VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05

CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
01.00.00.00 INFRAESTRUCT. PEDAGOGICA (03 AULAS, DEPOSITOS, SS.HH. N 357,316.05 289,743.84 67,572.21
02.00.00.00 INFRAESTRUCTURA DE SERVICIOS (SUM, COCINA,DESPENSA, SS 140,737.20 116,252.40 24,484.80
03.00.00.00 INFRAESTRUCTURA ADMINISTRATIVA (DIRECCION, SECRETARIA, 111,961.77 93,179.57 18,782.20
04.00.00.00 ESPACIOS EXTERIORES (CERCO PERIMETRICO, PATIO DE FORM 187,320.09 99,241.10 88,078.99
05.00.00.00 MITIGACION DE IMPACTO AMBIENTAL 5,000.00 0.00 5,000.00
06.00.00.00 COBERTURA DE MOBILIARIO, EQUIPOS Y MATERIAL EDUCATIVO 36,671.50 0.00 36,671.50
07.00.00.00 CAPACITACION 7,500.00 0.00 7,500.00

COSTO DIRECTO 846,506.62 598,416.92 248,089.61


GASTOS GENERALES 11.81389 100,005.41 70,696.35 29,309.05
UTILIDAD 7.0 % 59,255.46 41,889.18 17,366.27
SUB TOTAL 1,005,767.49 711,002.46 294,764.93
FACTOR RELACION 0.99999524 1,005,762.71 710,999.07 294,763.53
IGV 18.00 % 181,037.29 127,979.83 53,057.44
TOTAL 1,186,800.00 838,978.90 347,820.97
Presupuesto General TOTAL PRESUPUESTO 1,186,800.00 838,978.90 347,820.97

70.69% 29.31%

01 INFRAESTRUCT. PEDAGOGICA (03 AULAS, DEPOSITOS, SS.HH. NIÑOS Y NIÑAS) 357,316.05 289,743.84 67,572.21
01 ESTRUCTURAS
1.01 OBRAS PROVISIONALES
01.01.01 CERCO PROVISIONAL DE PROTECCION CON ARPILLERA H=1.80 m 146.00 13.28 1,938.88 146.00 1,938.88 100.00% 0.00 0.00%
01.01.02 ALQUILER DE LOCAL PARA OBRA (ALMACEN, OFICINA Y GUARDIA mes 5.00 240.00 1,200.00 5.00 1,200.00 100.00% 0.00 0.00%
01.01.03 BAÑO PPROVICIONAL (GABINETE DISAL) und 1.00 614.37 614.37 1.00 614.37 100.00% 0.00 0.00%
01.01.04 AGUA PARA LA CONSTRUCCION mes 5.00 100.00 500.00 4.00 400.00 80.00% 1.00 100.00 20.00%
01.01.05 ENERGIA ELECTRICA PARA LA CONSTRUCCION mes 5.00 250.00 1,250.00 4.00 1,000.00 80.00% 1.00 250.00 20.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
01.01.06 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 760.75 760.75 1.00 760.75 100.00% 0.00 0.00%
01.01.07 PLACA RECORDATORIA und 1.00 600.00 600.00 0.00 0.00% 1.00 600.00 100.00%
01.01.08 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 888.38 888.38 1.00 888.38 100.00% 0.00 0.00%
01.01.09 FLETE TERRESTRE glb 1.00 15,000.00 15,000.00 0.90 13,500.00 90.00% 0.10 1,500.00 10.00%
1.02 TRABAJOS PRELIMINARES -
01.02.01 DESMONTAJE DE TECHO TRADICIONAL CON MADERA Y CALAMIN m2 218.34 3.79 827.51 218.34 827.51 100.00% 0.00 0.00%
01.02.02 DEMOLICION DE PISO DE MADERA m2 176.13 2.60 457.94 176.13 457.94 100.00% 0.00 0.00%
01.02.03 DEMOLICION DE MUROS DE ADOBE m3 232.27 16.10 3,739.55 232.27 3,739.55 100.00% 0.00 0.00%
01.02.04 DEMOLICION DE MUROS DE CONCRETO m3 35.63 76.01 2,708.24 35.63 2,708.24 100.00% 0.00 0.00%
01.02.05 DEMOLICION DE LOSA DE CONCRETO E = 15 CM m2 304.26 34.06 10,363.10 304.26 10,363.10 100.00% 0.00 0.00%
01.02.06 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 686.58 6.72 4,613.82 686.58 4,613.82 100.00% 0.00 0.00%
01.02.07 LIMPIEZA DE TERRENO MANUAL m2 346.46 0.82 284.10 346.46 284.10 100.00% 0.00 0.00%
01.02.08 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 346.46 1.23 426.15 346.46 426.15 100.00% 0.00 0.00%
01.02.09 TRAZO NIVELES Y REPLANTEO DURANTE LA CONSTRUCCION m2 346.46 0.99 343.00 346.46 343.00 100.00% 0.00 0.00%
1.03 MOVIMIENTO DE TIERRAS
01.03.01 CORTE DE TERRENO NATURAL MANUAL CON MAQUINARIA m3 84.32 4.47 376.91 84.32 376.91 100.00% 0.00 0.00%
01.03.02 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 70.54 14.30 1,008.72 70.54 1,008.72 100.00% 0.00 0.00%
01.03.03 NIVELACION INTERIOR Y APISONADO PARA PISO m2 278.04 2.49 692.32 278.04 692.32 100.00% 0.00 0.00%
01.03.04 RELLENO CON MATERIAL DE PRESTAMO m3 132.07 28.47 3,760.03 132.07 3,760.03 100.00% 0.00 0.00%
01.03.05 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA m3 193.58 8.01 1,550.58 193.58 1,550.58 100.00% 0.00 0.00%
1.04 OBRAS DE CONCRETO SIMPLE
01.04.01 CIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO HORMIGON + 30% m3 56.43 138.03 7,789.03 56.43 7,789.03 100.00% 0.00 0.00%
1.05 OBRAS DE CONCRETO ARMADO
01.05.01 COLUMNAS
01.05.01.01 COLUMNAS: ACERO F´C=4,200 KG/CM2 GRADO 60 kg 3,024.63 4.28 12,945.42 3,024.63 12,945.42 100.00% 0.00 0.00%
01.05.01.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 154.56 27.86 4,306.04 154.56 4,306.04 100.00% 0.00 0.00%
01.05.01.03 COLUMNAS CONCRETO f'c=210 kg/cm2 m3 16.70 307.93 5,142.43 16.70 5,142.43 100.00% 0.00 0.00%
01.05.02 SOBRECIMIENTOS
01.05.02.01 SOBRECIMIENTOS : ACERO FY = 4200 KG/CM2 GRADO 60 kg 1,890.38 4.28 8,090.83 1,890.38 8,090.83 100.00% 0.00 0.00%
01.05.02.02 SOBRECIMIENTOS: ENCOFRADO Y DESENCOFRADO NORMAL m2 125.42 28.58 3,584.50 125.42 3,584.50 100.00% 0.00 0.00%
01.05.02.03 SOBRECIMIENTOS CONCRETO F'C =210 KG/CM2 m3 11.82 289.20 3,418.34 11.82 3,418.34 100.00% 0.00 0.00%
01.05.03 VIGAS
01.05.03.01 VIGAS: ACERO F´Y=4,200 KG/CM2 GRADO 60 kg 1,949.81 4.28 8,345.19 1,949.81 8,345.19 100.00% 0.00 0.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
01.05.03.02 VIGAS ENCOFRADO Y DESENCOFRADO NORMAL m2 148.01 28.58 4,230.13 148.01 4,230.13 100.00% 0.00 0.00%
01.05.03.03 VIGAS CONCRETO F'C=210 KG/CM2 m3 14.51 289.20 4,196.29 14.51 4,196.29 100.00% 0.00 0.00%
1.06 ESTRUCTURAS METALICAS Y COBERTURAS
01.06.01 ARMADURA 2 DE TIJERAL METALICO SEGUN DISEÑO und 12.00 1,167.10 14,005.20 12.00 14,005.20 100.00% 0.00 0.00%
01.06.02 ARMADURA 5 DE TIJERAL METALICO SEGUN DISEÑO und 3.00 1,186.55 3,559.65 3.00 3,559.65 100.00% 0.00 0.00%
01.06.03 ARMADURA 6 DE TIJERAL METALICO SEGUN DISEÑO und 3.00 923.24 2,769.72 3.00 2,769.72 100.00% 0.00 0.00%
01.06.04 VIGUETA METALICA MV -1 DE 2" X 2" e=1.5MM m 83.43 34.71 2,895.86 83.43 2,895.86 100.00% 0.00 0.00%
01.06.05 VIGUETA METALICA MV -2 DE 2" X 2" e=2.5MM m 428.97 36.59 15,696.01 428.97 15,696.01 100.00% 0.00 0.00%
01.06.06 COBERTURA DE CALAMINON T E=4mm m2 396.18 70.77 28,037.66 396.18 28,037.66 100.00% 0.00 0.00%
01.06.07 CUMBRERA DE CALAMINON m 68.85 46.01 3,167.79 68.85 3,167.79 100.00% 0.00 0.00%
01.06.08 ARRIOSTRE DE PLANO SUPERIOR L = 2.00 M A 3.00M und 6.00 20.41 122.46 6.00 122.46 100.00% 0.00 0.00%
01.06.09 ARRIOSTRE DE PLANO SUPERIOR L = 3.00 M A 4.00M und 54.00 20.41 1,102.14 54.00 1,102.14 100.00% 0.00 0.00%
01.06.10 APOYO MOVIL DE ARMADURA EN VIGA und 18.00 8.23 148.14 18.00 148.14 100.00% 0.00 0.00%
01.06.11 APOYO FIJO DE ARMADURA EN VIGA und 18.00 8.23 148.14 18.00 148.14 100.00% 0.00 0.00%
2 ARQUITECTURA
2.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO DE LADRILLO K.K. DE ARCILLA DE CABEZA. H-10 9 x14x24 m2 118.68 132.49 15,723.91 118.68 15,723.91 100.00% 0.00 0.00%
02.01.02 MURO DE LADRILLO K.K. DE ARCILLA DE SOGA H-10 9 x14x24 cm m2 95.05 90.26 8,579.21 95.05 8,579.21 100.00% 0.00 0.00%
2.02 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01 TARRAJEO PRIMARIO RAYADO (MEZCLA C:A 1:5, E=1.5CM) m2 32.78 13.31 436.30 32.78 436.30 100.00% 0.00 0.00%
02.02.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA 1:5 m2 272.03 14.35 3,903.63 272.03 3,903.63 100.00% 0.00 0.00%
02.02.03 TARRAJEO EN EXTERIOR ACABADO CON CEMENTO-ARENA 1:5 m2 131.20 16.95 2,223.84 131.20 2,223.84 100.00% 0.00 0.00%
02.02.04 TARRAJEO EN COLUMNAS EXTERIORE E INTERIOR (MORTERO 1: m2 153.02 22.87 3,499.57 153.02 3,499.57 100.00% 0.00 0.00%
02.02.05 TARRAJEO EN VIGAS (MORTERO 1:5) m2 148.01 27.33 4,045.11 148.01 4,045.11 100.00% 0.00 0.00%
02.02.06 VESTIDURA DE DERRAMES (1:5) m 284.16 6.44 1,829.99 284.16 1,829.99 100.00% 0.00 0.00%
02.02.07 BRUÑAS E= 1CM m 409.01 4.39 1,795.55 409.01 1,795.55 100.00% 0.00 0.00%
02.02.08 JUNTA DE DILATACION CON ESPUIMA PLASTICA + JEBE MICRO m 49.20 14.09 693.23 49.20 693.23 100.00% 0.00 0.00%
2.03 CIELORRASOS
02.03.01 CIELORRASO EXTERIOS CON PLANCHAS DE PVC m2 115.92 55.80 6,468.34 0.00 0.00 0.00% 115.92 6,468.34 100.00%
02.03.02 CIELORRASO CON BALDOSA ACUSTICA 60X1.20 DE FIBRA MINE m2 225.19 52.83 11,896.79 0.00 0.00 0.00% 225.19 11,896.79 100.00%
2.04 PISOS Y VEREDAS
02.04.01 PISOS
02.04.01.01 FALSO PISO DE 4" DE CONCRETO 1:8 m2 223.77 37.41 8,371.24 223.77 8,371.24 100.00% 0.00 0.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
02.04.01.02 PISO DE MADERA AGUANO MACHIHEMBRADA 1"X4"X10' m2 179.45 64.95 11,655.28 179.45 11,655.28 100.00% 0.00 0.00%
02.04.01.03 PISO DECEMENTO PULIDO 2" BRUÑADO Y COLOREADO m2 13.02 25.20 328.10 13.02 328.10 100.00% 0.00 0.00%
02.04.01.04 PISO CERAMICO ANTIDESLIZANTE NACIONAL 30x30cm m2 28.55 48.26 1,377.82 28.55 1,377.82 100.00% 0.00 0.00%
02.04.02 VEREDAS
02.04.02.01 RELLENO CON MATERIAL AFIRMADO E = 4" m3 42.65 23.30 993.75 42.65 993.75 100.00% 0.00 0.00%
02.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDA m2 44.41 29.44 1,307.43 44.41 1,307.43 100.00% 0.00 0.00%
02.04.02.03 VEREDA DE CONCRETO 140 KG/CM2, ACABADO FROTACHADO m2 113.72 59.82 6,802.73 113.72 6,802.73 100.00% 0.00 0.00%
02.04.02.04 JUNTA ASFALTIC E = 1" EN VEREDA m 151.61 6.23 944.53 0.00 0.00 0.00% 151.61 944.53 100.00%
2.05 ZOCALOS Y CONTRAZOCALOS
02.05.01 ZOCALO DE CERAMICA 30 X 30 cm m2 32.57 49.89 1,624.92 32.57 1,624.92 100.00% 0.00 0.00%
02.05.02 CONTRAZOCALO CEMENTO H = 10 CM m 16.40 7.27 119.23 16.40 119.23 100.00% 0.00 0.00%
02.05.03 CONTRAZOCALO MADERA AGUANO 3/4" x 3"+ RODON 3/4" m 96.05 6.42 616.64 0.00 0.00 0.00% 96.05 616.64 100.00%
02.05.04 CONTRAZOCALO DE CEMENTO S/COLOREAR H = 0.45 CM (MORTE m2 37.83 6.48 245.14 37.83 245.14 100.00% 0.00 0.00%
2.06 CARPINTERIA DE MADERA
02.06.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO S/DISEÑO m2 31.50 361.47 11,386.31 0.00 0.00 0.00% 31.50 11,386.31 100.00%
02.06.02 PIZARRA ACRILICA 1.20X2.48M CON TICERO Y MARCO DE MADER und 3.00 754.13 2,262.39 0.00 0.00 0.00% 3.00 2,262.39 100.00%
02.06.03 DIVISIONE DE MELAMINA EN SS.HH. m2 7.88 142.86 1,125.74 0.00 0.00 0.00% 7.88 1,125.74 100.00%
2.07 CERRAJERIA
02.07.01 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" pza 60.00 4.96 297.60 0.00 0.00 0.00% 60.00 297.60 100.00%
02.07.02 CERRADURA DOS GOLPES EN PUERTAS INTERIORES pza 15.00 94.31 1,414.65 0.00 0.00 0.00% 15.00 1,414.65 100.00%
2.08 VIDRIOS, CRISTALES Y SIMILARES
02.08.01 VIDRIO SISTEMA MODUGLASS 6MM PROVISIONES Y COLOCACIO p2 909.67 10.79 9,815.34 0.00 0.00 0.00% 909.67 9,815.34 100.00%
02.08.02 VIDRIO TIPO CATEDRAL TEMPLEX PROVICION Y COLOCACION E p2 57.64 10.79 621.94 0.00 0.00 0.00% 57.64 621.94 100.00%
2.09 PINTURA
02.09.01 PINTURA LATEX EN MUROS INTERIORES 2 MANOS (incluye columnam2 575.77 5.35 3,080.37 0.00 0.00 0.00% 575.77 3,080.37 100.00%
02.09.02 PINTURA DE CONTRAZOCALO C/BARNIZ ECONOMICO m 96.05 8.21 788.57 0.00 0.00 0.00% 96.05 788.57 100.00%
02.09.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS (incluye column m2 207.71 5.35 1,111.25 0.00 0.00 0.00% 207.71 1,111.25 100.00%
2.1 INSTALACION PARA AGUAS PLUVIALES
02.10.01 CANALETA PLUVIAL DE PLANCHA GALVANIZADA E = 0.6MM INC m 119.20 44.61 5,317.51 119.20 5,317.51 100.00% 0.00 0.00%
02.10.02 BAJADA DE AGUAS PLUVIALES CON TUBERIA PVC SAP 3" m 92.95 32.60 3,030.17 92.95 3,030.17 100.00% 0.00 0.00%
02.10.03 PROTECCION DE BAJADA DE AGUAS PLUVIALES CON CONCRET und 12.00 74.82 897.84 12.00 897.84 100.00% 0.00 0.00%
02.11 VARIOS
02.11.01 PRUEBA DE CONTROL DE CALIDAD und 30.00 30.00 900.00 25.00 750.00 83.33% 5.00 150.00 16.67%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
02.11.02 LIMPIEZA FINAL DE OBRA m2 346.46 0.90 311.81 0.00 0.00 0.00% 346.46 311.81 100.00%
3 INSTALACIONES SANITARIAS
3.01 APARATOS SANITARIOS Y ACCESORIOS
03.01.01 INODORO TANQUE BAJO DE LOSA NIÑOS (NAC. BLANCO) pza 4.00 329.90 1,319.60 4.00 1,319.60 100.00% 0.00 0.00%
03.01.02 LAVATORIO DE LOSA BLANCA PARA NIÑOS INC. ACCESORIOS pza 6.00 160.04 960.24 6.00 960.24 100.00% 0.00 0.00%
03.01.03 URINARIO INDIVIDUAL TIPO CADET NIÑOS C/BLANCO INC. ACCE pza 4.00 130.38 521.52 4.00 521.52 100.00% 0.00 0.00%
03.01.04 TANQUE ELEVADO DE POLITILENO (ROTOPLAS) und 1.00 2,016.46 2,016.46 0.00 0.00 0.00% 1.00 2,016.46 100.00%
3.02 INSTALACIONES SANITARIAS
03.02.01 SALIDA DE DESAGUE EN PVC pto 17.00 32.92 559.64 17.00 559.64 100.00% 0.00 0.00%
03.02.02 SALIDA PARA VENTILACION pto 6.00 47.41 284.46 6.00 284.46 100.00% 0.00 0.00%
03.02.03 TUBERIA PVC SAL 2" m 29.20 13.09 382.23 29.20 382.23 100.00% 0.00 0.00%
03.02.04 TUBERIA PVC SAL 4" m 65.00 14.85 965.25 65.00 965.25 100.00% 0.00 0.00%
03.02.05 REGISTRO DE BRONCE 4" und 5.00 27.69 138.45 5.00 138.45 100.00% 0.00 0.00%
03.02.06 REGISTRO DE BRONCE 2" und 3.00 23.55 70.65 3.00 70.65 100.00% 0.00 0.00%
03.02.07 SUMIDERO DE BRONCE DE 4" und 3.00 31.97 95.91 3.00 95.91 100.00% 0.00 0.00%
03.02.08 CAJA DE REG. ALB. 10"X20" C/TAPA CONCRETO und 3.00 119.91 359.73 3.00 359.73 100.00% 0.00 0.00%
03.02.09 CODO PVC 2"X90° und 18.00 4.65 83.70 18.00 83.70 100.00% 0.00 0.00%
03.02.10 CODO PVC 4"X90° und 14.00 8.47 118.58 14.00 118.58 100.00% 0.00 0.00%
03.02.11 CODO PVC 4"X45° und 6.00 8.47 50.82 6.00 50.82 100.00% 0.00 0.00%
03.02.12 YEE PVC SAL 2" und 6.00 4.70 28.20 6.00 28.20 100.00% 0.00 0.00%
03.02.13 YEE PVC SAL 4" und 15.00 6.92 103.80 15.00 103.80 100.00% 0.00 0.00%
03.02.14 YEE PVC SAL 4" A 2" und 4.00 6.18 24.72 4.00 24.72 100.00% 0.00 0.00%
03.02.15 REDUCCION PVC SAL 4" A 2" und 4.00 6.18 24.72 4.00 24.72 100.00% 0.00 0.00%
3.03 SISTEMA DE AGUA FRIA
03.03.01 SALIDA DE AGUA FRIA - PVC pto 20.00 37.90 758.00 20.00 758.00 100.00% 0.00 0.00%
03.03.02 TUBERIA PVC CLASE 10 - 1/2" m 29.25 8.26 241.61 29.25 241.61 100.00% 0.00 0.00%
03.03.03 TUBERIA PVC CLASE 10 - 3/4" m 12.45 7.39 92.01 12.45 92.01 100.00% 0.00 0.00%
03.03.04 TUBERIA PVC CLASE 10 - 1" m 89.68 8.26 740.76 89.68 740.76 100.00% 0.00 0.00%
03.03.05 VALVULA DE COMPUERTA DE BRONCE DE 3/4" und 3.00 61.46 184.38 3.00 184.38 100.00% 0.00 0.00%
03.03.06 CAJA PARA VALVULA (NICHO DE CERAM.) und 3.00 15.68 47.04 3.00 47.04 100.00% 0.00 0.00%
03.03.07 CODO PVC CLASE 10 - 1/2" und 16.00 2.49 39.84 16.00 39.84 100.00% 0.00 0.00%
03.03.08 CODO PVC CLASE 10 - 3/4" und 10.00 3.92 39.20 10.00 39.20 100.00% 0.00 0.00%
03.03.09 TEE PVC CLASE 10 1/2" und 2.00 2.49 4.98 2.00 4.98 100.00% 0.00 0.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
03.03.10 TEE PVC CLASE 10 3/4" und 10.00 2.95 29.50 10.00 29.50 100.00% 0.00 0.00%
03.03.11 REDUCCION PVC CLASE 10 3/4" @ 1/2" und 11.00 4.96 54.56 11.00 54.56 100.00% 0.00 0.00%
4 INSTALACIONES ELECTRICAS
4.01 SALIDAS PARA ALUMBRADO, TOMACORRIENTES
04.01.01 SALIDA DE ALUMBRADO und 60.00 33.33 1,999.80 60.00 1,999.80 100.00% 0.00 0.00%
04.01.02 SALIDA PARA INTERRUPTORES SIMPLE und 12.00 42.92 515.04 12.00 515.04 100.00% 0.00 0.00%
04.01.03 SALIDA PARA INTERRUPTORES DOBLES und 3.00 37.31 111.93 3.00 111.93 100.00% 0.00 0.00%
04.01.04 CAJA DE PASO 100 X 100 X 30 MM und 3.00 16.06 48.18 3.00 48.18 100.00% 0.00 0.00%
04.01.05 SALIDA PARA TOMACORRIENTE CON LINEA A TIERRA und 24.00 40.26 966.24 0.00 0.00 0.00% 24.00 966.24 100.00%
4.02 CANALIZACIONES Y/O TUBERIAS
04.02.01 TUBERIA PVC-P 20MM m 299.42 7.79 2,332.48 299.42 2,332.48 100.00% 0.00 0.00%
04.02.02 TUBERIA PVC-P 25MM m 72.00 7.81 562.32 72.00 562.32 100.00% 0.00 0.00%
4.03 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS
04.03.01 CONDUCTOR 1X2.5MM2 THW m 418.49 3.92 1,640.48 418.49 1,640.48 100.00% 0.00 0.00%
04.03.02 CONDUCTOR 1X4MM2 THW m 349.44 4.39 1,534.04 349.44 1,534.04 100.00% 0.00 0.00%
04.03.03 CONDUCTOR 1X6MM2 THW m 230.40 4.59 1,057.54 230.40 1,057.54 100.00% 0.00 0.00%
4.04 TABLERO PRINCIPALES
04.04.01 TABLERO DE DISTRIBUCION TD-2 und 1.00 270.39 270.39 1.00 270.39 100.00% 0.00 0.00%
04.04.02 TABLERO DE DISTRIBUCION TD-3 und 1.00 270.39 270.39 1.00 270.39 100.00% 0.00 0.00%
04.04.03 TABLERO DE DISTRIBUCION TD-5 und 1.00 370.39 370.39 1.00 370.39 100.00% 0.00 0.00%
4.05 DISPOSITIVOS DE MANIOBRA Y PROTECCION
04.05.01 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X18 A und 4.00 40.76 163.04 0.00 0.00 0.00% 4.00 163.04 100.00%
04.05.02 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X20 A und 5.00 45.76 228.80 0.00 0.00 0.00% 5.00 228.80 100.00%
04.05.03 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X25 A und 3.00 50.76 152.28 0.00 0.00 0.00% 3.00 152.28 100.00%
04.05.04 INTERRUPTOR TERMOMAGNETICO DIFERENCIAL 2x20 A und 3.00 55.76 167.28 0.00 0.00 0.00% 3.00 167.28 100.00%
4.06 ARTEFACTOS DE ILUMINACION 0.00
04.06.01 LUMINARIA C/EQ.4 LAMP. FLUORESC. 18 W C/U C/REJILLA TIPO "A und 12.00 161.74 1,940.88 0.00 0.00 0.00% 12.00 1,940.88 100.00%
04.06.02 LUMINARIA C/EQ.4 LAMP. FLUORESC. 18 W C/U C/REJILLA TIPO "B und 36.00 161.46 5,812.56 0.00 0.00 0.00% 36.00 5,812.56 100.00%
04.06.03 LUMINARIA DE 2 FLUORESCENTES DE 36W 220VCA P/ADOS TIPO und 12.00 115.20 1,382.40 0.00 0.00 0.00% 12.00 1,382.40 100.00%
COSTO DIRECTO 357,316.05 - 289,743.84 67,572.21 -
GASTOS GENERALES 11.81389 42,212.95 34,230.04 7,982.91
UTILIDAD 7.0 % 25,012.12 20,282.07 4,730.05
SUB TOTAL 424,541.12 344,255.94 80,285.18
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
IGV 18.00 % 76,417.40 61,966.07 14,451.33
TOTAL 500,958.52 406,222.01 94,736.51
Presupuesto General TOTAL PRESUPUESTO 500,958.52 406,222.01 94,736.51

