SS.HH. DISCAPACITADOS S/. 435,100.78 S/. 78,318.14 S/. 30,457.05 S/. 543,875.97 S/. 538,686.44 S/. 96,963.56 S/. 635,650.00
TOTAL S/. 435,100.78 S/. 78,318.14 S/. 30,457.05 S/. 543,875.97 S/. 538,686.44 S/. 96,963.56 S/. 635,650.00
72 30 YEE PVC SAP DESAGUE DE 2"x2" UND 39.1400 S/. 2.05 S/. 80.24
ADAPTADOR PVC SAP PRESION C-
72 30 UND 64.0000 S/. 0.68 S/. 43.52
10 Ø 1/2"
ADAPTADOR PVC SAP PRESION C-
72 30 UND 28.0000 S/. 0.76 S/. 21.28
10 Ø 3/4"
TUBERIA PVC SAL PARA
72 30 PZA 37.0000 S/. 6.27 S/. 231.99
VENTILACION DE 2"x3m
72 30 CODO PVC SAL DESAGUE 2"x90° UND 37.0000 S/. 0.98 S/. 36.26
5 21 PIEDRA CHANCADA DE 1/2" - 3/4" M3 136.0478 S/. 51.61 S/. 7,021.43
4 21 ARENA FINA M3 18.9650 S/. 38.05 S/. 721.62
5 21 ARENA GRUESA M3 96.8530 S/. 42.29 S/. 4,095.91
5 21 AFIRMADO DE BASE DE 1 - 1/2" M3 9.1700 S/. 34.50 S/. 316.37
5 21 HORMIGON M3 18.3696 S/. 24.12 S/. 443.07
10 10 AGUA M3 63.3211 S/. 9.00 S/. 569.89
CEMENTO PORTLAND TIPO I (42.5
21 21 BLS 2,459.3446 S/. 18.05 S/. 44,391.17
kg)
4 21 YESO EN BOLSAS DE 20kg BLS 3.8045 S/. 8.31 S/. 31.62
24 10 PORCELANA BLANCA KG 30.0000 S/. 3.05 S/. 91.50
LADRILLO ARCILLA CLASE IV TIPO
17 21 KING KONG 18 HUECOS (30% MIL 2.5544 S/. 508.47 S/. 1,298.84
vacios)
30 30 PEGAMENTO PARA PVC GAL 3.1159 S/. 135.25 S/. 421.43
PEGAMENTO CERAMICO EN
24 10 BLS 136.5150 S/. 12.29 S/. 1,677.77
POLVO 25 kg EXTERIOR
ADITIVO IMPERMEABILIZANTE
4 21 KG 0.6480 S/. 3.50 S/. 2.27
PARA MORTERO
ADITIVO REDUCTOR DE AGUA,
30 30 RETARDANTE DE FRAGUA E L 12.0684 S/. 0.48 S/. 5.79
INCORPORADOR DE AIRE
30 30 ADITIVO SUPERPLASTIFICANTE L 3.4817 S/. 4.70 S/. 16.36
FIBRA DE POLIPROPILENO bls x
30 30 BLS 0.9895 S/. 29.92 S/. 29.61
600gr
CALENDARIO DE ADQUISICIÓN DE MATERIALES
EJECUCIÓN DE : "SERVICIOS HIGIÉNICOS PARA PERSONAS CON DISCAPACIDAD DE LA INVERSIÓN DE
OBRA AMPLIACIÓN MARGINAL: MEJORAMIENTO DE LAS CONDICIONES DE ACCESIBILIDAD
PARA PERSONAS CON DISCAPACIDAD EN EL PREDIO Nº8 DE LA UNFV"
CLIENTE : UNIVERSIDAD NACIONAL FEDERICO VILLAREAL Costo al: 11/1/2017
CONTRATISTA : CONSORCIO ARTICO
INTEGRANTES DEL - INGENIERÍA Y CONSTRUCCIÓN DE INFRAESTRUCTURA S.A.C.
CONSORCIO - MILUSMAR S.A.C.
LUGAR : LIMA - LIMA - LIMA
INTERRUPTOR TERMOMAGNETICO
12 30 UND 12.0000 S/. 67.00 S/. 804.00
2x20A 10kA TIPO TORNILLO
CARTELES DE PROMOCION DE LA
30 30 SEGURIDAD Y CONSERVACION DEL UND 4.0000 S/. 5.51 S/. 22.04
MEDIO AMBIENTE
SERVICIOS HIGIENICOS
30 30 PORTATILES MODELO EJECUTIVO UND 5.0000 S/. 1,100.00 S/. 5,500.00
SIMPLE
CHARLA DE INDUCCION PARA EL
30 30 UND 6.0000 S/. 140.00 S/. 840.00
PERSONAL NUEVO
30 30 CHARLA DE SENSIBILIZACION UND 5.0000 S/. 160.00 S/. 800.00
30 30 CHARLA DE INSTRUCCION UND 5.0000 S/. 160.00 S/. 800.00
CAPACITACION DE LA CUADRILLA
30 30 UND 6.0000 S/. 200.00 S/. 1,200.00
DE EMERGENCIAS
30 30 CORDEL RLL 0.1522 S/. 5.00 S/. 0.76
30 30 PROVICION DE AGUA MES 5.0000 S/. 300.00 S/. 1,500.00
PROVICION DE ENERGIA
7 30 MES 5.0000 S/. 400.00 S/. 2,000.00
ELECTRICA
--------------------
MONTO TOTAL DE MATERIALES S/. 210,966.42
PORCENTAJE DE INCIDENCIA 100.00%
CALENDARIO DE ADQUISICIÓN DE MATERIALES
EJECUCIÓN DE : "SERVICIOS HIGIÉNICOS PARA PERSONAS CON DISCAPACIDAD DE LA INVERSIÓN DE AMPLIACIÓN MARGINAL:
OBRA MEJORAMIENTO DE LAS CONDICIONES DE ACCESIBILIDAD PARA PERSONAS CON DISCAPACIDAD EN EL PREDIO Nº8 DE LA
UNFV"
CLIENTE : UNIVERSIDAD NACIONAL FEDERICO VILLAREAL Costo al: 11/1/2017
CONTRATISTA : CONSORCIO ARTICO
INTEGRANTES DEL - INGENIERÍA Y CONSTRUCCIÓN DE INFRAESTRUCTURA S.A.C.
