185,530.00

6.6 1 M2 Pasang Pintu Panel Kayu Jati


a. Bahan
0.040 M3 Kayu Jati, Papan 8,250,000.00 330,000.00 330,000.00
330,000.00 330,000.00

b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
2.500 Oh Tukang Kayu 90,000.00 225,000.00 225,000.00
0.250 Oh Kepala Tukang 110,000.00 27,500.00 27,500.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
323,000.00 323,000.00
Jumlah 330,000.00 323,000.00 653,000.00

6.7 1 M2 Pasang Pintu Panel Kayu Kls. II


a. Bahan
0.040 M3 Kayu Kls. II 6,500,000.00 260,000.00 260,000.00
260,000.00 260,000.00

b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
2.500 Oh Tukang Kayu 90,000.00 225,000.00 225,000.00
0.250 Oh Kepala Tukang 110,000.00 27,500.00 27,500.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
323,000.00 323,000.00

Jumlah 260,000.00 323,000.00 583,000.00

- 33 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6.8 1 M2 Pasang Pintu dan Jendela Kaca Kayu Jati 14,691,600.00


a. Bahan
0.035 M3 Kayu Jati, 8,250,000.00 288,750.00 288,750.00
288,750.00 14,980,350.00
b. Tenaga
0.800 Oh Pekerja 65,000.00 52,000.00 52,000.00
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.040 Oh Mandor 110,000.00 4,400.00 4,400.00
258,400.00 258,400.00
Jumlah 288,750.00 258,400.00 547,150.00

6.9 1 M2 Pasang Pintu dan Jendela Kaca Kayu Kls. II


a. Bahan
0.035 M3 Kayu Kls. II 6,500,000.00 227,500.00 227,500.00
227,500.00 227,500.00

b. Tenaga
0.800 Oh Pekerja 65,000.00 52,000.00 52,000.00
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.040 Oh Mandor 110,000.00 4,400.00 4,400.00
258,400.00 258,400.00
Jumlah 227,500.00 258,400.00 485,900.00

6.10 1 M2 Pasang Pintu dan Jendela Kaca Kayu Kls. III


a. Bahan
0.035 M3 Kayu Kls. III 3,300,000.00 115,500.00 115,500.00
115,500.00 115,500.00

b. Tenaga
0.800 Oh Pekerja 65,000.00 52,000.00 52,000.00
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.040 Oh Mandor 110,000.00 4,400.00 4,400.00
258,400.00 258,400.00

Jumlah 115,500.00 258,400.00 373,900.00

6.11 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Jati


a. Bahan
0.064 M3 Kayu Jati, Papan 8,250,000.00 528,000.00 528,000.00
528,000.00 528,000.00

b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
3.000 Oh Tukang Kayu 90,000.00 270,000.00 270,000.00
0.300 Oh Kepala Tukang 110,000.00 33,000.00 33,000.00
0.300 Oh Mandor 110,000.00 33,000.00 33,000.00
401,000.00 401,000.00
Jumlah 528,000.00 401,000.00 929,000.00

6.12 1 M2 Pasang Pintu dan Jendela Jalusi Kayu Kls. II


a. Bahan
0.064 M3 Kayu Kls. II 6,500,000.00 416,000.00 416,000.00
416,000.00 416,000.00
b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
3.000 Oh Tukang Kayu 90,000.00 270,000.00 270,000.00
0.300 Oh Kepala Tukang 110,000.00 33,000.00 33,000.00
0.500 Oh Mandor 110,000.00 55,000.00 55,000.00
423,000.00 423,000.00

Jumlah 416,000.00 423,000.00 839,000.00

6.13 1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Jati


a. Bahan
0.020 M3 Kayu Jati, Papan 8,250,000.00 161,700.00 161,700.00
0.030 Kg Paku Biasa 1/2" - 1" 18,000.00 540.00 540.00
0.300 Ltr Lem Kayu 20,000.00 6,000.00 6,000.00
1.000 Lbr Plywood 4' x 8' x 4 mm 68,000.00 68,000.00 68,000.00
236,240.00 236,240.00
b. Tenaga
0.600 Oh Pekerja 65,000.00 39,000.00 39,000.00
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
244,300.00 244,300.00
Jumlah 236,240.00 244,300.00 480,540.00

- 34 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6.14 1 M2 Pasang Pintu Plywood Rangkap, Rangka Kayu Kls. II


a. Bahan
0.020 M3 Kayu Kls. II 6,500,000.00 127,400.00 127,400.00
0.030 Kg Paku Biasa 1/2" - 1" 18,000.00 540.00 540.00
0.300 Ltr Lem Kayu 20,000.00 6,000.00 6,000.00
1.000 Lbr Plywood 4' x 8' x 4 mm 68,000.00 68,000.00 68,000.00
201,940.00 201,940.00
b. Tenaga
0.600 Oh Pekerja 65,000.00 39,000.00 39,000.00
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
244,300.00 244,300.00
Jumlah 201,940.00 244,300.00 446,240.00

6.15 1 M Daun Pintu Plywood Sungkay rangkap, kayu kls. II


2

a. Bahan
0.020 M3 Kayu Kelas II 6,500,000.00 127,400.00 127,400.00
1.000 Lbr Plywood Sungkai 3 mm 110,000.00 110,000.00 110,000.00
0.300 Ltr Lem Kayu 20,000.00 6,000.00 6,000.00
0.030 Kg Paku Biasa 1/2" - 1" 18,000.00 540.00 540.00
243,940.00 243,940.00
b. Tenaga
2.000 Oh Tukang Kayu 90,000.00 180,000.00 180,000.00
0.200 Oh Kepala Tukang 110,000.00 22,000.00 22,000.00
0.600 Oh Pekerja 65,000.00 39,000.00 39,000.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
244,300.00 244,300.00
Jumlah 243,940.00 244,300.00 488,240.00

6.16 1 M3 Pasang Konstruksi Kuda-kuda Kayu Jati


a. Bahan
1.100 M3 Kayu Jati, Balok 8,250,000.00 9,075,000.00 9,075,000.00
15.000 Kg Besi Strip 10,000.00 150,000.00 150,000.00
0.800 Kg Paku Biasa 2" - 5" 15,000.00 12,000.00 12,000.00
9,237,000.00 9,237,000.00
b. Tenaga
4.000 Oh Pekerja 65,000.00 260,000.00 260,000.00
12.000 Oh Tukang Kayu 90,000.00 1,080,000.00 1,080,000.00
1.200 Oh Kepala Tukang 110,000.00 132,000.00 132,000.00
0.200 Oh Mandor 110,000.00 22,000.00 22,000.00
1,494,000.00 1,494,000.00
Jumlah 9,237,000.00 1,494,000.00 10,731,000.00

6.17 1 M3 Pasang Konstruksi Kuda-kuda Kayu Kls. II


a. Bahan
1.100 M3 Kayu Kelas II, Balok 6,500,000.00 7,150,000.00 7,150,000.00
15.000 Kg Besi Strip 10,000.00 150,000.00 150,000.00
0.800 Kg Paku Biasa 2" - 5" 15,000.00 12,000.00 12,000.00
7,312,000.00 7,312,000.00
b. Tenaga
4.000 Oh Pekerja 65,000.00 260,000.00 260,000.00
12.000 Oh Tukang Kayu 90,000.00 1,080,000.00 1,080,000.00
1.200 Oh Kepala Tukang 110,000.00 132,000.00 132,000.00
0.200 Oh Mandor 110,000.00 22,000.00 22,000.00
1,494,000.00 1,494,000.00
Jumlah 7,312,000.00 1,494,000.00 8,806,000.00

6.18 1 M Pasang Konstruksi Kuda-kuda Kayu Kls. III


3

a. Bahan
1.100 M3 Kayu Kls. III, Balok 3,300,000.00 3,630,000.00 3,630,000.00
15.000 Kg Besi Strip 10,000.00 150,000.00 150,000.00
0.800 Kg Paku Biasa 2" - 5" 15,000.00 12,000.00 12,000.00
3,792,000.00 3,792,000.00
b. Tenaga
4.000 Oh Pekerja 65,000.00 260,000.00 260,000.00
12.000 Oh Tukang Kayu 90,000.00 1,080,000.00 1,080,000.00
1.200 Oh Kepala Tukang 110,000.00 132,000.00 132,000.00
0.200 Oh Mandor 110,000.00 22,000.00 22,000.00
1,494,000.00 1,494,000.00
Jumlah 3,792,000.00 1,494,000.00 5,286,000.00

6.19 1 M2 Pasang Kaso + Reng Genteng Kayu Kls. III


a. Bahan
0.012 M3 Kayu Kelas III, Untuk genteng kodok/biasa 3,300,000.00 39,600.00 39,600.00
0.014 M3 Kayu Kelas III, untuk genteng beton/keramik 3,300,000.00 46,200.00 46,200.00
0.150 Kg Paku Biasa 2" - 5" 15,000.00 2,250.00 2,250.00
kayu kls. III, untuk genteng kodok/biasa 41,850.00 41,850.00
kayu kls. III, untuk genteng beton 48,450.00 48,450.00

- 35 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.005 Oh Mandor 110,000.00 550.00 550.00
17,150.00 17,150.00
kayu kls. III, untuk genteng kodok/biasa 41,850.00 17,150.00 59,000.00
kayu kls. III, untuk genteng beton 48,450.00 17,150.00 65,600.00

6.20 1 M2 Pasang Kaso + Reng Genteng Kayu Kls. II


a. Bahan
0.012 M3 Kayu Kelas II, Untuk genteng kodok/biasa 6,500,000.00 78,000.00 78,000.00
0.014 M3 Kayu Kelas II, untuk genteng beton/keramik 6,500,000.00 91,000.00 91,000.00
0.150 Kg Paku Biasa 2" - 5" 15,000.00 2,250.00 2,250.00
kayu kls. II, untuk genteng kodok/biasa 80,250.00 80,250.00
kayu kls. II, untuk genteng beton 93,250.00 93,250.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.005 Oh Mandor 110,000.00 550.00 550.00
17,150.00 17,150.00
kayu kls. II, untuk genteng kodok/biasa 80,250.00 17,150.00 97,400.00
kayu kls. II, untuk genteng beton 93,250.00 17,150.00 110,400.00
6.21 1 M2 Pasang Kaso + Reng Atap Sirap,seng/asbes Kayu Kls. II
a. Bahan
0.017 M3 Kayu Kls. II, untuk sirap 6,500,000.00 107,250.00 107,250.00
0.010 M3 Kayu Kls. II, untuk seng dan asbes 6,500,000.00 65,000.00 65,000.00
0.200 Kg Paku Biasa 2" - 5" 15,000.00 3,000.00 3,000.00
kayu kls. II, untuk sirap 110,250.00 110,250.00
kayu kls. II, untuk seng/asbes 68,000.00 68,000.00
b. Tenaga
0.120 Oh Pekerja 65,000.00 7,800.00 7,800.00
0.120 Oh Tukang Kayu 90,000.00 10,800.00 10,800.00
0.012 Oh Kepala Tukang 110,000.00 1,320.00 1,320.00
0.006 Oh Mandor 110,000.00 660.00 660.00
20,580.00 20,580.00
kayu kls. II, untuk sirap 110,250.00 20,580.00 130,830.00
kayu kls. II, untuk seng/asbes 68,000.00 20,580.00 88,580.00

6.22 1 M2 Pasang Kaso + Reng Atap Sirap,seng/asbes Kayu Kls. III


a. Bahan
0.017 M3 Kayu Kls. III, Untuk sirap 3,300,000.00 54,450.00 54,450.00
0.010 M3 Kayu Kls. III, untuk seng dan asbes 3,300,000.00 33,000.00 33,000.00
0.200 Kg Paku Biasa 2" - 5" 15,000.00 3,000.00 3,000.00
kayu kls. III, untuk sirap 57,450.00 57,450.00
kayu kls. III, untuk seng/asbes 36,000.00 36,000.00
b. Tenaga
0.120 Oh Pekerja 65,000.00 7,800.00 7,800.00
0.120 Oh Tukang Kayu 90,000.00 10,800.00 10,800.00
0.012 Oh Kepala Tukang 110,000.00 1,320.00 1,320.00
0.006 Oh Mandor 110,000.00 660.00 660.00
20,580.00 20,580.00
kayu kls. III, untuk sirap 57,450.00 20,580.00 78,030.00
kayu kls. III, untuk seng/asbes 36,000.00 20,580.00 56,580.00

6.23 1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Jati


a. Bahan
0.012 M3 Kayu Jati, Unglen 8,250,000.00 99,000.00 99,000.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00 1,500.00
100,500.00 100,500.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.250 Oh Tukang Kayu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
43,250.00 43,250.00
Jumlah 100,500.00 43,250.00 143,750.00
6.24 1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Kls. II
a. Bahan
0.012 M3 Kayu Kls. II 6,500,000.00 78,000.00 78,000.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00 1,500.00
79,500.00 79,500.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.250 Oh Tukang Kayu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
43,250.00 43,250.00
Jumlah 79,500.00 43,250.00 122,750.00

- 36 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6.25 1 M2 Pasang Rangka Langit-langit (1,00 x 1,00) m, Kayu Kls. III


a. Bahan
0.012 M3 Kayu Kls. III, Balok 3,300,000.00 39,600.00 39,600.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00 1,500.00
41,100.00 41,100.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.250 Oh Tukang Kayu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
43,250.00 43,250.00
Jumlah 41,100.00 43,250.00 84,350.00

6.26 1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Jati


a. Bahan
0.023 M3 Kayu Jati, Balok 8,250,000.00 189,750.00 189,750.00
0.150 Kg Paku Biasa 2" - 5" 15,000.00 2,250.00 2,250.00
192,000.00 192,000.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.300 Oh Tukang Kayu 90,000.00 27,000.00 27,000.00
0.030 Oh Kepala Tukang 110,000.00 3,300.00 3,300.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
44,400.00 44,400.00
Jumlah 192,000.00 44,400.00 236,400.00

6.27 1 M2 Pasang Rangka Langit-langit (30 x 60) cm, Kayu Kls. II


a. Bahan
0.023 M3 Kayu Kls. II 6,500,000.00 149,500.00 149,500.00
0.150 Kg Paku Biasa 2" - 5" 15,000.00 2,250.00 2,250.00
151,750.00 151,750.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.300 Oh Tukang Kayu 90,000.00 27,000.00 27,000.00
0.030 Oh Kepala Tukang 110,000.00 3,300.00 3,300.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
44,400.00 44,400.00
Jumlah 151,750.00 44,400.00 196,150.00

6.28 1 M Pasang Rangka Langit-langit (30 x 60) m, Kayu Kls. III


2

a. Bahan
0.023 M3 Kayu Kls. III 3,300,000.00 75,900.00 75,900.00
0.150 Kg Paku Biasa 2" - 5" 15,000.00 2,250.00 2,250.00
78,150.00 78,150.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.300 Oh Tukang Kayu 90,000.00 27,000.00 27,000.00
0.030 Oh Kepala Tukang 110,000.00 3,300.00 3,300.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
44,400.00 44,400.00
Jumlah 78,150.00 44,400.00 122,550.00

6.29 1 M2 Pasang Rangka Langit-langit (30 x 30) cm, Kayu Jati


a. Bahan
0.027 M3 Kayu Jati, Balok 8,250,000.00 222,750.00 222,750.00
0.200 Kg Paku Biasa 2" - 5" 15,000.00 3,000.00 3,000.00
225,750.00 225,750.00

b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.350 Oh Tukang Kayu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
52,975.00 52,975.00
Jumlah 225,750.00 52,975.00 278,725.00

6.30 1 M2 Pasang Rangka Langit-langit (30 x 30) cm, Kayu Kls. II


a. Bahan
0.027 M3 Kayu Kls. II 6,500,000.00 175,500.00 175,500.00
0.200 Kg Paku Biasa 2" - 5" 15,000.00 3,000.00 3,000.00
178,500.00 178,500.00

b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.350 Oh Tukang Kayu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
52,975.00 52,975.00

Jumlah 178,500.00 52,975.00 231,475.00

- 37 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6.31 1 M2 Pasang Rangka Langit-langit (30 x 30) m, Kayu Kls. III


a. Bahan
0.027 M3 Kayu Kls. III 3,300,000.00 89,100.00 89,100.00
0.200 Kg Paku Biasa 2" - 5" 15,000.00 3,000.00 3,000.00
92,100.00 92,100.00
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.350 Oh Tukang Kayu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
52,975.00 52,975.00
Jumlah 92,100.00 52,975.00 145,075.00

6.32 1 M' Pasang Lisplang Ukuran (3 x 20) cm, Kayu Jati


a. Bahan
0.007 M3 Kayu Jati, Papan 8,250,000.00 59,400.00 59,400.00
0.050 Kg Paku Biasa 2" - 5" 15,000.00 750.00 750.00
60,150.00 60,150.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.005 Oh Mandor 110,000.00 550.00 550.00
27,800.00 27,800.00
Jumlah 60,150.00 27,800.00 87,950.00

6.33 1 M' Pasang Lisplang Ukuran (3 x 20) cm, Kayu Kls. II


a. Bahan
0.007 M3 Kayu Kls. II 6,500,000.00 46,800.00 46,800.00
0.050 Kg Paku Biasa 2" - 5" 15,000.00 750.00 750.00
47,550.00 47,550.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.005 Oh Mandor 110,000.00 550.00 550.00
27,800.00 27,800.00
Jumlah 47,550.00 27,800.00 75,350.00

6.34 1 M' Pasang Lisplang Ukuran (3 x 30) cm, Kayu Jati


a. Bahan
0.011 M3 Kayu Jati, Papan 8,250,000.00 90,750.00 90,750.00
0.050 Kg Paku Biasa 2" - 5" 15,000.00 750.00 750.00
91,500.00 91,500.00
b. Tenaga
0.110 Oh Pekerja 65,000.00 7,150.00 7,150.00
0.220 Oh Tukang Kayu 90,000.00 19,800.00 19,800.00
0.022 Oh Kepala Tukang 110,000.00 2,420.00 2,420.00
0.005 Oh Mandor 110,000.00 550.00 550.00
29,920.00 29,920.00
Jumlah 91,500.00 29,920.00 121,420.00

6.35 1 M' Pasang Lisplang Ukuran (3 x 30) cm, Kayu Kls. II


a. Bahan
0.011 M3 Kayu Kls. II 6,500,000.00 71,500.00 71,500.00
0.050 Kg Paku Biasa 2" - 5" 15,000.00 750.00 750.00
72,250.00 72,250.00

b. Tenaga
0.110 Oh Pekerja 65,000.00 7,150.00 7,150.00
0.220 Oh Tukang Kayu 90,000.00 19,800.00 19,800.00
0.022 Oh Kepala Tukang 110,000.00 2,420.00 2,420.00
0.005 Oh Mandor 110,000.00 550.00 550.00
29,920.00 29,920.00

Jumlah 72,250.00 29,920.00 102,170.00

6.36 1 M' Pasang Lisplang Ukuran 2 x (3 x 20) cm, Kayu Kls.II


a. Bahan
0.015 M3 Kayu Kls.II 6,500,000.00 94,250.00 94,250.00
0.060 Kg Paku Biasa 2" - 5" 15,000.00 900.00 900.00
95,150.00 95,150.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.250 Oh Tukang Kayu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
43,250.00 43,250.00
Jumlah 95,150.00 43,250.00 138,400.00

- 38 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6.37 1 M' Pasang Lisplang Ukuran 2 x (2 x 20) cm, Kayu Kls. II


a. Bahan
0.009 M3 Kayu Kls. II 6,500,000.00 55,900.00 55,900.00
0.060 Kg Paku Biasa 2" - 5" 15,000.00 900.00 900.00
56,800.00 56,800.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
22,100.00 22,100.00
Jumlah 56,800.00 22,100.00 78,900.00

6.38 1 M' Pasang Lisplang Ukuran 2 x (2 x 20) cm, Kayu Kls. III
a. Bahan
0.009 M3 Kayu Kls. III 3,300,000.00 29,040.00 29,040.00
0.060 Kg Paku Biasa 2" - 5" 15,000.00 900.00 900.00
29,940.00 29,940.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
22,100.00 22,100.00
Jumlah 29,940.00 22,100.00 52,040.00

6.39 1 M2 Pasang Rangka Dinding Pemisah + Papan Kayu Kls. II


a. Bahan
0.020 M3 Kayu Kls. II, Balok 6,500,000.00 126,750.00 126,750.00
0.007 M3 Kayu Kls.II, Papan 6,500,000.00 45,500.00 45,500.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00 1,500.00
173,750.00 173,750.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.450 Oh Tukang Kayu 90,000.00 40,500.00 40,500.00
0.045 Oh Kepala Tukang 110,000.00 4,950.00 4,950.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
63,450.00 63,450.00

Jumlah 173,750.00 63,450.00 237,200.00

6.40 1 M Pasang Rangka Dinding Pemisah + Papan Kayu Kls. III


2

a. Bahan
0.020 M3 Kayu Kls. III, Balok 3,300,000.00 64,350.00 64,350.00
0.007 M3 Kayu Kls. III, Papan 3,300,000.00 23,100.00 23,100.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00 1,500.00
88,950.00 88,950.00

b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.450 Oh Tukang Kayu 90,000.00 40,500.00 40,500.00
0.045 Oh Kepala Tukang 110,000.00 4,950.00 4,950.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
63,450.00 63,450.00
Jumlah 88,950.00 63,450.00 152,400.00

6.41 1 M2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu kls. II


a. Bahan
0.020 M3 Kayu Kls. II, Balok 6,500,000.00 126,750.00 126,750.00
0.007 M3 Kayu Kls. II, Papan 6,500,000.00 45,500.00 45,500.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00 1,500.00
173,750.00 173,750.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.450 Oh Tukang Kayu 90,000.00 40,500.00 40,500.00
0.045 Oh Kepala Tukang 110,000.00 4,950.00 4,950.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
63,450.00 63,450.00
Jumlah 173,750.00 63,450.00 237,200.00

6.42 1 M2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas III
a. Bahan
0.020 M3 Kayu Kelas III, Balok 3,300,000.00 64,350.00 64,350.00
0.007 M3 Kayu Kelas III, Papan 3,300,000.00 23,100.00 23,100.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00 1,500.00
0.560 Ltr Lem Kayu 20,000.00 11,200.00 11,200.00
1.000 Lbr Plywood 4' x 8' x 4 mm 68,000.00 68,000.00 68,000.00
168,150.00 168,150.00

- 39 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.600 Oh Tukang Kayu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
74,700.00 74,700.00
Jumlah 168,150.00 74,700.00 242,850.00

6.43 1 M2 Pasang Dinding Lambriziring Dari Papan Jati


a. Bahan
0.007 M3 Kayu Jati, Balok 8,250,000.00 57,750.00 57,750.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00 1,500.00
0.150 Kg Paku Skrup 3,5" 45,000.00 6,750.00 6,750.00
66,000.00 66,000.00
b. Tenaga
0.600 Oh Pekerja 65,000.00 39,000.00 39,000.00
1.800 Oh Tukang Kayu 90,000.00 162,000.00 162,000.00
0.180 Oh Kepala Tukang 110,000.00 19,800.00 19,800.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
224,100.00 224,100.00
Jumlah 66,000.00 224,100.00 290,100.00
6.44 1 M2 Pasang Plywood Tebal 4 mm, Untuk Dinding
a. Bahan
0.400 Lbr Plywood 4' x 8' x 4 mm 68,000.00 27,200.00 27,200.00
0.050 Kg Paku Biasa 1/2" - 1" 18,000.00 900.00 900.00
28,100.00 28,100.00
b. Tenaga
0.025 Oh Pekerja 65,000.00 1,625.00 1,625.00
0.075 Oh Tukang Kayu 90,000.00 6,750.00 6,750.00
0.008 Oh Kepala Tukang 110,000.00 825.00 825.00
0.001 Oh Mandor 110,000.00 143.00 143.00
9,343.00 9,343.00
Jumlah 28,100.00 9,343.00 37,443.00

6.45 1 M' Pasang List Plafond Kayu Profil


a. Bahan
1.050 M' Kayu Profil kecil 2,500.00 2,625.00 2,625.00
1.050 M' Kayu Profil sedang 3,500.00 3,675.00 3,675.00
1.050 M' Kayu Profil besar 7,500.00 7,875.00 7,875.00
Kayu Profil kecil 2,625.00 2,625.00
Kayu Profil sedang 3,675.00 3,675.00
Kayu Profil besar 7,875.00 7,875.00
b. Tenaga
0.021 Oh Pekerja 65,000.00 1,365.00 1,365.00
0.021 Oh Tukang Kayu 90,000.00 1,890.00 102,170.00
0.002 Oh Kepala Tukang 110,000.00 220.00 220.00
0.001 Oh Mandor 110,000.00 110.00 110.00
3,585.00 103,865.00
Kayu Profil kecil 2,625.00 3,585.00 6,210.00
Kayu Profil sedang 3,675.00 3,585.00 7,260.00
Kayu Profil Besar 7,875.00 3,585.00 11,460.00

6.46 1 M2 Pasang Interior Display lapis plywood Sungkay + politur


a. Bahan
0.360 Kpg Plywood Sungkay 3 mm 110,000.00 39,600.00 39,600.00
0.360 Kpg Plywood 4 mm 68,000.00 24,480.00 24,480.00
0.600 Kg Lem Vinyl 8,500.00 5,100.00 5,100.00
0.150 Ltr Politur dasar 49,000.00 7,350.00 7,350.00
0.372 Ltr Politur jadi 53,000.00 19,716.00 19,716.00
2.000 Lbr Amplas 3,500.00 7,000.00 7,000.00
0.220 Kg Paku Biasa 15,000.00 3,300.00 3,300.00
106,546.00 106,546.00
b. Tenaga
0.145 Oh Tukang Cat 90,000.00 13,050.00 13,050.00
0.008 Oh Kepala Tukang 110,000.00 880.00 880.00
0.110 Oh Pekerja 65,000.00 7,150.00 7,150.00
0.005 Oh Mandor 110,000.00 550.00 550.00
21,630.00 21,630.00
106,546.00 21,630.00 128,176.00

6.47 1 M2 Pasang lapis plywood Sungkay tanpa rangka, politur dan lis profil
a. Bahan
0.360 Kpg Plywood Sungkay 3 mm 110,000.00 39,600.00 39,600.00
0.050 Kg Paku 1/2" - 1 " 18,000.00 900.00 900.00
40,500.00 40,500.00
b. Tenaga
0.075 Oh Tukang Kayu 90,000.00 6,750.00 6,750.00
0.008 Oh Kepala Tukang 110,000.00 825.00 825.00
0.025 Oh Pekerja 65,000.00 1,625.00 1,625.00
0.001 Oh Mandor 110,000.00 143.00 143.00
9,343.00 9,343.00
40,500.00 9,343.00 49,843.00

- 40 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

6.48 1 M2 Pasang lapis plywood Sungkay + list kayu, tanpa rangka dan politur
a. Bahan
0.360 Kpg Plywood Sungkay 3 mm 110,000.00 39,600.00 39,600.00
0.250 LS List kayu 2,500.00 625.00 625.00
0.150 Kg Paku 1/2" - 2 " 18,000.00 2,700.00 2,700.00
2.000 Lbr Amplas 3,500.00 7,000.00 7,000.00
49,925.00 49,925.00
b. Tenaga
0.096 Oh Tukang Kayu 90,000.00 8,640.00 8,640.00
0.010 Oh Kepala Tukang 110,000.00 1,045.00 1,045.00
0.046 Oh Pekerja 65,000.00 2,990.00 2,990.00
0.002 Oh Mandor 110,000.00 253.00 253.00
12,928.00 12,928.00
49,925.00 12,928.00 62,853.00

6.49 1 M2 Pasangan Interior display + lapis jati dipolitur


Bahan
0.360 Kpg Plywood Jati 3 mm 110,000.00 39,600.00 39,600.00
0.360 Kpg Plywood 20 mm 210,000.00 75,600.00 75,600.00
0.600 Kg Lem Vinyl 8,500.00 5,100.00 5,100.00
0.150 Ltr Politur dasar 49,000.00 7,350.00 7,350.00
0.372 Ltr Politur jadi 53,000.00 19,716.00 19,716.00
2.000 Lbr Amplas 3,500.00 7,000.00 7,000.00
0.220 Kg Paku 15,000.00 3,300.00 3,300.00
157,666.00 157,666.00
Tenaga
0.025 Oh Pekerja 65,000.00 1,625.00 1,625.00
0.135 Oh Tukang Kayu 90,000.00 12,150.00 12,150.00
0.024 Oh Kepala Tukang 110,000.00 2,585.00 2,585.00
0.004 Oh Mandor 110,000.00 418.00 418.00
16,778.00 16,778.00
157,666.00 16,778.00 174,444.00

6.50 1 M2 Dinding Sekat Teakwood 4 mm, Rangkap + Rangka Kayu kls. II


a. Bahan
0.020 M3 Kayu Kelas II 6,500,000.00 126,750.00 126,750.00
2.000 M2 Teakwood 4 mm 40,000.00 80,000.00 80,000.00
0.100 Kg Paku Biasa 2"-5" 15,000.00 1,500.00 1,500.00
0.050 Kg Paku Plywood 18,000.00 900.00 900.00
209,150.00 209,150.00
b. Tenaga
0.450 Oh Tukang Kayu 90,000.00 40,500.00 40,500.00
0.045 Oh Kepala Tukang 110,000.00 4,950.00 4,950.00
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.075 Oh Mandor 110,000.00 8,250.00 8,250.00
63,450.00 63,450.00
Jumlah 209,150.00 63,450.00 272,600.00

6.51 1 M Dinding pemisah Plywood Sungkai rangkap + rangka kayu kls. II


2

a. Bahan
0.020 M3 Kayu Kelas II 6,500,000.00 126,750.00 126,750.00
0.007 M3 Kayu Kelas II, Papan 3,300,000.00 23,100.00 23,100.00
0.100 Kg Paku Biasa 2"-5" 15,000.00 1,500.00 1,500.00
1.000 Lbr Plywood Sungkai 110,000.00 110,000.00 110,000.00
0.050 Kg Paku Plywood 18,000.00 900.00 900.00
262,250.00 262,250.00
b. Tenaga
0.600 Oh Tukang Kayu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
74,700.00 74,700.00

Jumlah 262,250.00 74,700.00 336,950.00


VII PEKERJAAN BETON

7.1 1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr


a. Bahan
218.000 Kg Semen Portland 1,250.00 272,500.00 272,500.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.870 M3 Koral Beton 421,683.00 366,864.21 366,864.21
687,464.21 687,464.21
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00

Jumlah 687,464.21 141,300.00 828,764.21

- 41 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

7.2 1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 6 Kr


a. Bahan
197.000 Kg Semen Portland 1,250.00 246,250.00 246,250.00
0.470 M3 Pasir Beton 92,500.00 43,475.00 43,475.00
0.940 M3 Koral Beton 421,683.00 396,382.02 396,382.02
686,107.02 686,107.02

b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
Jumlah 686,107.02 141,300.00 827,407.02

7.3 1 M Membuat Beton Tumbuk, 1 Pc : 4 Ps : 6 Kr


3

a. Bahan
173.000 Kg Semen Portland 1,250.00 216,250.00 216,250.00
0.570 M3 Pasir Beton 92,500.00 52,725.00 52,725.00
0.870 M3 Koral Beton 421,683.00 366,864.21 366,864.21
635,839.21 635,839.21

b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
Jumlah 635,839.21 141,300.00 777,139.21

7.4 1 M2 Membuat Lantai Kerja Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr, Tebal 5 cm


a. Bahan
10.000 Kg Semen Portland 1,250.00 12,500.00 12,500.00
0.026 M3 Pasir Beton 92,500.00 2,405.00 2,405.00
0.044 M3 Koral Beton 421,683.00 18,554.05 18,554.05
33,459.05 33,459.05
b. Tenaga
1.150 Oh Pekerja 65,000.00 74,750.00 74,750.00
0.020 Oh Tukang Batu 90,000.00 1,800.00 1,800.00
0.002 Oh Kepala Tukang 110,000.00 220.00 220.00
0.006 Oh Mandor 110,000.00 660.00 660.00
77,430.00 77,430.00
Jumlah 33,459.05 77,430.00 110,889.05

7.5 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Kr


a. Bahan
232.000 Kg Semen Portland 1,250.00 290,000.00 290,000.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
667,012.74 667,012.74
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
Jumlah 667,012.74 141,300.00 808,312.74

7.6 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 4 Kr


a. Bahan
280.000 Kg Semen Portland 1,250.00 350,000.00 350,000.00
0.450 M3 Pasir Beton 92,500.00 41,625.00 41,625.00
0.900 M3 Koral Beton 421,683.00 379,514.70 379,514.70
771,139.70 771,139.70

b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
Jumlah 771,139.70 141,300.00 912,439.70

7.7 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 2,5 Kr


a. Bahan
352.000 Kg Semen Portland 1,250.00 440,000.00 440,000.00
0.560 M3 Pasir Beton 92,500.00 51,800.00 51,800.00
0.700 M3 Koral Beton 421,683.00 295,178.10 295,178.10
786,978.10 786,978.10

- 42 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
Jumlah 786,978.10 141,300.00 928,278.10

7.8 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 3 Kr


a. Bahan
357.000 Kg Semen Portland 1,250.00 446,250.00 446,250.00
0.420 M3 Pasir Beton 92,500.00 38,850.00 38,850.00
0.540 M3 Koral Beton 421,683.00 227,708.82 227,708.82
712,808.82 712,808.82
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
Jumlah 712,808.82 141,300.00 854,108.82

7.9 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 2,5 Kr


a. Bahan
386.000 Kg Semen Portland 1,250.00 482,500.00 482,500.00
0.470 M3 Pasir Beton 92,500.00 43,475.00 43,475.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
854,887.74 854,887.74
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00

Jumlah 854,887.74 141,300.00 996,187.74

7.10 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1 Ps : 2 Kr


a. Bahan
479.000 Kg Semen Portland 1,250.00 598,750.00 598,750.00
0.370 M3 Pasir Beton 92,500.00 34,225.00 34,225.00
0.740 M3 Koral Beton 421,683.00 312,045.42 312,045.42
945,020.42 945,020.42
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00
Jumlah 945,020.42 141,300.00 1,086,320.42

7.11 1 M Membuat Tiang Pancang Prestressed Beton


3

a. Bahan
440.000 Kg Semen Portland 1,250.00 550,000.00 550,000.00
0.500 M3 Pasir Beton 92,500.00 46,250.00 46,250.00
0.800 M3 Koral Beton Pecah Split 468,000.00 374,400.00 374,400.00
2.460 Gln Rapidrant - - -
970,650.00 970,650.00
b. Tenaga
1.650 Oh Pekerja 65,000.00 107,250.00 107,250.00
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.080 Oh Mandor 110,000.00 8,800.00 8,800.00
141,300.00 141,300.00

Jumlah 970,650.00 141,300.00 1,111,950.00

7.12 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Split


a. Bahan
336.000 Kg Semen Portland 1,250.00 420,000.00 420,000.00
0.540 M3 Pasir Beton 92,500.00 49,950.00 49,950.00
0.810 M3 Koral Beton Pecah Split 468,000.00 379,080.00 379,080.00
849,030.00 849,030.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
275,350.00 275,350.00
Jumlah 849,030.00 275,350.00 1,124,380.00

- 43 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
7.13 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 4 Split
a. Bahan
291.000 Kg Semen Portland 1,250.00 363,750.00 363,750.00
0.470 M3 Pasir Beton 92,500.00 43,475.00 43,475.00
0.930 M3 Koral Beton pecah Split 468,000.00 435,240.00 435,240.00
842,465.00 842,465.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
275,350.00 275,350.00
Jumlah 842,465.00 275,350.00 1,117,815.00

7.14 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 3 Split


a. Bahan
367.000 Kg Semen Portland 1,250.00 458,750.00 458,750.00
0.440 M3 Pasir Beton 92,500.00 40,700.00 40,700.00
0.880 M3 Koral Beton 2/3 Split 471,683.00 415,081.04 415,081.04
914,531.04 914,531.04
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
275,350.00 275,350.00

Jumlah 914,531.04 275,350.00 1,189,881.04

7.15 1 M Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 2,5 Split


3

a. Bahan
400.000 Kg Semen Portland 1,250.00 500,000.00 500,000.00
0.480 M3 Pasir Beton 92,500.00 44,400.00 44,400.00
0.800 M3 Koral Beton 2/3 Split 471,683.00 377,346.40 377,346.40
921,746.40 921,746.40
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
275,350.00 275,350.00

Jumlah 921,746.40 275,350.00 1,197,096.40

7.16 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1 Ps : 1 Split


a. Bahan
615.000 Kg Semen Portland 1,250.00 768,750.00 768,750.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.520 M3 Koral Beton Pecah Split 471,683.00 245,275.16 245,275.16
1,062,125.16 1,062,125.16

b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
275,350.00 275,350.00
Jumlah 1,062,125.16 275,350.00 1,337,475.16

7.17 1 M3 Membuat Beton Kedap Air dengan Strorox - 100


a. Bahan
400.000 Kg Semen Portland 1,250.00 500,000.00 500,000.00
0.480 M3 Pasir Beton 92,500.00 44,400.00 44,400.00
0.800 M3 Koral Beton 2/3 471,683.00 377,346.40 377,346.40
1.200 Kg Strorox - 100 - - -
921,746.40 921,746.40
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
1.000 Oh Mandor 110,000.00 110,000.00 110,000.00
275,350.00 275,350.00
Jumlah

7.18 1 Kg Pembesian dengan Besi Polos atau Besi Ulir


a. Bahan
1.050 Kg Besi Beton ( Polos / Ulir ) 19,000.00 19,950.00 19,950.00
0.015 Kg Kawat Beton 18,000.00 270.00 270.00
20,220.00 20,220.00

- 44 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.007 Oh Pekerja 65,000.00 455.00 455.00
0.007 Oh Tukang Besi 90,000.00 630.00 630.00
0.001 Oh Kepala Tukang 110,000.00 77.00 77.00
0.000 Oh Mandor 110,000.00 33.00 33.00
1,195.00 1,195.00
Jumlah 20,220.00 1,195.00 21,415.00

7.19 1 Kg Kabel Presstressed Polos / Strands


a. Bahan
1.050 Kg Besi Presstressed Polos 19,000.00 19,950.00 19,950.00
0.010 Kg Kawat Beton 18,000.00 180.00 180.00
20,130.00 20,130.00
b. Tenaga
0.005 Oh Pekerja 65,000.00 325.00 325.00
0.005 Oh Tukang Besi 90,000.00 450.00 450.00
0.001 Oh Kepala Tukang 110,000.00 55.00 55.00
0.000 Oh Mandor 110,000.00 33.00 33.00
863.00 863.00
Jumlah 20,130.00 863.00 20,993.00

7.20 1 M2 Pasang Bekisting Untuk Pondasi


a. Bahan
0.040 M3 Kayu Kls. IV 1,500,000.00 60,000.00 60,000.00
0.300 Kg Paku Biasa 2"- 5" 15,000.00 4,500.00 4,500.00
64,500.00 64,500.00
b. Tenaga
0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00
0.260 Oh Tukang Kayu 90,000.00 23,400.00 23,400.00
0.026 Oh Kepala Tukang 110,000.00 2,860.00 2,860.00
0.005 Oh Mandor 110,000.00 550.00 550.00
46,310.00 46,310.00

Jumlah 64,500.00 46,310.00 110,810.00

7.21 1 M2 Pasang Bekisting Untuk Sloof


a. Bahan
0.045 M3 Kayu Kls. IV 1,500,000.00 67,500.00 67,500.00
0.300 Kg Paku Biasa 2"- 5" 15,000.00 4,500.00 4,500.00
72,000.00 72,000.00

b. Tenaga
0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00
0.260 Oh Tukang Kayu 90,000.00 23,400.00 23,400.00
0.026 Oh Kepala Tukang 110,000.00 2,860.00 2,860.00
0.005 Oh Mandor 110,000.00 550.00 550.00
46,310.00 46,310.00

Jumlah 72,000.00 46,310.00 118,310.00

7.22 1 M2 Pasang Bekisting Untuk Kolom (Untuk bangunan gedung)


a. Bahan
0.040 M3 Kayu Kls. IV 1,500,000.00 60,000.00 60,000.00
0.400 Kg Paku Biasa 2"- 5" 15,000.00 6,000.00 6,000.00
0.015 M3 Balok Kayu Kls. IV 1,500,000.00 22,500.00 22,500.00
2.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 16,000.00 16,000.00
104,500.00 104,500.00
b. Tenaga
0.300 Oh Pekerja 65,000.00 19,500.00 19,500.00
0.330 Oh Tukang Kayu 90,000.00 29,700.00 29,700.00
0.033 Oh Kepala Tukang 110,000.00 3,630.00 3,630.00
0.006 Oh Mandor 110,000.00 660.00 660.00
53,490.00 53,490.00

Jumlah 104,500.00 53,490.00 157,990.00

7.23 1 M Pasang Bekisting Untuk Kolom (Jerambah Beton)


2

a. Bahan
0.020 M3 Kayu Kls. IV 1,500,000.00 30,000.00 30,000.00
0.500 Btg Hek 9,000.00 4,500.00 4,500.00
0.200 Kg Paku Biasa 2"- 5" 15,000.00 3,000.00 3,000.00
37,500.00 37,500.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.165 Oh Tukang Kayu 90,000.00 14,850.00 14,850.00
0.017 Oh Kepala Tukang 110,000.00 1,815.00 1,815.00
0.003 Oh Mandor 110,000.00 330.00 330.00
26,745.00 26,745.00

