1. Lembar Persetujuan
Afillgisfilkiak
a•us•a as
MENMSEIS/I
mrnei Fres Fr ray
SUCIDFINCICI PT. SUPERINTENDING COMPANY OF INDONESIA
PIPA PENYALUR
Review by Approved by
PT.Superintending Company Of Indonesia
. ci1J DO
§driC,Q
CORN2n
Didik Agus Triwoto
Verified by
Dir. Jen. EBTKE
afigqi.4201Ca
IMIRWIlla St
at nt n us
NOCIPFWAIWPF
ESUCOFINCIO
2. Daftar lsi
Araigibti EV&
MUMS St
MEENt OS NM
NIS WV Vit.1ner
SUCOFINDO
DAFTAR ISI
1. Lembar Persetujuan
2. Daftar Isi
3. Certificate of Inspection
4. Executive Summary
5. Laporan Pemeriksaan Teknis
3. Certificate of Inspection
Mitt&%nib.
Certificate No. 00976/ALAQAM
mileglinle Wray
Date: January 30, 2019
SUCOFINO0
Issuing Office.
Gatot Subroto No. 161 Pecohraya Bandar Lampung 35228. Indonesia
Phone/Facs: +62 721 474660/0721 474661
Email, cs.bdI©sucofindo.co.id
CERTIFICATE OF INSPECTION
Inspection Finding(s):
1. Review of documents was performed with satisfactory result
2. Visual inspection was performed with satisfactory result
3. Spot check and witness of related testing was performed with satisfactory result
Conclusion :
Based on the above satisfactory results, we recommend that this steam pipeline total length 1.172 Km,
from Outlet Separator (SPR-01B/Cluster C) to Interface PT. PGE & PT. PLN to be re-certified by DIRJEN
EBTKE for further operation.
The Certificate/report is issued under our General Terms and Conditions, copy of vithicb is available upon request or may be accessed at WWW. sucofindo.co.id
2101011800981
,11U1,
25 NI
SCI-2007A
AiratigiCiak
nswnan
Attachment SIMMER
To Certificate No. 00976/ALAQAM
Date: January 30, 2019 SUCOFINDO
Issuing Office.
JI. Gatot Subroto No. 161 Pecohraya Bandar Lampung 35228,
Pagel of 1 Indonesia
Phone/Facsi +62 721 474660/0721 474661
Email: cs.bdl@sucofindo.co.id
I. TECHNICAL SPECIFICATION(S) :
III. RECOMMENDATION
Based on the above result, we recommended that this onshore Steam pipeline total length 1.172 Km
from Outlet Separator (SPR-01B/Cluster C) to Interface PT. PGE & PT. PLN to be re-certified by
Migas for further operation.
This certificate is accepted by whom it may concern on the understanding that we are not responsible
for any differences claimed or uncovered. Issuance of this certification does not release the contractor
from their contractual obligations.
This certificate reflects our findings at time and place of inspection only and is issued without prejudice.
1111 1 II
1124603
SCI-2 00 7P
Ainimmoriaraa.
amansan
IlingreaK4gir
SUCOFINDO
4. Executive Summary
taiga
MME1MIIIM
MERMEN
minarywor
SUCOFINDO
RINGKASAN EKSEKUTIF
PT. Pertamina Geaothermal - Area Ulubelu adalah salah satu anak perusahaan dani PT
Pertamina (Persero) yang bergerak pada bidang Pemanfaatan Energi Panas Bumi. PT.
Pertamina Geaothermal - Area Ulubelu membangun pipa penyalur. Pipa penyalur yang
dimiliki saat ini adalah 2 jalur pipa penyalur Steam, dani Outlet Separator (SPR-
01B/Cluster C) ke Interface PT. PGE & PT. PLN sepanjang 1,172 Km dan dad Outlet
Separator (SPR-02/Cluster D) ke Power Plant sepanjang 2.850 Km. Kedua jalur pipa
penyalur tersebut terletak di Kecamatan Ulubelu, Kabupaten Tanggamus, Provinsi
Lampung. Pipa penyalur Steam tersebut dikonstruksi pada tahun 2012 dan sudah
beroperasi kurang lebih 6 tahun, jalur pipa tersebut dikonstruksi di atas lahan sendiri
(ROW) milik sendiri yang melintasi daerah perhutanan, perkebunan, rawa dan sungai
serta memintas jalan. Pipa penyalur steam tersebut di desain pada Klas Lokasi 1 dan 3.
Pipa penyalur steam mempunyai resiko tinggi terhadap kecelakaan dan berakibat fatal
bagi manusia, peralatan serta lingkungan sekitar. Dalam rangka mencegah kecelakaan
sebagaimana tersebut serta untuk memenuhi persyaratan Pemerintah sesuai dengan
Peraturan Menteri Pertambangan Dan Energi No. 06 P/0746/M.PE/1991 mengenai
"Pemeriksaan Keselamatan Kerja Atas Instalasi, Peralatan, Dan Teknik Yang
Dipergunakan Dalam Pertambanagn Minyak Dan Gas Bumi Dan Pen gusahaan Sumber
Daya Panas Bumf', Keputusan Direktur Jendral Minyak dan Gas Bumi No.
84.1QDJM/1998 "Pedoman Dan Tata Cam Pemeriksaan Keselamatan Kerja Atas
lnstalasi, Peralatan Dan Teknik Yang Dipergunakan Dalam Usaha Pertambangan Minyak
Dan Gas Bumi Dan Pen gusahaan Sumber Daya Panas Bumf' serta Keputusan Menteri
Pertambangan Dan Energi No. 300.K/38/M.PE/1997 "Keselamatan Kerja Pipa Penyalur
Minyak Dan Gas Bumi', maka pihak PT. Pertamina Geaothermal - Area Ulubelu
bermaksud untuk mendapatkan perpanjangan Sertifikat Kelayakan Penggunaan
Peralatan (SKPP) dani konstruksi pipa penyalur gas yang dibangun sejak tahun 2012 dan
telah digunakan selama kurang lebih 6 tahun.
