System Frequency: 60 Hz
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Cable Length: No
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 523 58.223 33.074 9.102 4.355 0.000 0.000 0.000 0.000
184.900 117.062
ETAP
Project: C.S.E RPLC Page: 18
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
CAMPO NORTE 1.500 13.800 2.400 5.50 7.10 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
PAL 1-1 150.000 230.000 16.500 7.00 42.00 0 0 0 0 0 7.0000 Std Pos. Seq. 0.0
PM2 0.038 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PM6 0.075 13.800 0.208 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PM8 0.050 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PM18 0.150 13.800 0.208 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PM21 0.113 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PM23 0.150 13.800 0.208 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PM25 0.113 13.800 0.208 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PM-3 0.150 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PM-17 0.225 13.800 0.208 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PM_3 0.500 13.800 0.480 5.75 3.09 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0
PM_4 0.500 13.800 0.480 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PMC-1 0.225 13.800 0.240 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PMC-2 0.150 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PMC-7 0.113 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
PMC-8 0.075 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T1-1 1.500 13.800 0.480 5.90 7.10 0 0 0 0 0 5.9000 Std Pos. Seq. 0.0
T2-1 0.010 0.480 0.240 2.30 1.13 0 0 0 0 0 2.3000 Std Pos. Seq. 0.0
T3-2 1.500 13.800 0.480 5.90 7.10 0 0 0 0 0 5.9000 Std Pos. Seq. 0.0
T4-2 0.075 13.800 0.240 5.75 2.47 0 0 0 -5.000 0 5.7500 Std Pos. Seq. 0.0
T5-1 2.500 13.800 2.400 5.50 10.67 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T9-1 3.750 13.800 4.160 6.03 10.67 0 0 0 0 0 6.0300 Std Pos. Seq. 0.0
T10-1 0.100 13.800 0.220 5.75 2.47 0 0 0 -5.000 0 5.7500 Std Pos. Seq. 0.0
T11-1 1.500 13.800 0.480 6.09 7.10 0 0 0 0 0 6.0900 Std Pos. Seq. 0.0
T12-1 5.000 13.800 4.160 5.50 12.14 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T13-2 0.025 13.800 0.220 5.75 2.47 0 0 0 -2.500 0 5.7500 Std Pos. Seq. 0.0
T14-1 1.500 13.800 0.480 5.73 7.10 0 0 0 0 0 5.7300 Std Pos. Seq. 0.0
T15-1 0.015 0.480 0.240 2.30 1.13 0 0 0 0 0 2.3000 Std Pos. Seq. 0.0
T15-2 0.300 13.800 2.400 5.50 3.09 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T16-1 0.015 0.480 0.240 2.30 1.13 0 0 0 0 0 2.3000 Std Pos. Seq. 0.0
T16-2 0.030 13.800 0.220 5.75 2.47 0 0 0 -2.500 0 5.7500 Std Pos. Seq. 0.0
T18 3.000 13.800 2.400 5.50 10.67 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T19 1.500 13.800 0.480 5.74 7.10 0 0 0 0 0 5.7400 Std Pos. Seq. 0.0
ETAP
Project: C.S.E RPLC Page: 28
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
T20-1 2.300 13.800 4.160 5.89 10.67 0 0 0 0 0 5.8900 Std Pos. Seq. 0.0
T21 0.150 2.400 0.220 4.00 3.45 0 0 0 -2.500 0 4.0000 Std Pos. Seq. 0.0
T22 1.500 13.800 0.480 5.54 7.10 0 0 0 0 0 5.5400 Std Pos. Seq. 0.0
T24 1.500 13.800 0.480 5.54 7.10 0 0 0 0 0 5.5400 Std Pos. Seq. 0.0
T25 0.300 13.800 0.220 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T26-1 2.300 13.800 4.160 5.89 10.67 0 0 0 0 0 5.8900 Std Pos. Seq. 0.0
T27 0.300 13.800 0.220 5.00 3.09 0 0 0 0 0 5.0000 Std Pos. Seq. 0.0
T28 1.500 13.800 0.480 5.73 7.10 0 0 0 0 0 5.7300 Std Pos. Seq. 0.0
T29 0.113 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T30 0.300 13.800 0.220 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T31 0.150 13.800 0.208 5.75 2.47 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0
T33-1 0.750 13.800 0.480 5.47 3.96 0 0 0 0 0 5.4700 Std Pos. Seq. 0.0
T34 0.113 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T35 1.500 13.800 2.400 5.50 7.10 0 0 0 -5.000 0 5.5000 Std Pos. Seq. 0.0
T36 1.500 13.800 2.400 5.50 7.10 0 0 0 -5.000 0 5.5000 Std Pos. Seq. 0.0
T41 0.045 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T43 0.300 2.400 0.480 5.59 4.70 0 0 0 0 0 5.5900 Std Pos. Seq. 0.0
T44 0.225 13.800 0.240 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T45 5.000 13.800 4.160 5.50 12.14 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T46-1 0.750 13.800 0.480 5.47 3.96 0 0 0 0 0 5.4700 Std Pos. Seq. 0.0
T47 3.000 13.800 2.400 5.50 10.67 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T48 0.030 2.400 0.220 2.60 1.69 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0
T49 0.300 13.800 0.480 5.75 2.47 0 0 0 -2.500 -2.500 5.7500 Std Pos. Seq. 0.0
T50 0.750 13.800 2.400 5.50 3.96 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T51-1 0.300 13.800 0.480 5.49 3.09 0 0 0 0 0 5.4900 Std Pos. Seq. 0.0
T52 0.030 2.400 0.220 2.60 1.69 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0
T53 0.500 13.800 0.240 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T54 0.750 13.800 2.400 5.50 3.96 0 0 0 -2.500 0 5.5000 Std Pos. Seq. 0.0
T55 0.300 13.800 0.480 5.00 2.47 0 0 0 0 0 5.0000 Std Pos. Seq. 0.0
T57 0.045 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T58-1 1.725 13.800 0.480 5.75 7.10 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T59 0.750 13.800 0.480 5.75 3.96 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0
T60 0.038 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T61 0.075 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T62-1 0.750 13.800 2.400 5.50 3.96 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T63 0.045 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
ETAP
Project: C.S.E RPLC Page: 29
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
T64 1.500 13.800 4.160 5.50 7.10 0 0 0 5.000 0 5.5000 Std Pos. Seq. 0.0
T65 0.300 4.160 0.480 4.80 4.70 0 0 0 0 0 4.8000 Std Pos. Seq. 0.0
T66 0.045 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T67 0.750 13.800 0.480 5.75 3.96 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T68 1.000 2.400 0.480 3.70 5.79 0 0 0 0 0 3.7000 Std Pos. Seq. 0.0
T70 0.075 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T71-1 1.725 13.800 0.480 5.75 7.10 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T72 0.025 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T73 0.113 2.400 0.480 4.00 3.45 0 0 0 0 0 4.0000 Std Pos. Seq. 0.0
T75 0.075 2.400 0.480 2.60 1.92 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0
T77 0.030 2.400 0.240 2.60 1.69 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0
T81 0.150 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T84 0.300 13.800 0.240 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T86 0.045 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T88 0.075 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T92 0.010 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T94 0.150 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T95 1.000 13.800 2.400 5.50 5.79 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T96 0.150 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T100 0.045 0.480 0.240 2.60 1.69 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0
T101 0.750 13.800 0.480 5.75 3.96 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T102 0.045 0.480 0.240 2.60 1.69 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0
T104 0.300 13.800 0.480 5.75 3.09 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0
T105 0.150 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T107 0.045 13.800 0.480 5.75 2.47 0 0 0 5.000 0 5.7500 Std Pos. Seq. 0.0
T108 0.500 13.800 0.480 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T109 0.300 13.800 2.400 5.68 3.09 0 0 0 0 0 5.6800 Std Pos. Seq. 0.0
T110 0.300 13.800 0.480 5.75 3.09 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0
T111 1.000 13.800 2.400 5.50 5.79 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T113 0.045 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T119 0.500 13.800 0.480 4.90 3.09 0 0 0 0 0 4.9000 Std Pos. Seq. 0.0
T124 0.113 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T126 0.150 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T128 0.300 13.800 0.480 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T130 0.300 13.800 0.480 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T137 0.750 13.800 0.480 5.75 3.96 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
ETAP
Project: C.S.E RPLC Page: 30
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
T138 0.750 13.800 0.480 5.75 3.96 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T140 1.500 13.800 2.400 5.50 7.10 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T142 0.150 2.400 0.240 4.00 3.45 0 0 0 0 0 4.0000 Std Pos. Seq. 0.0
T143 1.000 13.800 0.220 5.75 5.79 0 0 0 5.000 0 5.7500 Std Pos. Seq. 0.0
T148 0.075 13.800 0.208 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T153 0.038 13.800 0.480 5.75 2.47 0 0 0 -2.500 0 5.7500 Std Pos. Seq. 0.0
T156 0.025 13.800 0.240 5.75 2.47 0 0 0 -2.500 0 5.7500 Std Pos. Seq. 0.0
T158 0.150 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T160 0.113 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T-19-13/T1 1.500 13.800 2.400 5.75 7.10 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T-20-13/T1 1.500 13.800 2.400 5.75 7.10 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T-21-13/T1 0.750 13.800 0.480 5.50 3.96 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T-22-13/T1 0.750 13.800 0.480 5.50 3.96 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T-24-1 0.750 13.800 0.480 5.54 3.96 0 0 0 0 0 5.5400 Std Pos. Seq. 0.0
