You are on page 1of 114

ETAP

Project: C.S.E RPLC Page: 1


5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (2): Normal

Generation Category (1): Design

Load Diversity Factor: Global

Constant kVA=80%, Constant Z=50%, Generic=100%, Constant I=100%

Swing V-Control Load Total


Number of Buses: 1 0 522 523

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 170 0 0 295 23 44 532

Method of Solution: Fast-Decoupled Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 60 Hz

Unit System: English

Project Filename: SIMULACION CP

Output Filename: D:\Documents and Settings\BARRIAR\Mis documentos\FLUJO DE CARGA CP\Untitled.lfr


ETAP
Project: C.S.E RPLC Page: 2
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


ETAP
Project: C.S.E RPLC Page: 3
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

B3-2 2.400 1 104.2 1.0 0.155 0.092

B4-2 0.480 1 98.8 0.3 0.226 0.134

B6 2.400 1 100.0 1.1 0.058 0.035

B7 0.480 1 100.2 1.2

B9 2.400 1 99.5 0.7 0.003 0.001 0.017 0.006

B14 0.480 1 100.0 1.1 0.009 0.005

B16 0.480 1 99.3 -0.5 0.010 0.005 0.004 0.002

B21 0.480 1 98.7 -0.7 0.034 0.020

B.DE TRANF 2,4KV 2.400 1 99.2 0.6 0.132 0.078

B.DE TRANSF.BARRA"B" 2.400 1 99.2 0.5 0.207 0.123

B.DE TRASNF.BARRA"A" 2.400 1 99.4 0.8

B/MEREY 2.400 1 99.5 0.4 0.043 0.026

B/TRANS (480) 0.480 1 99.3 0.7 0.008 0.004

BARRA"A"4,16-1 4.160 1 99.5 0.6

BARRA "A" 480V (FCC) 0.480 1 98.3 0.2 0.208 0.111

BARRA"A"480V-1 0.480 1 99.9 1.0

BARRA"B"4,16-1 4.160 1 99.3 -0.8

BARRA "B" 480V (FCC) 0.480 1 98.8 -0.9 0.137 0.067

BARRA"B"480V-1 0.480 1 99.6 -0.4

BARRA "G" 13.800 1 100.2 1.2

BARRA "G" DA-3 2.400 1 99.8 1.0 0.110 0.065

BARRA "G" DA-3. 0.480 1 99.0 0.8 0.051 0.031

BARRA "H" 13.800 1 99.9 -0.3

BARRA "H" DA-3 2.400 1 99.4 -0.6 0.150 0.089

BARRA "H" DA-3. 0.480 1 98.8 -0.7 0.041 0.024

BARRA__A-1 13.800 1 124.9 3.8

BARRA_A1-1 230.000 1 100.3 0.2

BARRA A 480V 0.480 1 99.8 0.9 0.164 0.084

barra a 480v STG 0.480 1 100.1 1.1

BARRA A-1 0.480 1 97.1 0.3

BARRA A ALQUILACION 4.160 1 99.7 -0.5 0.086 0.038

BARRA A ALQUILACION 0.480 1 94.7 -0.2 0.461 0.278


480V
BARRA A STG 0.480 1 100.1 1.1 0.039 0.023

BARRA A T.E# 2 4.160 1 99.5 0.6 0.403 0.239


ETAP
Project: C.S.E RPLC Page: 4
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

BARRA A T.E# 2 480V 0.480 1 99.5 1.0 0.064 0.038

BARRA A TE#1 0.480 1 98.4 0.8 0.204 0.123

BARRA A UNIDAD 51 Y 52 0.480 1 98.8 0.4 0.211 0.104 0.019 0.012

BARRA B1 ALQUILACION 0.480 1 99.0 -0.5 0.006 0.003

BARRA B 480V 0.480 1 99.4 -0.7 0.247 0.118

BARRA B-1 0.480 1 99.0 -0.5

BARRA B ALQUILACION 4.160 1 100.2 1.2

BARRA B ALQUILACION 0.480 1 98.3 -0.6 0.137 0.082


480V
BARRA B STG 0.480 1 99.8 -0.4 0.059 0.035

BARRA B T.E# 1 0.480 1 98.1 -0.6 0.216 0.131

BARRA B T.E # 2 4.160 1 99.3 -0.8 0.410 0.243

BARRA B T.E # 2 480V 0.480 1 99.2 -0.4 0.064 0.038

BARRA B UNIDAD 51 Y 52 0.480 1 100.0 -0.2

BC 2.400 1 97.2 -1.9 0.824 0.511

BCI 4,16"A" 4.160 1 99.5 0.8

BCI 4,16"B" 4.160 1 99.5 0.8

BCI 13,8 "A" 13.800 1 99.5 0.8

BCI 13,8 "B" 13.800 1 99.5 0.8

BP-XFR-53-5A01 34.500 1 99.7 -2.0

BP-XFR-53-5A02 34.500 1 99.7 -2.0

BP-XFR-53-5B01 34.500 1 99.7 -2.0

BP-XFR-53-5B02 34.500 1 99.7 -2.0

BP-XFR-53-5B03 34.500 1 99.7 -2.0

BP-XFR-53-5B04 34.500 1 99.7 -2.0

BP-XFR-53-5B05 34.500 1 99.7 -2.0

BP-XFR-53-5B06 34.500 1 99.7 -2.0

BP-XFR-53-5B07 34.500 1 99.7 -2.0

BP-XFR-53-5B08 34.500 1 99.7 -2.0

BP-XFR-53-5D02 34.500 1 99.7 -2.0

BP-XFR-53-7A01 230.000 1 100.3 0.2

BP-XFR-53-7A02 230.000 1 100.3 0.2

Bus1-3 230.000 1 100.3 0.2

Bus1-4 2.400 1 98.7 0.3

Bus2-4-1 230.000 1 100.3 0.2

Bus2-5 0.480 1 95.1 -0.2

Bus3-2 0.480 1 100.0 -0.2


ETAP
Project: C.S.E RPLC Page: 5
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus4-2 230.000 1 100.3 0.2