Jumlah 37,500.00 26,745.00 64,245.00

- 45 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
7.24 1 M2 Pasang Bekisting Untuk Balok (Untuk bangunan gedung)
a. Bahan
0.040 M3 Kayu Kls. IV 1,500,000.00 60,000.00 60,000.00
0.400 Kg Paku Biasa 2"- 5" 15,000.00 6,000.00 6,000.00
0.018 M3 Balok Kayu Kls. IV 1,500,000.00 27,000.00 27,000.00
2.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 16,000.00 16,000.00
109,000.00 109,000.00
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.330 Oh Tukang Kayu 90,000.00 29,700.00 29,700.00
0.033 Oh Kepala Tukang 110,000.00 3,630.00 3,630.00
0.006 Oh Mandor 110,000.00 660.00 660.00
54,790.00 54,790.00
Jumlah 109,000.00 54,790.00 163,790.00

7.25 1 M2 Pasang Bekisting Untuk Balok (Jerambah Beton)


a. Bahan
0.020 M3 Kayu Kls. IV 1,500,000.00 30,000.00 30,000.00
0.500 Btg Hek 9,000.00 4,500.00 4,500.00
2.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 16,000.00 16,000.00
0.200 Kg Paku Biasa 2"- 5" 15,000.00 3,000.00 3,000.00
53,500.00 53,500.00
b. Tenaga
0.160 Oh Pekerja 65,000.00 10,400.00 10,400.00
0.165 Oh Tukang Kayu 90,000.00 14,850.00 14,850.00
0.017 Oh Kepala Tukang 110,000.00 1,815.00 1,815.00
0.003 Oh Mandor 110,000.00 330.00 330.00
27,395.00 27,395.00
Jumlah 53,500.00 27,395.00 80,895.00

7.26 1 M2 Pasang Bekisting Untuk Lantai, plat dak (untuk bangunan gedung)
a. Bahan
0.040 M3 Kayu Kls. IV 1,500,000.00 60,000.00 60,000.00
0.400 Kg Paku Biasa 2"- 5" 15,000.00 6,000.00 6,000.00
0.015 M3 Balok Kayu Kls.IV 1,500,000.00 22,500.00 22,500.00
6.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 48,000.00 48,000.00
136,500.00 136,500.00
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.330 Oh Tukang Batu 90,000.00 29,700.00 29,700.00
0.033 Oh Kepala Tukang 110,000.00 3,630.00 3,630.00
0.006 Oh Mandor 110,000.00 660.00 660.00
54,790.00 54,790.00
Jumlah 136,500.00 54,790.00 191,290.00

7.27 1 M2 Pasang Bekisting Untuk Lantai ( jerambah beton)


a. Bahan
1.500 Kpg Papan Kayu Kls IV 16,500.00 24,750.00 24,750.00
0.200 Kg Paku Biasa 2"- 5" 15,000.00 3,000.00 3,000.00
2.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 16,000.00 16,000.00
43,750.00 43,750.00
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.330 Oh Tukang Batu 90,000.00 29,700.00 29,700.00
0.033 Oh Kepala Tukang 110,000.00 3,630.00 3,630.00
0.006 Oh Mandor 110,000.00 660.00 660.00
54,790.00 54,790.00
Jumlah 43,750.00 54,790.00 98,540.00

7.28 1 M2 Pasang Bekisting Untuk Dinding


a. Bahan
0.030 M3 Kayu Kls. IV 1,500,000.00 45,000.00 45,000.00
0.400 Kg Paku Biasa 2"- 5" 15,000.00 6,000.00 6,000.00
0.020 M3 Balok Kayu Kls.IV 1,500,000.00 30,000.00 30,000.00
3.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 24,000.00 24,000.00
4.000 Bh Formtie / Penjaga Jarak Bekisting / Spacer - - -
105,000.00 105,000.00
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.330 Oh Tukang Kayu 90,000.00 29,700.00 29,700.00
0.033 Oh Kepala Tukang 110,000.00 3,630.00 3,630.00
0.006 Oh Mandor 110,000.00 660.00 660.00
54,790.00 54,790.00
Jumlah 105,000.00 54,790.00 159,790.00
7.29 1 M2 Pasang Bekisting Untuk Tangga
a. Bahan
0.030 M3 Kayu Kls. IV 1,500,000.00 45,000.00 45,000.00
0.400 Kg Paku Biasa 2"- 5" 15,000.00 6,000.00 6,000.00
0.015 M3 Balok Kayu Kls. IV 1,500,000.00 22,500.00 22,500.00
2.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 16,000.00 16,000.00
89,500.00 89,500.00

- 46 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.330 Oh Tukang Kayu 90,000.00 29,700.00 29,700.00
0.033 Oh Kepala Tukang 110,000.00 3,630.00 3,630.00
0.006 Oh Mandor 110,000.00 660.00 660.00
54,790.00 54,790.00
Jumlah 89,500.00 54,790.00 144,290.00
7.30 1 M3 Beton Ready Mix K 175 dengan pengangkutan
a. Bahan
1.020 M3 Beton Ready Mix K 175 850,000.00 867,000.00 867,000.00
867,000.00 867,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
1.000 Ls Pengangkutan dan mobilisasi mobil Pick up 15,583.33 15,583.33 15,583.33
166,269.70 166,269.70

Jumlah 867,000.00 166,269.70 1,033,269.70

7.31 1 M Beton Ready Mix K 175 tanpa pengangkutan


3

a. Bahan
1.020 M3 Beton Ready Mix K 175 850,000.00 867,000.00 867,000.00
867,000.00 867,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37
Jumlah 867,000.00 150,686.37 1,017,686.37

7.32 1 M3 Beton Ready Mix K 225 dengan pengangkutan


a. Bahan
1.020 M3 Beton Ready Mix K 225 900,000.00 918,000.00 918,000.00
918,000.00 918,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
1.000 Ls Pengangkutan dan mobilisasi mobil Pick up 15,583.33 15,583.33 15,583.33
166,269.70 166,269.70
Jumlah 918,000.00 166,269.70 1,084,269.70

7.33 1 M Beton Ready Mix K 225 tanpa pengangkutan


3

a. Bahan
1.020 M3 Beton Ready Mix K 225 900,000.00 918,000.00 918,000.00
918,000.00 918,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37

Jumlah 918,000.00 150,686.37 1,068,686.37

7.34 1 M3 Beton Ready Mix K 250 dengan pengangkutan


a. Bahan
1.020 M3 Beton Ready Mix K 250 950,000.00 969,000.00 969,000.00
969,000.00 969,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
1.000 Ls Pengangkutan dan mobilisasi mobil Pick up 15,583.33 15,583.33 15,583.33
166,269.70 166,269.70
Jumlah 969,000.00 166,269.70 1,135,269.70
7.35 1 M3 Beton Ready Mix K 250 tanpa pengangkutan
a. Bahan
1.020 M3 Beton Ready Mix K 250 950,000.00 969,000.00 969,000.00
969,000.00 969,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37
Jumlah 969,000.00 150,686.37 1,119,686.37

- 47 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
7.36 1 M3 Beton Ready Mix K 275 dengan pengangkutan
a. Bahan
1.020 M3 Beton Ready Mix K 275 1,000,000.00 1,020,000.00 1,020,000.00
1,020,000.00 1,020,000.00

b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
1.000 Ls Pengangkutan dan mobilisasi mobil Pick up 15,583.33 15,583.33 15,583.33
166,269.70 166,269.70
Jumlah 1,020,000.00 166,269.70 1,186,269.70

7.37 1 M3 Beton Ready Mix K 275 tanpa pengangkutan


a. Bahan
1.020 M3 Beton Ready Mix K 275 1,000,000.00 1,020,000.00 1,020,000.00
1,020,000.00 1,020,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37

Jumlah 1,020,000.00 150,686.37 1,170,686.37

7.38 1 M3 Beton Ready Mix K 300 dengan pengangkutan


a. Bahan
1.020 M3 Beton Ready Mix K 300 1,050,000.00 1,071,000.00 1,071,000.00
1,071,000.00 1,071,000.00

b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
1.000 Ls Pengangkutan dan mobilisasi mobil Pick up 15,583.33 15,583.33 15,583.33
166,269.70 166,269.70
Jumlah 1,071,000.00 166,269.70 1,237,269.70

7.39 1 M3 Beton Ready Mix K 300 tanpa pengangkutan


a. Bahan
1.020 M3 Beton Ready Mix K 300 1,050,000.00 1,071,000.00 1,071,000.00
1,071,000.00 1,071,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37

Jumlah 1,071,000.00 150,686.37 1,221,686.37

7.40 1 M Beton Ready Mix K 350 dengan pengangkutan


3

a. Bahan
1.020 M3 Beton Ready Mix K 350 1,100,000.00 1,122,000.00 1,122,000.00
1,122,000.00 1,122,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
1.000 Ls Pengangkutan dan mobilisasi mobil Pick up 15,583.33 15,583.33 15,583.33
166,269.70 166,269.70
Jumlah 1,122,000.00 166,269.70 1,288,269.70

7.41 1 M3 Beton Ready Mix K 350 tanpa pengangkutan


a. Bahan
1.020 M3 Beton Ready Mix K 350 1,100,000.00 1,122,000.00 1,122,000.00
1,122,000.00 1,122,000.00

b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37
Jumlah 1,122,000.00 150,686.37 1,272,686.37

- 48 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
7.42 1 M' Pasang Kayu Mal Bekisting untuk Beton Ready Mix jalan
a. Bahan
0.500 Kpg Papan Kayu Kls. IV 16,500.00 8,250.00 8,250.00
0.200 Kg Paku Biasa 2"- 5" 15,000.00 3,000.00 3,000.00
0.009 M3 Balok Kayu Kls. IV 1,500,000.00 13,500.00 13,500.00
24,750.00 24,750.00

b. Tenaga
0.160 Oh Pekerja 65,000.00 10,400.00 10,400.00
0.165 Oh Tukang Kayu 90,000.00 14,850.00 14,850.00
0.017 Oh Kepala Tukang 110,000.00 1,815.00 1,815.00
0.003 Oh Mandor 110,000.00 330.00 330.00
27,395.00 27,395.00

Jumlah 24,750.00 27,395.00 52,145.00


7.43 1 M3 Membuat Beton dengan Mutu K 225
a. Bahan
388.000 Kg Semen Portland 1,250.00 485,000.00 485,000.00
0.650 M3 Pasir Beton 92,500.00 60,125.00 60,125.00
0.650 M3 Koral Beton 421,683.00 274,093.95 274,093.95
819,218.95 819,218.95
b. Tenaga
6.000 Oh Pekerja 65,000.00 390,000.00 390,000.00
1.000 Oh Tukang Batu 90,000.00 0.17 90,000.00 90,000.00
0.100 Oh Kepala Tukang 110,000.00 0.02 11,000.00 11,000.00
0.300 Oh Mandor 110,000.00 0.05 33,000.00 33,000.00
524,000.00 524,000.00

Jumlah 819,218.95 524,000.00 1,343,218.95

7.44 1 M3 Membuat Beton dengan Mutu K 275


a. Bahan
400.000 Kg Semen Portland 1,250.00 500,000.00 500,000.00
0.400 M3 Pasir Beton 92,500.00 37,000.00 37,000.00
0.820 M3 Koral Beton 421,683.00 345,780.06 345,780.06
882,780.06 882,780.06
b. Tenaga
6.000 Oh Pekerja 65,000.00 390,000.00 390,000.00
1.000 Oh Tukang Batu 90,000.00 90,000.00 90,000.00
0.100 Oh Kepala Tukang 110,000.00 11,000.00 11,000.00
0.300 Oh Mandor 110,000.00 33,000.00 33,000.00
524,000.00 524,000.00

Jumlah 882,780.06 524,000.00 1,406,780.06

7.45 1 M2 Pasang Jembatan Cor


a. Bahan
0.026 M3 Kayu Kls. IV 1,500,000.00 39,600.00 39,600.00
0.600 Kg Paku Biasa 2"- 5" 15,000.00 9,000.00 9,000.00
0.500 Btg Kayu Gelam dia. 6-8 cm 8,000.00 4,000.00 4,000.00
52,600.00 52,600.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.050 Oh Tukang Kayu 90,000.00 4,500.00 4,500.00
0.005 Oh Kepala Tukang 110,000.00 550.00 550.00
0.007 Oh Mandor 110,000.00 770.00 770.00
15,570.00 15,570.00

Jumlah 52,600.00 15,570.00 68,170.00

7.46 1 M3 Membuat Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting )


a. Bahan
0.200 M3 Kayu Kls. IV 1,500,000.00 300,000.00 300,000.00
1.500 Kg Paku Biasa 2"- 5" 15,000.00 22,500.00 22,500.00
150.000 Kg Besi Beton Polos 19,000.00 2,850,000.00 2,850,000.00
2.250 Kg Kawat Beton 18,000.00 40,500.00 40,500.00
323.000 Kg Semen Portland 1,250.00 403,750.00 403,750.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
3,993,762.74 3,993,762.74

b. Tenaga
3.900 Oh Pekerja 65,000.00 253,500.00 253,500.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
1.040 Oh Tukang Kayu 90,000.00 93,600.00 93,600.00
1.050 Oh Tukang Besi 90,000.00 94,500.00 94,500.00
0.245 Oh Kepala Tukang 110,000.00 26,950.00 26,950.00
0.165 Oh Mandor 110,000.00 18,150.00 18,150.00
518,200.00 518,200.00

Jumlah 3,993,762.74 518,200.00 4,511,962.74

7.47 1 M3 Membuat Sloof Beton Bertulang ( 100 Kg Besi + Bekisting )

- 49 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
a. Bahan
0.270 M3 Kayu Kls. IV 1,500,000.00 405,000.00 405,000.00
2.000 Kg Paku Biasa 2"- 5" 15,000.00 30,000.00 30,000.00
100.000 Kg Besi Beton Polos 19,000.00 1,900,000.00 1,900,000.00
3.000 Kg Kawat Beton 18,000.00 54,000.00 54,000.00
323.000 Kg Semen Portland 1,250.00 403,750.00 403,750.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
3,169,762.74 3,169,762.74
b. Tenaga
4.850 Oh Pekerja 65,000.00 315,250.00 315,250.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
1.560 Oh Tukang Kayu 90,000.00 140,400.00 140,400.00
1.400 Oh Tukang Besi 90,000.00 126,000.00 126,000.00
0.331 Oh Kepala Tukang 110,000.00 36,410.00 36,410.00
0.170 Oh Mandor 110,000.00 18,700.00 18,700.00
668,260.00 668,260.00
Jumlah 3,169,762.74 668,260.00 3,838,022.74
7.48 1 M3 Membuat Kolom Beton Bertulang ( 300 Kg Besi + Bekisting )
a. Bahan
0.400 M3 Kayu Kls. IV 1,500,000.00 600,000.00 600,000.00
4.000 Kg Paku Biasa 2"- 5" 15,000.00 60,000.00 60,000.00
300.000 Kg Besi Beton Polos 19,000.00 5,700,000.00 5,700,000.00
4.500 Kg Kawat Beton 18,000.00 81,000.00 81,000.00
323.000 Kg Semen Portland 1,250.00 403,750.00 403,750.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
0.150 M3 Kayu Balok Kls. IV 1,500,000.00 225,000.00 225,000.00
20.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 160,000.00 160,000.00
b. Tenaga 7,606,762.74 7,606,762.74
7.300 Oh Pekerja 65,000.00 474,500.00 474,500.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
3.300 Oh Tukang Kayu 90,000.00 297,000.00 297,000.00
2.100 Oh Tukang Besi 90,000.00 189,000.00 189,000.00
0.570 Oh Kepala Tukang 110,000.00 62,700.00 62,700.00
0.250 Oh Mandor 110,000.00 27,500.00 27,500.00
1,082,200.00 1,082,200.00
Jumlah 7,606,762.74 1,082,200.00 8,688,962.74
7.49 1 M3 Membuat Kolom Beton Bertulang ( 200 Kg Besi + Bekisting )
a. Bahan
0.400 M3 Kayu Kls. IV 1,500,000.00 600,000.00 600,000.00
4.000 Kg Paku Biasa 2"- 5" 15,000.00 60,000.00 60,000.00
200.000 Kg Besi Beton Polos 19,000.00 3,800,000.00 3,800,000.00
4.500 Kg Kawat Beton 18,000.00 81,000.00 81,000.00
232.000 Kg Semen Portland 1,250.00 290,000.00 290,000.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
0.150 M3 Kayu Balok Kls. IV 1,500,000.00 225,000.00 225,000.00
20.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 160,000.00 160,000.00
5,593,012.74 5,593,012.74
b. Tenaga
7.300 Oh Pekerja 65,000.00 474,500.00 474,500.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
3.300 Oh Tukang Kayu 90,000.00 297,000.00 297,000.00
2.100 Oh Tukang Besi 90,000.00 189,000.00 189,000.00
0.570 Oh Kepala Tukang 110,000.00 62,700.00 62,700.00
0.250 Oh Mandor 110,000.00 27,500.00 27,500.00
1,082,200.00 1,082,200.00
Jumlah 5,593,012.74 1,082,200.00 6,675,212.74
7.50 1 M3 Membuat Kolom Beton Bertulang ( 100 Kg Besi + Bekisting )
a. Bahan
0.400 M3 Kayu Kls. IV 1,500,000.00 600,000.00 600,000.00
4.000 Kg Paku Biasa 2"- 5" 15,000.00 60,000.00 60,000.00
100.000 Kg Besi Beton Polos 19,000.00 1,900,000.00 1,900,000.00
4.500 Kg Kawat Beton 18,000.00 81,000.00 81,000.00
232.000 Kg Semen Portland 1,250.00 290,000.00 290,000.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
0.150 M3 Kayu Balok Kls. IV 1,500,000.00 225,000.00 225,000.00
20.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 160,000.00 160,000.00
3,693,012.74 3,693,012.74
b. Tenaga
7.300 Oh Pekerja 65,000.00 474,500.00 474,500.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
3.300 Oh Tukang Kayu 90,000.00 297,000.00 297,000.00
2.100 Oh Tukang Besi 90,000.00 189,000.00 189,000.00
0.570 Oh Kepala Tukang 110,000.00 62,700.00 62,700.00
0.250 Oh Mandor 110,000.00 27,500.00 27,500.00
1,082,200.00 1,082,200.00
Jumlah 3,693,012.74 1,082,200.00 4,775,212.74

- 50 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

7.51 1 M3 Membuat Balok Beton Bertulang ( 200 Kg Besi + Bekisting )


a. Bahan
0.320 M3 Kayu Kls. IV 1,500,000.00 480,000.00 480,000.00
3.200 Kg Paku Biasa 2"- 5" 15,000.00 48,000.00 48,000.00
200.000 Kg Besi Beton Polos 19,000.00 3,800,000.00 3,800,000.00
3.000 Kg Kawat Beton 18,000.00 54,000.00 54,000.00
232.000 Kg Semen Portland 1,250.00 290,000.00 290,000.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
0.140 M3 Kayu Balok Kls. IV 1,500,000.00 210,000.00 210,000.00
16.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 128,000.00 128,000.00
5,387,012.74 5,387,012.74
b. Tenaga
5.960 Oh Pekerja 65,000.00 387,400.00 387,400.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
2.800 Oh Tukang Kayu 90,000.00 252,000.00 252,000.00
1.400 Oh Tukang Besi 90,000.00 126,000.00 126,000.00
0.455 Oh Kepala Tukang 110,000.00 50,050.00 50,050.00
0.208 Oh Mandor 110,000.00 22,880.00 22,880.00
869,830.00 869,830.00
Jumlah 5,387,012.74 869,830.00 6,256,842.74

7.52 1 M3 Membuat Balok Beton Bertulang ( 150 Kg Besi + Bekisting )


a. Bahan
0.320 M3 Kayu Kls. IV 1,500,000.00 480,000.00 480,000.00
3.200 Kg Paku Biasa 2"- 5" 15,000.00 48,000.00 48,000.00
150.000 Kg Besi Beton Polos 19,000.00 2,850,000.00 2,850,000.00
2.250 Kg Kawat Beton 18,000.00 40,500.00 40,500.00
232.000 Kg Semen Portland 1,250.00 290,000.00 290,000.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
0.120 M3 Kayu Balok Kls. IV 1,500,000.00 180,000.00 180,000.00
32.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 256,000.00 256,000.00
4,521,512.74 4,521,512.74
b. Tenaga
5.800 Oh Pekerja 65,000.00 377,000.00 377,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
2.800 Oh Tukang Kayu 90,000.00 252,000.00 252,000.00
1.050 Oh Tukang Besi 90,000.00 94,500.00 94,500.00
0.420 Oh Kepala Tukang 110,000.00 46,200.00 46,200.00
0.185 Oh Mandor 110,000.00 20,350.00 20,350.00
821,550.00 821,550.00
Jumlah 4,521,512.74 821,550.00 5,343,062.74

7.53 1 M3 Membuat Balok Beton Bertulang ( 100 Kg Besi + Bekisting )


a. Bahan
0.320 M3 Kayu Kls. IV 1,500,000.00 480,000.00 480,000.00
3.200 Kg Paku Biasa 2"- 5" 15,000.00 48,000.00 48,000.00
110.000 Kg Besi Beton Polos 19,000.00 2,090,000.00 2,090,000.00
2.250 Kg Kawat Beton 18,000.00 40,500.00 40,500.00
232.000 Kg Semen Portland 1,250.00 290,000.00 290,000.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
0.120 M3 Kayu Balok Kls. IV 1,500,000.00 180,000.00 180,000.00
32.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 256,000.00 256,000.00
3,761,512.74 3,761,512.74
b. Tenaga
5.800 Oh Pekerja 65,000.00 377,000.00 377,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
2.800 Oh Tukang Kayu 90,000.00 252,000.00 252,000.00
1.050 Oh Tukang Besi 90,000.00 94,500.00 94,500.00
0.420 Oh Kepala Tukang 110,000.00 46,200.00 46,200.00
0.185 Oh Mandor 110,000.00 20,350.00 20,350.00
821,550.00 821,550.00

Jumlah 3,761,512.74 821,550.00 4,583,062.74

7.54 1 M3 Membuat Dinding Beton Bertulang ( 150 Kg Besi + Bekisting )


a. Bahan
0.240 M3 Kayu Kls. IV 1,500,000.00 360,000.00 360,000.00
3.200 Kg Paku Biasa 2"- 5" 15,000.00 48,000.00 48,000.00
150.000 Kg Besi Beton Polos 19,000.00 2,850,000.00 2,850,000.00
2.250 Kg Kawat Beton 18,000.00 40,500.00 40,500.00
232.000 Kg Semen Portland 1,250.00 290,000.00 290,000.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
0.160 M3 Kayu Balok Kls. IV 1,500,000.00 240,000.00 240,000.00
24.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 192,000.00 192,000.00
4,397,512.74 4,397,512.74

- 51 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
5.600 Oh Pekerja 65,000.00 364,000.00 364,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
2.640 Oh Tukang Kayu 90,000.00 237,600.00 237,600.00
1.050 Oh Tukang Besi 90,000.00 94,500.00 94,500.00
0.400 Oh Kepala Tukang 110,000.00 44,000.00 44,000.00
0.193 Oh Mandor 110,000.00 21,230.00 21,230.00
792,830.00 792,830.00
Jumlah 4,397,512.74 792,830.00 5,190,342.74

7.55 1 M3 Membuat 1/2 Dinding Beton Bertulang ( 100 Kg Besi + Bekisting)


a. Bahan
0.120 M3 Kayu Kls. IV 1,500,000.00 180,000.00 180,000.00
3.200 Kg Paku Biasa 2"- 5" 15,000.00 48,000.00 48,000.00
100.000 Kg Besi Beton Polos 19,000.00 1,900,000.00 1,900,000.00
1.250 Kg Kawat Beton 18,000.00 22,500.00 22,500.00
232.000 Kg Semen Portland 1,250.00 290,000.00 290,000.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
2,817,512.74 2,817,512.74
b. Tenaga
5.600 Oh Pekerja 83,000.00 464,800.00 464,800.00
0.350 Oh Tukang Batu 43,000.00 15,050.00 15,050.00
2.640 Oh Tukang Kayu 43,000.00 113,520.00 113,520.00
1.050 Oh Tukang Besi 43,000.00 45,150.00 45,150.00
0.400 Oh Kepala Tukang 6,500.00 2,600.00 2,600.00
0.193 Oh Mandor 60,000.00 11,580.00 11,580.00
652,700.00 652,700.00
Jumlah 2,817,512.74 652,700.00 3,470,212.74
7.56 1 M3 Membuat Tangga Beton Bertulang ( 200 Kg Besi + Bekisting )
a. Bahan
0.250 M3 Kayu Kls. IV 1,500,000.00 375,000.00 375,000.00
3.000 Kg Paku Biasa 2"- 5" 15,000.00 45,000.00 45,000.00
200.000 Kg Besi Beton Polos 19,000.00 3,800,000.00 3,800,000.00
3.000 Kg Kawat Beton 18,000.00 54,000.00 54,000.00
232.000 Kg Semen Portland 1,250.00 290,000.00 290,000.00
0.520 M3 Pasir Beton 92,500.00 48,100.00 48,100.00
0.780 M3 Koral Beton 421,683.00 328,912.74 328,912.74
0.105 M3 Kayu Balok Kls. IV 1,500,000.00 157,500.00 157,500.00
14.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 112,000.00 112,000.00
5,210,512.74 5,210,512.74
b. Tenaga
5.600 Oh Pekerja 65,000.00 364,000.00 364,000.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
2.300 Oh Tukang Kayu 90,000.00 207,000.00 207,000.00
1.400 Oh Tukang Besi 90,000.00 126,000.00 126,000.00
0.405 Oh Kepala Tukang 110,000.00 44,550.00 44,550.00
0.202 Oh Mandor 110,000.00 22,220.00 22,220.00
795,270.00 795,270.00
Jumlah 5,210,512.74 795,270.00 6,005,782.74

7.57 1 M' Membuat Kolom Penguat Beton Bertulang (11x11)cm + bekisting (kolom praktis)
a. Bahan
0.002 M3 Kayu Kls. IV 1,500,000.00 3,000.00 3,000.00
0.010 Kg Paku Biasa 2"- 5" 15,000.00 150.00 150.00
3.000 Kg Besi Beton Polos 19,000.00 57,000.00 57,000.00
0.450 Kg Kawat Beton 18,000.00 8,100.00 8,100.00
4.000 Kg Semen Portland 1,250.00 5,000.00 5,000.00
0.006 M Pasir Beton
3
92,500.00 555.00 555.00
0.009 M3 Koral Beton 421,683.00 3,795.15 3,795.15
77,600.15 77,600.15
b. Tenaga
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.020 Oh Tukang Batu 90,000.00 1,800.00 1,800.00
0.020 Oh Tukang Kayu 90,000.00 1,800.00 1,800.00
0.020 Oh Tukang Besi 90,000.00 1,800.00 1,800.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.003 Oh Mandor 110,000.00 330.00 330.00
10,290.00 10,290.00
Jumlah 77,600.15 10,290.00 87,890.15
7.58 1 M' Membuat Ring Balok Beton Bertulang ( 10 x 15 ) cm
a. Bahan
0.003 M3 Kayu Kls. IV 1,500,000.00 4,500.00 4,500.00
0.020 Kg Paku Biasa 2"- 5" 15,000.00 300.00 300.00
3.600 Kg Besi Beton Polos 19,000.00 68,400.00 68,400.00
0.050 Kg Kawat Beton 18,000.00 900.00 900.00
5.500 Kg Semen Portland 1,250.00 6,875.00 6,875.00
0.009 M3 Pasir Beton 92,500.00 832.50 832.50
0.015 M3 Koral Beton 421,683.00 6,325.25 6,325.25
88,132.75 88,132.75

- 52 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.033 Oh Tukang Batu 90,000.00 2,970.00 2,970.00
0.033 Oh Tukang Kayu 90,000.00 2,970.00 2,970.00
0.033 Oh Tukang Besi 90,000.00 2,970.00 2,970.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.005 Oh Mandor 110,000.00 550.00 550.00
17,060.00 17,060.00
Jumlah 88,132.75 17,060.00 105,192.75

7.59 1 M2 Pasang Bekisting Untuk Lantai, plat dak dengan plywood 4 mm


a. Bahan
0.040 M3 Kayu Kls. IV 1,500,000.00 60,000.00 60,000.00
0.400 Kg Paku Biasa 2"- 5" 15,000.00 6,000.00 6,000.00
0.015 M3 Balok Kayu Kls.IV 1,500,000.00 22,500.00 22,500.00
0.350 Lbr Plywood 4 mm 68,000.00 23,800.00 23,800.00
6.000 Btg Kayu Gelam dia. 6-8 cm 8,000.00 48,000.00 48,000.00
160,300.00 160,300.00

b. Tenaga
0.320 Oh Pekerja 65,000.00 20,800.00 20,800.00
0.330 Oh Tukang Batu 90,000.00 29,700.00 29,700.00
0.033 Oh Kepala Tukang 110,000.00 3,630.00 3,630.00
0.006 Oh Mandor 110,000.00 660.00 660.00
54,790.00 54,790.00

Jumlah 160,300.00 54,790.00 215,090.00

7.60 1 M3 Beton Ready Mix K-175 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai)
a. Bahan
1.020 M3 Beton Ready Mix K-175 850,000.00 867,000.00 867,000.00
867,000.00 867,000.00

b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
0.167 M3 Concrete Pump 114,560.00 19,093.72 19,093.72
169,780.09 169,780.09
Jumlah 867,000.00 169,780.09 1,036,780.09

7.61 1 M3 Beton Ready Mix K-175 untuk Kolom, Balok, Plat Lantai, tangga tanpa Concrete Pump (belalai)
a. Bahan
1.020 M3 Beton Ready Mix K-175 850,000.00 867,000.00 867,000.00
867,000.00 867,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37
Jumlah 867,000.00 150,686.37 1,017,686.37

7.62 1 M Beton Ready Mix K-225 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai)
3

a. Bahan
1.020 M3 Beton Ready Mix K-225 900,000.00 918,000.00 918,000.00
918,000.00 918,000.00

b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
0.167 M3 Concrete Pump 114,560.00 19,093.72 19,093.72
169,780.09 169,780.09
Jumlah 918,000.00 169,780.09 1,087,780.09

7.63 1 M3 Beton Ready Mix K-225 untuk Kolom, Balok, Plat Lantai, tangga tanpa Concrete Pump (belalai)
a. Bahan
1.020 M3 Beton Ready Mix K-225 900,000.00 918,000.00 918,000.00
918,000.00 918,000.00
b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
150,686.37 150,686.37

Jumlah 918,000.00 150,686.37 1,068,686.37

- 53 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
7.64 1 M3 Beton Ready Mix K-275 untuk Kolom, Balok, Plat Lantai, tangga dengan Concrete Pump (belalai)
a. Bahan
1.020 M3 Beton Ready Mix K-275 1,000,000.00 1,020,000.00 1,020,000.00
1,020,000.00 1,020,000.00

b. Tenaga
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.167 Oh Tukang batu 90,000.00 15,003.00 15,003.00
0.002 Oh Kepala Tukang 110,000.00 183.37 183.37
0.050 Oh Mandor 110,000.00 5,500.00 5,500.00
0.167 M3 Concrete Pump 114,560.00 19,093.72 19,093.72
169,780.09 169,780.09
Jumlah 1,020,000.00 169,780.09 1,189,780.09
VIII PEKERJAAN PENUTUP ATAP

8.1 1 M2 Pasang Atap Genteng Kodok


a. Bahan
25.000 Bh Genteng Kodok 1,000.00 25,000.00 25,000.00
25,000.00 25,000.00

b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.075 Oh Tukang Kayu 90,000.00 6,750.00 6,750.00
0.008 Oh Kepala Tukang 110,000.00 880.00 880.00
0.008 Oh Mandor 110,000.00 880.00 880.00
18,260.00 18,260.00
Jumlah 25,000.00 18,260.00 43,260.00

8.2 1 M2 Pasang Atap Genteng keramik biasa bergalzur


a. Bahan
18.000 Bh Genteng Keramik biasa/lokal 8,000.00 144,000.00 144,000.00
144,000.00 144,000.00

b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.075 Oh Tukang Kayu 90,000.00 6,750.00 6,750.00
0.008 Oh Kepala Tukang 110,000.00 880.00 880.00
0.008 Oh Mandor 110,000.00 880.00 880.00
18,260.00 18,260.00

Jumlah 144,000.00 18,260.00 162,260.00

8.3 1 M2 Pasang Atap Genteng keramik KIA Natural / sejenis


a. Bahan
15.000 Bh Genteng Keramik KIA Natural atau sejenis 12,000.00 180,000.00 180,000.00
180,000.00 180,000.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.075 Oh Tukang Kayu 90,000.00 6,750.00 6,750.00
0.008 Oh Kepala Tukang 110,000.00 880.00 880.00
0.008 Oh Mandor 110,000.00 880.00 880.00
18,260.00 18,260.00
Jumlah 180,000.00 18,260.00 198,260.00

8.4 1 M2 Pasang Atap Genteng keramik KIA Berwarna / sejenis


a. Bahan
15.000 Bh Genteng Keramik KIA Warna atau sejenis 17,000.00 255,000.00 255,000.00
255,000.00 255,000.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.075 Oh Tukang Kayu 90,000.00 6,750.00 6,750.00
0.008 Oh Kepala Tukang 110,000.00 880.00 880.00
0.008 Oh Mandor 110,000.00 880.00 880.00
18,260.00 18,260.00
Jumlah 255,000.00 18,260.00 273,260.00

8.5 1 M' Pasang Bubung Genteng Kodok


a. Bahan
5.000 Bh Genteng Bubung Kodok 4,000.00 20,000.00 20,000.00
8.000 Kg Semen Portland 1,250.00 10,000.00 10,000.00
0.032 M3 Pasir Pasang 92,500.00 2,960.00 2,960.00
32,960.00 32,960.00
b. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.002 Oh Mandor 110,000.00 220.00 220.00
46,420.00 46,420.00

Jumlah 32,960.00 46,420.00 79,380.00

- 54 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
8.6 1 M' Pasang Bubung Genteng Keramik biasa berglazzur
a. Bahan
4.000 Bh Genteng Bubung Keramik lokal 10,000.00 40,000.00 40,000.00
8.000 Kg Semen Portland 1,250.00 10,000.00 10,000.00
0.032 M3 Pasir Pasang 92,500.00 2,960.00 2,960.00
52,960.00 52,960.00

b. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.002 Oh Mandor 110,000.00 220.00 220.00
46,420.00 46,420.00
Jumlah 52,960.00 46,420.00 99,380.00

8.7 1 M' Pasang Bubung Genteng Keramik KIA Natural atau sejenis
a. Bahan
3.000 Bh Genteng Bubung Keramik KIA Natural atau sejenis 20,000.00 60,000.00 60,000.00
8.000 Kg Semen Portland 1,250.00 10,000.00 10,000.00
0.032 M3 Pasir Pasang 92,500.00 2,960.00 2,960.00
72,960.00 72,960.00

b. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.002 Oh Mandor 110,000.00 220.00 220.00
46,420.00 46,420.00
Jumlah 72,960.00 46,420.00 119,380.00

8.8 1 M' Pasang Bubung Genteng Keramik KIA Warna atau sejenis
a. Bahan
3.000 Bh Genteng Bubung Keramik KIA Warna atau sejenis 25,000.00 75,000.00 75,000.00
8.000 Kg Semen Portland 1,250.00 10,000.00 10,000.00
0.032 M3 Pasir Pasang 92,500.00 2,960.00 2,960.00
87,960.00 87,960.00

b. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.002 Oh Mandor 110,000.00 220.00 220.00
46,420.00 46,420.00

Jumlah 87,960.00 46,420.00 134,380.00

8.9 1 M Pasang Roof Light Fibreglass Polycarbon


2

a. Bahan
1.000 M2 Fiber warna Polycarbon 80,000.00 80,000.00 80,000.00
0.050 Kg Paku Biasa 1/2" - 1" 18,000.00 900.00 900.00
80,900.00 80,900.00

b. Tenaga
0.140 Oh Pekerja 65,000.00 9,100.00 9,100.00
0.067 Oh Tukang Kayu 90,000.00 6,030.00 6,030.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.007 Oh Mandor 110,000.00 770.00 770.00
16,670.00 16,670.00

Jumlah 80,900.00 16,670.00 97,570.00

8.10 1 M Pasang Atap Asbes Gelombang kecil lbr 0,8 tbl 4 mm


2

a. Bahan
1.100 M2 Asbes Gelombang kecil lebar 80 cm 25,000.00 27,500.00 27,500.00
0.120 Kg Paku Pancing 22,000.00 2,640.00 2,640.00
30,140.00 30,140.00

b. Tenaga
0.140 Oh Pekerja 65,000.00 9,100.00 9,100.00
0.067 Oh Tukang Kayu 90,000.00 6,030.00 6,030.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.007 Oh Mandor 110,000.00 770.00 770.00
16,670.00 16,670.00
Jumlah 30,140.00 16,670.00 46,810.00

8.11 1 M2 Pasang Atap Asbes Gelombang kecil lbr 1,05 tbl 4 mm


a. Bahan
1.100 M2 Asbes Gelombang kecil lebar 105 cm 32,000.00 35,200.00 35,200.00
0.120 Kg Paku Pancing 22,000.00 2,640.00 2,640.00
37,840.00 37,840.00

- 55 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.140 Oh Pekerja 65,000.00 9,100.00 9,100.00
0.067 Oh Tukang Kayu 90,000.00 6,030.00 6,030.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.007 Oh Mandor 110,000.00 770.00 770.00
16,670.00 16,670.00

Jumlah 37,840.00 16,670.00 54,510.00


8.12 1 M2 Pasang Atap Onduline
a. Bahan
1.100 M2 Onduline gel. 75 X 200 cm 58,500.00 64,350.00 64,350.00
0.120 Kg Paku Pancing 22,000.00 2,640.00 2,640.00
66,990.00 66,990.00

b. Tenaga
0.140 Oh Pekerja 65,000.00 9,100.00 9,100.00
0.067 Oh Tukang Kayu 90,000.00 6,030.00 6,030.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.007 Oh Mandor 110,000.00 770.00 770.00
16,670.00 16,670.00

Jumlah 66,990.00 16,670.00 83,660.00

8.13 1 M2 Pasang Atap Asbes Gelombang besar lbr 1,05 tbl 4 mm


a. Bahan
1.100 M2 Asbes Gelombang besar lebar 105 cm 35,000.00 38,500.00 38,500.00
0.120 Kg Paku Pancing 22,000.00 2,640.00 2,640.00
41,140.00 41,140.00

b. Tenaga
0.140 Oh Pekerja 65,000.00 9,100.00 9,100.00
0.067 Oh Tukang Kayu 90,000.00 6,030.00 6,030.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.007 Oh Mandor 110,000.00 770.00 770.00
16,670.00 16,670.00
Jumlah 41,140.00 16,670.00 57,810.00

8.14 1 M' Pasang Bubung/nok Asbes Gelombang kecil


a. Bahan
1.100 M' Bubung Asbes Gelombang Kecil 23,500.00 25,850.00 25,850.00
6.000 Bh Paku Asbes 600.00 3,600.00 3,600.00
29,450.00 29,450.00

b. Tenaga
0.084 Oh Pekerja 65,000.00 5,460.00 5,460.00
0.125 Oh Tukang Kayu 90,000.00 11,250.00 11,250.00
0.013 Oh Kepala Tukang 110,000.00 1,430.00 1,430.00
0.004 Oh Mandor 110,000.00 440.00 440.00
18,580.00 18,580.00
Jumlah 29,450.00 18,580.00 48,030.00

8.15 1 M' Pasang Bubung/Nok Asbes Gelombang besar


a. Bahan
1.100 M' Bubung Asbes Gelombang Besar 24,000.00 26,400.00 26,400.00
6.000 Bh Paku Asbes 600.00 3,600.00 3,600.00
30,000.00 30,000.00

b. Tenaga
0.084 Oh Pekerja 65,000.00 5,460.00 5,460.00
0.125 Oh Tukang Kayu 90,000.00 11,250.00 11,250.00
0.013 Oh Kepala Tukang 110,000.00 1,430.00 1,430.00
0.004 Oh Mandor 110,000.00 440.00 440.00
18,580.00 18,580.00
Jumlah 30,000.00 18,580.00 48,580.00

8.16 1 M2 Pasang Atap Beton Cisangkan


a. Bahan
17.000 Bh Genteng Beton Cisangkan 7,500.00 127,500.00 127,500.00
0.030 Kg Paku Biasa 2" - 5" 15,000.00 450.00 450.00
127,950.00 127,950.00

b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
24,200.00 24,200.00

Jumlah 127,950.00 24,200.00 152,150.00

- 56 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
8.17 1 M2 Pasang Atap Genteng Beton
a. Bahan
11.000 Bh Genteng Beton 5,700.00 62,700.00 62,700.00
0.030 Kg Paku Biasa 2" - 5" 15,000.00 450.00 450.00
63,150.00 63,150.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
24,200.00 24,200.00
Jumlah 63,150.00 24,200.00 87,350.00

8.18 1 M2 Pasang Atap Genteng Metal biasa (77 cm X 88 cm)


a. Bahan
1.020 M2 Genteng Metal 32,000.00 32,640.00 32,640.00
0.200 Kg Paku Biasa 2" - 5" 15,000.00 3,000.00 3,000.00
35,640.00 35,640.00

b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 110.00 110.00
23,210.00 23,210.00
Jumlah 35,640.00 23,210.00 58,850.00

8.19 1 M2 Pasang Atap Genteng Metal Zincalume


a. Bahan
1.020 M2 Genteng Metal 160,000.00 163,200.00 163,200.00
0.200 Kg Paku Biasa 2" - 5" 15,000.00 3,000.00 3,000.00
166,200.00 166,200.00

b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 110.00 110.00
23,210.00 23,210.00
Jumlah 166,200.00 23,210.00 189,410.00

