FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
4 Benton 124123.00 I-40 Benton County Rest Area Renovation (IA) PE 0.0 PE 0.0
4 Benton, Houston 040813.03 SR-147 Benton/Houston Ferry Boat and Mooring Construction CN 0.0 0.0
Replacement/Construction
1 Blount, Knox 124131.00 I-140 ITS Expansion From I-140 MM 2 to SR-115 (US- Construction 0.0 0.0 CN
129, Alcoa Hwy., Exit 11) (IA)
1 Blount, Knox 124133.01 SR-115 ITS expansion from south of Topside Road to Construction 0.0 CN 0.0
US-129 Cherokee Trail Interchange (IA) Priority 1
1 Blount 124754.00 SR-115 From SR-73 (Lamar Alexander Pkwy) to SR-35 Right-of-Way ROW 0.0 0.0
US-129 (IA)
Bypass
1
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
1 Blount 101651.02 SR-115 (Relocated Alcoa Highway), From Proposed Stage Const 0.0 SC 0.0
US-129 Interchange at Tyson Boulevard to SR-162
(Pellissippi Parkway) (IA)
1 Blount 101423.00 SR-162 (Pellissippi Pkwy) From SR-33 to SR-73 (US-321) Right-of-Way ROW 0.0 0.0
EXT (Re-Budgeted-ROW&Stage Const) (IA)
1 Blount 101725.02 SR-336 (Montvale Rd.), From Montvale Station Road to Construction 0.0 0.0 CN
SR-73 (Lamar Alexander Pkwy) (IA)
2 Bradley 124013.00 I-75 SR-308 (Lauderdale Highway) Interchange Ramps Construction 0.0 CN 0.0
(IA)
2 Bradley-Hamilton- 101430.02 SR-60 (Georgetown Rd. NW) From Near SR-306 in Right-of-Way 0.0 0.0 ROW
Meigs Bradley County to Near SR-58 in Hamilton County
(IA)
1 Campbell 124147.00 I-75 From Anderson-Campbell County Line to SR-9 Environmental ENV 0.0 PE
(Appalachian HWY.) RT. and 2425 Royal Blue Rd. Studies/PE
Lt. (IA)
1 Campbell 128535.00 I-75 ITS Expansion at SR-63 (Howard Baker Rd., Exit PE PE 0.0 0.0
141) Interchange and SR-9/SR-116 (US-25W, Exit
134) Interchange ( IA )
2
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
1 Campbell 124150.00 I-75 ITS Expansion at SR-63 (Howard Baker Rd., Exit Construction 0.0 0.0 CN
141) Interchange and SR-9/SR-116 (US-25W, Exit
134) Interchange ( IA )
1 Campbell 124153.00 I-75 ITS, From Near MM 135 to Near MM 160 (SR- Construction 0.0 CN 0.0
9/US-25W), Jellico (IA)
1 Campbell 101407.02 SR-63 (General Carl W. Stiner Hwy.) From Near Frontier Construction 0.0 CN 0.0
Road/Woodson Lane to Near Claiborne County
Line (Re-Budgeted-ROW&CONST) (IA) APD
1 Campbell 101406.04 SR-63 (Howard Baker Hwy.), From Near the Intersection Construction 0.0 0.0 CN
of SR-297 and West of Old SR-63 to West of
Stinking Creek Road (Truck Climbing Lane) (***)
(Previous: Scott Co. Line to I-75) (IA)
2 Cannon 124038.00 SR-1 (W. Main St.) From West of Woodbury to New SR- Environmental ENV 0.0 PE
US-70 1 (US-70S) East of Woodbury (IA) Studies/PE
4 Carroll-Gibson 100326.01 SR-76 (E. Main St.) From West of Cades-Atwood Road Construction 0.0 CN 0.0
US-79 to East of SR-77 (IA)
4 Carroll 100326.03 SR-76 (Broad St. N.) From West of Cutlip Lane to West Right-of-Way 0.0 0.0 ROW
US-79 of Sydnor/Winston Rd (IA)
3