Bus4-3 2.400 1 99.0 0.3

Bus5-4 13.800 1 99.7 0.5

Bus6-3 230.000 1 100.3 0.2

Bus6-4 13.800 1 99.7 0.5

Bus7-4 230.000 1 100.3 0.2

Bus7-5 0.480 1 99.7 0.5

Bus8-2 0.480 1 95.1 1.2

Bus9-2 0.480 1 99.6 -0.4 0.026 0.012

Bus10 34.500 1 99.7 -2.0 0.960 0.595 0.150 0.093

Bus10-2 0.480 1 99.8 1.0

Bus11-2 13.800 1 99.9 1.2

Bus12-1 0.480 1 98.7 1.0 0.092 0.055

Bus13-1 2.400 1 98.7 0.3 0.706 0.419

Bus14-1 0.480 1 99.8 1.0

Bus15-1 13.800 1 100.0 -0.2

Bus16-1 0.480 1 99.4 -0.6

Bus17-1 13.800 1 100.3 1.2 0.323 0.156

Bus18-1 0.480 1 99.4 -0.6

Bus19-1 0.480 1 99.5 0.8

Bus20-4 0.480 1 97.2 -0.6 0.171 0.102

Bus21-3 0.480 1 99.1 -0.7

Bus22 13.800 1 99.8 1.0

Bus22-4 4.160 1 99.5 -0.5 0.170 0.101

Bus23-3 4.160 1 99.5 -0.5 0.170 0.101

Bus25-2 230.000 1 100.3 0.2

Bus25-3 0.480 1 105.3 1.2

Bus26-2 230.000 1 100.3 0.2

Bus27-3-1 13.800 1 100.3 1.2

Bus29-3-1 13.800 1 100.0 -0.2

Bus31-3 0.480 1 99.9 -0.3

Bus32-3 0.480 1 99.5 0.8

Bus34-3 0.480 1 99.5 0.8

Bus35-3 0.480 1 100.1 1.2

Bus37-3 0.480 1 95.3 1.2

Bus41-3 13.800 1 100.2 1.2


ETAP
Project: C.S.E RPLC Page: 6
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus43-3 0.480 1 99.3 -0.5 0.009 0.005 0.006 0.003

Bus45-1 0.208 1 99.6 0.8 0.034 0.016

Bus46-1 0.480 1 99.2 0.7 0.009 0.004

Bus48-1-1 0.480 1 99.0 0.5

Bus49-1-1 0.480 1 99.3 -0.7

Bus50-1 0.240 1 101.8 -0.4 0.005 0.002 0.029 0.013

Bus51-1 0.480 1 99.4 0.8

Bus53 4.160 1 103.3 -3.0 0.341 0.144

Bus53-1 13.800 1 98.7 0.7

Bus54 4.160 1 103.4 -2.9 0.179 0.077

Bus55 4.160 1 103.3 -2.9 0.256 0.109

Bus55-1 0.220 1 99.1 0.5

Bus56 4.160 1 103.3 -3.2 1.911 0.925

Bus56-1-1 0.480 1 99.6 0.7

Bus57 4.160 1 103.6 -3.0 0.115 0.050

Bus57-1 0.220 1 99.1 0.5

Bus58 4.160 1 103.5 -3.1 0.604 0.249

Bus59 34.500 1 100.0 -1.8

Bus59-1-1 0.220 1 103.0 0.2 0.003 0.002 0.016 0.007

Bus61 4.160 1 98.4 -3.2 1.337 0.648

Bus62-1-1 0.480 1 100.0 -0.2

Bus63-1 13.800 1 100.2 1.2

Bus64 4.160 1 98.4 -2.9 0.179 0.076

Bus64-1 13.800 1 100.3 1.2

Bus65 4.160 1 98.4 -3.1 1.911 0.925

Bus65-1 0.240 1 99.6 0.9 0.001 0.000

Bus66-1 0.240 1 99.7 1.0 0.006 0.003

Bus67-1 13.800 1 100.1 1.2

Bus68 6.600 1 99.8 -4.4

Bus68-1 13.800 1 100.1 1.2

Bus69 13.800 1 101.4 -2.6

Bus69-1 0.220 1 100.5 0.3 0.003 0.002

Bus70 13.800 1 101.2 -2.6 4.559 3.444

Bus70-1 0.240 1 99.9 1.1 0.008 0.004

Bus71 6.600 1 99.2 -4.8 4.097 1.592

Bus71-1 13.800 1 100.1 1.2


ETAP
Project: C.S.E RPLC Page: 7
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus72-1 0.208 1 104.6 0.9 0.019 0.009

Bus73-1 13.800 1 100.0 -0.2

Bus74-1 0.480 1 105.3 1.2

Bus75-1 0.220 1 100.0 -0.2 0.010 0.003

Bus76-1 0.480 1 100.0 -0.2

Bus77-1 13.800 1 98.7 0.7

Bus79-1 13.800 1 99.4 0.8

Bus80-1 13.800 1 100.1 1.2

Bus81 4.160 1 103.5 -2.4 0.443 0.379

Bus81-1 2.400 1 98.7 0.7

Bus82 4.160 1 103.8 -2.5 0.404 0.169

Bus82-1 0.240 1 99.5 0.9 0.010 0.005

Bus83 4.160 1 103.9 -2.5 0.173 0.074

Bus84-1 0.240 1 98.9 -0.6 0.004 0.002

Bus85-1 13.800 1 99.6 -0.2

Bus87 4.160 1 103.5 -2.5 0.182 0.078

Bus87-1 0.480 1 100.9 -0.9 0.014 0.009

Bus88-1 2.400 1 101.8 -0.6 0.073 0.033

Bus89-1 2.400 1 98.7 0.7

Bus91-1 0.220 1 103.5 -1.4 0.076 0.034 0.010 0.005

Bus92-1 0.240 1 100.5 -1.0 0.007 0.002

Bus93-1 2.400 1 101.0 -0.8

Bus94-1 2.400 1 102.5 -0.4

Bus97 4.160 1 98.1 -2.6 0.231 0.098

Bus98 4.160 1 98.6 -2.7 0.117 0.051

Bus98-1 0.480 1 99.9 -0.1

Bus99 4.160 1 98.7 -2.7 0.173 0.074

Bus99-1 2.400 1 102.6 -0.4

Bus101 4.160 1 97.6 -2.4 0.886 0.757

Bus101-1 2.400 1 102.4 -0.6 0.284 0.129 0.414 0.189

Bus103 4.160 1 98.5 -2.8 0.710 0.286

Bus103-1-1 0.480 1 98.6 -0.9

Bus104-1 0.240 1 99.6 -0.3 0.018 0.008

Bus106-1-1 0.480 1 99.7 0.8

Bus107-1 0.240 1 99.4 -0.3 0.007 0.003

Bus108 13.800 1 101.4 -2.6


ETAP
Project: C.S.E RPLC Page: 8
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus108-1 13.800 1 99.9 -0.1