8.20 1 M2 Pasang Atap Genteng Metal Zincalume berpasir mutu A


a. Bahan
1.020 M2 Genteng Metal Zincalume berpasir 85,000.00 86,700.00 86,700.00
0.200 Kg Paku Biasa 2" - 5" 15,000.00 3,000.00 3,000.00
89,700.00 89,700.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 110.00 110.00
23,210.00 23,210.00
Jumlah 89,700.00 23,210.00 112,910.00

8.21 1 M Pasang Atap Genteng Metal Warna


2

a. Bahan
1.020 M2 Genteng Metal warna 40,000.00 40,800.00 40,800.00
0.200 Kg Paku Biasa 2" - 5" 15,000.00 3,000.00 3,000.00
43,800.00 43,800.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 110.00 110.00
23,210.00 23,210.00

Jumlah 43,800.00 23,210.00 67,010.00


8.22 1 M2 Pasang Atap Genteng Metal Zincalume berpasir mutu B
a. Bahan
1.020 M2 Genteng Metal Zincalume 60,000.00 61,200.00 61,200.00
berpasir kualitas biasa
0.200 Kg Paku Biasa 2" - 5" 15,000.00 3,000.00 3,000.00
64,200.00 64,200.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 110.00 110.00
23,210.00 23,210.00
Jumlah 64,200.00 23,210.00 87,410.00

- 57 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
8.23 1 M' Pasang Nok Genteng Beton
a. Bahan
3.500 Bh Nok Genteng Beton 6,000.00 21,000.00 21,000.00
0.050 Kg Paku Biasa 2" - 5" 15,000.00 750.00 750.00
10.800 Kg Semen Abu-abu 1,250.00 13,500.00 13,500.00
0.032 M3 Pasir Pasang 92,500.00 2,960.00 2,960.00
1.000 Kg Semen Warna 12,000.00 12,000.00 12,000.00
50,210.00 50,210.00
b. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.020 Oh Mandor 110,000.00 2,200.00 2,200.00
48,400.00 48,400.00
Jumlah 50,210.00 48,400.00 98,610.00

8.24 1 M' Pasang Nok Genteng Beton Cisangkan


a. Bahan
5.000 Bh Nok Genteng Beton 6,100.00 30,500.00 30,500.00
0.050 Kg Paku Biasa 2" - 5" 15,000.00 750.00 750.00
10.800 Kg Semen Abu-abu 1,250.00 13,500.00 13,500.00
0.032 M3 Pasir Pasang 92,500.00 2,960.00 2,960.00
1.000 Kg Semen Warna 12,000.00 12,000.00 12,000.00
59,710.00 59,710.00

b. Tenaga
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.020 Oh Mandor 110,000.00 2,200.00 2,200.00
48,400.00 48,400.00
Jumlah 59,710.00 48,400.00 108,110.00

8.25 1 M Pasang Nok Genteng Metal


'

a. Bahan
1.100 Bh Nok Genteng Metal 30,000.00 33,000.00 33,000.00
0.050 Kg Paku Biasa 1/2" - 1" 18,000.00 900.00 900.00
33,900.00 33,900.00

b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.150 Oh Tukang Kayu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
32,830.00 32,830.00
Jumlah 33,900.00 32,830.00 66,730.00

8.26 1 M2 Pasang Atap Seng Gelombang


a. Bahan
1.020 M2 Seng Gelombang BJLS 7,425.00 7,573.50 7,573.50
0.020 Kg Paku Biasa 1/2" - 1" 18,000.00 360.00 360.00
7,933.50 7,933.50

b. Tenaga
0.120 Oh Pekerja 65,000.00 7,800.00 7,800.00
0.060 Oh Tukang Kayu 90,000.00 5,400.00 5,400.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.006 Oh Mandor 110,000.00 660.00 660.00
14,520.00 14,520.00

Jumlah 7,933.50 14,520.00 22,453.50

8.27 1 M' Pasang Atap Nok Seng


a. Bahan
1.000 M' Seng Plat BJLS 33 cm X 100 cm 13,200.00 13,200.00 13,200.00
0.040 Kg Paku Biasa 1/2" - 1" 18,000.00 720.00 720.00
13,920.00 13,920.00

b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.070 Oh Tukang Kayu 90,000.00 6,300.00 6,300.00
0.008 Oh Kepala Tukang 110,000.00 880.00 880.00
0.006 Oh Mandor 110,000.00 660.00 660.00
17,590.00 17,590.00

Jumlah 13,920.00 17,590.00 31,510.00


8.28 1 M2 Pasang Atap Aluminium
a. Bahan
1.050 M2 Atap Alluminium Gelombang Tebal 0,5 100,000.00 105,000.00 105,000.00
0.020 Kg Paku Hak Panjang 15 cm 45,000.00 900.00 900.00
105,900.00 105,900.00

- 58 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.750 Oh Tukang Kayu 90,000.00 67,500.00 67,500.00
0.008 Oh Kepala Tukang 110,000.00 880.00 880.00
0.006 Oh Mandor 110,000.00 660.00 660.00
78,790.00 78,790.00
Jumlah 105,900.00 78,790.00 184,690.00

8.29 1 M' Pasang Nok Aluminium


a. Bahan
1.200 M' Nok Standar 30,000.00 36,000.00 36,000.00
0.040 Kg Paku Hak Panjang 15 cm 45,000.00 1,800.00 1,800.00
37,800.00 37,800.00

b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
1.000 Oh Tukang Kayu 90,000.00 90,000.00 90,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
98,700.00 98,700.00
Jumlah 37,800.00 98,700.00 136,500.00

8,30 1 M2 Pasang Aluminium Foil / Sisalation


a. Bahan
1.050 M2 Sisalation / Alluminium Foil 18,500.00 19,425.00 19,425.00
19,425.00 19,425.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.050 Oh Tukang Kayu 90,000.00 4,500.00 4,500.00
0.005 Oh Kepala Tukang 110,000.00 550.00 550.00
0.008 Oh Mandor 110,000.00 880.00 880.00
15,680.00 15,680.00
Jumlah 19,425.00 15,680.00 35,105.00

8,31 1 M Gording, Sako, Kitau, Blandar kayu Kelas II


3

(F1) a. Bahan
1.100 M3 Kayu Kelas II 6,500,000.00 7,150,000.00 7,150,000.00
0.250 Kg Paku 15,000.00 3,750.00 3,750.00
7,153,750.00 7,153,750.00
b. Tenaga
15.000 Oh Tukang 90,000.00 1,350,000.00 1,350,000.00
1.500 Oh Kepala Tukang 110,000.00 165,000.00 165,000.00
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.250 Oh Mandor 110,000.00 27,500.00 27,500.00
1,549,000.00 1,549,000.00

Jumlah 7,153,750.00 1,549,000.00 8,702,750.00

8,32 1 M3 Gording, Sako, Kitau, Blandar kayu Kelas III


(F1) a. Bahan
1.100 M3 Kayu Kelas III 3,300,000.00 3,630,000.00 3,630,000.00
0.250 Kg Paku 15,000.00 3,750.00 3,750.00
3,633,750.00 3,633,750.00
b. Tenaga
15.000 Oh Tukang 90,000.00 1,350,000.00 1,350,000.00
1.500 Oh Kepala Tukang 110,000.00 165,000.00 165,000.00
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.250 Oh Mandor 110,000.00 27,500.00 27,500.00
1,549,000.00 1,549,000.00
Jumlah 3,633,750.00 1,549,000.00 5,182,750.00

#VALUE! 1 M2 Rangka Atap baja Ringan "GigaSteel"


a. Bahan
2.100 M' - Hot dipped Galvalume Steel G550-75x33 Z75 (T.075) 22,500.00 47,250.00 47,250.00
1.200 M' - Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) 18,800.00 22,560.00 22,560.00
6.200 M' - Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) 16,300.00 101,060.00 101,060.00
30.000 Bh - Screw / Dynabolt 1,900.00 57,000.00 57,000.00
0.030 M' - Valery Gutter Talang Jurai 125,400.00 3,762.00 3,762.00
0.700 M' - Strap Bracing 12,500.00 8,750.00 8,750.00
1.100 M2 - Alunium Foil Model Karung 18,500.00 20,350.00 20,350.00
260,732.00 260,732.00
b. Tenaga
0.100 Oh Tukang Terampil 90,000.00 9,000.00 9,000.00
0.100 Oh Tukang biasa 65,000.00 6,500.00 6,500.00
0.050 Oh Kepala Tukang 110,000.00 5,500.00 5,500.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
22,100.00 22,100.00

Jumlah 260,732.00 22,100.00 282,832.00

- 59 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
IX PEKERJAAN LANGIT-LANGIT
9.1 1 M2 Langit-langit Asbes/Eternit ( 1,00 x 1,00 ) m, Tebal 2,7 mm
a. Bahan
1.100 Lbr Asbes/Eternit Tebal 2,7 mm 23,000.00 25,300.00 25,300.00
0.010 Kg Paku 18,000.00 180.00 180.00
25,480.00 25,480.00
b. Tenaga
0.030 Oh Pekerja 65,000.00 1,950.00 1,950.00
0.070 Oh Tukang Kayu 90,000.00 6,300.00 6,300.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.002 Oh Mandor 110,000.00 165.00 165.00
9,185.00 9,185.00
Jumlah 25,480.00 9,185.00 34,665.00

9.2 1 M2 Langit-langit Asbes / Eternit ( 1,00 x 1,00 ) m, Tebal 3,5 mm


a. Bahan
1.100 Lbr Asbes / Eternit Tebal 3,5 mm 27,000.00 29,700.00 29,700.00
0.010 Kg Paku 18,000.00 180.00 180.00
29,880.00 29,880.00
b. Tenaga
0.030 Oh Pekerja 65,000.00 1,950.00 1,950.00
0.070 Oh Tukang Kayu 90,000.00 6,300.00 6,300.00
0.007 Oh Kepala Tukang 110,000.00 770.00 770.00
0.002 Oh Mandor 110,000.00 165.00 165.00
9,185.00 9,185.00
Jumlah 29,880.00 9,185.00 39,065.00

9.3 1 M2 Langit-langit Kalsiboard ( 1,20 x 2,40 ) m, Tebal 3,5 mm


a. Bahan
0.360 Kpg Kalsiboard Tebal 3,5 mm 55,000.00 19,800.00 19,800.00
0.010 Kg Paku 18,000.00 180.00 180.00
19,980.00 19,980.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 19,980.00 15,035.00 35,015.00

9.4 1 M2 Langit-langit Kalsiboard ( 1,20 x 2,40 ) m, Tebal 4,5 mm


a. Bahan
0.360 Kpg Kalsiboard Tebal 4,5 mm 58,000.00 20,880.00 20,880.00
0.010 Kg Paku 18,000.00 180.00 180.00
21,060.00 21,060.00

b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 21,060.00 15,035.00 36,095.00

9.5 1 M Langit-langit Asbes/Eternit, Rangka Kayu Kls. II


2

a. Bahan
0.012 M3 Kayu Kls. II, Balok 6,500,000.00 78,000.00 78,000.00
0.060 Kg Paku Biasa 15,000.00 900.00 900.00
1.100 M2 Asbes / Eternit tebal 2,7 mm 23,000.00 25,300.00 25,300.00
1.100 M2 Asbes / Eternit tebal 3,5 mm 27,000.00 29,700.00 29,700.00
Tebal 2,7 mm 104,200.00 104,200.00
Tebal 3,5 mm 108,600.00 108,600.00
b. Tenaga
0.180 Oh Pekerja 65,000.00 11,700.00 11,700.00
0.320 Oh Tukang Kayu 90,000.00 28,800.00 28,800.00
0.032 Oh Kepala Tukang 110,000.00 3,520.00 3,520.00
0.009 Oh Mandor 110,000.00 990.00 990.00
45,010.00 45,010.00

1 M2 Eternit tebal 2,7 mm, rangka kayu kls. II 104,200.00 45,010.00 149,210.00
1 M2 Eternit tebal 3,5 mm, rangka kayu kls. II 108,600.00 45,010.00 153,610.00

9.6 1 M2 Langit-langit Asbes/Eternit, Rangka Kayu Kls. III


a. Bahan
0.012 M3 Kayu Kls. III, Balok 3,300,000.00 39,600.00 39,600.00
0.060 Kg Paku Biasa 15,000.00 900.00 900.00
1.100 M2 Asbes / Eternit tebal 2,7 mm 23,000.00 25,300.00 25,300.00
1.100 M2 Asbes / Eternit tebal 3,5 mm 27,000.00 29,700.00 29,700.00
Tebal 2,7 mm 65,800.00 65,800.00
Tebal 3,5 mm 70,200.00 70,200.00

- 60 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.180 Oh Pekerja 65,000.00 11,700.00 11,700.00
0.320 Oh Tukang Kayu 90,000.00 28,800.00 28,800.00
0.032 Oh Kepala Tukang 110,000.00 3,520.00 3,520.00
0.009 Oh Mandor 110,000.00 990.00 990.00
45,010.00 45,010.00

1 M2 Eternit tebal 2,7 mm, rangka kayu kls. III 65,800.00 45,010.00 110,810.00
1 M2 Eternit tebal 3,5 mm, rangka kayu kls. III 70,200.00 45,010.00 115,210.00

9.7 1 M2 Langit-langit Kalsiboard, Rangka Kayu Kls. II


a. Bahan
0.012 M3 Kayu Kls. II, Balok 6,500,000.00 78,000.00 78,000.00
0.060 Kg Paku Biasa 15,000.00 900.00 900.00
0.360 Kpg Kalsiboard tebal 3,5 mm 55,000.00 19,800.00 19,800.00
0.360 Kpg Kalsiboard tebal 4,5 mm 58,000.00 20,880.00 20,880.00
Tebal 3,5 mm 98,700.00 98,700.00
Tebal 4,5 mm 99,780.00 99,780.00
b. Tenaga
0.270 Oh Pekerja 65,000.00 17,550.00 17,550.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.040 Oh Kepala Tukang 110,000.00 4,400.00 4,400.00
0.014 Oh Mandor 110,000.00 1,485.00 1,485.00
59,435.00 59,435.00

1 M2 Kalsiboard tebal 3,5 mm, rangka kayu kls. II 98,700.00 59,435.00 158,135.00
1 M2 Kalsiboard tebal 4,5 mm, rangka kayu kls. II 99,780.00 59,435.00 159,215.00

9.8 1 M2 Langit-langit Kalsiboard, Rangka Kayu Kls. III


a. Bahan
0.012 M3 Kayu Kls. III, Balok 3,300,000.00 39,600.00 39,600.00
0.060 Kg Paku Biasa 15,000.00 900.00 900.00
0.360 Kpg Kalsiboard tebal 3,5 mm 55,000.00 19,800.00 19,800.00
0.360 Kpg Kalsiboard tebal 4,5 mm 58,000.00 20,880.00 20,880.00
Tebal 3,5 mm 60,300.00 60,300.00
Tebal 4,5 mm 61,380.00 61,380.00
b. Tenaga
0.270 Oh Pekerja 65,000.00 17,550.00 17,550.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.040 Oh Kepala Tukang 110,000.00 4,400.00 4,400.00
0.014 Oh Mandor 110,000.00 1,485.00 1,485.00
59,435.00 59,435.00

1 M2 Kalsiboard tebal 3,5 mm, rangka kayu kls. III 60,300.00 59,435.00 119,735.00
1 M2 Kalsiboard tebal 4,5 mm, rangka kayu kls. III 61,380.00 59,435.00 120,815.00

9.9 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 3 mm


a. Bahan
0.360 Lbr Plywood 4' x 8' x 3 mm 42,000.00 15,120.00 15,120.00
0.030 Kg Paku 18,000.00 540.00 540.00
15,660.00 15,660.00

b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 15,660.00 15,035.00 30,695.00

9.10 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 4 mm


a. Bahan
0.360 Lbr Plywood 4' x 8' x 4 mm 68,000.00 24,480.00 24,480.00
0.030 Kg Paku 18,000.00 540.00 540.00
25,020.00 25,020.00

b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 25,020.00 15,035.00 40,055.00

9.11 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 6 mm


a. Bahan
0.360 Lbr Plywood 4' x 8' x 6 mm 88,000.00 31,680.00 31,680.00
0.030 Kg Paku 18,000.00 540.00 540.00
32,220.00 32,220.00

- 61 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00

Jumlah 32,220.00 15,035.00 47,255.00

9.12 1 M2 Langit-langit Plywood ( 120 x 240 ) cm, Tebal 9 mm


a. Bahan
0.360 Lbr Plywood 4' x 8' x 9 mm 125,000.00 45,000.00 45,000.00
0.030 Kg Paku 18,000.00 540.00 540.00
45,540.00 45,540.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 45,540.00 15,035.00 60,575.00

9.13 1 M Langit-langit Plywood ( 120 x 240 ) cm, Tebal 12 mm


2

a. Bahan
0.360 Lbr Plywood 4' x 8' x 12 mm 160,000.00 57,600.00 57,600.00
0.030 Kg Paku 18,000.00 540.00 540.00
58,140.00 58,140.00

b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00

Jumlah 58,140.00 15,035.00 73,175.00

9.14 1 M Langit-langit Teakwood (120 X 240), Tebal 3 mm


2

a. Bahan
1.000 M2 Teakwood 4' x 8' x 3 mm 36,000.00 36,000.00 36,000.00
0.030 Kg Paku 18,000.00 540.00 540.00
36,540.00 36,540.00

b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 36,540.00 15,035.00 51,575.00

9.15 1 M2 Langit-langit Teakwood ( 120 x 240 ) cm, Tebal 4 mm


a. Bahan
1.000 M2 Teakwood 4' x 8' x 4 mm 40,000.00 40,000.00 40,000.00
0.030 Kg Paku 18,000.00 540.00 540.00
40,540.00 40,540.00

b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.004 Oh Mandor 110,000.00 385.00 385.00
15,035.00 15,035.00
Jumlah 40,540.00 15,035.00 55,575.00

9.16 1 M2 Langit-langit Plywood + Rangka Kayu Kls. II


a. Bahan
0.012 M3 Kayu Kls.II, Balok 6,500,000.00 78,000.00 78,000.00
0.060 Kg Paku Biasa 2" - 5" 15,000.00 900.00 900.00
0.360 Lbr Plywood 4' x 8' x 3 mm 42,000.00 15,120.00 15,120.00
0.360 Lbr Plywood 4' x 8' x 4 mm 68,000.00 24,480.00 24,480.00
0.360 Lbr Plywood 4' x 8' x 6 mm 88,000.00 31,680.00 31,680.00
0.360 Lbr Plywood 4' x 8' x 9 mm 125,000.00 45,000.00 45,000.00
0.360 Lbr Plywood 4' x 8' x 12 mm 160,000.00 57,600.00 57,600.00
Tebal 3 mm 94,020.00 94,020.00
Tebal 4 mm 103,380.00 103,380.00
Tebal 6 mm 110,580.00 110,580.00
Tebal 9 mm 123,900.00 123,900.00
Tebal 12 mm 136,500.00 136,500.00

- 62 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.270 Oh Pekerja 65,000.00 17,550.00 17,550.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.040 Oh Kepala Tukang 110,000.00 4,400.00 4,400.00
0.014 Oh Mandor 110,000.00 1,485.00 1,485.00
59,435.00 59,435.00

1 M2 Plywood tebal 3 mm, rangka kayu kls. II 94,020.00 59,435.00 153,455.00


1 M2 Plywood tebal 4 mm, rangka kayu kls. II 103,380.00 59,435.00 162,815.00
1 M2 Plywood tebal 6 mm, rangka kayu kls. II 110,580.00 59,435.00 170,015.00
1 M2 Plywood tebal 9 mm, rangka kayu kls. II 123,900.00 59,435.00 183,335.00
1 M2 Plywood tebal 12 mm, rangka kayu kls. II 136,500.00 59,435.00 195,935.00

9.17 1 M2 Langit-langit Plywood + Rangka Kayu Kls. III


a. Bahan
0.012 M3 Kayu Kls.III, Balok 3,300,000.00 39,600.00 39,600.00
0.060 Kg Paku Biasa 2" - 5" 15,000.00 900.00 900.00
0.360 Lbr Plywood 4' x 8' x 3 mm 42,000.00 15,120.00 15,120.00
0.360 Lbr Plywood 4' x 8' x 4 mm 68,000.00 24,480.00 24,480.00
0.360 Lbr Plywood 4' x 8' x 6 mm 88,000.00 31,680.00 31,680.00
0.360 Lbr Plywood 4' x 8' x 9 mm 125,000.00 45,000.00 45,000.00
0.360 Lbr Plywood 4' x 8' x 12 mm 160,000.00 57,600.00 57,600.00
Tebal 3 mm 55,620.00 55,620.00
Tebal 4 mm 64,980.00 64,980.00
Tebal 6 mm 72,180.00 72,180.00
Tebal 9 mm 85,500.00 85,500.00
Tebal 12 mm 98,100.00 98,100.00
b. Tenaga
0.270 Oh Pekerja 65,000.00 17,550.00 17,550.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.040 Oh Kepala Tukang 110,000.00 4,400.00 4,400.00
0.014 Oh Mandor 110,000.00 1,485.00 1,485.00
59,435.00 59,435.00

1 M2 Plywood tebal 3 mm, rangka kayu kls. III 55,620.00 59,435.00 115,055.00
1 M2 Plywood tebal 4 mm, rangka kayu kls. III 64,980.00 59,435.00 124,415.00
1 M2 Plywood tebal 6 mm, rangka kayu kls. III 72,180.00 59,435.00 131,615.00
1 M2 Plywood tebal 9 mm, rangka kayu kls. III 85,500.00 59,435.00 144,935.00
1 M2 Plywood tebal 12 mm, rangka kayu kls. III 98,100.00 59,435.00 157,535.00

9.18 1 M2 Langit-langit Lat Kayu Jati


a. Bahan
0.024 M3 Kayu Jati, Papan 8,250,000.00 198,000.00 198,000.00
0.010 Kg Paku 15,000.00 150.00 150.00
0.050 Kg Paku Sekrup 45,000.00 2,250.00 2,250.00
198,150.00 198,150.00

b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.600 Oh Tukang Kayu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
74,700.00 74,700.00
Jumlah 198,150.00 74,700.00 272,850.00
9.19 1 M2 Langit-langit Soft Board
a. Bahan
0.350 Lbr Soft Board 4' x 8' x 4 mm 67,500.00 23,625.00 23,625.00
0.030 Kg Paku Biasa 18,000.00 540.00 540.00
23,625.00 23,625.00
b. Tenaga
0.600 Oh Pekerja 65,000.00 39,000.00 39,000.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.003 Oh Mandor 110,000.00 330.00 330.00
49,430.00 49,430.00
Jumlah 23,625.00 49,430.00 73,055.00

9.20 1 M' List Langit-langit Gypsum


a. Bahan
1.100 M' List Gypsum Besar 22,000.00 24,200.00 24,200.00
1.100 M' List Gypsum Kecil 12,000.00 13,200.00 13,200.00
0.010 Kg Paku Gypsum 25,000.00 250.00 250.00
List Gypsum besar 24,450.00 24,450.00
List Gypsum kecil 13,450.00 13,450.00
b. Tenaga
0.050 Oh Pekerja 65,000.00 3,250.00 3,250.00
0.050 Oh Tukang Kayu 90,000.00 4,500.00 4,500.00
0.005 Oh Kepala Tukang 110,000.00 550.00 550.00
0.003 Oh Mandor 110,000.00 330.00 330.00
8,630.00 8,630.00
List Gypsum Besar 24,450.00 8,630.00 33,080.00
List Gypsum Kecil 13,450.00 8,630.00 22,080.00

- 63 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
9.21 1 M2 Langit-langit Gypsum Board, Tebal 9 mm
a. Bahan
0.364 Lbr Gypsum Board ( 120 x 240 x 9 ) mm 63,000.00 22,932.00 22,932.00
0.300 Kg Cornes 7,000.00 2,100.00 2,100.00
0.025 roll Textile Tape 6,850.00 171.25 171.25
0.110 Kg Paku Sekrup 45,000.00 4,950.00 4,950.00
0.060 Kg Paku Biasa 2" - 5" 15,000.00 900.00
0.040 Kg Paku Gypsum 25,000.00 1,000.00
32,053.25 30,153.25

b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.050 Oh Tukang Kayu 90,000.00 4,500.00 4,500.00
0.005 Oh Kepala Tukang 110,000.00 550.00 550.00
0.005 Oh Mandor 110,000.00 550.00 550.00
12,100.00 12,100.00
Jumlah 32,053.25 12,100.00 44,153.25

9.22 1 M2 Langit-langit Gypsum Board 9 mm + Rangka Kayu


a. Bahan
0.012 M3 Kayu Kls.III, Balok 3,300,000.00 39,600.00 39,600.00
0.012 M3 Kayu Kls.II, Balok 6,500,000.00 78,000.00 78,000.00
0.300 Kg Cornes 7,000.00 2,100.00 2,100.00
0.025 roll Textile Tape 6,850.00 171.25 171.25
0.110 Kg Paku Sekrup 45,000.00 4,950.00 4,950.00
0.060 Kg Paku Biasa 2" - 5" 15,000.00 900.00 900.00
0.040 Kg Paku Gypsum 25,000.00 1,000.00 1,000.00
0.364 Lbr Gypsum Board x 9 mm 63,000.00 22,932.00 22,932.00
Kayu Kls.II, Balok 110,053.25 110,053.25
Kayu Kls.III, Balok 71,653.25 71,653.25

b. Tenaga
0.260 Oh Pekerja 65,000.00 16,900.00 16,900.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.040 Oh Kepala Tukang 110,000.00 4,400.00 4,400.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
58,730.00 58,730.00

1 M2 Gypsum Board 9 mm, rangka kayu kls. III 71,653.25 58,730.00 130,383.25
1 M2 Gypsum Board 9 mm, rangka kayu kls. II 110,053.25 58,730.00 168,783.25

9.23 1 M2 Langit-langit Gypsum Board 9 mm + Rangka besi hollow


a. Bahan
2.500 Btg Besi hollow galvanis 2/4 25,000.00 62,500.00 62,500.00
0.300 Kg Cornes 7,000.00 2,100.00 2,100.00
0.025 roll Textile Tape 6,850.00 171.25 171.25
0.110 Kg Paku Sekrup 45,000.00 4,950.00 4,950.00
0.060 Kg Paku Biasa 2" - 5" 15,000.00 900.00 900.00
0.040 Kg Paku Gypsum 25,000.00 1,000.00 1,000.00
0.364 Lbr Gypsum Board x 9 mm 63,000.00 22,932.00 22,932.00
94,553.25 94,553.25
b. Tenaga
0.260 Oh Pekerja 65,000.00 16,900.00 16,900.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.040 Oh Kepala Tukang 110,000.00 4,400.00 4,400.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
58,730.00 58,730.00
1 M2 Gypsum Board 9 mm, rangka besi hollow 2/4 galvanis 94,553.25 58,730.00 153,283.25

X PEKERJAAN SANITASI

10.1 Memasang 1 Buah Kloset Duduk


Me Bahan
1.000 Bh Kloset Duduk ex toto 2,250,000.00 2,250,000.00 2,250,000.00
Perlengkapan ( 6 % Harga Kloset ) 135,000.00 135,000.00
2,385,000.00 2,385,000.00
b. Tenaga
3.300 Oh Pekerja 65,000.00 214,500.00 214,500.00
1.100 Oh Tukang Batu 90,000.00 99,000.00 99,000.00
0.001 Oh Kepala Tukang 110,000.00 110.00 110.00
0.160 Oh Mandor 110,000.00 17,600.00 17,600.00
331,210.00 331,210.00
Jumlah 2,385,000.00 331,210.00 2,716,210.00

10.2 Memasang 1 Buah Kloset Jongkok Porselen


a. Bahan
1.000 Bh Kloset Jongkok Porselen 160,000.00 160,000.00 160,000.00
6.000 Kg Semen Portland 1,250.00 7,500.00 7,500.00
0.010 M3 Pasir Pasang 92,500.00 925.00 925.00
168,425.00 168,425.00

- 64 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
1.500 Oh Tukang Batu 90,000.00 135,000.00 135,000.00
1.500 Oh Kepala Tukang 110,000.00 165,000.00 165,000.00
0.160 Oh Mandor 110,000.00 17,600.00 17,600.00
382,600.00 382,600.00
Jumlah 168,425.00 382,600.00 551,025.00

10.3 Memasang 1 Buah Kloset Jongkok Teraso


a. Bahan
1.000 Bh Kloset Jongkok Teraso 32,000.00 32,000.00 32,000.00
7.000 Bh Bata Merah/kecil 5 x 10x 20 cm 1,250.00 8,750.00 8,750.00
6.000 Kg Semen Portland 1,250.00 7,500.00 7,500.00
0.010 M3 Pasir Pasang 92,500.00 925.00 925.00
49,175.00 49,175.00

b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
1.500 Oh Tukang Batu 90,000.00 135,000.00 135,000.00
0.300 Oh Kepala Tukang 110,000.00 33,000.00 33,000.00
0.110 Oh Mandor 110,000.00 12,100.00 12,100.00
245,100.00 245,100.00
Jumlah 49,175.00 245,100.00 294,275.00

10.4 Memasang 1 Buah Urinoir


a. Bahan
1.000 Bh Urinoir 1,400,000.00 1,400,000.00 1,400,000.00
Perlengkapan ( 30 % Harga Urinoir ) 420,000.00 420,000.00
6.000 Kg Semen Portland 1,250.00 7,500.00 7,500.00
0.010 M Pasir Pasang
3
92,500.00 925.00 925.00
1,828,425.00 1,828,425.00

b. Tenaga
1.000 Oh Pekerja 65,000.00 65,000.00 65,000.00
1.000 Oh Tukang Batu 90,000.00 90,000.00 90,000.00
0.100 Oh Kepala Tukang 110,000.00 11,000.00 11,000.00
0.100 Oh Mandor 110,000.00 11,000.00 11,000.00
177,000.00 177,000.00

Jumlah 1,828,425.00 177,000.00 2,005,425.00

10.5 Memasang 1 Buah Wastafel


a. Bahan
1.000 Bh Wastafel 450,000.00 450,000.00 450,000.00
Perlengkapan ( 12 % Harga Wastafel ) 54,000.00 54,000.00
6.000 Kg Semen Portland 1,250.00 7,500.00 7,500.00
0.010 M Pasir Pasang
3
92,500.00 925.00 925.00
512,425.00 512,425.00

b. Tenaga
1.200 Oh Pekerja 65,000.00 78,000.00 78,000.00
1.450 Oh Tukang Batu 90,000.00 130,500.00 130,500.00
0.150 Oh Kepala Tukang 110,000.00 16,500.00 16,500.00
0.100 Oh Mandor 110,000.00 11,000.00 11,000.00
236,000.00 236,000.00
Jumlah 512,425.00 236,000.00 748,425.00

10.6 Memasang 1 Buah Bak Mandi Teraso Volume 0,30 m3


a. Bahan
1.000 Bh Bak Teraso 180,000.00 180,000.00 180,000.00
6.000 Kg Semen Portland 1,250.00 7,500.00 7,500.00
0.010 M3 Pasir Pasang 92,500.00 925.00 925.00
188,425.00 188,425.00

b. Tenaga
2.100 Oh Pekerja 65,000.00 136,500.00 136,500.00
0.750 Oh Tukang Batu 90,000.00 67,500.00 67,500.00
0.070 Oh Kepala Tukang 110,000.00 7,700.00 7,700.00
0.110 Oh Mandor 110,000.00 12,100.00 12,100.00
223,800.00 223,800.00
Jumlah 188,425.00 223,800.00 412,225.00

10.7 Memasang 1 Buah Bak Mandi Fibreglass Volume 0,30 m3


a. Bahan
1.000 Bh Bak Fibreglass 180,000.00 180,000.00 180,000.00
Perlengkapan ( 18 % Harga Bak Fibreglass ) 32,400.00 32,400.00
212,400.00 212,400.00

- 65 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
1.800 Oh Pekerja 65,000.00 117,000.00 117,000.00
2.700 Oh Tukang Batu 90,000.00 243,000.00 243,000.00
0.540 Oh Kepala Tukang 110,000.00 59,400.00 59,400.00
0.110 Oh Mandor 110,000.00 12,100.00 12,100.00
431,500.00 431,500.00
Jumlah 212,400.00 431,500.00 643,900.00

10.8 Memasang 1 Buah Bak Mandi Porselin Batu Bata Volume 0,30 m3
a. Bahan
0.400 M3 Batu Bata 512,000.00 204,800.00 204,800.00
120.000 Kg Semen Portland 1,250.00 150,000.00 150,000.00
0.300 M3 Pasir Pasang 92,500.00 27,750.00 27,750.00
360.000 Bh Porselen ( 11 x 11 ) cm 700.00 252,000.00 252,000.00
6.000 Kg Semen Nat 12,000.00 72,000.00 72,000.00
706,550.00 706,550.00
b. Tenaga
6.000 Oh Pekerja 65,000.00 390,000.00 390,000.00
3.000 Oh Tukang Batu 90,000.00 270,000.00 270,000.00
0.300 Oh Kepala Tukang 110,000.00 33,000.00 33,000.00
0.300 Oh Mandor 110,000.00 33,000.00 33,000.00
726,000.00 726,000.00
Jumlah 706,550.00 726,000.00 1,432,550.00

10.9 Memasang 1 Buah Bak Beton Volume 1 m3 Air


a. Bahan
0.900 M3 Beton 1 : 1,5 : 2,5 1,197,096.40 1,077,386.76 1,077,386.76
180.000 Kg Besi Beton 19,000.00 3,420,000.00 3,420,000.00
8.000 M3 Kayu Cetakan - - -
5.000 M2 Ubin Porselen 11,000.00 55,000.00 55,000.00
Perlengkapan ( 10 % Harga Total Bahan ) 122,709.64 122,709.64
4,675,096.40 4,675,096.40
b. Tenaga
3.500 Oh Pekerja 65,000.00 227,500.00 227,500.00
4.500 Oh Tukang Batu 90,000.00 405,000.00 405,000.00
0.900 Oh Kepala Tukang 110,000.00 99,000.00 99,000.00
0.900 Oh Mandor 110,000.00 99,000.00 99,000.00
830,500.00 830,500.00

Jumlah 4,675,096.40 830,500.00 5,505,596.40

10.10 Memasang 1 Buah Bak Fibreglass Volume 1 m3 Air


a. Bahan
1.000 Bh Bak Fibreglass 180,000.00 180,000.00 180,000.00
Perlengkapan ( 12 % Harga Bak Fibreglass ) 21,600.00 21,600.00
201,600.00 201,600.00
b. Tenaga
3.000 Oh Pekerja 65,000.00 195,000.00 195,000.00
4.500 Oh Tukang Batu 90,000.00 405,000.00 405,000.00
0.900 Oh Kepala Tukang 110,000.00 99,000.00 99,000.00
0.900 Oh Mandor 110,000.00 99,000.00 99,000.00
798,000.00 798,000.00
Jumlah 201,600.00 798,000.00 999,600.00

10.11 Memasang 1 M' Pipa Penyalur Air Limbah Jenis Pipa Tanah, dia. 15 cm
a. Bahan
1.600 M' Pipa Tanah (Paralon) dia. 15 cm 123,750.00 198,000.00 198,000.00
0.680 Kg Semen Portland 1,250.00 850.00 850.00
0.013 M3 Pasir Pasang 92,500.00 1,202.50 1,202.50
0.011 M3 Pasir Urug 65,000.00 715.00 715.00
200,767.50 200,767.50
b. Tenaga
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.030 Oh Tukang Batu 90,000.00 2,700.00 2,700.00
0.003 Oh Kepala Tukang 110,000.00 330.00 330.00
0.003 Oh Mandor 110,000.00 275.00 275.00
7,205.00 7,205.00
Jumlah 200,767.50 7,205.00 207,972.50

10.12 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (30 x 30)
cm, Tinggi 35 cm
a. Bahan
0.145 M3 Batu Bata 512,000.00 74,240.00 74,240.00
44.000 Kg Semen Portland 1,250.00 55,000.00 55,000.00
0.070 M3 Pasir Pasang 92,500.00 6,475.00 6,475.00
0.070 M3 Batu Kerikil 400,000.00 28,000.00 28,000.00
1.600 Kg Besi Beton 19,000.00 30,400.00 30,400.00
0.060 M3 Pasir Beton 92,500.00 5,550.00 5,550.00
199,665.00 199,665.00

- 66 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
3.200 Oh Pekerja 65,000.00 208,000.00 208,000.00
1.015 Oh Tukang Batu 90,000.00 91,350.00 91,350.00
0.002 Oh Kepala Tukang 110,000.00 165.00 165.00
0.016 Oh Mandor 110,000.00 1,760.00 1,760.00
301,275.00 301,275.00
Jumlah 199,665.00 301,275.00 500,940.00

10.13 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (45 x 45)
cm, Tinggi 50 cm
a. Bahan
0.250 M3 Batu Bata 512,000.00 128,000.00 128,000.00
77.000 Kg Semen Portland 1,250.00 96,250.00 96,250.00
0.130 M3 Pasir Pasang 92,500.00 12,025.00 12,025.00
0.020 M3 Batu Kerikil 400,000.00 8,000.00 8,000.00
2.600 Kg Besi Beton 19,000.00 49,400.00 49,400.00
0.090 M3 Pasir Beton 92,500.00 8,325.00 8,325.00
302,000.00 302,000.00
b. Tenaga
1.420 Oh Pekerja 65,000.00 92,300.00 92,300.00
0.473 Oh Tukang Batu 90,000.00 42,570.00 42,570.00
0.047 Oh Kepala Tukang 110,000.00 5,170.00 5,170.00
0.071 Oh Mandor 110,000.00 7,810.00 7,810.00
147,850.00 147,850.00
Jumlah 302,000.00 147,850.00 449,850.00

10.14 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata Ukuran (60 x 60)
cm, Tinggi 65 cm
a. Bahan
0.371 M3 Batu Bata 512,000.00 189,952.00 189,952.00
114.000 Kg Semen Portland 1,250.00 142,500.00 142,500.00
0.184 M3 Pasir Pasang 92,500.00 17,020.00 17,020.00
0.033 M3 Batu Kerikil 400,000.00 13,200.00 13,200.00
4.850 Kg Besi Beton 19,000.00 92,150.00 92,150.00
0.120 M3 Pasir Beton 92,500.00 11,100.00 11,100.00
465,922.00 465,922.00

b. Tenaga
2.160 Oh Pekerja 65,000.00 140,400.00 140,400.00
0.720 Oh Tukang Batu 90,000.00 64,800.00 64,800.00
0.100 Oh Tukang Gali 90,000.00 9,000.00 9,000.00
0.072 Oh Kepala Tukang 110,000.00 7,920.00 7,920.00
0.108 Oh Mandor 110,000.00 11,880.00 11,880.00
234,000.00 234,000.00
Jumlah 465,922.00 234,000.00 699,922.00

10.15 Memasang 1 m' Pipa Galvanis Dia. /2" 1

a. Bahan
1.200 M' Pipa Galvanis 18,500.00 22,200.00 22,200.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 6,475.00 6,475.00
28,675.00 28,675.00

b. Tenaga
0.054 Oh Pekerja 65,000.00 3,510.00 3,510.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.027 Oh Mandor 110,000.00 2,970.00 2,970.00
15,570.00 15,570.00
Jumlah 28,675.00 15,570.00 44,245.00

10.16 Memasang 1 m' Pipa Galvanis Dia. 3/4"


a. Bahan
1.200 M' Pipa Galvanis 23,400.00 28,080.00 28,080.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 8,190.00 8,190.00
36,270.00 36,270.00

b. Tenaga
0.054 Oh Pekerja 65,000.00 3,510.00 3,510.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.027 Oh Mandor 110,000.00 2,970.00 2,970.00
15,570.00 15,570.00

Jumlah 36,270.00 15,570.00 51,840.00

10.17 Memasang 1 m' Pipa Galvanis Dia. 1"


a. Bahan
1.200 M' Pipa Galvanis 29,175.00 35,010.00 35,010.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 10,211.25 10,211.25
45,221.25 45,221.25

- 67 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.054 Oh Pekerja 65,000.00 3,510.00 3,510.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.027 Oh Mandor 110,000.00 2,970.00 2,970.00
15,570.00 15,570.00

Jumlah 45,221.25 15,570.00 60,791.25

10.18 Memasang 1 m' Pipa Galvanis Dia. 11/2"


a. Bahan
1.200 M' Pipa Galvanis 41,700.00 50,040.00 50,040.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 14,595.00 14,595.00
64,635.00 64,635.00

b. Tenaga
0.108 Oh Pekerja 65,000.00 7,020.00 7,020.00
0.180 Oh Tukang Batu 90,000.00 16,200.00 16,200.00
0.018 Oh Kepala Tukang 110,000.00 1,980.00 1,980.00
0.005 Oh Mandor 110,000.00 594.00 594.00
25,794.00 25,794.00

Jumlah 64,635.00 25,794.00 90,429.00

10.19 Memasang 1 m' Pipa Galvanis Dia. 3"


a. Bahan
1.200 M' Pipa Galvanis 108,500.00 130,200.00 130,200.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 37,975.00 37,975.00
168,175.00 168,175.00

b. Tenaga
0.108 Oh Pekerja 65,000.00 7,020.00 7,020.00
0.180 Oh Tukang Batu 90,000.00 16,200.00 16,200.00
0.018 Oh Kepala Tukang 110,000.00 1,980.00 1,980.00
0.005 Oh Mandor 110,000.00 594.00 594.00
25,794.00 25,794.00
Jumlah 168,175.00 25,794.00 193,969.00