T-25-1 0.750 13.800 0.480 5.54 3.96 0 0 0 0 0 5.5400 Std Pos. Seq. 0.0
T-26-1-1 1.500 13.800 0.480 5.50 7.10 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T-27-1-1 1.500 13.800 0.480 5.50 7.10 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0
T-36-13/T1 0.300 13.800 2.400 5.62 3.09 0 0 0 0 0 5.6200 Std Pos. Seq. 0.0
T-53-27/T1 0.500 13.800 0.480 5.44 3.09 0 0 0 0 0 5.4400 Std Pos. Seq. 0.0
T-57-27/T1 1.500 13.800 2.400 5.75 7.10 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T-66-15/T1 1.500 13.800 2.400 5.62 7.10 0 0 0 0 0 5.6200 Std Pos. Seq. 0.0
T-67 0.750 13.800 0.440 5.75 3.96 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0
T-68 0.750 13.800 0.440 5.75 3.96 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
T-69 0.500 13.800 0.480 4.92 3.09 0 0 0 0 0 4.9200 Std Pos. Seq. 0.0
T-71 0.750 13.800 0.480 5.24 3.96 0 0 0 -2.500 0 5.2400 Std Pos. Seq. 0.0
T-72 0.750 13.800 0.480 5.24 3.96 0 0 0 -2.500 0 5.2400 Std Pos. Seq. 0.0
T-74 7.500 13.800 4.160 5.60 14.23 0 0 0 5.000 0 5.6000 Std Pos. Seq. 0.0
T-75 0.300 13.800 0.480 5.75 3.09 0 0 0 5.000 0 5.7500 Std Pos. Seq. 0.0
T-76 0.300 13.800 0.480 5.75 3.09 0 0 0 5.000 0 5.7500 Std Pos. Seq. 0.0
T-77 7.500 13.800 4.160 5.60 14.23 0 0 0 0 0 5.6000 Std Pos. Seq. 0.0
T-78 2.500 13.800 2.400 5.63 10.67 0 0 0 0 0 5.6300 Std Pos. Seq. 0.0
T-79 2.500 13.800 2.400 5.77 10.67 0 0 0 0 0 5.7700 Std Pos. Seq. 0.0
T-80 1.500 13.800 2.400 7.00 7.10 0 0 0 0 0 7.0000 Std Pos. Seq. 0.0
T-82 1.500 13.800 2.400 6.30 7.10 0 0 0 0 0 6.3000 Std Pos. Seq. 0.0
TFB-3001 0.300 4.160 0.480 4.80 4.70 0 0 0 0 0 4.8000 Std Pos. Seq. 0.0
TFB-3002 0.300 4.160 0.480 5.99 4.70 0 0 0 0 0 5.9900 Std Pos. Seq. 0.0
ETAP
Project: C.S.E RPLC Page: 31
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
TFM-3001 1.500 13.800 4.160 5.53 7.10 0 0 0 0 0 5.5300 Std Pos. Seq. 0.0
TFM-3002 1.500 13.800 4.160 5.53 7.10 0 0 0 0 0 5.5300 Std Pos. Seq. 0.0
TPA-03 5.000 13.800 2.400 5.72 12.14 0 0 0 0 0 5.7200 Std Pos. Seq. 0.0
TPA-04 5.000 13.800 2.400 5.68 12.14 0 0 0 0 0 5.6800 Std Pos. Seq. 0.0
TX-BARRA A-1-1 1.000 13.800 4.160 5.63 5.79 0 0 0 0 0 5.6300 Std Pos. Seq. 0.0
TX-BARRA B-1-1 1.000 13.800 4.160 5.63 5.79 0 0 0 0 0 5.6300 Std Pos. Seq. 0.0
XFR53-4F01-1 1.500 13.800 0.480 6.06 7.10 0 0 0 0 0 6.0600 Std Pos. Seq. 0.0
XFR53-4F02-1 1.500 13.800 0.480 6.06 7.10 0 0 0 0 0 6.0600 Std Pos. Seq. 0.0
XFR-53-3B03 2.500 4.160 0.480 5.75 10.70 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0
XFR-53-3B04 2.500 4.160 0.480 5.75 10.70 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
XFR-53-3D01 2.500 4.160 0.480 5.82 10.67 0 0 0 0 0 5.8200 Std Pos. Seq. 0.0
XFR-53-3D02 2.500 4.160 0.480 5.82 10.67 0 0 0 0 0 5.8200 Std Pos. Seq. 0.0
XFR-53-4B01 8.000 13.800 6.600 6.50 14.20 0 0 0 0 0 6.5000 Std Pos. Seq. 0.0
XFR-53-5A01 0.750 34.500 0.480 5.75 5.80 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
XFR-53-5A02 0.750 34.500 0.480 5.75 5.80 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
XFR-53-5B01 15.000 34.500 4.160 7.50 18.60 0 0 0 0 5.000 7.5000 Std Pos. Seq. 0.0
XFR-53-5B03 15.000 34.500 4.160 7.50 18.60 0 0 0 0 5.000 7.5000 Std Pos. Seq. 0.0
XFR-53-5B04 15.000 34.500 4.160 7.50 18.60 0 0 0 0 0 7.5000 Std Pos. Seq. 0.0
XFR-53-5B05 20.000 34.500 13.800 4.68 18.60 0 0 0 0 5.000 4.6800 Std Pos. Seq. 0.0
XFR-53-5B06 20.000 34.500 13.800 4.68 18.60 0 0 0 0 0 4.6800 Std Pos. Seq. 0.0
XFR-53-5B07 2.500 34.500 0.480 5.75 10.70 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
XFR-53-5B08 2.500 34.500 0.480 5.75 10.70 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
XFR-53-5D01 5.000 34.500 4.160 5.22 12.14 0 0 0 0 0 5.2200 Std Pos. Seq. 0.0
XFR-53-5D02 5.000 34.500 4.160 5.22 12.14 0 0 0 0 0 5.2200 Std Pos. Seq. 0.0
XFR-53-5X01 20.000 13.800 34.500 7.50 18.60 0 0 0 0 0 7.5000 Std Pos. Seq. 0.0
XFR-53-5X02 20.000 13.800 34.500 7.50 18.60 0 0 0 0 0 7.5000 Std Pos. Seq. 0.0
XFR-53-7A02 55.000 230.000 34.500 10.00 34.10 0 0 0 0 0 10.0000 Std Pos. Seq. 0.0
XFR--53-5B02 15.000 34.500 4.160 7.50 18.60 0 0 0 0 0 7.5000 Std Pos. Seq. 0.0
PAL 1-1 * BARRA_A1-1 PAL_A-1 -10.00 10.00 0.625 BARRA_A1-1 100.00 230.000
T-80 * P2-7G (AGUA SALADA) n1 -10.00 10.00 0.625 P2-7G (AGUA SALADA) 100.00 13.800
XFR-53-5X01 * Bus22 Bus59 -10.00 10.00 0.625 PPE BARRA_A 100.00 13.800
ETAP
Project: C.S.E RPLC Page: 32
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
XFR-53-5X02 * Bus119 Bus120 -10.00 10.00 0.625 PPE BARRA_B 100.00 13.800
BD-19-2B11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-19-2B12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-20-2B11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-20-2B12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-20-2B13 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-20-2B14 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-45-2B11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-45-2B12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-45-2B13 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-45-2B14 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-46-2D11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-46-2D12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-47-2D11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-47-2D12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-48-2D11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-48-2D12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-49-2D11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-49-2D13 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-49-2D14 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base
BD-53-3B11 0.5800000 0.5800000 0.0000000 % in 4,160 kV base and 100,0 MVA base
BD-53-3B12 0.5800000 0.5800000 0.0000000 % in 4,160 kV base and 100,0 MVA base
BD-53-3B14 0.5800000 0.5800000 0.0000000 % in 4,160 kV base and 100,0 MVA base
BD-53-5B13 0.5800000 0.5800000 0.0000000 % in 4,160 kV base and 100,0 MVA base
ETAP
Project: C.S.E RPLC Page: 33
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Branch Connections
T72 2W XFMR P11-8H (S/E BOM DE CARGA) Bus84-1 8631.20 21319.06 23000.00
TFM-3001 2W XFMR BCI 13,8 "A" BCI 4,16"A" 51.42 365.06 368.67
TFM-3002 2W XFMR BCI 13,8 "B" BCI 4,16"B" 51.42 365.06 368.67
TPA-03 2W XFMR Bus17-1 S.A BARRA "A" 2.4KV 9.39 114.01 114.40
TPA-04 2W XFMR Bus15-1 S.A BARRA "B" 2.4KV 9.33 113.22 113.60
Cable1-2 Cable BARRA "G" P2-7G (AGUA SALADA) 1.04 0.24 1.07
Cable2-3 Cable PDC_RPLC BARRA "E" SISOR BARRA "1" 0.24 0.30 0.39
Cable4-5 Cable PDC_RPLC BARRA "F" SISOR BARRA "2" 0.24 0.30 0.39
Cable10-2 Cable P2-7G (AGUA SALADA) G-8 (BOMBA DE TRANF.) 24.36 5.51 24.98
ETAP
Project: C.S.E RPLC Page: 38
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Cable34-2 Cable DA-3 BARRA G (2.4) BARRA "G" DA-3 22.21 22.73 31.78
Cable36-2 Cable DA-3 BARRA H (2.4) BARRA "H" DA-3 22.21 22.73 31.78
ETAP
Project: C.S.E RPLC Page: 39
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Cable43-2 Cable DA-3 BARRA G (480) BARRA "G" DA-3. 555.21 434.60 705.08
Cable45-2 Cable DA-3 BARRA H (480) BARRA "H" DA-3. 555.21 434.60 705.08
Cable73-1 Cable PDC_RPLC BARRA "E" POSTE: 1-7E 0.15 0.18 0.23
Cable75-1 Cable barra a 480v STG BARRA A STG 86.72 141.83 166.24
Cable105-1 Cable P11-8H (S/E BOM DE CARGA) Bus85-1 1.04 0.24 1.07
Cable166-1-1 Cable Bus49-1-1 BARRA "B" 480V (FCC) 173.44 283.66 332.48
Cable167-1-1 Cable Bus48-1-1 BARRA "A" 480V (FCC) 173.44 283.66 332.48
Line11 Line P13-6E BCI 13,8 "A" 2.81 2.34 3.66 0.0001453
Line21 Line P15-7F BCI 13,8 "B" 2.81 2.34 3.66 0.0001453
Line30 Line S/E TL 6G-4 S/E TL 6G-3 8.04 6.70 10.47 0.0004151
Line31 Line P16-7E (GLP) P17-7E (GLP) 1.41 1.17 1.83 0.0000726
Line63 Line Bus130 P11-8H (S/E BOM DE CARGA) 2.81 2.34 3.66 0.0001453
Line66 Line Bus88-1 TANQ AGUA SERV. EL 996.94 820.69 1291.28 0.0000477
CHAURE
Line68 Line P1-4G P2-4G 6.03 4.96 7.81 0.0003152
Line72 Line Bus77-1 P23-6E (PLANTA DE HIELO) 2.01 1.67 2.62 0.0001038
Line74 Line TANQ AGUA SERV. EL PLANT AGUA SERV EL 99.69 82.07 129.13 0.0000048
CHAURE CHAURE
Line76 Line P1-10B P17-10B 24.12 19.86 31.24 0.0012608
Line77 Line PLANT AGUA SERV EL Bus93-1 2990.81 2462.06 3873.85 0.0001430
CHAURE
Line79 Line P26-10B P27-10B 1.41 1.16 1.82 0.0000735
Line88 Line P10-6E CRUZ DE LA PALOMA P11/6E 2.01 1.67 2.62 0.0001038
Line109 Line CASETA 1-6H CASETA 2-6H 2.01 1.67 2.62 0.0001038
Line113 Line RESP CASETA1-3I RESP CASETA2-3I 2.01 1.67 2.62 0.0001038
Line114 Line CASETA 2-6H CASETA 3-6H 2.01 1.67 2.62 0.0001038
Line115 Line RESP CASETA2-3I RESP CASETA3-3I 2.01 1.67 2.62 0.0001038
ETAP
Project: C.S.E RPLC Page: 45
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Line146 Line P11-8H (S/E BOM DE CARGA) P37-8H 36.19 30.14 47.09 0.0018681
ID ID Type Library Size Adj. (ft) % Tol #/ph T (°C) R X Y Adj.(ohm) % Tol
Cable100 EM-4603-1. Ind. Motor 0,6NCUN3 2 492.1 0.0 1 75 .20200 .03900 .0000000 .0000 0.0
Cable155 EM-4603-2. Ind. Motor 0,6NCUN3 2 492.1 0.0 1 75 .20200 .03900 .0000000 .0000 0.0
Cable106 EM-4604-1 Ind. Motor 0,6NCUS1 10 492.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable105 EM-4604-2. Ind. Motor 0,6NCUS1 10 492.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable114 EM-4702-1. Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
Cable115 EM-4702-2. Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
Cable159 EM-4704- 4 Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
Cable118 EM-4704-1. Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
Cable133 EM-4902-1. Ind. Motor 0,6NCUS1 10 328.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable18-2 G-2002 Ind. Motor 15MCUS3 500 656.2 0.0 3 75 .03000 .03940 .0000000 .0000 0.0
