Professional Documents
Culture Documents
Project:
PERMOHONAN KEBENARAN MERANCANG UNTUK MEROBOHLAN 1 BLOK BANGUNAN TERBENGKALAI
5 TINGKAT SEDIADA DAN MEMBINA SEMULA 1 BLOK BANGUNAN 42 TINGKAT YANG
MENGANDUGI 2 MENARA
PANGSAPURI PERKHIDMATAN YANG MNEGANDUNGI:-
FASA 1 - (A) 18 UNIT KEDAI DI TINGKAT 1
(B) 16 UNIT PEJABAT DI TINGKAT 2
(C ) TEMPAT LETAK KENDERAAN DI TINGKAT 3 & 4
FASA 2- (A) 260 UNIT PANGSAPURI PERKHIDMATAN (MENARA A) DI TINGKAT 10 HINGGA 42
(B) TEMPAT LETAK KENDERAAN DI TINGKAT 5 HINGGA 8
(C ) KAWASAN LAPANG, KOLAM RENANG DAN KEMUDAHAN FASILITI DI TINGKAT 9
FASA 3 - (A) 260 UNIT PANGSAPURI PERKHIDMATAN (MENARA B) DI TINGKAT 10 HINGGA 42, DI
JALAN ROZHAN, DI ATAS LOT 12089 DAN ATAS FASAMUKIM
PT4012, 1 & 2. 15,
SEBERANG PERAI TENGAH, PULAU PINANG.
SECARA SERENTAK DENGAN PERMOHONAN PENYERAHAN BALIK DAN PEMBILIMILIKAN
SEMULA
SEK.SYEN (DI204D,
BAWAH
KTN).
From Table 4.1, the Design Storm ARI for Residential of High Density for Minor System should be of 10 year.
However for Water Quality Design Storm, it should be checked against 3 months ARI.
The time of concentration tc at the development outlet is estimated to be 20 minutes.
Pervious Area
Open space = 2000 m^2 0 m^2
R= 2 yrs (ARI)
a= 4.5140 c= -0.2311 } Table 13.A1: Fitted Coefficients
b= 0.6729 d= 0.0118 } for IDF curves for Pulau Pinang
t= 30 t= 60
bln(t) = 2.2887 bln(t) = 2.7551
c(ln(t))2 = -2.6734 c(ln(t))2 = -3.8741
d(ln(t))3 = 0.4643 d(ln(t))3 = 0.8099
I30 =
2
98.84 mm/hr
2
I60 = 67.01 mm/hr
P30 =
2
49.42 mm P60 =
2
67.01 mm
2
P24th = 140 mm Figure 13.3 (For Pulau Pinang)
Therefore, FD = 0.38 Table 13.3 (For tc = 20 minutes)
Calculate size of lined drain section for Water Quality (Sedimentation) control
3 months ARI
n= 0.013
S= 0.5 %
B= 1.20 m (Base Width of Drain)
Qtotal n /(So1/2 B8/3) = 0.103
V= Q/A
= 0.90 m/s > 0.6 m/s OK
Check against 10 Year ARI of 5 minutes duration
R= 10 yrs (ARI)
a= 3.7277 c= -0.4023 } Table 13.A1: Fitted Coefficients
b= 1.4393 d= 0.0241 } for IDF curves for Pulau Pinang
t= 30 t= 60
bln(t) = 4.8953 bln(t) = 5.8930
c(ln(t))2 = -4.6539 c(ln(t))2 = -6.7440
d(ln(t))3 = 0.9482 d(ln(t))3 = 1.6541
10
I30 = 136.65 mm/hr
10
I60 = 92.83 mm/hr
10
P30 = 68.32 mm P60 =
10
92.83 mm
10 Year ARI
I = Pd / d Equation 13.4
10
I20 = 177.03 mm/h
y/B = 1 For Z = 0
y= 1.800 m (Depth of Drain)
V= Q/A
= 0.77 m/s > 0.6 m/s OK
< 4 m/s OK
Conclusion
1.80M
Proposed Drain Size=
>1.85M
*The Proposed drain size provided is adequate for 10 yr and 3 Month ARI for Quantity and Quality requirement.