02 INFRAESTRUCTURA DE SERVICIOS (SUM, COCINA,DESPENSA, SS.HH Y GUARDIANIA) 140,737.20 116,252.40 24,484.80


05 ESTRUCTURAS
5.01 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL m2 153.56 0.82 125.92 153.56 125.92 100.00% 0.00 0.00%
05.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 153.56 1.23 188.88 153.56 188.88 100.00% 0.00 0.00%
05.01.03 TRAZO NIVELES Y REPLANTEO DURANTE LA CONSTRUCCION m2 153.56 0.99 152.02 153.56 152.02 100.00% 0.00 0.00%
5.02 MOVIMIENTO DE TIERRAS
05.02.01 CORTE DE TERRENO NATURAL MANUAL CON MAQUINARIA m3 38.39 4.47 171.60 38.39 171.60 100.00% 0.00 0.00%
05.02.02 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 32.01 14.30 457.74 32.01 457.74 100.00% 0.00 0.00%
05.02.03 NIVELACION INTERIOR Y APISONADO PARA PISO m2 126.29 2.49 314.46 126.29 314.46 100.00% 0.00 0.00%
05.02.04 RELLENO CON MATERIAL DE PRESTAMO m3 132.07 28.47 3,760.03 132.07 3,760.03 100.00% 0.00 0.00%
05.02.05 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA m3 87.99 8.01 704.80 87.99 704.80 100.00% 0.00 0.00%
5.03 OBRAS DE CONCRETO SIMPLE
05.03.01 CIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO HORMIGON + 30% m3 25.60 138.03 3,533.57 25.60 3,533.57 100.00% 0.00 0.00%
5.04 OBRAS DE CONCRETO ARMADO
05.04.01 COLUMNAS
05.04.01.01 COLUMNAS: ACERO F´C=4,200 KG/CM2 GRADO 60 kg 1,657.80 4.28 7,095.38 1,657.80 7,095.38 100.00% 0.00 0.00%
05.04.01.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 84.18 27.86 2,345.25 84.18 2,345.25 100.00% 0.00 0.00%
05.04.01.03 COLUMNAS CONCRETO f'c=210 kg/cm2 m3 9.23 307.93 2,842.19 9.23 2,842.19 100.00% 0.00 0.00%
05.04.02 SOBRECIMIENTOS
05.04.02.01 SOBRECIMIENTOS : ACERO FY = 4200 KG/CM2 GRADO 60 kg 872.18 4.28 3,732.93 872.18 3,732.93 100.00% 0.00 0.00%
05.04.02.02 SOBRECIMIENTOS: ENCOFRADO Y DESENCOFRADO NORMAL m2 57.50 28.58 1,643.35 57.50 1,643.35 100.00% 0.00 0.00%
05.04.02.03 SOBRECIMIENTOS CONCRETO F'C =210 KG/CM2 m3 6.11 289.20 1,767.01 6.11 1,767.01 100.00% 0.00 0.00%
05.04.03 VIGAS
05.04.03.01 VIGAS: ACERO F´Y=4,200 KG/CM2 GRADO 60 kg 736.18 4.28 3,150.85 736.18 3,150.85 100.00% 0.00 0.00%
05.04.03.02 VIGAS ENCOFRADO Y DESENCOFRADO NORMAL m2 53.15 28.58 1,519.03 53.15 1,519.03 100.00% 0.00 0.00%
05.04.03.03 VIGAS CONCRETO F'C=210 KG/CM2 m3 4.84 289.20 1,399.73 4.84 1,399.73 100.00% 0.00 0.00%
5.05 ESTRUCTURAS METALICAS Y COBERTURAS
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
05.05.01 ARMADURA 3 DE TIJERAL METALICO SEGUN DISEÑO und 4.00 1,198.81 4,795.24 4.00 4,795.24 100.00% 0.00 0.00%
05.05.02 ARMADURA 10 DE TIJERAL METALICO SEGUN DISEÑO und 1.00 812.17 812.17 1.00 812.17 100.00% 0.00 0.00%
05.05.03 ARMADURA 11 DE TIJERAL METALICO SEGUN DISEÑO und 2.00 916.44 1,832.88 2.00 1,832.88 100.00% 0.00 0.00%
05.05.04 ARMADURA 12 DE TIJERAL METALICO SEGUN DISEÑO und 2.00 811.28 1,622.56 2.00 1,622.56 100.00% 0.00 0.00%
05.05.05 VIGUETA METALICA MV -2 DE 2" X 2" e=2.5MM m 201.06 36.59 7,356.79 201.06 7,356.79 100.00% 0.00 0.00%
05.05.06 VIGUETA METALICA MV - 3 DE 2" X 4" e=1.5MM m 25.60 36.17 925.95 25.60 925.95 100.00% 0.00 0.00%
05.05.07 VIGUETA METALICA MV - 4 DE 2" X 4" e=3.0MM m 16.40 42.81 702.08 16.40 702.08 100.00% 0.00 0.00%
05.05.08 COBERTURA CON CALAMINON T DE 0.40MM m2 173.10 70.77 12,250.29 173.10 12,250.29 100.00% 0.00 0.00%
05.05.09 CUMBRERA DE CALAMINON m 25.94 46.01 1,193.50 25.94 1,193.50 100.00% 0.00 0.00%
05.05.10 ARRIOSTRE DE PLANO SUPERIOR L = 2.00 M A 3.00M und 16.00 20.41 326.56 16.00 326.56 100.00% 0.00 0.00%
05.05.11 ARRIOSTRE DE PLANO SUPERIOR L = 3.00 M A 4.00M und 28.00 20.41 571.48 28.00 571.48 100.00% 0.00 0.00%
05.05.12 APOYO MOVIL DE ARMADURA EN VIGA und 11.00 8.23 90.53 11.00 90.53 100.00% 0.00 0.00%
05.05.13 APOYO FIJO DE ARMADURA EN VIGA und 11.00 8.23 90.53 11.00 90.53 100.00% 0.00 0.00%
6 ARQUITECTURA
6.01 MUROS Y TABIQUES DE ALBAÑILERIA
06.01.01 MURO DE LADRILLO K.K. DE ARCILLA DE CABEZA. H-10 9 x14x24 m2 85.06 132.49 11,269.60 85.06 11,269.60 100.00% 0.00 0.00%
06.01.02 MURO DE LADRILLO K.K. DE ARCILLA DE SOGA H-10 9 x14x24 cm m2 33.88 90.26 3,058.01 33.88 3,058.01 100.00% 0.00 0.00%
6.02 REVOQUES ENLUCIDOS Y MOLDURAS
06.02.01 TARRAJEO PRIMARIO RAYADO (MEZCLA C:A 1:5, E=1.5CM) m2 25.09 13.31 333.95 25.09 333.95 100.00% 0.00 0.00%
06.02.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA 1:5 m2 143.75 14.35 2,062.81 143.75 2,062.81 100.00% 0.00 0.00%
06.02.03 TARRAJEO EN EXTERIOR ACABADO CON CEMENTO-ARENA 1:5 m2 70.81 16.95 1,200.23 70.81 1,200.23 100.00% 0.00 0.00%
06.02.04 TARRAJEO EN COLUMNAS EXTERIORE E INTERIOR (MORTERO 1: m2 82.59 22.87 1,888.83 82.59 1,888.83 100.00% 0.00 0.00%
06.02.05 TARRAJEO EN VIGAS (MORTERO 1:5) m2 53.15 27.33 1,452.59 53.15 1,452.59 100.00% 0.00 0.00%
06.02.06 VESTIDURA DE DERRAMES (1:5) m 117.84 6.44 758.89 117.84 758.89 100.00% 0.00 0.00%
06.02.07 BRUÑAS E= 1CM m 168.85 4.39 741.25 168.85 741.25 100.00% 0.00 0.00%
06.02.08 JUNTA DE DILATACION CON ESPUIMA PLASTICA + JEBE MICRO m 35.60 14.09 501.60 35.60 501.60 100.00% 0.00 0.00%
6.03 CIELORRASOS
06.03.01 CIELORRASO EXTERIOS CON PLANCHAS DE PVC m2 46.49 55.80 2,594.14 0.00 0.00 0.00% 46.49 2,594.14 100.00%
06.03.02 CIELORRASO CON BALDOSA ACUSTICA 60X1.20 DE FIBRA MINE m2 100.57 52.83 5,313.11 0.00 0.00 0.00% 100.57 5,313.11 100.00%
6.04 PISOS Y VEREDAS
06.04.01 PISOS
06.04.01.01 FALSO PISO DE 4" DE CONCRETO 1:8 m2 101.03 37.41 3,779.53 101.03 3,779.53 100.00% 0.00 0.00%
06.04.01.02 PISO DE MADERA AGUANO MACHIHEMBRADA 1"X4"X10' m2 78.12 64.95 5,073.89 78.12 5,073.89 100.00% 0.00 0.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
06.04.01.03 PISO CERAMICO ANTIDESLIZANTE NACIONAL 30x30cm m2 22.91 48.26 1,105.64 22.91 1,105.64 100.00% 0.00 0.00%
06.04.02 VEREDAS
06.04.02.01 RELLENO CON MATERIAL AFIRMADO E = 4" m3 14.21 23.30 331.09 14.21 331.09 100.00% 0.00 0.00%
06.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDA m2 10.30 29.44 303.23 10.30 303.23 100.00% 0.00 0.00%
06.04.02.03 VEREDA DE CONCRETO 140 KG/CM2, ACABADO FROTACHADO m2 37.64 59.82 2,251.62 37.64 2,251.62 100.00% 0.00 0.00%
06.04.02.04 JUNTA ASFALTIC E = 1" EN VEREDA m 40.30 6.23 251.07 0.00 0.00 0.00% 40.30 251.07 100.00%
6.05 ZOCALOS Y CONTRAZOCALOS
06.05.01 ZOCALO DE CERAMICA 30 X 30 cm m2 25.27 49.89 1,260.72 25.27 1,260.72 100.00% 0.00 0.00%
06.05.02 CONTRAZOCALO CEMENTO H = 10 CM m 15.80 7.27 114.87 15.80 114.87 100.00% 0.00 0.00%
06.05.03 CONTRAZOCALO MADERA AGUANO 3/4" x 3"+ RODON 3/4" m 45.25 6.42 290.51 0.00 0.00 0.00% 45.25 290.51 100.00%
06.05.04 CONTRAZOCALO DE CEMENTO S/COLOREAR H = 0.45 CM (MORTE m2 15.46 6.48 100.18 15.46 100.18 100.00% 0.00 0.00%
6.06 CARPINTERIA DE MADERA
06.06.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO S/DISEÑO m2 15.54 361.47 5,617.24 0.00 0.00 0.00% 15.54 5,617.24 100.00%
6.07 CERRAJERIA
06.07.01 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" pza 32.00 4.96 158.72 0.00 0.00 0.00% 32.00 158.72 100.00%
06.07.02 CERRADURA DOS GOLPES EN PUERTAS INTERIORES pza 8.00 94.31 754.48 0.00 0.00 0.00% 8.00 754.48 100.00%
6.08 VIDRIOS, CRISTALES Y SIMILARES
06.08.01 VIDRIO SISTEMA MODUGLASS 6MM PROVISIONES Y COLOCACIO p2 276.48 10.79 2,983.22 0.00 0.00 0.00% 276.48 2,983.22 100.00%
06.08.02 VIDRIO TIPO CATEDRAL TEMPLEX PROVICION Y COLOCACION E p2 3.23 10.79 34.85 0.00 0.00 0.00% 3.23 34.85 100.00%
6.09 PINTURA
06.09.01 PINTURA LATEX EN MUROS INTERIORES 2 MANOS (incluye columnam2 271.03 5.35 1,450.01 0.00 0.00 0.00% 271.03 1,450.01 100.00%
06.09.02 PINTURA DE CONTRAZOCALO C/BARNIZ ECONOMICO m 45.25 8.21 371.50 0.00 0.00 0.00% 45.25 371.50 100.00%
06.09.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS (incluye column m2 112.11 5.35 599.79 0.00 0.00 0.00% 112.11 599.79 100.00%
6.1 INSTALACION PARA AGUAS PLUVIALES
06.10.01 CANALETA PLUVIAL DE PLANCHA GALVANIZADA E = 0.6MM INC m 43.55 44.61 1,942.77 43.55 1,942.77 100.00% 0.00 0.00%
06.10.02 BAJADA DE AGUAS PLUVIALES CON TUBERIA PVC SAP 3" m 18.15 32.60 591.69 18.15 591.69 100.00% 0.00 0.00%
06.10.03 PROTECCION DE BAJADA DE AGUAS PLUVIALES CON CONCRET und 2.00 74.82 149.64 2.00 149.64 100.00% 0.00 0.00%
6.11 VARIOS
06.11.01 PRUEBA DE CONTROL DE CALIDAD und 18.00 30.00 540.00 15.00 450.00 83.33% 3.00 90.00 16.67%
06.11.02 LIMPIEZA FINAL DE OBRA m2 153.56 0.90 138.20 0.00 0.00 0.00% 153.56 138.20 100.00%
7 INSTALACIONES SANITARIAS
7.01 APARATOS SANITARIOS Y ACCESORIOS
07.01.01 INODORO TANQUE BAJO DE LOSA 1RA CALIDAD ADULTO (NAC. B pza 1.00 222.72 222.72 1.00 222.72 100.00% 0.00 0.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
07.01.02 LAVATORIO DE LOSA BLANCA DE PRIMERA 545X460MM pza 1.00 171.86 171.86 1.00 171.86 100.00% 0.00 0.00%
7.02 INSTALACIONES SANITARIAS
07.02.01 SALIDA DE DESAGUE EN PVC pto 7.00 32.92 230.44 7.00 230.44 100.00% 0.00 0.00%
07.02.02 SALIDA PARA VENTILACION pto 2.00 47.41 94.82 2.00 94.82 100.00% 0.00 0.00%
07.02.03 TUBERIA PVC SAL 2" m 38.05 13.09 498.07 38.05 498.07 100.00% 0.00 0.00%
07.02.04 TUBERIA PVC SAL 4" m 18.51 14.85 274.87 18.51 274.87 100.00% 0.00 0.00%
07.02.05 REGISTRO DE BRONCE 4" und 1.00 27.69 27.69 1.00 27.69 100.00% 0.00 0.00%
07.02.06 REGISTRO DE BRONCE 2" und 3.00 23.55 70.65 3.00 70.65 100.00% 0.00 0.00%
07.02.07 SUMIDERO DE BRONCE DE 2" und 2.00 23.70 47.40 2.00 47.40 100.00% 0.00 0.00%
07.02.08 CAJA DE REG. ALB. 10"X20" C/TAPA CONCRETO und 3.00 119.91 359.73 3.00 359.73 100.00% 0.00 0.00%
07.02.09 CODO PVC 2"X90° und 13.00 4.65 60.45 13.00 60.45 100.00% 0.00 0.00%
07.02.10 CODO PVC 4"X90° und 1.00 8.47 8.47 1.00 8.47 100.00% 0.00 0.00%
07.02.11 CODO PVC 4"X45° und 2.00 8.47 16.94 2.00 16.94 100.00% 0.00 0.00%
07.02.12 YEE PVC SAL 4" A 2" und 2.00 6.18 12.36 2.00 12.36 100.00% 0.00 0.00%
07.02.13 REDUCCION PVC SAL 4" A 2" und 2.00 6.18 12.36 2.00 12.36 100.00% 0.00 0.00%
7.03 SISTEMA DE AGUA FRIA
07.03.01 SALIDA DE AGUA FRIA - PVC pto 7.00 37.90 265.30 7.00 265.30 100.00% 0.00 0.00%
07.03.02 TUBERIA PVC CLASE 10 - 1/2" m 6.87 8.26 56.75 6.87 56.75 100.00% 0.00 0.00%
07.03.03 TUBERIA PVC CLASE 10 - 3/4" m 44.96 7.39 332.25 44.96 332.25 100.00% 0.00 0.00%
07.03.04 VALVULA DE COMPUERTA DE BRONCE DE 3/4" und 2.00 61.46 122.92 2.00 122.92 100.00% 0.00 0.00%
07.03.05 CAJA PARA VALVULA (NICHO DE CERAM.) und 2.00 15.68 31.36 2.00 31.36 100.00% 0.00 0.00%
07.03.06 CODO PVC CLASE 10 - 1/2" und 4.00 2.49 9.96 4.00 9.96 100.00% 0.00 0.00%
07.03.07 CODO PVC CLASE 10 - 3/4" und 5.00 3.92 19.60 5.00 19.60 100.00% 0.00 0.00%
07.03.08 TEE PVC CLASE 10 1/2" und 2.00 2.49 4.98 2.00 4.98 100.00% 0.00 0.00%
8 INSTALACIONES ELECTRICAS
8.01 SALIDAS PARA ALUMBRADO, TOMACORRIENTES
08.01.01 SALIDA DE ALUMBRADO und 24.00 33.33 799.92 24.00 799.92 100.00% 0.00 0.00%
08.01.02 SALIDA PARA INTERRUPTORES SIMPLE und 9.00 42.92 386.28 9.00 386.28 100.00% 0.00 0.00%
08.01.03 SALIDA PARA INTERRUPTOR DE COMMUTACION und 2.00 62.39 124.78 2.00 124.78 100.00% 0.00 0.00%
08.01.04 CAJA DE PASO 100 X 100 X 30 MM und 2.00 16.06 32.12 2.00 32.12 100.00% 0.00 0.00%
08.01.05 SALIDA PARA TOMACORRIENTE CON LINEA A TIERRA und 12.00 40.26 483.12 12.00 483.12 100.00% 0.00 0.00%
8.02 CANALIZACIONES Y/O TUBERIAS
08.02.01 TUBERIA PVC-P 20MM m 136.31 7.79 1,061.85 136.31 1,061.85 100.00% 0.00 0.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
08.02.02 TUBERIA PVC-P 25MM m 47.00 7.81 367.07 47.00 367.07 100.00% 0.00 0.00%
8.03 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS
08.03.01 CONDUCTOR 1X2.5MM2 THW m 190.66 3.92 747.39 190.66 747.39 100.00% 0.00 0.00%
08.03.02 CONDUCTOR 1X4MM2 THW m 158.85 4.39 697.35 158.85 697.35 100.00% 0.00 0.00%
08.03.03 CONDUCTOR 1X6MM2 THW m 28.80 4.59 132.19 28.80 132.19 100.00% 0.00 0.00%
8.04 TABLERO PRINCIPALES
08.04.01 TABLERO DE DISTRIBUCION TD-4 und 1.00 270.39 270.39 1.00 270.39 100.00% 0.00 0.00%
8.05 DISPOSITIVOS DE MANIOBRA Y PROTECCION
08.05.01 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X18 A und 1.00 40.76 40.76 0.00 0.00 0.00% 1.00 40.76 100.00%
08.05.02 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X20 A und 2.00 45.76 91.52 0.00 0.00 0.00% 2.00 91.52 100.00%
08.05.03 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X25 A m 1.00 50.76 50.76 0.00 0.00 0.00% 1.00 50.76 100.00%
08.05.04 INTERRUPTOR TERMOMAGNETICO DIFERENCIAL 2x20 A und 1.00 55.76 55.76 0.00 0.00 0.00% 1.00 55.76 100.00%
8.06 ARTEFACTOS DE ILUMINACION
08.06.01 LUMINARIA C/EQ.4 LAMP. FLUORESC. 18 W C/U C/REJILLA TIPO "A und 6.00 161.74 970.44 0.00 0.00 0.00% 6.00 970.44 100.00%
08.06.02 LUMINARIA C/EQ.4 LAMP. FLUORESC. 18 W C/U C/REJILLA TIPO "B und 12.00 161.46 1,937.52 0.00 0.00 0.00% 12.00 1,937.52 100.00%
08.06.03 LUMINARIA DE 2 FLUORESCENTES DE 36W 220VCA P/ADOS TIPO und 6.00 115.20 691.20 0.00 0.00 0.00% 6.00 691.20 100.00%
COSTO DIRECTO 140,737.20 - 116,252.40 24,484.80 -
GASTOS GENERALES 11.81389 16,626.55 13,733.94 2,892.61
UTILIDAD 7.0 % 9,851.60 8,137.67 1,713.94
SUB TOTAL 167,215.35 138,124.01 29,091.34
IGV 18.00 % 30,098.76 24,862.32 5,236.44
TOTAL 197,314.11 162,986.33 34,327.79
Presupuesto General TOTAL PRESUPUESTO 197,314.11 162,986.33 34,327.79