Bus109 13.800 1 100.3 1.2

Bus112-1 0.208 1 102.3 -0.6 0.036 0.017 0.091 0.041

Bus114-1 0.240 1 98.8 -0.7 0.002 0.001

Bus115-1 0.210 1 101.6 -0.4 0.036 0.017 0.093 0.042

Bus116-1 0.208 1 103.3 0.0 0.019 0.009 0.047 0.022

Bus117-1-1 2.400 1 100.0 -0.2

Bus118 13.800 1 100.0 -0.2

Bus118-1 0.240 1 98.0 -0.1

Bus118-2 0.240 1 99.9 -0.1

Bus119 13.800 1 100.0 -0.3

Bus119-1 2.400 1 100.0 -0.2

Bus120 34.500 1 99.8 -1.9

Bus120-1 2.400 1 102.6 -0.4 0.199 0.091 0.290 0.132

Bus125-1 13.800 1 100.2 1.2

Bus126-1 0.480 1 104.5 0.8 0.076 0.047 0.032 0.020

Bus128 13.800 1 100.1 1.2

Bus129-1 0.480 1 99.5 -0.6

Bus130 13.800 1 99.6 -0.2

Bus132 13.800 1 99.9 -0.2

Bus134-1 13.800 1 100.0 -0.2

Bus137 13.800 1 99.8 -0.3

Bus138 0.480 1 99.4 -0.5 0.004 0.003

Bus139-1 13.800 1 100.2 1.2

Bus140 0.480 1 98.9 -0.8 0.102 0.063 0.042 0.026

Bus141-1 13.800 1 100.0 -0.2

Bus144 0.240 1 99.0 -0.7 0.006 0.002

Bus145-1-1 4.160 1 100.2 1.2

Bus148 0.240 1 99.6 0.8 0.007 0.002

Bus149-1-1 4.160 1 99.7 -0.5

Bus154-1-1 0.480 1 99.6 -0.5

Bus157-1-1 0.480 1 98.9 0.3

Bus166 13.800 1 99.9 -0.3

Bus168 13.800 1 100.2 1.2

Bus169 13.800 1 99.8 -0.3

Bus170 0.240 1 99.6 -0.4 0.003 0.001 0.001 0.001


ETAP
Project: C.S.E RPLC Page: 9
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus177 0.480 1 100.0 -0.2

Bus179 4.160 1 94.5 0.6 0.232 0.099

Bus180 13.800 1 99.6 0.8

Bus181 13.800 1 99.9 1.2 0.017 1.920 0.003 0.300

Bus182 13.800 1 99.8 -0.2

Bus185 13.800 1 99.9 1.2

Bus186 4.160 1 94.9 0.9 0.597 0.246

Bus188 4.160 1 99.5 -0.6 0.886 0.396

Bus190 0.480 1 93.7 0.0 0.062 0.030

Bus196 0.480 1 104.7 0.9 0.027 0.017 0.004 0.003

Bus198 0.480 1 104.6 0.9 0.027 0.017 0.004 0.003

Bus228 0.480 1 99.4 0.8 0.091 0.054

Bus229 13.800 1 100.2 1.2

Bus230 0.440 1 104.1 0.6 0.023 0.014 0.131 0.081

Bus234 13.800 1 99.8 -0.3

Bus235 0.440 1 99.8 -0.3

Bus238 0.480 1 100.5 -1.3 0.271 0.168 0.042 0.026

Bus240 0.480 1 102.4 -0.3

Bus244 0.480 1 98.7 -0.7 0.011 0.007

Bus248 0.480 1 99.8 -0.3

Bus253 13.800 1 99.8 -0.3

Bus255 13.800 1 99.8 -0.3

Bus256 0.240 1 98.4 -1.0 0.010 0.005 0.024 0.012

Bus257 0.240 1 98.6 -1.0 0.012 0.005 0.031 0.013

Bus259 0.480 1 99.4 -0.5 0.028 0.014

Bus260 13.800 1 99.9 -0.3

Bus263 13.800 1 99.8 -0.3 0.140 0.083

Bus264 0.480 1 98.9 -0.9 0.035 0.015 0.033 0.014

Bus266 0.480 1 99.8 -0.3

Bus267 13.800 1 99.8 -0.3

Bus271 0.208 1 99.8 -0.3

Bus275 0.208 1 98.8 -0.8 0.010 0.005 0.015 0.007

Bus278 0.220 1 94.7 -0.6 0.122 0.064

Bus280 0.208 1 98.9 -0.8 0.002 0.001 0.015 0.007

Bus285 0.208 1 98.9 -0.8 0.002 0.001 0.015 0.007

Bus291 0.480 1 98.6 -1.0 0.011 0.005


ETAP
Project: C.S.E RPLC Page: 10
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus293 0.208 1 98.9 -0.8 0.033 0.015

Bus294 13.800 1 99.9 -0.3

Bus295 0.480 1 101.1 -1.0 0.011 0.005

Bus296 13.800 1 99.9 -0.3

Bus299 0.240 1 101.0 -1.1 0.009 0.004

Bus301 0.480 1 99.6 -0.4 0.003 0.001 0.007 0.003

Bus304 0.480 1 99.6 -0.4 0.002 0.001 0.005 0.002

Bus305 0.480 1 105.3 1.2

Bus307 0.480 1 100.0 -0.2

Bus313-1 0.480 1 98.6 -0.9 0.085 0.053

Bus_G6 13.800 1 100.3 1.2

BXFR-53-5D01 34.500 1 99.7 -2.0

C.DE BOMBAS"E"(2,4) 2.400 1 100.0 1.1

C.DE BOMBAS"E"(4,16) 4.160 1 99.9 1.0

C.DE BOMBAS"E"(480) 0.480 1 100.0 1.1

C.DE BOMBAS"F" (2,4) 2.400 1 99.5 -0.5

C.DE BOMBAS"F"(4,16) 4.160 1 99.4 -0.6

C.DE BOMBAS"F"(480) 0.480 1 99.8 -0.3

CASETA 1 13.800 1 100.1 1.2

CASETA 1-6H 13.800 1 100.1 1.2

CASETA 2 13.800 1 100.1 1.2

CASETA 2-6H 13.800 1 100.1 1.2

CASETA 3 13.800 1 100.1 1.2 0.033 0.016 0.014 0.007

CASETA 3-6H 13.800 1 100.1 1.2

CCM"E"(2.4) 2.400 1 100.0 1.1 0.066 0.039

CCM"E"(4,16) 4.160 1 99.9 1.0 0.203 0.121

CCM"E"(480) 0.480 1 99.7 1.1 0.019 0.011

CCM"F"(2,4) 2.400 1 99.4 -0.5 0.275 0.163

CCM"F"(4,16) 4.160 1 99.3 -0.6 0.663 0.393

CCM"F"(480) 0.480 1 99.0 -0.3 0.041 0.024

CCM A/SERV. 0.480 1 100.8 -0.9 0.014 0.009

CDD "A" 34.500 1 99.7 -2.0 8.640 4.551 1.350 0.711

CDD "B" 34.500 1 99.7 -2.0 8.640 4.551 1.350 0.711

CONTROL C DE BOMBAS 13.800 1 99.9 -0.2

DA-3 BARRA G (2.4) 2.400 1 99.8 1.0

DA-3 BARRA G (480) 0.480 1 99.5 0.8


ETAP
Project: C.S.E RPLC Page: 11
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