Cable104 GM-4601 Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
Cable101 GM-4602 A Ind. Motor 0,6NCUN3 8 492.1 0.0 1 75 .81100 .05030 .0000000 .0000 0.0
Cable103 GM-4603 Ind. Motor 0,6NCUN3 2 492.1 0.0 1 75 .20200 .03900 .0000000 .0000 0.0
Cable102 GM-4604. Ind. Motor 0,6NCUS1 12 492.1 0.0 1 75 2.06739 .89000 .0000000 .0000 0.0
Cable150 GM-4606. Ind. Motor 0,6NCUS1 10 492.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable162 GM-4701 Ind. Motor 0,6NCUN3 8 492.1 0.0 1 75 .81100 .05030 .0000000 .0000 0.0
Cable6-1 GM-4702B Ind. Motor 5,0NCUN1 4 492.1 0.0 1 75 .31379 .11000 .0000000 .0000 0.0
Cable116 GM-4706 A. Ind. Motor 0,6NCUN3 1/0 492.1 0.0 1 75 .12700 .03600 .0000000 .0000 0.0
Cable3-1 GM-4801A Ind. Motor 5,0NCUN1 4 492.1 0.0 1 75 .31379 .11000 .0000000 .0000 0.0
Cable122 GM-4802. Ind. Motor 0,6NCUS1 10 492.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable145 GM-4901-B Ind. Motor 0,6NCUN3 350 328.1 0.0 1 75 .03680 .03280 .0000000 .0000 0.0
Cable132 GM-4901-C Ind. Motor 0,6MCUN3 350 328.1 0.0 1 75 .03780 .03730 .0000000 .0000 0.0
Cable137 GM-4902A. Ind. Motor 0,6NCUS1 12 4921.3 0.0 1 75 2.06739 .89000 .0000000 .0000 0.0
Cable139 GM-4902B. Ind. Motor 0,6NCUS1 12 4921.3 0.0 1 75 2.06739 .89000 .0000000 .0000 0.0
Cable129 GM-4904. Ind. Motor 0,6NCUS1 10 328.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable130 GM-4905-A Ind. Motor 0,6NCUS1 10 328.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable131 GM-4951 Ind. Motor 0,6NCUN3 2 328.1 0.0 1 75 .20200 .03900 .0000000 .0000 0.0
Cable125 GM-4951 B Ind. Motor 0,6NCUN3 2 328.1 0.0 1 75 .20200 .03900 .0000000 .0000 0.0
Cable120 Mtr51 Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
ETAP
Project: C.S.E RPLC Page: 48
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
B3-2 2.400 104.160 0.9 0 0 0.155 0.092 n1 -0.155 -0.092 41.7 86.0
B4-2 0.480 98.842 0.2 0 0 0.226 0.134 B9 -0.226 -0.134 319.9 86.0
B6 2.400 99.994 1.0 0 0 0.058 0.035 G-8 (BOMBA DE TRANF.) -0.058 -0.035 16.3 86.0
B7 0.480 100.157 1.1 0 0 0 0 G-8 (BOMBA DE TRANF.) 0.000 0.000 0.0 0.0
B9 2.400 99.484 0.6 0 0 0.020 0.007 B4-2 0.227 0.137 64.0 85.6
B14 0.480 100.005 1.0 0 0 0.009 0.005 P16-4G -0.009 -0.005 12.1 86.0 -2.500
B16 0.480 99.299 -0.7 0 0 0.014 0.007 TALLER MECANICO -0.014 -0.007 18.7 89.0
B21 0.480 98.717 -0.9 0 0 0.034 0.020 DA-3 BARRA H (480) -0.034 -0.020 48.4 86.0
B.DE TRANF 2,4KV 2.400 99.238 0.5 0 0 0.132 0.078 P14-7F -0.132 -0.078 37.2 86.0
B.DE TRANSF.BARRA"B" 2.400 99.243 0.4 0 0 0.207 0.123 Bus55-1 0.001 0.001 0.3 85.0
B.DE TRASNF.BARRA"A" 2.400 99.427 0.7 0 0 0 0 B/TRANS (480) 0.008 0.004 2.1 85.9
B/MEREY 2.400 99.469 0.3 0 0 0.043 0.026 Bus5-4 -0.043 -0.026 12.1 86.0
B/TRANS (480) 0.480 99.316 0.6 0 0 0.008 0.004 B.DE TRASNF.BARRA"A" -0.008 -0.004 10.6 86.0
BARRA"A"4,16-1 4.160 99.531 0.5 0 0 0 0 BARRA A T.E# 2 0.403 0.239 65.3 86.0
BARRA "A" 480V (FCC) 0.480 98.338 0.1 0 0 0.208 0.111 Bus48-1-1 -0.208 -0.111 288.7 88.2
BARRA"A"480V-1 0.480 99.861 0.9 0 0 0 0 BARRA A T.E# 2 480V 0.064 0.038 89.4 86.0
BARRA"B"4,16-1 4.160 99.281 -0.9 0 0 0 0 BARRA B T.E # 2 0.410 0.243 66.6 86.0
BARRA "B" 480V (FCC) 0.480 98.833 -1.0 0 0 0.137 0.067 Bus49-1-1 -0.137 -0.067 185.5 89.9
BARRA"B"480V-1 0.480 99.626 -0.6 0 0 0 0 BARRA B T.E # 2 480V 0.064 0.038 89.6 86.0
BARRA "G" 13.800 100.175 1.1 0 0 0 0 P2-7G (AGUA SALADA) 0.215 0.129 10.5 85.8
BARRA "G" DA-3 2.400 99.803 0.8 0 0 0.110 0.065 DA-3 BARRA G (2.4) -0.110 -0.065 30.9 86.0
BARRA "G" DA-3. 0.480 99.041 0.6 0 0 0.051 0.031 DA-3 BARRA G (480) -0.051 -0.031 72.6 86.0
BARRA "H" 13.800 99.902 -0.4 0 0 0 0 TALLER MECANICO 0.018 0.009 0.8 88.8
BARRA "H" DA-3 2.400 99.391 -0.7 0 0 0.150 0.089 DA-3 BARRA H (2.4) -0.150 -0.089 42.1 86.0
BARRA "H" DA-3. 0.480 98.782 -0.8 0 0 0.041 0.024 DA-3 BARRA H (480) -0.041 -0.024 58.0 86.0
BARRA__A-1 13.800 124.880 3.8 140.000 92.962 0 0 PAL_A-1 140.000 92.962 5630.1 83.3
BARRA A 480V 0.480 99.816 0.7 0 0 0.164 0.084 Bus17-1 -0.164 -0.084 221.5 89.0
barra a 480v STG 0.480 100.139 1.0 0 0 0 0 BARRA A STG 0.039 0.023 55.0 86.0
BARRA A-1 0.480 97.084 0.2 0 0 0 0 BARRA A ALQUILACION 0.470 0.290 683.8 85.1
480V
Bus157-1-1 -0.469 -0.282 678.1 85.7
BARRA A ALQUILACION 4.160 99.692 -0.6 0 0 0.086 0.038 Bus149-1-1 -0.086 -0.038 13.0 91.6
BARRA A ALQUILACION 0.480 94.674 -0.4 0 0 0.461 0.278 BARRA A-1 -0.461 -0.278 683.8 85.6
480V
BARRA A STG 0.480 100.072 1.0 0 0 0.039 0.023 barra a 480v STG -0.039 -0.023 55.0 86.0
BARRA A T.E# 2 4.160 99.512 0.5 0 0 0.403 0.239 BARRA"A"4,16-1 -0.403 -0.239 65.3 86.0
BARRA A T.E# 2 480V 0.480 99.465 0.9 0 0 0.064 0.038 BARRA"A"480V-1 -0.064 -0.038 89.4 86.0
BARRA A TE#1 0.480 98.424 0.7 0 0 0.204 0.123 Bus106-1-1 -0.204 -0.123 290.8 85.6
BARRA A UNIDAD 51 Y 0.480 98.765 0.3 0 0 0.230 0.116 Bus56-1-1 -0.230 -0.116 313.1 89.3
52
BARRA B1 ALQUILACION 0.480 99.012 -0.6 0 0 0.006 0.003 BARRA B-1 -0.006 -0.003 8.0 85.6
BARRA B 480V 0.480 99.426 -0.8 0 0 0.247 0.118 Bus15-1 -0.247 -0.118 331.1 90.3
BARRA B-1 0.480 99.012 -0.6 0 0 0 0 Bus154-1-1 -0.145 -0.093 209.1 84.0
BARRA B ALQUILACION 4.160 100.203 1.1 0 0 0 0 Bus145-1-1 0.000 0.000 0.0 0.0
BARRA B ALQUILACION 0.480 98.327 -0.8 0 0 0.137 0.082 BARRA B-1 -0.137 -0.082 195.3 85.9
480V
BARRA B STG 0.480 99.748 -0.5 0 0 0.059 0.035 Bus31-3 -0.059 -0.035 82.2 86.0
BARRA B T.E# 1 0.480 98.079 -0.7 0 0 0.216 0.131 Bus129-1 -0.216 -0.131 309.8 85.6
BARRA B T.E # 2 4.160 99.262 -0.9 0 0 0.410 0.243 BARRA"B"4,16-1 -0.410 -0.243 66.6 86.0
BARRA B T.E # 2 480V 0.480 99.228 -0.6 0 0 0.064 0.038 BARRA"B"480V-1 -0.064 -0.038 89.6 86.0
BARRA B UNIDAD 51 Y 52 0.480 100.006 -0.3 0 0 0 0 Bus62-1-1 0.000 0.000 0.0 0.0
BC 2.400 97.166 -2.0 0 0 0.824 0.511 n38 0.019 0.010 5.3 88.8
BCI 4,16"A" 4.160 99.508 0.7 0 0 0 0 Bus34-3 0.000 0.000 0.0 0.0
ETAP
Project: C.S.E RPLC Page: 50
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
BCI 4,16"B" 4.160 99.508 0.7 0 0 0 0 Bus32-3 0.000 0.000 0.0 0.0
BCI 13,8 "A" 13.800 99.508 0.7 0 0 0 0 P13-6E 1.740 0.839 81.2 90.1
BCI 13,8 "B" 13.800 99.508 0.7 0 0 0 0 P15-7F -1.740 -0.839 81.2 90.1
Bus5-4 13.800 99.650 0.4 0 0 0 0 P39-6E (MEREY) -0.043 -0.026 2.1 85.9
Bus6-3 230.000 100.318 0.2 0 0 0 0 Gua. II 230 58.400 31.730 166.3 87.9
Bus6-4 13.800 99.650 0.4 0 0 0 0 P39-6E (MEREY) 0.000 0.000 0.0 100.0
Bus7-4 230.000 100.318 0.2 0 0 0 0 Gua. II 230 58.400 31.730 166.3 87.9
Bus9-2 0.480 99.574 -0.5 0 0 0.025 0.012 CONTROL C DE BOMBAS -0.025 -0.012 33.7 91.0
Bus10 34.500 99.737 -2.0 0 0 1.109 0.688 PDC-53-5A01A -1.109 -0.688 21.9 85.0
Bus11-2 13.800 99.879 1.1 0 0 0 0 Bus179 0.295 0.133 13.6 91.1 5.000
Bus12-1 0.480 98.667 0.8 0 0 0.092 0.055 Bus10-2 -0.092 -0.055 130.9 86.0
Bus13-1 2.400 98.695 0.2 0 0 0.706 0.419 Bus4-3 -0.706 -0.419 200.2 86.0
Bus14-1 0.480 99.828 0.9 0 0 0 0 SISOR BARRA "1" -0.094 -0.056 132.3 86.1
Bus15-1 13.800 100.011 -0.3 0 0 0 0 PPE BARRA_B -1.758 -0.860 81.9 89.8
Bus16-1 0.480 99.409 -0.7 0 0 0 0 SISOR BARRA "2" -0.175 -0.104 246.4 86.0
Bus17-1 13.800 100.248 1.1 0 0 0.324 0.157 PPE BARRA_A -1.172 -0.607 55.1 88.8
Bus20-4 0.480 97.224 -0.7 0 0 0.171 0.102 Bus18-1 -0.171 -0.102 246.4 86.0
Bus22 13.800 99.845 0.9 0 0 0 0 PPE BARRA_A -13.848 -8.016 670.5 86.5
Bus22-4 4.160 99.470 -0.6 0 0 0.170 0.101 JET-A1 -0.170 -0.101 27.5 86.0
Bus23-3 4.160 99.470 -0.6 0 0 0.170 0.101 JET-A1 -0.170 -0.101 27.5 86.0
Bus31-3 0.480 99.848 -0.4 0 0 0 0 BARRA B STG 0.059 0.035 82.2 86.0
Bus32-3 0.480 99.508 0.7 0 0 0 0 BCI 4,16"B" 0.000 0.000 0.0 0.0
Bus34-3 0.480 99.508 0.7 0 0 0 0 BCI 4,16"A" 0.000 0.000 0.0 0.0
Bus43-3 0.480 99.251 -0.6 0 0 0.015 0.007 P3-7F -0.015 -0.007 20.6 90.0
Bus45-1 0.208 99.594 0.7 0 0 0.034 0.015 Bus41-3 -0.034 -0.015 103.5 91.0
Bus46-1 0.480 99.189 0.6 0 0 0.008 0.004 P17-3I -0.008 -0.004 11.2 91.0
Bus48-1-1 0.480 99.027 0.3 0 0 0 0 BARRA "A" 480V (FCC) 0.209 0.113 288.7 88.0
Bus49-1-1 0.480 99.266 -0.8 0 0 0 0 BARRA "B" 480V (FCC) 0.137 0.067 185.5 89.8
Bus50-1 0.240 101.831 -0.5 0 0 0.035 0.016 P25-6E -0.035 -0.016 90.4 91.0
Bus53 4.160 103.351 -3.0 0 0 0.341 0.144 MCC-53-3B01 -0.341 -0.144 49.7 92.1
Bus54 4.160 103.434 -3.0 0 0 0.179 0.077 MCC-53-3B01 -0.179 -0.077 26.2 91.9
Bus55 4.160 103.339 -3.0 0 0 0.256 0.109 MCC-53-3B01 -0.256 -0.109 37.4 92.0
Bus55-1 0.220 99.136 0.4 0 0 0.001 0.001 B.DE TRANSF.BARRA"B" -0.001 -0.001 3.7 85.0
Bus56 4.160 103.333 -3.3 0 0 1.911 0.925 MCC-53-3B01 -1.911 -0.925 285.1 90.0
Bus56-1-1 0.480 99.625 0.6 0 0 0 0 BARRA A UNIDAD 51 Y 52 0.231 0.118 313.1 89.1
Bus57 4.160 103.562 -3.0 0 0 0.115 0.050 MCC-53-3B01 -0.115 -0.050 16.8 91.7
Bus57-1 0.220 99.136 0.4 0 0 0.001 0.001 B.DE TRANSF.BARRA"B" -0.001 -0.001 3.7 85.0
Bus58 4.160 103.524 -3.1 0 0 0.604 0.249 MCC-53-3B01 -0.604 -0.249 87.5 92.5
Bus59-1-1 0.220 102.971 0.1 0 0 0.021 0.009 Bus53-1 -0.021 -0.009 58.2 91.0
Bus61 4.160 98.395 -3.3 0 0 1.337 0.648 MCC-53-3B02 -1.337 -0.648 209.6 90.0
Bus62-1-1 0.480 100.006 -0.3 0 0 0 0 BARRA B UNIDAD 51 Y 52 0.000 0.000 0.0 0.0
Bus64 4.160 98.440 -3.0 0 0 0.179 0.076 MCC-53-3B02 -0.179 -0.076 27.5 92.0
Bus65 4.160 98.394 -3.1 0 0 1.911 0.925 MCC-53-3B02 -1.911 -0.925 299.4 90.0
ETAP
Project: C.S.E RPLC Page: 54
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Bus65-1 0.240 99.576 0.8 0 0 0.001 0.000 Bus14-1 -0.001 0.000 2.9 91.0
Bus66-1 0.240 99.746 0.9 0 0 0.006 0.003 P4-6G -0.006 -0.003 16.5 91.0
Bus69-1 0.220 100.491 0.2 0 0 0.004 0.002 Bus77-1 -0.004 -0.002 12.1 91.0
Bus70 13.800 101.247 -2.6 0 0 4.559 3.444 Bus108 -4.559 -3.444 236.1 79.8