TEMPORARY EARTHDRAINS DESIGN BASED ON 'MANUAL SALIRAN MESRA ALAM'
Permohonan Untuk Kelulusan Kerja Tanah
Project:
Cadangan Mendirikan 10 Unit Bengkel Industri & Dewan Pameran Setingkat Dengan Pejabat 2 Tingkat
Berkembar, Lot 1788, Mukim 14, Jalan Rozhan, Seberang Perai Tengah.
From Table 4.1, the Design Storm ARI for Residential of High Density for Minor System should be of 2 year.
However for Water Quality Design Storm, it should be checked against 3 months ARI.
The time of concentration tc at the development outlet is estimated to be 5 minutes.
R= 2 yrs (ARI)
a= 4.5140 c= -0.2311 } Table 13.A1: Fitted Coefficients
b= 0.6729 d= 0.0118 } for IDF curves for Pulau Pinang
t= 30 t= 60
bln(t) = 2.2887 bln(t) = 2.7551
c(ln(t))2 = -2.6734 c(ln(t))2 = -3.8741
d(ln(t))3 = 0.4643 d(ln(t))3 = 0.8099
I30 =
2
98.84 mm/hr I60 =
2
67.01 mm/hr
P30 =
2
49.42 mm P60 =
2
67.01 mm
2
P24th = 140 mm Figure 13.3 (For Pulau Pinang)
Therefore, FD = 1.70 Table 13.3 (For tc = 5 minutes)
3 months ARI
n= 0.013
S= 0.1 %
B= 0.45 m (Base Width of Drain)
Qtotal n /(So1/2 B8/3) = 1.080
V= Q/A
= 0.86 m/s > 0.6 m/s OK
R= 2 yrs (ARI)
a= 4.5140 c= -0.2311 } Table 13.A1: Fitted Coefficients
b= 0.6729 d= 0.0118 } for IDF curves for Pulau Pinang
t= 30 t= 60
bln(t) = 2.2887 bln(t) = 2.7551
c(ln(t))2 = -2.6734 c(ln(t))2 = -3.8741
d(ln(t))3 = 0.4643 d(ln(t))3 = 0.8099
2
I30 = 98.84 mm/hr I60 =
2
67.01 mm/hr
2
P30 = 49.42 mm P60 =
2
67.01 mm
2 Year ARI
I = Pd / d Equation 13.4
2
I5 = 234.18 mm/h
V= Q/A
= 0.66 m/s > 0.6 m/s OK
< 2 m/s OK
Conclusion
*The Earth drain size provided is adequate for 2 yr and 3 Month ARI for Quantity and Quality requirement.
Table 13.3 Values of FD for Equation 13.3
P24th (mm)
2
Duration
West Coast East Coast
(minutes) < 100 120 130 (PG) 150 > 180 All
5 2.08 1.85 1.77 1.62 1.40 1.39
10 1.28 1.13 1.08 0.99 0.86 1.03
15 0.80 0.72 0.69 0.62 0.54 0.74
20 0.47 0.42 0.40 0.36 0.32 0.48
30 0 0 0 0 0 0
Pd =
10
P30 - FD(10P60-10P30)
10
Equation 13.3
Id =
10
Pd / d
10
Equation 13.4
Duration, d Pd
10
Id
10
R= 10 yrs ARI
a= 3.7277 c= -0.4023 } Table 13.A1: Fitted Coefficients
b= 1.4393 d= 0.0241 } for IDF curves for Pulau Pinang
t= 40 t= 50
bln(t) = 5.3094 bln(t) = 5.6306
c(ln(t))2 = -5.4744 c(ln(t))2 = -6.1568
d(ln(t))3 = 1.2098 d(ln(t))3 = 1.4429
10
It = 118.21 mm/hr It =
10
104.00 mm/hr