03 INFRAESTRUCTURA ADMINISTRATIVA (DIRECCION, SECRETARIA, TOPICO, SS.HH Y HALL) 111,961.77 93,179.57 18,782.20
09 ESTRUCTURAS
9.01 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DE TERRENO MANUAL m2 93.28 0.82 76.49 93.28 76.49 100.00% 0.00 0.00%
09.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 93.28 1.23 114.73 93.28 114.73 100.00% 0.00 0.00%
09.01.03 TRAZO NIVELES Y REPLANTEO DURANTE LA CONSTRUCCION m2 93.28 0.99 92.35 93.28 92.35 100.00% 0.00 0.00%
9.02 MOVIMIENTO DE TIERRAS
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
09.02.01 CORTE DE TERRENO NATURAL MANUAL CON MAQUINARIA m3 23.32 4.47 104.24 23.32 104.24 100.00% 0.00 0.00%
09.02.02 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 29.16 14.30 416.99 29.16 416.99 100.00% 0.00 0.00%
09.02.03 NIVELACION INTERIOR Y APISONADO PARA PISO m2 66.14 2.49 164.69 66.14 164.69 100.00% 0.00 0.00%
09.02.04 RELLENO CON MATERIAL DE PRESTAMO m3 33.07 28.47 941.50 33.07 941.50 100.00% 0.00 0.00%
09.02.05 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA m3 65.60 8.01 525.46 65.60 525.46 100.00% 0.00 0.00%
9.03 OBRAS DE CONCRETO SIMPLE
09.03.01 CIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO HORMIGON + 30% m3 23.33 138.03 3,220.24 23.33 3,220.24 100.00% 0.00 0.00%
9.04 OBRAS DE CONCRETO ARMADO
09.04.01 COLUMNAS
09.04.01.01 COLUMNAS: ACERO F´C=4,200 KG/CM2 GRADO 60 kg 1,725.12 4.28 7,383.51 1,725.12 7,383.51 100.00% 0.00 0.00%
09.04.01.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 89.78 27.86 2,501.27 89.78 2,501.27 100.00% 0.00 0.00%
09.04.01.03 COLUMNAS CONCRETO f'c=210 kg/cm2 m3 8.90 307.93 2,740.58 8.90 2,740.58 100.00% 0.00 0.00%
09.04.02 SOBRECIMIENTOS
09.04.02.01 SOBRECIMIENTOS : ACERO FY = 4200 KG/CM2 GRADO 60 kg 736.03 4.28 3,150.21 736.03 3,150.21 100.00% 0.00 0.00%
09.04.02.02 SOBRECIMIENTOS: ENCOFRADO Y DESENCOFRADO NORMAL m2 59.38 28.58 1,697.08 59.38 1,697.08 100.00% 0.00 0.00%
09.04.02.03 SOBRECIMIENTOS CONCRETO F'C =210 KG/CM2 m3 5.02 289.20 1,451.78 5.02 1,451.78 100.00% 0.00 0.00%
09.04.03 VIGAS
09.04.03.01 VIGAS: ACERO F´Y=4,200 KG/CM2 GRADO 60 kg 756.05 4.28 3,235.89 756.05 3,235.89 100.00% 0.00 0.00%
09.04.03.02 VIGAS ENCOFRADO Y DESENCOFRADO NORMAL m2 54.92 28.58 1,569.61 54.92 1,569.61 100.00% 0.00 0.00%
09.04.03.03 VIGAS CONCRETO F'C=210 KG/CM2 m3 7.39 289.20 2,137.19 7.39 2,137.19 100.00% 0.00 0.00%
9.05 ESTRUCTURAS METALICAS Y COBERTURAS
09.05.01 ARMADURA 7 DE TIJERAL METALICO SEGUN DISEÑO und 1.00 1,167.10 1,167.10 1.00 1,167.10 100.00% 0.00 0.00%
09.05.02 ARMADURA 8 DE TIJERAL METALICO SEGUN DISEÑO und 3.00 916.44 2,749.32 3.00 2,749.32 100.00% 0.00 0.00%
09.05.03 ARMADURA 9 DE TIJERAL METALICO SEGUN DISEÑO und 5.00 916.44 4,582.20 5.00 4,582.20 100.00% 0.00 0.00%
09.05.04 VIGUETA METALICA MV -1 DE 2" X 2" e=1.5MM m 14.75 34.71 511.97 14.75 511.97 100.00% 0.00 0.00%
09.05.05 VIGUETA METALICA MV -2 DE 2" X 2" e=2.5MM m 98.08 36.59 3,588.75 98.08 3,588.75 100.00% 0.00 0.00%
09.05.06 VIGUETA METALICA MV - 3 DE 2" X 4" e=1.5MM m 36.10 36.17 1,305.74 36.10 1,305.74 100.00% 0.00 0.00%
09.05.07 VIGUETA METALICA MV - 4 DE 2" X 4" e=3.0MM m 15.91 42.81 681.11 15.91 681.11 100.00% 0.00 0.00%
09.05.08 COBERTURA CON CALAMINON T DE 0.40MM m2 117.34 70.77 8,304.15 117.34 8,304.15 100.00% 0.00 0.00%
09.05.09 CUMBRERA DE CALAMINON m 27.95 46.01 1,285.98 27.95 1,285.98 100.00% 0.00 0.00%
09.05.10 ARRIOSTRE DE PLANO SUPERIOR L = 2.00 M A 3.00M und 15.00 20.41 306.15 15.00 306.15 100.00% 0.00 0.00%
09.05.11 ARRIOSTRE DE PLANO SUPERIOR L = 3.00 M A 4.00M und 14.00 20.41 285.74 14.00 285.74 100.00% 0.00 0.00%
10 ARQUITECTURA
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
10.01 MUROS Y TABIQUES DE ALBAÑILERIA
10.01.01 MURO DE LADRILLO K.K. DE ARCILLA DE CABEZA. H-10 9 x14x24 m2 48.77 132.49 6,461.54 48.77 6,461.54 100.00% 0.00 0.00%
10.01.02 MURO DE LADRILLO K.K. DE ARCILLA DE SOGA H-10 9 x14x24 cm m2 51.37 90.26 4,636.66 51.37 4,636.66 100.00% 0.00 0.00%
10.02 REVOQUES ENLUCIDOS Y MOLDURAS
10.02.01 TARRAJEO PRIMARIO RAYADO (MEZCLA C:A 1:5, E=1.5CM) m2 9.44 13.31 125.65 9.44 125.65 100.00% 0.00 0.00%
10.02.02 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA 1:5 m2 130.17 14.35 1,867.94 130.17 1,867.94 100.00% 0.00 0.00%
10.02.03 TARRAJEO EN EXTERIOR ACABADO CON CEMENTO-ARENA 1:5 m2 41.65 16.95 705.97 41.65 705.97 100.00% 0.00 0.00%
10.02.04 TARRAJEO EN COLUMNAS EXTERIORE E INTERIOR (MORTERO 1: m2 86.83 22.87 1,985.80 86.83 1,985.80 100.00% 0.00 0.00%
10.02.05 TARRAJEO EN VIGAS (MORTERO 1:5) m2 54.92 27.33 1,500.96 54.92 1,500.96 100.00% 0.00 0.00%
10.02.06 VESTIDURA DE DERRAMES (1:5) m 75.48 6.44 486.09 75.48 486.09 100.00% 0.00 0.00%
10.02.07 BRUÑAS E= 1CM m 79.60 4.39 349.44 79.60 349.44 100.00% 0.00 0.00%
10.02.08 MURO ENCHAPADO CON PIEDRA LAJA FORMA REGULAR m2 12.59 70.85 892.00 12.59 892.00 100.00% 0.00 0.00%
10.02.09 JUNTA DE DILATACION CON ESPUIMA PLASTICA + JEBE MICRO m 16.00 14.09 225.44 16.00 225.44 100.00% 0.00 0.00%
10.03 CIELORRASOS
10.03.01 CIELORRASO EXTERIOS CON PLANCHAS DE PVC m2 50.76 55.80 2,832.41 0.00 0.00 0.00% 50.76 2,832.41 100.00%
10.03.02 CIELORRASO CON BALDOSA ACUSTICA 60X1.20 DE FIBRA MINE m2 51.58 52.83 2,724.97 0.00 0.00 0.00% 51.58 2,724.97 100.00%
10.04 PISOS Y VEREDAS
10.04.01 PISOS
10.04.01.01 FALSO PISO DE 4" DE CONCRETO 1:8 m2 51.35 37.41 1,921.00 51.35 1,921.00 100.00% 0.00 0.00%
10.04.01.02 PISO DE MADERA AGUANO MACHIHEMBRADA 1"X4"X10' m2 20.96 64.95 1,361.35 20.96 1,361.35 100.00% 0.00 0.00%
10.04.01.03 PISO CERAMICO ANTIDESLIZANTE NACIONAL 30x30cm m2 23.09 48.26 1,114.32 23.09 1,114.32 100.00% 0.00 0.00%
10.04.01.04 PISO DE CEMENTO PULIDO 2" BRUÑADO Y COLOREADO m2 7.30 25.20 183.96 7.30 183.96 100.00% 0.00 0.00%
10.04.02 VEREDAS
10.04.02.01 RELLENO CON MATERIAL AFIRMADO E = 4" m3 8.01 23.30 186.63 8.01 186.63 100.00% 0.00 0.00%
10.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDA m2 7.60 29.44 223.74 7.60 223.74 100.00% 0.00 0.00%
10.04.02.03 VEREDA DE CONCRETO 140 KG/CM2, ACABADO FROTACHADO m2 21.37 59.82 1,278.35 21.37 1,278.35 100.00% 0.00 0.00%
10.04.02.04 JUNTA ASFALTIC E = 1" EN VEREDA m 25.85 6.23 161.05 0.00 0.00 0.00% 25.85 161.05 100.00%
10.05 ZOCALOS Y CONTRAZOCALOS
10.05.01 ZOCALO DE CERAMICA 30 X 30 cm m2 9.44 49.89 470.96 9.44 470.96 100.00% 0.00 0.00%
10.05.02 CONTRAZOCALO CERAMICO H = 10 CM m 26.27 7.54 198.08 26.27 198.08 100.00% 0.00 0.00%
10.05.03 CONTRAZOCALO MADERA AGUANO 3/4" x 3"+ RODON 3/4" m 25.35 6.42 162.75 0.00 0.00 0.00% 25.35 162.75 100.00%
10.05.04 CONTRAZOCALO DE CEMENTO S/COLOREAR H = 0.45 CM (MORTE m2 7.43 6.48 48.15 7.43 48.15 100.00% 0.00 0.00%
10.05.05 CONTRAZOCALO ENCHAPADO PIEDRA LAJA FORMA REGULAR H= m2 2.25 84.79 190.78 0.00 0.00 0.00% 2.25 190.78 100.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
10.06 CARPINTERIA DE MADERA
10.06.01 PUERTA DE MADERA AGUANO TABLERO REBAJADO S/DISEÑO m2 11.76 361.47 4,250.89 0.00 0.00 0.00% 11.76 4,250.89 100.00%
10.07 CERRAJERIA
10.07.01 BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4" pza 24.00 4.96 119.04 0.00 0.00 0.00% 24.00 119.04 100.00%
10.07.02 CERRADURA DOS GOLPES EN PUERTAS INTERIORES pza 6.00 94.31 565.86 0.00 0.00 0.00% 6.00 565.86 100.00%
10.08 VIDRIOS, CRISTALES Y SIMILARES
10.08.01 VIDRIO SISTEMA MODUGLASS 6MM PROVISIONES Y COLOCACIO p2 175.22 10.79 1,890.62 0.00 0.00 0.00% 175.22 1,890.62 100.00%
10.08.02 VIDRIO TIPO CATEDRAL TEMPLEX PROVICION Y COLOCACION E p2 6.46 10.79 69.70 0.00 0.00 0.00% 6.46 69.70 100.00%
10.09 PINTURA
10.09.01 PINTURA LATEX EN MUROS INTERIORES 2 MANOS (incluye columnam2 248.97 5.35 1,331.99 0.00 0.00 0.00% 248.97 1,331.99 100.00%
10.09.02 PINTURA DE CONTRAZOCALO C/BARNIZ ECONOMICO m 25.35 8.21 208.12 0.00 0.00 0.00% 25.35 208.12 100.00%
10.09.03 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS (incluye column m2 85.06 5.35 455.07 0.00 0.00 0.00% 85.06 455.07 100.00%
10.1 INSTALACION PARA AGUAS PLUVIALES
10.10.01 CANALETA PLUVIAL DE PLANCHA GALVANIZADA E = 0.6MM INC m 42.97 44.61 1,916.89 42.97 1,916.89 100.00% 0.00 0.00%
10.10.02 BAJADA DE AGUAS PLUVIALES CON TUBERIA PVC SAP 3" m 33.90 32.60 1,105.14 33.90 1,105.14 100.00% 0.00 0.00%
10.10.03 PROTECCION DE BAJADA DE AGUAS PLUVIALES CON CONCRET und 4.00 74.82 299.28 4.00 299.28 100.00% 0.00 0.00%
10.11 VARIOS
10.11.01 PRUEBA DE CONTROL DE CALIDAD und 10.00 30.00 300.00 8.00 240.00 80.00% 2.00 60.00 20.00%
10.11.02 LIMPIEZA FINAL DE OBRA m2 93.28 0.90 83.95 0.00 0.00 0.00% 93.28 83.95 100.00%
11 INSTALACIONES SANITARIAS
11.01 APARATOS SANITARIOS Y ACCESORIOS
11.01.01 INODORO TANQUE BAJO DE LOSA 1RA CALIDAD ADULTO (NAC. B pza 1.00 222.72 222.72 1.00 222.72 100.00% 0.00 0.00%
11.01.02 LAVATORIO DE LOSA BLANCA DE PRIMERA 545X460MM pza 1.00 171.86 171.86 1.00 171.86 100.00% 0.00 0.00%
11.01.03 URINARIO INDIVIDUAL TIPO CADET C/BLANCO INC. ACCESORIOS pza 1.00 93.22 93.22 1.00 93.22 100.00% 0.00 0.00%
11.02 INSTALACIONES SANITARIAS
11.02.01 SALIDA DE DESAGUE EN PVC pto 5.00 32.92 164.60 5.00 164.60 100.00% 0.00 0.00%
11.02.02 SALIDA PARA VENTILACION pto 1.00 47.41 47.41 1.00 47.41 100.00% 0.00 0.00%
11.02.03 TUBERIA PVC SAL 2" m 6.35 13.09 83.12 6.35 83.12 100.00% 0.00 0.00%
11.02.04 TUBERIA PVC SAL 4" m 29.15 14.85 432.88 29.15 432.88 100.00% 0.00 0.00%
11.02.05 REGISTRO DE BRONCE 4" und 1.00 27.69 27.69 1.00 27.69 100.00% 0.00 0.00%
11.02.06 REGISTRO DE BRONCE 2" und 1.00 23.55 23.55 1.00 23.55 100.00% 0.00 0.00%
11.02.07 SUMIDERO DE BRONCE DE 2" und 1.00 23.70 23.70 1.00 23.70 100.00% 0.00 0.00%
11.02.08 CAJA DE REG. ALB. 10"X20" C/TAPA CONCRETO und 1.00 119.91 119.91 1.00 119.91 100.00% 0.00 0.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
11.02.09 CODO PVC 2"X90° und 5.00 4.65 23.25 5.00 23.25 100.00% 0.00 0.00%
11.02.10 CODO PVC 4"X90° und 1.00 8.47 8.47 1.00 8.47 100.00% 0.00 0.00%
11.02.11 CODO PVC 4"X45° und 2.00 8.47 16.94 2.00 16.94 100.00% 0.00 0.00%
11.02.12 YEE PVC SAL 4" und 1.00 6.92 6.92 1.00 6.92 100.00% 0.00 0.00%
11.02.13 YEE PVC SAL 4" A 2" und 3.00 6.18 18.54 3.00 18.54 100.00% 0.00 0.00%
11.02.14 REDUCCION PVC SAL 4" A 2" und 3.00 6.18 18.54 3.00 18.54 100.00% 0.00 0.00%
11.03 SISTEMA DE AGUA FRIA
11.03.01 SALIDA DE AGUA FRIA - PVC pto 5.00 37.90 189.50 5.00 189.50 100.00% 0.00 0.00%
11.03.02 TUBERIA PVC CLASE 10 - 1/2" m 4.80 8.26 39.65 4.80 39.65 100.01% 0.00 0.00%
11.03.03 TUBERIA PVC CLASE 10 - 3/4" m 3.50 7.39 25.87 3.50 25.87 100.02% 0.00 0.00%
11.03.04 TUBERIA PVC CLASE 10 - 1" m 8.45 8.26 69.80 8.45 69.80 100.00% 0.00 0.00%
11.03.05 VALVULA DE COMPUERTA DE BRONCE DE 3/4" und 1.00 61.46 61.46 1.00 61.46 100.00% 0.00 0.00%
11.03.06 CAJA PARA VALVULA (NICHO DE CERAM.) und 1.00 15.68 15.68 1.00 15.68 100.00% 0.00 0.00%
11.03.07 CODO PVC CLASE 10 - 1/2" und 4.00 2.49 9.96 4.00 9.96 100.00% 0.00 0.00%
11.03.08 CODO PVC CLASE 10 - 3/4" und 7.00 3.92 27.44 7.00 27.44 100.00% 0.00 0.00%
11.03.09 TEE PVC CLASE 10 1/2" und 2.00 2.49 4.98 2.00 4.98 100.00% 0.00 0.00%
12 INSTALACIONES ELECTRICAS
12.01 SALIDAS PARA ALUMBRADO, TOMACORRIENTES
12.01.01 SALIDA DE ALUMBRADO und 16.00 33.33 533.28 16.00 533.28 100.00% 0.00 0.00%
12.01.02 SALIDA PARA INTERRUPTORES SIMPLE und 7.00 42.92 300.44 7.00 300.44 100.00% 0.00 0.00%
12.01.03 SALIDA PARA INTERRUPTORES DOBLES und 1.00 37.31 37.31 1.00 37.31 100.00% 0.00 0.00%
12.01.04 CAJA DE PASO 100 X 100 X 30 MM und 1.00 16.06 16.06 1.00 16.06 100.00% 0.00 0.00%
12.01.05 SALIDA PARA TOMACORRIENTE CON LINEA A TIERRA und 9.00 40.26 362.34 9.00 362.34 100.00% 0.00 0.00%
12.02 CANALIZACIONES Y/O TUBERIAS
12.02.01 TUBERIA PVC-P 20MM m 93.28 7.79 726.65 93.28 726.65 100.00% 0.00 0.00%
12.02.02 TUBERIA PVC-P 25MM m 33.50 7.81 261.64 33.50 261.64 100.00% 0.00 0.00%
12.03 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS
12.03.01 CONDUCTOR 1X2.5MM2 THW m 135.10 3.92 529.59 135.10 529.59 100.00% 0.00 0.00%
12.03.02 CONDUCTOR 1X4MM2 THW m 102.00 4.39 447.78 102.00 447.78 100.00% 0.00 0.00%
12.03.03 CONDUCTOR 1X6MM2 THW m 150.40 4.59 690.34 150.40 690.34 100.00% 0.00 0.00%
12.03.04 CONDUCTOR 1X10MM2 THW m 39.90 9.12 363.89 39.90 363.89 100.00% 0.00 0.00%
12.03.05 CONDUCTOR CU DESNUDO DE 16 MM2 m 18.00 9.67 174.06 18.00 174.06 100.00% 0.00 0.00%
12.04 TABLERO PRINCIPALES
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
12.04.01 TABLERO GENERAL TG und 1.00 440.78 440.78 1.00 440.78 100.00% 0.00 0.00%
12.04.02 TABLERO DE DISTRIBUCION TD-1 und 1.00 270.39 270.39 1.00 270.39 100.00% 0.00 0.00%
12.04.03 ACOMETIDA DOMICILIARIA (ELPU) glb 1.00 546.60 546.60 0.00 0.00 0.00% 1.00 546.60 100.00%
12.05 DISPOSITIVOS DE MANIOBRA Y PROTECCION
12.05.01 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X18 A und 2.00 40.76 81.52 0.00 0.00 0.00% 2.00 81.52 100.00%
12.05.02 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X20 A und 1.00 45.76 45.76 0.00 0.00 0.00% 1.00 45.76 100.00%
12.05.03 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X25 A und 5.00 50.76 253.80 0.00 0.00 0.00% 5.00 253.80 100.00%
12.05.04 INTERRUPTOR THERMOMAGNETICO TRIFASICO 3X25 A und 1.00 40.76 40.76 0.00 0.00 0.00% 1.00 40.76 100.00%
12.05.05 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2X20 A und 1.00 55.76 55.76 0.00 0.00 0.00% 1.00 55.76 100.00%
12.06 INSTALACION DE SISTEMA DE PUESTA A TIERRA
12.06.01 POZO PUESTO A TIERRA und 1.00 439.14 439.14 0.00 0.00 0.00% 1.00 439.14 100.00%
12.07 ARTEFACTOS DE ILUMINACION
12.07.01 LUMINARIA C/EQ.4 LAMP. FLUORESC. 18 W C/U C/REJILLA TIPO "A und 11.00 161.74 1,779.14 0.00 0.00 0.00% 11.00 1,779.14 100.00%
12.07.02 LUMINARIA DE 2 FLUORESCENTES DE 36W 220VCA P/ADOS TIPO und 3.00 115.20 345.60 0.00 0.00 0.00% 3.00 345.60 100.00%
12.07.03 LUMINARIA TIPO SPOT LIGHT und 2.00 43.46 86.92 0.00 0.00 0.00% 2.00 86.92 100.00%
COSTO DIRECTO 111,961.77 - 18,782.20 -
GASTOS GENERALES 11.81389 13,227.05 - 2,218.91
UTILIDAD 7.0 % 7,837.32 - 1,314.75
SUB TOTAL 133,026.14 0.00 22,315.86
IGV 18.00 % 23,944.71 - 4,016.86
TOTAL 156,970.85 0.00 26,332.72
Presupuesto General TOTAL PRESUPUESTO 156,970.85 0.00 26,332.72