Bus70-1 0.240 99.887 1.0 0 0 0.008 0.004 Bus71-1 -0.008 -0.004 20.6 91.0
Bus71 6.600 99.154 -4.9 0 0 4.097 1.592 Bus68 -4.097 -1.592 387.8 93.2
Bus72-1 0.208 104.568 0.8 0 0 0.020 0.010 Bus63-1 -0.020 -0.010 60.4 90.0 5.000
Bus74-1 0.480 105.261 1.1 0 0 0 0 Bus64-1 0.000 0.000 0.0 0.0 5.000
Bus75-1 0.220 99.993 -0.3 0 0 0.010 0.003 P14-6E -0.010 -0.003 27.6 95.0
Bus81 4.160 103.456 -2.4 0 0 0.443 0.379 MCC-53-3B03 -0.443 -0.379 78.2 76.0
Bus82 4.160 103.781 -2.6 0 0 0.404 0.169 MCC-53-3B03 -0.404 -0.169 58.5 92.2
Bus82-1 0.240 99.472 0.8 0 0 0.010 0.005 P9-8H -0.010 -0.005 27.4 89.0
Bus83 4.160 103.902 -2.6 0 0 0.173 0.074 MCC-53-3B03 -0.173 -0.074 25.1 91.9
Bus84-1 0.240 98.924 -0.7 0 0 0.003 0.002 P11-8H (S/E BOM DE -0.003 -0.002 9.4 89.0
CARGA)
ETAP
Project: C.S.E RPLC Page: 55
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Bus85-1 13.800 99.597 -0.4 0 0 0 0 P11-8H (S/E BOM DE -0.849 -0.558 42.7 83.5
CARGA)
BC 0.849 0.558 42.7 83.5
Bus87 4.160 103.530 -2.5 0 0 0.182 0.078 MCC-53-3B03 -0.182 -0.078 26.5 91.9
Bus87-1 0.480 100.875 -1.0 0 0 0.014 0.009 TANQ AGUA SERV. EL -0.014 -0.009 19.6 85.0
CHAURE
Bus88-1 2.400 101.810 -0.8 0 0 0.075 0.034 TANQ AGUA SERV. EL 0.035 0.020 9.6 87.2
CHAURE
Bus169 -0.111 -0.054 29.1 89.8
Bus91-1 0.220 103.529 -1.5 0 0 0.086 0.039 Bus94-1 -0.086 -0.039 240.6 91.0
Bus92-1 0.240 100.535 -1.1 0 0 0.007 0.002 Bus93-1 -0.007 -0.002 17.6 95.0
Bus93-1 2.400 101.012 -0.9 0 0 0 0 PLANT AGUA SERV EL -0.007 -0.002 1.8 94.9
CHAURE
Bus92-1 0.007 0.002 1.8 94.9
Bus97 4.160 98.101 -2.7 0 0 0.231 0.098 MCC-53-3B04 -0.231 -0.098 35.5 92.0
Bus98 4.160 98.649 -2.8 0 0 0.117 0.051 MCC-53-3B04 -0.117 -0.051 17.9 91.7
Bus99 4.160 98.652 -2.8 0 0 0.173 0.074 MCC-53-3B04 -0.173 -0.074 26.4 91.9
Bus101 4.160 97.650 -2.5 0 0 0.886 0.757 MCC-53-3B04 -0.886 -0.757 165.7 76.0
Bus101-1 2.400 102.355 -0.8 0 0 0.718 0.327 Bus53-1 -0.718 -0.327 185.4 91.0
Bus103 4.160 98.494 -2.9 0 0 0.710 0.286 MCC-53-3B04 -0.710 -0.286 107.9 92.7
Bus104-1 0.240 99.606 -0.4 0 0 0.018 0.008 G/N -0.018 -0.008 48.5 91.0
Bus106-1-1 0.480 99.713 0.7 0 0 0 0 BARRA A TE#1 0.206 0.125 290.8 85.6
Bus107-1 0.240 99.419 -0.5 0 0 0.007 0.003 Bus108-1 -0.007 -0.003 19.4 91.0
Bus109 13.800 100.250 1.1 16.900 8.500 0 0 PPE BARRA_A 16.900 8.500 789.5 89.3
Bus112-1 0.208 102.337 -0.7 0 0 0.132 0.060 PMG1 -0.132 -0.060 392.6 91.0
Bus114-1 0.240 98.780 -0.8 0 0 0.002 0.001 P10-7F -0.002 -0.001 6.2 91.0
Bus115-1 0.210 101.627 -0.5 0 0 0.132 0.060 PMG2 -0.132 -0.060 393.0 91.0
ETAP
Project: C.S.E RPLC Page: 56
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Bus116-1 0.208 103.327 -0.1 0 0 0.069 0.032 PMG3 -0.069 -0.032 205.0 91.0
Bus118 13.800 100.013 -0.3 18.000 9.200 0 0 PPE BARRA_B 18.000 9.200 845.6 89.0
Bus118-1 0.240 98.046 -0.2 0 0 0 0 BARRA A-1 0.001 0.007 18.3 12.7
Bus119 13.800 99.971 -0.4 0 0 0 0 PPE BARRA_B -7.530 -1.764 323.6 97.4
Bus120-1 2.400 102.628 -0.5 0 0 0.504 0.230 Bus53-1 -0.591 -0.271 152.4 90.9
Bus126-1 0.480 104.489 0.7 0 0 0.111 0.069 Bus125-1 -0.111 -0.069 150.3 85.0 5.000
Bus128 13.800 100.102 1.0 0 0 0 0 PPE BARRA_A -5.128 -2.832 244.8 87.5
Bus129-1 0.480 99.452 -0.7 0 0 0 0 BARRA B T.E# 1 0.219 0.132 309.8 85.6
Bus130 13.800 99.645 -0.4 0 0 0 0 P11-8H (S/E BOM DE 0.859 0.561 43.1 83.7
CARGA)
P1-8H -0.859 -0.561 43.1 83.7
Bus132 13.800 99.916 -0.3 0 0 0 0 PPE BARRA_B -1.595 -2.928 139.6 47.9
Bus137 13.800 99.833 -0.4 0 0 0 0 TQ LABORATORIO 10B -0.144 -0.091 7.1 84.5
Bus138 0.480 99.352 -0.6 0 0 0.005 0.003 P13-6H -0.005 -0.003 6.4 86.0
Bus140 0.480 98.889 -0.9 0 0 0.143 0.089 Bus137 -0.143 -0.089 205.0 85.0
Bus144 0.240 98.964 -0.8 0 0 0.006 0.002 P37-8H -0.006 -0.002 15.7 95.0
Bus145-1-1 4.160 100.203 1.1 0 0 0 0 BARRA B ALQUILACION 0.000 0.000 0.0 0.0
Bus148 0.240 99.552 0.7 0 0 0.006 0.002 P30-6G -0.006 -0.002 16.4 95.0
ETAP
Project: C.S.E RPLC Page: 57
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Bus149-1-1 4.160 99.695 -0.6 0 0 0 0 BARRA A ALQUILACION 0.086 0.038 13.0 91.6
Bus154-1-1 0.480 99.568 -0.6 0 0 0 0 BARRA B-1 0.145 0.094 209.1 84.0
Bus157-1-1 0.480 98.888 0.2 0 0 0 0 BARRA A-1 0.478 0.288 678.1 85.7
Bus170 0.240 99.639 -0.5 0 0 0.004 0.002 TALLER MECANICO -0.004 -0.002 10.8 89.0
Bus179 4.160 94.461 0.5 0 0 0.232 0.099 Bus11-2 -0.294 -0.129 47.2 91.6
Bus181 13.800 99.879 1.1 0 0 0.020 2.219 PDC_RPLC BARRA "E" -0.912 -2.602 115.5 33.1
Bus182 13.800 99.842 -0.3 0 0 0 0 PDC_RPLC BARRA "F" -0.886 -0.403 40.8 91.0
Bus186 4.160 94.896 0.8 0 0 0.597 0.246 Bus181 -0.597 -0.246 94.4 92.5
Bus188 4.160 99.497 -0.7 0 0 0.886 0.396 Bus182 -0.886 -0.396 135.3 91.3
Bus190 0.480 93.741 -0.1 0 0 0.062 0.030 Bus179 -0.062 -0.030 88.6 90.4
Bus196 0.480 104.666 0.8 0 0 0.032 0.020 P24-10A -0.032 -0.020 42.9 85.0 5.000
Bus198 0.480 104.647 0.8 0 0 0.032 0.020 P17-10A -0.032 -0.020 42.9 85.0 5.000
Bus228 0.480 99.399 0.7 0 0 0.091 0.054 G39 -0.091 -0.054 128.5 86.0
Bus229 13.800 100.227 1.1 0 0 0 0 TQ LABORATORIO 10A -0.166 -0.105 8.2 84.4
Bus230 0.440 104.096 0.5 0 0 0.165 0.103 Bus229 -0.165 -0.103 245.4 85.0 5.000
Bus234 13.800 99.843 -0.4 0 0 0 0 TQ LABORATORIO 10B 0.000 0.000 0.0 0.0
Bus238 0.480 100.538 -1.4 0 0 0.314 0.195 G34 -0.314 -0.195 442.4 85.0
Bus244 0.480 98.706 -0.9 0 0 0.010 0.006 G10 -0.010 -0.006 14.8 85.0
Bus256 0.240 98.425 -1.1 0 0 0.033 0.016 Bus253 -0.033 -0.016 89.9 90.0
Bus257 0.240 98.573 -1.1 0 0 0.043 0.018 Bus255 -0.043 -0.018 112.5 92.3
Bus259 0.480 99.437 -0.6 0 0 0.028 0.013 Bus260 -0.028 -0.013 37.3 90.0
Bus263 13.800 99.836 -0.4 0 0 0.139 0.083 Bus260 -0.208 -0.112 9.9 88.0
Bus264 0.480 98.901 -1.0 0 0 0.068 0.028 Bus263 -0.068 -0.028 89.5 92.2
Bus275 0.208 98.802 -0.9 0 0 0.024 0.012 G12 -0.024 -0.012 76.5 90.0
Bus278 0.220 94.653 -0.7 0 0 0.109 0.057 G13 -0.109 -0.057 341.5 88.6
Bus280 0.208 98.881 -0.9 0 0 0.017 0.008 G30 -0.017 -0.008 52.8 91.6
Bus285 0.208 98.915 -0.9 0 0 0.017 0.008 G5 -0.017 -0.008 52.8 91.6
Bus291 0.480 98.623 -1.1 0 0 0.011 0.005 G35 -0.011 -0.005 14.2 91.6
Bus293 0.208 98.858 -0.9 0 0 0.033 0.014 Bus294 -0.033 -0.014 99.9 91.6
Bus295 0.480 101.071 -1.1 0 0 0.011 0.005 Bus296 -0.011 -0.005 14.6 91.6
Bus299 0.240 100.951 -1.2 0 0 0.009 0.004 P20-10B -0.009 -0.004 22.7 92.3
Bus301 0.480 99.639 -0.5 0 0 0.010 0.004 P26-10B -0.010 -0.004 12.9 92.3
Bus304 0.480 99.640 -0.5 0 0 0.007 0.003 P27-10B -0.007 -0.003 9.7 92.3
Bus313-1 0.480 98.587 -1.0 0 0 0.085 0.053 Bus103-1-1 -0.085 -0.053 122.0 85.0
Bus_G6 13.800 100.250 1.1 10.000 6.400 0 0 PPE BARRA_A 10.000 6.400 495.5 84.2
C.DE BOMBAS"E"(2,4) 2.400 100.013 1.0 0 0 0 0 CCM"E"(2.4) 0.066 0.039 18.4 86.0
C.DE BOMBAS"E"(4,16) 4.160 99.944 0.9 0 0 0 0 CCM"E"(4,16) 0.204 0.121 32.9 86.0
C.DE BOMBAS"E"(480) 0.480 100.045 1.0 0 0 0 0 CCM"E"(480) 0.019 0.011 26.4 86.0
C.DE BOMBAS"F" (2,4) 2.400 99.546 -0.6 0 0 0 0 CCM"F"(2,4) 0.275 0.163 77.4 86.0
C.DE BOMBAS"F"(4,16) 4.160 99.397 -0.7 0 0 0 0 CCM"F"(4,16) 0.664 0.394 107.8 86.0
C.DE BOMBAS"F"(480) 0.480 99.783 -0.4 0 0 0 0 CCM"F"(480) 0.041 0.024 57.7 86.0
CASETA 1-6H 13.800 100.066 1.1 0 0 0 0 P1-4G -0.101 -0.057 4.9 87.2
CASETA 2-6H 13.800 100.064 1.1 0 0 0 0 CASETA 1-6H -0.043 -0.023 2.0 88.1
CASETA 3 13.800 100.063 1.1 0 0 0.047 0.023 n24 0.024 0.014 1.2 85.9
CASETA 3-6H 13.800 100.063 1.1 0 0 0 0 CASETA 2-6H -0.035 -0.018 1.7 88.7
CCM"E"(2.4) 2.400 99.969 1.0 0 0 0.066 0.039 C.DE BOMBAS"E"(2,4) -0.066 -0.039 18.4 86.0
CCM"E"(4,16) 4.160 99.899 0.9 0 0 0.203 0.121 C.DE BOMBAS"E"(4,16) -0.203 -0.121 32.9 86.0
CCM"E"(480) 0.480 99.693 1.0 0 0 0.019 0.011 C.DE BOMBAS"E"(480) -0.019 -0.011 26.4 86.0
CCM"F"(2,4) 2.400 99.364 -0.6 0 0 0.275 0.163 C.DE BOMBAS"F" (2,4) -0.275 -0.163 77.4 86.0
ETAP
Project: C.S.E RPLC Page: 60
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
CCM"F"(4,16) 4.160 99.250 -0.7 0 0 0.663 0.393 C.DE BOMBAS"F"(4,16) -0.663 -0.393 107.8 86.0
CCM"F"(480) 0.480 99.016 -0.4 0 0 0.041 0.024 C.DE BOMBAS"F"(480) -0.041 -0.024 57.7 86.0
CCM A/SERV. 0.480 100.788 -1.0 0 0 0.014 0.009 PLANT AGUA SERV EL -0.014 -0.009 19.7 85.0
CHAURE
CDD "A" 34.500 99.741 -2.0 0 0 9.983 5.259 PDC-53-5A01A -9.983 -5.259 189.3 88.5
CDD "B" 34.500 99.741 -2.0 0 0 9.983 5.259 PDC-53-5A01B -9.983 -5.259 189.3 88.5
CONTROL C DE BOMBAS 13.800 99.913 -0.3 0 0 0 0 P1-7F -0.025 -0.012 1.2 90.9
DA-3 BARRA G (2.4) 2.400 99.843 0.8 0 0 0 0 BARRA "G" DA-3 0.110 0.065 30.9 86.0
DA-3 BARRA G (480) 0.480 99.464 0.7 0 0 0 0 BARRA "G" DA-3. 0.052 0.031 72.6 86.0
DA-3 BARRA H (2.4) 2.400 99.445 -0.7 0 0 0 0 BARRA "H" DA-3 0.150 0.089 42.1 86.0
DA-3 BARRA H (480) 0.480 99.120 -0.8 0 0 0 0 BARRA "H" DA-3. 0.041 0.024 58.0 86.0
G1-1 13.800 100.248 1.1 0 0 0 0 PPE BARRA_A -1.595 -0.947 77.4 86.0
G2-1 13.800 100.012 -0.3 0 0 0 0 PPE BARRA_B -1.149 -0.679 55.8 86.1
G11 13.800 99.846 -0.4 0 0 0 0 TQ LABORATORIO 10B 0.460 0.295 22.9 84.2
G15 13.800 100.095 1.0 0 0 0 0 PDC_RPLC BARRA "E" -0.288 -0.172 14.0 85.9
G16 13.800 99.894 -0.3 0 0 0 0 PDC_RPLC BARRA "F" -0.981 -0.591 48.0 85.7
G21 13.800 100.249 1.1 0 0 0 0 PPE BARRA_A -0.039 -0.023 1.9 85.9
G22 13.800 100.012 -0.3 0 0 0 0 PPE BARRA_B -0.059 -0.035 2.9 85.9
G33 13.800 100.241 1.1 0 0 0.160 0.053 PPE BARRA_A -0.647 -0.347 30.6 88.1
G34 13.800 99.841 -0.4 0 0 0 0 TQ LABORATORIO 10B -0.317 -0.204 15.8 84.1
G36 13.800 99.999 -0.3 0 0 0 0 PPE BARRA_B -1.033 -0.584 49.6 87.1
G-4 13.800 99.885 -0.4 0 0 0 0 BARRA "H" -0.305 -0.175 14.7 86.7
G-5 13.800 100.165 1.1 0 0 0 0 BARRA "G" -0.497 -0.293 24.1 86.1
G-8 (BOMBA DE TRANF.) 13.800 100.157 1.1 0 0 0 0 P2-7G (AGUA SALADA) -0.058 -0.035 2.8 85.9
* Gua. II 230 230.000 100.000 0.0 -116.692 -67.922 0 0 Bus6-3 -58.346 -33.961 169.5 86.4