CONSORCIO - MILUSMAR S.A.C.
LUGAR : LIMA - LIMA - LIMA
30 YEE PVC SAP DESAGUE DE 2"x2" UND 39.1400 S/. 2.05 S/. 80.24 S/. 80.24
ADAPTADOR PVC SAP PRESION C-
30 UND 64.0000 S/. 0.68 S/. 43.52 S/. 43.52
10 Ø 1/2"
ADAPTADOR PVC SAP PRESION C-
30 UND 28.0000 S/. 0.76 S/. 21.28 S/. 21.28
10 Ø 3/4"
TUBERIA PVC SAL PARA
10 PZA 37.0000 S/. 6.27 S/. 231.99 S/. 231.99
VENTILACION DE 2"x3m
10 CODO PVC SAL DESAGUE 2"x90° UND 37.0000 S/. 0.98 S/. 36.26 S/. 36.26
21 PIEDRA CHANCADA DE 1/2" - 3/4" M3 136.0478 S/. 51.61 S/. 7,021.43 S/. 2,870.31 S/. 2,980.88 S/. 1,170.24
21 ARENA FINA M3 18.9650 S/. 38.05 S/. 721.62 S/. 601.35 S/. 120.27
21 ARENA GRUESA M3 96.8530 S/. 42.29 S/. 4,095.91 S/. 1,315.61 S/. 2,243.94 S/. 536.36
21 AFIRMADO DE BASE DE 1 - 1/2" M3 9.1700 S/. 34.50 S/. 316.37 S/. 316.37
21 HORMIGON M3 18.3696 S/. 24.12 S/. 443.07 S/. 295.38 S/. 147.69
21 AGUA M3 63.3211 S/. 9.00 S/. 569.89 S/. 148.99 S/. 320.38 S/. 100.52
CEMENTO PORTLAND TIPO I (42.5
21 BLS 2,459.3446 S/. 18.05 S/. 44,391.17 S/. 15,179.33 S/. 22,592.32 S/. 6,619.52
kg)
21 YESO EN BOLSAS DE 20kg BLS 3.8045 S/. 8.31 S/. 31.62 S/. 31.62
21 PORCELANA BLANCA KG 30.0000 S/. 3.05 S/. 91.50 S/. 34.88 S/. 56.62
LADRILLO ARCILLA CLASE IV TIPO
21 KING KONG 18 HUECOS (30% MIL 2.5544 S/. 508.47 S/. 1,298.84 S/. 1,298.84
vacios)
30 PEGAMENTO PARA PVC GAL 3.1159 S/. 135.25 S/. 421.43 S/. 421.43
PEGAMENTO CERAMICO EN
30 BLS 136.5150 S/. 12.29 S/. 1,677.77 S/. 1,341.94 S/. 335.83
POLVO 25 kg EXTERIOR
ADITIVO IMPERMEABILIZANTE
30 KG 0.6480 S/. 3.50 S/. 2.27 S/. 2.27
PARA MORTERO
ADITIVO REDUCTOR DE AGUA,
30 RETARDANTE DE FRAGUA E L 12.0684 S/. 0.48 S/. 5.79 S/. 3.72 S/. 2.07
INCORPORADOR DE AIRE
30 ADITIVO SUPERPLASTIFICANTE L 3.4817 S/. 4.70 S/. 16.36 S/. 16.36
FIBRA DE POLIPROPILENO bls x
30 BLS 0.9895 S/. 29.92 S/. 29.61 S/. 29.61
600gr
CERAMICO BLANCO
10 M2 149.7615 S/. 16.86 S/. 2,524.98 S/. 2,524.98
ANTIDESLIZANTE 0.40x0.40m
CERAMICO BLANCO PARED
10 M2 423.6015 S/. 16.86 S/. 7,141.92 S/. 4,286.85 S/. 2,855.07
0.40x0.40m
FRAGUA BLANCA INTERIOR
10 KG 129.3835 S/. 4.15 S/. 536.94 S/. 429.55 S/. 107.39
EXTERIOR
10 CRUCETAS DE PVC UND 1,835.0000 S/. 0.03 S/. 55.05 S/. 45.88 S/. 9.17
30 TAPAJUNTA PZA 45.0000 S/. 18.50 S/. 832.50 S/. 832.50
30 TAPACANTO DE PVC 8mm M 273.0250 S/. 1.60 S/. 436.84 S/. 349.47 S/. 87.37
CALENDARIO DE ADQUISICIÓN DE MATERIALES
EJECUCIÓN DE : "SERVICIOS HIGIÉNICOS PARA PERSONAS CON DISCAPACIDAD DE LA INVERSIÓN DE AMPLIACIÓN MARGINAL:
OBRA MEJORAMIENTO DE LAS CONDICIONES DE ACCESIBILIDAD PARA PERSONAS CON DISCAPACIDAD EN EL PREDIO Nº8 DE LA
UNFV"
CLIENTE : UNIVERSIDAD NACIONAL FEDERICO VILLAREAL Costo al: 11/1/2017
CONTRATISTA : CONSORCIO ARTICO
INTEGRANTES DEL - INGENIERÍA Y CONSTRUCCIÓN DE INFRAESTRUCTURA S.A.C.
