You are on page 1of 3

I.

- DATOS
*A *B
MANO DE
VOLUMEN DE MATERIA PRIMA
PRODUCTO OBRA ACTIVIDAD INDUCTOR DE COSTO A B C D
PRODUCCION DIRECTA
DIRECTA

A 8,000.00 180 80 AJUSTE DE MAQUINA N° AJUSTES 400.00 200.00 800.00 1000.00

B 20,000.00 240 60 PROCESAMIENTO HORAS MAQUINA 8000 2000 10000 8000

MATERIAL
C 4,000.00 80 40 PROVISIONAMIENTO DE MATERIAL
CONSUMIDO
1440 4800 320 240

D 2,000.00 120 40 INGIENERA N° CAMBIOS 2600 400 1600 2400

SUPERVISION N° DE INSPECCIONES 12000 10000 8000 10000

UNIDADES
OCUPACION 8000 20000 4000 2000
PRODUCIDAS

II.- DISTRIBUCION DE COSTOS INDIRECTOS DE FABRICACION (EXPRESADO EN MILES DE SOLES) IV.- DISTRIBUCION DEL CIF

INDUCTOR DE
ACTIVIDAD A B C D TOTAL ACTIVIDAD A B C
COSTO

AJUSTE DE MAQUINA N° AJUSTES 343.75 171.88 687.50 859.38 2,062.50 MATERIA PRIMA DIRECTA 1,400,000 4,800,000 320,000

PROCESAMIENTO HORAS MAQUINA 1,315.00 328.75 1,643.75 1,315.00 4,602.50 MANO DE OBRA DIRECTA 640,000 1,200,000 160,000

PROVISIONAMIENTO DE MATERIAL
556.94 1,856.47 123.76 92.82 2,630.00 AJUSTE DE MAQUINA 3,850,000 962,500 4,812,500
MATERIAL CONSUMIDO

INGIENERA N° CAMBIOS 831.07 127.86 511.43 767.14 2,237.50 TOTALES (A) 5,890,000 6,962,500.00 5,292,500

N° DE
SUPERVISION 239.25 199.38 159.50 199.38 797.50
INSPECCIONES

OCUPACION
UNIDADES
PRODUCIDAS
269.41 673.53 134.71 67.35 1,145.00 DIFERENCIA 294,576 -2,395,357 1,551,851

TOTAL 13,475.00

III.- ESTADO DE COSTO DE PRODUCCION


TOTALES (B) 5,595,424.37 9,357,857.14 3,740,649.16

ACTIVIDAD A B C D TOTAL
C.I.F DIFERENCIA DE MANO DE OBRA
MATERIA PRIMA DIRECTA 1,400,000 4,800,000 320,000 240,000 6,760,000

COSTO POR ABSORCION


MANO DE OBRA DIRECTA 640,000 1,200,000 160,000 80,000 2,080,000

M.P.D
C.I.F M.O.D.
ES IGUAL

AJUSTE DE MAQUINA 343,750 171,875 687,500 859,375 2,062,500


DISTRIBUCION C.I.F
BASE : HORAS MAQUINA
PROCESAMIENTO 1,315,000 328,750 1,643,750 1,315,000 4,602,500
TOTAL : 28,000
PROVISIONAMIENTO DE
556,941 1,856,471 123,765 92,824 2,630,000
MATERIAL FORMULA
INGIENERA 831,071 127,857 511,429 767,143 2,237,500
TOTAL C.I.F 13,475,000
TOTAL HORAS MAQUINA 28,000
SUPERVISION 239,250 199,375 159,500 199,375 797,500

OCUPACION 269,412 673,529 134,706 67,353 1,145,000


1.- 481.25
TOTALES 5,595,424 9,357,857 3,740,649 3,621,069 22,315,000
2.- 481.25 X 3,000

22,315,000
3.- 1,443,750
TOTAL

2,400.00

28,000.00

6,800.00

7,000.00

40,000.00

34,000.00

D TOTAL

240,000 6,760,000

80,000 2,080,000

3,850,000 13,475,000

4,170,000 22,315,000

548,931 0

3,621,069.33 22,315,000