Pengoperasian pipa penyalur steam tersebut oleh pihak PT. Pertamina Geaothermal -
Area Ulubelu telah mendapakan izin dani Ditjen MIGAS dengan diterbitkannya setifikat
kelayakan penggunaan peralatan no. 532.Stf/30/DEP/2012, tanggal 27 Agustus 2012,
yang berakhir masa berlakunya tanggal 29 April 2015
Untuk merealisasikan rencana tersebut maka PT. Pertamina Geaothermal - Area Ulubelu
menunjuk PT SUCOFINDO (Persero) sebagai PJIT, untuk melaksanakan Pemeriksaan
Teknis terhadap pipa penyalur dimaksud. PT SUCOFINDO (Persero) adalah salah satu
Perusahaan Jasa Inspeksi Teknis (PJIT) yang telah ditunjuk untuk melaksanakan
pemeriksaan teknis dalam rangka menjamin keamanan dan keselamatan kerja dan
lindungan lingkungan meliputi :
Aspek keselamatan kerja dan lingkungan
Aspek efisiensi dan kesinambungan operasi
Aspek kondisi pipa penyalur dan bagiannya yang bertekanan, harus dalam kondisi
balk dan aman
Aspek kemampuan kerja pipa penyalur yang dibangun.
RE-SERTIFIKASI PIPA PENYALUR GAS 28" MI11K PT. PERTAMINA GEAOTHERMAL - AREA ULUBELU
Atiettaligaik
ana'nna
MEI NWEll
191FW/411,/
SUCOFINDO
Dad hasil pemeriksaan teknis yang telah dilakukan dapat disimpulkan bahwa kondisi pipa
penyalur masih dalam kondisi baik dan masih layak untuk dioperasikan.
Disiapkan oleh:
MINN
km gni Fro%
SLICOFINDO
LAPO RAN
PEMERIKSAAN TEKNIS
BAB I PENDAHULUAN
PT. Pertamina Geothermal Energi - Area Ulubelu adalah salah satu anak
perusahaan dari PT Pertamina (Persero) yang bergerak di bidang Pemanfaatan
Energi Panas Bumi. Pipa penyalur yang dimiliki saat ini adalah 2 jalur pipa
penyalur Steam, dani Outlet Separator (SPR-01B/Cluster C) ke Interface PT. POE
& PT. PLN sepanjang 1,172 Km dan dani Outlet Separator (SPR-02/Cluster D) ke
Power Plant sepanjang 2,850 Km.
Konstruksi pipa penyalur tersebut mempunyai resiko kecelakaan cukup besar yang
dapat membahayakan jiwa manusia, peralatan itu sendiri dan lingkungan
sekitarnya, oleh karena itu dalam rangka memenuhi keselamatan dan persyaratan
sena ketentuan Pemerintah Indonesia, tentang Keselamatan dan Keamanan Kerja,
maka PT. Pertamina Geothermal Energi - Area Ulubelu, menunjuk PT
SUCOFINDO untuk melakukan pemeriksaan teknis ulang terhadap konstruksi pipa
penyalur gas yang izin operasinya (SKPP) akan segera berakhir masa berlakunya.
Maksud dan tujuan dilakukannya pemenksaan teknis ulang terhadap konstruksi pipa
penyalur Steam dani Outlet Separator (SPR-01B/Cluster C) ke Interface PT. PGE &
PT. PLN sepanjang 1,172 Km dan dani Outlet Separator (SPR-02/Cluster D) ke Power
Plant sepanjang 2,850 Km, milik PT. Pertamina Geothermal Energi - Area Ulubelu
adalah dalam rangka memperoleh perpanjangan Sertifikat Kelayakan Penggunaan
Peralatan (SKPP) sesuai dengan peraturan pemerintah untuk :
1. Mematuhi ketentuan Peraturan Menteri No. 06P/0746/MPE/1991,
2. Menjamin keselamatan masyarakat umum, keselamatan tenaga kerja,
keselamatan instalasi dan peralatan serta lindungan lingkungan.
1.3. Definisi
2.1.1. Referensi
1. Pipa Penyalur Gas dari Outlet Separator (SPR-01B/Cluster C) ke Interface PT. PGE
& PT. PLN
a. Material Pipa : API 5L GR. B
b. Standard Pembangunan : ASME/ANSI B.31.8
c. Diameter pipa (OD) 30" ( 762 mm)
d. Ketebalan (T) : 9,53 mm
e. Corrosion Allowance : 0,125 inch ( 3,175 mm)
f. Panjang Pipa (L) 1,172 Km ( 1.172 meter)
g. Klas Lokasi 1 dan 3
h. Fluida yang dialirkan Steam
i. Pengendali Korosi Impressed Current & Polyethylene Coating
j. Tekanan Design 10,8 Bar (156,64 Psi)
k. Temperatur Design : 410°F ( 210 °C )
I. Tekanan Ops Max : 8 Bar (116,04 Psi)
m. Piranti Pengaman 3 (Tiga) Unit PSV
n. Tahun dibuat/ digunakan : 2012
o. ROW : 20m.
Metodologi yang digunakan dalam pelaksanaan pemeriksaan teknis untuk pipa penyalur
gas, dilakukan dengan menggunakan metode pemeriksaan sebagai berikut:
Wqr/V ne , of.
SLICOPINEDO
o PID Drawing
4. Pengecekan re-rating
Rerating adalah upaya untuk mengubah tekanan operasi dalam suatu sistem
pipa penyalur dani tekanan desainnya. Rerating dapat dilakukan dengan 2
cara yaitu: menurunkan tekanan atau menaikan tekanan.