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
4 Chester- 124164.00 SR-22 From SR-69 in Milledgeville to SR-100 in Chester Environmental ENV 0.0 PE
Henderson- (IA) Studies/PE
McNairy
4 Chester 124160.00 SR-100 From SR-5 to Church Street (Old US-5) in Environmental ENV 0.0 PE
Henderson (IA) Studies/PE
1 Claiborne 118734.00 SR-32 (Dixie Hwy) Interchange at SR-345 (IA) APD Construction CN 0.0 0.0
US-25E
1 Claiborne 101409.00 SR-63 From Near Campbell Co. Line to Near Hall Lane Construction 0.0 CN 0.0
(Re-Budgeted ROW&Const.) (IA) APD
2 Clay 127491.00 SR-52 From Near Kyle St. to Existing SR-52 Near PE PE 0.0 0.0
Washington St. (Celina Bypass)
2 Clay 127491.00 SR-52 From Near Kyle St. to Existing SR-52 Near Right-of-Way 0.0 0.0 ROW
Washington St. (Celina Bypass)
1 Cocke 124292.00 I-40 ITS Rural Deployment on I-40 to State Line (IA) PE PE 0.0 0.0
4
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
1 Cocke 124292.00 I-40 ITS Rural Deployment on I-40 to State Line (IA) Construction 0.0 0.0 CN
1 Cocke 124301.00 I-40 Hartford Welcome Center Renovation (IA) PE 0.0 0.0 PE
1 Cocke 101399.00 SR-35 (Newport Bypass) From Near SR-9 (US-25) to Construction CN 0.0 0.0
US-321 Near Saint Tide Hollow Road (IA)
2 Coffee 123817.00 SR-2 (Hillsboro Hwy.) From Joe Hickerson Rd. to AEDC PE PE 0.0 0.0
US-41 Rd. (IA)
2 Coffee 123817.00 SR-2 (Hillsboro Hwy.) From Joe Hickerson Rd. to AEDC Right-of-Way 0.0 0.0 ROW
US-41 Rd. (IA)
2 Cumberland 124051.00 I-40 Cumberland County Rest Area Renovation (IA) PE 0.0 0.0 PE
2 Cumberland- 100260.05 SR-28 (S. York Hwy.) From Near Lowe Road in Construction 0.0 CN 0.0
Fentress US-127 Cumberland County to Near Little Road North of
SR-62 in Clarkrange (IA)
5
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
3 Davidson 124165.00 I-24 Ramp Improvements Exits 35, 40, 57, 59, and 60 PE PE 0.0
(IA)
3 Davidson 124169.00 I-24 Harding Place Interchange Re-configuration (IA) Environmental ENV 0.0 PE
Studies/PE
3 Davidson 124173.00 I-24 Downtown loop I-24, including south of Fern to PE 0.0 0.0 PE
Trinity Lane (IA)
3 Davidson 124177.00 I-24 From Old Hickory Boulevard to I-65, Exit 40-Exit- PE 0.0 PE
44 (IA)
3 Davidson- 124260.04 I-24 ITS SMART Corridor, From I-440 (Exit 53) to SR- Construction CN 0.0 0.0
Rutherford 10 (Exit 81 / US-231) in Murfreesboro and SR-1
from I-24 to SR-10 in Murfreesboro and Various
Connector Routes. (IA) (Phase 2)
3 Davidson 124211.00 I-40 From McCrory Lane (Exit 192) to Just West of SR- Environmental ENV 0.0 PE
1/US-70S (Exit 196) (IA) Studies/PE
3 Davidson-Dickson-124255.00 I-40 ITS From Near US-70S (Exit 196) to Near I-840 Construction CN 0.0 0.0
Cheatham- and from Near SR-255 (Donelson Pike, Exit 216)
Williamson- to Near US-70 (Exit 239) (IA)
Wilson
6
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
3 Davidson 116896.00 I-40 I-40/SR-255 (Donelson Pike) Relocation From Construction 0.0 CN CN