GX 13.800 99.912 -0.3 0 0 0 0 PDC_RPLC BARRA "F" -0.340 -0.204 16.6 85.7
LPG.1 0.480 99.920 1.0 0 0 0.014 0.008 P16-7E (GLP) -0.014 -0.008 19.2 86.0
LPG.2 2.400 99.761 0.8 0 0 0.071 0.042 P17-7E (GLP) -0.071 -0.042 19.8 86.0
MCC-19-2B01, 0.480 98.371 -3.3 0 0 0.093 0.047 PDC-53-2B01A -0.093 -0.047 126.8 89.4
MCC-19-2B02 0.480 98.426 -3.2 0 0 0.093 0.047 PDC-53-2B01B -0.093 -0.047 127.1 89.4
MCC-20-2B01 0.480 98.368 -3.3 0 0 0.621 0.315 PDC-53-2B01A -0.621 -0.315 851.4 89.2
MCC-20-2B02 0.480 98.422 -3.2 0 0 0.637 0.339 PDC-53-2B01B -0.637 -0.339 882.0 88.3
MCC-20-2B03B 0.480 98.425 -3.2 0 0 0.182 0.084 PDC-53-2B01B -0.182 -0.084 245.3 90.9
MCC-45-2B01 0.480 108.381 -3.3 0 0 0.517 0.249 PDC-53-2B02A -0.517 -0.249 636.6 90.1
MCC-45-2B02 0.480 98.175 -3.4 0 0 0.357 0.174 PDC-53-2B02B -0.357 -0.174 486.3 89.8
MCC-45-2B03A 0.480 108.383 -3.3 0 0 0.139 0.086 PDC-53-2B02A -0.139 -0.086 181.8 85.0
MCC-45-2B03B 0.480 98.177 -3.4 0 0 0.129 0.080 PDC-53-2B02B -0.129 -0.080 185.4 85.0
MCC-46-2D01 0.480 98.803 -2.9 0 0 0.097 0.048 PDC-53-2D01 A -0.097 -0.048 132.2 89.7
MCC-46-2D02. 0.480 98.805 -2.9 0 0 0.052 0.026 PDC-53-2D01 B -0.052 -0.026 71.2 89.2
MCC-47-2D01 0.480 98.802 -2.9 0 0 0.133 0.063 PDC-53-2D01 A -0.133 -0.063 179.1 90.3
MCC-47-2D02 0.480 98.805 -2.9 0 0 0.027 0.014 PDC-53-2D01 B -0.027 -0.014 37.6 88.8
MCC-48-2D01 0.480 98.803 -2.9 0 0 0.038 0.018 PDC-53-2D01 A -0.038 -0.018 51.2 90.0
MCC-49-2D01 0.480 98.802 -2.9 0 0 0.143 0.071 PDC-53-2D01 A -0.143 -0.071 195.0 89.5
MCC-49-2D03A 0.480 98.803 -2.9 0 0 0.087 0.054 PDC-53-2D01 A 0.017 -0.010 23.9 -84.9
MCC-49-2D03B 0.480 98.803 -2.9 0 0 0.212 0.127 PDC-53-2D01 B -0.316 -0.170 436.8 88.0
MMC-20-2B03A 0.480 98.370 -3.3 0 0 0.231 0.127 PDC-53-2B01A -0.231 -0.127 322.5 87.7
n2 2.400 99.126 0.7 0 0 0.053 0.039 S/E TL 6G-4 -0.053 -0.039 16.0 81.0
n3 0.480 99.259 0.8 0 0 0.016 0.012 S/E TL 6G-3 -0.016 -0.012 24.0 81.0
n4 0.240 99.978 1.0 0 0 0.008 0.004 Bus67-1 -0.008 -0.004 20.6 91.0
n5 0.240 99.887 1.0 0 0 0.008 0.004 Bus68-1 -0.008 -0.004 20.6 91.0
n6 0.240 99.912 0.9 0 0 0.013 0.004 S/E TLG-2 -0.013 -0.004 33.0 95.0
n7 0.240 100.052 1.0 0 0 0.008 0.004 Bus80-1 -0.008 -0.004 20.6 91.0
n16 0.480 99.379 -0.7 0 0 0.006 0.002 P12-6H -0.006 -0.002 7.4 95.0
n19 0.480 99.352 -0.6 0 0 0.005 0.003 P31-6H -0.005 -0.003 6.4 86.0
n22 0.480 99.958 1.0 0 0 0.015 0.011 CASETA 1 -0.015 -0.011 22.0 81.0
n23 0.480 99.963 1.0 0 0 0.016 0.010 CASETA 2 -0.016 -0.010 22.0 85.0
n24 0.480 99.914 1.0 0 0 0.024 0.014 CASETA 3 -0.024 -0.014 33.1 86.0
n26 0.480 98.980 0.6 0 0 0.059 0.035 Bus19-1 -0.059 -0.035 83.2 86.0
n27 0.480 99.445 0.7 0 0 0.002 0.001 Bus19-1 -0.002 -0.001 3.3 86.0
n28 0.480 98.853 -0.8 0 0 0.032 0.019 Bus21-3 -0.032 -0.019 45.8 86.0
n29 0.480 99.100 -0.8 0 0 0.002 0.001 Bus21-3 -0.002 -0.001 3.3 86.0
n30 0.240 98.706 -1.0 0 0 0.009 0.003 DA-3 BARRA H (480) -0.009 -0.003 22.9 95.0
ETAP
Project: C.S.E RPLC Page: 66
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
n31 0.240 98.706 -1.0 0 0 0.009 0.003 DA-3 BARRA H (480) -0.009 -0.003 22.9 95.0
n36 2.400 99.782 0.8 0 0 0.027 0.012 Bus168 -0.027 -0.012 7.1 91.0
n37 2.400 99.494 -0.6 0 0 0.027 0.012 Bus166 -0.027 -0.012 7.1 91.0
n39 0.240 96.728 -2.3 0 0 0.019 0.010 n38 -0.019 -0.010 53.2 89.0
P1-4G 13.800 100.154 1.1 0 0 0 0 BARRA "G" -0.110 -0.057 5.2 88.8
P1-6E 13.800 100.096 1.0 0 0 0 0 PDC_RPLC BARRA "E" -3.026 0.491 128.1 -98.7
P1-6H7G 13.800 99.898 -0.4 0 0 0 0 BARRA "H" -0.217 -0.115 10.3 88.4
P1-7F 13.800 99.913 -0.3 0 0 0 0 PDC_RPLC BARRA "F" 0.788 -1.624 75.6 -43.6
P1-8H 13.800 99.805 -0.3 0 0 0 0 BARRA "H" -0.860 -0.561 43.0 83.8
P2-7G (AGUA SALADA) 13.800 100.173 1.1 0 0 0 0 BARRA "G" -0.215 -0.129 10.5 85.8
P4-6E 13.800 98.900 0.6 0 0 0 0 P10-6E CRUZ DE LA 1.723 0.829 80.9 90.1
PALOMA
P13-6E -1.723 -0.829 80.9 90.1
P10-6E CRUZ DE LA 13.800 98.832 0.6 0 0 0 0 P4-6E -1.722 -0.828 80.9 90.1
PALOMA
P11/6E 1.722 0.828 80.9 90.1
P11-8H (S/E BOM DE 13.800 99.607 -0.4 0 0 0 0 Bus85-1 0.849 0.558 42.7 83.5
CARGA)
Bus130 -0.858 -0.560 43.1 83.7
P13-6E 13.800 99.439 0.7 0 0 0 0 BCI 13,8 "A" -1.739 -0.839 81.2 90.1
P16-7E (GLP) 13.800 100.057 1.0 0 0 0 0 P10-7E -0.093 -0.053 4.5 86.8
P17-7E (GLP) 13.800 100.055 1.0 0 0 0 0 P16-7E (GLP) -0.079 -0.045 3.8 86.9
P22-6G 13.800 100.119 1.1 0 0 0 0 S/E TLG-2 0.013 0.004 0.6 94.9
P34-6G 13.800 100.135 1.1 0 0 0 0 BARRA "G" -0.137 -0.077 6.6 87.2
P37-7F 13.800 99.652 0.4 0 0 0 0 P39-6E (MEREY) 0.043 0.026 2.1 86.1
P37-8H 13.800 99.605 -0.4 0 0 0 0 P11-8H (S/E BOM DE -0.006 -0.002 0.3 94.8
CARGA)
Bus144 0.006 0.002 0.3 94.8
P39-6E (MEREY) 13.800 99.650 0.4 0 0 0 0 Bus5-4 0.043 0.026 2.1 85.9
P40-6E 13.800 99.650 0.4 0 0 0 0 P39-6E (MEREY) 0.000 0.000 0.0 0.0
PDC-53-2A01A 0.480 99.561 -2.2 0 0 0.030 0.019 BP-XFR-53-5A01 -0.030 -0.019 42.5 85.0
PDC-53-2A01B 0.480 99.562 -2.2 0 0 0.030 0.018 BP-XFR-53-5A02 -0.030 -0.018 42.3 85.0
PDC-53-3D01 A 4.160 99.390 -2.4 0 0 0.151 0.065 PDC-53-2D01 A 0.395 0.216 62.9 87.8
PDC-53-3D01 B 4.160 99.391 -2.4 0 0 0.148 0.064 PDC-53-2D01 B 0.396 0.216 63.0 87.8
PDC-53-4B01A 13.800 101.411 -2.6 0 0 0 0 BP-XFR-53-5B05 -4.802 -12.679 559.3 35.4 5.000
ETAP
Project: C.S.E RPLC Page: 73
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
PDC_RPLC BARRA "E" 13.800 100.102 1.0 0 0 0 0 SISOR BARRA "1" 0.805 0.492 39.4 85.3
PDC_RPLC BARRA "F" 13.800 99.916 -0.3 0 0 0 0 SISOR BARRA "2" 0.175 0.106 8.6 85.7
PLANT AGUA SERV EL 2.400 101.275 -0.8 0 0 0 0 TANQ AGUA SERV. EL -0.021 -0.011 5.6 88.7
CHAURE CHAURE
ETAP
Project: C.S.E RPLC Page: 74
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
POSTE: 1-7E 13.800 100.101 1.0 0 0 0 0 PDC_RPLC BARRA "E" -0.093 -0.051 4.4 87.5
PPE BARRA_A 13.800 100.250 1.1 0 0 3.478 1.481 G33 0.647 0.347 30.6 88.1
PPE BARRA_B 13.800 100.013 -0.3 0 0 3.470 1.479 Bus132 1.597 2.931 139.6 47.9
RESPALDO.3I 13.800 100.066 1.1 0 0 0 0 RESP CASETA1-3I 0.000 0.000 0.0 0.0
RESP CASETA1-3I 13.800 100.066 1.1 0 0 0 0 RESP CASETA2-3I 0.043 0.023 2.0 88.2
RESP CASETA2-3I 13.800 100.064 1.1 0 0 0 0 RESP CASETA1-3I -0.043 -0.023 2.0 88.1
RESP CASETA3-3I 13.800 100.063 1.1 0 0 0 0 RESP CASETA2-3I -0.035 -0.018 1.7 88.7
ETAP
Project: C.S.E RPLC Page: 75
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
S.A BARRA "A" 2.4KV 2.400 99.772 0.7 0 0 0.683 0.358 Bus17-1 -0.683 -0.358 185.9 88.6
S.A BARRA "B" 2.4KV 2.400 99.046 -1.3 0 0 1.508 0.708 Bus15-1 -1.508 -0.708 404.6 90.5
S/E TL 6G-3 13.800 100.121 1.1 0 0 0 0 P4-6G -0.070 -0.051 3.6 80.9
S/E TL 6G-4 13.800 100.114 1.1 0 0 0 0 S/E TL 6G-3 -0.054 -0.039 2.8 80.6
S/E TL6H-1 MANIFOLT 2.400 99.325 -0.7 0 0 0.091 0.054 P9-6H -0.091 -0.054 25.5 86.0
NORTE
S/E TLG-2 13.800 100.119 1.1 0 0 0 0 P22-6G -0.013 -0.004 0.6 94.9
SISOR BARRA "1" 13.800 100.098 1.0 0 0 0 0 PDC_RPLC BARRA "E" -0.805 -0.492 39.4 85.3
SISOR BARRA "2" 13.800 99.915 -0.3 0 0 0 0 PDC_RPLC BARRA "F" -0.175 -0.106 8.6 85.7
TALLER MECANICO 13.800 99.900 -0.4 0 0 0 0 BARRA "H" -0.018 -0.009 0.8 88.8
TANQ AGUA SERV. EL 2.400 101.305 -0.8 0 0 0 0 Bus88-1 -0.035 -0.020 9.6 87.2
CHAURE
PLANT AGUA SERV EL 0.021 0.011 5.6 88.7
CHAURE
Bus87-1 0.014 0.009 3.9 84.8
TQ LABORATORIO 10A 13.800 100.228 1.1 0 0 0 0 G31 -0.166 -0.105 8.2 84.4
TQ LABORATORIO 10B 13.800 99.843 -0.4 0 0 0 0 Bus234 0.000 0.000 0.0 0.0
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
BARRA "A" 480V (FCC) 0.480 0.208 0.111 0 0 0 0 0 0 0.236 88.2 288.7
BARRA "B" 480V (FCC) 0.480 0.137 0.067 0 0 0 0 0 0 0.152 89.9 185.5
BARRA A UNIDAD 51 Y 52 0.480 0.211 0.104 0.019 0.012 0 0 0 0 0.257 89.3 313.1
CDD "A" 34.500 8.640 4.551 1.343 0.707 0 0 0 0 11.283 88.5 189.3
CDD "B" 34.500 8.640 4.551 1.343 0.707 0 0 0 0 11.283 88.5 189.3
MCC-49-2D03A 0.480 1600.0 0.033 0.020 0.055 0.034 0 0 0 0 0.117 88.7 142.8 8.9
PPE BARRA_A 13.800 2000.0 1.920 0.996 1.558 0.485 0 0 0 0 30.751 87.5 1283.3 64.2
PPE BARRA_B 13.800 2000.0 1.920 0.996 1.550 0.483 0 0 0 0 20.215 89.0 845.6 42.3
S.A BARRA "A" 2.4KV 2.400 0.683 0.358 0 0 0 0 0 0 0.771 88.6 185.9
S.A BARRA "B" 2.4KV 2.400 1.508 0.708 0 0 0 0 0 0 1.666 90.5 404.6
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: C.S.E RPLC Page: 91
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable9-3 -0.155 -0.092 0.157 0.093 1.4 0.3 104.2 104.9 0.78
T68 -0.226 -0.134 0.227 0.137 0.4 2.6 98.8 99.5 0.64
T-57-27/T1 -0.058 -0.035 0.058 0.035 0.0 0.2 100.0 100.2 0.16
T-66-15/T1 -0.246 -0.143 0.247 0.146 0.4 3.0 99.5 100.2 0.67
T49 -0.009 -0.005 0.009 0.005 0.0 0.0 100.0 100.2 0.15
PMC-7 -0.014 -0.007 0.014 0.007 0.0 0.1 99.3 99.9 0.60
Cable49-2 -0.034 -0.020 0.034 0.020 0.1 0.1 98.7 99.1 0.40
T-82 -0.132 -0.078 0.132 0.079 0.1 1.0 99.2 99.6 0.41
T48 0.001 0.001 -0.001 -0.001 0.0 0.0 99.2 99.1 0.11
T52 0.001 0.001 -0.001 -0.001 0.0 0.0 99.2 99.1 0.11
T-79 -0.209 -0.124 0.209 0.126 0.1 1.4 99.2 99.6 0.33
T43 0.008 0.004 -0.008 -0.004 0.0 0.0 99.4 99.3 0.11
T-78 -0.008 -0.004 0.008 0.004 0.0 0.0 99.4 99.4 0.01
T95 -0.043 -0.026 0.043 0.026 0.0 0.1 99.5 99.6 0.18
Cable89-1-1 0.403 0.239 -0.403 -0.239 0.1 0.1 99.5 99.5 0.02
T20-1 -0.403 -0.239 0.403 0.245 0.5 5.6 99.5 100.2 0.71
Cable167-1-1 -0.208 -0.111 0.209 0.113 1.0 1.6 98.3 99.0 0.69
Cable85-1-1 0.064 0.038 -0.064 -0.038 0.3 0.2 99.9 99.5 0.40
T33-1 -0.064 -0.038 0.064 0.038 0.1 0.4 99.9 100.2 0.38
Cable97-1-1 0.410 0.243 -0.410 -0.243 0.1 0.1 99.3 99.3 0.02
T26-1 -0.410 -0.243 0.411 0.249 0.6 5.9 99.3 100.0 0.73
Cable166-1-1 -0.137 -0.067 0.137 0.067 0.4 0.7 98.8 99.3 0.43
Cable88-1-1 0.064 0.038 -0.064 -0.038 0.3 0.2 99.6 99.2 0.40
T46-1 -0.064 -0.038 0.064 0.038 0.1 0.4 99.6 100.0 0.38
Cable1-2 0.215 0.129 -0.215 -0.129 0.0 0.0 100.2 100.2 0.00