04 ESPACIOS EXTERIORES (CERCO PERIMETRICO, PATIO DE FORMACION, AREAS VERDES Y JUEGOS) 187,320.09 99,241.10 88,078.99
13.01 TRABAJOS PRELIMINARES
13.01.01 LIMPIEZA DE TERRENO MANUAL m2 312.18 0.82 255.99 312.18 255.99 100.00% 0.00 0.00%
13.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 312.18 1.23 383.98 312.18 383.98 100.00% 0.00 0.00%
13.01.03 TRAZO NIVELES Y REPLANTEO DURANTE LA CONSTRUCCION m2 312.18 0.99 309.06 312.18 309.06 100.00% 0.00 0.00%
13.02 MOVIMIENTO DE TIERRAS 0.00 0.00
13.02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 63.47 14.30 907.62 63.47 907.62 100.00% 0.00 0.00%
13.02.02 RELLENO CON MATERIAL DE PRESTAMO m3 5.95 28.47 169.40 5.95 169.40 100.00% 0.00 0.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
13.02.03 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA m3 79.34 8.01 635.51 79.34 635.51 100.00% 0.00 0.00%
13.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
13.03.01 CIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO HORMIGON + 30% m3 50.78 138.03 7,009.16 50.78 7,009.16 100.00% 0.00 0.00%
13.03.02 SOBRECIMIENTOS: CONCRETO F'C = 175 KG/CM2 m3 10.35 218.66 2,263.13 10.35 2,263.13 100.00% 0.00 0.00%
13.03.03 SOBRECIMIENTOS: ENCOFRADO Y DESENCOFRADO NORMAL m2 128.08 28.58 3,660.53 128.08 3,660.53 100.00% 0.00 0.00%
13.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
13.04.01 SOBRECIMIENTOS 0.00 0.00
13.04.01.01 SOBRECIMIENTOS : ACERO FY = 4200 KG/CM2 GRADO 60 kg 38.60 4.28 165.21 38.60 165.21 100.00% 0.00 0.00%
13.04.01.02 SOBRECIMIENTOS: ENCOFRADO Y DESENCOFRADO NORMAL m2 2.41 28.58 68.88 2.41 68.88 100.00% 0.00 0.00%
13.04.01.03 SOBRECIMIENTOS CONCRETO F'C =210 KG/CM2 m3 0.18 289.20 52.06 0.18 52.06 100.01% 0.00 0.00%
13.04.02 COLUMNAS 0.00 0.00
13.04.02.01 COLUMNAS: ACERO F´C=4,200 KG/CM2 GRADO 60 kg 1,237.07 4.28 5,294.66 1,237.07 5,294.66 100.00% 0.00 0.00%
13.04.02.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 140.52 27.86 3,914.89 140.52 3,914.89 100.00% 0.00 0.00%
13.04.02.03 COLUMNAS CONCRETO f'c=210 kg/cm2 m3 11.49 307.93 3,538.12 11.49 3,538.12 100.00% 0.00 0.00%
13.04.03 VIGAS 0.00 0.00
13.04.03.01 VIGAS: ACERO F´Y=4,200 KG/CM2 GRADO 60 kg 347.93 4.28 1,489.14 347.93 1,489.14 100.00% 0.00 0.00%
13.04.03.02 VIGAS ENCOFRADO Y DESENCOFRADO NORMAL m2 43.00 28.58 1,228.94 43.00 1,228.94 100.00% 0.00 0.00%
13.04.03.03 VIGAS CONCRETO F'C=210 KG/CM2 m3 3.25 289.20 939.90 3.25 939.90 100.00% 0.00 0.00%
13.05 MUROS Y TABIQUES DE ALBAÑILERIA 0.00 0.00
13.05.01 MURO DE LADRILLO KK DE ARCILLA DE CABEZA 24x14x9 J = 1.5 m2 24.99 90.26 2,255.60 24.99 2,255.60 100.00% 0.00 0.00%
13.05.02 MURO DE LADRILLO KK DE ARCILLA DE SOGA 24x14x9 J = 1.5 m2 227.70 90.26 20,552.20 227.70 20,552.20 100.00% 0.00 0.00%
13.05.03 MURO CON TUBO DE FIERRO GALVANIZADO 4" e = 4.5 MM m2 18.26 166.51 3,040.47 18.26 3,040.47 100.00% 0.00 0.00%
13.06 REVOQUES ENLUCIDOS Y MOLDURAS 0.00 0.00
13.06.01 TARRAJEO INTERCALADO EN MUROS INTERIORES ACABADO CO m2 569.16 10.13 5,765.59 569.16 5,765.59 100.00% 0.00 0.00%
13.06.02 TARRAJEO EN COLUMNAS EXTERIORE E INTERIOR (MORTERO 1: m2 140.52 22.87 3,213.69 140.52 3,213.69 100.00% 0.00 0.00%
13.06.03 TARRAJEO EN VIGAS (MORTERO 1:5) m2 43.00 27.33 1,175.19 43.00 1,175.19 100.00% 0.00 0.00%
13.06.04 BRUÑAS E= 1CM m 440.23 4.39 1,932.61 440.23 1,932.61 100.00% 0.00 0.00%
13.06.05 JUNTA DE DILATACION CON ESPUIMA PLASTICA + JEBE MICRO m 36.00 14.09 507.24 36.00 507.24 100.00% 0.00 0.00%
13.07 VEREDAS DE CONCRETO 0.00 0.00
13.07.01 OBRAS PRELIMINARES 0.00 0.00
13.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 159.20 0.82 130.54 0.00 0.00 0.00% 159.20 130.54 100.00%
13.07.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 159.20 1.23 195.82 159.20 195.82 100.00% 0.00 0.00%
13.07.01.03 TRAZO DE NIVELES Y REPLANTEO DURANTE LA CONSTRUCCION m2 159.20 0.99 157.61 159.20 157.61 100.00% 0.00 0.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
13.07.02 MOVIMIENTO DE TIERRAS 0.00 0.00
13.07.02.01 REFINE Y NIVELACION EN TERRENO NORMAL m2 159.20 1.72 273.82 0.00 0.00 0.00% 159.20 273.82 100.00%
13.07.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA 50M m3 7.96 19.44 154.74 7.96 154.74 100.00% 0.00 0.00%
13.07.02.03 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO m3 15.92 23.36 371.89 15.92 371.89 100.00% 0.00 0.00%
13.07.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
13.07.03.01 VEREDA DE CONCRETO 140 KG/CM2, ACABADO FROTACHADO m2 149.30 59.82 8,931.13 127.00 7,597.14 85.06% 22.30 1,333.99 14.94%
13.07.03.02 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDA m2 35.74 29.44 1,052.19 30.00 883.20 83.94% 5.74 168.99 16.06%
13.07.03.03 JUNTA ASFALTIC E = 1" m 49.57 6.67 330.63 0.00 0.00 0.00% 49.57 330.63 100.00%
13.07.03.04 RAMPA DE CONCRETO 140 KG/CM2 ACABADO FROTACHADO Y m3 7.87 57.43 451.97 0.00 0.00 0.00% 7.87 451.97 100.00%
13.07.03.05 ENCOFRADO Y DESENCOFRADO NORMAL EN RAMPA m2 7.14 33.21 237.12 0.00 0.00 0.00% 7.14 237.12 100.00%
13.08 CARPINTERIA METALICA Y HERRERIA 0.00 0.00
13.08.01 PUERTA DE REJA METALICA PRINCIPAL SEGUN DISEÑO und 1.00 4,000.00 4,000.00 1.00 4,000.00 100.00% 0.00 0.00%
13.08.02 PUERTA DE REJA METALICA SECUNDARIO S/DISEÑO und 1.00 1,500.00 1,500.00 1.00 1,500.00 100.00% 0.00 0.00%
13.09 CERRAJERIA 0.00 0.00
13.09.01 CERRADURA TRES GOLPES EN PUERTA PRINCIPAL pza 2.00 68.63 137.26 0.00 0.00 0.00% 2.00 137.26 100.00%
13.1 PINTURA 0.00 0.00
13.10.01 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS (incluye column m2 774.69 5.35 4,144.59 0.00 0.00 0.00% 774.69 4,144.59 100.00%
14 CONSTRUCCION PATIO DE FORMACION (DURO Y BLANDO) 0.00 0.00
14.01 TRABAJOS PRELIMINARES 0.00 0.00
14.01.01 LIMPIEZA DE TERRENO MANUAL m2 262.97 0.82 215.64 0.00 0.00 0.00% 262.97 215.64 100.00%
14.01.02 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 262.97 1.23 323.45 0.00 0.00 0.00% 262.97 323.45 100.00%
14.01.03 TRAZO DE NIVELES Y REPLANTEO DURANTE LA CONSTRUCCION m2 262.97 0.99 260.34 0.00 0.00 0.00% 262.97 260.34 100.00%
14.02 MOVIMIENTO DE TIERRAS 0.00 0.00
14.02.01 CORTE DE TERRENO NATURAL CON MAQUINARIA m3 78.89 4.47 352.64 0.00 0.00 0.00% 78.89 352.64 100.00%
14.02.02 EXCAVACION DE ZANJAS PARA SARDINEL m3 3.35 21.55 72.19 0.00 0.00 0.00% 3.35 72.19 100.00%
14.02.03 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO m3 69.80 23.36 1,630.53 0.00 0.00 0.00% 69.80 1,630.53 100.00%
14.02.04 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA m3 15.56 8.01 124.64 0.00 0.00 0.00% 15.56 124.64 100.00%
14.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
14.03.01 SARDINEL: CONCRETO F'C = 175 KG/CM2 m3 3.86 207.87 802.38 0.00 0.00 0.00% 3.86 802.38 100.00%
14.03.02 SARDINELES: ENCOFRADO Y DESENCOFRADO NORMAL m2 42.06 24.40 1,026.26 0.00 0.00 0.00% 42.06 1,026.26 100.00%
14.04 PISOS DE CONCRETO 0.00 0.00
14.04.01 ENCOFRADO Y DESENCOFRADO NORMAL DE PISO m2 28.57 29.68 847.96 0.00 0.00 0.00% 28.57 847.96 100.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
14.04.02 PISO DE CEMENTO PULIDO S/COLOREAR CONCRETO F'C = 175 m3 26.30 196.34 5,163.74 0.00 0.00 0.00% 26.30 5,163.74 100.00%
14.04.03 JUNTA ASFALTIC E = 1" m 142.32 6.67 949.27 0.00 0.00 0.00% 142.32 949.27 100.00%
14.05 PINTURA 0.00 0.00
14.05.01 PINTURA DEMARCACION EN PLATAFORMA DEPORTIVA m2 80.90 2.91 235.42 0.00 0.00 0.00% 80.90 235.42 100.00%
14.06 REJILLA SUMIDERO DE EVACUACION DE AGUAS PLUVIALES 0.00 0.00
14.06.01 TRAZO NIVELACION Y REPLANTEO PRELIMINAR m2 28.55 1.23 35.12 0.00 0.00 0.00% 28.55 35.12 100.01%
14.06.02 EXCAVACION DE ZANJAS m3 9.99 21.55 215.28 0.00 0.00 0.00% 9.99 215.28 100.00%
14.06.03 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA 50M m3 9.99 19.44 194.21 0.00 0.00 0.00% 9.99 194.21 100.00%
14.06.04 CANALETAS: CONCRETO F'C = 175 KG/CM2 m3 6.98 207.87 1,450.93 0.00 0.00 0.00% 6.98 1,450.93 100.00%
14.06.05 CANALETA: ENCOFRADO Y DESENCOFRADO NORMAL m2 44.42 40.82 1,813.22 0.00 0.00 0.00% 44.42 1,813.22 100.00%
14.06.06 REJILLA PARA EVACUACION DE AGUAS PLUVIALES m2 17.77 74.06 1,316.05 0.00 0.00 0.00% 17.77 1,316.05 100.00%
14.07
ESTRUCTURAS DE CONCRETO EN PATIO 0.00 0.00
14.07.01 OBRAS PRELIMINARES 0.00 0.00
14.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 23.33 0.82 19.13 23.33 19.13 100.00% 0.00 0.00%
14.07.01.02 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 23.33 1.23 28.70 23.33 28.70 100.01% 0.00 0.00%
14.07.02 MOVIMIENTO DE TIERRAS 0.00 0.00
14.07.02.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS m3 9.06 21.55 195.24 9.06 195.24 100.00% 0.00 0.00%
14.07.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA 50M m3 9.06 19.44 176.13 9.06 176.13 100.00% 0.00 0.00%
14.07.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
14.07.03.01 CONCRETO EN CIMIENTACION F'C = 140 KG/CM2 + 25% P.M. m3 9.06 185.07 1,676.73 7.50 1,388.03 82.78% 1.56 288.71 17.22%
14.07.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
14.07.04.01 ESTRUCTURAS DE CONCRETO 175 KG/CM2; ACABDO, FROTACH m3 2.63 317.27 834.42 2.63 834.42 100.00% 0.00 0.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
