The first meeting of Energy Core Group was held in Corporate Office on
24/04/2007 under the chairmanship of Dir(Plg & NS) to review the activities of Energy
Conservation in BSNL. Following decisions were taken for implementation of Energy
Conservation Measures (ECMs) in BSNL.
A No Cost Measures:
1. CMD rationalization
2. Power Factor Improvement
3. Switch off Stand by Transformer
4. Thermostat Adjustment
5. Isolate non-AC area
6. Reduce excess illumination
7. Switch off lights in unmanned area
2. BSNL shall implement draft Energy Conservation Building code for all new
building > 500 KW connected load or 1000 sq m of air-conditioned area.
Additions to existing building with above parameters shall also be covered.
Code is available at website www.electrical.bsnl.co.in.
3. a) One SDE(E) and minimum one JTO in each SSA shall form Energy Audit
team associating the building in charge as other member. They shall
conduct energy audit for one building in each of the following categories:-
4. a) SSA level energy audit team shall be provided with basic energy monitoring
instrument as given below.
a. Load Manager
b. Anemometer
c. Tong Tester
d. Pressure Gauge
e. Tachometer
f. Stroboscope
g. Temperature & Humidity Monitor with RS 232 connectivity
h. Lux Meter
i. HT Megger
j. LT Megger
k. Earth Tester
l. Specific Gravity
m. Multimeter
b) The accredited energy audit team shall be provided with specialized equipment
for energy monitoring (one set at circle level) in addition to the above
instruments. PCE(E)/CE(E) shall be fully empowered to decide and procure
additional equipments based on their requirement.
5. PCE(E)/CE(E) shall identify the quantum of work for implementing EC
measures along with procurement of equipment and other accessories. The
budget provision in the Circle Budget shall be made in the RE 2007-08 and
BE 2008-09 keeping the target for completion 30% in this financial year
and balance in next financial year.
1 2 3 4 5 6 7 8
Elec &
% Fuel
kWh generated by DG Net kWh Change Exp Penalty kWh/
Net 9-10- Utility+DG Base kWh (13- Del
Total NewConn Add/Alt 11 8+12 Utility+DG 14)/14 Rupees Rupees (5+9)/4
9 10 11 12 13 14 15 16 17 18
Note : 1. DELs in column 4 shall include PSTN, WLL(fixed and mobile) and GSM.
2. Returns to be submitted quarterly. Return for quarter ending 03/07 to be received by
15/05/2007.