CONSORCIO - MILUSMAR S.A.C.
LUGAR : LIMA - LIMA - LIMA
INTERRUPTOR TERMOMAGNETICO
30 UND 12.0000 S/. 67.00 S/. 804.00 S/. 804.00
2x20A 10kA TIPO TORNILLO
CALENDARIO DE ADQUISICIÓN DE MATERIALES
EJECUCIÓN DE : "SERVICIOS HIGIÉNICOS PARA PERSONAS CON DISCAPACIDAD DE LA INVERSIÓN DE AMPLIACIÓN MARGINAL:
OBRA MEJORAMIENTO DE LAS CONDICIONES DE ACCESIBILIDAD PARA PERSONAS CON DISCAPACIDAD EN EL PREDIO Nº8 DE LA
UNFV"
CLIENTE : UNIVERSIDAD NACIONAL FEDERICO VILLAREAL Costo al: 11/1/2017
CONTRATISTA : CONSORCIO ARTICO
INTEGRANTES DEL - INGENIERÍA Y CONSTRUCCIÓN DE INFRAESTRUCTURA S.A.C.
CONSORCIO - MILUSMAR S.A.C.
LUGAR : LIMA - LIMA - LIMA
CARTELES DE PROMOCION DE LA
30 SEGURIDAD Y CONSERVACION DEL UND 4.0000 S/. 5.51 S/. 22.04 S/. 5.96 S/. 11.60 S/. 4.48
MEDIO AMBIENTE
SERVICIOS HIGIENICOS
30 UND 5.0000 S/. 750.00 S/. 3,750.00 S/. 3,333.35 S/. 416.65
PORTATILES MODELO ESTANDAR
SERVICIOS HIGIENICOS
30 PORTATILES MODELO EJECUTIVO UND 5.0000 S/. 1,100.00 S/. 5,500.00 S/. 4,888.90 S/. 611.10
SIMPLE
CHARLA DE INDUCCION PARA EL
30 UND 6.0000 S/. 140.00 S/. 840.00 S/. 840.00
PERSONAL NUEVO
30 CHARLA DE SENSIBILIZACION UND 5.0000 S/. 160.00 S/. 800.00 S/. 800.00
30 CHARLA DE INSTRUCCION UND 5.0000 S/. 160.00 S/. 800.00 S/. 800.00
CAPACITACION DE LA CUADRILLA
30 UND 6.0000 S/. 200.00 S/. 1,200.00 S/. 1,200.00
DE EMERGENCIAS
30 CORDEL RLL 0.1522 S/. 5.00 S/. 0.76 S/. 0.76
30 PROVICION DE AGUA MES 5.0000 S/. 300.00 S/. 1,500.00 S/. 1,500.00
PROVICION DE ENERGIA
30 MES 5.0000 S/. 400.00 S/. 2,000.00 S/. 2,000.00
ELECTRICA
-------------------- -------------------- -------------------- --------------------
MONTO TOTAL DE MATERIALES S/. 210,966.42 S/. 62,828.14 S/. 101,034.03 S/. 47,104.25
PORCENTAJE DE INCIDENCIA 100.00% 29.78% 47.89% 22.33%
CRONOGRAMA DE ADQUISICIÓN DE MATERIALES POR MONOMIO - SS.HH. DISCAPACITADOS
OBRA : "SERVICIOS HIGIENICOS PARA PERSONAS CON DISCAPACIDAD DE LA INVERSION DE AMPLIACION MARGINAL: MEJORAMIENTO DE LAS CONDICIONES DE ACCESIBILIDAD PARA
PERSONAS CON DISCAPACIDAD EN EL PREDIO N°8 DE LA UNFV-LIMA"
CLIENTE : UNIVERSIDAD NACIONAL FEDERICO VILLARREAL
UBICACIÓN : LIMA - LIMA - LIMA
PLAZO DE EJECUCIÓN : 180 DÍAS CALENDARIO
FÓRMULA :SS.HH. DISCAPACITADOS
Coeficiente de Porcentaje de Factor de I.U. Base I.U. Adelanto Monto Máximo Monto(01)
Saldo por valorizar para el Adelanto solicitado por
Monomio Símbolo CÓDIGO Descripción incidencia incidencia relación
: NOV 2017 : ABRIL 2018 de Materiales el Contratista
(CI) (I) (So) (Fr) (Io) (Ir) k M=CI*I*So*Fr*Ir/Io
SS.HH. DISCAPACITADOS S/. 107,737.29
1 MO 47 MANO DE OBRA 0.338 100.000% S/. 543,875.97 0.99046 S/. 580.90 S/. 582.52
S/. 580.90 S/. 582.52 0.339 NO APLICA
2 A 3 ACERO DE CONSTRUCCIÓN CORRUGADO 0.060 100.000% S/. 543,875.97 0.99046 S/. 464.75 S/. 501.98 ###
S/. 464.75 S/. 501.98 0.065 S/. 35,014.62 S/. 26,247.94
3 5 AGREGADO GRUESO 0.108 24.074% S/. 543,875.97 0.99046 S/. 216.23 S/. 216.64