14.07.04.02 ESTRUCTURA DE CONCRETO: ENCOFRADO Y DESENCOFRADO m2 30.48 27.86 849.17 30.48 849.17 100.00% 0.00 0.00%
14.07.04.03 ESTRUCTURA DE CONCRETO: ACERO FY = 4200 KG/CM2 GRADO kg 137.60 3.93 540.77 137.60 540.77 100.00% 0.00 0.00%
14.07.04.04 MASTIL PARA BANDERA INC. ACCESORIOS und 2.00 259.91 519.82 0.00 0.00 0.00% 2.00 519.82 100.00%
14.07.04.05 MODULO DE BASUDERO CON SOPORTE METALICO und 4.00 317.78 1,271.12 0.00 0.00 0.00% 4.00 1,271.12 100.00%
14.08
ESTRUCTURA DE SOPORTE TANQUE DE AGUA 0.00 0.00
14.08.01 TRABAJOS PRELIMINARES 0.00 0.00
14.08.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 9.61 1.23 11.82 9.61 11.82 100.00% 0.00 0.00%
14.08.02 MOVIMIENTO DE TIERRAS 0.00 0.00
14.08.02.01 EXCAVACION DE ZANJAS PARA ZAPATAS (TERRENO NORMAL) m3 7.60 16.34 124.18 7.60 124.18 100.00% 0.00 0.00%
14.08.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA 50M m3 9.50 19.44 184.68 9.50 184.68 100.00% 0.00 0.00%
14.08.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
14.08.03.01 FALSA ZAPATA DE CONCRETO CICLOPEO 1:12 + 30% P.G. m3 3.20 146.34 468.29 3.20 468.29 100.00% 0.00 0.00%
14.08.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
14.08.04.01 ZAPATAS 0.00 0.00
14.08.04.01.0ZAPATAS: ACERO F´Y=4,200 KG/CM2 GRADO 60 kg 58.98 3.93 231.79 58.98 231.79 100.00% 0.00 0.00%
14.08.04.01.0ZAPATAS: CONCRETO F'C=210 KG/CM2 m3 2.40 245.92 590.21 2.40 590.21 100.00% 0.00 0.00%
14.08.04.02 VIGAS DE CIMENTACION 0.00 0.00
14.08.04.02.0VIGAS DE CIMENTACION: ACERO FY = 4200 KG/CM2 GRADO 60 kg 117.29 3.93 460.95 117.29 460.95 100.00% 0.00 0.00%
14.08.04.02.0VIGAS DE CIMENTACION: ENCOFRADO Y DESENCOFRADO NORM m2 6.00 27.86 167.16 6.00 167.16 100.00% 0.00 0.00%
14.08.04.02.0VIGAS DE CIMENTACION: CONCRETO F'C = 210 KG/CM2 m3 0.45 245.92 110.66 0.45 110.66 100.00% 0.00 0.00%
14.08.04.03 PEDESTAL 0.00 0.00
14.08.04.03.0PEDESTAL: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 129.31 3.93 508.19 0.00 0.00 0.00% 129.31 508.19 100.00%
14.08.04.03.0PEDESTAL: ENCOFRADO Y DESNCOFRADO NORMAL m2 3.36 27.86 93.61 0.00 0.00 0.00% 3.36 93.61 100.00%
14.08.04.03.0PEDESTAL: CONCRETO F'C = 210 KG/CM2 m3 0.25 315.52 78.88 0.00 0.00 0.00% 0.25 78.88 100.00%
14.08.05 ESTRUCTURAS METALICAS 0.00 0.00
14.08.05.01 ESTRUCTURA METALICA PARA TANQUE ELEVADO und 1.00 4,496.99 4,496.99 0.00 0.00 0.00% 1.00 4,496.99 100.00%
14.08.06 LOSA DE CONCRETO 0.00 0.00
14.08.06.01 LOSA DE CONCRETO F'c=175 KG/CM2 m3 2.13 295.84 630.14 0.00 0.00 0.00% 2.13 630.14 100.00%
14.08.06.02 ENCOFRADO Y DESENCOFRADO NORMAL DE LOSA m2 4.14 29.68 122.88 0.00 0.00 0.00% 4.14 122.88 100.00%
14.09
INSTALACION DE MALLA RASCHEL
0.00 0.00
14.09.01 TRABAJOS PRELIMINARES 0.00 0.00
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
14.09.01.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 83.17 1.23 102.30 83.17 102.30 100.00% 0.00 0.00%
14.09.02 MOVIMIENTO DE TIERRAS 0.00 0.00
14.09.02.01 EXCAVACION DE ZANJAS PARA ZAPATAS (TERRENO NORMAL) m3 83.17 16.34 1,359.00 83.17 1,359.00 100.00% 0.00 0.00%
14.09.02.02 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINA m3 103.96 8.01 832.72 0.00 0.00 0.00% 103.96 832.72 100.00%
14.09.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00
14.09.03.01 FALSA ZAPATA DE CONCRETO CICLOPEO 1:12 + 30% P.G. m3 9.00 146.34 1,317.06 0.00 0.00 0.00% 9.00 1,317.06 100.00%
14.09.04 OBRAS DE CONCRETO ARMADO 0.00 0.00
14.09.04.01 ZAPATAS 0.00 0.00
14.09.04.01.0ZAPATAS: ACERO F´Y=4,200 KG/CM2 GRADO 60 kg 88.46 3.93 347.65 0.00 0.00 0.00% 88.46 347.65 100.00%
14.09.04.01.0ZAPATAS: CONCRETO F'C=210 KG/CM2 m3 3.00 245.92 737.76 0.00 0.00 0.00% 3.00 737.76 100.00%
14.09.04.02 PEDESTAL 0.00 0.00
14.09.04.02.0PEDESTAL: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 232.70 3.93 914.51 0.00 0.00 0.00% 232.70 914.51 100.00%
14.09.04.02.0PEDESTAL: ENCOFRADO Y DESNCOFRADO NORMAL m2 13.07 27.86 364.13 0.00 0.00 0.00% 13.07 364.13 100.00%
14.09.04.02.0PEDESTAL: CONCRETO F'C = 210 KG/CM2 m3 2.08 315.52 656.28 0.00 0.00 0.00% 2.08 656.28 100.00%
14.09.05 ESTRUCTURA METALICA Y COBERTURA 0.00 0.00
14.09.05.01 COLUMNA DE METALICAS CM-1 DE FºGº 2.5" L = 4.00M S/DISEÑO und 5.00 1,282.97 6,414.85 0.00 0.00 0.00% 5.00 6,414.85 100.00%
14.09.05.02 ARMADURA METALICA 01 DE Fº Gº Ø 2.5" S/DISEÑO und 1.00 1,500.00 1,500.00 0.00 0.00 0.00% 1.00 1,500.00 100.00%
14.09.05.03 INSTALACION DE MALLA RASCHEL INCLUYE ACCESORIOS E INS m 85.00 99.75 8,478.75 0.00 0.00 0.00% 85.00 8,478.75 100.00%
14.09.06 PINTURA 0.00 0.00
14.09.06.01 PINTURA ANTICORROSIVA EN CARPINTERIA METALICA m 351.60 2.99 1,051.28 0.00 0.00 0.00% 351.60 1,051.28 100.00%
14.1
PISOS DE GRASS SINTETICO
0.00 0.00
14.10.01 TRABAJOS PRELIMINARES 0.00 0.00
14.10.01.01 LIMPIEZA DE TERRENO MANUAL m2 183.33 0.82 150.33 0.00 0.00 0.00% 183.33 150.33 100.00%
14.10.01.02 TRAZO NIVELES Y REPLANTEO DURANTE LA CONSTRUCCION m2 183.33 0.99 181.50 0.00 0.00 0.00% 183.33 181.50 100.00%
14.10.02 MOVIMIENTO DE TIERRAS 0.00 0.00
14.10.02.01 EXCAVACION MASIVA CON MAQUINARIA m3 100.83 4.47 450.71 0.00 0.00 0.00% 100.83 450.71 100.00%
14.10.02.02 EXCAVACION EN FORMA MANUAL m3 1.05 14.30 15.02 0.00 0.00 0.00% 1.05 15.02 100.03%
14.10.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 10.19 1.72 17.53 0.00 0.00 0.00% 10.19 17.53 100.02%
14.10.02.04 ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA m3 101.88 6.72 684.63 0.00 0.00 0.00% 101.88 684.63 100.00%
14.10.02.05 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 197.31 2.37 467.62 0.00 0.00 0.00% 197.31 467.62 100.00%
14.10.03 SISTEMA DE DRENAJE 0.00 0.00
14.10.03.01 TUBERIA PVC SAP 3" CRIBADA PARA DRENAJE m 46.61 18.80 876.27 0.00 0.00 0.00% 46.61 876.27 100.00%
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
14.10.04 PISOS DE GRASS SINTETICO 0.00 0.00
14.10.04.01 CAMA DE ARENA PARA TUBERIA m3 1.05 49.42 51.89 0.00 0.00 0.00% 1.05 51.89 100.00%
14.10.04.02 GRAVA SELECCIONADO m3 32.08 29.54 947.64 0.00 0.00 0.00% 32.08 947.64 100.00%
14.10.04.03 CAPA DE HORMIGON m3 14.67 29.08 426.60 0.00 0.00 0.00% 14.67 426.60 100.00%
14.10.04.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO m3 9.17 23.36 214.21 0.00 0.00 0.00% 9.17 214.21 100.00%
14.10.04.05 GRASS SINTETICO INCLUYE INSTALACION m2 183.33 106.77 19,574.14 0.00 0.00 0.00% 183.33 19,574.14 100.00%
15 AREAS VERDES 0.00 0.00
15.01 TRABAJOS PRELIMINARES 0.00 0.00
15.01.01 LIMPIEZA DE TERRENO MANUAL m2 114.04 0.82 93.51 0.00 0.00 0.00% 114.04 93.51 100.00%
15.02 SEMBRADO DE GRASS NATURAL 0.00 0.00
15.02.01 TIERRA DE CHACRA PARA RELLENO EN AREAS VERDES m3 30.01 1.84 55.22 0.00 0.00 0.00% 30.01 55.22 100.00%
15.02.02 PREPARACION DE TERRENO DE CHACRA CON FERTILIZANTE H = m2 114.04 5.43 619.24 0.00 0.00 0.00% 114.04 619.24 100.00%
15.02.03 SEMBRADO DE GRASS (INC. SUMINISTRO Y SELECCION) m2 114.04 8.64 985.31 0.00 0.00 0.00% 114.04 985.31 100.00%
15.02.04 SEMBRADO DE PLANTAS ORNAMENTALES (INC. SUMINISTRO) und 25.00 31.27 781.75 0.00 0.00 0.00% 25.00 781.75 100.00%
15.02.05 SEMBRADO DE ARBOLES Y ARBUSTOS (INC. SUMINISTRO) und 20.00 35.52 710.40 0.00 0.00 0.00% 20.00 710.40 100.00%
15.03 VARIOS 0.00 0.00
15.03.01 LIMPIEZA FINAL DE OBRA me 114.04 0.90 102.64 0.00 0.00 0.00% 114.04 102.64 100.00%
16
INSTALACION DE JUEGOS INFANTILES 0.00 0.00
16.01 ADQUISICION DE JUEGOS DEPORTIVOS INC. INSTALACION 0.00 0.00
16.01.01 ADQUISICION DE MINIARCO Y TABLERO BASQUET und 2.00 1,059.32 2,118.64 1.00 1,059.32 50.00% 1.00 1,059.32 50.00%
16.02 ADQUISICION DE JUEGOS INFANTIL S/DISEÑO INC. INSTALACION 0.00 0.00
16.02.01 MODULO DE JUEGO INFANTIL TIPO I und 1.00 1,500.00 1,500.00 0.50 750.00 50.00% 0.50 750.00 50.00%
16.02.02 MODULO DE JUEGO INFANTIL TIPO II und 1.00 4,500.00 4,500.00 0.50 2,250.00 50.00% 0.50 2,250.00 50.00%
16.02.03 MODULO DE JUEGO INFANTIL TIPO III und 1.00 1,500.00 1,500.00 0.50 750.00 50.00% 0.50 750.00 50.00%
16.02.04 MODULO DE JUEGO INFANTIL TIPO IV und 1.00 2,000.00 2,000.00 0.50 1,000.00 50.00% 0.50 1,000.00 50.00%
COSTO DIRECTO 187,320.09 99,241.10 88,078.99 -
GASTOS GENERALES 11.81389 22,129.80 11,724.24 10,405.56
UTILIDAD 7.0 % 13,112.41 6,946.88 6,165.53
SUB TOTAL 222,562.30 117,912.22 104,650.08
IGV 18.00 % 40,061.21 21,224.20 18,837.01
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
TOTAL 262,623.51 139,136.42 123,487.09
Presupuesto General TOTAL PRESUPUESTO 262,623.51 139,136.42 123,487.09
5 MITIGACION DE IMPACTO AMBIENTAL 5,000.00 - 5,000.00
MITIGACION Y MANEJO DE IMPACTO AMBIENTAL glb 1.00 5,000.00 5,000.00 0.00 0.00 0.00% 1.00 5,000.00 100.00%
COSTO DIRECTO 575,304.22 275,807.19
GASTOS GENERALES 11.81389 67,965.84 - 32,583.57
UTILIDAD 7.0 % 40,271.30 - 19,306.50
SUB TOTAL 683,541.36 0.00 327,697.27
IGV 18.00 % 123,037.44 - 58,985.51
TOTAL 806,578.80 0.00 386,682.78
Presupuesto General TOTAL PRESUPUESTO 806,578.80 0.00 386,682.78
VALORIZACION MENSUAL DE EJECUCION DE OBRA Nº 05
CORRESPONDIENTE AL MES DE ABRIL 2016

