3.

4 Construction Engineer (Mechanical/ Electrical)

Marks
Reference/ Details of self
S. Max.
Description projects Claimed for Assessed
No. Points
self assessment by the
bidder
1 General Qualification 25
I) Graduate in Mechanical/
Electrical Engineering 21 B,Tech in Electrical and
25 Electronics 21
II) Post Graduation in Mechanical/ 04 Engineering in 2006
Electrical Engineering
2 Adequacy for the Project 70
Professional Experience in Building
a)
Projects:
Total Professional Experience in handling 1) Sr. Electrical
Building projects Engineer at Nhance
< 8 years -0 Consulting Engineers
8 years - 15 from October 2017 –
Add one mark extra for each additional year Present
of experience subject to maximum 5 (five)
marks. 2) Principal Engineer at
KBR-AMCDE, KSA from
Sep 2008- Aug-2017

i) 20 3) Material Planning 19
Engineer at WESCOSA,
KSA from Feb2008 to
July2008

4) Site Engineer at
Naseer Electrical Pvt.
Ltd. Hyd, India July-
2006 to Jan-2008

ii) Experience in similar capacity as 20 1) Responsible for the 20


Fabrication Engineer/ Construction Expert installation of lighting
on Major Building Project (of cost 40% of system, power
Project Cost or more) distribution system,
< 5 years -0 Telephone, Intercom
5 years - 15 and Audio Visual
Add one mark extra for each additional year system in accordance
of experience subject to maximum 5 (five) with engineering
marks. drawings for (2
Basements+Ground+5
floors) TCS building-
Project Cost 340 Crores

2) BI:10-00484)-
Upgrade Potable Water
System at 46 no’s SAOO
GOSP’s.
Prepared the proposal
drawings, cable and
conduit schedules,
calculations, MTO, ER
estimate &
SOW for installing new
4 no’s 7.5HP drinking
water pump motors by
taking power supply
from
existing MCC’s in
generator/switchgear
room. Also provide
lighting and local
control station for
each motor at all 46
no’s sites in Southern
Area Oil Operations Gas
Oil Separation Plant’s.-
Project Cost 400 Crores

3) J6800: Eight (8)


floor Residential &
Commercial building
for AYTB at Jubail.
Prepared the IFC
drawings, cable and
conduit schedules,
panel schedules,
calculations, MTO &
SOW for constructing
new 2 no’s 8 floors
building (1 no.
Residential & 1 no.
Commercial) at
AYTB, Jubail.-Project
Cost 350 Crores

4) (BI:10-00567)-
Rehabilitate Al-Mua’jjiz
Terminal (AMT) at
Yanbu.
Prepared the electrical
assessment reports for
all the existing
electrical equipment’s
such as
(emergency diesel
generators, power &
distribution
transformers,
switchgears (13.8KV,
4.16KV &
480V), MCC’s (4.16KV,
480V), existing 15KV,
5KV feeder cables,
cathodic protection
system etc.
Also, prepared the
proposal drawings,
datasheets, cable and
conduit schedules,
calculations,
MTO, ER Estimate &
SOW for new
110/13.8KV GIS
substation, new 10 no’s
buildings and
electrical driven
firewater pumps,
jockey pumps, foam
pumps, oily water
sump pumps and slop
tank pump motors-
Project Cost 335 Crores
iii) Experience in similar capacity as 20 1) Responsible for the 20
Construction Engineer/ Construction Expert installation of lighting
on at least one Major Building Project (of system, power
cost 40% of Project cost or more) distribution system,
< 1 project -0 Telephone, Intercom
1 project - 15 and Audio Visual
Add 2.5 mark extra for each additional system in accordance
project subject to maximum 5 (five) marks. with engineering
drawings for (2
Basements+Ground+5
floors) TCS building-
Project Cost 340 Crores

2) J6800: Eight (8)


floor Residential &
Commercial building
for AYTB at Jubail.
Prepared the IFC
drawings, cable and
conduit schedules,
panel schedules,
calculations, MTO &
SOW for constructing
new 2 no’s 8 floors
building (1 no.
Residential & 1 no.
Commercial) at
AYTB, Jubail.- Project
Cost 350 Crores

3) (BI: 10-07867 & BI:


10-12683)/WER-042:
ZULF AH Development-
Offshore Oil facilities &
Offshore Water
Injection Facilities.
Prepared Pre-Feed
(DBSP or FEL 2b)
design package for
Zuluf offshore
platforms under Zulf
Increment consisting of
2 no’s new 230/13.8kV
Electrical Distribuion
platforms (EDP), 35
no’s new
AH platforms, 78 no’s
existing AM platforms,
4 no’s new oil tie-in
platforms, 4 no’s
existing oil tiein
platforms, 19 no’s new
water injection
platforms and 3 no’s
new water tie-in
platforms. The
study was done by
evaluating 16 options
for powering offshore
oil facilities and 18
options for
powering offshore
water injection
facilities and came up
with the most suitable
techno-economic
option with
concurrence from SA
stakeholders. Based on
the selected option
FEED (Project
proposal or FEL3)
package will be
prepared in compliance
with S.Aramco,
international standards
and based on vendor
inputs. Prepared key
drawings such as single
line diagrams, block
diagrams, electrical
equipment layouts,
load lists, calculations,
study reports, vendor
inputs, etap
studies etc in order to
finalize techno-
economic evaluations.-
Project Cost-550
Crores

Experience in similar capacity on PPP 1) Construction of


projects (of cost 40% of Project cost or Schools for Sarva
more) Siksha Abhiyan in
iv) 10 2
2.0 marks for each projects subject to Manipur.- Project Cost
maximum 10 (ten) marks 650 Crores

Employment with the Firm


< 1 year -0
Employed with firm
3 1 year -3 5 3
since Oct-2017
Add 0.5 marks for each subsequent year
subject to maximum 2 marks
Total 100 85