DA-3 BARRA H (2.4) 2.400 1 99.4 -0.6

DA-3 BARRA H (480) 0.480 1 99.1 -0.7

G1-1 13.800 1 100.3 1.2

G2-1 13.800 1 100.0 -0.2

G3-1 13.800 1 100.2 1.2

G4-1 13.800 1 100.0 -0.2

G5 13.800 1 100.0 -0.2

G6-1 13.800 1 100.0 -0.2

G7-1 13.800 1 100.2 1.2

G10 13.800 1 99.9 -0.3

G11 13.800 1 99.8 -0.3

G12 13.800 1 99.8 -0.3

G13 13.800 1 99.9 -0.3

G14 13.800 1 100.2 1.2

G15 13.800 1 100.1 1.2

G16 13.800 1 99.9 -0.2

G17 13.800 1 100.2 1.2

G18 13.800 1 100.2 1.2

G19 13.800 1 100.3 1.2

G20 13.800 1 100.0 -0.2

G21 13.800 1 100.3 1.2

G22 13.800 1 100.0 -0.2

G23 13.800 1 99.9 -0.3

G24-1 13.800 1 100.0 -0.2

G25-1 13.800 1 100.2 1.2

G26 13.800 1 100.3 1.2

G27 13.800 1 100.0 -0.2

G28-1 13.800 1 100.2 1.2

G29-1 13.800 1 100.0 -0.2

G30 13.800 1 99.9 -0.2

G31 13.800 1 100.2 1.2

G32 13.800 1 100.2 1.2

G33 13.800 1 100.2 1.2 0.159 0.052

G34 13.800 1 99.8 -0.3

G35 13.800 1 99.9 -0.2

G36 13.800 1 100.0 -0.2


ETAP
Project: C.S.E RPLC Page: 12
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

G37 13.800 1 100.2 1.2

G38 13.800 1 100.2 1.2

G39 13.800 1 100.2 1.2

G-1 13.800 1 100.2 1.2

G-2 13.800 1 99.9 -0.3

G-4 13.800 1 99.9 -0.3

G-5 13.800 1 100.2 1.2

G-6 13.800 1 100.2 1.2

G-7 13.800 1 99.9 -0.3

G-8 (BOMBA DE TRANF.) 13.800 1 100.2 1.2

G/N 13.800 1 99.9 -0.1

GD 13.800 1 98.7 0.7

Gua. II 230 230.000 1 100.0 0.0

GX 13.800 1 99.9 -0.2

JET-A1 4.160 1 99.5 -0.5

LPG.1 0.480 1 99.9 1.1 0.014 0.008

LPG.2 2.400 1 99.8 1.0 0.071 0.042

MCC-19-2B01, 0.480 1 98.4 -3.2 0.093 0.047

MCC-19-2B02 0.480 1 98.4 -3.2 0.093 0.047

MCC-20-2B01 0.480 1 98.4 -3.2 0.491 0.235 0.135 0.083

MCC-20-2B02 0.480 1 98.4 -3.2 0.606 0.319 0.033 0.020

MCC-20-2B03B 0.480 1 98.4 -3.2 0.175 0.079 0.008 0.005

MCC-45-2B01 0.480 1 108.4 -3.3 0.516 0.249

MCC-45-2B02 0.480 1 98.2 -3.4 0.355 0.173 0.002 0.001

MCC-45-2B03A 0.480 1 108.4 -3.3 0.054 0.034 0.072 0.045

MCC-45-2B03B 0.480 1 98.2 -3.4 0.108 0.067 0.021 0.013

MCC-46-2D01 0.480 1 98.8 -2.8 0.097 0.048

MCC-46-2D02. 0.480 1 98.8 -2.8 0.052 0.026

MCC-47-2D01 0.480 1 98.8 -2.8 0.133 0.063

MCC-47-2D02 0.480 1 98.8 -2.8 0.027 0.014

MCC-48-2D01 0.480 1 98.8 -2.8 0.038 0.018

MCC-48-2D02 0.480 1 98.8 -2.8

MCC-49-2D01 0.480 1 98.8 -2.8 0.138 0.068 0.005 0.003

MCC-49-2D03A 0.480 1 98.8 -2.8 0.033 0.020 0.056 0.035

MCC-49-2D03B 0.480 1 98.8 -2.8 0.085 0.048 0.130 0.080

MCC-53-3B01 4.160 1 103.7 -3.0


ETAP
Project: C.S.E RPLC Page: 13
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

MCC-53-3B02 4.160 1 98.8 -3.0

MCC-53-3B03 4.160 1 104.1 -2.5

MCC-53-3B04 4.160 1 98.9 -2.7

MMC-20-2B03A 0.480 1 98.4 -3.2 0.210 0.113 0.022 0.014

n1 2.400 1 104.9 0.8

n2 2.400 1 99.1 0.8 0.053 0.039

n3 0.480 1 99.3 0.9 0.016 0.012

n4 0.240 1 100.0 1.1 0.008 0.004

n5 0.240 1 99.9 1.1 0.008 0.004

n6 0.240 1 99.9 1.0 0.013 0.004

n7 0.240 1 100.1 1.1 0.008 0.004

n16 0.480 1 99.4 -0.6 0.006 0.002

n19 0.480 1 99.4 -0.5 0.004 0.003

n22 0.480 1 100.0 1.1 0.015 0.011

n23 0.480 1 100.0 1.1 0.016 0.010

n24 0.480 1 99.9 1.1 0.024 0.014

n26 0.480 1 99.0 0.8 0.059 0.035

n27 0.480 1 99.4 0.8 0.002 0.001

n28 0.480 1 98.9 -0.7 0.032 0.019

n29 0.480 1 99.1 -0.7 0.002 0.001

n30 0.240 1 98.7 -0.9 0.009 0.003

n31 0.240 1 98.7 -0.9 0.009 0.003

n32 13.800 1 100.2 1.2

n33 13.800 1 99.9 -0.3

n36 2.400 1 99.8 0.9 0.027 0.012

n37 2.400 1 99.5 -0.5 0.027 0.012

n38 2.400 1 97.1 -1.9

n39 0.240 1 96.7 -2.2 0.020 0.010

n41 13.800 1 100.2 1.2

n42 13.800 1 99.9 -0.3

P1-10B 13.800 1 99.9 -0.2

P1-4G 13.800 1 100.2 1.2

P1-6E 13.800 1 100.1 1.2

P1-6H7G 13.800 1 99.9 -0.3

P1-7E 13.800 1 100.1 1.2

P1-7F 13.800 1 99.9 -0.2


ETAP
Project: C.S.E RPLC Page: 14
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