OBRA “MEJORAMIENTO DE SERVICIO EDUCATIVO DE NIVEL INICIAL EN LA I.E.I. 215 MARISCAL CASTILLA, DE LA CIUDAD DE AYAVIRI, PROVINCIA DE MELGAR - PUNO”
ENTIDAD EJECUTORA MUNICIPALIDAD PROVINCIAL DE MELGAR
MODALIDAD DE EJECUCION POR CONTRATA
PPTO CONTRATADO 1'186,800.00
EJECUTA : MAVIL CONTRATISTAS GENERALES E.I.R.L.
PRESUPUESTO AVANCE AVANCE
No. DESCRIPCION . ANTERIOR ACTUAL
UND METRADO P. U. PARCIAL METRADO MONTO % METRADO MONTO %
6 COBERTURA DE MOBILIARIO, EQUIPOS Y MATERIAL EDUCATIVO 36,671.50 - 36,671.50
EQUIPAMIENTO glb 1.00 36,671.50 36,671.50 0.00 0.00 0.00% 1.00 36,671.50 100.00%
COSTO DIRECTO 36,671.50 0.00 36,671.50 -
GASTOS GENERALES 11.81389 4,332.33 - 4,332.33
UTILIDAD 7.0 % 2,567.01 - 2,567.01
SUB TOTAL 43,570.84 0.00 43,570.84
IGV 18.00 % 7,842.75 - 7,842.75
TOTAL 51,413.59 0.00 51,413.59
Presupuesto General TOTAL PRESUPUESTO 51,413.59 0.00 51,413.59
7 CAPACITACION 7,500.00 - 7,500.00
CAPACITACION DOCENTE Y ESCUELA DE PADRES glb 1.00 7,500.00 7,500.00 0.00 0.00 0.00% 1.00 7,500.00 100.00%
COSTO DIRECTO 7,500.00 0.00 7,500.00 -
GASTOS GENERALES 11.81389 886.04 - 886.04
UTILIDAD 7.0 % 525.00 - 525.00
SUB TOTAL 8,911.04 0.00 8,911.04
IGV 18.00 % 1,603.99 - 1,603.99
TOTAL 10,515.03 0.00 10,515.03
Presupuesto General TOTAL PRESUPUESTO 10,515.03 838,978.90 10,515.03
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %

357,316.05 -

140,737.20 0.00

111,961.77 0.00

187,320.09 0.00

5,000.00 0.00

36,671.50 0.00

7,500.00 0.00

846,506.62 0.00
100,005.41 -
59,255.46 -
1,005,767.49 0.00
1,005,762.71 0.00
181,037.29 -
1,186,800.00 0.00
1,186,800.00 0.00

100.00%

357,316.05 -

146.00 1,938.88 100.00% 0.00 0.00 0.00%


5.00 1,200.00 100.00% 0.00 0.00 0.00%
1.00 614.37 100.00% 0.00 0.00 0.00%
5.00 500.00 100.00% 0.00 0.00 0.00%
5.00 1,250.00 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
1.00 760.75 100.00% 0.00 0.00 0.00%
1.00 600.00 100.00% 0.00 0.00 0.00%
1.00 888.38 100.00% 0.00 0.00 0.00%
1.00 15,000.00 100.00% 0.00 0.00 0.00%
0.00
218.34 827.51 100.00% 0.00 0.00 0.00%
176.13 457.94 100.00% 0.00 0.00 0.00%
232.27 3,739.55 100.00% 0.00 0.00 0.00%
35.63 2,708.24 100.00% 0.00 0.00 0.00%
304.26 10,363.10 100.00% 0.00 0.00 0.00%
686.58 4,613.82 100.00% 0.00 0.00 0.00%
346.46 284.10 100.00% 0.00 0.00 0.00%
346.46 426.15 100.00% 0.00 0.00 0.00%
346.46 343.00 100.00% 0.00 0.00 0.00%
0.00
84.32 376.91 100.00% 0.00 0.00 0.00%
70.54 1,008.72 100.00% 0.00 0.00 0.00%
278.04 692.32 100.00% 0.00 0.00 0.00%
132.07 3,760.03 100.00% 0.00 0.00 0.00%
193.58 1,550.58 100.00% 0.00 0.00 0.00%
0.00
56.43 7,789.03 100.00% 0.00 0.00 0.00%
0.00
0.00
3,024.63 12,945.42 100.00% 0.00 0.00 0.00%
154.56 4,306.04 100.00% 0.00 0.00 0.00%
16.70 5,142.43 100.00% 0.00 0.00 0.00%
0.00
1,890.38 8,090.83 100.00% 0.00 0.00 0.00%
125.42 3,584.50 100.00% 0.00 0.00 0.00%
11.82 3,418.34 100.00% 0.00 0.00 0.00%
0.00
1,949.81 8,345.19 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
148.01 4,230.13 100.00% 0.00 0.00 0.00%
14.51 4,196.29 100.00% 0.00 0.00 0.00%
0.00
12.00 14,005.20 100.00% 0.00 0.00 0.00%
3.00 3,559.65 100.00% 0.00 0.00 0.00%
3.00 2,769.72 100.00% 0.00 0.00 0.00%
83.43 2,895.86 100.00% 0.00 0.00 0.00%
428.97 15,696.01 100.00% 0.00 0.00 0.00%
396.18 28,037.66 100.00% 0.00 0.00 0.00%
68.85 3,167.79 100.00% 0.00 0.00 0.00%
6.00 122.46 100.00% 0.00 0.00 0.00%
54.00 1,102.14 100.00% 0.00 0.00 0.00%
18.00 148.14 100.00% 0.00 0.00 0.00%
18.00 148.14 100.00% 0.00 0.00 0.00%
0.00
0.00
118.68 15,723.91 100.00% 0.00 0.00 0.00%
95.05 8,579.21 100.00% 0.00 0.00 0.00%
0.00
32.78 436.30 100.00% 0.00 0.00 0.00%
272.03 3,903.63 100.00% 0.00 0.00 0.00%
131.20 2,223.84 100.00% 0.00 0.00 0.00%
153.02 3,499.57 100.00% 0.00 0.00 0.00%
148.01 4,045.11 100.00% 0.00 0.00 0.00%
284.16 1,829.99 100.00% 0.00 0.00 0.00%
409.01 1,795.55 100.00% 0.00 0.00 0.00%
49.20 693.23 100.00% 0.00 0.00 0.00%
0.00
115.92 6,468.34 100.00% 0.00 0.00 0.00%
225.19 11,896.79 100.00% 0.00 0.00 0.00%
0.00
0.00
223.77 8,371.24 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
179.45 11,655.28 100.00% 0.00 0.00 0.00%
13.02 328.10 100.00% 0.00 0.00 0.00%
28.55 1,377.82 100.00% 0.00 0.00 0.00%
0.00
42.65 993.75 100.00% 0.00 0.00 0.00%
44.41 1,307.43 100.00% 0.00 0.00 0.00%
113.72 6,802.73 100.00% 0.00 0.00 0.00%
151.61 944.53 100.00% 0.00 0.00 0.00%
0.00
32.57 1,624.92 100.00% 0.00 0.00 0.00%
16.40 119.23 100.00% 0.00 0.00 0.00%
96.05 616.64 100.00% 0.00 0.00 0.00%
37.83 245.14 100.00% 0.00 0.00 0.00%
0.00
31.50 11,386.31 100.00% 0.00 0.00 0.00%
3.00 2,262.39 100.00% 0.00 0.00 0.00%
7.88 1,125.74 100.00% 0.00 0.00 0.00%
0.00
60.00 297.60 100.00% 0.00 0.00 0.00%
15.00 1,414.65 100.00% 0.00 0.00 0.00%
0.00
909.67 9,815.34 100.00% 0.00 0.00 0.00%
57.64 621.94 100.00% 0.00 0.00 0.00%
0.00
575.77 3,080.37 100.00% 0.00 0.00 0.00%
96.05 788.57 100.00% 0.00 0.00 0.00%
207.71 1,111.25 100.00% 0.00 0.00 0.00%
0.00
119.20 5,317.51 100.00% 0.00 0.00 0.00%
92.95 3,030.17 100.00% 0.00 0.00 0.00%
12.00 897.84 100.00% 0.00 0.00 0.00%
0.00
30.00 900.00 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
346.46 311.81 100.00% 0.00 0.00 0.00%
0.00
0.00
4.00 1,319.60 100.00% 0.00 0.00 0.00%
6.00 960.24 100.00% 0.00 0.00 0.00%
4.00 521.52 100.00% 0.00 0.00 0.00%
1.00 2,016.46 100.00% 0.00 0.00 0.00%
0.00
17.00 559.64 100.00% 0.00 0.00 0.00%
6.00 284.46 100.00% 0.00 0.00 0.00%
29.20 382.23 100.00% 0.00 0.00 0.00%
65.00 965.25 100.00% 0.00 0.00 0.00%
5.00 138.45 100.00% 0.00 0.00 0.00%
3.00 70.65 100.00% 0.00 0.00 0.00%
3.00 95.91 100.00% 0.00 0.00 0.00%
3.00 359.73 100.00% 0.00 0.00 0.00%
18.00 83.70 100.00% 0.00 0.00 0.00%
14.00 118.58 100.00% 0.00 0.00 0.00%
6.00 50.82 100.00% 0.00 0.00 0.00%
6.00 28.20 100.00% 0.00 0.00 0.00%
15.00 103.80 100.00% 0.00 0.00 0.00%
4.00 24.72 100.00% 0.00 0.00 0.00%
4.00 24.72 100.00% 0.00 0.00 0.00%
0.00
20.00 758.00 100.00% 0.00 0.00 0.00%
29.25 241.61 100.00% 0.00 0.00 0.00%
12.45 92.01 100.00% 0.00 0.00 0.00%
89.68 740.76 100.00% 0.00 0.00 0.00%
3.00 184.38 100.00% 0.00 0.00 0.00%
3.00 47.04 100.00% 0.00 0.00 0.00%
16.00 39.84 100.00% 0.00 0.00 0.00%
10.00 39.20 100.00% 0.00 0.00 0.00%
2.00 4.98 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
10.00 29.50 100.00% 0.00 0.00 0.00%
11.00 54.56 100.00% 0.00 0.00 0.00%
0.00
0.00
60.00 1,999.80 100.00% 0.00 0.00 0.00%
12.00 515.04 100.00% 0.00 0.00 0.00%
3.00 111.93 100.00% 0.00 0.00 0.00%
3.00 48.18 100.00% 0.00 0.00 0.00%
24.00 966.24 100.00% 0.00 0.00 0.00%
0.00
299.42 2,332.48 100.00% 0.00 0.00 0.00%
72.00 562.32 100.00% 0.00 0.00 0.00%
0.00
418.49 1,640.48 100.00% 0.00 0.00 0.00%
349.44 1,534.04 100.00% 0.00 0.00 0.00%
230.40 1,057.54 100.00% 0.00 0.00 0.00%
0.00
1.00 270.39 100.00% 0.00 0.00 0.00%
1.00 270.39 100.00% 0.00 0.00 0.00%
1.00 370.39 100.00% 0.00 0.00 0.00%
0.00
4.00 163.04 100.00% 0.00 0.00 0.00%
5.00 228.80 100.00% 0.00 0.00 0.00%
3.00 152.28 100.00% 0.00 0.00 0.00%
3.00 167.28 100.00% 0.00 0.00 0.00%
0.00
12.00 1,940.88 100.00% 0.00 0.00 0.00%
36.00 5,812.56 100.00% 0.00 0.00 0.00%
12.00 1,382.40 100.00% 0.00 0.00 0.00%
- 357,316.05 - - 0.00
42,212.95 -
25,012.12 -
424,541.12 0.00
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
76,417.40 -
500,958.52 0.00
500,958.52 0.00