Taxiway Bridges Over Existing Donelson Pike to I-
40 (IA)
3 Robertson 124263.03 I-65 From near SR-257 (Exit 104) to near SR-25 (Exit PE PE 0.0 0.0
112) (IA) (Third Segment)
3 Robertson 124263.04 I-65 From near SR-25 (Exit 112) to near SR-109 (IA) PE PE 0.0 0.0
(Fourth Segment)
3 Davidson 124781.00 SR-11 (Dickerson Pike) From Fannin Dr. to Old Stone PE PE 0.0
US-31A Bridge Rd. to include the CSX Railroad Overpass
Structure (IA)
3 Davidson 123814.00 SR-24 (Charlotte Pike) From American Rd. to White PE PE 0.0 0.0
US-70 Bridge Rd. (IA)
3 Davidson 123815.00 SR-24 (Charlotte Pike) From I-40 to American Rd. (IA) PE PE 0.0
US-70
7
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
3 Davidson 123816.00 SR-24 From Old Hickory Boulevard to I-40 (IA) Environmental ENV 0.0 PE
US-70 Studies/PE
2 Dekalb 100261.03 SR-26 (Nashville Hwy.) From Near SR-53 to Near SR-96 Construction CN 0.0 0.0
US-70 (IA)
3 Dickson 124284.00 SR-840 From I-40 to SR-96 (IA) Environmental ENV 0.0 PE
Ext. Studies/PE
4 Dyer 124207.00 I-155 Dyersburg Welcome Center Renovation (IA) PE 0.0 PE 0.0
4 Dyer 124207.00 I-155 Dyersburg Welcome Center Renovation (IA) Right-of-Way 0.0 0.0 ROW
4 Dyer 104123.07 SR-104 From US-412 (SR-20) in Dyersburg to East of Don Right-of-Way 0.0 0.0 ROW
Hurley Road (IA)
8
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
4 Fayette 101607.01 SR-460 (Somerville Beltway), From Near SR-15(US-64) Construction CN 0.0 0.0
PROP West of Somerville to Near SR-76 South of
US-64 Somerville (IA)
2 Fentress-Pickett 123081.00 SR-28 (S. York Hwy.) From North of Jamestown to SR- Right-of-Way 0.0 0.0 ROW
US-127 111 (Spot Improvements) (IA)
1 Greene 124345.00 I-81 Greene County Rest Area Renovation (IA) PE 0.0 0.0 PE
1 Greene 100229.00 SR-35 (Newport Hwy.) From North of Nolichucky River Right-of-Way 0.0 0.0 ROW
US-321 (Bright Hope Road) to South of SR-349
(Warrensburg Rd.) near Pate Lane (***) (Re-
Budgeted-ROW) (IA)
2 Grundy 124782.00 SR-50 (Pelham Rd.) From LM 8.0, 7.5 miles East of I-24 Environmental ENV 0.0 PE
(Exit 127) to LM 11.0 (IA) Studies/PE
1 Hamblen, 124360.00 SR-34 (Andrew Johnson Hwy.) From Steadman Rd. to I- PE 0.0 PE
Hawkins, Greene US-11E 81 (IA)
2 Hamilton 124072.02 I-24 From GA State Line to East of Browns Ferry Rd. Right-of-Way 0.0 0.0 ROW
(IA)
9
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
2 Hamilton 124072.03 I-24 From East of Browns Ferry Rd. to near I-124 (US- Right-of-Way 0.0 0.0 ROW
27)(IA)
2 Hamilton 123105.00 I-75 Interchange Modification at Hamilton Place Mall Right-of-Way 0.0 ROW 0.0
(IA)
2 Hamilton-Bradley 124081.00 I-75 From North of SR-2 in Hamilton County to near Right-of-Way 0.0 0.0 ROW
SR-311 in Bradley County (IA)
2 Hamilton 124080.00 SR-8 From Near SR-27 (Suck Creek Road) to North of Right-of-Way 0.0 ROW 0.0
US-127 South Palisades Drive. (Mountain Rd.) (IA)
2 Hamilton 112152.02 SR-317 (Bonny Oaks Drive), From Industry Drive to Near Right-of-Way 0.0 ROW 0.0
