Industrialised Building System Design
INTRODUCTION
The adoption of Industrialised Building System (IBS) becomes one of the related technology
catalysts gearing towards the Fourth Industrial Revolution (4IR). Recent construction industry
agenda focuses on producing IBS champions industry to enhance and elevate the level of
productivity, quality and safety on the construction sites.
In accordance with the objective of IBS Roadmap 2003-2010, Budget 2005 announced that
all new government building projects are required to have no less than half of IBS content.
Second declaration was then made on the levy exemption of the housing projects that have
minimum score of 50% to attract private clients. From that point forward and helped by the
Construction Industry Master Plan 2006-2015 and 9th Malaysia Plan 2006-2010, various
exercises have been executed by the government.
OBJECTIVES
Based on the proposed design, you are required to proposed and explain the details of the
IBS components, production and construction process.
Submission requirement:
1. Proposed the main structural system (wall, column, floor, roof etc.).
2. Prepare the connection details of the joints between structural members (bolted
connection, welded connection, anchored connection).
Part 2: IBS Scoring System (Sr. Dr. Md Azree Md Othman)
Part 2(a)
Produce presentation drawings consist of floor plans and elevations (front, right, left and rear).
Part 2(b)
The scoring system is a structured system which measure the usage of IBS in building. The
maximum score is 100% and the calculation of the score is based on the following
components:
Submission requirement:
1. Presentation drawing: floor plan and elevations (front, right, left and rear).
2. Detail calculation of IBS score of proposed design.
Part 3(a):
Each group has to discuss each stakeholders’ role and responsibility based on the 2 types of
common procurement methods:
1. Traditional and
2. Design and Built.
Part 3(b):
Following Part 3(a), each group should suggest/propose a suitable procurement system to
construct the double-storey building. Each group should be able to provide justifications on
the chosen procurement system.
Part 4(a):
Construct a physical model of the proposed building in scale of 1:50 permanently attached on
an A3 size mounting board (new or recycled materials)
Part 4(b):
Prepare a 3D video based on the constructed design with a duration not more than 4minutes.
Submission requirements:
GROUPING
The group has been assigned to you and available in the eLearn.
ASSESSMENT
1. Part 1 - 30%
2. Part 2 - 25%
3. Part 3 - 25%
4. Part 4 - 20% (include Q&A session during exhibition)
OUTPUT
1. Poster
2. Infographic
3. Report
4. Physical Model
5. 3D model video
6. Power point presentation slides
IMPORTANT DATE
Date Details
28 Feb 2019 Project Brief
28 March 2019 Progress #1
9 May 2019 Progress #2
23 May 2019 Progress #3
30 May 2019 Exhibition
SUBMISSION
Project Issued : 28th February 2019
Submission & Exhibition Date : 30th May 2019