140,737.20 -

153.56 125.92 100.00% 0.00 0.00 0.00%


153.56 188.88 100.00% 0.00 0.00 0.00%
153.56 152.02 100.00% 0.00 0.00 0.00%
0.00
38.39 171.60 100.00% 0.00 0.00 0.00%
32.01 457.74 100.00% 0.00 0.00 0.00%
126.29 314.46 100.00% 0.00 0.00 0.00%
132.07 3,760.03 100.00% 0.00 0.00 0.00%
87.99 704.80 100.00% 0.00 0.00 0.00%
0.00
25.60 3,533.57 100.00% 0.00 0.00 0.00%
0.00
0.00
1,657.80 7,095.38 100.00% 0.00 0.00 0.00%
84.18 2,345.25 100.00% 0.00 0.00 0.00%
9.23 2,842.19 100.00% 0.00 0.00 0.00%
0.00
872.18 3,732.93 100.00% 0.00 0.00 0.00%
57.50 1,643.35 100.00% 0.00 0.00 0.00%
6.11 1,767.01 100.00% 0.00 0.00 0.00%
0.00
736.18 3,150.85 100.00% 0.00 0.00 0.00%
53.15 1,519.03 100.00% 0.00 0.00 0.00%
4.84 1,399.73 100.00% 0.00 0.00 0.00%
0.00
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
4.00 4,795.24 100.00% 0.00 0.00 0.00%
1.00 812.17 100.00% 0.00 0.00 0.00%
2.00 1,832.88 100.00% 0.00 0.00 0.00%
2.00 1,622.56 100.00% 0.00 0.00 0.00%
201.06 7,356.79 100.00% 0.00 0.00 0.00%
25.60 925.95 100.00% 0.00 0.00 0.00%
16.40 702.08 100.00% 0.00 0.00 0.00%
173.10 12,250.29 100.00% 0.00 0.00 0.00%
25.94 1,193.50 100.00% 0.00 0.00 0.00%
16.00 326.56 100.00% 0.00 0.00 0.00%
28.00 571.48 100.00% 0.00 0.00 0.00%
11.00 90.53 100.00% 0.00 0.00 0.00%
11.00 90.53 100.00% 0.00 0.00 0.00%
0.00
0.00
85.06 11,269.60 100.00% 0.00 0.00 0.00%
33.88 3,058.01 100.00% 0.00 0.00 0.00%
0.00
25.09 333.95 100.00% 0.00 0.00 0.00%
143.75 2,062.81 100.00% 0.00 0.00 0.00%
70.81 1,200.23 100.00% 0.00 0.00 0.00%
82.59 1,888.83 100.00% 0.00 0.00 0.00%
53.15 1,452.59 100.00% 0.00 0.00 0.00%
117.84 758.89 100.00% 0.00 0.00 0.00%
168.85 741.25 100.00% 0.00 0.00 0.00%
35.60 501.60 100.00% 0.00 0.00 0.00%
0.00
46.49 2,594.14 100.00% 0.00 0.00 0.00%
100.57 5,313.11 100.00% 0.00 0.00 0.00%
0.00
0.00
101.03 3,779.53 100.00% 0.00 0.00 0.00%
78.12 5,073.89 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
22.91 1,105.64 100.00% 0.00 0.00 0.00%
0.00
14.21 331.09 100.00% 0.00 0.00 0.00%
10.30 303.23 100.00% 0.00 0.00 0.00%
37.64 2,251.62 100.00% 0.00 0.00 0.00%
40.30 251.07 100.00% 0.00 0.00 0.00%
0.00
25.27 1,260.72 100.00% 0.00 0.00 0.00%
15.80 114.87 100.00% 0.00 0.00 0.00%
45.25 290.51 100.00% 0.00 0.00 0.00%
15.46 100.18 100.00% 0.00 0.00 0.00%
0.00
15.54 5,617.24 100.00% 0.00 0.00 0.00%
0.00
32.00 158.72 100.00% 0.00 0.00 0.00%
8.00 754.48 100.00% 0.00 0.00 0.00%
0.00
276.48 2,983.22 100.00% 0.00 0.00 0.00%
3.23 34.85 100.00% 0.00 0.00 0.00%
0.00
271.03 1,450.01 100.00% 0.00 0.00 0.00%
45.25 371.50 100.00% 0.00 0.00 0.00%
112.11 599.79 100.00% 0.00 0.00 0.00%
0.00
43.55 1,942.77 100.00% 0.00 0.00 0.00%
18.15 591.69 100.00% 0.00 0.00 0.00%
2.00 149.64 100.00% 0.00 0.00 0.00%
0.00
18.00 540.00 100.00% 0.00 0.00 0.00%
153.56 138.20 100.00% 0.00 0.00 0.00%
0.00
0.00
1.00 222.72 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
1.00 171.86 100.00% 0.00 0.00 0.00%
0.00
7.00 230.44 100.00% 0.00 0.00 0.00%
2.00 94.82 100.00% 0.00 0.00 0.00%
38.05 498.07 100.00% 0.00 0.00 0.00%
18.51 274.87 100.00% 0.00 0.00 0.00%
1.00 27.69 100.00% 0.00 0.00 0.00%
3.00 70.65 100.00% 0.00 0.00 0.00%
2.00 47.40 100.00% 0.00 0.00 0.00%
3.00 359.73 100.00% 0.00 0.00 0.00%
13.00 60.45 100.00% 0.00 0.00 0.00%
1.00 8.47 100.00% 0.00 0.00 0.00%
2.00 16.94 100.00% 0.00 0.00 0.00%
2.00 12.36 100.00% 0.00 0.00 0.00%
2.00 12.36 100.00% 0.00 0.00 0.00%
0.00
7.00 265.30 100.00% 0.00 0.00 0.00%
6.87 56.75 100.00% 0.00 0.00 0.00%
44.96 332.25 100.00% 0.00 0.00 0.00%
2.00 122.92 100.00% 0.00 0.00 0.00%
2.00 31.36 100.00% 0.00 0.00 0.00%
4.00 9.96 100.00% 0.00 0.00 0.00%
5.00 19.60 100.00% 0.00 0.00 0.00%
2.00 4.98 100.00% 0.00 0.00 0.00%
0.00
0.00
24.00 799.92 100.00% 0.00 0.00 0.00%
9.00 386.28 100.00% 0.00 0.00 0.00%
2.00 124.78 100.00% 0.00 0.00 0.00%
2.00 32.12 100.00% 0.00 0.00 0.00%
12.00 483.12 100.00% 0.00 0.00 0.00%
0.00
136.31 1,061.85 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
47.00 367.07 100.00% 0.00 0.00 0.00%
0.00
190.66 747.39 100.00% 0.00 0.00 0.00%
158.85 697.35 100.00% 0.00 0.00 0.00%
28.80 132.19 100.00% 0.00 0.00 0.00%
0.00
1.00 270.39 100.00% 0.00 0.00 0.00%
0.00
1.00 40.76 100.00% 0.00 0.00 0.00%
2.00 91.52 100.00% 0.00 0.00 0.00%
1.00 50.76 100.00% 0.00 0.00 0.00%
1.00 55.76 100.00% 0.00 0.00 0.00%
0.00
6.00 970.44 100.00% 0.00 0.00 0.00%
12.00 1,937.52 100.00% 0.00 0.00 0.00%
6.00 691.20 100.00% 0.00 0.00 0.00%
- 140,737.20 - - 0.00
16,626.55 -
9,851.60 -
167,215.35 0.00
30,098.76 -
197,314.11 0.00
197,314.11 0.00

111,961.77 -

93.28 76.49 100.00% 0.00 0.00 0.00%


93.28 114.73 100.00% 0.00 0.00 0.00%
93.28 92.35 100.00% 0.00 0.00 0.00%
0.00
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
23.32 104.24 100.00% 0.00 0.00 0.00%
29.16 416.99 100.00% 0.00 0.00 0.00%
66.14 164.69 100.00% 0.00 0.00 0.00%
33.07 941.50 100.00% 0.00 0.00 0.00%
65.60 525.46 100.00% 0.00 0.00 0.00%
0.00
23.33 3,220.24 100.00% 0.00 0.00 0.00%
0.00
0.00
1,725.12 7,383.51 100.00% 0.00 0.00 0.00%
89.78 2,501.27 100.00% 0.00 0.00 0.00%
8.90 2,740.58 100.00% 0.00 0.00 0.00%
0.00
736.03 3,150.21 100.00% 0.00 0.00 0.00%
59.38 1,697.08 100.00% 0.00 0.00 0.00%
5.02 1,451.78 100.00% 0.00 0.00 0.00%
0.00
756.05 3,235.89 100.00% 0.00 0.00 0.00%
54.92 1,569.61 100.00% 0.00 0.00 0.00%
7.39 2,137.19 100.00% 0.00 0.00 0.00%
0.00
1.00 1,167.10 100.00% 0.00 0.00 0.00%
3.00 2,749.32 100.00% 0.00 0.00 0.00%
5.00 4,582.20 100.00% 0.00 0.00 0.00%
14.75 511.97 100.00% 0.00 0.00 0.00%
98.08 3,588.75 100.00% 0.00 0.00 0.00%
36.10 1,305.74 100.00% 0.00 0.00 0.00%
15.91 681.11 100.00% 0.00 0.00 0.00%
117.34 8,304.15 100.00% 0.00 0.00 0.00%
27.95 1,285.98 100.00% 0.00 0.00 0.00%
15.00 306.15 100.00% 0.00 0.00 0.00%
14.00 285.74 100.00% 0.00 0.00 0.00%
0.00
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
0.00
48.77 6,461.54 100.00% 0.00 0.00 0.00%
51.37 4,636.66 100.00% 0.00 0.00 0.00%
0.00
9.44 125.65 100.00% 0.00 0.00 0.00%
130.17 1,867.94 100.00% 0.00 0.00 0.00%
41.65 705.97 100.00% 0.00 0.00 0.00%
86.83 1,985.80 100.00% 0.00 0.00 0.00%
54.92 1,500.96 100.00% 0.00 0.00 0.00%
75.48 486.09 100.00% 0.00 0.00 0.00%
79.60 349.44 100.00% 0.00 0.00 0.00%
12.59 892.00 100.00% 0.00 0.00 0.00%
16.00 225.44 100.00% 0.00 0.00 0.00%
0.00
50.76 2,832.41 100.00% 0.00 0.00 0.00%
51.58 2,724.97 100.00% 0.00 0.00 0.00%
0.00
0.00
51.35 1,921.00 100.00% 0.00 0.00 0.00%
20.96 1,361.35 100.00% 0.00 0.00 0.00%
23.09 1,114.32 100.00% 0.00 0.00 0.00%
7.30 183.96 100.00% 0.00 0.00 0.00%
0.00
8.01 186.63 100.00% 0.00 0.00 0.00%
7.60 223.74 100.00% 0.00 0.00 0.00%
21.37 1,278.35 100.00% 0.00 0.00 0.00%
25.85 161.05 100.00% 0.00 0.00 0.00%
0.00
9.44 470.96 100.00% 0.00 0.00 0.00%
26.27 198.08 100.00% 0.00 0.00 0.00%
25.35 162.75 100.00% 0.00 0.00 0.00%
7.43 48.15 100.00% 0.00 0.00 0.00%
2.25 190.78 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
0.00
11.76 4,250.89 100.00% 0.00 0.00 0.00%
0.00
24.00 119.04 100.00% 0.00 0.00 0.00%
6.00 565.86 100.00% 0.00 0.00 0.00%
0.00
175.22 1,890.62 100.00% 0.00 0.00 0.00%
6.46 69.70 100.00% 0.00 0.00 0.00%
0.00
248.97 1,331.99 100.00% 0.00 0.00 0.00%
25.35 208.12 100.00% 0.00 0.00 0.00%
85.06 455.07 100.00% 0.00 0.00 0.00%
0.00
42.97 1,916.89 100.00% 0.00 0.00 0.00%
33.90 1,105.14 100.00% 0.00 0.00 0.00%
4.00 299.28 100.00% 0.00 0.00 0.00%
0.00
10.00 300.00 100.00% 0.00 0.00 0.00%
93.28 83.95 100.00% 0.00 0.00 0.00%
0.00
0.00
1.00 222.72 100.00% 0.00 0.00 0.00%
1.00 171.86 100.00% 0.00 0.00 0.00%
1.00 93.22 100.00% 0.00 0.00 0.00%
0.00
5.00 164.60 100.00% 0.00 0.00 0.00%
1.00 47.41 100.00% 0.00 0.00 0.00%
6.35 83.12 100.00% 0.00 0.00 0.00%
29.15 432.88 100.00% 0.00 0.00 0.00%
1.00 27.69 100.00% 0.00 0.00 0.00%
1.00 23.55 100.00% 0.00 0.00 0.00%
1.00 23.70 100.00% 0.00 0.00 0.00%
1.00 119.91 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
5.00 23.25 100.00% 0.00 0.00 0.00%
1.00 8.47 100.00% 0.00 0.00 0.00%
2.00 16.94 100.00% 0.00 0.00 0.00%
1.00 6.92 100.00% 0.00 0.00 0.00%
3.00 18.54 100.00% 0.00 0.00 0.00%
3.00 18.54 100.00% 0.00 0.00 0.00%
0.00
5.00 189.50 100.00% 0.00 0.00 0.00%
4.80 39.65 100.01% 0.00 0.00 0.00%
3.50 25.87 100.02% 0.00 0.00 0.00%
8.45 69.80 100.00% 0.00 0.00 0.00%
1.00 61.46 100.00% 0.00 0.00 0.00%
1.00 15.68 100.00% 0.00 0.00 0.00%
4.00 9.96 100.00% 0.00 0.00 0.00%
7.00 27.44 100.00% 0.00 0.00 0.00%
2.00 4.98 100.00% 0.00 0.00 0.00%
0.00
0.00
16.00 533.28 100.00% 0.00 0.00 0.00%
7.00 300.44 100.00% 0.00 0.00 0.00%
1.00 37.31 100.00% 0.00 0.00 0.00%
1.00 16.06 100.00% 0.00 0.00 0.00%
9.00 362.34 100.00% 0.00 0.00 0.00%
0.00
93.28 726.65 100.00% 0.00 0.00 0.00%
33.50 261.64 100.00% 0.00 0.00 0.00%
0.00
135.10 529.59 100.00% 0.00 0.00 0.00%
102.00 447.78 100.00% 0.00 0.00 0.00%
150.40 690.34 100.00% 0.00 0.00 0.00%
39.90 363.89 100.00% 0.00 0.00 0.00%
18.00 174.06 100.00% 0.00 0.00 0.00%
0.00
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
1.00 440.78 100.00% 0.00 0.00 0.00%
1.00 270.39 100.00% 0.00 0.00 0.00%
1.00 546.60 100.00% 0.00 0.00 0.00%
0.00
2.00 81.52 100.00% 0.00 0.00 0.00%
1.00 45.76 100.00% 0.00 0.00 0.00%
5.00 253.80 100.00% 0.00 0.00 0.00%
1.00 40.76 100.00% 0.00 0.00 0.00%
1.00 55.76 100.00% 0.00 0.00 0.00%
0.00
1.00 439.14 100.00% 0.00 0.00 0.00%
0.00
11.00 1,779.14 100.00% 0.00 0.00 0.00%
3.00 345.60 100.00% 0.00 0.00 0.00%
2.00 86.92 100.00% 0.00 0.00 0.00%
- 111,961.77 - - 0.00
13,227.05 -
7,837.32 -
133,026.14 0.00
23,944.71 -
156,970.85 0.00
156,970.85 0.00

187,320.09 -

312.18 255.99 100.00% 0.00 0.00 0.00%


312.18 383.98 100.00% 0.00 0.00 0.00%
312.18 309.06 100.00% 0.00 0.00 0.00%
0.00
63.47 907.62 100.00% 0.00 0.00 0.00%
5.95 169.40 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
79.34 635.51 100.00% 0.00 0.00 0.00%
0.00
50.78 7,009.16 100.00% 0.00 0.00 0.00%
10.35 2,263.13 100.00% 0.00 0.00 0.00%
128.08 3,660.53 100.00% 0.00 0.00 0.00%
0.00
0.00
38.60 165.21 100.00% 0.00 0.00 0.00%
2.41 68.88 100.00% 0.00 0.00 0.00%
0.18 52.06 100.01% 0.00 0.00 0.00%
0.00
1,237.07 5,294.66 100.00% 0.00 0.00 0.00%
140.52 3,914.89 100.00% 0.00 0.00 0.00%
11.49 3,538.12 100.00% 0.00 0.00 0.00%
0.00
347.93 1,489.14 100.00% 0.00 0.00 0.00%
43.00 1,228.94 100.00% 0.00 0.00 0.00%
3.25 939.90 100.00% 0.00 0.00 0.00%
0.00
24.99 2,255.60 100.00% 0.00 0.00 0.00%
227.70 20,552.20 100.00% 0.00 0.00 0.00%
18.26 3,040.47 100.00% 0.00 0.00 0.00%
0.00
569.16 5,765.59 100.00% 0.00 0.00 0.00%
140.52 3,213.69 100.00% 0.00 0.00 0.00%
43.00 1,175.19 100.00% 0.00 0.00 0.00%
440.23 1,932.61 100.00% 0.00 0.00 0.00%
36.00 507.24 100.00% 0.00 0.00 0.00%
0.00
0.00
159.20 130.54 100.00% 0.00 0.00 0.00%
159.20 195.82 100.00% 0.00 0.00 0.00%
159.20 157.61 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
0.00
159.20 273.82 100.00% 0.00 0.00 0.00%
7.96 154.74 100.00% 0.00 0.00 0.00%
15.92 371.89 100.00% 0.00 0.00 0.00%
0.00
149.30 8,931.13 100.00% 0.00 0.00 0.00%
35.74 1,052.19 100.00% 0.00 0.00 0.00%
49.57 330.63 100.00% 0.00 0.00 0.00%
7.87 451.97 100.00% 0.00 0.00 0.00%
7.14 237.12 100.00% 0.00 0.00 0.00%
0.00
1.00 4,000.00 100.00% 0.00 0.00 0.00%
1.00 1,500.00 100.00% 0.00 0.00 0.00%
0.00
2.00 137.26 100.00% 0.00 0.00 0.00%
0.00
774.69 4,144.59 100.00% 0.00 0.00 0.00%

0.00
0.00
262.97 215.64 100.00% 0.00 0.00 0.00%
262.97 323.45 100.00% 0.00 0.00 0.00%
262.97 260.34 100.00% 0.00 0.00 0.00%
0.00
78.89 352.64 100.00% 0.00 0.00 0.00%
3.35 72.19 100.00% 0.00 0.00 0.00%
69.80 1,630.53 100.00% 0.00 0.00 0.00%
15.56 124.64 100.00% 0.00 0.00 0.00%
0.00
3.86 802.38 100.00% 0.00 0.00 0.00%
42.06 1,026.26 100.00% 0.00 0.00 0.00%
0.00
28.57 847.96 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
26.30 5,163.74 100.00% 0.00 0.00 0.00%
142.32 949.27 100.00% 0.00 0.00 0.00%
0.00
80.90 235.42 100.00% 0.00 0.00 0.00%
0.00
28.55 35.12 100.01% 0.00 0.00 0.00%
9.99 215.28 100.00% 0.00 0.00 0.00%
9.99 194.21 100.00% 0.00 0.00 0.00%
6.98 1,450.93 100.00% 0.00 0.00 0.00%
44.42 1,813.22 100.00% 0.00 0.00 0.00%
17.77 1,316.05 100.00% 0.00 0.00 0.00%