CA 21 CEMENTO PORTLAND TIPO I 75.926% S/. 543,875.97 0.99046 S/. 401.92 S/. 423.68 ###
S/. 357.22 S/. 373.84 0.113 S/. 60,871.57 S/. 44,391.17
4 24 CERÁMICA ESMALTADA Y SIN ESMALTAR 0.052 42.308% S/. 543,875.97 0.99046 S/. 243.60 S/. 243.19
AC 10 APARATO SANITARIO CON GRIFERÍA 57.692% S/. 543,875.97 0.99046 S/. 414.97 S/. 418.64 ###
S/. 342.47 S/. 344.41 0.052 S/. 28,011.69 S/. 1,009.13
5 7 ALAMBRE Y CABLE TIPO TW Y THW 0.092 18.478% S/. 543,875.97 0.99046 S/. 657.97 S/. 671.19
DTA 30 DÓLAR (GENERAL PONDERADO) 56.522% S/. 543,875.97 0.99046 S/. 465.87 S/. 469.88 ###
72 TUBERÍA DE PVC PARA AGUA 25.000% S/. 543,875.97 0.99046 S/. 425.95 S/. 429.31
S/. 491.39 S/. 496.94 0.093 S/. 50,097.84 S/. 4,888.90
6 48 MAQUINARIA Y EQUIPO NACIONAL 0.150 40.667% S/. 543,875.97 0.99046 S/. 363.07 S/. 365.01
MM 43 MADERA NACIONAL PARA ENCOF. Y CARPINT. 59.333% S/. 543,875.97 0.99046 S/. 658.32 S/. 670.45 ###
S/. 538.25 S/. 546.24 0.152 S/. 81,880.34 S/. 31,200.15
7 GGU 39 ÍNDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.200 100.000% S/. 543,875.97 0.99046 S/. 441.61 S/. 445.52 ###
S/. 441.61 S/. 445.52 0.202 NO APLICA
01.02.02 TRANSPORTE DE MATERIALES, EQUIPOS Y HERRAMIENTAS S/. 5,166.77 S/. 1,401.16 S/. 2,714.74 S/. 1,050.87
MES 1
I.U. INEI Descripción UND. METRADOS P. UNITARIO del 15/05/18 al
31/05/18
TRANSPORTE DE EQUIPOS,
43 CJT 1.0000 S/. 5,166.77 S/. 1,401.16
MAQUINARIAS Y HERRAMIENTAS
3 ALAMBRE GALVANIZADO N° 12 KG 5.8755 S/. 5.40
3 ALAMBRE NEGRO # 8 KG 589.5884 S/. 2.72 S/. 221.10
3 ANGULO METALICO 2"x2"x3/16" PZA 0.9450 S/. 78.60
ACERO CORRUGADO fy = 4200
3 KG 12,249.9410 S/. 2.41 S/. 3,274.43
kg/cm2 GRADO 60
3 BARRA LISA Ø 1/2" PZA 0.4200 S/. 22.77
CLAVOS PARA MADERA CON
3 KG 155.2692 S/. 3.16 S/. 248.76
CABEZA PROMEDIO
CLAVOS C/CABEZA
3 KG 2.1600 S/. 3.81
P/CONSTRUCCION D. PROMEDIO
TUBERIA PVC SAP PARA INST.
30 PZA 65.1000 S/. 5.06
ELECT. Ø 20mm
CURVA PVC SAP PARA INST. ELECT.
30 PZA 70.0000 S/. 0.81
Ø 20mm
UNION PVC SAP PARA INST. ELECT.
30 PZA 42.0000 S/. 0.27
DE Ø 20mm
CONEXION A CAJA PVC SAP PARA
30 UND 42.0000 S/. 0.24
INST. ELECT. Ø 20mm
TUBERIA PVC SAP PRESION C-10
30 PZA 26.2400 S/. 5.51
1/2"x5m
TUBERIA PVC SAP PARA DESAGUE
30 PZA 9.1000 S/. 42.22
DE 4"x3 m
TUBERIA PVC SAP PARA DESAGUE
30 PZA 13.3000 S/. 24.35
DE 2"x3 m
CODO PVC SAP PRESION C-10 Ø
30 UND 64.0000 S/. 0.85
1/2" x 90°
CODO PVC SAP DESAGUE DE 4" x
30 UND 26.7800 S/. 4.55
90°
CODO PVC SAP DESAGUE DE 2" x
30 UND 39.1400 S/. 0.93
90°
30 TRAMPA P PVC SAP DE 4" UND 26.7800 S/. 29.55
30 TRAMPA P PVC SAP DE 2" UND 39.1400 S/. 7.54
30 YEE PVC SAP DESAGUE DE 4"x4" UND 26.7800 S/. 9.54
MES 1
I.U. INEI Descripción UND. METRADOS P. UNITARIO del 15/05/18 al
31/05/18
21 AFIRMADO DE BASE DE 1 - 1/2" M3 9.1700 S/. 34.50
21 HORMIGON M3 18.3696 S/. 24.12 S/. 295.38
21 AGUA M3 63.3211 S/. 9.00 S/. 148.99