P1-8H 13.800 1 99.8 -0.2

P2-4G 13.800 1 100.2 1.2

P2-7G (AGUA SALADA) 13.800 1 100.2 1.2

P3-6E 13.800 1 100.0 1.1

P3-6H 13.800 1 99.9 -0.3

P3-7F 13.800 1 99.9 -0.2

P4-4G 13.800 1 100.2 1.2

P4-6E 13.800 1 98.9 0.7

P4-6G 13.800 1 100.1 1.2

P4-6H 13.800 1 99.9 -0.3

P4-7E 13.800 1 100.1 1.2

P5-6H 13.800 1 99.9 -0.3

P6-10A 13.800 1 100.2 1.2

P6-6G 13.800 1 100.1 1.2

P6-6H 13.800 1 99.9 -0.3

P7-6E 13.800 1 99.9 1.0

P7-7F 13.800 1 99.9 -0.1

P8-7E 13.800 1 100.1 1.2

P9-10A 13.800 1 100.2 1.2

P9-6H 13.800 1 99.9 -0.3

P9-7E 13.800 1 100.1 1.2

P9-8H 13.800 1 100.1 1.2

P10-6E 13.800 1 99.8 0.9

P10-6E CRUZ DE LA PALOMA 13.800 1 98.8 0.7

P10-7E 13.800 1 100.1 1.2

P10-7F 13.800 1 99.9 -0.1

P11/6E 13.800 1 98.8 0.7

P11-6E 13.800 1 99.7 0.9

P11-7F 13.800 1 99.9 -0.1

P11-8H (S/E BOM DE CARGA) 13.800 1 99.6 -0.2

P12-6E 13.800 1 99.7 0.9

P12-6H 13.800 1 99.9 -0.3

P12-7F 13.800 1 99.9 -0.1

P13-4G 13.800 1 99.8 -0.3

P13-6E 13.800 1 99.4 0.8

P13-6H 13.800 1 99.9 -0.3


ETAP
Project: C.S.E RPLC Page: 15
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

P13-7F 13.800 1 99.6 0.9

P14-6E 13.800 1 98.8 0.7

P14-7F 13.800 1 99.6 0.9

P15-6E 13.800 1 99.4 0.8

P15-7F 13.800 1 99.6 0.8

P16-4G 13.800 1 100.2 1.2

P16-6E 13.800 1 98.8 0.7

P16-7E (GLP) 13.800 1 100.1 1.2

P17-10A 13.800 1 100.2 1.2

P17-10B 13.800 1 99.9 -0.2

P17-3I 13.800 1 100.1 1.2

P17-6E 13.800 1 99.4 0.8

P17-7E (GLP) 13.800 1 100.1 1.2

P17-7F 13.800 1 99.6 0.8

P18-6E 13.800 1 99.4 0.8

P18-7E3I 13.800 1 100.1 1.2

P19-6E 13.800 1 98.7 0.7

P20-10B 13.800 1 99.9 -0.2

P22-6G 13.800 1 100.1 1.2

P23-6E (PLANTA DE HIELO) 13.800 1 98.7 0.7

P24-10A 13.800 1 100.2 1.2

P24-10B 13.800 1 99.9 -0.2

P24-6H4G 13.800 1 99.9 -0.3

P25-6E 13.800 1 98.7 0.7

P26-10B 13.800 1 99.9 -0.2

P26-7F 13.800 1 99.6 0.6

P27-10B 13.800 1 99.9 -0.2

P30-6G 13.800 1 100.1 1.2

P30-7F 13.800 1 99.7 0.5

P31-6H 13.800 1 99.9 -0.3

P31-7F 13.800 1 99.7 0.5

P33-7F 13.800 1 99.9 -0.1

P34-6G 13.800 1 100.1 1.2

P37-7F 13.800 1 99.7 0.5

P37-8H 13.800 1 99.6 -0.2

P38-6G8H 13.800 1 100.1 1.2


ETAP
Project: C.S.E RPLC Page: 16
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

P39-6E (MEREY) 13.800 1 99.7 0.5

P40-10B 13.800 1 99.8 -0.3

P40-6E 13.800 1 99.7 0.5

P48-7F 13.800 1 99.8 0.2

PAL_A-1 16.500 1 104.4 3.8

PDC-53-2A01A 0.480 1 99.6 -2.1 0.026 0.016 0.004 0.002

PDC-53-2A01B 0.480 1 99.6 -2.1 0.030 0.019

PDC-53-2B01A 0.480 1 98.4 -3.2

PDC-53-2B01B 0.480 1 98.4 -3.2

PDC-53-2B02A 0.480 1 108.4 -3.3

PDC-53-2B02B 0.480 1 98.2 -3.4

PDC-53-2D01 A 0.480 1 98.8 -2.8

PDC-53-2D01 B 0.480 1 98.8 -2.8

PDC-53-3B01A 4.160 1 103.8 -3.0

PDC-53-3B01B 4.160 1 98.8 -3.0

PDC-53-3B02A 4.160 1 104.1 -2.5

PDC-53-3B02B 4.160 1 98.9 -2.7

PDC-53-3D01 A 4.160 1 99.4 -2.3 0.151 0.065

PDC-53-3D01 B 4.160 1 99.4 -2.3 0.148 0.064

PDC-53-4B01A 13.800 1 101.4 -2.6

PDC-53-4B01B 13.800 1 101.4 -2.6

PDC-53-5A01A 34.500 1 99.7 -2.0

PDC-53-5A01B 34.500 1 99.7 -2.0

PDC_RPLC BARRA "E" 13.800 1 100.1 1.2

PDC_RPLC BARRA "F" 13.800 1 99.9 -0.2

PLANT AGUA SERV EL 2.400 1 101.3 -0.7


CHAURE
PLT. DE ASFALTO 13.800 1 100.2 1.2

PMG1 13.800 1 98.7 0.7

PMG2 13.800 1 98.7 0.7

PMG3 13.800 1 98.7 0.7

POSTE: 1-7E 13.800 1 100.1 1.2

PPE BARRA_A 13.800 1 100.3 1.2 1.920 0.996 1.550 0.483

PPE BARRA_B 13.800 1 100.0 -0.2 1.920 0.996 1.550 0.483

RESPALDO.3I 13.800 1 100.1 1.2

RESP CASETA1-3I 13.800 1 100.1 1.2

RESP CASETA2-3I 13.800 1 100.1 1.2


ETAP
Project: C.S.E RPLC Page: 17
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

RESP CASETA3-3I 13.800 1 100.1 1.2

S.A BARRA "A" 2.4KV 2.400 1 99.8 0.8 0.683 0.358

S.A BARRA "B" 2.4KV 2.400 1 99.0 -1.2 1.508 0.708

S/E TL 6G-3 13.800 1 100.1 1.2

S/E TL 6G-4 13.800 1 100.1 1.2

S/E TL6H-1 MANIFOLT 2.400 1 99.3 -0.6 0.091 0.054


NORTE
S/E TLG-2 13.800 1 100.1 1.2

SISOR BARRA "1" 13.800 1 100.1 1.2

SISOR BARRA "2" 13.800 1 99.9 -0.2

TALLER MECANICO 13.800 1 99.9 -0.3

TANQ AGUA SERV. EL 2.400 1 101.3 -0.7


CHAURE
TQ_1 13.800 1 100.2 1.2

TQ LABORATORIO 10A 13.800 1 100.2 1.2

TQ LABORATORIO 10B 13.800 1 99.8 -0.3

Line20~ 13.800 100.0 0.0

Line41~ 13.800 100.0 0.0

Line138~ 13.800 100.0 0.0

Line140~ 13.800 100.0 0.0

Line64~ 2.400 100.0 0.0

Line33~ 13.800 100.0 0.0

Line94~ 13.800 100.0 0.0

Total Number of Buses: 523 58.223 33.074 9.102 4.355 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