10.20 Memasang 1 m' Pipa Galvanis Dia. 4"


a. Bahan
1.200 M' Pipa Galvanis 141,400.00 169,680.00 169,680.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 49,490.00 49,490.00
219,170.00 219,170.00
b. Tenaga
0.135 Oh Pekerja 65,000.00 8,775.00 8,775.00
0.225 Oh Tukang Batu 90,000.00 20,250.00 20,250.00
0.023 Oh Kepala Tukang 110,000.00 2,475.00 2,475.00
0.007 Oh Mandor 110,000.00 748.00 748.00
32,248.00 32,248.00
Jumlah 219,170.00 32,248.00 251,418.00

10.21 Memasang 1 m' Pipa PVC Tipe AW Dia. /2" 1

a. Bahan
1.200 M' Pipa PVC 4,000.00 4,800.00 4,800.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 1,400.00 1,400.00
6,200.00 6,200.00
b. Tenaga
0.036 Oh Pekerja 65,000.00 2,340.00 2,340.00
0.060 Oh Tukang Batu 90,000.00 5,400.00 5,400.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.002 Oh Mandor 110,000.00 198.00 198.00
8,598.00 8,598.00
Jumlah 6,200.00 8,598.00 14,798.00

10.22 Memasang 1 m' Pipa PVC Tipe AW Dia. 3/4"


a. Bahan
1.200 M' Pipa PVC 5,500.00 6,600.00 6,600.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 1,925.00 1,925.00
8,525.00 8,525.00
b. Tenaga
0.036 Oh Pekerja 65,000.00 2,340.00 2,340.00
0.060 Oh Tukang Batu 90,000.00 5,400.00 5,400.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.002 Oh Mandor 110,000.00 198.00 198.00
8,598.00 8,598.00
Jumlah 8,525.00 8,598.00 17,123.00

10.23 Memasang 1 m' Pipa PVC Tipe AW Dia. 1"


a. Bahan
1.200 M' Pipa PVC 7,500.00 9,000.00 9,000.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 2,625.00 2,625.00
11,625.00 11,625.00

- 68 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.036 Oh Pekerja 65,000.00 2,340.00 2,340.00
0.060 Oh Tukang Batu 90,000.00 5,400.00 5,400.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.002 Oh Mandor 110,000.00 198.00 198.00
8,598.00 8,598.00
Jumlah 11,625.00 8,598.00 20,223.00

10.24 Memasang 1 m' Pipa PVC Tipe AW Dia. 11/2"


a. Bahan
1.200 M' Pipa PVC 13,000.00 15,600.00 15,600.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 4,550.00 4,550.00
20,150.00 20,150.00
b. Tenaga
0.036 Oh Pekerja 65,000.00 2,340.00 2,340.00
0.060 Oh Tukang Batu 90,000.00 5,400.00 5,400.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.002 Oh Mandor 110,000.00 198.00 198.00
8,598.00 8,598.00
Jumlah 20,150.00 8,598.00 28,748.00

10.25 Memasang 1 m' Pipa PVC Tipe AW Dia. 2"


a. Bahan
1.200 M' Pipa PVC 16,375.00 19,650.00 19,650.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 5,731.25 5,731.25
25,381.25 25,381.25

b. Tenaga
0.054 Oh Pekerja 65,000.00 3,510.00 3,510.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.003 Oh Mandor 110,000.00 297.00 297.00
12,897.00 12,897.00
Jumlah 25,381.25 12,897.00 38,278.25

10.26 Memasang 1 m' Pipa PVC Tipe AW Dia. 3"


a. Bahan
1.200 M' Pipa PVC 32,125.00 38,550.00 38,550.00
Perlengkapan ( 35 % Harga Pipa PVC ) 11,243.75 11,243.75
49,793.75 49,793.75
b. Tenaga
0.081 Oh Pekerja 65,000.00 5,265.00 5,265.00
0.135 Oh Tukang Batu 90,000.00 12,150.00 12,150.00
0.014 Oh Kepala Tukang 110,000.00 1,485.00 1,485.00
0.004 Oh Mandor 110,000.00 451.00 451.00
19,351.00 19,351.00
Jumlah 49,793.75 19,351.00 69,144.75

10.27 Memasang 1 m' Pipa PVC Tipe AW Dia. 4"


a. Bahan
1.200 M' Pipa PVC 52,000.00 62,400.00 62,400.00
Perlengkapan ( 35 % Harga Pipa Galvanis ) 18,200.00 18,200.00
80,600.00 80,600.00

b. Tenaga
0.081 Oh Pekerja 65,000.00 5,265.00 5,265.00
0.135 Oh Tukang Batu 90,000.00 12,150.00 12,150.00
0.014 Oh Kepala Tukang 110,000.00 1,485.00 1,485.00
0.004 Oh Mandor 110,000.00 451.00 451.00
19,351.00 19,351.00
Jumlah 80,600.00 19,351.00 99,951.00

10.28 Memasang 1 Buah Bak Cuci Piring Stainless Steel


a. Bahan
1.000 Bh Bak Cuci Stainless Steel 193,000.00 193,000.00 193,000.00
1.000 Set Kran air+ Asesories 25,000.00 25,000.00 25,000.00
218,000.00 218,000.00
b. Tenaga
0.030 Oh Pekerja 65,000.00 1,950.00 1,950.00
0.300 Oh Tukang Batu 90,000.00 27,000.00 27,000.00
0.030 Oh Kepala Tukang 110,000.00 3,300.00 3,300.00
0.002 Oh Mandor 110,000.00 165.00 165.00
32,415.00 32,415.00
Jumlah 218,000.00 32,415.00 250,415.00

10.29 Memasang 1 Buah Bak Cuci Piring Teraso


a. Bahan
1.000 Bh Bak Cuci Teraso 325,000.00 325,000.00 325,000.00
1.000 Set Kran air+ Asesories 25,000.00 25,000.00 25,000.00
20.000 Kg Semen Portland 1,250.00 25,000.00 25,000.00
0.050 M3 Pasir pasang 92,500.00 4,625.00 4,625.00
379,625.00 379,625.00

- 69 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.050 Oh Pekerja 65,000.00 3,250.00 3,250.00
0.500 Oh Tukang Batu 90,000.00 45,000.00 45,000.00
0.050 Oh Kepala Tukang 110,000.00 5,500.00 5,500.00
0.003 Oh Mandor 110,000.00 275.00 275.00
54,025.00 54,025.00
Jumlah 379,625.00 54,025.00 433,650.00

10.30 Memasang 1 Buah Kran Dia. 3/4" atau 1/2"


a. Bahan
1.000 Bh Kran Air 10,000.00 10,000.00 10,000.00
0.025 Bh Seal Tape 3,500.00 87.50 87.50
10,087.50 10,087.50

b. Tenaga
0.010 Oh Pekerja 65,000.00 650.00 650.00
0.100 Oh Tukang Batu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.005 Oh Mandor 110,000.00 550.00 550.00
11,300.00 11,300.00

Jumlah 10,087.50 11,300.00 21,387.50

10.31 1 Bh Septictank 1,5 m x 2,0 m x 1 m dan Resapan


10.500 M3 Galian Tanah 30,400.00 319,200.00 319,200.00
2.625 M3 Urugan Kembali 14,570.00 38,246.25 38,246.25
8.400 M2 Pas. Batu Bata 1 : 3 141,712.50 1,190,385.00 1,190,385.00
0.300 M3 Beton Tumbuk 1 : 3 : 5 828,764.21 248,629.26 248,629.26
13.500 M2 Plesteran 1 : 2 41,472.50 559,878.75 559,878.75
0.200 M3 Plat Beton bertulang (besi 100kg,1/2 dinding)1 : 2 : 3 3,470,212.74 694,042.55 694,042.55
1.000 Bh Pipa Hawa 2" 20,000.00 20,000.00 20,000.00

Resapan
0.750 M3 Koral Beton 421,683.00 316,262.25 316,262.25
1.000 M3 Pasir Pasang 92,500.00 92,500.00 92,500.00
4.000 M' Pipa dia. 4" 52,000.00 208,000.00 208,000.00
2.000 Bh Buis Beton dia. 50 cm 75,000.00 150,000.00 150,000.00
10.000 Kg Ijuk 9,000.00 90,000.00 90,000.00
3,927,144.06 3,927,144.06
Jumlah 3,927,144.06 3,927,144.06

XI PEKERJAAN BESI DAN ALUMINIUM

11.1 1 Kg Pasang besi WF dan Rangka Atap Baja


a. Bahan
1.100 Kg Besi Profil WF 17,000.00 18,700.00 18,700.00
0.080 Kg Meni Besi 42,000.00 3,360.00 3,360.00
22,060.00 22,060.00

b. Tenaga
0.006 Oh Tukang Besi 90,000.00 540.00 540.00
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.000 Oh Mandor 110,000.00 33.00 33.00
5,133.00 5,133.00
Jumlah 22,060.00 5,133.00 27,193.00

11.2 1 Kg Pasang besi CNP,INP,L dan Rangka Atap Baja


a. Bahan
1.100 Kg Besi CNP,INP dan L 15,000.00 16,500.00 16,500.00
0.080 Kg Meni Besi 42,000.00 3,360.00 3,360.00
19,860.00 19,860.00
b. Tenaga
0.006 Oh Tukang 90,000.00 540.00 540.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.000 Oh Mandor 110,000.00 33.00 33.00
5,133.00 5,133.00
Jumlah 19,860.00 5,133.00 24,993.00

11.3 1 m2 Pasang Pintu Besi Baja


a. Bahan
1.000 M2 Pintu Besi Baja 1,950,000.00 1,950,000.00 1,950,000.00
1,950,000.00 1,950,000.00

b. Tenaga
0.650 Oh Tukang Besi Konstruksi 90,000.00 58,500.00 58,500.00
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.065 Oh Kepala Tukang 110,000.00 7,150.00 7,150.00
0.032 Oh Mandor 110,000.00 3,520.00 3,520.00
111,420.00 111,420.00
Jumlah 1,950,000.00 111,420.00 2,061,420.00

- 70 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
11.4 1 m2 Pasang Jendela Besi
a. Bahan
1.000 M2 Jendela Besi 300,000.00 300,000.00 300,000.00
300,000.00 300,000.00

b. Tenaga
1.050 Oh Tukang Besi Konstruksi 90,000.00 94,500.00 94,500.00
1.050 Oh Pekerja 65,000.00 68,250.00 68,250.00
0.105 Oh Kepala Tukang 110,000.00 11,550.00 11,550.00
0.005 Oh Mandor 110,000.00 577.50 577.50
174,877.50 174,877.50
Jumlah 300,000.00 174,877.50 474,877.50

11.5 1 m2 Pasang Pintu Lipat


a. Bahan
1.000 M2 Pintu Lipat 380,000.00 380,000.00 380,000.00
380,000.00 380,000.00
b. Tenaga
1.050 Oh Tukang Besi Konstruksi 90,000.00 94,500.00 94,500.00
1.050 Oh Pekerja 65,000.00 68,250.00 68,250.00
0.105 Oh Kepala Tukang 110,000.00 11,550.00 11,550.00
0.005 Oh Mandor 110,000.00 572.00 572.00
174,872.00 174,872.00

Jumlah 380,000.00 174,872.00 554,872.00

11.6 1 m2 Pasang Pintu Sunscreen Alluminium


a. Bahan
1.000 M2 Sunscreen Alluminium 375,000.00 375,000.00 375,000.00
375,000.00 375,000.00

b. Tenaga
0.800 Oh Tukang Besi Konstruksi 90,000.00 72,000.00 72,000.00
0.080 Oh Pekerja 65,000.00 5,200.00 5,200.00
0.080 Oh Kepala Tukang 110,000.00 8,800.00 8,800.00
0.004 Oh Mandor 110,000.00 440.00 440.00
86,440.00 86,440.00
Jumlah 375,000.00 86,440.00 461,440.00

11.7 1 m Pasang Sunscreen Besi Holo 30/30


2

a. Bahan
1.000 Btg Besi Holo 30/30 140,000.00 140,000.00 140,000.00
140,000.00 140,000.00
b. Tenaga
0.800 Oh Tukang Besi Konstruksi 90,000.00 72,000.00 72,000.00
0.080 Oh Pekerja 65,000.00 5,200.00 5,200.00
0.080 Oh Kepala Tukang 110,000.00 8,800.00 8,800.00
0.004 Oh Mandor 110,000.00 440.00 440.00
86,440.00 86,440.00
Jumlah 140,000.00 86,440.00 226,440.00

11.8 1 m2 Pasang Rolling Door


a. Bahan
1.000 M2 Roll Door 585,000.00 585,000.00 585,000.00
585,000.00 585,000.00

b. Tenaga
1.500 Oh Tukang Besi Konstruksi 90,000.00 135,000.00 135,000.00
1.050 Oh Pekerja 65,000.00 68,250.00 68,250.00
0.105 Oh Kepala Tukang 110,000.00 11,550.00 11,550.00
0.005 Oh Mandor 110,000.00 572.00 572.00
215,372.00 215,372.00
Jumlah 585,000.00 215,372.00 800,372.00

11.9 1 m2 Pasang Pintu Alluminium


a. Bahan
1.000 M2 Pintu Alluminium 640,000.00 640,000.00 640,000.00
640,000.00 640,000.00

b. Tenaga
1.050 Oh Tukang Besi Konstruksi 90,000.00 94,500.00 94,500.00
1.050 Oh Pekerja 65,000.00 68,250.00 68,250.00
0.105 Oh Kepala Tukang 110,000.00 11,550.00 11,550.00
0.005 Oh Mandor 110,000.00 572.00 572.00
174,872.00 174,872.00
Jumlah 640,000.00 174,872.00 814,872.00

11.10 1 m Pasang Hordeng Vertikals Blinds


2

Bahan
1.000 M2 Vertikals Blinds 95,000.00 95,000.00 95,000.00
95,000.00 95,000.00

- 71 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.350 Oh Tukang Kayu 90,000.00 31,500.00 31,500.00
0.350 Oh Pekerja 65,000.00 22,750.00 22,750.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.002 Oh Mandor 110,000.00 192.50 192.50
58,292.50 58,292.50
Jumlah 95,000.00 58,292.50 153,292.50

11.11 1 m2 Pasang Hordeng Horizontal Blinds (aluminium)


Bahan
1.000 M2 Horizontal Blinds 92,000.00 92,000.00 92,000.00
92,000.00 92,000.00

b. Tenaga
0.350 Oh Tukang Kayu 90,000.00 31,500.00 31,500.00
0.350 Oh Pekerja 65,000.00 22,750.00 22,750.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.002 Oh Mandor 110,000.00 192.50 192.50
58,292.50 58,292.50
Jumlah 92,000.00 58,292.50 150,292.50

11.12 1 m2 Pasang Terali Besi Strip


a. Bahan
11.500 M' Besi Strip 2 x 3 5,000.00 57,500.00 57,500.00
57,500.00 57,500.00

b. Tenaga
1.200 Oh Tukang Las 90,000.00 108,000.00 108,000.00
1.200 Oh Pekerja 65,000.00 78,000.00 78,000.00
0.012 Oh Kepala Tukang 110,000.00 1,320.00 1,320.00
0.001 Oh Mandor 110,000.00 66.00 66.00
187,386.00 187,386.00

Jumlah 57,500.00 187,386.00 244,886.00

11.13 1 m Pasang Kawat Harmonika


2

a. Bahan
1.100 M2 Kawat Harmonika 39,000.00 42,900.00 42,900.00
0.020 Kg Paku Biasa 1/2" - 1" 18,000.00 360.00 360.00
0.002 M3 Kayu Kls.III, Papan 3,300,000.00 5,940.00 5,940.00
49,200.00 49,200.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 55.00 55.00
16,655.00 16,655.00
Jumlah 49,200.00 16,655.00 65,855.00

11.14 1 m2 Pasang Kawat Nyamuk


a. Bahan
1.100 M2 Kawat Nyamuk 18,000.00 19,800.00 19,800.00
0.020 Kg Paku Biasa 1/2" - 1" 18,000.00 360.00 360.00
0.002 M3 Kayu Kls.III, Papan 3,300,000.00 5,940.00 5,940.00
26,100.00 26,100.00

b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 55.00 55.00
16,655.00 16,655.00
Jumlah 26,100.00 16,655.00 42,755.00
11.15 1 m2 Pasang Kawat Kassa
a. Bahan
1.100 M2 Kawat Kassa 15,000.00 16,500.00 16,500.00
0.020 Kg Paku Biasa 1/2" - 1" 18,000.00 360.00 360.00
0.002 M3 Kayu Kls.III, Papan 3,300,000.00 5,940.00 5,940.00
22,800.00 22,800.00

b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 55.00 55.00
16,655.00 16,655.00
Jumlah 22,800.00 16,655.00 39,455.00

- 72 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
11.16 1 m2 Pasang Kawat Burung
a. Bahan
1.100 M2 Kawat Burung 20,000.00 22,000.00 22,000.00
0.020 Kg Paku Biasa 1/2" - 1" 18,000.00 360.00 360.00
0.002 M3 Kayu Kls.III, Papan 3,300,000.00 5,940.00 5,940.00
28,300.00 28,300.00
b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 55.00 55.00
16,655.00 16,655.00
Jumlah 28,300.00 16,655.00 44,955.00

11.17 1 m Pasang Jendela Nako dan Tralis


2

a. Bahan
1.100 M2 Jendela Nako 135,000.00 148,500.00 148,500.00
0.020 Kg Paku Biasa 1/2" - 1" atau Sekrup 18,000.00 360.00 360.00
0.025 Kg Besi Strip 10,000.00 250.00 250.00
149,110.00 149,110.00
b. Tenaga
0.200 Oh Pekerja 65,000.00 13,000.00 13,000.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.001 Oh Mandor 110,000.00 110.00 110.00
33,310.00 33,310.00

Jumlah 149,110.00 33,310.00 182,420.00

11.18 1 m' Pasang Talang Datar, Seng BJLS


a. Bahan
0.500 Lbr Seng Plat 3' x 6' bjls 106,000.00 53,000.00 53,000.00
0.015 Kg Paku Biasa 1/2" - 1" 18,000.00 270.00 270.00
0.010 M3 Kayu Kls.III, Papan 3,300,000.00 31,680.00 31,680.00
0.250 Kg Flincote / Meni Besi 42,000.00 10,500.00 10,500.00
95,450.00 95,450.00

b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.001 Oh Mandor 110,000.00 137.50 137.50
48,637.50 48,637.50
Jumlah 95,450.00 48,637.50 144,087.50

11.19 1 m' Pasang Talang Miring, Seng BJLS


a. Bahan
0.500 Lbr Seng Plat 3' x 6' bjls 106,000.00 53,000.00 53,000.00
0.015 Kg Paku Biasa 1/2" - 1" 18,000.00 270.00 270.00
0.019 M3 Kayu Kls.III, Papan 3,300,000.00 62,700.00 62,700.00
0.300 Kg Flincote / Meni Besi 42,000.00 12,600.00 12,600.00
128,570.00 128,570.00

b. Tenaga
0.040 Oh Pekerja 65,000.00 2,600.00 2,600.00
0.400 Oh Tukang Kayu 90,000.00 36,000.00 36,000.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.001 Oh Mandor 110,000.00 137.50 137.50
41,487.50 41,487.50

Jumlah 128,570.00 41,487.50 170,057.50

11.20 1 m' Pasang Talang 1/2 Lingkaran Dia. 10 cm, Seng BJLS
a. Bahan
0.300 Lbr Seng Plat 3' x 6' bjls 106,000.00 31,800.00 31,800.00
0.100 Kg Paku Biasa 1/2" - 1" 18,000.00 1,800.00 1,800.00
0.019 M3 Kayu Kls.III, Papan 3,300,000.00 62,700.00 62,700.00
0.500 Kg Besi Strip 10,000.00 5,000.00 5,000.00
101,300.00 101,300.00

b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
0.250 Oh Tukang Kayu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.001 Oh Mandor 110,000.00 137.50 137.50
35,137.50 35,137.50

Jumlah 101,300.00 35,137.50 136,437.50

- 73 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
XII PEKERJAAN KUNCI DAN KACA

12.1 1 Buah Pasang Kunci Tanam mutu B


a. Bahan
1.000 Bh Kunci Tanam mutu B 90,000.00 90,000.00 90,000.00
90,000.00 90,000.00

b. Tenaga
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.600 Oh Tukang Kayu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.003 Oh Mandor 110,000.00 330.00 330.00
64,830.00 64,830.00
Jumlah 90,000.00 64,830.00 154,830.00

12.2 1 Buah Pasang Kunci Tanam Hotel


a. Bahan
1.000 Bh Kunci Tanam Biasa 400,000.00 400,000.00 400,000.00
400,000.00 400,000.00
b. Tenaga
0.010 Oh Pekerja 65,000.00 650.00 650.00
0.500 Oh Tukang Kayu 90,000.00 45,000.00 45,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.005 Oh Mandor 110,000.00 550.00 550.00
47,300.00 47,300.00
Jumlah 400,000.00 47,300.00 447,300.00

12.3 1 Buah Pasang Kunci Tanam Kamar Mandi


a. Bahan
1.000 Bh Kunci Tanam Kamar Mandi 27,000.00 27,000.00 27,000.00
27,000.00 27,000.00

b. Tenaga
0.005 Oh Pekerja 65,000.00 325.00 325.00
0.500 Oh Tukang Kayu 90,000.00 45,000.00 45,000.00
0.005 Oh Kepala Tukang 110,000.00 550.00 550.00
0.003 Oh Mandor 110,000.00 275.00 275.00
46,150.00 46,150.00

Jumlah 27,000.00 46,150.00 73,150.00

12.4 1 Buah Pasang Engsel Pintu


a. Bahan
1.000 Bh Engsel Pintu 18,000.00 18,000.00 18,000.00
18,000.00 18,000.00

b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 18,000.00 16,207.50 34,207.50

12.5 1 Buah Pasang Engsel Jendela Kuningan


a. Bahan
1.000 Bh Engsel Kuningan Jendela 30,000.00 30,000.00 30,000.00
30,000.00 30,000.00
b. Tenaga
0.010 Oh Pekerja 65,000.00 650.00 650.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 55.00 55.00
10,805.00 10,805.00
Jumlah 30,000.00 10,805.00 40,805.00

12.6 1 Buah Pasang Engsel Angin


a. Bahan
1.000 Bh Engsel Angin 18,000.00 18,000.00 18,000.00
18,000.00 18,000.00
b. Tenaga
0.020 Oh Pekerja 65,000.00 1,300.00 1,300.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
22,600.00 22,600.00

Jumlah 18,000.00 22,600.00 40,600.00


12.7 1 Buah Pasang Kait Angin
a. Bahan
1.000 Bh Kait Angin 15,000.00 15,000.00 15,000.00
15,000.00 15,000.00

- 74 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 15,000.00 16,207.50 31,207.50

12.8 1 Buah Pasang Door Closer


a. Bahan
1.000 Bh Door Closer 240,000.00 240,000.00 240,000.00
240,000.00 240,000.00
b. Tenaga
0.050 Oh Pekerja 65,000.00 3,250.00 3,250.00
0.500 Oh Tukang Kayu 90,000.00 45,000.00 45,000.00
0.050 Oh Kepala Tukang 110,000.00 5,500.00 5,500.00
0.003 Oh Mandor 110,000.00 275.00 275.00
54,025.00 54,025.00
Jumlah 240,000.00 54,025.00 294,025.00

12.9 1 Buah Pasang Kunci Selot


a. Bahan
1.000 Bh Kunci Selot 13,000.00 13,000.00 13,000.00
13,000.00 13,000.00
b. Tenaga
0.020 Oh Pekerja 65,000.00 1,300.00 1,300.00
0.200 Oh Tukang Kayu 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.001 Oh Mandor 110,000.00 110.00 110.00
21,610.00 21,610.00

Jumlah 13,000.00 21,610.00 34,610.00

12.10 1 Buah Pasang Pegangan Pintu / Door Holder


a. Bahan
1.000 Bh Door Holder 30,000.00 30,000.00 30,000.00
30,000.00 30,000.00
b. Tenaga
0.050 Oh Pekerja 65,000.00 3,250.00 3,250.00
0.500 Oh Tukang Kayu 90,000.00 45,000.00 45,000.00
0.050 Oh Kepala Tukang 110,000.00 5,500.00 5,500.00
0.003 Oh Mandor 110,000.00 275.00 275.00
54,025.00 54,025.00
Jumlah 30,000.00 54,025.00 84,025.00

12.11 1 Buah Pasang Door Stop


a. Bahan
1.000 Bh Door Stop 22,000.00 22,000.00 22,000.00
22,000.00 22,000.00
b. Tenaga
0.010 Oh Pekerja 65,000.00 650.00 650.00
0.100 Oh Tukang Kayu 90,000.00 9,000.00 9,000.00
0.010 Oh Kepala Tukang 110,000.00 1,100.00 1,100.00
0.001 Oh Mandor 110,000.00 55.00 55.00
10,805.00 10,805.00

Jumlah 22,000.00 10,805.00 32,805.00

12.12 1 Buah Pasang Rel Pintu Dorong


a. Bahan
1.000 Bh Rel Pintu Dorong 240,000.00 240,000.00 240,000.00
240,000.00 240,000.00
b. Tenaga
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.600 Oh Tukang Kayu 90,000.00 54,000.00 54,000.00
0.060 Oh Kepala Tukang 110,000.00 6,600.00 6,600.00
0.003 Oh Mandor 110,000.00 330.00 330.00
64,830.00 64,830.00
Jumlah 240,000.00 64,830.00 304,830.00

12.13 1 Buah Pasang Kunci Lemari


a. Bahan
1.000 Bh Kunci Lemari 8,000.00 8,000.00 8,000.00
8,000.00 8,000.00
b. Tenaga
0.025 Oh Pekerja 65,000.00 1,625.00 1,625.00
0.250 Oh Tukang Kayu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.001 Oh Mandor 110,000.00 137.50 137.50
27,012.50 27,012.50

Jumlah 8,000.00 27,012.50 35,012.50

- 75 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
12.14 1 m2 Pasang Kaca, Tebal 3 mm
a. Bahan
1.100 M2 Kaca Tebal 3 mm 65,000.00 71,500.00 71,500.00
71,500.00 71,500.00
b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu/kaca 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 71,500.00 16,207.50 87,707.50

12.15 1 m2 Pasang Kaca, Tebal 5 mm


a. Bahan
1.100 M2 Kaca Tebal 5 mm 110,000.00 121,000.00 121,000.00
121,000.00 121,000.00

b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu/kaca 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 121,000.00 16,207.50 137,207.50

12.16 1 m Pasang Kaca, Tebal 8 mm


2

a. Bahan
1.100 M2 Kaca Polos 200,000.00 220,000.00 220,000.00
220,000.00 220,000.00

b. Tenaga
0.017 Oh Pekerja 65,000.00 1,072.50 1,072.50
0.165 Oh Tukang Kayu/kaca 90,000.00 14,850.00 14,850.00
0.017 Oh Kepala Tukang 110,000.00 1,815.00 1,815.00
0.001 Oh Mandor 110,000.00 88.00 88.00
17,825.50 17,825.50

Jumlah 220,000.00 17,825.50 237,825.50


12.17 1 m2 Pasang Kaca Buram, Tebal 12 mm
a. Bahan
1.100 M2 Kaca Buram 390,000.00 429,000.00 429,000.00
0.050 Kg Sealent 45,000.00 2,250.00 2,250.00
431,250.00 431,250.00

b. Tenaga
0.025 Oh Pekerja 65,000.00 1,625.00 1,625.00
0.250 Oh Tukang Kayu/kaca 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.001 Oh Mandor 110,000.00 137.50 137.50
27,012.50 27,012.50
Jumlah 431,250.00 27,012.50 458,262.50
12.18 1 m2 Pasang Kaca Cermin, Tebal 3 mm
a. Bahan
1.100 M2 Kaca Cermin Tebal 3 mm 124,000.00 136,400.00 136,400.00
136,400.00 136,400.00

b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu/kaca 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 136,400.00 16,207.50 152,607.50

12.19 1 m2 Pasang Kaca Cermin, Tebal 5 mm


a. Bahan
1.100 M2 Kaca Cermin Tebal 5 mm 325,000.00 357,500.00 357,500.00
357,500.00 357,500.00
b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu/kaca 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 357,500.00 16,207.50 373,707.50

12.20 1 m2 Pasang Kaca Patri, Tebal 5 mm


a. Bahan
1.100 M2 Kaca Patri 1,600,000.00 1,760,000.00 1,760,000.00
1,760,000.00 1,760,000.00

- 76 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu/kaca 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Jumlah 1,760,000.00 16,207.50 1,776,207.50

12.21 1 Set Pekerjaan Pasang Jendela Kaca Nako Biasa


a. Bahan
1.000 Set Bingkai Nako 14,000.00 14,000.00 14,000.00
1.000 Set Kaca Nako 6 daun 54,000.00 54,000.00 54,000.00
1.000 Set Kaca Nako 8 daun 62,000.00 62,000.00 62,000.00
Nako 6 daun 68,000.00 68,000.00
Nako 8 daun 76,000.00 76,000.00
b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu/kaca 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Nako 6 daun 68,000.00 16,207.50 84,207.50
Nako 8 daun 76,000.00 16,207.50 92,207.50

12.22 1 Set Pekerjaan Pasang Jendela Kaca Nako Rayben


a. Bahan
1.000 Set Bingkai Naco 14,000.00 14,000.00 14,000.00
1.000 Set Kaca Naco 6 daun Rayben 54,000.00 54,000.00 54,000.00
1.000 Set Kaca Naco 8 daun Rayben 61,000.00 61,000.00 61,000.00
Nako 6 daun 68,000.00 68,000.00
Nako 8 daun 75,000.00 75,000.00
b. Tenaga
0.015 Oh Pekerja 65,000.00 975.00 975.00
0.150 Oh Tukang Kayu/kaca 90,000.00 13,500.00 13,500.00
0.015 Oh Kepala Tukang 110,000.00 1,650.00 1,650.00
0.001 Oh Mandor 110,000.00 82.50 82.50
16,207.50 16,207.50
Nako 6 daun Rayben 68,000.00 16,207.50 84,207.50
Nako 8 daun Rayben 75,000.00 16,207.50 91,207.50

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING

13.1 1 m2 Pasang Lantai Granito Ukuran 60 x 60 cm


a. Bahan
3.080 Bh Ubin Granito 60 x 60 cm 117,000.00 360,360.00 360,360.00
9.800 Kg Semen Portland 1,250.00 12,250.00 12,250.00
0.022 M3 Pasir Pasang 92,500.00 1,988.75 1,988.75
1.300 Kg Semen Warna 12,000.00 15,600.00 15,600.00
390,198.75 390,198.75
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.120 Oh Tukang Batu 90,000.00 10,800.00 10,800.00
0.012 Oh Kepala Tukang 110,000.00 1,320.00 1,320.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
29,745.00 29,745.00

Jumlah 390,198.75 29,745.00 419,943.75

13.2 1 m Pasang Lantai Granito Ukuran 30 x 30 cm


2

a. Bahan
11.870 Bh Ubin Granito 30 x 30 cm 20,500.00 243,335.00 243,335.00
10.000 Kg Semen Portland 1,250.00 12,500.00 12,500.00
0.022 M3 Pasir Pasang 92,500.00 1,988.75 1,988.75
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
275,823.75 275,823.75
b. Tenaga
0.260 Oh Pekerja 65,000.00 16,900.00 16,900.00
0.125 Oh Tukang Batu 90,000.00 11,250.00 11,250.00
0.013 Oh Kepala Tukang 110,000.00 1,375.00 1,375.00
0.013 Oh Mandor 110,000.00 1,430.00 1,430.00
30,955.00 30,955.00
Jumlah 275,823.75 30,955.00 306,778.75

13.3 1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 60 x 60 cm


a. Bahan
3.000 Bh Ubin Teralux Marmer 60 x 60 cm 100,000.00 300,000.00 300,000.00
8.190 Kg Semen Portland 1,250.00 10,237.50 10,237.50
0.045 M3 Pasir Pasang 92,500.00 4,162.50 4,162.50
1.000 Kg Semen Warna 12,000.00 12,000.00 12,000.00
326,400.00 326,400.00

- 77 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.120 Oh Tukang Batu 90,000.00 10,800.00 10,800.00
0.012 Oh Kepala Tukang 110,000.00 1,320.00 1,320.00
0.013 Oh Mandor 110,000.00 1,375.00 1,375.00
29,745.00 29,745.00
Jumlah 326,400.00 29,745.00 356,145.00

13.4 1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm


a. Bahan
6.250 Bh Ubin Teralux Marmer 40 x 40 cm 48,000.00 300,000.00 300,000.00
8.800 Kg Semen Portland 1,250.00 11,000.00 11,000.00
0.022 M3 Pasir Pasang 92,500.00 1,988.75 1,988.75
1.300 Kg Semen Warna 12,000.00 15,600.00 15,600.00
328,588.75 328,588.75
b. Tenaga
0.672 Oh Pekerja 65,000.00 43,680.00 43,680.00
0.224 Oh Tukang Batu 90,000.00 20,160.00 20,160.00
0.022 Oh Kepala Tukang 110,000.00 2,420.00 2,420.00
0.034 Oh Mandor 110,000.00 3,740.00 3,740.00
70,000.00 70,000.00
Jumlah 328,588.75 70,000.00 398,588.75

13.5 1 m2 Pasang Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm


a. Bahan
11.870 Bh Ubin Teralux Marmer 30 x 30 cm 25,273.80 300,000.00 300,000.00
10.000 Kg Semen Portland 1,250.00 12,500.00 12,500.00
0.022 M3 Pasir Pasang 92,500.00 1,988.75 1,988.75
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
332,488.75 332,488.75
b. Tenaga
0.700 Oh Pekerja 65,000.00 45,500.00 45,500.00
0.340 Oh Tukang Batu 90,000.00 30,600.00 30,600.00
0.034 Oh Kepala Tukang 110,000.00 3,740.00 3,740.00
0.035 Oh Mandor 110,000.00 3,850.00 3,850.00
83,690.00 83,690.00
Jumlah 332,488.75 83,690.00 416,178.75

13.6 1 m' Pasang Plint Ubin Teraso Ukuran 10 x 30 cm


a. Bahan
3.530 Bh Plint Ubin Teraso 10 x 30 cm 850.00 3,000.50 3,000.50
1.560 Kg Semen Portland 1,250.00 1,950.00 1,950.00
0.003 M3 Pasir Pasang 92,500.00 277.50 277.50
0.190 Kg Semen Warna 12,000.00 2,280.00 2,280.00
7,508.00 7,508.00

b. Tenaga
0.080 Oh Pekerja 65,000.00 5,200.00 5,200.00
0.040 Oh Tukang Batu 90,000.00 3,600.00 3,600.00
0.004 Oh Kepala Tukang 110,000.00 440.00 440.00
0.004 Oh Mandor 110,000.00 440.00 440.00
9,680.00 9,680.00

Jumlah 7,508.00 9,680.00 17,188.00

13.7 1 m' Pasang Plint Ubin Teraso Ukuran 10 x 40 cm


a. Bahan
2.650 Bh Plint Ubin Teraso 10 x 40 cm 875.00 2,318.75 2,318.75
1.200 Kg Semen Portland 1,250.00 1,500.00 1,500.00
0.003 M3 Pasir Pasang 92,500.00 277.50 277.50
0.100 Kg Semen Warna 12,000.00 1,200.00 1,200.00
5,296.25 5,296.25

b. Tenaga
0.800 Oh Pekerja 65,000.00 52,000.00 52,000.00
0.040 Oh Tukang Batu 90,000.00 3,600.00 3,600.00
0.004 Oh Kepala Tukang 110,000.00 440.00 440.00
0.004 Oh Mandor 110,000.00 440.00 440.00
56,480.00 56,480.00

Jumlah 5,296.25 56,480.00 61,776.25


13.8 1 m' Pasang Plint Ubin Granito Ukuran 10 x 60 cm
a. Bahan
1.770 Bh Plint Ubin Granito 10 x 60 cm 29,250.00 51,772.50 51,772.50
1.200 Kg Semen Portland 1,250.00 1,500.00 1,500.00
0.003 M3 Pasir Pasang 92,500.00 277.50 277.50
0.100 Kg Semen Warna 12,000.00 1,200.00 1,200.00
54,750.00 54,750.00

- 78 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.060 Oh Pekerja 65,000.00 3,900.00 3,900.00
0.030 Oh Tukang Batu 90,000.00 2,700.00 2,700.00
0.003 Oh Kepala Tukang 110,000.00 330.00 330.00
0.003 Oh Mandor 110,000.00 330.00 330.00
7,260.00 7,260.00
Jumlah 54,750.00 7,260.00 62,010.00

13.9 1 m' Pasang Plint Ubin Granito Ukuran 10 x 30 cm


a. Bahan
3.330 Bh Plint Ubin Granito 10 x 30 cm 6,833.33 22,755.00 22,755.00
1.650 Kg Semen Portland 1,250.00 2,062.50 2,062.50
0.003 M3 Pasir Pasang 92,500.00 296.00 296.00
0.100 Kg Semen Warna 12,000.00 1,200.00 1,200.00
26,313.50 26,313.50

b. Tenaga
0.900 Oh Pekerja 65,000.00 58,500.00 58,500.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
68,085.00 68,085.00

Jumlah 26,313.50 68,085.00 94,398.50

13.10 1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 60 cm


a. Bahan
1.700 Bh Plint Ubin Teralux Marmer 10 x 60 cm 16,666.67 28,333.33 28,333.33
1.650 Kg Semen Portland 1,250.00 2,062.50 2,062.50
0.003 M3 Pasir Pasang 92,500.00 296.00 296.00
0.100 Kg Semen Warna 12,000.00 1,200.00 1,200.00
31,891.83 31,891.83

b. Tenaga
0.900 Oh Pekerja 65,000.00 58,500.00 58,500.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
68,085.00 68,085.00

Jumlah 31,891.83 68,085.00 99,976.83

13.11 1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 40 cm


a. Bahan
2.500 Bh Plint Ubin Teralux Marmer 10 x 40 cm 12,000.00 30,000.00 30,000.00
1.650 Kg Semen Portland 1,250.00 2,062.50 2,062.50
0.003 M3 Pasir Pasang 92,500.00 296.00 296.00
0.100 Kg Semen Warna 12,000.00 1,200.00 1,200.00
33,558.50 33,558.50
b. Tenaga
0.900 Oh Pekerja 65,000.00 58,500.00 58,500.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
68,085.00 68,085.00
Jumlah 33,558.50 68,085.00 101,643.50

13.12 1 m' Pasang Plint Ubin Teralux Marmer Ukuran 10 x 30 cm


a. Bahan
3.330 Bh Plint Ubin Teralux Marmer 10 x 30 cm 8,424.60 28,053.92 28,053.92
1.650 Kg Semen Portland 1,250.00 2,062.50 2,062.50
0.003 M3 Pasir Pasang 92,500.00 296.00 296.00
0.100 Kg Semen Warna 12,000.00 1,200.00 1,200.00
31,612.42 31,612.42

b. Tenaga
0.900 Oh Pekerja 65,000.00 58,500.00 58,500.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
68,085.00 68,085.00
Jumlah 31,612.42 68,085.00 99,697.42

13.13 1 m2 Pasang Lantai Keramik Artistik Ukuran 10 x 20 cm


a. Bahan
25.000 Bh Ubin Keramik Artistik 10 x 20 cm 6,100.00 152,500.00 152,500.00
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
188,610.00 188,610.00

- 79 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 188,610.00 78,950.00 267,560.00

13.14 1 m2 Pasang Lantai Keramik Artistik Ukuran 10 x 10 cm


a. Bahan
50.000 Bh Ubin Keramik Artistik 10 x 10 cm 6,100.00 305,000.00 305,000.00
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
2.000 Kg Semen Warna 12,000.00 24,000.00 24,000.00
347,110.00 347,110.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 347,110.00 78,950.00 426,060.00

13.15 1 m2 Pasang Lantai Keramik Artistik Ukuran 5 x 20 cm


a. Bahan
100.000 Bh Ubin Keramik Artistik 5 x 20 cm 6,100.00 610,000.00 610,000.00
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
646,110.00 646,110.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 646,110.00 78,950.00 725,060.00

13.16 1 m2 Pasang Plint Keramik Artistik Ukuran 10 x 20 cm


a. Bahan
5.000 Bh Plint Keramik Artistik 10 x 20 cm 6,100.00 30,500.00 30,500.00
1.650 Kg Semen Portland 1,250.00 2,062.50 2,062.50
0.003 M3 Pasir Pasang 92,500.00 296.00 296.00
0.100 Kg Semen Warna 12,000.00 1,200.00 1,200.00
34,058.50 34,058.50
b. Tenaga
0.090 Oh Pekerja 65,000.00 5,850.00 5,850.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
15,435.00 15,435.00
Jumlah 34,058.50 15,435.00 49,493.50

13.17 1 m2 Pasang Plint Keramik Artistik Ukuran 10 x 10 cm


a. Bahan
5.000 Bh Plint Keramik Artistik 10 x 10 cm 6,100.00 30,500.00 30,500.00
1.650 Kg Semen Portland 1,250.00 2,062.50 2,062.50
0.003 M3 Pasir Pasang 92,500.00 296.00 296.00
0.120 Kg Semen Warna 12,000.00 1,440.00 1,440.00
34,298.50 34,298.50

b. Tenaga
0.090 Oh Pekerja 65,000.00 5,850.00 5,850.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
15,435.00 15,435.00
Jumlah 34,298.50 15,435.00 49,733.50
13.18 1 m2 Pasang Plint Keramik Artistik Ukuran 5 x 20 cm
a. Bahan
5.000 Bh Plint Keramik Artistik 5 x 20 cm 6,100.00 30,500.00 30,500.00
0.850 Kg Semen Portland 1,250.00 1,062.50 1,062.50
0.002 M3 Pasir Pasang 92,500.00 203.50 203.50
0.080 Kg Semen Warna 12,000.00 960.00 960.00
32,726.00 32,726.00
b. Tenaga
0.090 Oh Pekerja 65,000.00 5,850.00 5,850.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
15,435.00 15,435.00
Jumlah 32,726.00 15,435.00 48,161.00