Pada kondisi normal, tekanan operasi steady maksimum dan tekanan head
stabs pada pipa statis pada sembarang titik tidak melampaui tekanan desain
internalnya dan rating tekanan untuk komponen yang digunakan.
Rerating pada pipa penyalur gas 28", milik PT. Pertamina Geothermal Energi -
Area Ulubelu belum dilakukan, karena selama masa pengoperasian selalu
dimonitor dan maintenance dilakukan dengan balk. Hal tersebut dibuktikan
dengan hasil pengukuran ketebalan dinding pipa penyalur pada tahun 2010
yang hasilnya masih aman dan dapat diterima.
BABIII PENUTUP
3.1. Kesimpulan
Berdasarkan hasil pemeriksaan teknis dan risk assessment terhadap pipa penyalur gas
milik PT. Pertamina Geothermal Energi - Area Ulubelu, maka dapat disimpulkan bahwa
konstruksi pipa penyalur steam mulai dani Outlet Separator (SPR-01B/Cluster C) ke
Interface PT. PGE & PT. PLN sepanjang 1,172 Km dan dani Outlet Separator (SPR-
02/Cluster D) ke Power Plant sepanjang 2,850 Km, yang berlokasi di Kecamatan
Ulubelu, Kabupaten Tanggamus, Provinsi Lampung, layak dan memenuhi ketentuan-
ketentuan sebagai berikut dibawah ini
1. Kebijakan Pemerintah
2. Persyaratan Perusahaan
3. Code dan Standard
4. Rekomendasi Praktis dan
5. Prosedur yang berlaku
3.2. Rekomendasi
Laporan ini hanya menyatakan hasil pemeriksaan teknis pada waktu dan tempat dimana
kegiatan tersebut dilaksanakan dan dikeluarkan dengan itikad balk dan tanpa prasangka.
HASH_ INSPEKSI
NO URAIAN KETERANGAN
Ada Tidak Ada
I REVIEW DOCUMEN
- SKPP (Migas) dan Laporan Pemeriksaan Teknis (PJIT) 1
sebelumnya
- Thickness Monitoring Program Procedure and Report H I
- Technical Corrosion procedur and Report J
(Monitoring Inhibitor Report)
- Prosedure dan Laporan Pengoperasian dan Pemeliharaan
- Pipeline Risk Assessment Report
- Laporan Pengelolaan dan Penanganan Lingkungan
- As built Drawing / Gambar jalur pipa penyalur
HASIL INSPEKSI
NO URAIAN KETERANGAN
Baik Tdk Baik
II PEMERIKSAAN VISUAL
- Periksa kondisi permukaan pipa
- Periksa dimensional (diameter, ketebalan) if
- Periksa coating/wraping yang terekspose
- Periksa cathodic protection fl
- Periksa kondisi flange
- Periksa valve V
- Periksa kekencangan baut J
- Sign Board
- Pressure gauge V
AcumaAziz Sukmohadt
Afrinkei 'Vasa
NIIIMantilli
MIME II PT. SUPERINTENDING COMPANY OF INDONESIA
Wirnlitiri I%
SUCOPIAIDO
Minimum
Spot of Point Of Meauserement TEMP.
Coordi nate of
Measurement (C )
90- 1800 270, Thickness
Pipe 030"
Spot 1 S : 050 1818.9' E : 104 3459.6' 9.8 9.9 9.9 9.8 170.0
Spot 2 S : 05° 1816.7' E : 104 3457.0' 17.5 17.4 17.3 17.3 155.8
Spot 3 S :05 1823.8 E : 104 3450.6' 10.0 10.3 10.0 10.0 169.7
Spot 4 5 : 05 1818.1' E : 104' 3447.3' 10.1 10.0 9.9 9.9 188.9
Spot 5 S : 05 0 1818.6' E : 104 3443.1' 10.0 9.9 9.8 9.8 167.9
Spot 6 S : 050 1816.0' E : 104 3438.7' 9.8 10.4 9.8 9.8 168.8
Spot 7 S : 05') 1813.4' E 104 ' 3434.0' 9.8 10.0 9.8 9.8 168.9
Spot 8 S :050 1814.3' E 104 34'28.8' 9.7 9.8 9.9 9.7 172.8
Spot 9 S : 05' 1815.8' E : 104 3425.3' 9.8 9.9 9.9 9.8 165.8
Spot 10 S : 05°1 1817.5' E : 104 3422.4' 9.8 9.9 9.8 9.8 169.6
Spot 11 S : 05 1818.8' E : 104 - 3418.1' 9.8 9.9 9.9 9.8 170.6
Spot 12 S : 05' 1818.7' E : 104 3414.3' 9.8 9.9 9.8 9.8 164.5
Spot 13 S : OS° 1824.7' E : 104 3407.1' 9.9 10.1 9.9 9.9 158.7
Spot 14 S : 05c. 1830.7' E : 104 3408.6' 9.7 9.9 9.8 9.7 164.5
Spot 15 S : 05° 1835.9' E 104' 34'10.4' 9.8 9.9 9.8 9.8 158.0
Spot 16 S : 05' 1837.1' E : 104 - 3413.7' 11.5 10.7 11.4 10.7 168.5
,
ric;TrLe)
•°'. ,PNI XD
Sign : Sign : Sign :
Ala." AVAIL
MIMS. CALCULATION CHECK OF
UM/M11.
