Professional Documents
Culture Documents
Bhd
Project Code : SB179
Pre-PDI Report By unit 14.09.2018 Maliki
Level : 9
Unit No.
Sub-con 1 (Type B) 2 (Type B) 3 (Type A) 3A (Type A) 5 (Type A) 6 (Type A) 7 (Type A) 8 (Type C) 9 (Type C)
Hitti (Aluminium 1.Silicon at AGW edges 1.Silicon at AGW edges 1.Silicon at AGW edges 1.Silicon at AGW edges 1.Silicon at AGW edges 1.Silicon at AGW edges 1.Silicon at AGW edges
Glass Window- 2.Bottom rail sliding glass 2.AGW not function at 2.Silicon damage at AGW 2.AGW not function at
AGW) door scracth bedroom edges master bedroom
WHS (wall skim 1.wall crack 1.wall crack 1.wall crack 1.wall crack 1.wall crack 1.wall crack 1.wall crack
& plasterer) 2.wall hollow 2.wall hollow 2.wall hollow 2.wall hollow 2.wall hollow 2.wall hollow 2.wall hollow
3.Jointing unproper at 3.Jointing unproper at 3.Jointing unproper at 3.Jointing unproper at 3.Jointing unproper at 3.Jointing unproper at 3.Jointing unproper at
door frame edges door frame edges door frame edges door frame edges door frame edges door frame edges door frame edges
4.Wall evennes 4.Wall evennes 4.Wall evennes 4.Wall evennes at AGW 4.Wall evennes 4.Wall evennes at AGW
5.Wall damage at living 5.Wall scracth
area (chipping/scracth)
Yong Fah (Tiler 1.Wall tile at kicthen area 1.Floor tile skiritng 1.Floor (screeding) hollow 1.Floor (screeding) hollow 1.Jointing at tile unproper 1.Jointing at tile unproper 1.Jointing at tile unproper
& Screeding) damage (chipping) unproper jointing at (Wall&Floor) (Wall&Floor) (Wall&Floor)
master bedroom toilet
2.Jointing at tile unproper 2.Floor (screeding) hollow 2.Jointing at tile unproper 2.Jointing at tile unproper
(Wall & Floor) (Wall&Floor) (Wall&Floor)
Win Tat 1.Silicon jointing at sink 1.Silicon jointing at 1.Silicon jointing at 1.Silicon jointing at N/A 1.Silicon jointing at 1.Silicon jointing at
(WC,Sink,Wash area (unproper jointing) sink,Wc,wash basin area sink,Wc,wash basin area sink,Wc,wash basin area sink,Wc,wash basin area sink,Wc,wash basin area
basin) (unproper jointing) (unproper jointing) (unproper jointing) (unproper jointing) (unproper jointing)
LWN (Painting *Final tochup after all *Final tochup after all *Final tochup after all *Final tochup after all *Final tochup after all *Final tochup after all 1.Scracth at door
Work) defect rectify defect rectify defect rectify defect rectify defect rectify defect rectify (painting)
2.Incomplete painting
work
CCK (Door & N/A 1.lockset missing (toilet & N/A 1.Door Cant properly N/A 1.lockset missing (toilet) 1.Lockset not proper
Ironmengry) bedroom) close at mstr.bedroom function at toilet master
INOVA ( Timber 1.Silicon jointing at N/A N/A N/A 1.Silicon jointing at N/A 1.Skirting damage
Laminated floor skriting area (between skriting area (between
& Floor Skirting) floor skirting and wall) floor skirting and wall)
2.Silicon jointing at
skriting area (between
floor skirting and wall)
Page 1