- 80 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

13.19 1 m2 Pasang Lantai Keramik Ukuran 10 x 20 cm


a. Bahan
50.000 Bh Ubin Keramik 10 x 20 cm 1,040.00 52,000.00 52,000.00
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
88,110.00 88,110.00

b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00

Jumlah 88,110.00 78,950.00 167,060.00

13.20 1 m Pasang Lantai Keramik Ukuran 20 x 20 cm


2

a. Bahan
25.000 Bh Ubin Keramik 20 x 20 cm 2,080.00 52,000.00 52,000.00
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
88,110.00 88,110.00

b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 88,110.00 78,950.00 167,060.00

13.21 1 m Pasang Lantai Keramik Ukuran 25 x 20 cm


2

a. Bahan
20.000 Bh Ubin Keramik 25 x 20 cm 3,400.00 68,000.00 68,000.00
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
104,110.00 104,110.00

b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 104,110.00 78,950.00 183,060.00

13.22 1 m2 Pasang Lantai Keramik Warna Ukuran 30 x 30 cm


a. Bahan
11.110 Bh Ubin Keramik Warna 30 x 30 cm 4,320.00 47,995.20 47,995.20
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
84,105.20 84,105.20

b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 84,105.20 78,950.00 163,055.20

13.23 1 m2 Pasang Lantai Keramik Putih Ukuran 30 x 30 cm


a. Bahan
11.110 Bh Ubin Keramik Putih 30 x 30 cm 4,320.00 47,995.20 47,995.20
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
84,105.20 84,105.20
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00

Jumlah 84,105.20 78,950.00 163,055.20

- 81 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
13.24 1 m2 Pasang Lantai Keramik Warna Ukuran 40 x 40 cm
a. Bahan
6.250 Bh Keramik Warna 40 x 40 cm mutu C 8,320.00 52,000.00 52,000.00
6.250 Bh Keramik Warna 40 x 40 cm mutu B 10,400.00 65,000.00 65,000.00
11.380 Kg Semen Portland 1,250.00 14,225.00 14,225.00
0.042 M3 Pasir Pasang 92,500.00 3,885.00 3,885.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
Mutu C 88,110.00 88,110.00
Mutu B 101,110.00 101,110.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00

Mutu C , Jumlah 88,110.00 78,950.00 167,060.00


Mutu B , Jumlah 101,110.00 78,950.00 180,060.00
13.25 1 m' Pasang Plint Keramik
a. Bahan
3.000 Bh Plint Keramik Putih 10 x 30 cm 1,440.00 4,320.00 4,320.00
3.000 Bh Plint Keramik Warna 10 x 30 cm 1,440.00 4,320.00 4,320.00
2.500 Bh Plint Keramik Warna 10 x 40 cm mutu C 3,328.00 8,320.00 8,320.00
2.500 Bh Plint Keramik Warna 10 x 40 cm mutu B 4,160.00 10,400.00 10,400.00
0.850 Kg Semen Portland 1,250.00 1,062.50 1,062.50
0.002 M3 Pasir Pasang 92,500.00 203.50 203.50
0.080 Kg Semen Warna 12,000.00 960.00 960.00
Plint keramik putih 10 X 30 cm 6,546.00 6,546.00
Plint keramik Warna 10 X 30 cm 6,546.00 6,546.00
Plint keramik Warna 10 X 40 cm, mutu C 10,546.00 10,546.00
Plint keramik Warna 10 X 40 cm, mutu B 12,626.00 12,626.00
b. Tenaga
0.090 Oh Pekerja 65,000.00 5,850.00 5,850.00
0.090 Oh Tukang Batu 90,000.00 8,100.00 8,100.00
0.009 Oh Kepala Tukang 110,000.00 990.00 990.00
0.005 Oh Mandor 110,000.00 495.00 495.00
15,435.00 15,435.00

Plint keramik putih 10 X 30 cm 6,546.00 15,435.00 21,981.00


Plint keramik Warna 10 X 30 cm 6,546.00 15,435.00 21,981.00
Plint keramik Warna 10 X 40 cm, mutu C 10,546.00 15,435.00 25,981.00
Plint keramik Warna 10 X 40 cm, mutu B 12,626.00 15,435.00 28,061.00

13.26 1 m2 Pasang Lantai Marmer


a. Bahan
1.052 M2 Marmer 300,000.00 315,600.00 315,600.00
14.150 Kg Semen Portland 1,250.00 17,687.50 17,687.50
0.039 M3 Pasir Pasang 92,500.00 3,607.50 3,607.50
2.000 Kg Semen Warna 12,000.00 24,000.00 24,000.00
360,895.00 360,895.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 360,895.00 78,950.00 439,845.00
13.27 1 m2 Pasang Lantai Karpet 6 mm
a. Bahan
1.050 M2 Carpet 6 mm 75,000.00 78,750.00 78,750.00
0.350 Kg Lem Vinyl 8,500.00 2,975.00 2,975.00
81,725.00 81,725.00
b. Tenaga
0.170 Oh Pekerja 65,000.00 11,050.00 11,050.00
0.170 Oh Tukang Batu 90,000.00 15,300.00 15,300.00
0.017 Oh Kepala Tukang 110,000.00 1,870.00 1,870.00
0.009 Oh Mandor 110,000.00 935.00 935.00
29,155.00 29,155.00
Jumlah 81,725.00 29,155.00 110,880.00
13.28 1 m2 Pasang dinding Wallpaper
a. Bahan
1.020 M2 Wallpaper 280,000.00 285,600.00 285,600.00
0.350 Kg Lem Vinyl 8,500.00 2,975.00 2,975.00
288,575.00 288,575.00
b. Tenaga
0.170 Oh Pekerja 65,000.00 11,050.00 11,050.00
0.170 Oh Tukang Batu 90,000.00 15,300.00 15,300.00
0.017 Oh Kepala Tukang 110,000.00 1,870.00 1,870.00
0.009 Oh Mandor 110,000.00 935.00 935.00
29,155.00 29,155.00
Jumlah 288,575.00 29,155.00 317,730.00

13.29 1 m2 Pasang Lantai Parquet Jati


a. Bahan

- 82 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
1.050 M2 Parquet Jati 385,000.00 404,250.00 404,250.00
0.600 Kg Lem Vinyl 8,500.00 5,100.00 5,100.00
409,350.00 409,350.00
b. Tenaga
0.650 Oh Pekerja 65,000.00 42,250.00 42,250.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.033 Oh Mandor 110,000.00 3,575.00 3,575.00
81,175.00 81,175.00
Jumlah 409,350.00 81,175.00 490,525.00

13.30 1 m Pasang Dinding Porselin 10 x 10 cm, putih


2

a. Bahan
100.000 Bh Porselin 11 x 11 cm, Putih 700.00 70,000.00 70,000.00
9.300 Kg Semen Abu-abu 1,250.00 11,625.00 11,625.00
0.018 M3 Pasir Pasang 92,500.00 1,665.00 1,665.00
1.500 Kg Semen Puith 2,000.00 3,000.00 3,000.00
86,290.00 86,290.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.500 Oh Tukang Batu 90,000.00 45,000.00 45,000.00
0.050 Oh Kepala Tukang 110,000.00 5,500.00 5,500.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
94,100.00 94,100.00
Jumlah 86,290.00 94,100.00 180,390.00

13.31 1 m Pasang Dinding Porselin 10 x 10 cm, Warna


2

a. Bahan
100.000 Bh Porselin 11 x 11 cm warna/setara disesuaikan 1,000.00 100,000.00 100,000.00
9.300 Kg Semen Abu-abu 1,250.00 11,625.00 11,625.00
0.018 M3 Pasir Pasang 92,500.00 1,665.00 1,665.00
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
131,290.00 131,290.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.500 Oh Tukang Batu 90,000.00 45,000.00 45,000.00
0.050 Oh Kepala Tukang 110,000.00 5,500.00 5,500.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
94,100.00 94,100.00
Jumlah 131,290.00 94,100.00 225,390.00

13.32 1 m Pasang Dinding Marmer


2

a. Bahan
1.020 M2 Marmer 300,000.00 306,000.00 306,000.00
2.000 Bh Paku Pancing 60 x 230 - - -
12.440 Kg Semen Abu-abu 1,250.00 15,550.00 15,550.00
0.025 M3 Pasir Pasang 92,500.00 2,312.50 2,312.50
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
341,862.50 341,862.50
b. Tenaga
0.720 Oh Pekerja 65,000.00 46,800.00 46,800.00
0.650 Oh Tukang Batu 90,000.00 58,500.00 58,500.00
0.065 Oh Kepala Tukang 110,000.00 7,150.00 7,150.00
0.035 Oh Mandor 110,000.00 3,850.00 3,850.00
116,300.00 116,300.00
Jumlah 341,862.50 116,300.00 458,162.50

13.33 1 m2 Pasang Dinding Batu Tempel Hitam/Kali + anti lumut (vernis)


a. Bahan
1.050 M2 Batu Tempel Hitam 93,000.00 97,650.00 97,650.00
0.100 Kg Anti Lumut/Vernis batu 65,000.00 6,500.00 6,500.00
11.750 Kg Semen Abu-abu 1,250.00 14,687.50 14,687.50
0.035 M3 Pasir Pasang 92,500.00 3,237.50 3,237.50
122,075.00 122,075.00
b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 122,075.00 78,950.00 201,025.00

13.34 1 m2 Pasang Dinding Batu Candi Hitam + anti lumut (vernis)


a. Bahan
1.050 M2 Batu Candi hitam 225,000.00 236,250.00 236,250.00
0.100 Kg Anti Lumut/Vernis batu 65,000.00 6,500.00 6,500.00
11.750 Kg Semen Abu-abu 1,250.00 14,687.50 14,687.50
0.035 M3 Pasir Pasang 92,500.00 3,237.50 3,237.50
260,675.00 260,675.00

- 83 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

b. Tenaga
0.620 Oh Pekerja 65,000.00 40,300.00 40,300.00
0.350 Oh Tukang Batu 90,000.00 31,500.00 31,500.00
0.035 Oh Kepala Tukang 110,000.00 3,850.00 3,850.00
0.030 Oh Mandor 110,000.00 3,300.00 3,300.00
78,950.00 78,950.00
Jumlah 260,675.00 78,950.00 339,625.00

13.35 1 m2 Pasang Dinding batu Alam / Palimanan + anti lumut(vernis)


a. Bahan
1.020 M2 Batu alam/Palimanan 168,000.00 171,360.00 171,360.00
0.100 Kg Anti Lumut/Vernis batu 65,000.00 6,500.00 6,500.00
12.440 Kg Semen Abu-abu 1,250.00 15,550.00 15,550.00
0.025 M3 Pasir Pasang 92,500.00 2,312.50 2,312.50
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
213,722.50 213,722.50
b. Tenaga
0.720 Oh Pekerja 65,000.00 46,800.00 46,800.00
0.650 Oh Tukang Batu 90,000.00 58,500.00 58,500.00
0.065 Oh Kepala Tukang 110,000.00 7,150.00 7,150.00
0.035 Oh Mandor 110,000.00 3,850.00 3,850.00
116,300.00 116,300.00
Jumlah 213,722.50 116,300.00 330,022.50

13.36 1 m2 Pasang Dinding batu Alam/KarangPilang + anti lumut(vernis)


a. Bahan
1.020 M2 Batu alam/KarangPilang 594,000.00 605,880.00 605,880.00
0.100 Kg Anti Lumut/Vernis batu 65,000.00 6,500.00 6,500.00
12.440 Kg Semen Abu-abu 1,250.00 15,550.00 15,550.00
0.025 M3 Pasir Pasang 92,500.00 2,312.50 2,312.50
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
648,242.50 648,242.50
b. Tenaga
0.720 Oh Pekerja 65,000.00 46,800.00 46,800.00
0.650 Oh Tukang Batu 90,000.00 58,500.00 58,500.00
0.065 Oh Kepala Tukang 110,000.00 7,150.00 7,150.00
0.035 Oh Mandor 110,000.00 3,850.00 3,850.00
116,300.00 116,300.00

Jumlah 648,242.50 116,300.00 764,542.50

13.37 1 m2 Pasang Dinding batu Alam/Andesit + anti lumut(vernis)


a. Bahan
1.020 M2 Batu alam/Andesit(garis-garis) 190,000.00 193,800.00 193,800.00
0.100 Kg Anti Lumut/Vernis batu 65,000.00 6,500.00 6,500.00
12.440 Kg Semen Abu-abu 1,250.00 15,550.00 15,550.00
0.025 M3 Pasir Pasang 92,500.00 2,312.50 2,312.50
1.500 Kg Semen Warna 12,000.00 18,000.00 18,000.00
236,162.50 236,162.50
b. Tenaga
0.720 Oh Pekerja 65,000.00 46,800.00 46,800.00
0.650 Oh Tukang Batu 90,000.00 58,500.00 58,500.00
0.065 Oh Kepala Tukang 110,000.00 7,150.00 7,150.00
0.035 Oh Mandor 110,000.00 3,850.00 3,850.00
116,300.00 116,300.00

Jumlah 236,162.50 116,300.00 352,462.50

13.38 1 m2 plint Kayu 2 x 10 cm


a. Bahan
0.002 M3 Kayu Jati Papan 8,250,000.00 19,800.00 19,800.00
0.050 Kg Paku Skrup 3,5" 45,000.00 2,250.00 2,250.00
22,050.00 22,050.00

b. Tenaga
0.120 Oh Pekerja 65,000.00 7,800.00 7,800.00
0.120 Oh Tukang Batu 90,000.00 10,800.00 10,800.00
0.012 Oh Kepala Tukang 110,000.00 1,320.00 1,320.00
0.006 Oh Mandor 110,000.00 660.00 660.00
20,580.00 20,580.00
Jumlah 22,050.00 20,580.00 42,630.00

13.39 1 m2 Pas. Lantai Batu Bata Diplester


a. Bahan
58.500 Bh Bata Lobang 9 x 9 x 19 cm 725.00 42,412.50 42,412.50
70.000 Bh Bata Lobang 5 x 11 x 22 cm 1,250.00 87,500.00 87,500.00
0.248 Zak Semen Portland (PC) 62,000.00 15,376.00 15,376.00
0.047 M3 Pasir Pasang 92,500.00 4,347.50 4,347.50
62,136.00 62,136.00
107,223.50 107,223.50

- 84 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.160 Oh Tukang Batu 90,000.00 14,400.00 14,400.00
0.076 Oh Kepala Tukang 110,000.00 8,360.00 8,360.00
0.025 Oh Mandor 110,000.00 2,750.00 2,750.00
41,760.00 41,760.00
Bata lobang 62,136.00 41,760.00 103,896.00
Bata merah/kecil 107,223.50 41,760.00 148,983.50

13.40 1 m2 Pas. Coneblock, tebal 8 cm


a. Bahan
50.000 Bh Conblock 8 cm biasa, 10 X 20 cm 2,450.00 122,500.00 122,500.00
50.000 Bh Conblock 8 cm Warna, 10 X 20 cm 3,000.00 150,000.00 150,000.00
0.100 M3 Pasir Pasang 92,500.00 9,250.00 9,250.00
Coneblock biasa 8 cm 131,750.00 131,750.00
Coneblock warna 8 cm 159,250.00 159,250.00

b. Tenaga
0.350 Oh Pekerja 65,000.00 22,750.00 22,750.00
0.018 Oh Mandor 110,000.00 1,925.00 1,925.00
24,675.00 24,675.00
Coneblock biasa, tbl 8 cm 131,750.00 24,675.00 156,425.00
Coneblock warna, tbl. 8 cm 159,250.00 24,675.00 183,925.00

13.41 1 m2 Pas. Coneblock, tebal 6 cm


a. Bahan
50.000 Bh Coneblock 6 cm biasa, 10 X 20 cm 1,800.00 90,000.00 90,000.00
50.000 Bh Coneblock 6 cm Warna, 10 X 20 cm 2,400.00 120,000.00 120,000.00
0.100 M3 Pasir Pasang 92,500.00 9,250.00 9,250.00
99,250.00 99,250.00
129,250.00 129,250.00
b. Tenaga
0.350 Oh Pekerja 65,000.00 22,750.00 22,750.00
0.018 Oh Mandor 110,000.00 1,925.00 1,925.00
24,675.00 24,675.00

Coneblock biasa 6 cm 99,250.00 24,675.00 123,925.00


Coneblock warna 6 cm 129,250.00 24,675.00 153,925.00

13.42 1 m2 Pas. Lantai Mozaik 30/30


a. Bahan
11.100 Bh Mozaik uk. 30 x 30 7,500.00 83,250.00 83,250.00
0.096 Zak Semen Portland (PC) 62,000.00 5,952.00 5,952.00
0.050 M3 Perekat 756,356.00 37,817.80 37,817.80
127,019.80 127,019.80
b. Tenaga
0.250 Oh Tukang Batu 90,000.00 22,500.00 22,500.00
0.025 Oh Kepala Tukang 110,000.00 2,750.00 2,750.00
0.500 Oh Pekerja 65,000.00 32,500.00 32,500.00
0.025 Oh Mandor 110,000.00 2,750.00 2,750.00
60,500.00 60,500.00
Jumlah 127,019.80 60,500.00 187,519.80

XIV PEKERJAAN PENGECATAN

14.1 1 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama


a. Bahan
0.050 Kg Soda Api 30,000.00 1,500.00 1,500.00
1,500.00 1,500.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
Oh Tukang Cat 90,000.00 - -
Oh Kepala Tukang 110,000.00 - -
0.003 Oh Mandor 110,000.00 275.00 275.00
10,025.00 10,025.00

Jumlah 1,500.00 10,025.00 11,525.00

14.2 1 m2 Mencuci bidang permukaan tembok yang pernah di cat

a. Bahan
0.050 Kg Sabun 11,200.00 560.00 560.00
560.00 560.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
Oh Tukang Cat 90,000.00 - -
Oh Kepala Tukang 110,000.00 - -
0.003 Oh Mandor 110,000.00 275.00 275.00
10,025.00 10,025.00
Jumlah 560.00 10,025.00 10,585.00

- 85 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
14.3 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
a. Bahan
0.050 Kg Sabun 11,200.00 560.00 560.00
560.00 560.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
Oh Tukang Cat 90,000.00 - -
Oh Kepala Tukang 110,000.00 - -
0.003 Oh Mandor 110,000.00 275.00 275.00
10,025.00 10,025.00
Jumlah 560.00 10,025.00 10,585.00

14.4 1 m Menyabun Permukaan Tembok Lama


2

a. Bahan
0.050 Kg Sabun 11,200.00 560.00 560.00
560.00 560.00
b. Tenaga
0.150 Oh Pekerja 65,000.00 9,750.00 9,750.00
Oh Tukang Cat 90,000.00 - -
Oh Kepala Tukang 110,000.00 - -
0.003 Oh Mandor 110,000.00 275.00 275.00
10,025.00 10,025.00
Jumlah 560.00 10,025.00 10,585.00
14.5 1 m2 Mendempul dan Menggosok Kayu
a. Bahan
0.080 Kg Dempul Jadi 20,000.00 1,600.00 1,600.00
0.020 Kg Minyak Cat 6,000.00 120.00 120.00
0.010 Kg Batu Apung 2,000.00 20.00 20.00
1,740.00 1,740.00
b. Tenaga
0.040 Oh Pekerja 65,000.00 2,600.00 2,600.00
0.040 Oh Tukang Cat 90,000.00 3,600.00 3,600.00
0.004 Oh Kepala Tukang 110,000.00 440.00 440.00
0.003 Oh Mandor 110,000.00 275.00 275.00
6,915.00 6,915.00
Jumlah 1,740.00 6,915.00 8,655.00

14.6 1 m Pengecatan Bidang Kayu Lama


2

a. Bahan
0.150 Kg Plamir 17,000.00 2,550.00 2,550.00
0.170 Kg Cat Dasar 32,000.00 5,440.00 5,440.00
0.170 Kg Cat Penutup 82,000.00 13,940.00 13,940.00
21,930.00 21,930.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.075 Oh Tukang Cat 90,000.00 6,750.00 6,750.00
0.008 Oh Kepala Tukang 110,000.00 825.00 825.00
0.003 Oh Mandor 110,000.00 275.00 275.00
12,400.00 12,400.00
Jumlah 21,930.00 12,400.00 34,330.00

14.7 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 1 lapis Cat


Dasar, 2 Lapis Cat Penutup )
a. Bahan
0.200 Kg Cat Meni 37,000.00 7,400.00 7,400.00
0.150 Kg Plamir 17,000.00 2,550.00 2,550.00
0.170 Kg Cat Dasar 32,000.00 5,440.00 5,440.00
0.260 Kg Cat Penutup 2 Kali 82,000.00 21,320.00 21,320.00
36,710.00 36,710.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.009 Oh Tukang Cat 90,000.00 810.00 810.00
0.006 Oh Kepala Tukang 110,000.00 660.00 660.00
0.003 Oh Mandor 110,000.00 275.00 275.00
6,295.00 6,295.00
Jumlah 36,710.00 6,295.00 43,005.00

14.8 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 1 lapis Cat


Dasar, 3 Lapis Cat Penutup )
a. Bahan
0.200 Kg Cat Meni 37,000.00 7,400.00 7,400.00
0.150 Kg Plamir 17,000.00 2,550.00 2,550.00
0.170 Kg Cat Dasar 32,000.00 5,440.00 5,440.00
0.350 Kg Cat Penutup 2 Kali 82,000.00 28,700.00 28,700.00
44,090.00 44,090.00
b. Tenaga
0.070 Oh Pekerja 65,000.00 4,550.00 4,550.00
0.105 Oh Tukang Cat 90,000.00 9,450.00 9,450.00
0.004 Oh Kepala Tukang 110,000.00 440.00 440.00
0.003 Oh Mandor 110,000.00 275.00 275.00
14,715.00 14,715.00
Jumlah 44,090.00 14,715.00 58,805.00

- 86 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

14.9 1 m2 Pelaburan Bidang Kayu dengan Politur


a. Bahan
0.150 Ltr Politur 49,000.00 7,350.00 7,350.00
0.372 Ltr Politur Jadi 53,000.00 19,716.00 19,716.00
2.000 Lbr Ampelas 3,500.00 7,000.00 7,000.00
34,066.00 34,066.00
b. Tenaga
Oh Pekerja 65,000.00 - -
0.060 Oh Tukang Cat 90,000.00 5,400.00 5,400.00
0.016 Oh Kepala Tukang 110,000.00 1,760.00 1,760.00
0.003 Oh Mandor 110,000.00 275.00 275.00
7,435.00 7,435.00
Jumlah 34,066.00 7,435.00 41,501.00

14.10 1 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter


a. Bahan
0.350 Ltr Residu atau Ter 45,000.00 15,750.00 15,750.00
15,750.00 15,750.00

b. Tenaga
0.100 Oh Pekerja 65,000.00 6,500.00 6,500.00
Oh Tukang Cat 90,000.00 - -
Oh Kepala Tukang 110,000.00 - -
0.006 Oh Mandor 110,000.00 660.00 660.00
7,160.00 7,160.00
Jumlah 15,750.00 7,160.00 22,910.00

14.11 1 m Pelaburan Bidang Kayu dengan Vernis


2

a. Bahan
0.150 Ltr Vernis 25,000.00 3,750.00 3,750.00
0.050 Kg Dempul 20,000.00 1,000.00 1,000.00
0.100 Lbr Ampelas 3,500.00 350.00 350.00
0.010 Bh Kuas 12,500.00 125.00 125.00
5,225.00 5,225.00
b. Tenaga
0.160 Oh Pekerja 65,000.00 10,400.00 10,400.00
0.160 Oh Tukang Cat 90,000.00 14,400.00 14,400.00
0.016 Oh Kepala Tukang 110,000.00 1,760.00 1,760.00
0.003 Oh Mandor 110,000.00 275.00 275.00
26,835.00 26,835.00
Jumlah 5,225.00 26,835.00 32,060.00

14.12 1 m2 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 lapis Cat


Dasar, 2 Lapis Cat Penutup )
a. Bahan
0.100 Kg Plamir 8,000.00 800.00 800.00
0.100 Kg Cat Dasar 32,000.00 3,200.00 3,200.00
0.260 Kg Cat Penutup 2 Kali, mutu C 12,500.00 3,250.00 3,250.00
0.260 Kg Cat Penutup 2 Kali, mutu B 26,000.00 6,760.00 6,760.00
0.260 Kg Cat Penutup 2 Kali, mutu B anti lumut/jamur 27,500.00 7,150.00 7,150.00
0.260 Kg Cat Penutup 2 Kali, mutu A anti lumut/jamur 95,000.00 24,700.00 24,700.00
Cat Mutu C 7,250.00 7,250.00
Cat Mutu B 10,760.00 10,760.00
Cat Mutu B, anti lumut/jamur 11,150.00 11,150.00
Cat Mutu A, anti lumut/jamur 28,700.00 28,700.00
b. Tenaga
0.020 Oh Pekerja 65,000.00 1,300.00 1,300.00
0.063 Oh Tukang Cat 90,000.00 5,670.00 5,670.00
0.006 Oh Kepala Tukang 110,000.00 693.00 693.00
0.003 Oh Mandor 110,000.00 275.00 275.00
7,938.00 7,938.00
Cat Tembok/plafond Mutu C 7,250.00 7,938.00 15,188.00
Cat tembok/plafond Mutu B 10,760.00 7,938.00 18,698.00
Cat tembok/plafond Mutu B, anti lumut/jamur 11,150.00 7,938.00 19,088.00
Cat tembok/plafond Mutu A, anti lumut/jamur 28,700.00 7,938.00 36,638.00

14.13 1 m2 Pengecatan Tembok Lama ( 1 lapis Cat Dasar, 2 Lapis cat


Penutup )
a. Bahan
0.120 Kg Cat Dasar 32,000.00 3,840.00 3,840.00
0.180 Kg Cat Penutup 2 Kali, mutu C 12,500.00 2,250.00 2,250.00
0.180 Kg Cat Penutup 2 Kali, mutu B 26,000.00 4,680.00 4,680.00
0.180 Kg Cat Penutup 2 Kali, Mutu B, anti lumut/jamur 27,500.00 4,950.00 4,950.00
Cat Mutu C 6,090.00 6,090.00
Cat Mutu B 8,790.00 8,790.00
Cat Mutu B, anti lumut/jamur 8,340.00 8,340.00
b. Tenaga
0.028 Oh Pekerja 65,000.00 1,820.00 1,820.00
0.042 Oh Tukang Cat 90,000.00 3,780.00 3,780.00
0.004 Oh Kepala Tukang 110,000.00 462.00 462.00
0.003 Oh Mandor 110,000.00 275.00 275.00
6,337.00 6,337.00

- 87 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

Cat Tembok/plafond Mutu C 6,090.00 6,337.00 12,427.00


Cat tembok/plafond Mutu B 8,790.00 6,337.00 15,127.00
Cat tembok/plafond Mutu B, anti lumut/jamur 8,340.00 6,337.00 14,677.00

14.14 1 m2 Pengecatan Permukaan Baja dengan Meni Besi


a. Bahan
0.100 Kg Meni Besi 42,000.00 4,200.00 4,200.00
0.010 Bh Kuas 12,500.00 125.00 125.00
4,325.00 4,325.00
b. Tenaga
0.020 Oh Pekerja 65,000.00 1,300.00 1,300.00
0.200 Oh Tukang Cat 90,000.00 18,000.00 18,000.00
0.020 Oh Kepala Tukang 110,000.00 2,200.00 2,200.00
0.010 Oh Mandor 110,000.00 1,100.00 1,100.00
22,600.00 22,600.00
Jumlah 4,325.00 22,600.00 26,925.00
14.15 1 m2 Pengecatan Permukaan Baja dengan Meni Besi dan perancah

a. Bahan
0.100 Kg Meni Besi 42,000.00 4,200.00 4,200.00
0.010 Bh Kuas 12,500.00 125.00 125.00
0.002 M3 Perancah Kayu/Gelam dia. 8 290,000.00 580.00 580.00
4,905.00 4,905.00
b. Tenaga
0.250 Oh Pekerja 65,000.00 16,250.00 16,250.00
0.225 Oh Tukang Cat 90,000.00 20,250.00 20,250.00
0.023 Oh Kepala Tukang 110,000.00 2,475.00 2,475.00
0.008 Oh Mandor 110,000.00 825.00 825.00
39,800.00 39,800.00
Jumlah 4,905.00 39,800.00 44,705.00
14.16 10 m2 Cat Semprot minyak Chames Stones ( 1/2 Ducco )
a. Bahan
7.560 Kg Cat Kilat 40,000.00 302,400.00 302,400.00
5.320 Ltr Thinner 12,000.00 63,840.00 63,840.00
5.000 Kg Ross Polac 28,000.00 140,000.00 140,000.00
4.000 Kg Isamu 48,000.00 192,000.00 192,000.00
4.000 Kg Epoxi 50,000.00 200,000.00 200,000.00
4.000 Lbr Amplas Niken 6,500.00 26,000.00 26,000.00
1.000 Ls Alat Bantu / Compressor 5,500.00 5,500.00 5,500.00
929,740.00 929,740.00
b. Tenaga
8.000 Oh Tukang Cat 90,000.00 720,000.00 720,000.00
0.800 Oh Kepala Tukang 110,000.00 88,000.00 88,000.00
4.000 Oh Pekerja 65,000.00 260,000.00 260,000.00
0.200 Oh Mandor 110,000.00 22,000.00 22,000.00
1,090,000.00 1,090,000.00
Jumlah 929,740.00 1,090,000.00 2,019,740.00
Untuk 1 M2 Jumlah 92,974.00 109,000.00 201,974.00

14.17 1 M2 Cat tembok/Plafond Chames Stone (berkerikil)


a. Bahan
0.466 Kg Cat Tembok mutu B, anti lumut/jamur 27,500.00 12,815.00 12,815.00
0.100 Kg Epoxi 50,000.00 5,000.00 5,000.00
0.233 Kg Mill 33,000.00 7,689.00 7,689.00
1.000 Ls Alat Bantu / Compressor 550.00 550.00 550.00
26,054.00 26,054.00
b. Tenaga
0.524 Oh Tukang Cat 90,000.00 47,116.80 47,116.80
0.080 Oh Kepala Tukang 110,000.00 8,800.00 8,800.00
0.400 Oh Pekerja 65,000.00 26,000.00 26,000.00
0.020 Oh Mandor 110,000.00 2,200.00 2,200.00
84,116.80 84,116.80
Jumlah 26,054.00 84,116.80 110,170.80
14.18 10 m2 Cat Melamic
a. Bahan
1.500 Kg Wood Filler ( dempul) 32,000.00 48,000.00 48,000.00
1.500 Kg Wood Stain ( pewarna) 60,000.00 90,000.00 90,000.00
1.500 Kg Sanding Sealer ( Cat dasar ) 38,000.00 57,000.00 57,000.00
2.400 Kg Melamic Clear 60,000.00 144,000.00 144,000.00
2.000 Ltr Thinner 35,000.00 70,000.00 70,000.00
6.000 Lbr Amplas Niken 6,500.00 39,000.00 39,000.00
1.000 Ls Alat Bantu / Compressor 5,500.00 5,500.00 5,500.00
453,500.00 453,500.00
b. Tenaga
12.000 Oh Tukang Cat 90,000.00 1,080,000.00 1,080,000.00
1.200 Oh Kepala Tukang 110,000.00 132,000.00 132,000.00
2.000 Oh Pekerja 65,000.00 130,000.00 130,000.00
0.100 Oh Mandor 110,000.00 11,000.00 11,000.00
1,353,000.00 1,353,000.00
Jumlah 453,500.00 1,353,000.00 1,806,500.00
Untuk 1 M2 Jumlah 45,350.00 135,300.00 180,650.00

- 88 -
Daftar Analisa Pekerjaan Kota Palembang Tahun 2014 Semester I

SATUAN HARGA
NO. Harga Jumlah Harga Jumlah Jumlah
URAIAN
Analisa Satuan Bahan Tenaga Bahan+Tenaga
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

XV PEKERJAAN INSTALASI LISTRIK GEDUNG

15.1 1 Titik Pemasangan Saklar Lampu


a. Bahan
3.000 btg Pipa listrik 5/8" 6,000.00 18,000.00 18,000.00
24.000 m' Kabel NYA 1,5 mm 3,900.00 93,600.00 93,600.00
3.000 Buah T Duss 1,200.00 3,600.00 3,600.00
4.000 Buah L Bow 2,500.00 10,000.00 10,000.00
3.000 Buah Las dop 500.00 1,500.00 1,500.00
1.000 Buah Saklar Ganda 13,500.00 13,500.00 13,500.00
24.000 Buah Klem biasa 140.00 3,360.00 3,360.00
1.000 Buah Mangkok 1,800.00 1,800.00 1,800.00
1.000 Buah Fitting 9,000.00 9,000.00 9,000.00
154,360.00 154,360.00
b. Upah
1.000 ls Tukang Instalasi listrik 85,000.00 85,000.00 85,000.00
85,000.00 85,000.00
Jumlah 154,360.00 85,000.00 239,360.00

15.2 1 Titik Pemasangan Stop Kontak Biasa


a. Bahan
2.000 btg Pipa listrik 5/8" 6,000.00 12,000.00 12,000.00
15.000 m' Kabel NYA 2,5 mm 5,200.00 78,000.00 78,000.00
1.000 Buah T Duss 1,200.00 1,200.00 1,200.00
1.000 Buah L Bow 2,500.00 2,500.00 2,500.00
2.000 Buah Las dop 500.00 1,000.00 1,000.00
1.000 Buah Stop kontak biasa 6,000.00 6,000.00 6,000.00
16.000 Buah Klem biasa 140.00 2,240.00 2,240.00
1.000 Buah Mangkok 1,800.00 1,800.00 1,800.00
104,740.00 104,740.00

b. Upah
1.000 ls Tukang Instalasi listrik 85,000.00 85,000.00 85,000.00
85,000.00 85,000.00
Jumlah 104,740.00 85,000.00 189,740.00

15.3 1 Titik Pemasangan Stop Kontak AC


a. Bahan
25.000 m' Kabel NYM 2 X 2,5 mm 13,000.00 325,000.00 325,000.00
1.000 Buah Stop kontak AC 75,000.00 75,000.00 75,000.00
50.000 Buah Klem biasa 140.00 7,000.00 7,000.00
407,000.00 407,000.00
b. Upah
1.000 ls Tukang Instalasi listrik 85,000.00 85,000.00 85,000.00
85,000.00 85,000.00

Jumlah 407,000.00 85,000.00 492,000.00

15.4 1 Titik Pemasangan MCB


a. Bahan
3.000 btg Pipa listrik 5/8" 6,000.00 18,000.00 18,000.00
15.000 m' Kabel NYA 2,5 mm 5,200.00 78,000.00 78,000.00
1.000 Buah T Duss 1,200.00 1,200.00 1,200.00
2.000 Buah L Bow 2,500.00 5,000.00 5,000.00
24.000 Buah Klem biasa 140.00 3,360.00 3,360.00
1.000 Buah MCB - -
105,560.00 105,560.00

b. Upah
1.000 ls Tukang Instalasi listrik 85,000.00 85,000.00 85,000.00
85,000.00 85,000.00

Jumlah 105,560.00 85,000.00 190,560.00

XVI PEKERJAAN RANGKA KUDA KUDA IWF

a. Bahan
1.150 Kg Besi Baja IWF 15,750.00 18,112.50

b. Tenaga
0.060 Oh Pekerja 75,000.00 4,500.00
0.060 Oh Tukang Las Konstruksi 90,000.00 5,400.00
0.006 Oh Kepala Tukang 110,000.00 660.00
0.003 Oh Mandor 110,000.00 330.00

18,112.50 10,890.00 29,002.50

- 89 -
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

DAFTAR VOLUME PEKERJAAN

No Uraian Pekerjaan Pek. Satuan


I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lahan 170.000 m2
2 Pek. Pembuatan Pagar Sementara 54.000 m'
3 Pek. Pembuatan Bouwplank 50.000 m'
4 Pek. Pembuatan Gudang Alat dan Material 8.000 m2
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 59.786 m3
2 Pek. Pondasi Batu Kali 33.708 m3
3 Pek. Anstampang Pondasi 7.637 m3
4 Pek. Urugan Pasir di Bawah Pondasi 3.819 m3
5 Pek. Timbunan Kembali Galian Pondasi 18.252 m3
III PEKERJAAN DINDING
1 Pek. Pasangan Dinding Batu Bata Merah 298.787 m2
2 Pek. Plesteran Luar 399.278 m2
3 Pek. Plesteran Dalam 322.147 m2
IV PEKERJAAN BETON
Pek. Beton
1 Pek. Beton Kolom 3.8815 m3
2 Pek. Beton Sloof 3.2391 m3
3 Pek. Beton Ring Balok 2.996 m3
4 Pek. Beton Balok 1.4361 m3
5 Pek. Beton Dak 1.6225 m3
6 Pek. Beton Kanopi 0.827 m3
Pek. Tulangan
1 Berat Tulangan Ǿ 12 31.016064 kg
2 Berat Tulangan Ǿ 10 1034.092 kg
3 Berat Tulangan Ǿ 8 244.095385 kg
4 Berat Tulangan Ǿ 6 248.91972 kg
5 Berat Tulangan D 10 378.35674 kg
Pek. Perancah
1 Pek. Perancah Kolom 61.241 m2
2 Pek. Perancah Sloof 40.6835 m2
3 Pek. Perancah Ring Balok 35.706 m2
4 Pek. Perancah Balok 23.824 m2
5 Pek. Perancah Dak 16.785 m2
6 Pek. Perancah Pondasi Batu Kali 95.661 m2
V PEKERJAAN ATAP
1 Pek. Rangka Atap Baja Ringan 87.7718 m2
2 Pek. Penutup Atap 87.7718 m2
3 Pek. Nok 1.020 m'
4 Pek. Jurai Luar 29.720 m2
5 Pek. Jurai Dalam 6.160 m'
6 Pek. Listplank 35.9 m'
VI PEKERJAAN PLAFOND
1 Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2
2 Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2
3 Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2
4 Pek. Overstek Plafond 9.1748 m2
5 Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m'
6 Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m'
7 Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m'
8 Pek. Lisplank Plafond Luar 40 m'
VII PEKERJAAN LANTAI
1 Pek. Timbunan Tanah Lantai 40.859 m3
2 Pek. Timbunan Pasir Lantai 7.866 m3
3 Pek. Cor Spesi Di Bawah Lantai 3.147 m3
4 Pek. Keramik Granite Tile 60x60 81.4 m2

FITRI HANDAYANI
DAFTAR VOLUME PEKERJAAN
(061630100055)/ 4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

5 Pek. Keramik Roman Ceramic 30x30 5.6 m2


6 Pek. Pemasangan Batu Sikat 18 m2
7 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2
8 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2
9 Pek. Plint Keramik 8.283 m
VII PEKERJAAN PINTU DAN JENDELA
1 Kusen Pintu dan Jendela 0.667 m3
2 Daun Pintu 3.075 m2
3 Daun Jendela 2.395 m2
4 Engsel Pintu 9 buah
5 Engsel Jendela 18 buah
6 Kunci Pintu 6 buah
7 Tunjang Angin 6 buah
8 Handle Pintu 12 buah
IX PEKERJAAN LISTRIK
1 Box MCB 1 buah
2 MCB 3 buah
3 Lampu Downlight (18 watt) 26 buah
4 Lampu Pijar (18 watt) 8 buah
5 Lampu Pijar (12 watt) 2 buah
6 Saklar Tunggal 5 buah
7 Saklar Ganda 6 buah
8 Stopkontak 15 buah
9 Instalasi AC 4 buah
10 Exhause 2 buah
11 Outlet Televisi 4 buah
12 Stopkontak AC 4 buah
X PEKERJAAN SANITASI
1 Pompa Air Bersih 1 unit
2 Stop kran 3 buah
3 Kran Air (KR) 1 buah
4 Floor Drain (FD) 2 buah
5 Shower 2 unit
6 Closet Duduk 2 unit
7 Kitchen Sink (KS) 1 unit
8 Meteran Air 1 buah
9 Water Heater 2 unit
10 Roof Drain (RD) 4 buah
11 Bak Kontrol 3 buah
12 Septicktank 1 unit
13 Pipa Air Bersih D 3/4" 46.09 m
14 Pipa Air Hujan D 3" 13.17 m
15 Pipa Air Hujan D 4" 15.83 m
16 Pipa Air Kotor D 4" 17.58 m
17 Pipa Air Kotor D 6" 2.59 m
18 Pipa Air Bekas D 6" 8.74 m
19 Pipa Air Bekas D 4" 14.41 m
XI PEKERJAAN FINISHING
1 Cat Dinding Baru Dalam 322.147 m2
2 Cat Dinding Baru Luar 134.078 m2
3 Cat Pagar 265.200 m2
4 Cat Daun Pintu 3.075 m2
5 Cat Daun Jendela 2.395 m2
6 Cat Kusen Pintu dan Jendela 29.530 m2
7 Cat Plafond Dalam 82.500 m2
8 Cat Plafond Luar 12.824 m2
9 Cat Listplank 35.900 m'
10 Cat Listplank Plafond Dalam 109.570 m'
11 Cat Listplank Plafond Luar 40.000 m'

FITRI HANDAYANI
DAFTAR VOLUME PEKERJAAN
(061630100055)/ 4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