Werlik,411, PIPE DESIGN
SUCOFINDO
1 Data
Material Pipa = API 5L Gr. B dari Spesifikasi teknis
Tekanan Desain (Pd) • 156.6 Psig dari Spesifikasi teknis
Diameter luar pipa (D) 30 Inch dari Spesifikasi teknis
Specified Min. Yield Strength 52000 Psig dari table D1 (appendix D) hal 115
Location Class (F) • 0.5 dari table (841.114A, hal 30)
Longitudinal Joint Factor (E) 1 dari table (841.115A, hal 32)
Temperature Derating (T) • 1 dari table (841.116A, hal 32)
Corrossion Allowance for 20 Y (CA) 0.118 Inch dad NAGE RP -0169 atau Justifikasi engineer
Thickness Actuall (tact) 9.4 mm
156.6 X 30 4,699
2x 52000 x 0.50 x 1 x 1 52,000
2 x S xtactxFxExT 19244.09
P = - 641.47 Psig
30
3 Kesimpulan •
Disiapkan oleh :
PT. SUCOFINDO (Persero)
tAilk..42aCt
taironan
NIgOnaw,41/F
SLICOFINDO
7. Lampiran
SERTIFIKAT KELAYAKAN_PENOGUNAAN PERALATAN
Nomor : 432 .Si:f/30/DEP/2012
rektorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi berdasarkan
nimbang 1. Surat dad Project Manager PT Pertamina Geothermal Energy Area Geothermal Ulubelu Nomor 566/PGE810/2012-
SO tanggal 13 Juni 2012 perihal Pelaksanaan Pengetesan/Pressure Test Pipeline Jalur Cluster D ke Power Plant;
2. Pelaksanaan Pasal 5 ayat 1 Keputusan Direktur Jenderal Minyak dan Gas Bumi Nomor 84.108/DJM/1998;
3. Laporan Hasil Pemeriksaan dan Pengujian oleh Perusahaan Jasa Inspeksi Teknik PT. Biro Klasifikasi Indonesia
(Persero) Nomor 101-P6/N2/2012-02;
engingat : 1. Undang-undang Nomor 1 Tahun 1970;
2. Undang-undang Nomor 27 Tabun 2003;
3. Peraturan Pemerintah Nomor 19 Tahun 1973:
4. Peraturan Pemedntah Nomor 59 Tahun 2007;
S. Peraturan Presiden RI Numor 24 Tahun 2010;
6. Keputusan Presiden Republik Indonesia Nomor 125/M Tahun 2011;
7. Peraturan Menteri Pertambangan dan Energi Nomor 06P/0746/M.PE/1991;
8. Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 18 tahun 2010;
9. Keputusan Menteri Pertarnbangan dan Energi Nomor 555.1426/M.PE/1995;
10. Keputusan Menteri Energi dan Sumber Daya Mineral Nomor 2168IV73/MEM/2012;
ii.Keputusan Direktur Jenderal Minyak dan Gas Bumi Nomor 84.1Q38/DJM/1998 Pasal 5 ayat 1:
nyatakan bahwa :
PIPA PENYALUR
mihk Pertamina Geothermal Energy
asi digurtakan : Area Geothermal Ulubelu, Lampung
ngan keterangan
ak dan memenuhi persyaratan keamanan dan keselamatan kerja sehingga dapat digunakan, dengan ketentuan:
PT. Pertamina Geothermal Energy bertanggung jawab sepenuhnya alas keselamatan operasi Pipa Penyalur Outlet Separator
(SPR-02/Cluster D) ke Power Plant tersebut di atas.
Pemeriksaan Pipa Penyalur Outlet Separator (SPR-02/Cluster D) ke Power Plant setts peralatan keselamatan operasi lainnya agar
cRaksanakan secara berkala sesuai dengan prosedur dan standar yang berlaku dan hasilnya ditaporkan kepada Direktur Panas Bumi.
Apabila terjadi penggantian komponen Pipa Penyalur Outlet Separator (SPR-02/Cluster D) Ke Power Plant, PT. Pertamina Geothermal
Energy wajib melaporkan kepada Direktorat Jenderal Energi Baru, Terbarukan dan Konservasi Energi.
Tekanan kerja maksimum diperbolehkan: 8,0 Bar pada suhu maksimum 210 CC.
Diterbitkan di Jakarta
Tanggal 31 Jolt 201
Berlaku sampai dengan : 20 Juni 2015
aTh.?.Direktur Jenderal Energi Baru, Terbarukan dan Konservasi Energi
b-Dhlildur.,Panas Bumi / Kepata Pelaksana lnspeksi Tambang Panas Bumi
isaaldi
NIP...19610205 198903 1 003
11111111117
1
J1
tttttt
"
-s%
/S.
0
!
edi
II
14
PROYEK ENGINEERING, PROCUREMENT, CONSTRUCTION &
COMMISSIONING (EPCC) FASILITAS PRODUICSI DAN
1111.
Jr PERTMAINA REINJEKSI FLUIDA GEOTHERMAL UNIT I & 2 Irr
GEOPHERNAL ENERGY
(2 x 55 MW) (STEAM GATHERING SYSTEM) IKP1C
GEOTHERMAL ULUBELU — LAMPUNG
Doc. No. UBL 1&2-00-PIP-CAL-0-001
PIPING WALL THICKNESS CALCULATION Rev. No. 0
Hal Iclad 7
44 II
NOMOR PROYEK : 10022
‘, .4.....-
0 16 Sept 2011 Issued for Design ifr'BTA ' HW/TP • SMY
A 23 Jun 2011 Issued for Review & Approval BTA HW/TP SMY
1. PENDAHULUAN 4 1 .BACKGROUND 4
2. TUJUAN 4 2.PURPOSE 4
4.3 AfAXIMUM ALLOWABLE STRESS (S) 6 4.3 MAXIMUM ALLOWABLE STRESS (S) 6
LAMPIRAN I APPENDIX I
PROYEK ENGINEERING, PROCUREMENT, CONSTRUCTION &
Ap.,, AT
COMMISSIONING (EPCC) FASILITAS PRODUKSI DAN
PERTAMINA REINJEKS1 FLUIDA GEOTHERMAL UNIT 1 & 2
GEOTHERMAL Dan
(2 x 55 MW) (STEAM GATHERING SYSTEM) IKPT
GEOTHERMAL ULUBELU — LAMPUNG
Dot. No. UHL l&2-00-PIP-CAL-0-001
PIPING WALL THICKNESS CALCULATION Rev. No. 0
Hal 4 dan 7
1. PENDAHULUAN 1. BACKGROUND
PT. PERTAMINA GEOTHERMAL ENERGY PT. PERTAMINA GEOTHERMAL
(PGE) Area Illubelu akan membangun sistern ENERGY (PGE) Ulubelu Area will build
perpipaan nap panas bumi baru untuk pipeline system of new geothermal steam to
mensuplai kebutuhan PLTP Unit 1 8c 2 supply the needs of PLTP Ulubelu unit I & 2
Lflubelu dengan kapasitas 2x55 MW. Terdapat with a capacity of 2x55 MW. There are II
11 sumur produksi untuk menyuplai uap ke production wells providing steam to
PLTP unit 1 & 2 dan 6 sumur reinjeksi. Fluida- Geothermal Power Plant units I & 2 and 6
fluida yang dialirkan melalui pipa-pipa wells reinjection. Service fluids to supply are
tersebut adalah 2 phasa, uap, brine, kondesat, 2 phases, steam, brine, condesate, cold brine;
brine dingin; uclara bertekanan, udara compressed air, instrument air and fuel oil
instrument dan bahan bakar bergantung pada depend on vendor.