0.00
0.00
23.33 19.13 100.00% 0.00 0.00 0.00%
23.33 28.70 100.01% 0.00 0.00 0.00%
0.00
9.06 195.24 100.00% 0.00 0.00 0.00%
9.06 176.13 100.00% 0.00 0.00 0.00%
0.00
9.06 1,676.73 100.00% 0.00 0.00 0.00%
0.00
2.63 834.42 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
30.48 849.17 100.00% 0.00 0.00 0.00%
137.60 540.77 100.00% 0.00 0.00 0.00%
2.00 519.82 100.00% 0.00 0.00 0.00%
4.00 1,271.12 100.00% 0.00 0.00 0.00%

0.00
0.00
9.61 11.82 100.00% 0.00 0.00 0.00%
0.00
7.60 124.18 100.00% 0.00 0.00 0.00%
9.50 184.68 100.00% 0.00 0.00 0.00%
0.00
3.20 468.29 100.00% 0.00 0.00 0.00%
0.00
0.00
58.98 231.79 100.00% 0.00 0.00 0.00%
2.40 590.21 100.00% 0.00 0.00 0.00%
0.00
117.29 460.95 100.00% 0.00 0.00 0.00%
6.00 167.16 100.00% 0.00 0.00 0.00%
0.45 110.66 100.00% 0.00 0.00 0.00%
0.00
129.31 508.19 100.00% 0.00 0.00 0.00%
3.36 93.61 100.00% 0.00 0.00 0.00%
0.25 78.88 100.00% 0.00 0.00 0.00%
0.00
1.00 4,496.99 100.00% 0.00 0.00 0.00%
0.00
2.13 630.14 100.00% 0.00 0.00 0.00%
4.14 122.88 100.00% 0.00 0.00 0.00%

0.00
0.00
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
83.17 102.30 100.00% 0.00 0.00 0.00%
0.00
83.17 1,359.00 100.00% 0.00 0.00 0.00%
103.96 832.72 100.00% 0.00 0.00 0.00%
0.00
9.00 1,317.06 100.00% 0.00 0.00 0.00%
0.00
0.00
88.46 347.65 100.00% 0.00 0.00 0.00%
3.00 737.76 100.00% 0.00 0.00 0.00%
0.00
232.70 914.51 100.00% 0.00 0.00 0.00%
13.07 364.13 100.00% 0.00 0.00 0.00%
2.08 656.28 100.00% 0.00 0.00 0.00%
0.00
5.00 6,414.85 100.00% 0.00 0.00 0.00%
1.00 1,500.00 100.00% 0.00 0.00 0.00%
85.00 8,478.75 100.00% 0.00 0.00 0.00%
0.00
351.60 1,051.28 100.00% 0.00 0.00 0.00%

0.00
0.00
183.33 150.33 100.00% 0.00 0.00 0.00%
183.33 181.50 100.00% 0.00 0.00 0.00%
0.00
100.83 450.71 100.00% 0.00 0.00 0.00%
1.05 15.02 100.03% 0.00 0.00 0.00%
10.19 17.53 100.02% 0.00 0.00 0.00%
101.88 684.63 100.00% 0.00 0.00 0.00%
197.31 467.62 100.00% 0.00 0.00 0.00%
0.00
46.61 876.27 100.00% 0.00 0.00 0.00%
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
0.00
1.05 51.89 100.00% 0.00 0.00 0.00%
32.08 947.64 100.00% 0.00 0.00 0.00%
14.67 426.60 100.00% 0.00 0.00 0.00%
9.17 214.21 100.00% 0.00 0.00 0.00%
183.33 19,574.14 100.00% 0.00 0.00 0.00%
0.00
0.00
114.04 93.51 100.00% 0.00 0.00 0.00%
0.00
30.01 55.22 100.00% 0.00 0.00 0.00%
114.04 619.24 100.00% 0.00 0.00 0.00%
114.04 985.31 100.00% 0.00 0.00 0.00%
25.00 781.75 100.00% 0.00 0.00 0.00%
20.00 710.40 100.00% 0.00 0.00 0.00%
0.00
114.04 102.64 100.00% 0.00 0.00 0.00%

0.00

0.00
2.00 2,118.64 100.00% 0.00 0.00 0.00%

0.00
1.00 1,500.00 100.00% 0.00 0.00 0.00%
1.00 4,500.00 100.00% 0.00 0.00 0.00%
1.00 1,500.00 100.00% 0.00 0.00 0.00%
1.00 2,000.00 100.00% 0.00 0.00 0.00%
- 187,320.09 - - 0.00
22,129.80 -
13,112.41 -
222,562.30 0.00
40,061.21 -
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %
262,623.51 0.00
262,623.51 0.00

5,000.00 -
1.00 5,000.00 100.00% 0.00 0.00 0.00%
575,304.22 -4.01
67,965.84 -0.47
40,271.30 -0.28
683,541.36 -4.76
123,037.45 -0.86
806,578.81 -5.62
806,578.81 -5.62
DE EJECUCION DE OBRA Nº 05
TE AL MES DE ABRIL 2016

Residente Ing Lucio C. Arpi Inofuente


Inspector Ing Justo Porto Huasco

AVANCE SALDO
ACUMULADO
METRADO MONTO % METRADO MONTO %

36,671.50 -
1.00 36,671.50 100.00% 0.00 0.00 0.00%
- 36,671.50 - - 0.00
4,332.33 -
2,567.01 -
43,570.84 0.00
7,842.75 -
51,413.59 0.00
51,413.59 0.00
7,500.00 -
1.00 7,500.00 100.00% 0.00 0.00 0.00%
- 7,500.00 - - 0.00
886.04 -
525.00 -
8,911.04 0.00
1,603.99 -
10,515.03 0.00
10,515.03 0.00
PLANILLA DE METRADOS

PROYECTO: METRADO MURO ACHAYA

ITEM DESCRIPCION Und.

LOCAL
MEDIDAS

ITEM DESCRIPCION PARCIAL TOTAL UND.
VECES
LARGO ANCHO ALTURA

2.09 PINTURA
02.13.01 PINTURA LATEX EN MUROS INTERIORES (Incluye Columnas y Derrames)
COLOR VERDE MUROS Y COLUMNAS LONGITUDINALES 2 20.00 2.7 108.00 108.00 m2
COLOR VERDE MUROS Y COLUMNAS TRANSVERSALES 8 6.00 2.7 129.60 129.60 m2

02.13.02 PINTURA EN MUROS EXTERIORES (Incluye Columnas y Derrames)


COLOR CELESTE PARA MUROS POR PAÑO 14 AREA 6.96 97.44 97.44 m2
COLOR AZUL PARA COLUMNAS 14 0.50 2.7 18.90 18.90 m2

02.13.05 PINTURA PARA CIELO RASO INTERIOR


COLOR BLANCO 1 20.00 7 140.00 140.00 m2

0 PINTURA PARA CIELO RASO EXTERIOR


COLOR BLANCO 1 20.00 0.9 18.00 18.00 m2

03.01 PINTURA PARA VOLADO PARAPETO


COLOR CELESTE 1 20.00 0.6 12.00 12.00 m2

REND. X m2 dos manos REDONDEO


TOTAL PINTURA COLOR VERDE 237.60 6.79 13.58 14 GLN
TOTAL PINTURA CELESTE 109.44 3.13 6.25 7 GLN
TOTAL PINTURA BLANCO 158.00 4.51 9.03 10 GLN
TOTAL PINTURA AZUL 18.90 0.54 1.08 1 GLN
METRADO DE ACERO
METRADO MURO ACHAYA
1.- NOMBRE DEL PROYECTO
2.- COMPONENTE LOCAL COMUNAL MULTIUSOS
LOCALIDAD : COLLANA
DISTRITO : DESAGUADERO
PROVINCIA : CHUCUITO
REGION : PUNO

DISEÑO DE ACERO DIAM.


# de Elem.
# Piezas Long. 1/4 3/8 1/2 5/8 3/4
Iguales por Elem.por Pieza 0.25 0.56 0.99 1.55 2.24
1.0 LOCAL COMUNAL
1.1 ZAPATAS
Z-1

1.15 1/2 18.00 5.00 1.15 0.00 0.00 103.50 0.00 0.00

0.95 1/2 18.00 6.00 0.95 0.00 0.00 102.60 0.00 0.00

1.2 COLUMNAS
C-1

4.75 1/2 14.00 6.00 4.95 0.00 0.00 415.80 0.00 0.00

0.20
EST 0.25
0.10
0.20 0.20 3/8 14.00 30.00 1.00 0.00 420.00 0.00 0.00 0.00

0.25
C-2 MOJINET

6.60 1/2 4.00 4.00 6.80 0.00 0.00 108.80 0.00 0.00

0.20
EST 0.20
0.15
0.20 0.20 3/8 4.00 35.00 0.95 0.00 133.00 0.00 0.00 0.00

0.20

1.3 VIGAS RECTAS


VC-101 25X40 A-A, C-C, 1-1, 2-2

0.20 0.20 1/2 2.00 2.00 25.35 0.00 0.00 101.40 0.00 0.00
23.95 1.00

23.95 1.00
0.20 0.20 1/2 2.00 2.00 25.35 0.00 0.00 101.40 0.00 0.00
0.15 0.20
0.35 0.35 3/8 2.00 150.00 1.25 0.00 375.00 0.00 0.00 0.00
0.20

VC-102 25X40 A-A, B-B, C-C, D-D 1-2

0.20 0.20 1/2 4.00 2.00 10.75 0.00 0.00 86.00 0.00 0.00
9.85 0.50

9.85 0.50
0.20 0.20 1/2 4.00 2.00 10.75 0.00 0.00 86.00 0.00 0.00

0.15 0.20
0.35 0.35 3/8 4.00 60.00 1.25 0.00 300.00 0.00 0.00 0.00
0.20

VIGA DE MOGINETE

5.00 1/2 4.00 2.00 5.00 0.00 0.00 40.00 0.00 0.00

0.25
3/8 4.00 25.00 0.25 0.00 25.00 0.00 0.00 0.00

TOTAL
CHAYA

1 PESO PESO
3.97 PARC. TOTAL

204.86
204.86

0.00 102.88

0.00 101.98

831.13 831.13

0.00 413.31

0.00 235.20

0.00 108.15

0.00 74.48

804.31
411.58

0.00 100.79

0.00 100.79
0.00 210.00

338.97

0.00 85.48

0.00 85.48

0.00 168.00

53.76

0.00 39.76

0.00 14.00

TOTAL KG. 1,840.31


PLANILLA DE METRADOS

PROYECTO:
MEJORAMIENTO DEL LOCAL COMUNAL MULTIUSOS DE LA COMUNIDAD DE COLLANA DEL DISTRITO DE DESAGUADERO – PROVINCIA
DE CHUCUITO – DEPARTAMENTO DE PUNO

ITEM DESCRIPCION Und.

LOCAL COMUNAL MULTIUSOS DE LA COMUNIDAD DE COLLANA


MEDIDAS

DESCRIPCION PARCIAL TOTAL UND.
VECES
LARGO ANCHO ALTURA

04 SUB PRESUPUESTO INSTALACIONES ELECTRICAS 0.00


0 0 0.00
04.01 SALIDA INSTALACIONES ELECTRICAS Y FUERZA 1.00 120.00 120.00 120.00 0.00
0 0 1.00 1.00 3.00 0.00
04.01.01 SALIDA DE ALUMBRADO DE TECHO (CAJAS F°G° OCTOGONALES 1.00 1.00 1.00 1.00 pto
0 0 1.00 1.00 1.00 3.00 0.00
04.01.02 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE, MODELO A5001 1.00 1.00 1.00 1.00 pto
0 0 1.00 1.00 1.00 1.00 0.00
0 1.00
0 PLACA 1.00 1.00 1.00 0.00
SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE, MODELO A5001, CON AM503SM2AL (CAJAS F°G°
04.01.03 RECTANGULARES) pto
0 0 1.00 1.00 1.00 1.00 0.00
0 0 1.00 30.00 12.00 360.00 360.00 0.00
0 0 1.00 24.00 9.90 237.60 237.60 0.00
0 0 1.00 24.00 9.90 237.60 237.60 0.00
0 0 0.00
0 0 71.14 0.00
04.01.04 SALIDA PARA TOMACORRIENTE SIMPLE, LUZ DE EMERGENCIA 18.00 1.20 1.20 1.20 31.10 pto
0 0 12.00 2.90 0.50 1.00 17.40 0.00
0 0 8.00 3.80 0.50 1.00 15.20 0.00
04.02 CAJA DE PASE 1.00 3.85 0.40 0.80 1.23 0.00
0 0 1.00 3.25 0.40 0.80 1.04 0.00
04.02.01 INSTALACION CAJA DE PASO GALVANIZADA 100x100x50mm INC 1.00 3.80 0.40 0.80 1.22 und
0 0 2.00 1.67 0.40 0.80 1.07 0.00
0 0 1.00 4.00 0.40 0.80 1.28 0.00
04.03 CANALIZACIONES Y/O TUBERIAS 1.00 3.40 0.40 0.80 1.09 0.00
0 0 1.00 1.60 0.40 0.80 0.51 0.00
04.03.01 TUBERIA EMPOTRADA Y/O ENTERRADA 0.00
0 0 219.36 0.00
PLANILLA DE METRADOS

PROYECTO:
MEJORAMIENTO DEL LOCAL COMUNAL MULTIUSOS DE LA COMUNIDAD DE COLLANA DEL DISTRITO DE DESAGUADERO – PROVINCIA
DE CHUCUITO – DEPARTAMENTO DE PUNO

ITEM DESCRIPCION Und.

04.03.01.01 INSTALACION DE DUCTOS PVC SEL D=20 MM 1.00 15.30 9.60 146.88 m
0 0 1.00 3.80 9.60 36.48 0.00
04.03.01.02 INSTALACION DE CURVAS PVC SEL Ø 20 mm 1.00 3.75 9.60 36.00 und
0 0 0.00
04.03.01.03 INSTALACION DE DUCTOS PVC SEL D=25mm 21.94 m
0 0 1.00 15.30 9.60 0.10 14.69 0.00
04.03.01.04 INSTALACION DE CURVAS PVC Ø 25mm 1.00 3.80 9.60 0.10 3.65 und
0 0 1.00 3.75 9.60 0.10 3.60 0.00
04.04 ALIMENTADORES, SUBALIMENTADORES Y DERIVADOS 0.00
0 0 53.36 0.00
04.04.01 CONDUCTORES Y/O CABLES 0.00
0 0 1.00 71.14 0.75 53.36 53.36 0.00
04.04.01.01 CABLEADO CONDUCTOR 4.00mm2, NH-70 (LSOH) m
0 0 0.00
04.04.01.02 CABLEADO CONDUCTOR 2.5mm2, NH-70 (LSOH) m
0 0 47.24 0.00
04.04.02 CABLEADPO CONDUCTOR 2.5mm2 - Para Puesta a Tierra 12.00 3.60 0.50 1.00 21.60 m
0 0 8.00 4.55 0.50 1.00 18.20 0.00
04.05 TABLEROS ELECTRICOS 1.00 3.85 0.40 0.80 1.23 0.00
0 0 1.00 3.25 0.40 0.80 1.04 0.00
04.05.01 TABLERO GENERAL DISTRIBUCION CON INTERRUPTORES TER 1.00 3.80 0.40 0.80 1.22 0.00
0 0 2.00 1.67 0.40 0.80 1.07 0.00
0 0 1.00 4.00 0.40 0.80 1.28 0.00
04.05.01.01 SUBTABLERO DE DISTRIBUCION 1.00 3.40 0.40 0.80 1.09 und
0 0 1.00 1.60 0.40 0.80 0.51 0.00
04.06 ARTEFACTOS DE ILUMINACION 0.00
0 0 0.00
04.06.01 ARTEFACTO DE ALUMBRADO : LUMINARIA SPOT TIPO LAMPARA AHORRADORA FLUORESCENTE CIRCULAR. 82.27 EQ
0 0 24.00 3.60 0.40 34.56 0.00
0 0 16.00 4.55 0.40 29.12 0.00
04.07 INSTALACIONES ESPECIALES Y PRUEBAS ELECTRICAS 2.00 3.85 0.40 3.08 0.00
0 0 2.00 3.25 0.40 2.60 0.00
04.07.01 POZO DE PUESTA A TIERRA 2.00 3.80 0.40 3.04 0.00
0 0 4.00 1.67 0.40 2.67 0.00
PLANILLA DE METRADOS

PROYECTO:
MEJORAMIENTO DEL LOCAL COMUNAL MULTIUSOS DE LA COMUNIDAD DE COLLANA DEL DISTRITO DE DESAGUADERO – PROVINCIA
DE CHUCUITO – DEPARTAMENTO DE PUNO

ITEM DESCRIPCION Und.

04.07.01.01 EXCAVACION PARA POZO PUESTA A TIERRA (Terreno Normal) 2.00 4.00 0.40 3.20 m3
0 0 2.00 3.40 0.40 2.72 0.00
04.07.01.02 POZO DE PUESTA A TIERRA 2.00 1.60 0.40 1.28 GLB
04.07.01.03 CAJA DE REGISTRO PARA POZO PUESTA A TIERRA pza
0 0 5.63 0.00
04.08 VARIOS 12.00 3.60 0.15 0.40 2.59 0.00
0 0 8.00 4.55 0.15 0.40 2.18 0.00
04.08.01 INSPECCION Y PRUEBAS ELECTRICAS 1.00 3.85 0.15 0.40 0.23 0.00
0 0 1.00 3.25 0.15 0.40 0.20 0.00
04.08.01.01 PRUEBAS EN INSTALACIONES ELECTRICAS 1.00 3.80 0.15 0.40 0.23 GLB
0 0 2.00 1.67 0.15 0.40 0.20 0.00