BARRA__A-1 13.800 Mvar/PF Control 1 124.9 3.8 140.000 92.962 83.3

Bus109 13.800 Mvar/PF Control 1 100.3 1.2 16.900 8.500 89.3

Bus118 13.800 Mvar/PF Control 1 100.0 -0.2 18.000 9.200 89.0

Bus_G6 13.800 Mvar/PF Control 1 100.3 1.2 10.000 6.400 84.2

Gua. II 230 230.000 Swing 1 100.0 0.0

184.900 117.062
ETAP
Project: C.S.E RPLC Page: 18
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Line/Cable Input Data

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)


Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Cable1 36089.2 0.0 1 75 0.017608 0.110761 0.0000013

Cable1-1-1 15NCUS3 750 1968.5 0.0 3 75 0.020300 0.033200

Cable1-2 15NCUS3 2 98.4 0.0 1 75 0.202000 0.045700

Cable2 36089.2 0.0 1 75 0.017608 0.110761 0.0000013

Cable2-3 15NCUS3 500 164.0 0.0 1 75 0.028400 0.035100

Cable3 35NCUS1 750 853.0 0.0 1 75 0.007558 0.022555

Cable3-1-1-1 15NCUS3 750 1968.5 0.0 3 75 0.020300 0.033200

Cable3-4 656.2 0.0 1 75 0.010333 0.127071

Cable4-5 15NCUS3 500 164.0 0.0 1 75 0.028400 0.035100

Cable5 35NCUS1 750 853.0 0.0 1 75 0.007558 0.022555

Cable5-2-1 15NCUS3 750 164.0 0.0 3 75 0.020300 0.033200

Cable5-3 15NCUS3 500 820.2 0.0 1 75 0.028400 0.035100

Cable6-1-1-1 15NCUS3 750 11154.9 0.0 3 75 0.020300 0.033200

Cable6-3 15NCUS3 4/0 98.4 0.0 1 75 0.064000 0.038900

Cable7-3-1 15NCUS3 750 1312.3 0.0 1 75 0.020300 0.033200

Cable8 35NCUS1 750 853.0 0.0 1 75 0.007558 0.022555

Cable8-1-1-1 15NCUS3 750 164.0 0.0 3 75 0.020300 0.033200

Cable8-3 15NCUS3 500 1640.4 0.0 1 75 0.028400 0.035100

Cable9-2-1 15NCUS3 750 4265.1 0.0 3 75 0.020300 0.033200

Cable9-3 15NCUS3 2 1312.3 0.0 1 75 0.202000 0.045700

Cable10 35NCUS1 750 853.0 0.0 1 75 0.007558 0.022555

Cable10-2 15NCUS3 2 2296.6 0.0 1 75 0.202000 0.045700

Cable11-2 15NCUS3 2 656.2 0.0 1 75 0.202000 0.045700

Cable12 35NCUS1 750 853.0 0.0 1 75 0.007558 0.022555

Cable12-2 15NCUS3 4/0 98.4 0.0 1 75 0.064000 0.038900

Cable13-2-1-1 15NCUS3 500 98.4 0.0 1 75 0.028400 0.035100

Cable14 35NCUS1 750 853.0 0.0 1 75 0.007558 0.022555

Cable14-2 15NCUS3 500 1640.4 0.0 1 75 0.028400 0.035100

Cable15 35NCUS1 250 324.8 0.0 1 75 0.058180 0.087000

Cable16-3 15NCUS3 500 656.2 0.0 1 75 0.028400 0.035100

Cable17-2-1 15NCUS3 750 1148.3 0.0 1 75 0.020300 0.033200

Cable18-4 15NCUS3 500 328.1 0.0 1 75 0.028400 0.035100

Cable20 35NCUS1 250 1722.4 0.0 1 75 0.058180 0.087000

Cable20-2-1 15NCUS3 750 4265.1 0.0 3 75 0.020300 0.033200


ETAP
Project: C.S.E RPLC Page: 19
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)


Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Cable20-3 15NCUS3 250 328.1 0.0 1 75 0.054700 0.038000