vendor.
Dokumen ini menjelaslcan mengenai proses This document describes the selection process
pemilihan tebai dinding pipa penyalur fluida of wall thickness of pipe by performing
dengan melakukan kalkulasi tcbal pipa calculations based on the standard pipe
berdasarkan standard ASME 831.I Power thickness ASME B31.1 Power Piping Code.
Piping Code
2. TUJUAN 2. PURPOSE
Tujuan dad dokumen ini adalah untuk The purpose of this document is to define and
menentulcan dan menghitung kebutuhan tebal calculate the wall thickness of pipes and
dinding pipa dan material sesuai dengan data- materials in accordance with design data that
data desain yang sudah direncanakan untuk have been planned for Production &
Proyek pembangunan Fasilitas Produksi & Reinjection Facilities Build in Geothermal
Reinjelcsi Fluida Panas Bumi Unit 1&2 (2 x 55 Power Plant Units 1 & 2 (2 x 55MW)
MW) di Area Geothermal Ulubelu— Lampung Geothermal Ulubelu Area - South Lampung.
Selatan.
Gra — +A
2(SE + Py)
Dengan; With;
= Tebal pipa minimum, in (mm) t„, Minimum Wall Thickness, in (mm)
= Tekanan desain internal, psig = Internal design pressure, psig (kPa)
(kPa)
Do = Diameter luar pipa, in (mm) = Outside Pipe Diameter, in (mm)
= Maximum Allowable stress Maximum Allowable material
material karena tekanan internal stress due to internal pressure at the
pada temperatur desain, psi (kPa) design temperature, psi (kPa)
= Efisiensi Sambungan lasan = Joint Efficiency
= Faktor Koefisien = Coefficient Factor
A = Ketebalan tambahan, in (mm) A = Additional Thickness, in (mm)
43. Maximum Allowable Stress (S) 4.3. Maximum Allowable Stress (S)
Material pipa yang digunakan pat Pipe material type used in these calculations
patitungan ini adalah material A106 Grade is a material A106 Grade B or A53 Grade B
B atau A53 Grade B atau API 5L Grade B. or API 5L Grade B.
Nilai (S) untuk material pipa yang akan The value of (S) for the pipe materials used is
digunakan adalah 17100 psi, diambil dari 17100 psi, taken from ASME B31.1, for
tabel di ASME B31.1, untuk suhu dibawah temperature up to 340 ° C.
340*C.
dengan temperature 5900 F adalah 0.4 temperature < 900 M is 0.4 taken from the
dianabil dari tabel 104.1.2(A) ASME /331.1 table 104.1.2 (A) ASME 831.I
Piping arra T3
Deogn Pressure ( P ): Allowable Stress (S) 17.1 kit
60 ban/ Addidonal Thickness (A)'
870.2262Psig 3 run
Coefficient ( Y ) 0.4
Design Temperature(T): 296 Goldin Mill Tot. 12.5%
Fliptlan 0 Obrc , .