RENCANA ANGGARAN BIAYA

Harga Satuan Jumlah Harga


No. Uraian Pekerjaan Volume Satuan
(Rp) (Rp)
1 2 3 4 5 6=3x5
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lahan 170.000 m2 Rp 12,000.00 Rp 2,040,000.00
2 Pek. Pembuatan Pagar Sementara 54.000 m' Rp 192,682.65 Rp 10,404,862.94
3 Pek. Pembuatan Bouwplank 50.000 m' Rp 58,550.00 Rp 2,927,500.00
4 Pek. Pembuatan Gudang Alat dan Material 8.000 m 2
Rp 653,721.65 Rp 5,229,773.20
Rp 20,602,136.14
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 Rp 30,400.00 Rp 1,817,494.40
2. Pek. Pondasi Batu Kali 33.708 m3 Rp 848,712.50 Rp 28,608,400.95
3. Pek. Anstampang Pondasi 7.637 m3 Rp 848,712.50 Rp 6,481,617.36
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 Rp 98,600.00 Rp 376,553.40
5. Pek. Timbunan Kembali Galian Tanah Pondasi 18.252 m3 Rp 14,570.00 Rp 265,931.64
Rp 37,549,997.75
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 Rp 138,402.50 Rp 41,352,867.77
2. Pek. Plesteran Luar 399.278 m 2
Rp 49,527.50 Rp 19,775,216.38
3. Pek. Plesteran Dalam 322.147 m2 Rp 48,400.00 Rp 15,591,914.80
Rp 76,719,998.95
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 Rp 808,312.74 Rp 3,137,465.90
2. Pek. Beton Sloof 3.2391 m3 Rp 808,312.74 Rp 2,618,205.80
3. Pek. Beton Ring Balok 2.996 m3 Rp 808,312.74 Rp 2,421,704.97
4. Pek. Beton Balok 1.4361 m3 Rp 808,312.74 Rp 1,160,817.93
5. Pek. Beton Dak 1.6225 m3 Rp 808,312.74 Rp 1,311,487.42
6. Pek. Beton Kanopi 0.827 m3 Rp 808,312.74 Rp 668,474.64
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.01606 kg Rp 21,415.00 Rp 664,209.01
2. Berat Tulangan Ǿ 10 1034.092 kg Rp 21,415.00 Rp 22,145,080.18
3. Berat Tulangan Ǿ 8 244.0954 kg Rp 21,415.00 Rp 5,227,302.67
4. Berat Tulangan Ǿ 6 248.9197 kg Rp 21,415.00 Rp 5,330,615.80
5. Berat Tulangan D 10 378.3567 kg Rp 21,415.00 Rp 8,102,509.59
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 Rp 157,990.00 Rp 9,675,465.59
2. Pek. Perancah Sloof 40.6835 m2 Rp 118,310.00 Rp 4,813,264.89
3. Pek. Perancah Ring Balok 35.706 m2 Rp 163,790.00 Rp 5,848,285.74
4. Pek. Perancah Balok 23.824 m2 Rp 163,790.00 Rp 3,902,132.96
5. Pek. Perancah Dak 16.785 m 2
Rp 191,290.00 Rp 3,210,802.65
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 Rp 110,810.00 Rp 10,600,195.41
Rp 90,838,021.13
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 Rp 282,832.00 Rp 24,824,673.74
2. Pek. Penutup Atap 87.7718 m 2
Rp 162,260.00 Rp 14,241,852.27
3. Pek. Nok 1.02 m' Rp 136,500.00 Rp 139,230.00
4. Pek. Jurai Luar 29.72 m2 Rp 119,380.00 Rp 3,547,973.60
5. Pek. Jurai Dalam 6.16 m' Rp 119,380.00 Rp 735,380.80
6. Pek. Listplank 35.9 m' Rp 102,170.00 Rp 3,667,903.00
Rp 47,157,013.41

FITRI HANDAYANI RENCANA ANGGARAN BIAYA


(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

VI PEKERJAAN PLAFOND
1. Pek. Plafond Gypsum (CH +3.00) 76.9 m2 Rp 153,283.25 Rp 11,787,481.93
2. Pek. Plafond Gypsum WR (CH +3.00) 5.6 m2 Rp 153,283.25 Rp 858,386.20
3. Pek. Plafond Gypsum (CH.+2,23) 3.65 m2 Rp 153,283.25 Rp 559,483.86
4. Pek. Overstek Plafond 9.1748 m2 Rp 153,283.25 Rp 1,406,343.16
5. Pek. Listplank Plafond Dlm Gypsum (CH +3.00) 82.83 m' Rp 7,260.00 Rp 601,345.80
6. Pek. Listplank Plafond Dlm Gypsum WR (CH +3.00) 13.66 m' Rp 6,210.00 Rp 84,828.60
7. Pek. Listplank Luar Gypsum (CH.+2,23) 13.08 m' Rp 6,210.00 Rp 81,226.80
8. Pek. Lisplank Plafond Luar 40 m' Rp 6,210.00 Rp 248,400.00
Rp 15,627,496.35
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 Rp 89,130.00 Rp 3,641,762.67
2. Pek. Timbunan Pasir Lantai 7.866 m 3
Rp 98,600.00 Rp 775,587.60
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 Rp 24,580.00 Rp 77,340.97
4. Pek. Keramik Granite Tile 60x60 81.4 m2 Rp 419,943.75 Rp 34,183,421.25
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 Rp 330,469.75 Rp 1,850,630.60
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 Rp 409,625.75 Rp 8,036,857.22
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 Rp 35,367.50 Rp 77,101.15
8 Pek. Plint Keramik 8.283 m Rp 62,010.00 Rp 513,628.83
Rp 49,156,330.29
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.667 m3 Rp 6,223,000.00 Rp 4,153,790.27
2. Daun Pintu 3.075 m2 Rp 583,000.00 Rp 1,792,725.00
3 Daun Jendela 2.395 m 2
Rp 438,900.00 Rp 1,051,165.50
4 Engsel Pintu 9 buah Rp 34,207.50 Rp 307,867.50
5 Engsel Jendela 18 buah Rp 40,805.00 Rp 734,490.00
6 Kunci Pintu 6 buah Rp 154,830.00 Rp 928,980.00
7 Kait Angin 6 buah Rp 31,207.50 Rp 187,245.00
8 Handle Pintu 12 buah Rp 84,025.00 Rp 1,008,300.00
Rp 10,164,563.27
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah Rp 190,560.00 Rp 190,560.00
2. MCB 3 buah Rp 44,000.00 Rp 132,000.00
3. Lampu Downlight (18 watt) 26 buah Rp 127,500.00 Rp 3,315,000.00
4. Lampu Pijar (18 watt) 8 buah Rp 111,000.00 Rp 888,000.00
5. Lampu Pijar (12 watt) 2 buah Rp 97,000.00 Rp 194,000.00
6. Saklar Tunggal 5 buah Rp 146,860.00 Rp 734,300.00
7. Saklar Ganda 6 buah Rp 239,360.00 Rp 1,436,160.00
8. Stopkontak 15 buah Rp 189,740.00 Rp 2,846,100.00
9. Instalasi AC 4 buah Rp 2,850,000.00 Rp 11,400,000.00
10. Exhause 2 buah Rp 229,900.00 Rp 459,800.00
11. Outlet Televisi 4 buah Rp 2,200,000.00 Rp 8,800,000.00
12. Stopkontak AC 4 buah Rp 492,000.00 Rp 1,968,000.00
Rp 32,363,920.00
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit Rp 400,000.00 Rp 400,000.00
2. Stop kran 3 buah Rp 18,387.50 Rp 55,162.50
3. Kran Air (KR) 1 buah Rp 21,387.50 Rp 21,387.50
4. Floor Drain (FD) 2 buah Rp 49,300.00 Rp 98,600.00
5. Shower 2 unit Rp 244,225.00 Rp 488,450.00
6. Closet Duduk 2 unit Rp 2,716,210.00 Rp 5,432,420.00
7. Kitchen Sink (KS) 1 unit Rp 250,415.00 Rp 250,415.00
8. Meteran Air 1 buah Rp 115,000.00 Rp 115,000.00
9. Water Heater 2 unit Rp 1,450,000.00 Rp 2,900,000.00
10. Roof Drain (RD) 4 buah Rp 61,300.00 Rp 245,200.00

FITRI HANDAYANI RENCANA ANGGARAN BIAYA


(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

11. Bak Kontrol 3 buah Rp 500,940.00 Rp 1,502,820.00


12. Septicktank 1 unit Rp 3,927,144.06 Rp 3,927,144.06
13. Pipa Air Bersih D 3/4" 46.09 m Rp 51,840.00 Rp 2,389,305.60
14. Pipa Air Hujan D 3" 13.17 m Rp 69,144.75 Rp 910,636.36
15 Pipa Air Hujan D 4" 15.83 m Rp 99,951.00 Rp 1,582,224.33
16 Pipa Air Kotor D 4" 17.58 m Rp 99,951.00 Rp 1,757,138.58
17 Pipa Air Kotor D 6" 2.59 m Rp 211,163.50 Rp 546,913.47
18 Pipa Air Bekas D 6" 8.74 m Rp 211,163.50 Rp 1,845,568.99
19 Pipa Air Bekas D 4" 14.41 m Rp 99,951.00 Rp 1,440,293.91
Rp 25,908,680.29
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 Rp 18,698.00 Rp 6,023,504.61
2. Cat Dinding Baru Luar 134.078 m 2
Rp 19,088.00 Rp 2,559,271.32
3. Cat Pagar 265.200 m2 Rp 19,088.00 Rp 5,062,137.60
4. Cat Daun Pintu 3.075 m2 Rp 43,005.00 Rp 132,240.38
5 Cat Daun Jendela 2.395 m2 Rp 43,005.00 Rp 102,996.98
6 Cat Kusen Pintu dan Jendela 29.530 m2 Rp 43,005.00 Rp 1,269,937.65
7 Cat Plafond Dalam 82.500 m2 Rp 18,698.00 Rp 1,542,585.00
8 Cat Plafond Luar 12.824 m 2
Rp 19,088.00 Rp 244,784.51
9 Cat Listplank 35.900 m' Rp 43,005.00 Rp 1,543,879.50
10 Cat Listplank Plafond Dalam 109.570 m' Rp 43,005.00 Rp 4,712,057.85
11 Cat Listplank Plafond Luar 40.000 m' Rp 43,005.00 Rp 1,720,200.00
Rp 24,913,595.39

FITRI HANDAYANI RENCANA ANGGARAN BIAYA


(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI RENCANA ANGGARAN BIAYA


(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

REKAPITULASI RENCANA ANGGARAN BIAYA

Jumlah Harga
No. Uraian Pekerjaan
(Rp)
I PEKERJAAN PERSIAPAN Rp 20,602,136.14
II PEKERJAAN PONDASI Rp 37,549,997.75
III PEKERJAAN DINDING Rp 76,719,998.95
IV PEKERJAAN BETON Rp 90,838,021.13
V PEKERJAAN ATAP Rp 47,157,013.41
VI PEKERJAAN PLAFOND Rp 15,627,496.35
VII PEKERJAAN LANTAI Rp 49,156,330.29
VII PEKERJAAN PINTU DAN JENDELA Rp 10,164,563.27
IX PEKERJAAN LISTRIK Rp 32,363,920.00
X PEKERJAAN SANITASI Rp 25,908,680.29
XI PEKERJAAN FINISHING Rp 24,913,595.39

TOTAL Rp 431,001,752.97
PPN (10%) Rp 43,100,175.30
Grand Total Rp 474,101,928.26
DIBULATKAN Rp 475,000,000.00
TERBILANG
Empat Ratus Tujuh Puluh Lima Juta Rupiah

FITRI HANDAYANI REKAPITULASI RENCANA


(061630100055)/4SA ANGGARAN BIAYA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

BOBOT

4.780059
8.712261
17.80039
21.07602
10.94126
3.625854
11.40513
2.358358
7.509
6.01127
5.780393
100

FITRI HANDAYANI REKAPITULASI RENCANA


(061630100055)/4SA ANGGARAN BIAYA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

DAFTAR KEBUTUHAN BAHAN

No Uraian Pekerjaan Vol.Pekerjaan Satuan Koefisien Volume Bahan


1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170.000 m2 0 0
2. Pek. Pembuatan Pagar Sementara
Kayu Gelam dia. 6-8 54.000 Btg 1.250 67.500
Semen Portland 54.000 Kg 2.500 135.000
Pasir Beton 54.000 M3 0.005 0.270
Koral Beton 54.000 M3 0.009 0.486
Kayu 5/7 kelas IV 54.000 M3 0.072 3.888
Paku Biasa 2"-5" 54.000 Kg 0.060 3.240
Teer/Residu 54.000 Lt 0.400 21.600
3. Pek. Pembuatan Bouwplank
Kayu 5/7 kelas IV 50.000 M3 0.012 0.600
Paku Biasa 2" - 5" 50.000 Kg 0.020 1.000
Kayu Papan 3/20 50.000 M3 0.007 0.350
4. Pek. Pembuatan Gudang Alat dan Material
Kayu Gelam dia. 6-8 8.000 Btg 1.700 13.600
Kayu 8.000 M 3
0.210 1.680
Paku Biasa 8.000 Kg 0.300 2.400
Semen Portland 8.000 Kg 10.500 84.000
Pasir Beton 8.000 M3 0.030 0.240
Koral Beton 8.000 M3 0.050 0.400
Seng Gelombang BJLS 8.000 Lbr 1.500 12.000

II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0 0
2. Pek. Pondasi Batu Kali
Batu Belah 15/20 cm / batu kali 33.708 M3 1.100 37.079
Semen Portland 33.708 Kg 202.000 6,809.016
Pasir Pasang 33.708 M3 0.485 16.348
3. Pek. Anstampang Pondasi
Batu Belah 15/20 cm / batu kali 7.637 M3 1.100 8.401
Semen Portland 7.637 Kg 202.000 1,542.674
Pasir Pasang 7.637 M3 0.485 3.704
4. Pek. Urugan Pasir di Bawah Pondasi
Pasir Urug 3.819 M3 1.200 4.583
5. Pek. Timbunan Kembali Galian Pondasi 18.252 M3 0

III PEKERJAAN DINDING


1. Pek. Pasangan Dinding Batu Bata Merah
Bata Merah 5 x 11 x 22 cm 298.787 Bh 70.000 20,915.090
Semen Portland 298.787 Kg 11.500 3,436.051
Pasir Pasang 298.787 M3 0.043 12.848
2. Pek. Plesteran Luar
Semen Portland 399.2775 Kg 7.290 2910.732975
Pasir Pasang 399.2775 M3 0.028 11.17977
3. Pek. Plesteran Dalam
Semen Portland 322.147 Kg 6.240 2010.19728
Pasir Pasang 322.147 M3 0.030 9.66441

FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom
Semen Portland 3.8815 Kg 232.000 900.508
Pasir Beton 3.8815 M3 0.520 2.018
Koral Beton 3.8815 M 3
0.780 3.028
2. Pek. Beton Sloof
Semen Portland 3.2391 Kg 232.000 751.471
Pasir Beton 3.2391 M3 0.520 1.684
Koral Beton 3.2391 M3 0.780 2.526
3. Pek. Beton Ring Balok
Semen Portland 2.996 Kg 232.000 695.072
Pasir Beton 2.996 M3 0.520 1.558
Koral Beton 2.996 M3 0.780 2.337
4. Pek. Beton Balok
Semen Portland 1.4361 Kg 232.000 333.175
Pasir Beton 1.4361 M 3
0.520 0.747
Koral Beton 1.4361 M3 0.780 1.120
5. Pek. Beton Dak
Semen Portland 1.6225 Kg 232.000 376.420
Pasir Beton 1.6225 M3 0.520 0.844
Koral Beton 1.6225 M 3
0.780 1.266
6. Pek. Beton Kanopi
Semen Portland 0.827 Kg 232.000 191.864
Pasir Beton 0.827 M3 0.520 0.430
Koral Beton 0.827 M3 0.780 0.645

Pek. Tulangan
1. Berat Tulangan Ǿ 12
Besi Beton ( Polos / Ulir ) 31.016064 Kg 1.050 32.567
Kawat Beton 31.016064 Kg 0.015 0.465
2. Berat Tulangan Ǿ 10
Besi Beton ( Polos / Ulir ) 1034.092 Kg 1.050 1,085.797
Kawat Beton 1034.092 Kg 0.015 15.511
3. Berat Tulangan Ǿ 8
Besi Beton ( Polos / Ulir ) 244.095385 Kg 1.050 256.300
Kawat Beton 244.095385 Kg 0.015 3.661
4. Berat Tulangan Ǿ 6
Besi Beton ( Polos / Ulir ) 248.91972 Kg 1.050 261.366
Kawat Beton 248.91972 Kg 0.015 3.734
5. Berat Tulangan D 10
Besi Beton ( Polos / Ulir ) 378.35674 Kg 1.050 397.275
Kawat Beton 378.35674 Kg 0.015 5.675

Pek. Perancah
1. Pek. Beton Kolom
Kayu Kls. IV 61.241 M3 0.040 2.450
Paku Biasa 2"- 5" 61.241 Kg 0.400 24.496
Balok Kayu Kls. IV 61.241 M3 0.015 0.919
Kayu Gelam dia. 6-8 cm 61.241 Btg 2.000 122.482
2. Pek. Beton Sloof
Kayu Kls. IV 40.6835 M3 0.045 1.831

FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Paku Biasa 2"- 5" 40.6835 Kg 0.300 12.205


3. Pek. Beton Ring Balok
Kayu Kls. IV 35.706 M3 0.040 1.428
Paku Biasa 2"- 5" 35.706 Kg 0.400 14.282
Balok Kayu Kls. IV 35.706 M3 0.018 0.643
Kayu Gelam dia. 6-8 cm 35.706 Btg 2.000 71.412
4. Pek. Beton Balok
Kayu Kls. IV 23.824 M3 0.040 0.953
Paku Biasa 2"- 5" 23.824 Kg 0.400 9.530
Balok Kayu Kls. IV 23.824 M3 0.018 0.429
Kayu Gelam dia. 6-8 cm 23.824 Btg 2.000 47.648
5. Pek. Beton Dak
Kayu Kls. IV 16.785 M3 0.040 0.671
Paku Biasa 2"- 5" 16.785 Kg 0.400 6.714
Balok Kayu Kls.IV 16.785 M3 0.015 0.252
Kayu Gelam dia. 6-8 cm 16.785 Btg 6.000 100.710
6. Pek. Pondasi Batu Kali
Kayu Kls. IV 95.661 M3 0.040 3.826
Paku Biasa 2"- 5" 95.661 Kg 0.300 28.698

V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan
- Hot dipped Galvalume Steel G550-75x33 Z75 (T.075) 87.7718 M' 2.1 184.32078
- Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) 87.7718 M' 1.2 105.32616
- Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) 87.7718 M' 6.2 544.18516
- Screw / Dynabolt 87.7718 bh 30 2633.154
- Valery Gutter Talang Jurai 87.7718 M' 0.03 2.633154
- Strap Bracing 87.7718 M' 0.7 61.44026
- Alunium Foil Model Karung 87.7718 M2 1.1 96.54898
2. Pek. Penutup Atap
Genteng Keramik biasa/lokal 87.7718 Bh 18.000 1579.8924
3. Pek. Nok
Nok Standar 1.02 M' 1.200 1.224
Paku Hak Panjang 15 cm 1.02 Kg 0.040 0.0408
4. Pek. Jurai Luar
Genteng Bubung Keramik KIA Natural atau sejenis 29.72 Bh 3.000 89.16
Semen Portland 29.72 Kg 8.000 237.76
Pasir Pasang 29.72 M3 0.032 0.95104
5. Pek. Jurai Dalam
Genteng Bubung Keramik KIA Natural atau sejenis 6.16 Bh 3.000 18.48
Semen Portland 6.16 Kg 8.000 49.28
Pasir Pasang 6.16 M3 0.032 0.19712
6. Pek. Listplank
Kayu Kls. II 35.9 M3 0.011 0.3949
Paku Biasa 2" - 5" 35.9 Kg 0.050 1.795

VI PEKERJAAN PLAFOND
1. Pek. Plafond Gypsum (CH +3.00)
Besi hollow galvanis 2/4 76.9 Btg 2.500 192.25
Cornes 76.9 Kg 0.300 23.07
Textile Tape 76.9 roll 0.025 1.9225
Paku Sekrup 76.9 Kg 0.110 8.459
Paku Biasa 2" - 5" 76.9 Kg 0.060 4.614
Paku Gypsum 76.9 Kg 0.040 3.076

FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Gypsum Board x 9 mm 76.9 Lbr 0.364 27.9916


2. Pek. Plafond Gypsum WR (CH +3.00)
Besi hollow galvanis 2/4 5.6 Btg 2.500 14
Cornes 5.6 Kg 0.300 1.68
Textile Tape 5.6 roll 0.025 0.14
Paku Sekrup 5.6 Kg 0.110 0.616
Paku Biasa 2" - 5" 5.6 Kg 0.060 0.336
Paku Gypsum 5.6 Kg 0.040 0.224
Gypsum Board x 9 mm 5.6 Lbr 0.364 2.0384
3. Pek. Plafond Gypsum (CH.+2,23)
Besi hollow galvanis 2/4 3.65 Btg 2.500 9.125
Cornes 3.65 Kg 0.300 1.095
Textile Tape 3.65 roll 0.025 0.09125
Paku Sekrup 3.65 Kg 0.110 0.4015
Paku Biasa 2" - 5" 3.65 Kg 0.060 0.219
Paku Gypsum 3.65 Kg 0.040 0.146
Gypsum Board x 9 mm 3.65 Lbr 0.364 1.3286
4. Pek. Overstek Plafond
Besi hollow galvanis 2/4 9.1748 Btg 2.500 22.937
Cornes 9.1748 Kg 0.300 2.75244
Textile Tape 9.1748 roll 0.025 0.22937
Paku Sekrup 9.1748 Kg 0.110 1.009228
Paku Biasa 2" - 5" 9.1748 Kg 0.060 0.550488
Paku Gypsum 9.1748 Kg 0.040 0.366992
Gypsum Board x 9 mm 9.1748 Lbr 0.364 3.3396272
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00)
Kayu Profil sedang 82.83 M' 1.050 86.9715
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00)
Kayu Profil kecil 13.66 M' 1.050 14.343
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23)
Kayu Profil kecil 13.08 M' 1.050 13.734
8. Pek. Lisplank Plafond Luar
Kayu Profil kecil 40 M' 1.050 42

VII PEKERJAAN LANTAI


1. Pek. Timbunan Tanah Lantai
Tanah Urug 40.859 M3 1.200 49.0308
2. Pek. Timbunan Pasir Lantai
Pasir Urug 7.866 M3 1.200 9.4392
3. Pek. Cor Spesi Di Bawah Lantai
Semen Portland 3.1465 Kg 4.320 13.59288
Pasir Pasang 3.1465 M3 0.016 0.050344
4. Pek. Keramik Granite Tile 60x60
Ubin Granito 60 x 60 cm 81.4 Bh 3.080 250.712
Semen Portland 81.4 Kg 9.800 797.72
Pasir Pasang 81.4 M 3
0.022 1.7501
Semen Warna 81.4 Kg 1.300 105.82
5. Pek. Keramik Roman Ceramic 30x30
Keramik Roman 30x30 5.6 Bh 3.080 17.248
Semen Portland 5.6 Kg 9.800 54.88
Pasir Pasang 5.6 M3 0.022 0.1204
Semen Warna 5.6 Kg 1.300 7.28
6 Pek. Luas Keramik Dinding WC(30x30)
Keramik Roman 30x30 19.62 Bh 3.080 60.4296

FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Semen Portland 19.62 Kg 9.800 192.276


Pasir Pasang 19.62 M 3
0.022 0.42183
Semen Warna 19.62 Kg 1.300 25.506
7 Pek. Luas List Keramik Dinding WC(30x10)
List Keramik 30 x 10 2.18 Bh 3.530 7.6954
Semen Portland 2.18 Kg 1.560 3.4008
Pasir Pasang 2.18 M3 0.003 0.00654
Semen Warna 2.18 Kg 0.190 0.4142
8 Pek. Plint Keramik
Plint Ubin Granito 10 x 60 cm 8.283 Bh 1.770 14.66091
Semen Portland 8.283 Kg 1.200 9.9396
Pasir Pasang 8.283 M3 0.003 0.024849
Semen Warna 8.283 Kg 0.100 0.8283

VII PEKERJAAN PINTU DAN JENDELA


1. Kusen Pintu dan Jendela
Kayu Kls. III 0.66749 M3 1.200 0.800988
2. Daun Pintu
Kayu Kls. II 3.075 M3 0.040 0.123
3. Daun Jendela
Kayu Kls. III 2.395 M3 0.035 0.083825
Kaca bening tbl 3 mm 2.395 M2 1.000 2.395
4 Engsel Pintu
Engsel Pintu 9 Bh 1.000 9
5 Engsel Jendela
Engsel Kuningan Jendela 18 Bh 1.000 18
6 Kunci Pintu
Kunci Tanam mutu B 6 Bh 1.000 6
7 Kait Angin
Kait Angin 6 Bh 1.000 6
8 Handle Pintu
Door Holder 12 Bh 1.000 12

IX PEKERJAAN LISTRIK
1. Box MCB
Pipa listrik 5/8" 1 btg 3.000 3
Kabel NYA 2,5 mm 1 m' 15.000 15
T Duss 1 Buah 1.000 1
L Bow 1 Buah 2.000 2
Klem biasa 1 Buah 24.000 24
2. MCB
MCB 3 Buah 1.000 3
3. Lampu Downlight (18 watt)
Lampu Downlight 18 watt 26 Buah 1.000 26
4. Lampu Pijar (18 watt)
Lampu Pijar 18 watt 8 Buah 1.000 8
5. Lampu Pijar (12 watt)
Lampu Pijar 12 watt 2 Buah 1.000 2
6. Saklar Tunggal
Pipa listrik 5/8" 5 btg 3.000 15
Kabel NYA 1,5 mm 5 m' 24.000 120
T Duss 5 Buah 3.000 15
L Bow 5 Buah 4.000 20
Las dop 5 Buah 3.000 15

FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Saklar Tunggal 5 Buah 1.000 5


Klem biasa 5 Buah 24.000 120
Mangkok 5 Buah 1.000 5
Fitting 5 Buah 1.000 5
7. Saklar Ganda
Pipa listrik 5/8" 6 btg 3.000 18
Kabel NYA 1,5 mm 6 m' 24.000 144
T Duss 6 Buah 3.000 18
L Bow 6 Buah 4.000 24
Las dop 6 Buah 3.000 18
Saklar Ganda 6 Buah 1.000 6
Klem biasa 6 Buah 24.000 144
Mangkok 6 Buah 1.000 6
Fitting 6 Buah 1.000 6
8. Stopkontak
Pipa listrik 5/8" 15 btg 2.000 30
Kabel NYA 2,5 mm 15 m' 15.000 225
T Duss 15 Buah 1.000 15
L Bow 15 Buah 1.000 15
Las dop 15 Buah 2.000 30
Stop kontak biasa 15 Buah 1.000 15
Klem biasa 15 Buah 16.000 240
Mangkok 15 Buah 1.000 15
9. Instalasi AC
AC Indor Panasonic 1 PK 600 Watt 4 Buah 1.000 4
10. Exhause
Exhaust Fan Kapasitas 672 CMH 2 Buah 1.000 2
11. Outlet Televisi
Samsung TV LED 32 Inch 4 Buah 1.000 4
12. Stopkontak AC
Kabel NYM 2 X 2,5 mm 4 m' 25.000 100
Stop kontak AC 4 Buah 1.000 4
Klem biasa 4 Buah 50.000 200

X PEKERJAAN SANITASI
1. Pompa Air Bersih
Pompa Air Bersih 1 unit 1.000 1
2. Stop kran
Stop kran 3 Bh 1.000 3
Seal Tape 3 Bh 0.025 0.075
3. Kran Air (KR)
Kran Air 1 Bh 1.000 1
Seal Tape 1 Bh 0.025 0.025
4. Floor Drain (FD)
Floor Drain 2 Bh 1.000 2
5. Shower
Shower 2 Bh 1.000 2
Perlengkapan ( 12 % Harga Shower) 2 0
Semen Portland 2 Kg 6.000 12
Pasir Pasang 2 M3 0.010 0.02
6. Closet Duduk
Kloset Duduk ex toto 2 Bh 1.000 2
Perlengkapan ( 6 % Harga Kloset )
7. Kitchen Sink (KS)

FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Bak Cuci Stainless Steel 1 Bh 1.000 1


Kran air+ Asesories 1 Set 1.000 1
8. Meteran Air
Meteran Air 1 buah 1.000 1
9. Water Heater
Water Heater 2 unit 1.000 2
10. Roof Drain (RD)
Roof Drain 4 Bh 1.000 4
11. Bak Kontrol
Batu Bata 3 M3 0.145 0.435
Semen Portland 3 Kg 44.000 132
Pasir Pasang 3 M3 0.070 0.21
Batu Kerikil 3 M3 0.070 0.21
Besi Beton 3 Kg 1.600 4.8
Pasir Beton 3 M3 0.060 0.18
12. Septicktank
Galian Tanah 1 M3 10.500 10.5
Urugan Kembali 1 M3 2.625 2.625
Pas. Batu Bata 1 : 3 1 M2 8.400 8.400
Bata Merah 5 x 11 x 22 cm 8.400 Bh 70.000 588
Semen Portland 8.400 Kg 11.500 96.6
Pasir Pasang 8.400 M3 0.043 0.3612
Beton Tumbuk 1 : 3 : 5 1 M3 0.300 0.3
Semen Portland 0.3 Kg 218.000 65.4
Pasir Beton 0.3 M3 0.520 0.156
Koral Beton 0.3 M3 0.870 0.261
Plesteran 1 : 2 1 M2 13.500 13.5
Semen Portland 13.5 Kg 8.520 115.02
Pasir Pasang 13.5 M3 0.017 0.2295
Plat Beton bertulang (besi 100kg,1/2 dinding)1 : 2 : 3 1 M3 0.200 0.2
Kayu Kls. IV 0.2 M3 0.120 0.024
Paku Biasa 2"- 5" 0.2 Kg 3.200 0.64
Besi Beton Polos 0.2 Kg 100.000 20
Kawat Beton 0.2 Kg 1.250 0.25
Semen Portland 0.2 Kg 232.000 46.4
Pasir Beton 0.2 M3 0.520 0.104
Koral Beton 0.2 M3 0.780 0.156
Pipa Hawa 2" 1 Bh 1.000 1
Resapan
Koral Beton 1 M3 0.750 0.75
Pasir Pasang 1 M3 1.000 1
Pipa dia. 4" 1 M' 4.000 4
Buis Beton dia. 50 cm 1 Bh 2.000 2
Ijuk 1 Kg 10.000 10
13. Pipa Air Bersih D 3/4"
Pipa Galvanis 46.09 M' 1.200 55.308
Perlengkapan ( 35 % Harga Pipa Galvanis )
14. Pipa Air Hujan D 3"
Pipa PVC 13.17 M' 1.200 15.804
Perlengkapan ( 35 % Harga Pipa PVC )
15 Pipa Air Hujan D 4"
Pipa PVC 15.83 M' 1.200 18.996
Perlengkapan ( 35 % Harga Pipa PVC )
16 Pipa Air Kotor D 4"

FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Pipa PVC 17.58 M' 1.200 21.096


Perlengkapan ( 35 % Harga Pipa PVC )
17 Pipa Air Kotor D 6"
Pipa PVC 2.59 M' 1.200 3.108
Perlengkapan ( 35 % Harga Pipa PVC )
18 Pipa Air Bekas D 6"
Pipa PVC 8.74 M' 1.200 10.488
Perlengkapan ( 35 % Harga Pipa PVC )
19 Pipa Air Bekas D 4"
Pipa PVC 14.41 M' 1.200 17.292
Perlengkapan ( 35 % Harga Pipa PVC )

XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam
Plamir 322.147 Kg 0.100 32.2147
Cat Dasar 322.147 Kg 0.100 32.2147
Cat Penutup 2 Kali, mutu B 322.147 Kg 0.260 83.75822
2. Cat Dinding Baru Luar
Plamir 134.078 Kg 0.100 13.40775
Cat Dasar 134.078 Kg 0.100 13.40775
Cat Penutup 2 Kali, mutu B anti lumut/jamur 134.078 Kg 0.260 34.86015
3. Cat Pagar
Plamir 265.200 Kg 0.100 26.52
Cat Dasar 265.200 Kg 0.100 26.52
Cat Penutup 2 Kali, mutu B anti lumut/jamur 265.200 Kg 0.260 68.952
4. Cat Daun Pintu
Cat Meni 3.075 Kg 0.200 0.615
Plamir 3.075 Kg 0.150 0.46125
Cat Dasar 3.075 Kg 0.170 0.52275
Cat Penutup 2 Kali 3.075 Kg 0.260 0.7995
5 Cat Daun Jendela
Cat Meni 2.395 Kg 0.200 0.479
Plamir 2.395 Kg 0.150 0.35925
Cat Dasar 2.395 Kg 0.170 0.40715
Cat Penutup 2 Kali 2.395 Kg 0.260 0.6227
6 Cat Kusen Pintu dan Jendela
Cat Meni 29.530 Kg 0.200 5.906
Plamir 29.530 Kg 0.150 4.4295
Cat Dasar 29.530 Kg 0.170 5.0201
Cat Penutup 2 Kali 29.530 Kg 0.260 7.6778
7 Cat Plafond Dalam
Plamir 82.500 Kg 0.100 8.25
Cat Dasar 82.500 Kg 0.100 8.25
Cat Penutup 2 Kali, mutu B 82.500 Kg 0.260 21.45
8 Cat Plafond Luar
Plamir 12.824 Kg 0.100 1.2824
Cat Dasar 12.824 Kg 0.100 1.2824
Cat Penutup 2 Kali, mutu B anti lumut/jamur 12.824 Kg 0.260 3.33424
9 Cat Listplank
Cat Meni 35.900 Kg 0.200 7.18
Plamir 35.900 Kg 0.150 5.385
Cat Dasar 35.900 Kg 0.170 6.103

FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Cat Penutup 2 Kali 35.900 Kg 0.260 9.334


10 Cat Listplank Plafond Dalam
Cat Meni 109.570 Kg 0.200 21.914
Plamir 109.570 Kg 0.150 16.4355
Cat Dasar 109.570 Kg 0.170 18.6269
Cat Penutup 2 Kali 109.570 Kg 0.260 28.4882
11 Cat Listplank Plafond Luar
Cat Meni 40.000 Kg 0.200 8
Plamir 40.000 Kg 0.150 6
Cat Dasar 40.000 Kg 0.170 6.8
Cat Penutup 2 Kali 40.000 Kg 0.260 10.4

FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI
DAFTAR KEBUTUHAN BAHAN
(061630100055)/4SA
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

REKAPITULASI KEBUTUHAN BAHAN

No. Uraian Bahan Satuan Jumlah Harga Satuan Jumlah Biaya


a b c d e f=dxe
1 AC Indor Panasonic 1 PK 600 Watt Bh 4 Rp 2,850,000.00 Rp 11,400,000.00
2 Aluminium Foil M2 96.54898 Rp 18,500.00 Rp 1,786,156.13
3 Bata Merah 5 x 11 x 22 cm Bh 21503.09 Rp 1,250.00 Rp 26,878,862.50
4 Bak Cuci Stainless Steel Bh 1 Rp 193,000.00 Rp 193,000.00
5 Batu Belah 15/20 cm / batu kali M3 45.4795 Rp 350,000.00 Rp 15,917,825.00
6 Batu Bata lobang M3 0.435 Rp 512,000.00 Rp 222,720.00
7 Batu Kerikil M3 0.21 Rp 421,683.00 Rp 88,553.43
8 Besi Beton ( Polos / Ulir ) Kg 2058.1039 Rp 19,000.00 Rp 39,103,974.18
9 Besi hollow galvanis 2/4 Btg 49.302 Rp 25,000.00 Rp 1,232,550.00
10 Buis Beton dia. 50 cm Bh 2 Rp 75,000.00 Rp 150,000.00
11 Cat Dasar Kg 119.15475 Rp 32,000.00 Rp 3,812,952.00
12 Cat Meni Kg 44.094 Rp 37,000.00 Rp 1,631,478.00
13 Cat Penutup Kg 57.3222 Rp 82,000.00 Rp 4,700,420.40
14 Cat Penutup 2 Kali, mutu B Kg 105.20822 Rp 26,000.00 Rp 2,735,413.72
15 Cat Penutup 2 Kali, mutu B anti lumut/jamur Kg 107.14639 Rp 27,500.00 Rp 2,946,525.73
16 Closed Duduk Standar (sejenis Ex.TOTOC721FV1) Bh 2 Rp 2,250,000.00 Rp 4,500,000.00
17 Cornes Kg 28.59744 Rp 7,000.00 Rp 200,182.08
18 Door Holder Bh 12 Rp 30,000.00 Rp 360,000.00
19 Engsel Pintu Bh 9 Rp 18,000.00 Rp 162,000.00
20 Engsel Kuningan 4" Bh 18 Rp 30,000.00 Rp 540,000.00
21 Exhaust Fan Kapasitas 672 CMH Bh 2 Rp 229,900.00 Rp 459,800.00
22 Fitting plafond listrik Bh 11 Rp 9,000.00 Rp 99,000.00
23 Floor Drain Bh 2 Rp 38,000.00 Rp 76,000.00
24 Genteng Bubung Keramik KIA Natural atau sejenis Bh 107.64 Rp 20,000.00 Rp 2,152,800.00
25 Genteng Keramik biasa/lokal Bh 1579.8924 Rp 8,000.00 Rp 12,639,139.20
26 Gypsum Board x 9 mm Lbr 34.6982272 Rp 63,000.00 Rp 2,185,988.31
27 Hot dipped Galvalume Steel G550-75x33 Z75 (T.075) M' 184.32078 Rp 22,500.00 Rp 4,147,217.55
28 Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) M' 105.32616 Rp 18,800.00 Rp 1,980,131.81
29 Hot dipped Galvalume Steel G550-32x25 B45 (T.0.45) M' 544.18516 Rp 16,300.00 Rp 8,870,218.11
30 Ijuk Kg 10 Rp 9,000.00 Rp 90,000.00
31 Kabel NYA 2,5 mm m' 240 Rp 5,200.00 Rp 1,248,000.00
32 Kabel NYM 2 X 2,5 mm m' 100 Rp 13,000.00 Rp 1,300,000.00
33 Kabel NYA 1,5 mm m' 264 Rp 3,900.00 Rp 1,029,600.00
34 Kaca bening tbl 3 mm M2 2.395 Rp 65,000.00 Rp 155,675.00
35 Kait Angin Bh 6 Rp 15,000.00 Rp 90,000.00
36 Kayu Gelam dia. 6-8 Btg 423.352 Rp 8,000.00 Rp 3,386,816.00
37 Kayu Kls. II M3 0.5179 Rp 6,500,000.00 Rp 3,366,350.00
38 Kayu Kls. III Btg 0.884813 3,300,000.00 Rp 2,919,882.90
39 Kayu kelas IV M 3
19.5933675 Rp 1,500,000.00 Rp 29,390,051.25
40 Kayu Papan 3/20 M3 0.35 Rp 3,300,000.00 Rp 1,155,000.00
41 Kayu Profil sedang M' 86.9715 Rp 3,500.00 Rp 304,400.25
42 Kayu Profil kecil M' 70.077 Rp 2,500.00 Rp 175,192.50
43 Kawat Beton Kg 29.2971986 Rp 18,000.00 Rp 527,349.58
44 Keramik Roman 30x30(golA) Bh 60.4296 Rp 113,650.00 Rp 6,867,824.04
45 Keramik Roman 30x30(golB) Bh 17.248 Rp 87,950.00 Rp 1,516,961.60
46 Klem biasa Bh 752 Rp 140.00 Rp 105,280.00
47 Koral Beton M3 12.974716 Rp 421,683.00 Rp 5,471,217.17
48 Kunci Tanam 2 slaag mutu B Bh 6 Rp 90,000.00 Rp 540,000.00