Cable21-2-1 15NCUS3 750 164.0 0.0 3 75 0.020300 0.033200

Cable21-3 15NCUS3 500 656.2 0.0 1 75 0.028400 0.035100

Cable22 35NCUS1 250 1722.4 0.0 1 75 0.058180 0.087000

Cable22-3 15NCUS3 250 328.1 0.0 1 75 0.054700 0.038000

Cable23-2-1 15NCUS3 750 11154.9 0.0 3 75 0.020300 0.033200

Cable23-3 15NCUS3 4/0 328.1 0.0 1 75 0.064000 0.038900

Cable24 35NCUS1 250 114.8 0.0 1 75 0.058180 0.087000

Cable25-2-1 15NCUS3 750 164.0 0.0 3 75 0.020300 0.033200

Cable25-3 15MCUS3 500 1968.5 0.0 1 75 0.030000 0.039400

Cable26 35NCUS1 250 114.8 0.0 1 75 0.058180 0.087000

Cable26-3 15NCUS3 4/0 328.1 0.0 1 75 0.064000 0.038900

Cable27 35NCUS1 750 3576.1 0.0 1 75 0.024798 0.074000

Cable27-2-1 15NCUS3 750 1968.5 0.0 3 75 0.020300 0.033200

Cable27-3-1 15NCUS3 500 656.2 0.0 1 75 0.028400 0.035100

Cable28-2-1 15NCUS3 750 1968.5 0.0 3 75 0.020300 0.033200

Cable29 35NCUS1 750 3576.1 0.0 1 75 0.024798 0.074000

Cable29-2-1 15MCUS3 500 1640.4 0.0 1 75 0.030000 0.039400

Cable30 15NCUS1 750 820.2 0.0 1 75 0.024798 0.074000

Cable30-2-1 15NCUS3 2 918.6 0.0 1 75 0.202000 0.045700

Cable31-2 15MCUS3 500 1148.3 0.0 1 75 0.030000 0.039400

Cable32 15NCUS1 750 820.2 0.0 1 75 0.007558 0.022555

Cable32-2-1 15NCUS3 250 853.0 0.0 1 75 0.054700 0.038000

Cable33-2 15MCUS3 500 1148.3 0.0 1 75 0.030000 0.039400

Cable34-2 5,0MCUS1 250 229.7 0.0 1 75 0.055700 0.057000

Cable35-2 15NCUS3 250 853.0 0.0 1 75 0.054700 0.038000

Cable36-2 5,0MCUS1 250 229.7 0.0 1 75 0.055700 0.057000

Cable37-2 15MCUS3 500 1148.3 0.0 1 75 0.030000 0.039400

Cable38-2 15MCUS3 500 1148.3 0.0 1 75 0.030000 0.039400

Cable39-2 15NCUS3 750 328.1 0.0 1 75 0.020300 0.033200

Cable40-2 15NCUS3 500 853.0 0.0 1 75 0.028400 0.035100

Cable42-2 15MCUS3 500 1968.5 0.0 1 75 0.030000 0.039400

Cable43-2 15MCUS3 250 229.7 0.0 1 75 0.055700 0.043600

Cable44-2 15MCUS3 500 1968.5 0.0 1 75 0.030000 0.039400

Cable45-2 15MCUS3 250 229.7 0.0 1 75 0.055700 0.043600

Cable46-2 15NCUS3 750 328.1 0.0 1 75 0.020300 0.033200


ETAP
Project: C.S.E RPLC Page: 20
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)


Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Cable47-2 15NCUS3 500 65.6 0.0 1 75 0.028400 0.035100

Cable49-2 15MCUS3 250 328.1 0.0 1 75 0.055700 0.043600

Cable50-1 15NCUS3 2 2460.6 0.0 1 75 0.202000 0.045700

Cable52-1 15NCUS3 2 1640.4 0.0 1 75 0.202000 0.045700

Cable53-1 15NCUS3 500 853.0 0.0 1 75 0.028400 0.035100

Cable54-1 15NCUS3 2 131.2 0.0 1 75 0.202000 0.045700

Cable56-1 15NCUS3 250 328.1 0.0 1 75 0.054700 0.038000

Cable58 5,0NCUS1 2 918.6 0.0 1 75 0.194078 0.079248

Cable58-1 15MCUS3 250 229.7 0.0 1 75 0.055700 0.043600

Cable59 5,0NCUS1 4 918.6 0.0 1 75 0.308153 0.082601

Cable59-1 15NCUS3 250 492.1 0.0 1 75 0.054700 0.038000

Cable60 5,0NCUS1 4 836.6 0.0 1 75 0.308153 0.082601

Cable60-1 15MCUS3 250 229.7 0.0 1 75 0.055700 0.043600

Cable61 5,0NCUS1 750 820.2 0.0 1 75 0.017850 0.061265

Cable61-1 15MCUS3 250 229.7 0.0 1 75 0.055700 0.043600

Cable62 5,0NCUS1 4 853.0 0.0 1 75 0.308153 0.082601

Cable62-1 15MCUS3 250 229.7 0.0 1 75 0.055700 0.043600

Cable63 5,0NCUS1 350 1049.9 0.0 1 75 0.037095 0.065227

Cable63-1 15NCUS3 500 131.2 0.0 1 75 0.028400 0.035100

Cable64-1 15NCUS3 250 492.1 0.0 1 75 0.054700 0.038000

Cable65-1-1 15NCUS3 750 164.0 0.0 1 75 0.020300 0.033200

Cable66 5,0NCUS3 4 918.6 0.0 1 75 0.308153 0.045415

Cable66-1 15NCUS3 500 65.6 0.0 1 75 0.028400 0.035100

Cable67-1 15NCUS3 250 492.1 0.0 1 75 0.054700 0.038000

Cable68 5,0NCUS3 750 918.6 0.0 1 75 0.020699 0.029870

Cable68-1 15NCUS3 250 492.1 0.0 1 75 0.054700 0.038000

Cable69 5,0NCUS1 750 967.8 0.0 1 75 0.017850 0.061265

Cable69-1 15NCUS3 750 98.4 0.0 1 75 0.020300 0.033200

Cable70-1 15NCUS3 4/0 492.1 0.0 1 75 0.064000 0.038900

Cable71-1 15NCUS3 500 3608.9 0.0 1 75 0.028400 0.035100

Cable72-1-1 15NCUS3 750 164.0 0.0 1 75 0.020300 0.033200

Cable73-1 15NCUS3 500 98.4 0.0 1 75 0.028400 0.035100

Cable74-1 15NCUS3 4/0 492.1 0.0 1 75 0.064000 0.038900

Cable75-1 15NCUS3 750 98.4 0.0 1 75 0.020300 0.033200

Cable76 15NCUS3 250 853.0 0.0 1 75 0.052458 0.038000

Cable76-1 15NCUS3 500 3608.9 0.0 1 75 0.028400 0.035100


ETAP
Project: C.S.E RPLC Page: 21
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)


Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Cable77 15NCUS3 750 147.6 0.0 1 75 0.019076 0.033000