M2 Ilisalowladtelps
-, .. :-,1”. .- jag Do0p Paned '. Saab
,listra 00. Pea. area va WO Val NW SONO
-SFS . 0 e P •• Sch. ltddimai Thildae Thleads SeL lama
Pa a Mae r MO Oa
0.5 0.84 A1065 SAILS 1.00 66.00 4 037 160.00 47' 160 4.78
0.75 1.05 A 1068 SAILS 1.00 60.00 4.189 160.00 5.57 lAO 5.56
1 1.32 A 106 B SNILS I® 60.00 4.381 2,3.130 4.55 80 4.55
1.3 La A 106 B SAILS 1.00 60.00 4.804 XS, an 5.09 • 80 506
2 7-38 A 106 B S.M1S I.00 60.00 5.148 X580
3 330
5.51 - go 3.54
A 106 11 SMIS 1.00 60.00 5.962 XS, 00 7.63 0.25 635 80 7.62
4 4-50 A 106 B &MIS 1.00 60.00 6.686 NS. 80 6.36 0.28 7.14 80 8.56
6 863 A 306!! sos Lao 6600 8.224 NS, SO 10.98 0.34 8.74 80 30.97
I 8.63 A 106 B SXOS 3.00 60.00 9.672 60.00 1032 so Imo
Is 10.73 A we B &MIS 1.00 60.00 11.211 N3. 60 12.70
12
so 15.09
12.-i5 API aL B SAILS 1.00 60.00 12638 XS 1270 80 17.48
14 14110 API 5L 11 SAPS 1.00 60.00 13.563 WAX 15.09 0.56 14.27 ao 19.05
161660 API 5111 &MIS 1.00 60.00 13.011 60.00 16.67
Is
0.63 15.41 80 21.44
111.00 API 5L B SAILS 1.00 EOM 16.439 60.00 19.03 0 69 17.48 80 23.83
70 21100 API 51. 11 5N0_5 100 60.00 17.907 60.00 20.63 0.75 19.05 80 26.19
72 ago AM 5L B SAMS 1.00 60.00 19.354 60.00 22.23 0.8! 20.62 80 28.58
24 24.60 API 318 SAILS 1.00 60.00 20102 60.00 24.62 0.88 22_23 80 30.%
Pipe Wall Thickness Calculation
PERTAMINA
ff
Chen. : PT. Pertamina Geothermal Enetxv
Project Number: 10022 Prepare by : BIA Rev :0
Ptoject Name : Steam Gathering Facilities ULUBELUIda Checked by: Date: 16.Sept.11
PAIR ans
Design Premawc ( P ): size up to 24" Allowable Suess (5) : 17.1 km
14.1 hark
Additional Thickness (A): 3 at"
204.5032Psig
26* and above Coefficient (V) 0.1
25 barg Tril 12.54 k
362.5942I'sig
Design Tempennum( T ) : 215 Cekius
Mirmarn
Pepe Slat. " OeM Pipe Jean Al I NI 2 Mask Saleclad Pa
Cmign Ramona] Schad*
Type - Ell. Prism Redman
- let ;,,: =245 WEI Wal Ma assay Mines
, a p Si. Tick llitlissam lleclinees Thlonam Sch. Tides.
in nun Oa b
0.5 0.84 SAILS 1.00 am
25.00 3.685 KS. 80 3.74
0.75 1 05 A10611 80 173
SAILS 1.00 25.00 3.749 2(5, 80 3.92
I 1 32 A 106 B 60 so]
SAILS 1.00 25.04) 3.330 XS, 80 4.55
1.5 ISO A 106 Fl ao 4.55
SAILS 1.00 25.00 4.008 XS. 80 5.09
2 238 A 106 B 00 5.08
SAILS 1.00 25.00 4.153 XS, 80 5.54 0.17 4.37 80 5.54
3 3.50 A 106 B SM1-5 1.00 23.00 4.497 30.00 4.78
4 4.50 A 10611 SID 5.49
SAUL 1.00 25.00 4.802 SID, 40 6.02 0.20 5.16 SID 602
II 6.113 A 806 8 SmLS 1.00 25.00 5.450 SID, 40 7.12 0.22
8 5.56 STD 711
8.63 A *068 SAILS 1.00 25330 6.061 20.00 6.35 STD 8.18
10 11175 A *0611 SAILS 1.00 25.00 6.709 30.00 7.80 0.28 7.09
12 1275 STD 9.27
API SI. B SAW 0.90 23.00 7.748 30.00 839 0.31 7.92 STD 9.53
14 1400 API 51_ B SAW 0.90 25.00 8.171 SID, 30 9.53 0.34 8.74
16 16410 STD 9.53
API 5L B SAW 0.90 25.00 8.849 SID, 30 933 SID 9.53
18 18.00 API SUB SAW 0.90 25.00 9.526 30.00 81.13 0.41 10.31
20 XS 12.70
20.00 API 5L 11 SAW 0.93 2300 10.204 XS, X/ 12.70 0.41 10_31 XS 12.70
22 22.00 Api sr. 13 SAW 0.90 23.00 10.882 33,30 12.70 0.44 11.13
24 XS 1270
24.00 API 51 B SAW , 0.90 25.00 11.559 XS 12.70 0.47 11.91 2(5 12_70
26 26.00 API 5L B SAW 0.90 13.60 8-241 SID 9.53 0.34 8.74 SID
28 21100 API SL B 9.53
SAW 0.90 1160 8.611 5713 9.53 0.34
30 8.74 STD 933
3000 API 51 B SAW 030 1160 8.981 STD 933 SID
32 37-00 API 5L B 933
SAW 0.90 13.60 9151 SID 9.53
34 34.00 10.31 10.31
API 5L B SAW 13.90 13.60 9.721 3(5,20 12.70 0.41 1031 10.31
36 3690 API SUB 10.31
SAW 0.90 1160 10.091 2(5, 20 12.70 0.41 1031 11.13 11.13
38 38.00 API 5L B SAW 0.90 13.60 10.462 XS 12.70 0.44 11.13 11.13
40 40.00 API 5L B 11.13
SAW 0.90 13.60 10.832 XS 1270 0.44 11.13 11.13 11.1.3
Pipe Wall Thickness Calculation
M. PERTAMINA
Are CLUINtleUAL era tale
E+ P.y)}
+4:„_„,„ E = Longitudinal weld joint efficiency factor Atabel 102.4.3)
= coefficient from Table 104.1_2(A) ASNIE 531.1
A = the sum of mechanical allowances (thread or groove depth) plus
corrosion and mosion allowances, (mm).
hl = klillTalerance (MT expressed in ^ii)
t = Minimum trivia-ad Will thickness
Piping Class TI
Design Pressure (P): US13am Mlowable Stress (5) : 17.1 ksi
135.64113Psig Additional Thickness (A): 3 nun
Design Tempenturc( T ) : Cothitient ( Y ) 0.4
210 Celcius
Mill Tol. 12.5%
Win= At 2 .