Cable5-3 0.497 0.293 -0.497 -0.293 0.0 0.1 100.2 100.2 0.01
Cable6-1-1-1 -0.959 -0.556 0.960 0.556 0.5 0.8 100.2 100.2 0.07
Cable50-1 0.137 0.077 -0.137 -0.077 0.1 0.0 100.2 100.1 0.04
Cable52-1 0.110 0.057 -0.110 -0.057 0.0 0.0 100.2 100.2 0.02
Cable34-2 -0.110 -0.065 0.110 0.065 0.0 0.0 99.8 99.8 0.04
Cable43-2 -0.051 -0.031 0.052 0.031 0.2 0.2 99.0 99.5 0.42
Cable11-2 0.018 0.009 -0.018 -0.009 0.0 0.0 99.9 99.9 0.00
Cable23-2-1 -1.401 -0.861 1.402 0.862 1.1 1.8 99.9 100.0 0.11
Cable25-3 0.305 0.175 -0.305 -0.175 0.0 0.1 99.9 99.9 0.02
ETAP
Project: C.S.E RPLC Page: 97
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable30-2-1 0.861 0.561 -0.860 -0.561 1.0 0.2 99.9 99.8 0.10
Cable54-1 0.217 0.115 -0.217 -0.115 0.0 0.0 99.9 99.9 0.00
Cable36-2 -0.150 -0.089 0.150 0.089 0.1 0.1 99.4 99.4 0.05
Cable45-2 -0.041 -0.024 0.041 0.024 0.1 0.1 98.8 99.1 0.34
Cable3-4 139.712 80.884 -139.709 -80.843 3.3 40.8 100.3 100.3 0.01
PAL 1-1 -139.712 -80.884 140.000 92.962 287.6 12078.3 100.3 104.4 4.11
T11-1 -0.164 -0.084 0.164 0.085 0.2 1.4 99.8 100.2 0.43
Cable75-1 0.039 0.023 -0.039 -0.023 0.0 0.0 100.1 100.1 0.07
T14-1 -0.039 -0.023 0.039 0.023 0.0 0.1 100.1 100.2 0.11
Cable303 0.470 0.290 -0.461 -0.278 9.1 11.3 97.1 94.7 2.41
Cable308 -0.469 -0.282 0.478 0.288 8.7 5.3 97.1 98.9 1.80
T15-1 -0.001 -0.007 0.001 0.007 0.1 0.1 97.1 98.0 0.96
Cable140-1-1-1 -0.086 -0.038 0.086 0.038 0.0 0.0 99.7 99.7 0.00
Cable117-1-1 -0.204 -0.123 0.206 0.125 2.7 1.6 98.4 99.7 1.29
Cable98-1-1 -0.230 -0.116 0.231 0.118 1.4 2.2 98.8 99.6 0.86
T19 -0.247 -0.118 0.248 0.121 0.4 2.9 99.4 100.0 0.59
Cable133-1-1-1 -0.145 -0.093 0.145 0.094 0.8 0.5 99.0 99.6 0.56
Cable306 0.138 0.083 -0.137 -0.082 0.7 0.9 99.0 98.3 0.69
T16-1 0.001 0.007 -0.001 -0.007 0.1 0.1 99.0 98.0 0.97
Cable69-1 -0.059 -0.035 0.059 0.035 0.0 0.1 99.7 99.8 0.10
Cable126-1-1 -0.216 -0.131 0.219 0.132 3.0 1.8 98.1 99.5 1.37
Line121 0.019 0.010 -0.019 -0.010 0.0 0.0 97.2 97.1 0.03
T140 -0.843 -0.521 0.849 0.558 5.3 37.8 97.2 99.6 2.43
Line11 1.740 0.839 -1.739 -0.839 1.1 0.7 99.5 99.4 0.07
Line21 -1.740 -0.839 1.741 0.840 1.1 0.7 99.5 99.6 0.07
Cable24 -0.030 -0.019 0.030 0.019 0.0 0.0 99.7 99.7 0.00
XFR-53-5A01 0.030 0.019 -0.030 -0.019 0.0 0.1 99.7 99.6 0.18
Cable26 -0.030 -0.019 0.030 0.019 0.0 0.0 99.7 99.7 0.00
XFR-53-5A02 0.030 0.019 -0.030 -0.018 0.0 0.1 99.7 99.6 0.18
Cable3 -3.418 -1.642 3.418 1.642 0.1 0.2 99.7 99.7 0.00
XFR-53-5B01 3.418 1.642 -3.414 -1.570 3.9 72.2 99.7 103.8 4.04
ETAP
Project: C.S.E RPLC Page: 98
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable5 -3.440 -1.740 3.440 1.741 0.1 0.2 99.7 99.7 0.00
XFR--53-5B02 3.440 1.740 -3.436 -1.666 4.0 74.6 99.7 98.8 0.95
Cable8 -1.866 -1.073 1.866 1.073 0.0 0.1 99.7 99.7 0.00
XFR-53-5B03 1.866 1.073 -1.865 -1.050 1.2 23.2 99.7 104.1 4.37
Cable10 -2.626 -1.582 2.626 1.582 0.1 0.2 99.7 99.7 0.00
XFR-53-5B04 2.626 1.582 -2.623 -1.535 2.5 47.2 99.7 98.9 0.85
Cable12 -4.827 -13.140 4.828 13.143 1.1 3.2 99.7 99.7 0.02
XFR-53-5B05 4.827 13.140 -4.802 -12.679 24.8 460.5 99.7 101.4 1.69
Cable14 -3.895 7.277 3.896 -7.276 0.4 1.1 99.8 99.7 0.01
XFR-53-5B06 3.895 -7.277 -3.887 7.437 8.6 160.0 99.8 101.4 1.66
Cable200 -0.947 -0.515 0.947 0.515 0.0 0.1 99.7 99.7 0.00
XFR-53-5B07 0.947 0.515 -0.945 -0.488 2.5 26.8 99.7 98.4 1.36
Cable201 -0.915 -0.494 0.915 0.494 0.0 0.1 99.7 99.7 0.00
XFR-53-5B08 0.915 0.494 -0.913 -0.469 2.3 24.9 99.7 98.4 1.31
Cable22 -0.544 -0.284 0.544 0.284 0.0 0.0 99.7 99.7 0.01
XFR-53-5D02 0.544 0.284 -0.544 -0.280 0.3 3.9 99.7 99.4 0.34
Cable207 -22.909 -17.567 22.909 17.476 0.4 -91.4 100.3 100.3 0.01
XFR-53-7A02 22.909 17.567 -22.867 -16.136 42.0 1430.9 100.3 99.7 0.57
Cable22-3 0.000 0.000 0.000 0.000 0.0 0.0 98.7 98.7 0.00
Cable20-3 0.709 0.421 -0.706 -0.419 2.2 1.5 99.0 98.7 0.31
T5-1 -0.709 -0.421 0.710 0.436 1.4 15.2 99.0 100.1 1.09
Cable6-3 -0.043 -0.026 0.043 0.026 0.0 0.0 99.6 99.6 0.00
Cable1 58.400 31.730 -58.346 -33.961 53.7 -2230.6 100.3 100.0 0.32
Cable12-2 0.000 0.000 0.000 0.000 0.0 0.0 99.6 99.6 0.00
Cable2 58.400 31.730 -58.346 -33.961 53.7 -2230.6 100.3 100.0 0.32
T55 -0.025 -0.012 0.025 0.012 0.0 0.1 99.6 99.9 0.34
Cable15 -1.109 -0.688 1.109 0.688 0.0 0.0 99.7 99.7 0.00
Cable23-3 0.093 0.055 -0.092 -0.055 1.1 0.7 99.8 98.7 1.16
T64 0.295 0.133 -0.294 -0.129 0.6 4.2 99.9 94.5 5.42
T1-1 -0.094 -0.056 0.095 0.056 0.1 0.5 99.8 100.1 0.27
T2-1 0.001 0.000 -0.001 0.000 0.0 0.0 99.8 99.6 0.25
Cable21-2-1 -1.758 -0.860 1.758 0.860 0.0 0.0 100.0 100.0 0.00
ETAP
Project: C.S.E RPLC Page: 99
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
TPA-04 1.511 0.740 -1.508 -0.708 2.6 32.0 100.0 99.0 0.96
T3-2 -0.175 -0.104 0.175 0.106 0.2 1.6 99.4 99.9 0.51
Cable8-1-1-1 -1.172 -0.607 1.172 0.607 0.0 0.0 100.2 100.2 0.00
TPA-03 0.684 0.364 -0.683 -0.358 0.6 6.8 100.2 99.8 0.48
Cable26-3 0.175 0.104 -0.171 -0.102 3.8 2.3 99.4 97.2 2.18
Cable58-1 0.059 0.035 -0.059 -0.035 0.3 0.2 99.5 99.0 0.48
Cable60-1 0.002 0.001 -0.002 -0.001 0.0 0.0 99.5 99.4 0.02
Cable61-1 0.032 0.019 -0.032 -0.019 0.1 0.1 99.1 98.9 0.27
Cable62-1 0.002 0.001 -0.002 -0.001 0.0 0.0 99.1 99.1 0.02
Cable30 -13.848 -8.016 13.876 8.098 27.4 81.9 99.8 100.2 0.40
XFR-53-5X01 13.848 8.016 -13.800 -7.114 48.5 902.5 99.8 100.0 0.16
Cable32-2-1 -0.170 -0.101 0.170 0.101 0.1 0.1 99.5 99.5 0.06
Cable35-2 -0.170 -0.101 0.170 0.101 0.1 0.1 99.5 99.5 0.06
Cable106-1 0.000 0.000 0.000 0.000 0.0 0.0 105.3 105.3 0.00
Cable146-1-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00
Cable144-1-1 -0.086 -0.054 0.086 0.054 0.0 0.0 100.0 100.0 0.00
T51-1 0.086 0.054 -0.085 -0.053 0.6 1.8 100.0 98.6 1.42
T28 -0.059 -0.035 0.059 0.035 0.0 0.2 99.8 100.0 0.16
Cable141-1 -0.054 -0.026 0.054 0.026 0.0 0.0 100.2 100.2 0.00
Cable143-1 0.021 0.010 -0.021 -0.010 0.0 0.0 100.2 100.2 0.00
PM-17 0.034 0.016 -0.034 -0.015 0.1 0.3 100.2 99.6 0.65
T29 -0.015 -0.007 0.015 0.008 0.1 0.1 99.3 99.9 0.65
T113 -0.008 -0.004 0.008 0.004 0.0 0.1 99.2 100.1 0.87
T-24-1 -0.209 -0.113 0.210 0.117 1.0 4.1 99.0 100.2 1.21
T-25-1 -0.137 -0.067 0.138 0.069 0.4 1.7 99.3 100.0 0.74
T4-2 -0.035 -0.016 0.035 0.017 0.4 1.0 101.8 98.7 3.09
Cable58 -0.341 -0.144 0.342 0.145 1.3 0.5 103.4 103.8 0.40
Line51 -1.335 -0.644 1.335 0.644 0.5 0.3 98.7 98.7 0.04
T10-1 0.021 0.010 -0.021 -0.009 0.1 0.3 98.7 103.0 4.27
T35 0.593 0.286 -0.591 -0.271 2.1 14.6 98.7 102.6 3.92
T36 0.721 0.349 -0.718 -0.327 3.0 21.6 98.7 102.4 3.65
Cable59 -0.179 -0.077 0.180 0.077 0.6 0.2 103.4 103.8 0.32
Cable60 -0.256 -0.109 0.257 0.109 1.1 0.3 103.3 103.8 0.41
Cable61 -1.911 -0.925 1.914 0.938 3.6 12.3 103.3 103.8 0.42
ETAP
Project: C.S.E RPLC Page: 100
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
XFR53-4F01-1 -0.231 -0.118 0.231 0.121 0.4 2.7 99.6 100.2 0.61
Cable62 -0.115 -0.050 0.115 0.050 0.2 0.1 103.6 103.8 0.19
Cable63 -0.604 -0.249 0.605 0.250 0.9 1.6 103.5 103.8 0.23
Cable27 13.800 7.114 -13.782 -7.060 18.0 53.6 100.0 99.7 0.26
Cable69 -1.337 -0.648 1.340 0.656 2.3 7.8 98.4 98.8 0.36
T31 0.021 0.010 -0.020 -0.010 0.1 0.2 100.2 104.6 4.33
Cable66 -0.179 -0.076 0.180 0.076 0.6 0.1 98.4 98.8 0.32
Cable104-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00
Cable68 -1.911 -0.925 1.916 0.933 5.1 7.4 98.4 98.8 0.36
T61 -0.006 -0.003 0.006 0.003 0.0 0.0 99.7 100.1 0.38
Cable91-1 -0.008 -0.004 0.008 0.004 0.0 0.0 100.1 100.1 0.00
PMC-1 0.008 0.004 -0.008 -0.004 0.0 0.0 100.1 100.0 0.15
Cable78 4.111 1.634 -4.097 -1.592 13.8 41.6 99.8 99.2 0.63
XFR-53-4B01 -4.111 -1.634 4.122 1.793 11.2 159.3 99.8 101.4 1.61
Cable93-1 -0.008 -0.004 0.008 0.004 0.0 0.0 100.1 100.1 0.00
PMC-2 0.008 0.004 -0.008 -0.004 0.0 0.0 100.1 99.9 0.24
Cable77 -4.122 -1.793 4.122 1.793 0.3 0.5 101.4 101.4 0.01
T13-2 -0.004 -0.002 0.004 0.002 0.0 0.0 100.5 98.7 1.76
Cable76 -4.559 -3.444 4.567 3.449 7.5 5.4 101.2 101.4 0.16
PM-3 -0.008 -0.004 0.008 0.004 0.0 0.0 99.9 100.1 0.24
Cable95-1 -0.008 -0.004 0.008 0.004 0.0 0.0 100.1 100.1 0.00
T16-2 -0.010 -0.003 0.010 0.003 0.1 0.2 100.0 98.8 1.22
Line57 -0.340 -0.163 0.340 0.162 0.0 -0.1 98.7 98.7 0.01
Line72 0.336 0.161 -0.336 -0.161 0.0 -0.1 98.7 98.7 0.01
Cable63-1 -0.008 -0.004 0.008 0.004 0.0 0.0 99.4 99.4 0.00
Cable103-1 -0.008 -0.004 0.008 0.004 0.0 0.0 100.1 100.1 0.00
T53 0.008 0.004 -0.008 -0.004 0.0 0.0 100.1 100.1 0.07
Cable171 -0.443 -0.379 0.447 0.380 3.9 1.0 103.5 104.1 0.65
CAMPO NORTE 0.000 0.000 0.000 0.000 0.0 0.0 98.7 98.7 0.00
Cable172 -0.404 -0.169 0.405 0.170 1.3 0.4 103.8 104.1 0.32
T70 -0.010 -0.005 0.010 0.005 0.0 0.1 99.5 100.1 0.66
Cable173 -0.173 -0.074 0.173 0.074 0.3 0.1 103.9 104.1 0.20
ETAP
Project: C.S.E RPLC Page: 101
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
T72 -0.003 -0.002 0.003 0.002 0.0 0.0 98.9 99.6 0.68
Cable105-1 -0.849 -0.558 0.849 0.558 0.1 0.0 99.6 99.6 0.01
Cable177 -0.182 -0.078 0.183 0.078 1.1 0.3 103.5 104.1 0.57
T73 -0.014 -0.009 0.014 0.009 0.0 0.1 100.9 101.3 0.43
Line66 0.035 0.020 -0.035 -0.020 0.2 0.1 101.8 101.3 0.50
T54 -0.111 -0.054 0.111 0.055 0.3 1.0 101.8 99.8 1.98
T21 -0.086 -0.039 0.087 0.042 0.6 2.2 103.5 102.5 1.02
T77 -0.007 -0.002 0.007 0.002 0.0 0.0 100.5 101.0 0.48
Line77 -0.007 -0.002 0.007 0.002 0.0 -0.1 101.0 101.3 0.26
Line81 -0.087 -0.041 0.087 0.042 0.1 0.1 102.5 102.6 0.12
Line64 0.000 0.000 0.000 0.000 0.0 0.0 102.5 102.5 0.00
Cable187 -0.231 -0.098 0.233 0.099 2.0 0.3 98.1 98.9 0.76
Cable188 -0.117 -0.051 0.117 0.051 0.3 0.0 98.6 98.9 0.21
Cable189 -0.173 -0.074 0.173 0.074 0.4 0.1 98.7 98.9 0.21
Cable191 -0.886 -0.757 0.902 0.761 15.4 4.2 97.6 98.9 1.21
Cable193 -0.710 -0.286 0.713 0.288 2.3 1.9 98.5 98.9 0.37
