1 General Qualification 25
I) Graduate in Mechanical/
Electrical Engineering 21 B,Tech in Electrical and
25 Electronics 21
II) Post Graduation in Mechanical/ 04 Engineering in 2006
Electrical Engineering
2 Adequacy for the Project 70
Professional Experience in Building
a)
Projects:
Total Professional Experience in handling 1) Sr. Electrical
Building projects Engineer at Nhance
< 8 years -0 Consulting Engineers
8 years - 15 from October 2017 –
Add one mark extra for each additional year Present
of experience subject to maximum 5 (five)
marks. 2) Principal Engineer at
KBR-AMCDE, KSA from
Sep 2008- Aug-2017
i) 20 3) Material Planning 19
Engineer at WESCOSA,
KSA from Feb2008 to
July2008
4) Site Engineer at
Naseer Electrical Pvt.
Ltd. Hyd, India July-
2006 to Jan-2008
2) BI:10-00484)-
Upgrade Potable Water
System at 46 no’s SAOO
GOSP’s.
Prepared the proposal
drawings, cable and
conduit schedules,
calculations, MTO, ER
estimate &
SOW for installing new
4 no’s 7.5HP drinking
water pump motors by
taking power supply
from
existing MCC’s in
generator/switchgear
room. Also provide
lighting and local
control station for
each motor at all 46
no’s sites in Southern
Area Oil Operations Gas
Oil Separation Plant’s.-
Project Cost 400 Crores
4) (BI:10-00567)-
Rehabilitate Al-Mua’jjiz
Terminal (AMT) at
Yanbu.
Prepared the electrical
assessment reports for
all the existing
electrical equipment’s
such as
(emergency diesel
generators, power &
distribution
transformers,
switchgears (13.8KV,
4.16KV &
480V), MCC’s (4.16KV,
480V), existing 15KV,
5KV feeder cables,
cathodic protection
system etc.
Also, prepared the
proposal drawings,
datasheets, cable and
conduit schedules,
calculations,
MTO, ER Estimate &
SOW for new
110/13.8KV GIS
substation, new 10 no’s
buildings and
electrical driven
firewater pumps,
jockey pumps, foam
pumps, oily water
sump pumps and slop
tank pump motors-
Project Cost 335 Crores
iii) Experience in similar capacity as 20 1) Responsible for the 20
Construction Engineer/ Construction Expert installation of lighting
on at least one Major Building Project (of system, power
cost 40% of Project cost or more) distribution system,
< 1 project -0 Telephone, Intercom
1 project - 15 and Audio Visual
Add 2.5 mark extra for each additional system in accordance
project subject to maximum 5 (five) marks. with engineering
drawings for (2
Basements+Ground+5
floors) TCS building-
Project Cost 340 Crores