trins9va -: Oar: -.. Ml • r IllsnuellySinallel PBS
Jan Denim Rural
1W SCAMS
bps Elf Press Thickness Om vvni WM WaI Inn*
E P tm Sas llinnsas Trienns nickname
0.5 0.84 A 106 B
an inn
11c19. ; ThIcPum
ShLLS 1.00 12.80 3.560 XS, 80 3.74
073 LOS 80 3.73
A 1068 SMLS 1.00 1280 3.593 XS, 80 3.92 -
1 1.32 A 1063 80 3.91
S13113 100 12.80 3.635 X4 80 4.55
13 1.9C A 1068 80 4.55
DIU 1.00 12.80 3.727 XS, 80 5.09
2 236 A 1068 80 5.08
5341.5 1.00 12.80 3.801 510, 40
3 330 A Ind 8 51311.5
3.92 - sin 3.91
1.1.10 12.80 3.978 30.00 4.78 0.17 4.37
4 STD 5.49
430 A 1068 SMLS 1.00 12.80 4.135 30.00 4.78 0.17 437
6 463 STD 6.02
A 106 B SMLS 1.00 12.30 4.468 STD, 40 7.12 0.19 4.78 STD
8 8.63 A 1068 7.11
SMLS 1.00 12.80 4.782 20.00 635 0-20 5.16 STD 8.18
10 10.75 A 106 B SMLS 1.50 1210 5.115 20.00 635 0.20 5.16
12 12.75 API 5L B STD 9.27
SAW 0.90 1230 5.650 20.00 635 .
14 1440 STD 933
API 5L B SAW 0.90 12.80 5.868 10.00 635 - STD
16 1400 API 5L B 9.53
SAW 0.90 1280 6.216 10.00 6.35
IS STD 9.53
1400 API 51,11 SAW 0.90 1280 6.565 20.00 7.93 0.28 7.14 STD
2,3 2000 API 51.8 933
SAW 090 12.80 6.913 STD, 20 9.53 0.28 7.14
n 2200 API 5L B
STD 933
24 24.00 API SL B
SAW
SAW
0.90
0.90
12.80
12.80
7.262
7410
STD, 20
570. 20
9.53 031 7.92 sm 9.53
9.53 0.31 7.92 57D 933
26 26.00 API SL 13 SAW 0.90 12.80 7.959 STD 933 0.34 8.74
28 28.00 STD 9.53
API 51 B SAW 0.90 12.80 8.307 57D 9.53 034 8.74 STD
30 30.00 933
API 5L B SAW 0.90 12.80 8.656 STD 933 034 8.74 STD 933
32 3200 API 5L B SAW 0.90 12.80 9.009 SID 9.53
34 SID 933
34.09 API 51.8 SAW 0.90 12.80 9.353 STD 9.53 -
36 STD 933
36-00 API 5L B SAW 0.90 1280 9.701 XS, 20 12.70 0.41 1031 1031
38 38.00 AP1 5L B 2031
SAW 0.90 12.80 10.050 XS 12.70 0.41 1031 10.31 10.31
40 40.00 API 5L B SAW 0.90 12.80 10.398 XS 1170 0.44 11.13 11.13 11.13
Pipe Wall Thickness Calculation
PERTAMINA
Ars COW Util4gALIN•111.A.
Gott : PT. Pertunina Gcotharrinl Energy
Psalm Number : 10022 Prepare by DTA Rey :0
Project Name : Spurn Gathering Facilities ULUBELUI&I! Checked by : NW bare: I6-Sept-II
PiP111110012 $I
Desipp Pressure Allowable Stress (S) : 17.1 ksi
(P): size up to 30" 133 baryj Additional Thickness (A): 3 mm
195.8009Psig Coefficient ( ) • 0.4
32" and above 10.8 harp Mill Tot 12.5°S,
156.6407Psig
Design Temper-mall') : 210 Celcius
41,41441" .. lAnInaan
.92212.211211. At 1 At 2 1.1a-ally Selected Pipe
.. Ir.-2:-• . Pa Jen Dieser Rnad Santliala
WS Ramat
-. . . Sal Ttchass
..1na.... . .stcr--:-. ._ --;;L: ,- - - -i own ' IA nm no
IL5 0.84 A *06 8 SMLS 100 13.50 3.568 XS, 80 3.74 80 3.73
0.75 1.05 A 7068 SMI-5 1.00 1330 3.602 XS, 80 192 80 3.91
1 1.32 A 106 B SMLS 1.00 13.50 3446 XS, 80 4.55 80 4.55
1.5 1.90 A 106 II 5141.5 1.00 13.50 3.743 XS, 80 5.09 so 5.08
2 2.36 A 10613 SAILS 1.00 1150 3.821 510, 40 3.92 . STD 3.91
3 330 A 3068 S IS 1.00 1330 4.008 30.00 4.78 0.17 4.37 STD 5.49
4 4.50 A 106 I SMLS 1.00 13.50 4.173 30.00 4.78 0.17 4.37 STD 6.02
6 643 A 1063 SMLS 1.00 13.50 4.525 STD, 40 7.12 0.19 4.78 SID 7.11
8 843 A 106 B SAILS 1.00 1330 4.855 20.00 635 0.20 5.16 STD 8.18
10 10.75 A 106 B SAILS 1.00 1330 5.207 20.00 6.35 0.22 156 STD 927
12 1275 API 51 B ERW 0.85 13.50 5.908 20.00 635 - STD 933
14 14.00 API 51 B SAW 0.90 13.50 6.001 10.00 635 - SID 9.53
16 16.00 API 51 B SAW 0.90 13.50 6.368 20.00 7.93 028 7.14 STD 933
18 18.00 API 51 B SAW 0.90 13.50 6.736 20110 7.93 0-28 7.14 STD 933
20 20.30 API M. B SAW 0.90 1330 7.103 STD 20 9.53 0.28 7.14 SID 9.53
22 72.00 API 31.0 SAW 0.90 13.50 7.471 510, 20 9.53 0.31 7.92 STD 9.53
24 2440 API 51 B SAW 0.90 1330 7.838 S113,20 9.53 031 7.92 SID 933