T84 -0.018 -0.008 0.018 0.008 0.0 0.1 99.6 99.9 0.26
T58-1 -0.206 -0.125 0.207 0.127 0.3 1.9 99.7 100.2 0.51
T88 -0.007 -0.003 0.007 0.003 0.0 0.0 99.4 99.9 0.45
Line98 -0.007 -0.003 0.007 0.003 0.0 0.0 99.9 99.9 0.00
T25 -0.132 -0.060 0.133 0.064 1.3 4.1 102.3 98.7 2.07
T92 -0.002 -0.001 0.002 0.001 0.0 0.0 98.8 99.9 1.09
T27 -0.132 -0.060 0.133 0.064 1.2 3.6 101.6 98.7 1.78
T30 -0.069 -0.032 0.070 0.033 0.4 1.1 103.3 98.7 1.08
Cable32 -7.530 -1.764 7.532 1.770 1.9 5.8 100.0 100.0 0.04
XFR-53-5X02 7.530 1.764 -7.518 -1.543 11.9 221.3 100.0 99.8 0.14
Cable29 7.518 1.543 -7.514 -1.530 4.4 13.1 99.8 99.7 0.09
Cable145-1 -0.111 -0.070 0.111 0.070 0.0 0.0 100.2 100.2 0.00
T59 0.111 0.070 -0.111 -0.069 0.3 1.3 100.2 104.5 4.25
Cable9-2-1 -5.128 -2.832 5.133 2.840 5.2 8.5 100.1 100.2 0.15
T71-1 -0.219 -0.132 0.220 0.135 0.3 2.2 99.5 100.0 0.54
Line63 0.859 0.561 -0.858 -0.560 0.3 0.1 99.6 99.6 0.04
Line125 -0.859 -0.561 0.860 0.561 1.3 0.4 99.6 99.8 0.16
ETAP
Project: C.S.E RPLC Page: 102
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable20-2-1 -1.595 -2.928 1.597 2.931 1.7 2.8 99.9 100.0 0.10
Cable168-1 -0.144 -0.091 0.144 0.091 0.0 0.0 99.8 99.8 0.01
T67 0.144 0.091 -0.143 -0.089 0.5 2.2 99.8 98.9 0.94
T57 -0.005 -0.003 0.005 0.003 0.0 0.0 99.4 99.9 0.54
Cable122-1-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00
T60 -0.006 -0.002 0.006 0.002 0.0 0.1 99.0 99.6 0.64
T63 -0.006 -0.002 0.006 0.002 0.0 0.1 99.6 100.1 0.57
TX-BARRA A-1-1 -0.086 -0.038 0.086 0.038 0.1 0.5 99.7 100.0 0.29
T-27-1-1 -0.145 -0.094 0.146 0.095 0.2 1.1 99.6 100.0 0.42
T-26-1-1 -0.478 -0.288 0.479 0.299 1.6 11.5 98.9 100.2 1.32
Cable94-1 -0.027 -0.012 0.027 0.012 0.0 0.0 99.9 99.9 0.00
T109 0.027 0.012 -0.027 -0.012 0.1 0.2 99.9 99.5 0.38
Cable92-1 -0.027 -0.012 0.027 0.012 0.0 0.0 100.2 100.2 0.00
T-36-13/T1 0.027 0.012 -0.027 -0.012 0.0 0.2 100.2 99.8 0.37
Cable99-1 -0.111 -0.055 0.111 0.055 0.0 0.0 99.8 99.8 0.00
PMC-8 -0.004 -0.002 0.004 0.002 0.0 0.0 99.6 99.9 0.26
T65 0.063 0.030 -0.062 -0.030 0.2 0.8 94.5 93.7 0.72
Cable66-1 -0.209 -0.126 0.209 0.126 0.0 0.0 99.6 99.6 0.00
Cable71-1 -0.912 -2.602 0.916 2.607 4.1 5.1 99.9 100.1 0.22
T-74 0.597 0.249 -0.597 -0.246 0.2 3.4 99.9 94.9 4.98
Cable76-1 -0.886 -0.403 0.887 0.403 0.5 0.6 99.8 99.9 0.07
T-77 0.886 0.403 -0.886 -0.396 0.5 7.1 99.8 99.5 0.34
T104 -0.032 -0.020 0.032 0.020 0.1 0.3 104.7 100.2 4.44
T110 -0.032 -0.020 0.032 0.020 0.1 0.3 104.6 100.2 4.43
T119 -0.091 -0.054 0.092 0.055 0.3 1.1 99.4 100.2 0.79
Cable160-1 -0.166 -0.105 0.166 0.105 0.0 0.0 100.2 100.2 0.00
T-67 0.166 0.105 -0.165 -0.103 0.7 2.9 100.2 104.1 3.87
T-71 -0.314 -0.195 0.317 0.204 2.3 9.2 100.5 99.8 0.70
PM8 -0.010 -0.006 0.010 0.007 0.1 0.2 98.7 99.9 1.14
Line45 -0.076 -0.035 0.076 0.035 0.0 -0.1 99.8 99.8 0.00
Line48 0.043 0.018 -0.043 -0.019 0.0 -0.1 99.8 99.8 0.00
ETAP
Project: C.S.E RPLC Page: 103
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
T124 0.033 0.017 -0.033 -0.016 0.3 0.7 99.8 98.4 1.42
T126 0.043 0.019 -0.043 -0.018 0.3 0.8 99.8 98.6 1.27
T128 -0.028 -0.013 0.028 0.014 0.1 0.2 99.4 99.8 0.41
Cable182-1 -0.235 -0.126 0.235 0.126 0.0 0.0 99.8 99.9 0.00
Cable186-1 0.208 0.112 -0.208 -0.112 0.0 0.0 99.8 99.8 0.01
T130 0.068 0.029 -0.068 -0.028 0.3 1.0 99.8 98.9 0.93
PM25 -0.024 -0.012 0.025 0.012 0.1 0.4 98.8 99.8 1.04
T143 -0.109 -0.057 0.109 0.058 0.2 1.0 94.7 99.9 5.21
PM6 -0.017 -0.008 0.017 0.008 0.1 0.3 98.9 99.9 1.05
T148 -0.017 -0.008 0.017 0.008 0.1 0.3 98.9 100.0 1.05
PM2 -0.011 -0.005 0.011 0.005 0.1 0.2 98.6 99.9 1.31
PM18 -0.033 -0.014 0.033 0.015 0.2 0.5 98.9 99.8 0.99
Cable198-1 -0.033 -0.015 0.033 0.015 0.0 0.0 99.8 99.9 0.00
T153 -0.011 -0.005 0.011 0.005 0.1 0.2 101.1 99.9 1.22
Cable200-1 -0.011 -0.005 0.011 0.005 0.0 0.0 99.9 99.9 0.00
T156 -0.009 -0.004 0.009 0.004 0.1 0.2 101.0 99.9 1.02
T158 -0.010 -0.004 0.010 0.004 0.0 0.0 99.6 99.9 0.29
T160 -0.007 -0.003 0.007 0.003 0.0 0.0 99.6 99.9 0.29
Cable20 -0.546 -0.285 0.546 0.285 0.0 0.0 99.7 99.7 0.01
XFR-53-5D01 0.546 0.285 -0.546 -0.281 0.3 4.0 99.7 99.4 0.34
Cable67-1 0.066 0.039 -0.066 -0.039 0.0 0.0 100.0 100.0 0.04
T47 -0.066 -0.039 0.066 0.039 0.0 0.1 100.0 100.1 0.08
Cable59-1 0.204 0.121 -0.203 -0.121 0.1 0.1 99.9 99.9 0.04
T45 -0.204 -0.121 0.204 0.121 0.1 0.6 99.9 100.1 0.15
Cable70-1 0.019 0.011 -0.019 -0.011 0.1 0.0 100.0 99.7 0.35
T22 -0.019 -0.011 0.019 0.011 0.0 0.0 100.0 100.1 0.05
Cable68-1 0.275 0.163 -0.275 -0.163 0.5 0.3 99.5 99.4 0.18
T18 -0.275 -0.163 0.275 0.165 0.2 1.9 99.5 99.9 0.35
Cable64-1 0.664 0.394 -0.663 -0.393 0.9 0.7 99.4 99.3 0.15
T12-1 -0.664 -0.394 0.665 0.401 0.5 6.6 99.4 99.9 0.50
Cable74-1 0.041 0.024 -0.041 -0.024 0.3 0.2 99.8 99.0 0.77
T24 -0.041 -0.024 0.041 0.025 0.0 0.1 99.8 99.9 0.11
T101 0.015 0.011 -0.015 -0.011 0.0 0.0 100.1 100.0 0.11
Line92 -0.101 -0.057 0.101 0.054 0.1 -3.1 100.1 100.2 0.09
ETAP
Project: C.S.E RPLC Page: 104
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Line109 0.043 0.023 -0.043 -0.023 0.0 -0.1 100.1 100.1 0.00
T137 0.016 0.010 -0.016 -0.010 0.0 0.0 100.1 100.0 0.10
Line114 0.035 0.018 -0.035 -0.018 0.0 -0.1 100.1 100.1 0.00
T138 0.024 0.014 -0.024 -0.014 0.0 0.1 100.1 99.9 0.15
T75 -0.014 -0.009 0.014 0.009 0.0 0.1 100.8 101.3 0.49
Line2 -0.025 -0.012 0.025 0.012 0.0 -0.1 99.9 99.9 0.00
T-19-13/T1 -0.110 -0.065 0.110 0.066 0.1 0.6 99.8 100.2 0.31
T-21-13/T1 -0.113 -0.067 0.113 0.068 0.3 1.2 99.5 100.2 0.69
T-20-13/T1 -0.150 -0.089 0.150 0.090 0.2 1.2 99.4 99.9 0.42
T100 0.009 0.003 -0.009 -0.003 0.0 0.0 99.1 98.7 0.41
T102 0.009 0.003 -0.009 -0.003 0.0 0.0 99.1 98.7 0.41
T-22-13/T1 -0.128 -0.071 0.129 0.073 0.4 1.6 99.1 99.9 0.75
Cable5-2-1 -1.595 -0.947 1.595 0.947 0.0 0.0 100.2 100.2 0.00
Cable65-1-1 0.909 0.521 -0.909 -0.521 0.0 0.0 100.2 100.2 0.00
Cable110-1-1 0.686 0.426 -0.686 -0.426 0.1 0.2 100.2 100.2 0.02
Cable25-2-1 -1.149 -0.679 1.149 0.679 0.0 0.0 100.0 100.0 0.00
Cable72-1-1 0.612 0.357 -0.612 -0.357 0.0 0.0 100.0 100.0 0.00
Cable112-1-1 0.451 0.268 -0.451 -0.268 0.0 0.1 100.0 100.0 0.02
Cable114-1-1 0.479 0.299 -0.479 -0.299 0.1 0.1 100.2 100.2 0.02
Cable116-1-1 0.231 0.133 -0.231 -0.133 0.0 0.0 100.0 100.0 0.01
Cable192-1 1.016 0.576 -1.015 -0.575 0.2 0.4 100.0 99.9 0.03
Cable194-1 -1.033 -0.584 1.033 0.584 0.2 0.4 100.0 100.0 0.03
Cable174-1 0.561 0.342 -0.561 -0.342 0.0 0.0 99.9 99.8 0.00
Cable172-1 0.460 0.295 -0.460 -0.295 0.0 0.0 99.8 99.8 0.00
Cable178-1 0.025 0.012 -0.025 -0.012 0.0 0.0 99.8 99.8 0.00
Cable180-1 0.076 0.035 -0.076 -0.035 0.0 0.0 99.8 99.8 0.00
Cable188-1 0.851 0.495 -0.851 -0.494 0.1 0.1 99.9 99.9 0.01
Cable190-1 -0.961 -0.553 0.961 0.553 0.4 0.7 99.9 99.9 0.07
Cable132-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00
Cable53-1 -0.288 -0.172 0.288 0.172 0.0 0.0 100.1 100.1 0.01
Cable40-2 -0.981 -0.591 0.981 0.591 0.2 0.2 99.9 99.9 0.02
Cable125-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00
Cable118-1 -0.155 -0.093 0.155 0.093 0.0 0.0 100.2 100.2 0.00
Cable128-1 0.155 0.093 -0.155 -0.093 0.0 0.0 100.2 100.2 0.00
Cable152-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00
Cable3-1-1-1 -0.039 -0.023 0.039 0.023 0.0 0.0 100.2 100.2 0.00
ETAP
Project: C.S.E RPLC Page: 105
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable39-2 0.039 0.023 -0.039 -0.023 0.0 0.0 100.2 100.2 0.00
Cable27-2-1 -0.059 -0.035 0.059 0.035 0.0 0.0 100.0 100.0 0.00
Cable46-2 0.059 0.035 -0.059 -0.035 0.0 0.0 100.0 100.0 0.00
Cable17-2-1 -0.138 -0.069 0.138 0.069 0.0 0.0 100.0 100.0 0.00
Cable7-3-1 -0.442 -0.238 0.442 0.238 0.0 0.1 100.2 100.2 0.01
Cable196-1 0.037 0.014 -0.037 -0.014 0.0 0.0 99.9 99.9 0.00
Cable113-1 -0.487 -0.294 0.487 0.294 0.0 0.0 100.2 100.2 0.00
Cable121-1 0.111 0.070 -0.111 -0.070 0.0 0.0 100.2 100.2 0.00
Cable156-1 0.166 0.105 -0.166 -0.105 0.0 0.0 100.2 100.2 0.01
Cable130-1 -0.155 -0.093 0.155 0.093 0.0 0.0 100.2 100.2 0.00
Cable136-1 0.155 0.093 -0.155 -0.093 0.0 0.0 100.2 100.2 0.00
Cable1-1-1 -0.647 -0.347 0.647 0.347 0.0 0.1 100.2 100.2 0.01
Cable170-1 -0.317 -0.204 0.317 0.204 0.0 0.0 99.8 99.8 0.00
Cable202-1 0.009 0.002 -0.009 -0.002 0.0 0.0 99.9 99.9 0.00
Cable204-1 0.017 0.007 -0.017 -0.007 0.0 0.0 99.9 99.9 0.00
Cable28-2-1 -1.033 -0.584 1.033 0.584 0.1 0.2 100.0 100.0 0.01
Cable153-1 0.092 0.055 -0.092 -0.055 0.0 0.0 100.2 100.2 0.00
Line14 -0.091 -0.055 0.091 0.055 0.0 -0.2 100.2 100.2 0.01
Line41 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00
Cable42-2 -0.247 -0.146 0.247 0.146 0.0 0.0 100.2 100.2 0.01
Cable29-2-1 0.305 0.175 -0.305 -0.175 0.0 0.0 99.9 99.9 0.01
Cable8-3 0.250 0.147 -0.250 -0.147 0.0 0.0 100.2 100.2 0.01
Cable31-2 0.110 0.066 -0.110 -0.066 0.0 0.0 100.2 100.2 0.00
Cable38-2 0.113 0.068 -0.113 -0.068 0.0 0.0 100.2 100.2 0.00
Cable33-2 0.150 0.090 -0.150 -0.090 0.0 0.0 99.9 99.9 0.00
Cable37-2 0.129 0.073 -0.129 -0.073 0.0 0.0 99.9 99.9 0.00
Cable10-2 -0.058 -0.035 0.058 0.035 0.0 0.0 100.2 100.2 0.02
Line95 -0.026 -0.012 0.026 0.012 0.0 0.0 99.9 99.9 0.00
Cable16-3 -0.336 -0.161 0.336 0.161 0.0 0.0 98.7 98.7 0.01
Cable18-4 0.336 0.161 -0.336 -0.161 0.0 0.0 98.7 98.7 0.00
Cable56-1 -0.340 -0.204 0.340 0.204 0.0 0.0 99.9 99.9 0.00
T9-1 0.340 0.204 -0.339 -0.201 0.2 2.5 99.9 99.5 0.38
T108 -0.014 -0.008 0.014 0.008 0.0 0.0 99.9 100.1 0.14
T111 -0.071 -0.042 0.071 0.042 0.1 0.4 99.8 100.1 0.29
BD-19-2B11 -0.093 -0.047 0.093 0.047 0.0 0.0 98.4 98.4 0.00
BD-19-2B12 -0.093 -0.047 0.093 0.047 0.0 0.0 98.4 98.4 0.00
ETAP
Project: C.S.E RPLC Page: 106
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
BD-20-2B11 -0.621 -0.315 0.621 0.315 0.0 0.0 98.4 98.4 0.00