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

49 Kran Air Bh 1 Rp 10,000.00 Rp 10,000.00


50 Kran air+ Asesories Set 1 Rp 25,000.00 Rp 25,000.00
51 L Bow Bh 61 Rp 2,500.00 Rp 152,500.00
52 Lampu Downlight 18 watt Bh 26 Rp 42,500.00 Rp 1,105,000.00
53 Lampu Pijar 18 watt Bh 8 Rp 26,000.00 Rp 208,000.00
54 Lampu Pijar 12 watt Bh 2 Rp 12,000.00 Rp 24,000.00
55 Lantai Granit 60 x 60 cm Bh 250.712 Rp 117,000.00 Rp 29,333,304.00
56 Las dop Bh 63 Rp 500.00 Rp 31,500.00
57 List Keramik 30 x 10 Bh 7.6954 Rp 6,000.00 Rp 46,172.40
58 Mangkok Saklar listrik Bh 26 Rp 1,800.00 Rp 46,800.00
59 MCB Bh 3 Rp 44,000.00 Rp 132,000.00
60 Meteran Air Bh 1 Rp 115,000.00 Rp 115,000.00
61 Nok Standar M' 1.224 Rp 30,000.00 Rp 36,720.00
62 Pasir Pasang/ Beton M3 67.318413 Rp 92,500.00 Rp 6,226,953.20
63 Pasir Urug M3 14.022 Rp 65,000.00 Rp 911,430.00
64 Paku Biasa 2"-5" Kg 110.720238 Rp 15,000.00 Rp 1,660,803.57
65 Paku Hak Panjang 15 cm/Paku Sekrup Kg 10.526528 Rp 45,000.00 Rp 473,693.76
66 Paku Gypsum Kg 3.812992 Rp 25,000.00 Rp 95,324.80
67 Pipa besi medium 2 mm & 3/4", pjg 6 m M' 55.308 Rp 23,400.00 Rp 1,294,207.20
68 Pipa Hawa 2" M' 1 20,000.00 Rp 20,000.00
69 Pipa PVC & 3" mutu A (Wavin dan sejenis) M' 15.804 Rp 32,125.00 Rp 507,703.50
70 Pipa PVC & 4" mutu A ( Wavin dan sejenis) M' 61.384 Rp 52,000.00 Rp 3,191,968.00
71 Pipa PVC & 6" (15 cm) mutu A (Wavin dan sejenis) M' 13.596 Rp 123,750.00 Rp 1,682,505.00
72 Pipa listrik 5/8" btg 66 Rp 6,000.00 Rp 396,000.00
73 Plamir Kayu Kg 33.0705 Rp 17,000.00 Rp 562,198.50
74 Plamir Tembok Kg 81.67485 Rp 8,000.00 Rp 653,398.80
75 Plint Ubin Granito 10 x 60 cm Bh 14.66091 Rp 29,250.00 Rp 428,831.62
76 Pompa Air Bersih Unit 1 Rp 400,000.00 Rp 400,000.00
77 Roof Drain Bh 4 Rp 50,000.00 Rp 200,000.00
78 Saklar Tunggal Bh 5 Rp 6,000.00 Rp 30,000.00
79 Saklar Ganda Bh 6 Rp 13,500.00 Rp 81,000.00
80 Samsung TV LED 32 Inch Bh 4 Rp 2,200,000.00 Rp 8,800,000.00
81 Screw / Dynabolt Buah 2633.154 Rp 1,900.00 Rp 5,002,992.60
82 Seal Tape Bh 0.1 Rp 3,500.00 Rp 350.00
83 Semen Portland Kg 21204.7304 Rp 1,250.00 Rp 26,505,913.04
84 Semen Warna Kg 139.8485 Rp 12,000.00 Rp 1,678,182.00
85 Seng Gelombang BJLS Lbr 12 Rp 7,425.00 Rp 89,100.00
86 Shower Bh 2 Rp 52,500.00 Rp 105,000.00
87 Stop kontak AC Bh 4 Rp 75,000.00 Rp 300,000.00
88 Stopkontak Biasa Bh 15 Rp 6,000.00 Rp 90,000.00
89 Stop kran Bh 3 Rp 7,000.00 Rp 21,000.00
90 Strap Bracing M' 61.44026 Rp 12,500.00 Rp 768,003.25
91 Tanah Urug M3 49.0308 Rp 55,000.00 Rp 2,696,694.00
92 T Duss Bh 49 Rp 1,200.00 Rp 58,800.00
93 Teer/Residu Lt 21.6 Rp 45,000.00 Rp 972,000.00
94 Textile Tape roll 2.38312 Rp 6,850.00 Rp 16,324.37
95 Valery Gutter Talang Jurai M' 2.633154 Rp 125,400.00 Rp 330,197.51
96 Water Heater unit 2 Rp 1,450,000.00 Rp 2,900,000.00
TOTAL BIAYA KEBUTUHAN BAHAN Rp 311,229,079.56
TOTAL BIAYA UPAH PEKERJA Rp 119,772,673.41

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Rp -
Rp -

Rp -

Rp -
Rp -

Rp -

Rp -

Rp -

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Perlengkapan ( 12 % Harga Shower) Bh 2 Rp 6,300.00 Rp 12,600.00

Perlengkapan ( 6 % Harga Kloset ) Bh 2 Rp 135,000.00 Rp 270,000.00

Rp -
Galian Tanah Rp -
Urugan Kembali Rp -
Pas. Batu Bata 1 : 3 Rp -
Beton Tumbuk 1 : 3 : 5 Rp -
Plesteran 1 : 2 Rp -
Plat Beton bertulang (besi 100kg,1/2 dinding)1 : 2 : 3 Rp -
Pipa Hawa 2" Rp -

Perlengkapan ( 35 % Harga Pipa PVC ) 55.308 Rp 8,190.00 Rp 452,972.52

Perlengkapan ( 35 % Harga Pipa PVC ) 15.804 Rp 11,243.75 Rp 177,696.23

Perlengkapan ( 35 % Harga Pipa PVC ) 57.384 Rp 18,200.00 Rp 1,044,388.80

Perlengkapan ( 35 % Harga Pipa PVC ) 13.596 Rp 43,312.50 Rp 588,876.75

Rp -

Rp -
Rp -
Rp -
Rp 589,691,183.67
Rp (158,689,430.70)
Rp -
Rp -

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI REKAPITULASI


(061630100055)/4SA KEBUTUHAN BAHAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

KURVA S PEKERJAAN PEMBANGUNAN RUMAH TINGGAL TIPE 86

Bobot Bulan 1 Bulan 2 Bulan 3 Bulan 4 Bulan 5 Bulan 6


No. Uraian Pekerjaan %
Bobot
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
I PEKERJAAN PERSIAPAN 4.78 2.39 2.39 0
II PEKERJAAN PONDASI 8.712 4.36 4.36
III PEKERJAAN DINDING 17.8 2.97 2.97 2.97 2.97 2.97 2.97
IV PEKERJAAN BETON 21.08 5.27 5.27 5.27 5.27
V PEKERJAAN ATAP 10.94 5.47 5.47
VI PEKERJAAN PLAFOND 3.626 1.81 1.81
VII PEKERJAAN LANTAI 11.41 3.8 3.8 3.8
VII PEKERJAAN PINTU & JENDELA 2.358 1.18 1.18
IX PEKERJAAN LISTRIK 7.509 2.5 2.5 2.5
X PEKERJAAN SANITASI 6.011 1.5 1.5 1.5 1.5
XI PEKERJAAN FINISHING 5.78 1.93 1.93 1.93 100
100

TOTAL BOBOT
RENCANA 2.39 6.75 4.36 5.27 5.27 5.27 8.24 2.97 2.97 2.97 2.97 8.44 7.28 5.61 3.8 3.8 1.18 3.68 4.01 4.01 1.5 3.43 1.93 1.93
RENCANA KUMULATIF 2.39 9.14 13.5 18.8 24 29.3 37.5 40.5 43.5 46.4 49.4 57.8 65.1 70.7 74.5 78.3 79.5 83.2 87.2 91.2 92.7 96.1 98.1 100
REALISASI 2.15 6.11 5.23 5.27 6.32 6.32 5.83 2.67 3.56 3.56 3.56 7.25 7.28 5.23 5.7 2.28 1.18 3.43 4.21 4.06 1.8 3.51 2.31 1.16
REALISASI KUMULATIF 2.15 8.26 13.5 18.8 25.1 31.4 37.2 39.9 43.5 47 50.6 57.8 65.1 70.4 76.1 78.3 79.5 83 87.2 91.2 93 96.5 98.8 100
DEVIASI -0.24 -0.87 0 0 1.05 2.11 -0.3 -0.59 0 0.59 1.19 0 0 -0.38 1.52 0 0 -0.25 -0.05 0 0.3 0.39 0.77 0

FITRI HANDAYANI
(061630100055)/4SA KURVA S
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI
(061630100055)/4SA KURVA S
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

LAPORAN KEMAJUAN PEKERJAAN


Nama Pekerjaan : BANGUNAN GEDUNG
Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke :1

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 0 45 45 0.2129921732
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 0 45 45 1.0863501807
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 0 45 45 0.3056542093
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 0 45 45 0.5460297838
4.7800585488 2.151026347
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 0 0 0 0
2. Pek. Pondasi Batu Kali 33.708 m 3
6.6376530381 0 0 0 0
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 0 0 0 0
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 0 0 0 0
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 0 0 0 0
8.7122610277 0
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 0 0 0 0
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 0 0 0 0
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 0 0 0 0
17.8003913954 0
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 0 0 0 0
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 0 0 0 0
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 0 0 0 0
4. Pek. Beton Balok 1.4361 m3 0.2693302099 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

5. Pek. Beton Dak 1.6225 m3 0.3042881871 0 0 0 0


6. Pek. Beton Kanopi 0.827 m 3
0.1550978926 0 0 0 0
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 0 0 0 0
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 0 0 0 0
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 0 0 0 0
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 0 0 0 0
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 0 0 0 0
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 0 0 0 0
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 0 0 0 0
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 0 0 0 0
4. Pek. Perancah Balok 23.824 m 2
0.9053635938 0 0 0 0
5. Pek. Perancah Dak 16.785 m2 0.7449627821 0 0 0 0
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 0 0 0 0
21.0760212712 0
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m 2
0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m 2
0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0


7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m 2
0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0


11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 2.151026347

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke :2

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 45 55 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 45 55 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 45 55 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 45 55 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 0 40 40 0.1686762884
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 0 40 40 2.6550612152
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 0 40 40 0.601539768
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 0 40 40 0.0349468091
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 0 40 40 0.0246803302
8.7122610277 3.4849044111
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 0 0 0 0


3. Pek. Plesteran Dalam 322.147 m 2
3.6175989292 0 0 0 0
17.8003913954 0
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 0 0 0 0
2. Pek. Beton Sloof 3.2391 m 3
0.6074698718 0 0 0 0
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 0 0 0 0
4. Pek. Beton Balok 1.4361 m3 0.2693302099 0 0 0 0
5. Pek. Beton Dak 1.6225 m3 0.3042881871 0 0 0 0
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 0 0 0 0
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 0 0 0 0
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 0 0 0 0
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 0 0 0 0
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 0 0 0 0
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 0 0 0 0
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 0 0 0 0
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 0 0 0 0
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 0 0 0 0
4. Pek. Perancah Balok 23.824 m2 0.9053635938 0 0 0 0
5. Pek. Perancah Dak 16.785 m2 0.7449627821 0 0 0 0
6. Pek. Perancah Pondasi Batu Kali 95.661 m 2
2.4594320875 0 0 0 0
21.0760212712 0
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m 3
0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m 2
0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m 2
0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0


4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0


2. Cat Dinding Baru Luar 134.0775 m 2
0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m 2
0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 8.2649629599

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke :3

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 40 60 100 0.4216907211


2. Pek. Pondasi Batu Kali 33.708 m 3
6.6376530381 40 60 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 40 60 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 40 60 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 40 60 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 0 0 0 0
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 0 0 0 0
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 0 0 0 0
17.8003913954 0
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 0 0 0 0
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 0 0 0 0
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 0 0 0 0
4. Pek. Beton Balok 1.4361 m3 0.2693302099 0 0 0 0
5. Pek. Beton Dak 1.6225 m 3
0.3042881871 0 0 0 0
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 0 0 0 0
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 0 0 0 0
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 0 0 0 0
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 0 0 0 0
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 0 0 0 0
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 0 0 0 0
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 0 0 0 0
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 0 0 0 0
3. Pek. Perancah Ring Balok 35.706 m 2
1.3569053257 0 0 0 0
4. Pek. Perancah Balok 23.824 m2 0.9053635938 0 0 0 0
5. Pek. Perancah Dak 16.785 m2 0.7449627821 0 0 0 0
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 0 0 0 0
21.0760212712 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m 2
0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m 2
0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0


6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0


15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m 2
0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 13.4923195765

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke :4

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m 3
0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 0 0 0 0
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 0 0 0 0
3. Pek. Plesteran Dalam 322.147 m 2
3.6175989292 0 0 0 0
17.8003913954 0
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 0 25 25 0.181986841
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 0 25 25 0.1518674679
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 0 25 25 0.1404695545
4. Pek. Beton Balok 1.4361 m3 0.2693302099 0 25 25 0.0673325525
5. Pek. Beton Dak 1.6225 m3 0.3042881871 0 25 25 0.0760720468
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 0 25 25 0.0387744732
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 0 25 25 0.0385270481
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 0 25 25 1.2845121875
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 0 25 25 0.3032065783
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 0 25 25 0.3091991951
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 0 25 25 0.4699812432

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 0 25 25 0.5612196194
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 0 25 25 0.2791905631
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 0 25 25 0.3392263314
4. Pek. Perancah Balok 23.824 m2 0.9053635938 0 25 25 0.2263408985
5. Pek. Perancah Dak 16.785 m2 0.7449627821 0 25 25 0.1862406955
6. Pek. Perancah Pondasi Batu Kali 95.661 m 2
2.4594320875 0 25 25 0.6148580219
21.0760212712 5.2690053178
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m 2
0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m 3
0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0


8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m 2
0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

6. Closet Duduk 2 unit 1.2604171474 0 0 0 0


7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m 2
0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m 2
0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 18.7613248943

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke :5

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m 3
0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 0 0 0 0
2. Pek. Plesteran Luar 399.2775 m 2
4.5881985967 0 0 0 0
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 0 0 0 0
17.8003913954 0
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 25 30 55 0.4003710503
2. Pek. Beton Sloof 3.2391 m 3
0.6074698718 25 30 55 0.3341084295
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 25 30 55 0.3090330199
4. Pek. Beton Balok 1.4361 m3 0.2693302099 25 30 55 0.1481316154

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

5. Pek. Beton Dak 1.6225 m3 0.3042881871 25 30 55 0.1673585029


6. Pek. Beton Kanopi 0.827 m 3
0.1550978926 25 30 55 0.0853038409
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 25 30 55 0.0847595058
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 25 30 55 2.8259268124
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 25 30 55 0.6670544722
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 25 30 55 0.6802382292
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 25 30 55 1.033958735
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 25 30 55 1.2346831626
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 25 30 55 0.6142192389
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 25 30 55 0.7462979292
4. Pek. Perancah Balok 23.824 m 2
0.9053635938 25 30 55 0.4979499766
5. Pek. Perancah Dak 16.785 m2 0.7449627821 25 30 55 0.4097295302
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 25 30 55 1.3526876481
21.0760212712 11.5918116992
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m 2
0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m 2
0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0


7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m 2
0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0


11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 25.0841312757

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke :6

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 0 0 0 0
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 0 0 0 0


17.8003913954 0
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 55 30 85 0.6187552596
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 55 30 85 0.516349391
3. Pek. Beton Ring Balok 2.996 m 3
0.561878218 55 30 85 0.4775964853
4. Pek. Beton Balok 1.4361 m3 0.2693302099 55 30 85 0.2289306784
5. Pek. Beton Dak 1.6225 m3 0.3042881871 55 30 85 0.2586449591
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 55 30 85 0.1318332087
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 55 30 85 0.1309919635
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 55 30 85 4.3673414374
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 55 30 85 1.0309023661
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 55 30 85 1.0512772633
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 55 30 85 1.5979362269
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 55 30 85 1.9081467059
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 55 30 85 0.9492479147
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 55 30 85 1.1533695269
4. Pek. Perancah Balok 23.824 m2 0.9053635938 55 30 85 0.7695590547
5. Pek. Perancah Dak 16.785 m2 0.7449627821 55 30 85 0.6332183648
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 55 30 85 2.0905172744
21.0760212712 17.9146180805
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m 2
0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0


2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m 2
0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m 3
0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0


5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0


3. Cat Pagar 265.2 m 2
1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m 2
0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 31.4069376571

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke :7

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381


3. Pek. Anstampang Pondasi 7.637 m 3
1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 0 15 15 1.4391890804
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 0 15 15 0.6882297895
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 0 15 15 0.5426398394
17.8003913954 2.6700587093
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 85 15 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 85 15 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 85 15 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 85 15 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 85 15 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m 3
0.1550978926 85 15 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 85 15 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 85 15 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 85 15 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 85 15 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 85 15 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 85 15 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 85 15 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 85 15 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 85 15 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 85 15 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 85 15 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0


2. Pek. Penutup Atap 87.7718 m 2
3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m 2
1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0


7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0


16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m 2
0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 37.2383995571

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke :8

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 15 15 30 2.8783781609
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 15 15 30 1.376459579
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 15 15 30 1.0852796788
17.8003913954 5.3401174186
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m 3
0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775


2. Pek. Perancah Sloof 40.6835 m 2
1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m 2
0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m 3
0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0


11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0


8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m 2
1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 39.9084582664

LAPORAN KEMAJUAN PEKERJAAN

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke :9

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 30 20 50 4.7972969348
2. Pek. Plesteran Luar 399.2775 m 2
4.5881985967 30 20 50 2.2940992983
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 30 20 50 1.8087994646
17.8003913954 8.9001956977
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926


Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m 2
0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m 2
3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

VII PEKERJAAN LANTAI


1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m 2
1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m 2
0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m 2
0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0


5.7803930533 0
100 43.4685365454

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 10

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m 3
6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 50 20 70 6.7162157087
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 50 20 70 3.2117390177
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 50 20 70 2.5323192504

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

17.8003913954 12.4602739768
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m 3
0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m 2
1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0
3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0


3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m 2
0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m 2
7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0


6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0


4. Cat Daun Pintu 3.075 m 2
0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 47.0286148245

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 11

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201


4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m 3
0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 70 20 90 8.6351344826
2. Pek. Plesteran Luar 399.2775 m 2
4.5881985967 70 20 90 4.129378737
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 70 20 90 3.2558390363
17.8003913954 16.0203522558
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m 3
0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m 2
0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 0 0 0


3. Pek. Nok 1.02 m' 0.0323038129 0 0 0 0
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 0 0 0
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 0 0 0
6. Pek. Listplank 35.9 m' 0.8510181165 0 0 0 0
10.941257914 0
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m 2
0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m 2
0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0


8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0


17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m 2
0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 50.5886931036

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 12

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404


2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 90 10 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 90 10 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 90 10 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526


3. Pek. Perancah Ring Balok 35.706 m 2
1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 0 50 50 2.8798808319
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 0 50 50 1.6521803183
3. Pek. Nok 1.02 m' 0.0323038129 0 50 50 0.0161519065
4. Pek. Jurai Luar 29.72 m2 0.8231923828 0 50 50 0.4115961914
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 0 50 50 0.0853106507
6. Pek. Listplank 35.9 m' 0.8510181165 0 50 50 0.4255090582
10.941257914 5.470628957
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 0 0 0
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 0 0 0
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m 2
0.129810113 0 0 0 0
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 0 0 0
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 0 0 0
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 0 0 0
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 0 0 0
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 0 0 0
3.6258544756 0
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m 2
7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

8. Meteran Air 1 buah 0.026682026 0 0 0 0


9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m 2
0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 57.8393612001

LAPORAN KEMAJUAN PEKERJAAN

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 13

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m 3
0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m 2
3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m 3
0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m 2
2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 50 50 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 50 50 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 50 50 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 50 50 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 50 50 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 50 50 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 0 50 50 1.3674517382
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 0 50 50 0.0995803606
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 0 50 50 0.0649050565
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 0 50 50 0.1631481952
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 0 50 50 0.06976141
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 0 50 50 0.0098408648
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 0 50 50 0.0094230243
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 0 50 50 0.0288165881
3.6258544756 1.8129272378
VII PEKERJAAN LANTAI

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 0 0 0


2. Pek. Timbunan Pasir Lantai 7.866 m 3
0.1799499874 0 0 0 0
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 0 0 0
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 0 0 0
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 0 0 0 0
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 0 0 0
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m 2
0.0178888252 0 0 0 0
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 0 0 0
11.4051346536 0
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m 2
0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m 2
0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m 2
0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

5.7803930533 0
100 65.1229173949

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 14

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m 2
4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m 2
1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 50 50 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 50 50 100 0.1991607213

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 50 50 100 0.129810113


4. Pek. Overstek Plafond 9.1748 m 2
0.3262963903 50 50 100 0.3262963903
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 50 50 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 50 50 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 50 50 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 50 50 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 0 30 30 0.2534859298
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 0 30 30 0.0539849962
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 0 30 30 0.0053833403
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 0 30 30 2.3793467902
5. Pek. Keramik Roman Ceramic 30x30 5.6 m 2
0.4293789033 0 30 30 0.128813671
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 0 30 30 0.5594077397
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 0 30 30 0.0053666475
8 Pek. Plint Keramik 8.283 m 0.1191709376 0 30 30 0.0357512813
11.4051346536 3.4215403961
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0


7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0


5 Cat Daun Jendela 2.395 m 2
0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 70.3573850287

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 15

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m 3
0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m 2
3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m 3
0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m 2
2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129


4. Pek. Jurai Luar 29.72 m 2
0.8231923828 100 0 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 100 0 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 100 0 100 0.1991607213
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 100 0 100 0.129810113
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 100 0 100 0.3262963903
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 100 0 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 100 0 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 100 0 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 100 0 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 30 50 80 0.6759624795
2. Pek. Timbunan Pasir Lantai 7.866 m 3
0.1799499874 30 50 80 0.1439599899
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 30 50 80 0.0143555741
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 30 50 80 6.3449247739
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 30 50 80 0.3435031226
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 30 50 80 1.4917539726
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 30 50 80 0.0143110601
8 Pek. Plint Keramik 8.283 m 0.1191709376 30 50 80 0.0953367501
11.4051346536 9.1241077229
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m 2
0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

8 Handle Pintu 12 buah 0.233943364 0 0 0 0


2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0


18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m 2
0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m 2
0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 76.0599523555

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 16

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126


3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m 3
6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m 3
0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257


4. Pek. Perancah Balok 23.824 m 2
0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 100 0 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 100 0 100 0.1991607213
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 100 0 100 0.129810113
4. Pek. Overstek Plafond 9.1748 m 2
0.3262963903 100 0 100 0.3262963903
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 100 0 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 100 0 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 100 0 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 100 0 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 80 20 100 0.8449530994
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 80 20 100 0.1799499874
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 80 20 100 0.0179444676
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 80 20 100 7.9311559674
5. Pek. Keramik Roman Ceramic 30x30 5.6 m 2
0.4293789033 80 20 100 0.4293789033
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 80 20 100 1.8646924658
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 80 20 100 0.0178888252
8 Pek. Plint Keramik 8.283 m 0.1191709376 80 20 100 0.1191709376
11.4051346536 11.4051346536

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

VII PEKERJAAN PINTU DAN JENDELA


1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 0 0 0
2. Daun Pintu 3.075 m2 0.4159437839 0 0 0 0
3 Daun Jendela 2.395 m2 0.2438889152 0 0 0 0
4 Engsel Pintu 9 buah 0.071430684 0 0 0 0
5 Engsel Jendela 18 buah 0.1704146201 0 0 0 0
6 Kunci Pintu 6 buah 0.2155397266 0 0 0 0
7 Tunjang Angin 6 buah 0.0434441388 0 0 0 0
8 Handle Pintu 12 buah 0.233943364 0 0 0 0
2.3583577561 0
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

9. Water Heater 2 unit 0.6728510917 0 0 0 0


10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m 2
0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 78.3409792862

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Waktu Pelaksanaan : 180 Hari Kerja


Minggu Ke : 17

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m 3
0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m 3
0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924


2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m 2
0.8231923828 100 0 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 100 0 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m 2
0.1991607213 100 0 100 0.1991607213
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 100 0 100 0.129810113
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 100 0 100 0.3262963903
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 100 0 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 100 0 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 100 0 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 100 0 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 100 0 100 0.8449530994

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 100 0 100 0.1799499874


3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m 3
0.0179444676 100 0 100 0.0179444676
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 100 0 100 7.9311559674
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 100 0 100 0.4293789033
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 100 0 100 1.8646924658
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 100 0 100 0.0178888252
8 Pek. Plint Keramik 8.283 m 0.1191709376 100 0 100 0.1191709376
11.4051346536 11.4051346536
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 0 50 50 0.4818762617
2. Daun Pintu 3.075 m2 0.4159437839 0 50 50 0.207971892
3 Daun Jendela 2.395 m2 0.2438889152 0 50 50 0.1219444576
4 Engsel Pintu 9 buah 0.071430684 0 50 50 0.035715342
5 Engsel Jendela 18 buah 0.1704146201 0 50 50 0.0852073101
6 Kunci Pintu 6 buah 0.2155397266 0 50 50 0.1077698633
7 Tunjang Angin 6 buah 0.0434441388 0 50 50 0.0217220694
8 Handle Pintu 12 buah 0.233943364 0 50 50 0.116971682
2.3583577561 1.1791788781
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 0 0 0
2. MCB 3 buah 0.0306263256 0 0 0 0
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 0 0 0
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 0 0 0
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 0 0 0
6. Saklar Tunggal 5 buah 0.1703705368 0 0 0 0
7. Saklar Ganda 6 buah 0.333214422 0 0 0 0
8. Stopkontak 15 buah 0.6603453421 0 0 0 0
9. Instalasi AC 4 buah 2.6450008432 0 0 0 0
10. Exhause 2 buah 0.1066817007 0 0 0 0
11. Outlet Televisi 4 buah 2.0417550368 0 0 0 0
12. Stopkontak AC 4 buah 0.4566106719 0 0 0 0
7.5089996218 0
X PEKERJAAN SANITASI

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0


2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m 2
1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m 2
0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

100 79.5201581643

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 18

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m 3
0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m 2
3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m 3
0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m 2
3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 100 0 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 100 0 100 0.1991607213
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 100 0 100 0.129810113

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 100 0 100 0.3262963903


5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 100 0 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 100 0 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 100 0 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 100 0 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 100 0 100 0.8449530994
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 100 0 100 0.1799499874
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 100 0 100 0.0179444676
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 100 0 100 7.9311559674
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 100 0 100 0.4293789033
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 100 0 100 1.8646924658
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 100 0 100 0.0178888252
8 Pek. Plint Keramik 8.283 m 0.1191709376 100 0 100 0.1191709376
11.4051346536 11.4051346536
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 50 50 100 0.9637525234
2. Daun Pintu 3.075 m2 0.4159437839 50 50 100 0.4159437839
3 Daun Jendela 2.395 m2 0.2438889152 50 50 100 0.2438889152
4 Engsel Pintu 9 buah 0.071430684 50 50 100 0.071430684
5 Engsel Jendela 18 buah 0.1704146201 50 50 100 0.1704146201
6 Kunci Pintu 6 buah 0.2155397266 50 50 100 0.2155397266
7 Tunjang Angin 6 buah 0.0434441388 50 50 100 0.0434441388
8 Handle Pintu 12 buah 0.233943364 50 50 100 0.233943364
2.3583577561 2.3583577561
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 0 30 30 0.0132639832
2. MCB 3 buah 0.0306263256 0 30 30 0.0091878977
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 0 30 30 0.2307415209
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 0 30 30 0.0618094934
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 0 30 30 0.0135034254
6. Saklar Tunggal 5 buah 0.1703705368 0 30 30 0.051111161

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

7. Saklar Ganda 6 buah 0.333214422 0 30 30 0.0999643266


8. Stopkontak 15 buah 0.6603453421 0 30 30 0.1981036026
9. Instalasi AC 4 buah 2.6450008432 0 30 30 0.793500253
10. Exhause 2 buah 0.1066817007 0 30 30 0.0320045102
11. Outlet Televisi 4 buah 2.0417550368 0 30 30 0.612526511
12. Stopkontak AC 4 buah 0.4566106719 0 30 30 0.1369832016
7.5089996218 2.2526998865
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 0 0 0
2. Stop kran 3 buah 0.0127986718 0 0 0 0
3. Kran Air (KR) 1 buah 0.0049622768 0 0 0 0
4. Floor Drain (FD) 2 buah 0.0228769371 0 0 0 0
5. Shower 2 unit 0.1133290054 0 0 0 0
6. Closet Duduk 2 unit 1.2604171474 0 0 0 0
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 0 0 0
8. Meteran Air 1 buah 0.026682026 0 0 0 0
9. Water Heater 2 unit 0.6728510917 0 0 0 0
10. Roof Drain (RD) 4 buah 0.0568907199 0 0 0 0
11. Bak Kontrol 3 buah 0.3486807164 0 0 0 0
12. Septicktank 1 unit 0.9111666099 0 0 0 0
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 0 0 0
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 0 0 0
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 0 0 0
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 0 0 0
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 0 0 0
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 0 0 0
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 0 0 0
6.0112702826 0
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0


6 Cat Kusen Pintu dan Jendela 29.53 m 2
0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 82.9520369289

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 19

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m 3
6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m 3
0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m 2
1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828


5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 100 0 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m 2
0.1991607213 100 0 100 0.1991607213
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 100 0 100 0.129810113
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 100 0 100 0.3262963903
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 100 0 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 100 0 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 100 0 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 100 0 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 100 0 100 0.8449530994
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 100 0 100 0.1799499874
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m 3
0.0179444676 100 0 100 0.0179444676
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 100 0 100 7.9311559674
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 100 0 100 0.4293789033
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 100 0 100 1.8646924658
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 100 0 100 0.0178888252
8 Pek. Plint Keramik 8.283 m 0.1191709376 100 0 100 0.1191709376
11.4051346536 11.4051346536
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 100 0 100 0.9637525234
2. Daun Pintu 3.075 m2 0.4159437839 100 0 100 0.4159437839
3 Daun Jendela 2.395 m2 0.2438889152 100 0 100 0.2438889152
4 Engsel Pintu 9 buah 0.071430684 100 0 100 0.071430684
5 Engsel Jendela 18 buah 0.1704146201 100 0 100 0.1704146201
6 Kunci Pintu 6 buah 0.2155397266 100 0 100 0.2155397266
7 Tunjang Angin 6 buah 0.0434441388 100 0 100 0.0434441388
8 Handle Pintu 12 buah 0.233943364 100 0 100 0.233943364

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2.3583577561 2.3583577561
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 30 40 70 0.0309492941
2. MCB 3 buah 0.0306263256 30 40 70 0.0214384279
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 30 40 70 0.5383968822
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 30 40 70 0.1442221512
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 30 40 70 0.0315079925
6. Saklar Tunggal 5 buah 0.1703705368 30 40 70 0.1192593757
7. Saklar Ganda 6 buah 0.333214422 30 40 70 0.2332500954
8. Stopkontak 15 buah 0.6603453421 30 40 70 0.4622417395
9. Instalasi AC 4 buah 2.6450008432 30 40 70 1.8515005902
10. Exhause 2 buah 0.1066817007 30 40 70 0.0746771905
11. Outlet Televisi 4 buah 2.0417550368 30 40 70 1.4292285258
12. Stopkontak AC 4 buah 0.4566106719 30 40 70 0.3196274703
7.5089996218 5.2562997352
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 0 20 20 0.0185614094
2. Stop kran 3 buah 0.0127986718 0 20 20 0.0025597344
3. Kran Air (KR) 1 buah 0.0049622768 0 20 20 0.0009924554
4. Floor Drain (FD) 2 buah 0.0228769371 0 20 20 0.0045753874
5. Shower 2 unit 0.1133290054 0 20 20 0.0226658011
6. Closet Duduk 2 unit 1.2604171474 0 20 20 0.2520834295
7. Kitchen Sink (KS) 1 unit 0.0581006918 0 20 20 0.0116201384
8. Meteran Air 1 buah 0.026682026 0 20 20 0.0053364052
9. Water Heater 2 unit 0.6728510917 0 20 20 0.1345702183
10. Roof Drain (RD) 4 buah 0.0568907199 0 20 20 0.011378144
11. Bak Kontrol 3 buah 0.3486807164 0 20 20 0.0697361433
12. Septicktank 1 unit 0.9111666099 0 20 20 0.182233322
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 0 20 20 0.1108721987
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 0 20 20 0.0422567357
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 0 20 20 0.073420784
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 0 20 20 0.0815374215
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 0 20 20 0.0253787119

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 0 20 20 0.0856409041


19 Pipa Air Bekas D 4" 14.41 m 0.334173562 0 20 20 0.0668347124
6.0112702826 1.2022540565
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m 2
1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 87.1578908341

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 20

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762


4. Pek. Pembuatan Gudang Alat dan Material 8 m 2
1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m 2
4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938


5. Pek. Perancah Dak 16.785 m 2
0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m 2
3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 100 0 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 100 0 100 0.1991607213
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 100 0 100 0.129810113
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 100 0 100 0.3262963903
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 100 0 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 100 0 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 100 0 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 100 0 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 100 0 100 0.8449530994
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 100 0 100 0.1799499874
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 100 0 100 0.0179444676
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 100 0 100 7.9311559674
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 100 0 100 0.4293789033
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 100 0 100 1.8646924658
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 100 0 100 0.0178888252
8 Pek. Plint Keramik 8.283 m 0.1191709376 100 0 100 0.1191709376
11.4051346536 11.4051346536
VII PEKERJAAN PINTU DAN JENDELA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 100 0 100 0.9637525234


2. Daun Pintu 3.075 m 2
0.4159437839 100 0 100 0.4159437839
3 Daun Jendela 2.395 m2 0.2438889152 100 0 100 0.2438889152
4 Engsel Pintu 9 buah 0.071430684 100 0 100 0.071430684
5 Engsel Jendela 18 buah 0.1704146201 100 0 100 0.1704146201
6 Kunci Pintu 6 buah 0.2155397266 100 0 100 0.2155397266
7 Tunjang Angin 6 buah 0.0434441388 100 0 100 0.0434441388
8 Handle Pintu 12 buah 0.233943364 100 0 100 0.233943364
2.3583577561 2.3583577561
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 70 30 100 0.0442132773
2. MCB 3 buah 0.0306263256 70 30 100 0.0306263256
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 70 30 100 0.7691384031
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 70 30 100 0.2060316446
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 70 30 100 0.0450114179
6. Saklar Tunggal 5 buah 0.1703705368 70 30 100 0.1703705368
7. Saklar Ganda 6 buah 0.333214422 70 30 100 0.333214422
8. Stopkontak 15 buah 0.6603453421 70 30 100 0.6603453421
9. Instalasi AC 4 buah 2.6450008432 70 30 100 2.6450008432
10. Exhause 2 buah 0.1066817007 70 30 100 0.1066817007
11. Outlet Televisi 4 buah 2.0417550368 70 30 100 2.0417550368
12. Stopkontak AC 4 buah 0.4566106719 70 30 100 0.4566106719
7.5089996218 7.5089996218
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 20 30 50 0.0464035236
2. Stop kran 3 buah 0.0127986718 20 30 50 0.0063993359
3. Kran Air (KR) 1 buah 0.0049622768 20 30 50 0.0024811384
4. Floor Drain (FD) 2 buah 0.0228769371 20 30 50 0.0114384686
5. Shower 2 unit 0.1133290054 20 30 50 0.0566645027
6. Closet Duduk 2 unit 1.2604171474 20 30 50 0.6302085737
7. Kitchen Sink (KS) 1 unit 0.0581006918 20 30 50 0.0290503459
8. Meteran Air 1 buah 0.026682026 20 30 50 0.013341013
9. Water Heater 2 unit 0.6728510917 20 30 50 0.3364255458

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

10. Roof Drain (RD) 4 buah 0.0568907199 20 30 50 0.0284453599


11. Bak Kontrol 3 buah 0.3486807164 20 30 50 0.1743403582
12. Septicktank 1 unit 0.9111666099 20 30 50 0.4555833049
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 20 30 50 0.2771804968
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 20 30 50 0.1056418392
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 20 30 50 0.18355196
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 20 30 50 0.2038435538
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 20 30 50 0.0634467797
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 20 30 50 0.2141022603
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 20 30 50 0.167086781
6.0112702826 3.0056351413
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m 2
0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 91.2139718054

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

Minggu Ke : 21

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m 3
0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498


3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m 2
1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 100 0 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 100 0 100 0.1991607213
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m 2
0.129810113 100 0 100 0.129810113
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 100 0 100 0.3262963903
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 100 0 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 100 0 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 100 0 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 100 0 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 100 0 100 0.8449530994
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 100 0 100 0.1799499874

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 100 0 100 0.0179444676
4. Pek. Keramik Granite Tile 60x60 81.4 m 2
7.9311559674 100 0 100 7.9311559674
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 100 0 100 0.4293789033
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 100 0 100 1.8646924658
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 100 0 100 0.0178888252
8 Pek. Plint Keramik 8.283 m 0.1191709376 100 0 100 0.1191709376
11.4051346536 11.4051346536
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 100 0 100 0.9637525234
2. Daun Pintu 3.075 m2 0.4159437839 100 0 100 0.4159437839
3 Daun Jendela 2.395 m2 0.2438889152 100 0 100 0.2438889152
4 Engsel Pintu 9 buah 0.071430684 100 0 100 0.071430684
5 Engsel Jendela 18 buah 0.1704146201 100 0 100 0.1704146201
6 Kunci Pintu 6 buah 0.2155397266 100 0 100 0.2155397266
7 Tunjang Angin 6 buah 0.0434441388 100 0 100 0.0434441388
8 Handle Pintu 12 buah 0.233943364 100 0 100 0.233943364
2.3583577561 2.3583577561
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 100 0 100 0.0442132773
2. MCB 3 buah 0.0306263256 100 0 100 0.0306263256
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 100 0 100 0.7691384031
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 100 0 100 0.2060316446
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 100 0 100 0.0450114179
6. Saklar Tunggal 5 buah 0.1703705368 100 0 100 0.1703705368
7. Saklar Ganda 6 buah 0.333214422 100 0 100 0.333214422
8. Stopkontak 15 buah 0.6603453421 100 0 100 0.6603453421
9. Instalasi AC 4 buah 2.6450008432 100 0 100 2.6450008432
10. Exhause 2 buah 0.1066817007 100 0 100 0.1066817007
11. Outlet Televisi 4 buah 2.0417550368 100 0 100 2.0417550368
12. Stopkontak AC 4 buah 0.4566106719 100 0 100 0.4566106719
7.5089996218 7.5089996218
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 50 30 80 0.0742456377

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2. Stop kran 3 buah 0.0127986718 50 30 80 0.0102389375


3. Kran Air (KR) 1 buah 0.0049622768 50 30 80 0.0039698214
4. Floor Drain (FD) 2 buah 0.0228769371 50 30 80 0.0183015497
5. Shower 2 unit 0.1133290054 50 30 80 0.0906632043
6. Closet Duduk 2 unit 1.2604171474 50 30 80 1.0083337179
7. Kitchen Sink (KS) 1 unit 0.0581006918 50 30 80 0.0464805534
8. Meteran Air 1 buah 0.026682026 50 30 80 0.0213456208
9. Water Heater 2 unit 0.6728510917 50 30 80 0.5382808733
10. Roof Drain (RD) 4 buah 0.0568907199 50 30 80 0.0455125759
11. Bak Kontrol 3 buah 0.3486807164 50 30 80 0.2789445731
12. Septicktank 1 unit 0.9111666099 50 30 80 0.7289332879
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 50 30 80 0.4434887948
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 50 30 80 0.1690269427
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 50 30 80 0.2936831359
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 50 30 80 0.326149686
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 50 30 80 0.1015148474
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 50 30 80 0.3425636165
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 50 30 80 0.2673388496
6.0112702826 4.8090162261
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 0 0 0
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 0 0 0
3. Cat Pagar 265.2 m2 1.174505107 0 0 0 0
4. Cat Daun Pintu 3.075 m 2
0.0306820968 0 0 0 0
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 0 0 0
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 0 0 0
7 Cat Plafond Dalam 82.5 m2 0.357906897 0 0 0 0
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 0 0 0
9 Cat Listplank 35.9 m' 0.3582072438 0 0 0 0
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 0 0 0
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 0 0 0
5.7803930533 0
100 93.0173528902

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 22

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m 3
0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642


2. Pek. Beton Sloof 3.2391 m 3
0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m 2
0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 100 0 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 100 0 100 0.1991607213
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 100 0 100 0.129810113
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 100 0 100 0.3262963903

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 100 0 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 100 0 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 100 0 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 100 0 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 100 0 100 0.8449530994
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 100 0 100 0.1799499874
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 100 0 100 0.0179444676
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 100 0 100 7.9311559674
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 100 0 100 0.4293789033
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 100 0 100 1.8646924658
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m 2
0.0178888252 100 0 100 0.0178888252
8 Pek. Plint Keramik 8.283 m 0.1191709376 100 0 100 0.1191709376
11.4051346536 11.4051346536
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 100 0 100 0.9637525234
2. Daun Pintu 3.075 m 2
0.4159437839 100 0 100 0.4159437839
3 Daun Jendela 2.395 m2 0.2438889152 100 0 100 0.2438889152
4 Engsel Pintu 9 buah 0.071430684 100 0 100 0.071430684
5 Engsel Jendela 18 buah 0.1704146201 100 0 100 0.1704146201
6 Kunci Pintu 6 buah 0.2155397266 100 0 100 0.2155397266
7 Tunjang Angin 6 buah 0.0434441388 100 0 100 0.0434441388
8 Handle Pintu 12 buah 0.233943364 100 0 100 0.233943364
2.3583577561 2.3583577561
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 100 0 100 0.0442132773
2. MCB 3 buah 0.0306263256 100 0 100 0.0306263256
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 100 0 100 0.7691384031
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 100 0 100 0.2060316446
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 100 0 100 0.0450114179
6. Saklar Tunggal 5 buah 0.1703705368 100 0 100 0.1703705368
7. Saklar Ganda 6 buah 0.333214422 100 0 100 0.333214422