26 26.00 API M. B SAW 0.90 13.50 8.205 SID 9.53 034 8.74 STD 9.53
28 2400 API 51 B SAW 0.90 1330 8.573 STD 933 034 8.74 SID 933
30 30.00 API 51. B SAW 0.90 13.50 8.940 STD 933 57D 9.53
32 32.00 API 51 B SAW 0.90 10.80 8.137 STD 9.53 0.34 8.74 SID 933
34 34.00 APi 51.8 SAW 0.90 10.80 8.431 SID 933 034 8.74 STD 9.53
36 36.00 API 51 B SAW 0.90 10.80 8.725 STD 933 034 8.74 STD 933
38 31100 API 51 B SAW 0.90 10.80 9.019 STD 933 STD 933
40 40.00 API SEE SAW 0.90 10.80 9.314 STD 9.53 STD 9.53
42 42.00 API 5143 SAW 0.90 10.80 9.608 XS 12.70 0.41 10.31 1031 10.31
44 44.00 API 51.13 SAW 0.90 10.80 9.902 XS 12.70 0.41 10.31 10.31 10.31
46 46.00 API 51. B SAW 090 10.80 10.196 XS 12.70 0.41 1031 1031 1031
46 48.00 API 51 B SAW 0.90 10.80 10.491 XS 12.70 0.44 11.13 11.13 11.13
32 12.00 API SIB SAW 0.90 10.80 11.079 0.00 0.44 11.13 11.13 11.13
Pipe Wall Thickness Calculation
ramrrarama
Ars
Cheat PT. Pertamina Geothermal Energy
Prawn Number 10022 Prepare by : 8Th Rev : 0
Prmeet Name : Steam Gathering FaCiliatS UW8E1.111842 Checked by: FIVE Date: 16 Xert-II
-
'Pipe wall thickness ralculation in accordance with
Newsearharr.
0.SME 131.1 paragraph 104.12
P = Internal design pressure
D = Outside diameter of pipe.
PigirsC1•44 112
Design Passage (P ) ! Allowable Stress (S) : 17.1 ksi
size on to 20" 20.4 bug Additional Thickness (A):
295.8769Psig 3 own
Coefficient (fl .. 04
22" and above 13.4 bazg Mill Tol
194. 3505Psig 123%
Design Tcmperatt re( 1) : 210 Celdus
-Nonni ppm
JJ J z 5
Piping Class Cl
Allowable Stresa (5) 17 1 lot
Design Pressure (P) 16 barg
Addiuong Thickness (A) 3 miss
2320403N% Cocrtici tit ( )
Design Tempe-enure( I) 0.0
711 Celan,
Malin! 12.5•'•
Plerabs Ape
Wall
1InwelblediodPbe
Wei Ignsinh
DPW 0 a P to SW. Twines Tanner llilebwee 8th. Tibias
In
bas ars is a
Us 0.84 A 104 3 &MIS 100 16.00 3393 XS. 80 3.74 SO 173
0.75 1.05 410611 5 3 OS 1.00 16.00 3.634 X5.80 3.92 80 3.91
1 1.32 k 106 B 530-5 LOD 16.00 3.686 XS. 80 435 NO 4.55
1.5 1.90 A 106 B SMLS '.00 16.90 1801 X.5,110 309 SO
2 SAS
2.36 A 106 B &MIS 3.00 16.00 3.694 SM. 46 192 STD 3.92
I 3.50 A 1968 53IIS 1.60 16.00 4.114 30.00 4.76 0.17 437 STD 3.49
4 4 30 A 106 3 S305 1.00 16.00 4.310 30.00 4.78 0.17 437 STD 6.02
6 6.63 4 106 B SOS 1.00 16.00 4.726 07J, 40 7.12 0.19 4.78 SID
1 7.11
8463 4 166 Et 53.0.3 1.00 16.00 £118 20.00 6.35 0.20 3.16 SID 6.18
10 10.75 A 106 II 53.833. i430 16.00 3333 20.00 6.35
a 12
14
16
12.75
1409
1600
API 5L B
API 518
API 5113
ERB
EllW
035
013
16.00
16.00
6.364
6.652
31.1.00
20.00
8.39
7.93
0.22
023
0-28
536
7.14
7.14
5713
30
20
9.27
3_38
7.92
EMI 0.85 16.00 7.113 SI.00 7.93 0.211 7.34 20 7.92
IS 18-00 API 3L B ERW 0.8.5 16.00 7373 20.00 7.93
X 20.00 20 7.92
API 5L II EIOX 0.11.5 16.00 8.034 STD.213 953 034 11.74 20 933
22 2200 API 5L B ERW 0.83 16.00 6.494 STD, 20 9.53
24 034 8.14 20 933
2.400 API 51.13 PAW 0.85 16.00 8.935 STD, 2.1 9.33 20 9.53 •
Pipe Wall Thickness Calculation
PVIRTAAIIIIMen
s e woos mt. !seem.
oon in 'c 0 Ma we
ASUE 831.1 pazsgeaph 104.1.2 (NM
P = Intent. elt.ism piesseue
Oweidc thumbs of pipe.
S
Maximum allowable mess in immoral dor to internal pressure
F.{ + Ai
: - E
Y
Loapealanal wad porn efficiency Lamm ,(abel 101.43)
(2(S.E+P.y)) coefficarne fem. Table 104.1.2( t).1SNIE 1331.1
A a. the sum !dined...al allouvirta (thms(' or name depth) ph
Common and stoma filiminces. (mu)
AI a Min Tulerance DIY exprened a ".1
t = NImunian Requited Wan rheeknees
a 2.5. CALCULATION
20T2-127-TH.20--82-141-TH,2(Y72-125-TH,1473-10E-TH,1273-091-TH, 2 A4 AS 03 OF 31
S ITT3-101-TH.12"-T2.110•TH.IrT2-115-TH.10--T2-117-TH.T2-10',1113-TH)