Adamson Circle (IA) (#3 Priority)
2 Hamilton 112152.04 SR-317 (Bonny Oaks Drive), From West of Bonnyshire Construction 0.0 CN 0.0
Drive to Near I-75 (IA) (#1 Priority)
2 Hamilton 112524.01 SR-317 (Apison Pike) From Near SR-321(Ooltewah- Construction CN 0.0 0.0
Ringgold Road) to Near Layton Lane (IA) (#1
Priority)
10
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
4 Hardin 101885.01 SR-128 From Pyburn Rd. to SR-226 (Airport Rd.) (***) (IA) Construction CN 0.0 0.0
1 Hawkins 101394.00 SR-31 (Flat Gap Rd.) From Mooresburg to Adams Lane Right-of-Way ROW 0.0 0.0
(***) (Re-budgeted-ROW) (IA)
1 Hawkins 107579.00 SR-66 From SR-34 in Bulls Gap to South of Speedwell Right-of-Way 0.0 0.0 ROW
Road/Old Highway 66 (IA)
4 Haywood 102251.02 SR-19 From Near Lauderdale County Line to East of Right-of-Way 0.0 0.0 ROW
Binford Lane (IA)
3 Hickman 123079.00 SR-100 SR-100 and SR-48 Intersection Improvements Right-of-Way 0.0 0.0 ROW
(IA)
3 Humphreys 111109.02 SR-13 From Near the Perry County Line to Near I-40 (IA) Right-of-Way 0.0 0.0 ROW
2 Jackson, Putnam 124083.00 SR-96 From SR-53 to US-70N (SR-24), (Spot PE 0.0 0.0 PE
Improvements) (IA)
11
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
1 Jefferson 124423.00 I-81 I-40 to SR-341 Roy Messer Hwy. (IA) PE 0.0 0.0 PE
1 Knox 123073.00 SR-162 (Pellissippi Pkwy) Interchange at SR-62 (Oak Right-of-Way 0.0 ROW 0.0
Ridge Hwy) in Solway (IA)
3 Lincoln 124496.00 SR-10 (Huntsville Hwy.) From SR-110 to South of Elk PE PE 0.0
US-231 River (IA)
1 Loudon 124480.00 I-75 From Pond Creek Road (SR-323) to the I-40/I-75 Environmental ENV 0.0 PE
Junction (IA) Studies/PE
4 Madison 114149.01 I-40 From East of SR-5 (US-45) to Near SR-1 (US-70) Construction CN 0.0 0.0
in Jackson (IA)
4 Madison 114149.03 I-40 From West of SR-20 (US-412, Hollywood Drive) to Construction 0.0 CN 0.0
West of SR-186 (US-45 ByPass) (IA)
2 Marion 124086.00 SR-2 From Near Hillcrest Lane in Kimball to Magnolia Right-of-Way 0.0 0.0 ROW
US-64/72 Ave. in Jasper (IA)
12
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
2 Marion 124785.00 SR-156 From East of Patton School Road to West of First Environmental ENV 0.0 PE
Street (Approx 1 Mile West of Cedar Ave. in South Studies/PE
Pittsburg to Approximately 1.7 Miles West) (IA)
3 Maury 115786.00 I-65 Interchange at SR-99 (US-412) in Columbia (IA) Construction CN 0.0 0.0
3 Maury, 124786.00 SR-6 (Columbia Pike) From Duplex Rd. in Spring Hill to Environmental ENV 0.0 PE
Williamson I-840 in Thompson's Station (IA) Studies/PE
2 McMinn 124087.00 I-75 Interchange Improvements at SR-30 and SR-305 Construction 0.0 CN 0.0
(IA)
1 Monroe 102380.02 SR-322 (Sweetwater Vonore Rd.) From Sheppard Road to Construction 0.0 0.0 CN
SR-72 (***) (IA)
1 Monroe 102380.03 SR-322 From Sweetwater-Vonore Road to Near Acorn Right-of-Way 0.0 ROW 0.0
Gap Road (IA)
1 Monroe 102380.04 SR-322 From Near Acorn Gap Road to Sheppard Road Right-of-Way 0.0 ROW 0.0