CEMENTO PORTLAND TIPO I (42.5
21 BLS 2,459.3446 S/. 18.05 S/. 15,179.33
kg)
21 YESO EN BOLSAS DE 20kg BLS 3.8045 S/. 8.31 S/. 31.62
21 PORCELANA BLANCA KG 30.0000 S/. 3.05
LADRILLO ARCILLA CLASE IV TIPO
21 KING KONG 18 HUECOS (30% MIL 2.5544 S/. 508.47
vacios)
30 PEGAMENTO PARA PVC GAL 3.1159 S/. 135.25
PEGAMENTO CERAMICO EN
30 BLS 136.5150 S/. 12.29
POLVO 25 kg EXTERIOR
ADITIVO IMPERMEABILIZANTE
30 KG 0.6480 S/. 3.50
PARA MORTERO
ADITIVO REDUCTOR DE AGUA,
30 RETARDANTE DE FRAGUA E L 12.0684 S/. 0.48 S/. 3.72
INCORPORADOR DE AIRE
30 ADITIVO SUPERPLASTIFICANTE L 3.4817 S/. 4.70
FIBRA DE POLIPROPILENO bls x
30 BLS 0.9895 S/. 29.92
600gr
CERAMICO BLANCO
10 M2 149.7615 S/. 16.86
ANTIDESLIZANTE 0.40x0.40m
CERAMICO BLANCO PARED
10 M2 423.6015 S/. 16.86
0.40x0.40m
FRAGUA BLANCA INTERIOR
10 KG 129.3835 S/. 4.15
EXTERIOR
10 CRUCETAS DE PVC UND 1,835.0000 S/. 0.03
30 TAPAJUNTA PZA 45.0000 S/. 18.50
30 TAPACANTO DE PVC 8mm M 273.0250 S/. 1.60
COBERTURA DE POLIPROPILENO
30 PL 40.5876 S/. 21.79 S/. 795.35
e=1.2mm
43 MADERA TORNILLO P2 3,890.9603 S/. 4.95 S/. 11,996.13
43 TRIPLAY DE 1200 x 2400 x 6mm PL 82.3650 S/. 32.54 S/. 2,487.43
43 MADERA ANDAMIAJE P2 260.3858 S/. 4.41
43 PISO DE MADERA M2 68.1000 S/. 47.02 S/. 2,879.81
43 PUERTAS Y VENTANAS M2 5.6424 S/. 76.86 S/. 390.02
SUMINISTRO TABIQUE DE
43 M2 71.8200 S/. 180.00
MELAMINE
SUMINISTRO DE PUERTA DE
43 UND 16.0000 S/. 216.00
MELAMINE 0.60x2.10m
SUMINISTRO DE PUERTA DE
43 UND 8.0000 S/. 324.00
MELAMINE 0.90x2.10m
SUMINISTRO DE PUERTA DE
43 UND 4.0000 S/. 600.00
MADERA 0.90x2.10m
43 REGLA DE MADERA P2 60.4329 S/. 4.95 S/. 112.10
CALENDARIO DE ADQUISICIÓN DE MATERIALES
EJECUCIÓN DE : "SERVICIOS HIGIÉNICOS PARA PERSONAS CON DISCAPACIDAD DE LA INVERSIÓN
OBRA DE AMPLIACIÓN MARGINAL: MEJORAMIENTO DE LAS CONDICIONES DE
ACCESIBILIDAD PARA PERSONAS CON DISCAPACIDAD EN EL PREDIO Nº8 DE LA
UNFV"
CLIENTE : UNIVERSIDAD NACIONAL FEDERICO VILLAREAL
CONTRATISTA : CONSORCIO ARTICO
INTEGRANTES DEL - INGENIERÍA Y CONSTRUCCIÓN DE INFRAESTRUCTURA S.A.C.
CONSORCIO - MILUSMAR S.A.C.
LUGAR : LIMA - LIMA - LIMA
MES 1
I.U. INEI Descripción UND. METRADOS P. UNITARIO del 15/05/18 al
31/05/18
BALDOSA DE FIBRA MINERAL
3 C/ACABADO ARENADO BISELADO M2 41.1285 S/. 20.27
24"x24"x5/8"
PERFIL "T" TIPO PRELUDE XL DE
3 PZA 48.9625 S/. 8.39
24mm 3.66m
3 ANGULO PERIMETRAL 3.66m PZA 3.1336 S/. 4.92
43 LIJA PARA MADERA UND 64.6772 S/. 1.27
30 PINTURA LATEX GAL 53.8715 S/. 36.27
30 PINTURA ESMALTE SINTETICO GAL 0.8179 S/. 46.73 S/. 38.22
30 THINNER GAL 0.0750 S/. 19.49 S/. 1.46
30 IMPRIMANTE O SELLADOR GAL 36.9277 S/. 19.49
30 CINTA AISLANTE ELECTRICA UND 2.8000 S/. 2.00
30 CINTA TEFLON UND 7.7895 S/. 0.76
TUBO DE ABASTO ALUMINIO
10 TRENZADO 1/2" M x 5/8 H x35cm PZA 22.0000 S/. 14.58
P/INODORO
TUBO DE ABASTO ALUMINIO
10 TRENZADO 1/2" M x 5/8 H x35cm PZA 20.0000 S/. 11.78
P/LAVATORIO
MES 1
I.U. INEI Descripción UND. METRADOS P. UNITARIO del 15/05/18 al