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

8. Stopkontak 15 buah 0.6603453421 100 0 100 0.6603453421


9. Instalasi AC 4 buah 2.6450008432 100 0 100 2.6450008432
10. Exhause 2 buah 0.1066817007 100 0 100 0.1066817007
11. Outlet Televisi 4 buah 2.0417550368 100 0 100 2.0417550368
12. Stopkontak AC 4 buah 0.4566106719 100 0 100 0.4566106719
7.5089996218 7.5089996218
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 80 20 100 0.0928070471
2. Stop kran 3 buah 0.0127986718 80 20 100 0.0127986718
3. Kran Air (KR) 1 buah 0.0049622768 80 20 100 0.0049622768
4. Floor Drain (FD) 2 buah 0.0228769371 80 20 100 0.0228769371
5. Shower 2 unit 0.1133290054 80 20 100 0.1133290054
6. Closet Duduk 2 unit 1.2604171474 80 20 100 1.2604171474
7. Kitchen Sink (KS) 1 unit 0.0581006918 80 20 100 0.0581006918
8. Meteran Air 1 buah 0.026682026 80 20 100 0.026682026
9. Water Heater 2 unit 0.6728510917 80 20 100 0.6728510917
10. Roof Drain (RD) 4 buah 0.0568907199 80 20 100 0.0568907199
11. Bak Kontrol 3 buah 0.3486807164 80 20 100 0.3486807164
12. Septicktank 1 unit 0.9111666099 80 20 100 0.9111666099
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 80 20 100 0.5543609936
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 80 20 100 0.2112836784
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 80 20 100 0.3671039199
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 80 20 100 0.4076871075
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 80 20 100 0.1268935593
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 80 20 100 0.4282045206
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 80 20 100 0.334173562
6.0112702826 6.0112702826
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 0 40 40 0.5590236758
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 0 40 40 0.237518414
3. Cat Pagar 265.2 m2 1.174505107 0 40 40 0.4698020428
4. Cat Daun Pintu 3.075 m2 0.0306820968 0 40 40 0.0122728387
5 Cat Daun Jendela 2.395 m2 0.0238971128 0 40 40 0.0095588451

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 0 40 40 0.1178591633


7 Cat Plafond Dalam 82.5 m 2
0.357906897 0 40 40 0.1431627588
8 Cat Plafond Luar 12.824 m2 0.0567943194 0 40 40 0.0227177277
9 Cat Listplank 35.9 m' 0.3582072438 0 40 40 0.1432828975
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 0 40 40 0.437312175
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 0 40 40 0.1596466825
5.7803930533 2.3121572213
100 96.531764168

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 23

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762
4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m3 0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m2 3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m3 0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m 2
1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938
5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821
6. Pek. Perancah Pondasi Batu Kali 95.661 m2 2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014


6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 100 0 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 100 0 100 0.1991607213
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m 2
0.129810113 100 0 100 0.129810113
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 100 0 100 0.3262963903
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 100 0 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 100 0 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 100 0 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 100 0 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 100 0 100 0.8449530994
2. Pek. Timbunan Pasir Lantai 7.866 m3 0.1799499874 100 0 100 0.1799499874
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 100 0 100 0.0179444676
4. Pek. Keramik Granite Tile 60x60 81.4 m 2
7.9311559674 100 0 100 7.9311559674
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 100 0 100 0.4293789033
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 100 0 100 1.8646924658
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m2 0.0178888252 100 0 100 0.0178888252
8 Pek. Plint Keramik 8.283 m 0.1191709376 100 0 100 0.1191709376
11.4051346536 11.4051346536
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 100 0 100 0.9637525234
2. Daun Pintu 3.075 m2 0.4159437839 100 0 100 0.4159437839
3 Daun Jendela 2.395 m2 0.2438889152 100 0 100 0.2438889152
4 Engsel Pintu 9 buah 0.071430684 100 0 100 0.071430684
5 Engsel Jendela 18 buah 0.1704146201 100 0 100 0.1704146201
6 Kunci Pintu 6 buah 0.2155397266 100 0 100 0.2155397266
7 Tunjang Angin 6 buah 0.0434441388 100 0 100 0.0434441388
8 Handle Pintu 12 buah 0.233943364 100 0 100 0.233943364
2.3583577561 2.3583577561

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 100 0 100 0.0442132773
2. MCB 3 buah 0.0306263256 100 0 100 0.0306263256
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 100 0 100 0.7691384031
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 100 0 100 0.2060316446
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 100 0 100 0.0450114179
6. Saklar Tunggal 5 buah 0.1703705368 100 0 100 0.1703705368
7. Saklar Ganda 6 buah 0.333214422 100 0 100 0.333214422
8. Stopkontak 15 buah 0.6603453421 100 0 100 0.6603453421
9. Instalasi AC 4 buah 2.6450008432 100 0 100 2.6450008432
10. Exhause 2 buah 0.1066817007 100 0 100 0.1066817007
11. Outlet Televisi 4 buah 2.0417550368 100 0 100 2.0417550368
12. Stopkontak AC 4 buah 0.4566106719 100 0 100 0.4566106719
7.5089996218 7.5089996218
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 100 0 100 0.0928070471
2. Stop kran 3 buah 0.0127986718 100 0 100 0.0127986718
3. Kran Air (KR) 1 buah 0.0049622768 100 0 100 0.0049622768
4. Floor Drain (FD) 2 buah 0.0228769371 100 0 100 0.0228769371
5. Shower 2 unit 0.1133290054 100 0 100 0.1133290054
6. Closet Duduk 2 unit 1.2604171474 100 0 100 1.2604171474
7. Kitchen Sink (KS) 1 unit 0.0581006918 100 0 100 0.0581006918
8. Meteran Air 1 buah 0.026682026 100 0 100 0.026682026
9. Water Heater 2 unit 0.6728510917 100 0 100 0.6728510917
10. Roof Drain (RD) 4 buah 0.0568907199 100 0 100 0.0568907199
11. Bak Kontrol 3 buah 0.3486807164 100 0 100 0.3486807164
12. Septicktank 1 unit 0.9111666099 100 0 100 0.9111666099
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 100 0 100 0.5543609936
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 100 0 100 0.2112836784
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 100 0 100 0.3671039199
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 100 0 100 0.4076871075
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 100 0 100 0.1268935593
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 100 0 100 0.4282045206

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

19 Pipa Air Bekas D 4" 14.41 m 0.334173562 100 0 100 0.334173562


6.0112702826 6.0112702826
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 40 40 80 1.1180473517
2. Cat Dinding Baru Luar 134.0775 m2 0.593796035 40 40 80 0.475036828
3. Cat Pagar 265.2 m2 1.174505107 40 40 80 0.9396040856
4. Cat Daun Pintu 3.075 m2 0.0306820968 40 40 80 0.0245456774
5 Cat Daun Jendela 2.395 m2 0.0238971128 40 40 80 0.0191176902
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 40 40 80 0.2357183267
7 Cat Plafond Dalam 82.5 m2 0.357906897 40 40 80 0.2863255176
8 Cat Plafond Luar 12.824 m2 0.0567943194 40 40 80 0.0454354555
9 Cat Listplank 35.9 m' 0.3582072438 40 40 80 0.286565795
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 40 40 80 0.8746243499
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 40 40 80 0.3192933649
5.7803930533 4.6243144426
100 98.8439213893

LAPORAN KEMAJUAN PEKERJAAN

Nama Pekerjaan : BANGUNAN GEDUNG


Waktu Pelaksanaan : 180 Hari Kerja
Minggu Ke : 24

Tahap Penyelesaian (%) Seluruh Pekerjaan


No. Uraian Pekerjaan Volume Satuan Nilai Bobot (%)
Minggu Lalu Minggu Ini Total Bobot (%)
a b c d e f g h=f+g i=(h/100)xe
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan 170 m2 0.4733159404 100 0 100 0.4733159404
2. Pek. Pembuatan Pagar Sementara 54 m' 2.4141115126 100 0 100 2.4141115126
3. Pek. Pembuatan Bouwplank 50 m' 0.6792315762 100 0 100 0.6792315762

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

4. Pek. Pembuatan Gudang Alat dan Material 8 m2 1.2133995196 100 0 100 1.2133995196
4.7800585488 4.7800585488
II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi 59.786 m3 0.4216907211 100 0 100 0.4216907211
2. Pek. Pondasi Batu Kali 33.708 m3 6.6376530381 100 0 100 6.6376530381
3. Pek. Anstampang Pondasi 7.637 m3 1.5038494201 100 0 100 1.5038494201
4. Pek. Urugan Pasir di Bawah Pondasi 3.819 m 3
0.0873670229 100 0 100 0.0873670229
5. Pek. Timbunan Kembali Galian Pondasi 18.252 m3 0.0617008256 100 0 100 0.0617008256
8.7122610277 8.7122610277
III PEKERJAAN DINDING
1. Pek. Pasangan Dinding Batu Bata Merah 298.787 m2 9.5945938695 100 0 100 9.5945938695
2. Pek. Plesteran Luar 399.2775 m2 4.5881985967 100 0 100 4.5881985967
3. Pek. Plesteran Dalam 322.147 m 2
3.6175989292 100 0 100 3.6175989292
17.8003913954 17.8003913954
IV PEKERJAAN BETON
Pek. Beton
1. Pek. Beton Kolom 3.8815 m3 0.7279473642 100 0 100 0.7279473642
2. Pek. Beton Sloof 3.2391 m 3
0.6074698718 100 0 100 0.6074698718
3. Pek. Beton Ring Balok 2.996 m3 0.561878218 100 0 100 0.561878218
4. Pek. Beton Balok 1.4361 m3 0.2693302099 100 0 100 0.2693302099
5. Pek. Beton Dak 1.6225 m3 0.3042881871 100 0 100 0.3042881871
6. Pek. Beton Kanopi 0.827 m3 0.1550978926 100 0 100 0.1550978926
Pek. Tulangan
1. Berat Tulangan Ǿ 12 31.016064 kg 0.1541081924 100 0 100 0.1541081924
2. Berat Tulangan Ǿ 10 1034.092 kg 5.1380487498 100 0 100 5.1380487498
3. Berat Tulangan Ǿ 8 244.095385 kg 1.2128263131 100 0 100 1.2128263131
4. Berat Tulangan Ǿ 6 248.91972 kg 1.2367967803 100 0 100 1.2367967803
5. Berat Tulangan D 10 378.35674 kg 1.8799249728 100 0 100 1.8799249728
Pek. Perancah
1. Pek. Perancah Kolom 61.241 m2 2.2448784775 100 0 100 2.2448784775
2. Pek. Perancah Sloof 40.6835 m2 1.1167622526 100 0 100 1.1167622526
3. Pek. Perancah Ring Balok 35.706 m2 1.3569053257 100 0 100 1.3569053257
4. Pek. Perancah Balok 23.824 m2 0.9053635938 100 0 100 0.9053635938

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

5. Pek. Perancah Dak 16.785 m2 0.7449627821 100 0 100 0.7449627821


6. Pek. Perancah Pondasi Batu Kali 95.661 m 2
2.4594320875 100 0 100 2.4594320875
21.0760212712 21.0760212712
V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan 87.7718 m2 5.7597616638 100 0 100 5.7597616638
2. Pek. Penutup Atap 87.7718 m2 3.3043606366 100 0 100 3.3043606366
3. Pek. Nok 1.02 m' 0.0323038129 100 0 100 0.0323038129
4. Pek. Jurai Luar 29.72 m2 0.8231923828 100 0 100 0.8231923828
5. Pek. Jurai Dalam 6.16 m' 0.1706213014 100 0 100 0.1706213014
6. Pek. Listplank 35.9 m' 0.8510181165 100 0 100 0.8510181165
10.941257914 10.941257914
VI PEKERJAAN PLAFOND
1. Pek. Plafond Dalam Gypsum (CH +3.00) 76.9 m2 2.7349034764 100 0 100 2.7349034764
2. Pek. Plafond Dalam Gypsum WR (CH +3.00) 5.6 m2 0.1991607213 100 0 100 0.1991607213
3. Pek. Plafond Luar Gypsum (CH.+2,23) 3.65 m2 0.129810113 100 0 100 0.129810113
4. Pek. Overstek Plafond 9.1748 m2 0.3262963903 100 0 100 0.3262963903
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00) 82.83 m' 0.13952282 100 0 100 0.13952282
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00) 13.66 m' 0.0196817297 100 0 100 0.0196817297
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23) 13.08 m' 0.0188460486 100 0 100 0.0188460486
8. Pek. Lisplank Plafond Luar 40 m' 0.0576331763 100 0 100 0.0576331763
3.6258544756 3.6258544756
VII PEKERJAAN LANTAI
1. Pek. Timbunan Tanah Lantai 40.859 m3 0.8449530994 100 0 100 0.8449530994
2. Pek. Timbunan Pasir Lantai 7.866 m 3
0.1799499874 100 0 100 0.1799499874
3. Pek. Cor Spesi Di Bawah Lantai 3.1465 m3 0.0179444676 100 0 100 0.0179444676
4. Pek. Keramik Granite Tile 60x60 81.4 m2 7.9311559674 100 0 100 7.9311559674
5. Pek. Keramik Roman Ceramic 30x30 5.6 m2 0.4293789033 100 0 100 0.4293789033
6 Pek. Luas Keramik Dinding WC(30x30) 19.62 m2 1.8646924658 100 0 100 1.8646924658
7 Pek. Luas List Keramik Dinding WC(30x10) 2.18 m 2
0.0178888252 100 0 100 0.0178888252
8 Pek. Plint Keramik 8.283 m 0.1191709376 100 0 100 0.1191709376
11.4051346536 11.4051346536
VII PEKERJAAN PINTU DAN JENDELA
1. Kusen Pintu dan Jendela 0.66749 m3 0.9637525234 100 0 100 0.9637525234

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

2. Daun Pintu 3.075 m2 0.4159437839 100 0 100 0.4159437839


3 Daun Jendela 2.395 m 2
0.2438889152 100 0 100 0.2438889152
4 Engsel Pintu 9 buah 0.071430684 100 0 100 0.071430684
5 Engsel Jendela 18 buah 0.1704146201 100 0 100 0.1704146201
6 Kunci Pintu 6 buah 0.2155397266 100 0 100 0.2155397266
7 Tunjang Angin 6 buah 0.0434441388 100 0 100 0.0434441388
8 Handle Pintu 12 buah 0.233943364 100 0 100 0.233943364
2.3583577561 2.3583577561
IX PEKERJAAN LISTRIK
1. Box MCB 1 buah 0.0442132773 100 0 100 0.0442132773
2. MCB 3 buah 0.0306263256 100 0 100 0.0306263256
3. Lampu Downlight (18 watt) 26 buah 0.7691384031 100 0 100 0.7691384031
4. Lampu Pijar (18 watt) 8 buah 0.2060316446 100 0 100 0.2060316446
5. Lampu Pijar (12 watt) 2 buah 0.0450114179 100 0 100 0.0450114179
6. Saklar Tunggal 5 buah 0.1703705368 100 0 100 0.1703705368
7. Saklar Ganda 6 buah 0.333214422 100 0 100 0.333214422
8. Stopkontak 15 buah 0.6603453421 100 0 100 0.6603453421
9. Instalasi AC 4 buah 2.6450008432 100 0 100 2.6450008432
10. Exhause 2 buah 0.1066817007 100 0 100 0.1066817007
11. Outlet Televisi 4 buah 2.0417550368 100 0 100 2.0417550368
12. Stopkontak AC 4 buah 0.4566106719 100 0 100 0.4566106719
7.5089996218 7.5089996218
X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0.0928070471 100 0 100 0.0928070471
2. Stop kran 3 buah 0.0127986718 100 0 100 0.0127986718
3. Kran Air (KR) 1 buah 0.0049622768 100 0 100 0.0049622768
4. Floor Drain (FD) 2 buah 0.0228769371 100 0 100 0.0228769371
5. Shower 2 unit 0.1133290054 100 0 100 0.1133290054
6. Closet Duduk 2 unit 1.2604171474 100 0 100 1.2604171474
7. Kitchen Sink (KS) 1 unit 0.0581006918 100 0 100 0.0581006918
8. Meteran Air 1 buah 0.026682026 100 0 100 0.026682026
9. Water Heater 2 unit 0.6728510917 100 0 100 0.6728510917
10. Roof Drain (RD) 4 buah 0.0568907199 100 0 100 0.0568907199

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

11. Bak Kontrol 3 buah 0.3486807164 100 0 100 0.3486807164


12. Septicktank 1 unit 0.9111666099 100 0 100 0.9111666099
13. Pipa Air Bersih D 3/4" 46.09 m 0.5543609936 100 0 100 0.5543609936
14. Pipa Air Hujan D 3" 13.17 m 0.2112836784 100 0 100 0.2112836784
15 Pipa Air Hujan D 4" 15.83 m 0.3671039199 100 0 100 0.3671039199
16 Pipa Air Kotor D 4" 17.58 m 0.4076871075 100 0 100 0.4076871075
17 Pipa Air Kotor D 6" 2.59 m 0.1268935593 100 0 100 0.1268935593
18 Pipa Air Bekas D 6" 8.74 m 0.4282045206 100 0 100 0.4282045206
19 Pipa Air Bekas D 4" 14.41 m 0.334173562 100 0 100 0.334173562
6.0112702826 6.0112702826
XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam 322.147 m2 1.3975591896 80 20 100 1.3975591896
2. Cat Dinding Baru Luar 134.0775 m 2
0.593796035 80 20 100 0.593796035
3. Cat Pagar 265.2 m2 1.174505107 80 20 100 1.174505107
4. Cat Daun Pintu 3.075 m2 0.0306820968 80 20 100 0.0306820968
5 Cat Daun Jendela 2.395 m2 0.0238971128 80 20 100 0.0238971128
6 Cat Kusen Pintu dan Jendela 29.53 m2 0.2946479083 80 20 100 0.2946479083
7 Cat Plafond Dalam 82.5 m2 0.357906897 80 20 100 0.357906897
8 Cat Plafond Luar 12.824 m2 0.0567943194 80 20 100 0.0567943194
9 Cat Listplank 35.9 m' 0.3582072438 80 20 100 0.3582072438
10 Cat Listplank Plafond Dalam 109.57 m' 1.0932804374 80 20 100 1.0932804374
11 Cat Listplank Plafond Luar 40 m' 0.3991167062 80 20 100 0.3991167062
5.7803930533 5.7803930533
100 100

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
ESTIMASI BIAYA
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI SRIWIJAYA

FITRI HANDAYANI LAPORAN


(061630100055) KEMAJUAN PEKERJAAN
DAFTAR RENCANA UPAH PEKERJAAN

No Uraian Pekerjaan Vol.Pekerjaan Satuan


Koefisien Volume Bahan
1 2 3 4
I PEKERJAAN PERSIAPAN
1. Pek. Pembersihan Lahan
Pekerja 170.000 Oh 0.100 17.000
Mandor 170.000 Oh 0.050 8.500
2. Pek. Pembuatan Pagar Sementara
Tukang Kayu 54.000 Oh 0.200 10.800
Pekerja 54.000 Oh 0.400 21.600
Kepala Tukang 54.000 Oh 0.020 1.080
Mandor 54.000 Oh 0.020 1.080
3. Pek. Pembuatan Bouwplank
Tukang Kayu 50.000 Oh 0.100 5.000
Pekerja 50.000 Oh 0.100 5.000
Kepala Tukang 50.000 Oh 0.010 0.500
Mandor 50.000 Oh 0.005 0.250
4. Pek. Pembuatan Gudang Alat dan Material
Tukang Kayu 8.000 Oh 2.000 16.000
Pekerja 8.000 Oh 1.000 8.000
Kepala Tukang 8.000 Oh 0.200 1.600
Mandor 8.000 Oh 0.050 0.400

II PEKERJAAN PONDASI
1. Pek. Galian Tanah Pondasi
Pekerja 59.786 Oh 0.400 23.914
Tukang Gali 59.786 - - -
Kepala Tukang 59.786 - - -
Mandor 59.786 Oh 0.040 2.391
2. Pek. Pondasi Batu Kali
Pekerja 33.708 Oh 1.500 50.562
Tukang Batu 33.708 Oh 0.600 20.225
Kepala Tukang 33.708 Oh 0.060 2.022
Mandor 33.708 Oh 0.075 2.528
3. Pek. Anstampang Pondasi
Pekerja 7.637 Oh 1.500 11.456
Tukang Batu 7.637 Oh 0.600 4.582
Kepala Tukang 7.637 Oh 0.060 0.458
Mandor 7.637 Oh 0.075 0.573
4. Pek. Urugan Pasir di Bawah Pondasi
Pekerja 3.819 Oh 0.300 1.146
Tukang Gali 3.819 - - -
Kepala Tukang 3.819 - - -
Mandor 3.819 Oh 0.010 0.038
5. Pek. Timbunan Kembali Galian Pondasi
Pekerja 18.252 Oh 0.192 3.504
Tukang Gali 18.252 - -
Kepala Tukang 18.252 - -
Mandor 18.252 Oh 0.019 0.347

III PEKERJAAN DINDING


1. Pek. Pasangan Dinding Batu Bata Merah
Pekerja 298.787 Oh 0.320 95.612
Tukang Batu 298.787 Oh 0.100 29.879
Kepala Tukang 298.787 Oh 0.010 2.988
Mandor 298.787 Oh 0.015 4.482
2. Pek. Plesteran Luar
Pekerja 399.2775 Oh 0.250 99.819
Tukang Batu 399.2775 Oh 0.200 79.856
Kepala Tukang 399.2775 Oh 0.020 7.986
Mandor 399.2775 Oh 0.013 4.991
3. Pek. Plesteran Dalam
Pekerja 322.147 Oh 0.250 80.537
Tukang Batu 322.147 Oh 0.200 64.429
Kepala Tukang 322.147 Oh 0.020 6.443
Mandor 322.147 Oh 0.013 4.027

IV PEKERJAAN BETON
1. Pek. Beton Kolom
Pekerja 3.8815 Oh 1.650 6.404
Tukang Batu 3.8815 Oh 0.250 0.970
Kepala Tukang 3.8815 Oh 0.025 0.097
Mandor 3.8815 Oh 0.080 0.311
2. Pek. Beton Sloof
Pekerja 3.2391 Oh 1.650 5.344515
Tukang Batu 3.2391 Oh 0.250 0.809775
Kepala Tukang 3.2391 Oh 0.025 0.0809775
Mandor 3.2391 Oh 0.080 0.259128
3. Pek. Beton Ring Balok
Pekerja 2.996 Oh 1.650 4.9434
Tukang Batu 2.996 Oh 0.250 0.749
Kepala Tukang 2.996 Oh 0.025 0.0749
Mandor 2.996 Oh 0.080 0.23968
4. Pek. Beton Balok
Pekerja 1.4361 Oh 1.650 2.369565
Tukang Batu 1.4361 Oh 0.250 0.359025
Kepala Tukang 1.4361 Oh 0.025 0.0359025
Mandor 1.4361 Oh 0.080 0.114888
5. Pek. Beton Dak
Pekerja 1.6225 Oh 1.650 2.677125
Tukang Batu 1.6225 Oh 0.250 0.405625
Kepala Tukang 1.6225 Oh 0.025 0.0405625
Mandor 1.6225 Oh 0.080 0.1298
6. Pek. Beton Kanopi
Pekerja 0.827 Oh 1.650 1.36455
Tukang Batu 0.827 Oh 0.250 0.20675
Kepala Tukang 0.827 Oh 0.025 0.020675
Mandor 0.827 Oh 0.080 0.06616

Pek. Tulangan
1. Berat Tulangan Ǿ 12
Pekerja 31.016064 Oh 0.007 0.217112448
Tukang Besi 31.016064 Oh 0.007 0.217112448
Kepala Tukang 31.016064 Oh 0.001 0.0217112448
Mandor 31.016064 Oh 0.000 0.0093048192
2. Berat Tulangan Ǿ 10
Pekerja 1034.092 Oh 0.007 7.238644
Tukang Besi 1034.092 Oh 0.007 7.238644
Kepala Tukang 1034.092 Oh 0.001 0.7238644
Mandor 1034.092 Oh 0.000 0.3102276
3. Berat Tulangan Ǿ 8
Pekerja 244.09539 Oh 0.007 1.708667695
Tukang Besi 244.09539 Oh 0.007 1.708667695
Kepala Tukang 244.09539 Oh 0.001 0.1708667695
Mandor 244.09539 Oh 0.000 0.0732286155
4. Berat Tulangan Ǿ 6
Pekerja 248.91972 Oh 0.007 1.74243804
Tukang Besi 248.91972 Oh 0.007 1.74243804
Kepala Tukang 248.91972 Oh 0.001 0.174243804
Mandor 248.91972 Oh 0.000 0.074675916
5. Berat Tulangan D 10
Pekerja 378.35674 Oh 0.007 2.64849718
Tukang Besi 378.35674 Oh 0.007 2.64849718
Kepala Tukang 378.35674 Oh 0.001 0.264849718
Mandor 378.35674 Oh 0.000 0.113507022

Pek. Perancah
1. Pek. Beton Kolom
Pekerja 61.241 Oh 0.300 18.3723
Tukang Kayu 61.241 Oh 0.330 20.20953
Kepala Tukang 61.241 Oh 0.033 2.020953
Mandor 61.241 Oh 0.006 0.367446
2. Pek. Beton Sloof 0
Pekerja 40.6835 Oh 0.300 12.20505
Tukang Kayu 40.6835 Oh 0.260 10.57771
Kepala Tukang 40.6835 Oh 0.026 1.057771
Mandor 40.6835 Oh 0.005 0.2034175
3. Pek. Beton Ring Balok
Pekerja 35.706 Oh 0.320 11.42592
Tukang Kayu 35.706 Oh 0.330 11.78298
Kepala Tukang 35.706 Oh 0.033 1.178298
Mandor 35.706 Oh 0.006 0.214236
4. Pek. Beton Balok
Pekerja 23.824 Oh 0.320 7.62368
Tukang Kayu 23.824 Oh 0.330 7.86192
Kepala Tukang 23.824 Oh 0.033 0.786192
Mandor 23.824 Oh 0.006 0.142944
5. Pek. Beton Dak
Pekerja 16.785 Oh 0.320 5.3712
Tukang Batu 16.785 Oh 0.330 5.53905
Kepala Tukang 16.785 Oh 0.033 0.553905
Mandor 16.785 Oh 0.006 0.10071
6. Pek. Pondasi Batu Kali
Pekerja 95.661 Oh 0.300 28.6983
Tukang Kayu 95.661 Oh 0.260 24.87186
Kepala Tukang 95.661 Oh 0.026 2.487186
Mandor 95.661 Oh 0.005 0.478305
7. Pek. Dinding
8. Pek. Kanopi

V PEKERJAAN ATAP
1. Pek. Rangka Atap Baja Ringan
Tukang Terampil 87.7718 Oh 0.100 8.77718
Tukang biasa 87.7718 Oh 0.100 8.77718
Kepala Tukang 87.7718 Oh 0.050 4.38859
Mandor 87.7718 Oh 0.010 0.877718
2. Pek. Penutup Atap
Pekerja 87.7718 Oh 0.150 13.16577
Tukang Kayu 87.7718 Oh 0.075 6.582885
Kepala Tukang 87.7718 Oh 0.008 0.7021744
Mandor 87.7718 Oh 0.008 0.7021744
3. Pek. Nok
Pekerja 1.02 Oh 0.100 0.102
Tukang Kayu 1.02 Oh 1.000 1.02
Kepala Tukang 1.02 Oh 0.010 0.0102
Mandor 1.02 Oh 0.010 0.0102
4. Pek. Jurai Luar
Pekerja 29.72 Oh 0.400 11.888
Tukang Kayu 29.72 Oh 0.200 5.944
Kepala Tukang 29.72 Oh 0.020 0.5944
Mandor 29.72 Oh 0.002 0.05944
5. Pek. Jurai Dalam
Pekerja 6.16 Oh 0.400 2.464
Tukang Kayu 6.16 Oh 0.200 1.232
Kepala Tukang 6.16 Oh 0.020 0.1232
Mandor 6.16 Oh 0.002 0.01232
6. Pek. Listplank
Pekerja 35.9 Oh 0.110 3.949
Tukang Kayu 35.9 Oh 0.220 7.898
Kepala Tukang 35.9 Oh 0.022 0.7898
Mandor 35.9 Oh 0.005 0.1795

VI PEKERJAAN PLAFOND
1. Pek. Plafond Gypsum (CH +3.00)
Pekerja 76.9 Oh 0.260 19.994
Tukang Kayu 76.9 Oh 0.400 30.76
Kepala Tukang 76.9 Oh 0.040 3.076
Mandor 76.9 Oh 0.013 0.9997
2. Pek. Plafond Gypsum WR (CH +3.00)
Pekerja 5.6 Oh 0.260 1.456
Tukang Kayu 5.6 Oh 0.400 2.24
Kepala Tukang 5.6 Oh 0.040 0.224
Mandor 5.6 Oh 0.013 0.0728
3. Pek. Plafond Gypsum (CH.+2,23)
Pekerja 3.65 Oh 0.260 0.949
Tukang Kayu 3.65 Oh 0.400 1.46
Kepala Tukang 3.65 Oh 0.040 0.146
Mandor 3.65 Oh 0.013 0.04745
4. Pek. Overstek Plafond
Pekerja 9.1748 Oh 0.260 2.385448
Tukang Kayu 9.1748 Oh 0.400 3.66992
Kepala Tukang 9.1748 Oh 0.040 0.366992
Mandor 9.1748 Oh 0.013 0.1192724
5. Pek. Listplank Plafond Dalam Gypsum (CH +3.00)
Pekerja 82.83 Oh 0.021 1.73943
Tukang Kayu 82.83 Oh 0.021 1.73943
Kepala Tukang 82.83 Oh 0.002 0.16566
Mandor 82.83 Oh 0.001 0.08283
6. Pek. Listplank Plafond Dalam Gypsum WR (CH +3.00)
Pekerja 13.66 Oh 0.021 0.28686
Tukang Kayu 13.66 Oh 0.021 0.28686
Kepala Tukang 13.66 Oh 0.002 0.02732
Mandor 13.66 Oh 0.001 0.01366
7. Pek. Listplank Plafond Dalam Gypsum (CH.+2,23)
Pekerja 13.08 Oh 0.021 0.27468
Tukang Kayu 13.08 Oh 0.021 0.27468
Kepala Tukang 13.08 Oh 0.002 0.02616
Mandor 13.08 Oh 0.001 0.01308
8. Pek. Lisplank Plafond Luar
Pekerja 40 Oh 0.021 0.84
Tukang Kayu 40 Oh 0.021 0.84
Kepala Tukang 40 Oh 0.002 0.08
Mandor 40 Oh 0.001 0.04

VII PEKERJAAN LANTAI


1. Pek. Timbunan Tanah Lantai
Pekerja 40.859 Oh 0.300 12.2577
Mandor 40.859 Oh 0.033 1.348347
2. Pek. Timbunan Pasir Lantai
Pekerja 7.866 Oh 0.300 2.3598
Tukang Gali 7.866 - - 0
Kepala Tukang 7.866 - - 0
Mandor 7.866 Oh 0.010 0.07866
3. Pek. Cor Spesi Di Bawah Lantai
Pekerja 3.1465 Oh 0.150 0.471975
Tukang Gali 3.1465 Oh 0.070 0.220255
Kepala Tukang 3.1465 Oh 0.007 0.0220255
Mandor 3.1465 Oh 0.008 0.025172
4. Pek. Keramik Granite Tile 60x60
Pekerja 81.4 Oh 0.250 20.35
Tukang Batu 81.4 Oh 0.120 9.768
Kepala Tukang 81.4 Oh 0.012 0.9768
Mandor 81.4 Oh 0.013 1.0175
5. Pek. Keramik Roman Ceramic 30x30
Pekerja 5.6 Oh 0.250 1.4
Tukang Batu 5.6 Oh 0.120 0.672
Kepala Tukang 5.6 Oh 0.012 0.0672
Mandor 5.6 Oh 0.013 0.07
6. Pek. Pemasangan Batu Sikat
0
0
0
0
7. Pek. Luas Keramik Dinding WC(30x30)
Pekerja 19.62 Oh 0.250 4.905
Tukang Batu 19.62 Oh 0.120 2.3544
Kepala Tukang 19.62 Oh 0.012 0.23544
Mandor 19.62 Oh 0.013 0.24525
8. Pek. Luas List Keramik Dinding WC(30x10)
Pekerja 2.18 Oh 0.080 0.1744
Tukang Batu 2.18 Oh 0.040 0.0872
Kepala Tukang 2.18 Oh 0.004 0.00872
Mandor 2.18 Oh 0.004 0.00872
9. Pek. Plint Keramik
Pekerja 8.283 Oh 0.060 0.49698
Tukang Batu 8.283 Oh 0.030 0.24849
Kepala Tukang 8.283 Oh 0.003 0.024849
Mandor 8.283 Oh 0.003 0.024849

VII PEKERJAAN PINTU DAN JENDELA


1. Kusen Pintu dan Jendela
Pekerja 0.66749 Oh 6.000 4.00494
Tukang Kayu 0.66749 Oh 18.000 12.01482
Kepala Tukang 0.66749 Oh 2.000 1.33498
Mandor 0.66749 Oh 0.300 0.200247
2. Daun Pintu
Pekerja 3.075 Oh 1.000 3.075
Tukang Kayu 3.075 Oh 2.500 7.6875
Kepala Tukang 3.075 Oh 0.250 0.76875
Mandor 3.075 Oh 0.050 0.15375
3 Daun Jendela
Pekerja 2.395 Oh 0.800 1.916
Tukang Kayu 2.395 Oh 2.000 4.79
Kepala Tukang 2.395 Oh 0.200 0.479
Mandor 2.395 Oh 0.040 0.0958
4 Engsel Pintu
Pekerja 9 Oh 0.015 0.135
Tukang Kayu 9 Oh 0.150 1.35
Kepala Tukang 9 Oh 0.015 0.135
Mandor 9 Oh 0.001 0.00675
5 Engsel Jendela
Pekerja 18 Oh 0.010 0.18
Tukang Kayu 18 Oh 0.100 1.8
Kepala Tukang 18 Oh 0.010 0.18
Mandor 18 Oh 0.001 0.009
6 Kunci Pintu
Pekerja 6 Oh 0.060 0.36
Tukang Kayu 6 Oh 0.600 3.6
Kepala Tukang 6 Oh 0.060 0.36
Mandor 6 Oh 0.003 0.018
7 Kait Angin
Pekerja 6 Oh 0.015 0.09
Tukang Kayu 6 Oh 0.150 0.9
Kepala Tukang 6 Oh 0.015 0.09
Mandor 6 Oh 0.001 0.0045
8 Handle Pintu
Pekerja 12 Oh 0.050 0.6
Tukang Kayu 12 Oh 0.500 6
Kepala Tukang 12 Oh 0.050 0.6
Mandor 12 Oh 0.003 0.03

IX PEKERJAAN LISTRIK
1. Box MCB
Tukang Instalasi listrik 1 ls 1.000 1
2. MCB

3. Lampu Downlight (18 watt)


Tukang Instalasi listrik 26 ls 1.000 26
4. Lampu Pijar (18 watt)
Tukang Instalasi listrik 8 ls 1.000 8
5. Lampu Pijar (12 watt)
Tukang Instalasi listrik 2 ls 1.000 2
6. Saklar Tunggal
Tukang Instalasi listrik 5 ls 1.000 5
7. Saklar Ganda
Tukang Instalasi listrik 6 ls 1.000 6
8. Stopkontak
Tukang Instalasi listrik 15 ls 1.000 15
9. Instalasi AC
4 0
10. Exhause
2 0
11. Outlet Televisi
4 0
12. Stopkontak AC
Tukang Instalasi listrik 4 ls 1.000 4

X PEKERJAAN SANITASI
1. Pompa Air Bersih 1 unit 0

2. Stop kran
Pekerja 3 Oh 0.010 0.03
Tukang Batu 3 Oh 0.100 0.3
Kepala Tukang 3 Oh 0.010 0.03
Mandor 3 Oh 0.005 0.015
3. Kran Air (KR)
Pekerja 1 Oh 0.010 0.01
Tukang Batu 1 Oh 0.100 0.1
Kepala Tukang 1 Oh 0.010 0.01
Mandor 1 Oh 0.005 0.005
4. Floor Drain (FD)
Pekerja 2 Oh 0.010 0.02
Tukang Batu 2 Oh 0.100 0.2
Kepala Tukang 2 Oh 0.010 0.02
Mandor 2 Oh 0.005 0.01
5. Shower
Pekerja 2 Oh 1.000 2
Tukang Batu 2 Oh 1.000 2
Kepala Tukang 2 Oh 0.100 0.2
Mandor 2 Oh 0.100 0.2
6. Closet Duduk
Pekerja 2 Oh 3.300 6.6
Tukang Batu 2 Oh 1.100 2.2
Kepala Tukang 2 Oh 0.001 0.002
Mandor 2 Oh 0.160 0.32
7. Kitchen Sink (KS)
Pekerja 1 Oh 0.030 0.03
Tukang Batu 1 Oh 0.300 0.3
Kepala Tukang 1 Oh 0.030 0.03
Mandor 1 Oh 0.002 0.0015
8. Meteran Air 1 buah 0

9. Water Heater 2 unit 0

10. Roof Drain (RD)


Pekerja 4 Oh 0.010 0.04
Tukang Batu 4 Oh 0.100 0.4
Kepala Tukang 4 Oh 0.010 0.04
Mandor 4 Oh 0.005 0.02
11. Bak Kontrol
Pekerja 3 Oh 3.200 9.6
Tukang Batu 3 Oh 1.015 3.045
Kepala Tukang 3 Oh 0.002 0.0045
Mandor 3 Oh 0.016 0.048
12. Septicktank 1 unit - 0
13. Pipa Air Bersih D 3/4"
Pekerja 46.09 Oh 0.054 2.48886
Tukang Batu 46.09 Oh 0.090 4.1481
Kepala Tukang 46.09 Oh 0.009 0.41481
Mandor 46.09 Oh 0.027 1.24443
14. Pipa Air Hujan D 3"
Pekerja 13.17 Oh 0.081 1.06677
Tukang Batu 13.17 Oh 0.135 1.77795
Kepala Tukang 13.17 Oh 0.014 0.177795
Mandor 13.17 Oh 0.004 0.053997
15 Pipa Air Hujan D 4"
Pekerja 15.83 Oh 0.081 1.28223
Tukang Batu 15.83 Oh 0.135 2.13705
Kepala Tukang 15.83 Oh 0.014 0.213705
Mandor 15.83 Oh 0.004 0.064903
16 Pipa Air Kotor D 4"
Pekerja 17.58 Oh 0.081 1.42398
Tukang Batu 17.58 Oh 0.135 2.3733
Kepala Tukang 17.58 Oh 0.014 0.23733
Mandor 17.58 Oh 0.004 0.072078
17 Pipa Air Kotor D 6"
Pekerja 2.59 Oh 0.081 0.20979
Tukang Batu 2.59 Oh 0.135 0.34965
Kepala Tukang 2.59 Oh 0.014 0.034965
Mandor 2.59 Oh 0.004 0.010619
18 Pipa Air Bekas D 6"
Pekerja 8.74 Oh 0.081 0.70794
Tukang Batu 8.74 Oh 0.135 1.1799
Kepala Tukang 8.74 Oh 0.014 0.11799
Mandor 8.74 Oh 0.004 0.035834
19 Pipa Air Bekas D 4"
Pekerja 14.41 Oh 0.081 1.16721
Tukang Batu 14.41 Oh 0.135 1.94535
Kepala Tukang 14.41 Oh 0.014 0.194535
Mandor 14.41 Oh 0.004 0.059081

XI PEKERJAAN FINISHING
1. Cat Dinding Baru Dalam
Pekerja 322.147 Oh 0.020 6.44294
Tukang Cat 322.147 Oh 0.063 20.295261
Kepala Tukang 322.147 Oh 0.006 2.0295261
Mandor 322.147 Oh 0.003 0.8053675
2. Cat Dinding Baru Luar
Pekerja 134.078 Oh 0.020 2.68155
Tukang Cat 134.078 Oh 0.063 8.4468825
Kepala Tukang 134.078 Oh 0.006 0.84468825
Mandor 134.078 Oh 0.003 0.33519375
3. Cat Pagar
Pekerja 265.200 Oh 0.020 5.304
Tukang Cat 265.200 Oh 0.063 16.7076
Kepala Tukang 265.200 Oh 0.006 1.67076
Mandor 265.200 Oh 0.003 0.663
4. Cat Daun Pintu
Pekerja 3.075 Oh 0.070 0.21525
Tukang Cat 3.075 Oh 0.009 0.027675
Kepala Tukang 3.075 Oh 0.006 0.01845
Mandor 3.075 Oh 0.003 0.0076875
5 Cat Daun Jendela
Pekerja 2.395 Oh 0.070 0.16765
Tukang Cat 2.395 Oh 0.009 0.021555
Kepala Tukang 2.395 Oh 0.006 0.01437
Mandor 2.395 Oh 0.003 0.0059875
6 Cat Kusen Pintu dan Jendela
Pekerja 29.530 Oh 0.070 2.0671
Tukang Cat 29.530 Oh 0.009 0.26577
Kepala Tukang 29.530 Oh 0.006 0.17718
Mandor 29.530 Oh 0.003 0.073825
7 Cat Plafond Dalam
Pekerja 82.500 Oh 0.020 1.65
Tukang Cat 82.500 Oh 0.063 5.1975
Kepala Tukang 82.500 Oh 0.006 0.51975
Mandor 82.500 Oh 0.003 0.20625
8 Cat Plafond Luar
Pekerja 12.824 Oh 0.020 0.25648
Tukang Cat 12.824 Oh 0.063 0.807912
Kepala Tukang 12.824 Oh 0.006 0.0807912
Mandor 12.824 Oh 0.003 0.03206
9 Cat Listplank
Pekerja 35.900 Oh 0.070 2.513
Tukang Cat 35.900 Oh 0.009 0.3231
Kepala Tukang 35.900 Oh 0.006 0.2154
Mandor 35.900 Oh 0.003 0.08975
10 Cat Listplank Plafond Dalam
Pekerja 109.570 Oh 0.070 7.6699
Tukang Cat 109.570 Oh 0.009 0.98613
Kepala Tukang 109.570 Oh 0.006 0.65742
Mandor 109.570 Oh 0.003 0.273925
11 Cat Listplank Plafond Luar
Pekerja 40.000 Oh 0.070 2.8
Tukang Cat 40.000 Oh 0.009 0.36
Kepala Tukang 40.000 Oh 0.006 0.24
Mandor 40.000 Oh 0.003 0.1