(IA)
13
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
3 Montgomery 124656.00 I-24 From KY/TN State Line to SR-76 (Exit 11) (IA) Environmental ENV 0.0 PE
Studies/PE
3 Montgomery 101463.02 SR-149/ SR-374; From Dotsonville Road to SR-149, SR- Right-of-Way 0.0 0.0 ROW
SR-374 149 From SR-374 to River Road (Re-Budgeted
ROW) (IA)
3 Montgomery 101463.03 SR-374 From Dotsonville Road to US-79 (SR-76) (Re- Right-of-Way 0.0 0.0 ROW
Budgeted-ROW & Stage Const) (IA) HPP
3 Moore 124669.00 SR-55 (Lynchburg Hwy.) From the Intersection at Riddle Environmental ENV 0.0 PE
Rd. to the 5 Points Rd. Intersection (Safety Studies/PE
Improvements) (IA)
3 Moore 123070.00 SR-55 Near the Intersection of Goodbranch Rd. to Near Right-of-Way ROW 0.0 0.0
Moore County High School (IA)
3 Moore 123070.00 SR-55 From Near the Intersection of Goodbranch Rd. to Construction 0.0 0.0 CN
Near Moore County High School (IA)
1 Morgan 124516.02 SR-62 (Knoxville Highway), From SR-116 to Rock Bridge Environmental ENV 0.0 PE
Rd. (IA) Studies/PE
14
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
1 Morgan 124516.03 SR-62 (Knoxville Highway), From Rock Bridge Rd. to SR- PE PE 0.0
61 (IA)
4 Obion 101343.01 I-69 From South of SR-3 to South of SR-5 (IA) Paving PV 0.0 0.0
PROP
4 Obion 101344.01 I-69 From South of SR-5 to West of SR-21 (IA) Paving PV 0.0 0.0
PROP
4 Obion 124745.00 I-69 From Rogers Rd in Kentucky to SR-3 (US-45W & PE PE 0.0
US-51) in Obion County (IA)
2 Overton 103678.01 SR-52 (Jamestown Hwy.) From SR-52/85, West of Construction 0.0 0.0 CN
Alpine to West of Pickett County Line (***) (IA)
3 Perry 111109.03 SR-13 4 spot improvements at (B, C, D & F), From SR- Construction CN 0.0 0.0
20 to South of the Humphreys County Line (IA)
3 Perry 111109.01 SR-13 3 Spot Improvements at (E,H,K), From SR-20 to Construction CN 0.0 0.0
South of the Humphreys County Line (IA)
15
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
2 Polk 102420.08 SR-40 From East of Ocoee River to SR-68 in Ducktown Right-of-Way 0.0 0.0 ROW
US-64 (IA)
2 Putnam 125028.00 SR-135 (N. Willow Ave.) From West Broad Street to West Environmental ENV 0.0 PE
12th Street (IA) Studies/PE
2 Putnam 112538.00 SR-136 (S. Jefferson Ave.) From Near SR-111 to Near I- Construction 0.0 CN 0.0
40 (IA)
2 Rhea 109410.03 SR-30 (Old Washington Hwy.) From Near SR-29 (US-27) Right-of-Way 0.0 0.0 ROW
to West of New Union Rd. / White Oak Rd.(IA)
3 Robertson 101558.00 I-65 Weigh Station (Near the KY State Line) (IA) Right-of-Way ROW 0.0 0.0
3 Rutherford 124683.00 I-24 I-24 Ramp Improvements Exits 66, 70, 81, 84, and PE PE 0.0 0.0
89 (IA)
16
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
3 Rutherford 124683.00 I-24 I-24 Ramp Improvements Exits 66, 70, 81, 84, and Right-of-Way 0.0 0.0 ROW
89 (IA)
3 Rutherford 104004.02 SR-99 (New Salem Highway), From I-24 to SR-96 (Old Construction 0.0 CN 0.0