31/05/18
TORNILLO DE ACERO DE ALTA
10 RESISTENCIA 1/4"x2" CABEZA CTO 2.1000 S/. 8.60
EXAGONAL
30 VALVULA ANGULAR P/URINARIO PZA 18.0000 S/. 73.70
VALVULA COMPUERTA DE BRONCE
30 UND 14.0000 S/. 25.34
Ø 3/4"
10 LLAVE PARA LAVATORIO DELFHI PZA 20.0000 S/. 83.85
DADO INTERRUPTOR SIMPLE 16A
30 PZA 14.0000 S/. 7.20
MAGIC 5001
PLACA DE ALUMINIO 1 CAV
CHAMPAGNE C/TORNILLOS +
30 PZA 14.0000 S/. 7.80
SOPORTE DE RESINA 503/1SR
TICINO
INTERRUPTOR TERMOMAGNETICO
30 UND 12.0000 S/. 67.00
2x20A 10kA TIPO TORNILLO
MES 1
I.U. INEI Descripción UND. METRADOS P. UNITARIO del 15/05/18 al
31/05/18
SEÑALES DE ADVERTENCIA DE
30 UND 6.0000 S/. 4.66 S/. 7.56
INFORMACION
SEÑALES DE ADVERTENCIA DE
30 UND 6.0000 S/. 5.51 S/. 8.94
OBLIGACION
SEÑALES DE EQUIPOS CONTRA
30 UND 10.0000 S/. 4.66 S/. 12.60
INCENDIO
30 SEÑALES DE AREAS DE TRABAJO UND 10.0000 S/. 4.66 S/. 12.60
CARTELES DE PROMOCION DE LA
30 SEGURIDAD Y CONSERVACION DEL UND 4.0000 S/. 5.51 S/. 5.96
MEDIO AMBIENTE
SERVICIOS HIGIENICOS
30 PORTATILES MODELO EJECUTIVO UND 5.0000 S/. 1,100.00 S/. 4,888.90
SIMPLE
CHARLA DE INDUCCION PARA EL
30 UND 6.0000 S/. 140.00 S/. 840.00
PERSONAL NUEVO
30 CHARLA DE SENSIBILIZACION UND 5.0000 S/. 160.00 S/. 800.00
30 CHARLA DE INSTRUCCION UND 5.0000 S/. 160.00 S/. 800.00
CAPACITACION DE LA CUADRILLA
30 UND 6.0000 S/. 200.00 S/. 1,200.00
DE EMERGENCIAS
30 CORDEL RLL 0.1522 S/. 5.00 S/. 0.76
30 PROVICION DE AGUA MES 5.0000 S/. 300.00 S/. 1,500.00
PROVICION DE ENERGIA
30 MES 5.0000 S/. 400.00 S/. 2,000.00
ELECTRICA
--------------------
MONTO TOTAL DE MATERIALES S/. 62,828.14
PORCENTAJE DE INCIDENCIA S/. 0.30
CALENDARIO DE ADQUISICIÓN DE MATERIALES
EJECUCIÓN DE : "SERVICIOS HIGIÉNICOS PARA PERSONAS CON DISCAPACIDAD DE LA INVERSIÓN
OBRA DE AMPLIACIÓN MARGINAL: MEJORAMIENTO DE LAS CONDICIONES DE
ACCESIBILIDAD PARA PERSONAS CON DISCAPACIDAD EN EL PREDIO Nº8 DE LA
UNFV"
CLIENTE : UNIVERSIDAD NACIONAL FEDERICO VILLAREAL
CONTRATISTA : CONSORCIO ARTICO
INTEGRANTES DEL - INGENIERÍA Y CONSTRUCCIÓN DE INFRAESTRUCTURA S.A.C.
CONSORCIO - MILUSMAR S.A.C.
LUGAR : LIMA - LIMA - LIMA
MES 2
I.U. INEI Descripción UND. METRADOS P. UNITARIO del 01/06/18 al
30/06/18
TRANSPORTE DE EQUIPOS,
43 CJT 1.0000 S/. 5,166.77 S/. 2,714.74
MAQUINARIAS Y HERRAMIENTAS
3 ALAMBRE GALVANIZADO N° 12 KG 5.8755 S/. 5.40
3 ALAMBRE NEGRO # 8 KG 589.5884 S/. 2.72 S/. 1,061.85
3 ANGULO METALICO 2"x2"x3/16" PZA 0.9450 S/. 78.60 S/. 74.28
ACERO CORRUGADO fy = 4200
3 KG 12,249.9410 S/. 2.41 S/. 20,627.13
kg/cm2 GRADO 60
3 BARRA LISA Ø 1/2" PZA 0.4200 S/. 22.77 S/. 9.56
CLAVOS PARA MADERA CON
3 KG 155.2692 S/. 3.16 S/. 224.36
CABEZA PROMEDIO
CLAVOS C/CABEZA
3 KG 2.1600 S/. 3.81 S/. 6.85
P/CONSTRUCCION D. PROMEDIO
TUBERIA PVC SAP PARA INST.
30 PZA 65.1000 S/. 5.06
ELECT. Ø 20mm
CURVA PVC SAP PARA INST. ELECT.
30 PZA 70.0000 S/. 0.81
Ø 20mm
UNION PVC SAP PARA INST. ELECT.