BD-20-2B12 -0.637 -0.339 0.637 0.339 0.0 0.0 98.4 98.4 0.00
BD-20-2B14 -0.182 -0.084 0.182 0.084 0.0 0.0 98.4 98.4 0.00
BD-45-2B11 -0.517 -0.249 0.517 0.249 0.0 0.0 108.4 108.4 0.00
BD-45-2B12 -0.357 -0.174 0.357 0.174 0.0 0.0 98.2 98.2 0.00
BD-45-2B13 -0.139 -0.086 0.139 0.086 0.0 0.0 108.4 108.4 0.00
BD-45-2B14 -0.129 -0.080 0.129 0.080 0.0 0.0 98.2 98.2 0.00
BD-46-2D11 -0.097 -0.048 0.097 0.048 0.0 0.0 98.8 98.8 0.00
BD-46-2D12 -0.052 -0.026 0.052 0.026 0.0 0.0 98.8 98.8 0.00
BD-47-2D11 -0.133 -0.063 0.133 0.063 0.0 0.0 98.8 98.8 0.00
BD-47-2D12 -0.027 -0.014 0.027 0.014 0.0 0.0 98.8 98.8 0.00
BD-48-2D11 -0.038 -0.018 0.038 0.018 0.0 0.0 98.8 98.8 0.00
BD-49-2D11 -0.143 -0.071 0.143 0.071 0.0 0.0 98.8 98.8 0.00
BD-49-2D13 0.017 -0.010 -0.017 0.010 0.0 0.0 98.8 98.8 0.00
BD-49-2D14 -0.316 -0.170 0.316 0.170 0.0 0.0 98.8 98.8 0.00
BD-53-3B11 -3.413 -1.569 3.414 1.570 0.8 0.8 103.8 103.8 0.03
BD-53-3B12 -3.435 -1.665 3.436 1.666 0.9 0.9 98.8 98.8 0.03
BD-53-5B13 -1.207 -0.702 1.208 0.702 0.1 0.1 104.1 104.1 0.01
BD-53-3B14 -2.137 -1.273 2.138 1.274 0.4 0.4 98.9 98.9 0.02
BD-20-2B13 -0.231 -0.127 0.231 0.127 0.0 0.0 98.4 98.4 0.00
T-80 -0.157 -0.093 0.157 0.094 0.2 1.4 104.9 100.2 4.77
T15-2 -0.053 -0.039 0.054 0.039 0.3 0.8 99.1 100.1 0.99
T34 -0.016 -0.012 0.016 0.012 0.1 0.2 99.3 100.1 0.86
T44 -0.013 -0.004 0.013 0.004 0.0 0.0 99.9 100.1 0.21
T66 -0.006 -0.002 0.006 0.002 0.0 0.0 99.4 99.9 0.51
T86 -0.005 -0.003 0.005 0.003 0.0 0.0 99.4 99.9 0.54
T142 0.019 0.010 -0.019 -0.010 0.0 0.1 97.1 96.7 0.41
Line68 0.009 0.003 -0.009 -0.003 0.0 -0.3 100.2 100.2 0.00
Cable86-1 -3.026 0.491 3.026 -0.491 0.2 0.3 100.1 100.1 0.01
Line58 3.026 -0.491 -3.023 0.493 2.6 2.1 100.1 100.0 0.07
Line137 0.217 0.115 -0.217 -0.115 0.0 -0.1 99.9 99.9 0.01
Line90 0.093 0.051 -0.093 -0.052 0.0 -0.3 100.1 100.1 0.01
Cable84-1 0.788 -1.624 -0.788 1.624 0.1 0.1 99.9 99.9 0.00
Line22 -0.813 1.612 0.814 -1.612 0.9 0.6 99.9 99.9 0.01
Line142 0.009 0.003 -0.009 -0.004 0.0 -0.2 100.2 100.2 0.00
ETAP
Project: C.S.E RPLC Page: 107
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Line93 3.024 -0.493 -3.018 0.498 5.7 4.4 100.0 99.9 0.16
Line100 0.111 0.053 -0.111 -0.054 0.0 -0.1 99.9 99.9 0.00
Line106 -0.111 -0.053 0.111 0.053 0.0 -0.1 99.9 99.9 0.00
Line24 -0.829 1.604 0.831 -1.603 2.0 1.3 99.9 99.9 0.03
Line144 0.009 0.004 -0.009 -0.005 0.0 -0.9 100.2 100.2 0.00
Cable14-2 1.723 0.829 -1.722 -0.828 0.9 1.1 98.9 98.8 0.07
Line42 -1.723 -0.829 1.732 0.835 8.3 5.8 98.9 99.4 0.54
Line3 -0.127 -0.072 0.127 0.072 0.0 -0.2 100.1 100.1 0.01
Line26 0.070 0.051 -0.070 -0.051 0.0 -0.3 100.1 100.1 0.01
Line36 0.051 0.019 -0.051 -0.019 0.0 -0.1 100.1 100.1 0.00
Line112 -0.111 -0.053 0.111 0.053 0.0 -0.1 99.9 99.9 0.00
Line5 0.093 0.052 -0.093 -0.052 0.0 -0.3 100.1 100.1 0.01
Line122 -0.111 -0.053 0.111 0.053 0.0 -0.1 99.9 99.9 0.00
Line32 -0.091 -0.055 0.091 0.055 0.0 -0.2 100.2 100.2 0.01
Line39 0.027 0.008 -0.027 -0.009 0.0 -1.0 100.1 100.1 0.01
Line126 -0.111 -0.053 0.111 0.053 0.0 -0.2 99.9 99.9 0.01
Line108 3.018 -0.498 -3.014 0.501 4.0 3.1 99.9 99.8 0.11
Line85 -0.859 1.590 0.860 -1.590 0.7 0.4 99.9 99.9 0.01
Line102 0.002 0.001 -0.002 -0.001 0.0 -0.2 99.9 99.9 0.00
Line7-2 0.093 0.052 -0.093 -0.052 0.0 -0.1 100.1 100.1 0.00
Line12-1 -0.091 -0.055 0.091 0.054 0.0 -0.5 100.2 100.2 0.01
Line131 -0.202 -0.108 0.202 0.107 0.0 -0.2 99.9 99.9 0.01
T50 0.091 0.055 -0.091 -0.054 0.2 0.8 99.9 99.3 0.55
Line9 0.093 0.052 -0.093 -0.053 0.0 -0.5 100.1 100.1 0.01
Line101 -0.010 -0.005 0.010 0.005 0.0 -0.3 100.1 100.1 0.00
Line116 3.015 -0.501 -3.013 0.502 1.3 1.0 99.8 99.7 0.04
Line88 1.722 0.828 -1.722 -0.827 0.8 0.5 98.8 98.8 0.05
Line25 0.093 0.053 -0.093 -0.053 0.0 -0.5 100.1 100.1 0.01
Line111 0.000 0.000 0.000 0.000 0.0 -0.1 99.9 99.9 0.00
Line49 1.371 0.662 -1.370 -0.661 0.5 0.3 98.8 98.7 0.04
Line53 0.351 0.166 -0.351 -0.166 0.0 -0.1 98.8 98.8 0.01
Line120 3.013 -0.502 -3.012 0.503 1.3 1.0 99.7 99.7 0.04
Line146 0.006 0.000 -0.006 -0.002 0.0 -1.9 99.6 99.6 0.00
Line29 3.012 -0.502 -3.011 0.504 1.3 1.0 99.7 99.6 0.04
Line33 0.000 0.000 0.000 0.000 0.0 -0.2 99.7 99.7 0.00
Line133 -0.208 -0.109 0.208 0.109 0.0 -0.1 99.9 99.9 0.00
ETAP
Project: C.S.E RPLC Page: 108
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Line83 -0.111 -0.055 0.111 0.054 0.0 -1.0 99.8 99.9 0.03
Line138 0.000 -0.001 0.000 0.000 0.0 -0.6 99.8 99.8 0.00
Line35 0.008 0.004 -0.008 -0.004 0.0 -0.1 99.4 99.4 0.00
Line135 -0.212 -0.112 0.212 0.112 0.0 0.0 99.9 99.9 0.00
Cable47-2 0.132 0.079 -0.132 -0.079 0.0 0.0 99.6 99.6 0.00
Line37 2.878 -0.583 -2.876 0.585 2.4 1.9 99.6 99.6 0.07
Line55 0.341 0.162 -0.341 -0.162 0.0 -0.1 98.8 98.8 0.01
Line43 0.000 0.000 0.000 0.000 0.0 -0.1 99.4 99.4 0.00
Line13 0.925 -1.550 -0.924 1.551 1.3 0.9 99.6 99.6 0.01
Line140 0.000 -0.001 0.000 0.000 0.0 -0.6 100.2 100.2 0.00
Line28 0.341 0.162 -0.340 -0.162 0.1 -0.2 98.8 98.7 0.02
Line31 0.079 0.045 -0.079 -0.045 0.0 -0.1 100.1 100.1 0.00
Line6-1 -0.123 -0.074 0.123 0.074 0.0 -0.5 100.2 100.2 0.02
Line71 0.000 0.001 0.000 -0.001 0.0 -0.2 99.9 99.9 0.00
Line10 -0.008 -0.004 0.008 0.004 0.0 -0.1 100.1 100.1 0.00
Line47 0.000 0.000 0.000 0.000 0.0 -0.1 99.4 99.4 0.00
Line34 0.008 0.003 -0.008 -0.003 0.0 -0.1 100.1 100.1 0.00
Line19 0.924 -1.551 -0.920 1.553 3.3 2.2 99.6 99.6 0.04
Line94 0.000 -0.001 0.000 0.000 0.0 -1.0 100.1 100.1 0.00
Line69 -0.009 -0.002 0.009 0.002 0.0 -0.3 99.9 99.9 0.00
Cable101-1 0.013 0.004 -0.013 -0.004 0.0 0.0 100.1 100.1 0.00
Line148 0.006 0.002 -0.006 -0.002 0.0 -0.6 100.1 100.1 0.00
Line20 0.000 -0.001 0.000 0.000 0.0 -0.5 100.2 100.2 0.00
Line79 0.007 0.003 -0.007 -0.003 0.0 -0.1 99.9 99.9 0.00
Line17 0.920 -1.553 -0.918 1.555 2.0 1.3 99.6 99.7 0.02
Line15 0.918 -1.555 -0.918 1.555 0.5 0.3 99.7 99.7 0.01
Line127 0.043 0.025 -0.043 -0.026 0.0 -0.5 99.7 99.7 0.01
Line130 0.874 -1.580 -0.867 1.586 7.9 5.4 99.7 99.8 0.11
Line87 -0.860 1.590 0.866 -1.586 6.6 4.5 99.9 99.8 0.09
Line61 0.010 0.005 -0.010 -0.005 0.0 -0.3 100.1 100.1 0.00
Line84 0.043 0.026 -0.043 -0.026 0.0 -0.1 99.7 99.6 0.00
Line124 0.000 0.000 0.000 0.000 0.0 -0.1 99.6 99.6 0.00
XFR-53-3B03 -0.656 -0.336 0.657 0.347 1.1 11.7 108.4 104.1 4.27
XFR-53-3B04 -0.485 -0.254 0.486 0.261 0.7 7.1 98.2 98.9 0.70
XFR-53-3D01 -0.395 -0.211 0.395 0.216 0.4 4.8 98.8 99.4 0.59
XFR-53-3D02 -0.395 -0.211 0.396 0.216 0.4 4.8 98.8 99.4 0.59
Cable2-3 0.805 0.492 -0.805 -0.492 0.0 0.0 100.1 100.1 0.00
ETAP
Project: C.S.E RPLC Page: 109
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable73-1 0.093 0.051 -0.093 -0.051 0.0 0.0 100.1 100.1 0.00
Cable4-5 0.175 0.106 -0.175 -0.106 0.0 0.0 99.9 99.9 0.00
Line74 -0.021 -0.011 0.021 0.011 0.0 0.0 101.3 101.3 0.03
Cable21-3 0.203 0.097 -0.203 -0.097 0.0 0.0 98.7 98.7 0.00
Cable27-3-1 0.070 0.033 -0.070 -0.033 0.0 0.0 98.7 98.7 0.00
Line113 0.043 0.023 -0.043 -0.023 0.0 -0.1 100.1 100.1 0.00
Line115 0.035 0.018 -0.035 -0.018 0.0 -0.1 100.1 100.1 0.00
Line30 0.054 0.039 -0.054 -0.039 0.0 -0.4 100.1 100.1 0.01
840.7 11693.7
ETAP
Project: C.S.E RPLC Page: 110
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
% Voltage
Connected Load Cable/Heater Losses Terminal on
% Vd % Vst
ID Type ID Library kW kvar Bus Bus kV Load kV Operating Starting
G-2002 Ind. Motor Cable18-2 15MCUS3 1.7 2.3 101.25 101.21 105.81 0.04 101.02
GM-4801A Ind. Motor Cable3-1 5,0NCUN1 0.4 0.1 99.39 99.19 99.19 0.19 98.61
GM-4702B Ind. Motor Cable6-1 5,0NCUN1 0.4 0.1 99.39 99.20 99.20 0.19 98.63
EM-4604-1 Ind. Motor Cable106 0,6NCUS1 98.80 98.80 103.10 0.00 0.00
EM-4604-2. Ind. Motor Cable105 0,6NCUS1 0.1 0.0 98.80 97.46 101.70 1.34 91.53
GM-4601 Ind. Motor Cable104 0,6NCUN3 0.7 0.1 98.80 96.20 100.38 2.61 88.98
GM-4603 Ind. Motor Cable103 0,6NCUN3 1.0 0.2 98.80 96.75 100.96 2.05 90.83
GM-4604. Ind. Motor Cable102 0,6NCUS1 0.0 0.0 98.80 98.46 102.74 0.34 96.42
GM-4602 A Ind. Motor Cable101 0,6NCUN3 0.7 0.0 98.80 95.59 99.75 3.21 86.19
EM-4603-1. Ind. Motor Cable100 0,6NCUN3 0.6 0.1 98.80 97.17 101.40 1.63 92.21
GM-4606. Ind. Motor Cable150 0,6NCUS1 0.1 0.1 98.81 96.72 100.93 2.08 87.41
EM-4603-2. Ind. Motor Cable155 0,6NCUN3 0.6 0.1 98.81 97.18 101.40 1.63 92.22
EM-4702-1. Ind. Motor Cable114 0,6NCUN3 0.9 0.1 98.80 95.85 100.02 2.95 87.56
EM-4702-2. Ind. Motor Cable115 0,6NCUN3 0.9 0.1 98.80 95.85 100.02 2.95 87.56
GM-4706 A. Ind. Motor Cable116 0,6NCUN3 1.4 0.4 98.80 96.82 101.03 1.98 90.88
EM-4704-1. Ind. Motor Cable118 0,6NCUN3 0.9 0.1 98.80 95.85 100.02 2.95 87.56
Mtr51 Ind. Motor Cable120 0,6NCUN3 0.9 0.1 98.80 95.85 100.02 2.95 87.56
GM-4701 Ind. Motor Cable162 0,6NCUN3 0.2 0.0 98.81 97.20 101.42 1.61 91.52
EM-4704- 4 Ind. Motor Cable159 0,6NCUN3 0.9 0.1 98.81 95.85 100.02 2.95 87.56
GM-4802. Ind. Motor Cable122 0,6NCUS1 0.1 0.0 98.80 97.28 101.51 1.52 90.01
GM-4951 B Ind. Motor Cable125 0,6NCUN3 0.7 0.1 98.80 97.45 101.68 1.36 93.48
GM-4902A. Ind. Motor Cable137 0,6NCUS1 98.80 98.80 103.10 0.00 0.00
GM-4902B. Ind. Motor Cable139 0,6NCUS1 98.80 98.80 103.10 0.00 0.00
GM-4901-B Ind. Motor Cable145 0,6NCUN3 1.0 0.9 98.80 97.89 102.15 0.91 93.43
EM-4902-1. Ind. Motor Cable133 0,6NCUS1 0.1 0.0 98.80 97.79 102.04 1.01 92.78
GM-4904. Ind. Motor Cable129 0,6NCUS1 98.80 98.80 103.10 0.00 0.00
GM-4905-A Ind. Motor Cable130 0,6NCUS1 0.1 0.0 98.80 97.79 102.04 1.01 92.78
GM-4951 Ind. Motor Cable131 0,6NCUN3 98.80 98.80 103.10 0.00 0.00
GM-4901-C Ind. Motor Cable132 0,6MCUN3 98.80 98.80 103.10 0.00 0.00
ETAP
Project: C.S.E RPLC Page: 111
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Critical Report
Critical Report
Marginal Report
Marginal Report
MW Mvar MVA % PF
Number of Iterations: 3