Fort Parkway) in Murfreesboro (IA)
3 Rutherford 107045.00 SR-266 (W. Jefferson Pike) From Near SR-102 to East of I-Construction CN 0.0 0.0
840 (IA)
1 Scott 101414.00 SR-29 (Lon Foust Hwy.) From North of Wolf Creek Road Right-of-Way 0.0 0.0 ROW
US-27 to Old US-27 at Robbins (***) (Re-Budgeted-
ROW) (IA)
1 Sevier 124789.00 SR-XXX (Jake Thomas Connector) From SR-449 to SR-73 Construction CN 0.0 0.0
(US-321/441) (IA)
1 Sevier 100989.00 SR-73 (East Pkwy.) From Near Buckhorn Road to East of Right-of-Way 0.0 ROW 0.0
US-321 SR-416 (Phase 2) (***) (IA)
1 Sevier 124788.00 SR-449 (Veterans Blvd.) From SR-35 to Robert Right-of-Way 0.0 ROW 0.0
EXT Henderson Road (IA)
17
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
4 Shelby, Fayette 124755.00 I-269 ITS Expansion on I-269 from I-40 Southward to PE PE 0.0 0.0
the Mississippi State Line (IA)
4 Shelby, Fayette 124759.00 SR-385 ITS Expansion from MM 7 to MM 15 (IA) Construction 0.0 CN 0.0
4 Shelby 100339.02 SR-4 (Lamar Ave.) From South of Shelby Drive to Near Construction 0.0 0.0 CN
US-78 Raines/Perkins Road Interchange (IA)
1 Sullivan 124621.00 SR-XXX From US-11E (SR-34) Near Bristol Motor Environmental ENV 0.0 PE
Speedway to US-11W(SR-1) Near Pinnacle Studies/PE
Parkway (IA)
1 Sullivan 124590.00 I-81 ITS Expansion along I-81 between I-26 (Exit 57) PE PE 0.0 0.0
Interchange and Virginia State Line (IA)
1 Sullivan 124590.00 I-81 ITS Expansion along I-81 between I-26 (Exit 57) Construction 0.0 0.0 CN
Interchange and Virginia State Line (IA)
3 Sumner 106634.02 SR-109 (Proposed SR-109 Portland Bypass), From SR- Right-of-Way ROW 0.0 0.0
PROP 52, west of Portland to existing SR-109, north of
Portland (IA)
18
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
3 Sumner 106634.03 SR-109 (Proposed SR-109 Portland Bypass), From Right-of-Way 0.0 ROW 0.0
PROP existing SR-109, south of Portland to SR-52, west
of Portland.(IA)
1 Union 104563.02 SR-61 From North David Drive to Tater Valley Road Right-of-Way 0.0 0.0 ROW
(EPD/PHASE 2) (IA)
1 Union 104563.04 SR-61 From North of Archer Road to South of Jim Town Right-of-Way 0.0 0.0 ROW
Road (PHASE 2) (IA)
1 Washington 124790.00 SR-XXX (Knob Creek Rd.), From SR-354 (Boones Creek Environmental ENV 0.0 PE
(LR6040) Rd.) to Mizpah Hills Dr. (IA) Studies/PE
1 Washington, 124663.00 SR-36 (Fort Henry Dr.) From SR-75 to I-81 (IA) PE PE 0.0
Sullivan
1 Washington- 112834.02 SR-93 (Sullivan Gardens Parkway) From Morgan Lane in Construction 0.0 0.0 CN
Sullivan Washington County to South of Baileyton Road in
Sullivan County (TPR Option 5, Spot
Improvement) (IA)
3 Williamson 128576.00 I-65 Interchange at Buckner Road (Design Build) Construction CN 0.0 0.0
19
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
3 Williamson 124792.00 SR-6 (Columbia Pike) From I-840 in Thompson's Environmental ENV 0.0 PE
US-31 Station to Mack Hatcher Pkwy. in Franklin (IA) Studies/PE