30 PZA 42.0000 S/. 0.27
DE Ø 20mm
CONEXION A CAJA PVC SAP PARA
30 UND 42.0000 S/. 0.24
INST. ELECT. Ø 20mm
TUBERIA PVC SAP PRESION C-10
30 PZA 26.2400 S/. 5.51 S/. 144.58
1/2"x5m
TUBERIA PVC SAP PARA DESAGUE
30 PZA 9.1000 S/. 42.22 S/. 384.20
DE 4"x3 m
TUBERIA PVC SAP PARA DESAGUE
30 PZA 13.3000 S/. 24.35 S/. 323.86
DE 2"x3 m
CODO PVC SAP PRESION C-10 Ø
30 UND 64.0000 S/. 0.85 S/. 54.40
1/2" x 90°
CODO PVC SAP DESAGUE DE 4" x
30 UND 26.7800 S/. 4.55 S/. 121.85
90°
CODO PVC SAP DESAGUE DE 2" x
30 UND 39.1400 S/. 0.93 S/. 36.40
90°
30 TRAMPA P PVC SAP DE 4" UND 26.7800 S/. 29.55 S/. 791.35
30 TRAMPA P PVC SAP DE 2" UND 39.1400 S/. 7.54 S/. 295.12
30 YEE PVC SAP DESAGUE DE 4"x4" UND 26.7800 S/. 9.54 S/. 255.48
30 YEE PVC SAP DESAGUE DE 2"x2" UND 39.1400 S/. 2.05 S/. 80.24
ADAPTADOR PVC SAP PRESION C-
30 UND 64.0000 S/. 0.68 S/. 43.52
10 Ø 1/2"
ADAPTADOR PVC SAP PRESION C-
30 UND 28.0000 S/. 0.76 S/. 21.28
10 Ø 3/4"
TUBERIA PVC SAL PARA
10 PZA 37.0000 S/. 6.27 S/. 231.99
VENTILACION DE 2"x3m
10 CODO PVC SAL DESAGUE 2"x90° UND 37.0000 S/. 0.98 S/. 36.26
21 PIEDRA CHANCADA DE 1/2" - 3/4" M3 136.0478 S/. 51.61 S/. 2,980.88
21 ARENA FINA M3 18.9650 S/. 38.05 S/. 601.35
21 ARENA GRUESA M3 96.8530 S/. 42.29 S/. 2,243.94
CALENDARIO DE ADQUISICIÓN DE MATERIALES
EJECUCIÓN DE : "SERVICIOS HIGIÉNICOS PARA PERSONAS CON DISCAPACIDAD DE LA INVERSIÓN
OBRA DE AMPLIACIÓN MARGINAL: MEJORAMIENTO DE LAS CONDICIONES DE
ACCESIBILIDAD PARA PERSONAS CON DISCAPACIDAD EN EL PREDIO Nº8 DE LA
UNFV"
CLIENTE : UNIVERSIDAD NACIONAL FEDERICO VILLAREAL
CONTRATISTA : CONSORCIO ARTICO
INTEGRANTES DEL - INGENIERÍA Y CONSTRUCCIÓN DE INFRAESTRUCTURA S.A.C.
CONSORCIO - MILUSMAR S.A.C.
LUGAR : LIMA - LIMA - LIMA
MES 2
I.U. INEI Descripción UND. METRADOS P. UNITARIO del 01/06/18 al
30/06/18
21 AFIRMADO DE BASE DE 1 - 1/2" M3 9.1700 S/. 34.50 S/. 316.37
21 HORMIGON M3 18.3696 S/. 24.12 S/. 147.69
21 AGUA M3 63.3211 S/. 9.00 S/. 320.38
CEMENTO PORTLAND TIPO I (42.5
21 BLS 2,459.3446 S/. 18.05 S/. 22,592.32
kg)
21 YESO EN BOLSAS DE 20kg BLS 3.8045 S/. 8.31
21 PORCELANA BLANCA KG 30.0000 S/. 3.05 S/. 34.88
LADRILLO ARCILLA CLASE IV TIPO
21 KING KONG 18 HUECOS (30% MIL 2.5544 S/. 508.47 S/. 1,298.84
vacios)
30 PEGAMENTO PARA PVC GAL 3.1159 S/. 135.25 S/. 421.43
PEGAMENTO CERAMICO EN
30 BLS 136.5150 S/. 12.29 S/. 1,341.94
POLVO 25 kg EXTERIOR
ADITIVO IMPERMEABILIZANTE
30 KG 0.6480 S/. 3.50 S/. 2.27
PARA MORTERO
ADITIVO REDUCTOR DE AGUA,
30 RETARDANTE DE FRAGUA E L 12.0684 S/. 0.48 S/. 2.07
INCORPORADOR DE AIRE
30 ADITIVO SUPERPLASTIFICANTE L 3.4817 S/. 4.70 S/. 16.36
FIBRA DE POLIPROPILENO bls x
30 BLS 0.9895 S/. 29.92 S/. 29.61
600gr
CERAMICO BLANCO
10 M2 149.7615 S/. 16.86 S/. 2,524.98
ANTIDESLIZANTE 0.40x0.40m
CERAMICO BLANCO PARED
10 M2 423.6015 S/. 16.86 S/. 4,286.85
0.40x0.40m
FRAGUA BLANCA INTERIOR
10 KG 129.3835 S/. 4.15 S/. 429.55
EXTERIOR
10 CRUCETAS DE PVC UND 1,835.0000 S/. 0.03 S/. 45.88
30 TAPAJUNTA PZA 45.0000 S/. 18.50 S/. 832.50
30 TAPACANTO DE PVC 8mm M 273.0250 S/. 1.60 S/. 349.47
COBERTURA DE POLIPROPILENO
30 PL 40.5876 S/. 21.79 S/. 89.05
e=1.2mm
43 MADERA TORNILLO P2 3,890.9603 S/. 4.95 S/. 6,276.42
43 TRIPLAY DE 1200 x 2400 x 6mm PL 82.3650 S/. 32.54 S/. 192.73
43 MADERA ANDAMIAJE P2 260.3858 S/. 4.41 S/. 1,148.30
43 PISO DE MADERA M2 68.1000 S/. 47.02 S/. 322.25
43 PUERTAS Y VENTANAS M2 5.6424 S/. 76.86 S/. 43.65
SUMINISTRO TABIQUE DE
43 M2 71.8200 S/. 180.00 S/. 4,309.20
MELAMINE
SUMINISTRO DE PUERTA DE
43 UND 16.0000 S/. 216.00 S/. 2,808.00
MELAMINE 0.60x2.10m
SUMINISTRO DE PUERTA DE
43 UND 8.0000 S/. 324.00 S/. 1,512.00
MELAMINE 0.90x2.10m
SUMINISTRO DE PUERTA DE
43 UND 4.0000 S/. 600.00 S/. 2,400.00
MADERA 0.90x2.10m
43 REGLA DE MADERA P2 60.4329 S/. 4.95 S/. 162.11
CALENDARIO DE ADQUISICIÓN DE MATERIALES
EJECUCIÓN DE : "SERVICIOS HIGIÉNICOS PARA PERSONAS CON DISCAPACIDAD DE LA INVERSIÓN
OBRA DE AMPLIACIÓN MARGINAL: MEJORAMIENTO DE LAS CONDICIONES DE
ACCESIBILIDAD PARA PERSONAS CON DISCAPACIDAD EN EL PREDIO Nº8 DE LA
UNFV"
CLIENTE : UNIVERSIDAD NACIONAL FEDERICO VILLAREAL
CONTRATISTA : CONSORCIO ARTICO
INTEGRANTES DEL - INGENIERÍA Y CONSTRUCCIÓN DE INFRAESTRUCTURA S.A.C.
