You are on page 1of 1

Wira Syukur (M) Sdn.

Bhd
Project Code : SB179
Pre-PDI Report By unit 14.09.2018 Maliki
Level : 9
Unit No.
Sub-con 1 (Type B) 2 (Type B) 3 (Type A) 3A (Type A) 5 (Type A) 6 (Type A) 7 (Type A) 8 (Type C) 9 (Type C)
Hitti (Aluminium 1.Silicon at AGW edges 1.Silicon at AGW edges 1.Silicon at AGW edges 1.Silicon at AGW edges 1.Silicon at AGW edges 1.Silicon at AGW edges 1.Silicon at AGW edges
Glass Window- 2.Bottom rail sliding glass 2.AGW not function at 2.Silicon damage at AGW 2.AGW not function at
AGW) door scracth bedroom edges master bedroom

WHS (wall skim 1.wall crack 1.wall crack 1.wall crack 1.wall crack 1.wall crack 1.wall crack 1.wall crack
& plasterer) 2.wall hollow 2.wall hollow 2.wall hollow 2.wall hollow 2.wall hollow 2.wall hollow 2.wall hollow
3.Jointing unproper at 3.Jointing unproper at 3.Jointing unproper at 3.Jointing unproper at 3.Jointing unproper at 3.Jointing unproper at 3.Jointing unproper at
door frame edges door frame edges door frame edges door frame edges door frame edges door frame edges door frame edges
4.Wall evennes 4.Wall evennes 4.Wall evennes 4.Wall evennes at AGW 4.Wall evennes 4.Wall evennes at AGW
5.Wall damage at living 5.Wall scracth
area (chipping/scracth)

Yong Fah (Tiler 1.Wall tile at kicthen area 1.Floor tile skiritng 1.Floor (screeding) hollow 1.Floor (screeding) hollow 1.Jointing at tile unproper 1.Jointing at tile unproper 1.Jointing at tile unproper
& Screeding) damage (chipping) unproper jointing at (Wall&Floor) (Wall&Floor) (Wall&Floor)
master bedroom toilet
2.Jointing at tile unproper 2.Floor (screeding) hollow 2.Jointing at tile unproper 2.Jointing at tile unproper
(Wall & Floor) (Wall&Floor) (Wall&Floor)

3.Jointing at tile unproper 3.Floor tile lippage at


(Wall& floor) living area
4.Wall tile hollow at
kicthen area
5.Wall tile stain at toilet
area
An Plaster N/A 1.Gap at ceiling (jointing 1.Gap at ceiling (jointing 1.Gap at ceiling (jointing 1.Gap at ceiling (jointing 1.Gap at ceiling (jointing 1.Gap at ceiling (jointing
(Plaster Ceiling) unproper) unproper) unproper) unproper) unproper) unproper)
2.Ceiling damage/crack

Win Tat 1.Silicon jointing at sink 1.Silicon jointing at 1.Silicon jointing at 1.Silicon jointing at N/A 1.Silicon jointing at 1.Silicon jointing at
(WC,Sink,Wash area (unproper jointing) sink,Wc,wash basin area sink,Wc,wash basin area sink,Wc,wash basin area sink,Wc,wash basin area sink,Wc,wash basin area
basin) (unproper jointing) (unproper jointing) (unproper jointing) (unproper jointing) (unproper jointing)

LWN (Painting *Final tochup after all *Final tochup after all *Final tochup after all *Final tochup after all *Final tochup after all *Final tochup after all 1.Scracth at door
Work) defect rectify defect rectify defect rectify defect rectify defect rectify defect rectify (painting)
2.Incomplete painting
work
CCK (Door & N/A 1.lockset missing (toilet & N/A 1.Door Cant properly N/A 1.lockset missing (toilet) 1.Lockset not proper
Ironmengry) bedroom) close at mstr.bedroom function at toilet master

2.Door cant close properly 2.Door cant open


at master bedroom toilet properly/smooth at
& Toilet 2 bedroom

INOVA ( Timber 1.Silicon jointing at N/A N/A N/A 1.Silicon jointing at N/A 1.Skirting damage
Laminated floor skriting area (between skriting area (between
& Floor Skirting) floor skirting and wall) floor skirting and wall)
2.Silicon jointing at
skriting area (between
floor skirting and wall)

Noted : 1.unit No1 And No9 pending handover form arch

Page 1

You might also like