3 Williamson 124870.00 SR-397 (Mack Hatcher Pkwy.) From SR-96 East of PE PE 0.0
Franklin to US-31(SR-6, Columbia Pike) South of
Franklin (South Quadrant) (IA)
3 Wilson 124884.00 I-40 I-40 at Central Pike (SR-265) New Interchange PE PE 0.0 0.0
(IA)
3 Wilson 124886.00 SR-24 (Lebanon Rd.) From Park Glen Drive to Bender's Right-of-Way 0.0 0.0 ROW
Ferry Road (IA) (Local Programs)
3 Wilson 124885.00 SR-171 (Mt. Juliet Rd.) From Central Pike (SR-265) to Right-of-Way 0.0 0.0 ROW
Providence Way (IA) (Local Programs)
3 Wilson-Davidson 124887.00 SR-265 (Central Pike) From SR-45 (Old Hickory Environmental ENV 0.0 PE
Boulevard) to SR-171 (MT. Juliet Road) (IA) Studies/PE
20
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
21
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
TRANSIT PROJECTS
County Description Type of Work
Statewide State Funded Program: Urban Transit Operating
Assistance Bristol, Chattanooga, Clarksville,
Jackson, Johnson City, Knoxville Memphis,
Nashville, Kingsport, Morristown, Murfreesboro, Capital/ Operating CA/OP CA/OP CA/OP
Cleveland, Oak Ridge, Franklin, Gatlinburg,
Pigeon Forge, and Sevierville
Statewide
Federal Transit Administration Formula
Program (5303- Metropolitan Transportation
Planning Program) and State Matching Funds
Planning PL PL PL
– Bristol, Chattanooga, Clarksville, Jackson,
Johnson City, Knoxville, Memphis, Nashville,
Kingsport, Morristown, Murfreesboro, Cleveland.
Statewide Federal Transit Administration Formula
Program (5304) and State Matching Funds– Planning PL PL PL
Statewide Transit Planning
Large Urban Federal Transit Administration Formula
Areas Program (5307) State Matching Funds – Large
Capital/ Operating CA/OP CA/OP CA/OP
Urbanized Areas – Chattanooga, Knoxville,
Memphis, Nashville Capital Assistance
Small Urban Federal Transit Administration Formula Program
Areas (5307) State Matching Funds – Small Urbanized
Areas Capital and Operating Assistance – Bristol, Capital/ Operating CA/OP CA/OP CA/OP
Cleveland, Clarksville, Jackson, Johnson City,
Kingsport, Morristown, Murfreesboro
Madison Federal Transit Administration Formula Program
(5307) State Matching Funds Small Transit
Capital/ Operating CA/OP CA/OP CA/OP
Intensive Cities Performance Apportionment:
Jackson
Shelby, Hamilton Federal Transit Administration Formula
Program (5329) and State Matching Funds Oversight OS OS OS
State Safety Oversight
22
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
23
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
24
TENNESSEE DEPARTMENT OF TRANSPORTATION
FISCAL YEARS 2020‐2022
COMPREHENSIVE MULTIMODAL PROGRAM
April 18, 2019
AVIATION PROJECTS
25
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
MEADOW ST. BRIDGE OVER RIGHT FORK COAL
1 ANDERSON 0A460 CREEK 0.108 PE, ROW, CONST
WALKING HORSE PKWY. BRIDGE OVER SUGAR
3 BEDFORD SR‐64 CREEK 9.45 PE, ROW, CONST
OLD STINKING CREEK RD. BRIDGE OVER STINKING