CONSORCIO - MILUSMAR S.A.C.
LUGAR : LIMA - LIMA - LIMA
MES 2
I.U. INEI Descripción UND. METRADOS P. UNITARIO del 01/06/18 al
30/06/18
BALDOSA DE FIBRA MINERAL
3 C/ACABADO ARENADO BISELADO M2 41.1285 S/. 20.27
24"x24"x5/8"
PERFIL "T" TIPO PRELUDE XL DE
3 PZA 48.9625 S/. 8.39
24mm 3.66m
3 ANGULO PERIMETRAL 3.66m PZA 3.1336 S/. 4.92
43 LIJA PARA MADERA UND 64.6772 S/. 1.27 S/. 41.07
30 PINTURA LATEX GAL 53.8715 S/. 36.27 S/. 976.96
30 PINTURA ESMALTE SINTETICO GAL 0.8179 S/. 46.73
30 THINNER GAL 0.0750 S/. 19.49
30 IMPRIMANTE O SELLADOR GAL 36.9277 S/. 19.49 S/. 359.86
30 CINTA AISLANTE ELECTRICA UND 2.8000 S/. 2.00
30 CINTA TEFLON UND 7.7895 S/. 0.76 S/. 5.92
TUBO DE ABASTO ALUMINIO
10 TRENZADO 1/2" M x 5/8 H x35cm PZA 22.0000 S/. 14.58 S/. 40.14
P/INODORO
TUBO DE ABASTO ALUMINIO
10 TRENZADO 1/2" M x 5/8 H x35cm PZA 20.0000 S/. 11.78 S/. 188.40
P/LAVATORIO
MES 2
I.U. INEI Descripción UND. METRADOS P. UNITARIO del 01/06/18 al
30/06/18
TORNILLO DE ACERO DE ALTA
10 RESISTENCIA 1/4"x2" CABEZA CTO 2.1000 S/. 8.60 S/. 18.06
EXAGONAL
30 VALVULA ANGULAR P/URINARIO PZA 18.0000 S/. 73.70 S/. 628.38
VALVULA COMPUERTA DE BRONCE
30 UND 14.0000 S/. 25.34 S/. 354.76
Ø 3/4"
10 LLAVE PARA LAVATORIO DELFHI PZA 20.0000 S/. 83.85 S/. 1,341.60
DADO INTERRUPTOR SIMPLE 16A
30 PZA 14.0000 S/. 7.20
MAGIC 5001
PLACA DE ALUMINIO 1 CAV
CHAMPAGNE C/TORNILLOS +
30 PZA 14.0000 S/. 7.80
SOPORTE DE RESINA 503/1SR
TICINO
INTERRUPTOR TERMOMAGNETICO
30 UND 12.0000 S/. 67.00
2x20A 10kA TIPO TORNILLO
MES 2
I.U. INEI Descripción UND. METRADOS P. UNITARIO del 01/06/18 al
30/06/18
SEÑALES DE ADVERTENCIA DE
30 UND 6.0000 S/. 4.66 S/. 14.70
INFORMACION
SEÑALES DE ADVERTENCIA DE
30 UND 6.0000 S/. 5.51 S/. 17.40
OBLIGACION
SEÑALES DE EQUIPOS CONTRA
30 UND 10.0000 S/. 4.66 S/. 24.50
INCENDIO
30 SEÑALES DE AREAS DE TRABAJO UND 10.0000 S/. 4.66 S/. 24.50
CARTELES DE PROMOCION DE LA
30 SEGURIDAD Y CONSERVACION DEL UND 4.0000 S/. 5.51 S/. 11.60
MEDIO AMBIENTE
SERVICIOS HIGIENICOS
30 PORTATILES MODELO EJECUTIVO UND 5.0000 S/. 1,100.00 S/. 611.10
SIMPLE
CHARLA DE INDUCCION PARA EL
30 UND 6.0000 S/. 140.00
PERSONAL NUEVO
30 CHARLA DE SENSIBILIZACION UND 5.0000 S/. 160.00
30 CHARLA DE INSTRUCCION UND 5.0000 S/. 160.00
CAPACITACION DE LA CUADRILLA
30 UND 6.0000 S/. 200.00
DE EMERGENCIAS
30 CORDEL RLL 0.1522 S/. 5.00
30 PROVICION DE AGUA MES 5.0000 S/. 300.00
PROVICION DE ENERGIA
30 MES 5.0000 S/. 400.00
ELECTRICA
--------------------
MONTO TOTAL DE MATERIALES S/. 101,034.03
PORCENTAJE DE INCIDENCIA S/. 0.48