1 CAMPBELL 0A080 CREEK 0.785 PE, ROW, CONST
26
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
GILLEY HILL RD. BRIDGE OVER BRAWLEYS FORK
2 CANNON 0A181 CREEK 2.702 PE, ROW, CONST
W. MAIN ST. BRIDGE OVER EAST FORK STONES
2 CANNON US‐70S (SR‐1) RIVER 6.15 PE, ROW, CONST
BLEVINS HOLLOW RD. BRIDGE OVER STONEY
1 CARTER 0A967 CREEK 0.048 PE, ROW, CONST
ESTEP LOOP (HODGE BRANCH ROAD) BRIDGE
1 CARTER 0A974 OVER STONY CREEK 1.614 PE, ROW, CONST
BUCKLICK LN. BRIDGE OVER BIG SYCAMORE
1 CLAIBORNE 0A250 CREEK 0.356 PE, ROW, CONST
27
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
BLANKENSHIP RD. BRIDGE OVER MULHERIN
4 DYER 0A333 CREEK 0.95 PE, ROW, CONST
28
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
29
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
BURNT CHURCH RD. BRIDGE OVER LITTLE TURKEY
4 HARDIN 01723 CREEK 2.22 PE, ROW, CONST
30
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
SHADY GROVE RD. BRIDGE OVER THOMPSON
4 HENRY 01715 CREEK 2.21 PE, ROW, CONST
W. BEAVERDAM RD. BRIDGE OVER BEAVER DAM
3 HICKMAN 0A325 CREEK 4.36 PE, ROW, CONST
31
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
W. BEAVERDAM RD. BRIDGE OVER WADES
3 HICKMAN 0A325 BRANCH 4.135 PE, ROW, CONST
CEDAR GROVE RD. BRIDGE OVER HURRICANE
3 HUMPHREYS 0A341 CREEK 0.492 PE, ROW, CONST
32
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
STEELMAN RD. BRIDGE OVER EAST FORK
3 LINCOLN 0A001 MULBERRY CREEK 0.275 PE, ROW, CONST
33
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
VESTAL HOLLOW RD. BRIDGE OVER LEIPERS
3 MAURY 0A048 CREEK 0.04 PE, ROW, CONST
OLD SOWELL MILL PK. BRIDGE OVER CEDAR
3 MAURY 0B310 CREEK 1.567 PE, ROW, CONST
MT. PLEASANT RD. BRIDGE OVER MULBERRY
1 MONROE 01139 CREEK 10 PE, ROW, CONST
34
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
POVO RD. BRIDGE OVER NORTH FORK NOTCHY
1 MONROE 02344 CREEK 1.27 PE, ROW, CONST
SHADY GROVE RD. BRIDGE OVER MCADOO
3 MONTGOMERY 01888 CREEK 6.67 PE, ROW, CONST
35
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
STANLEY CREEK RD. BRIDGE OVER STANLEY
1 SCOTT 0A450 CREEK 0.315 PE, ROW, CONST
36
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
FT. HENRY DR. BRIDGE OVER SOUTH HOLSTON
1 SULLIVAN SR‐36 RIVER LM 5.02 (RL) 5.02 PE, ROW, CONST
FT. HENRY DR. BRIDGE OVER SOUTH HOLSTON
1 SULLIVAN SR‐36 RIVER LM 5.03 (LL) 5.02 PE, ROW, CONST
TUMBLING CREEK RD. BRIDGE OVER SPIVEY
1 UNICOI 0A051 CREEK 0.224 PE, ROW, CONST
37
TENNESSEE DEPARTMENT OF TRANSPORTATION FISCAL YEAR 2020
COMPREHENSIVE STATE ROUTE AND OFF‐SYSTEM BRIDGE PROGRAM
April 18, 2019
EDWARDS HOLLOW RD. BRIDGE OVER LITTLE
1 UNION 01345 BARREN CREEK 0.03 PE, ROW, CONST
LITTLE TATER VALLEY RD. BRIDGE OVER BULL
1 UNION 0A128 RUN CREEK 0.07 PE, ROW, CONST
TOMMY CAMPBELL RD. BRIDGE OVER LITTLE
1 WASHINGTON 0B181 CHEROKEE CREEK 0.098 PE, ROW, CONST
LOWER SHARON RD. BRIDGE OVER TERRELL
4 WEAKLEY 01610 BRANCH 2.89 PE, ROW, CONST