Cable78 8,0NCUS1 750 1230.3 0.0 1 75 0.024798 0.075000

Cable84-1 15NCUS3 500 164.0 0.0 1 75 0.028400 0.035100

Cable85-1-1 15NCUS3 4/0 164.0 0.0 1 75 0.064000 0.038900

Cable86-1 15NCUS3 500 164.0 0.0 1 75 0.028400 0.035100

Cable88-1-1 15NCUS3 4/0 164.0 0.0 1 75 0.064000 0.038900

Cable89-1-1 15NCUS3 500 164.0 0.0 1 75 0.028400 0.035100

Cable91-1 15NCUS3 2 98.4 0.0 1 75 0.202000 0.045700

Cable92-1 15MCUS3 500 1148.3 0.0 1 75 0.030000 0.039400

Cable93-1 15NCUS3 2 98.4 0.0 1 75 0.202000 0.045700

Cable94-1 15MCUS3 500 1148.3 0.0 1 75 0.030000 0.039400

Cable95-1 15NCUS3 2 98.4 0.0 1 75 0.202000 0.045700

Cable97-1-1 15NCUS3 500 164.0 0.0 1 75 0.028400 0.035100

Cable98-1-1 15NCUS3 750 229.7 0.0 1 75 0.020300 0.033200

Cable99-1 15MCUS3 500 49.2 0.0 1 75 0.030000 0.039400

Cable101-1 15NCUS3 2 98.4 0.0 1 75 0.202000 0.045700

Cable102-1-1 15NCUS3 750 229.7 0.0 1 75 0.020300 0.033200

Cable103-1 15NCUS3 2 98.4 0.0 1 75 0.202000 0.045700

Cable104-1 15NCUS3 750 328.1 0.0 1 75 0.020300 0.033200

Cable105-1 15NCUS3 2 98.4 0.0 1 75 0.202000 0.045700

Cable106-1 15NCUS3 4/0 229.7 0.0 1 75 0.064000 0.038900

Cable107-1 15NCUS3 750 328.1 0.0 1 75 0.020300 0.033200

Cable109-1 15NCUS3 4/0 229.7 0.0 1 75 0.064000 0.038900

Cable110-1-1 15NCUS3 750 1640.4 0.0 1 75 0.020300 0.033200

Cable112-1-1 15NCUS3 750 1640.4 0.0 1 75 0.020300 0.033200

Cable113-1 15NCUS3 750 164.0 0.0 1 75 0.020300 0.033200

Cable114-1-1 15NCUS3 750 1968.5 0.0 1 75 0.020300 0.033200

Cable116-1-1 15NCUS3 750 1968.5 0.0 1 75 0.020300 0.033200

Cable117-1-1 15NCUS3 4/0 164.0 0.0 1 75 0.064000 0.038900

Cable118-1 15NCUS3 750 984.3 0.0 1 75 0.020300 0.033200

Cable120-1-1 15NCUS3 500 229.7 0.0 1 75 0.028400 0.035100

Cable121-1 15NCUS3 750 164.0 0.0 1 75 0.020300 0.033200

Cable122-1-1 15NCUS3 750 82.0 0.0 1 75 0.020300 0.033200

Cable124-1-1 15NCUS3 750 82.0 0.0 1 75 0.020300 0.033200

Cable125-1 15NCUS3 750 656.2 0.0 1 75 0.020300 0.033200

Cable126-1-1 15NCUS3 4/0 164.0 0.0 1 75 0.064000 0.038900


ETAP
Project: C.S.E RPLC Page: 22
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)


Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Cable128-1 15NCUS3 750 820.2 0.0 1 75 0.020300 0.033200

Cable130-1 15NCUS3 750 820.2 0.0 1 75 0.020300 0.033200

Cable132-1 15NCUS3 750 328.1 0.0 1 75 0.020300 0.033200

Cable133-1-1-1 15NCUS3 4/0 98.4 0.0 1 75 0.064000 0.038900

Cable136-1 15NCUS3 750 65.6 0.0 1 75 0.020300 0.033200

Cable140-1-1-1 15NCUS3 500 98.4 0.0 1 75 0.028400 0.035100

Cable141-1 15NCUS3 750 32.8 0.0 1 75 0.020300 0.033200

Cable143-1 15NCUS3 750 32.8 0.0 1 75 0.020300 0.033200

Cable144-1-1 15NCUS3 750 492.1 0.0 1 75 0.020300 0.033200

Cable145-1 15NCUS3 750 32.8 0.0 1 75 0.020300 0.033200

Cable146-1-1 15NCUS3 750 492.1 0.0 1 75 0.020300 0.033200

Cable152-1 15NCUS3 750 328.1 0.0 1 75 0.020300 0.033200

Cable153-1 15NCUS3 750 164.0 0.0 1 75 0.020300 0.033200

Cable154-1 15NCUS3 750 328.1 0.0 1 75 0.020300 0.033200

Cable156-1 15NCUS3 750 3280.8 0.0 1 75 0.020300 0.033200

Cable160-1 15NCUS3 750 164.0 0.0 1 75 0.020300 0.033200

Cable164-1 15NCUS3 750 164.0 0.0 1 75 0.020300 0.033200

Cable166-1-1 15NCUS3 750 196.9 0.0 1 75 0.020300 0.033200

Cable167-1-1 15NCUS3 750 196.9 0.0 1 75 0.020300 0.033200

Cable168-1 15NCUS3 750 3280.8 0.0 1 75 0.020300 0.033200

Cable170-1 15NCUS3 750 328.1 0.0 1 75 0.020300 0.033200

Cable171 5,0NCUN3 1/0 1706.0 0.0 1 75 0.124337 0.033528

Cable172 5,0NCUS3 1/0 1017.1 0.0 1 75 0.124337 0.038710

Cable172-1 15NCUS3 750 328.1 0.0 1 75 0.020300 0.033200

Cable173 5,0NCUS3 1/0 1476.4 0.0 1 75 0.124337 0.038710

Cable174-1 15NCUS3 750 328.1 0.0 1 75 0.020300 0.033200

Cable177 5,0NCUS1 4 1640.4 0.0 1 75 0.308153 0.082601

Cable178-1 15NCUS3 750 328.1 0.0 1 75 0.020300 0.033200

Cable180-1 15NCUS3 750 131.2 0.0 1 75 0.020300 0.033200

Cable182-1 15NCUS3 750 131.2 0.0 1 75 0.020300 0.033200

Cable184-1 15NCUS3 750 131.2 0.0 1 75 0.020300 0.033200

Cable186-1 15NCUS3 750 3280.8 0.0 1 75 0.020300 0.033200

Cable187 5,0NCUN3 4 1722.4 0.0 1 75 0.308153 0.039319

Cable188 5,0NCUS3 4 951.4 0.0 1 75 0.308153 0.045415

Cable188-1 15NCUS3 750 820.2 0.0 1 75 0.020300 0.033200

Cable189 5,0NCUS3 1/0 1476.4 0.0 1 75 0.124337 0.038710


ETAP
Project: C.S.E RPLC Page: 23
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)


Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Cable190-1 15NCUS3 750 3280.8 0.0 1 75 0.020300 0.033200

Cable191 5,0NCUN3 1/0 1509.2 0.0 1 75 0.124337 0.033528

Cable192-1 15NCUS3 750 1640.4 0.0 1 75 0.020300 0.033200

Cable193 5,0NCUS3 350 1673.2 0.0 1 75 0.039682 0.032614

Cable194-1 15NCUS3 750 1640.4 0.0 1 75 0.020300 0.033200

Cable196-1 15NCUS3 750 820.2 0.0 1 75 0.020300 0.033200

Cable198-1 15NCUS3 750 820.2 0.0 1 75 0.020300 0.033200

Cable200 35NCUS1 750 853.0 0.0 1 75 0.024798 0.074000

Cable200-1 15NCUS3 750 820.2 0.0 1 75 0.020300 0.033200

Cable201 35NCUS1 750 853.0 0.0 1 75 0.024798 0.074000

Cable202-1 15NCUS3 750 820.2 0.0 1 75 0.020300 0.033200

Cable204-1 15NCUS3 750 820.2 0.0 1 75 0.020300 0.033200

Cable207 1312.3 0.0 1 75 0.017608 0.110761 0.0000013

Cable208 1312.3 0.0 1 75 0.017608 0.110761 0.0000013

Cable303 15NCUS3 500 229.7 0.0 1 75 0.028400 0.035100

Cable306 15NCUS3 500 229.7 0.0 1 75 0.028400 0.035100

Cable308 15NCUS3 4/0 98.4 0.0 1 75 0.064000 0.038900

Line2 164.0 0.0 1 75 0.116697 0.097184 0.0000017

Line3 656.2 0.0 1 75 0.116671 0.096070 0.0000017

Line5 984.3 0.0 1 75 0.116697 0.097184 0.0000017

Line6-1 1640.4 0.0 1 75 0.116671 0.096070 0.0000017

Line7-2 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line9 1640.4 0.0 1 75 0.116697 0.097184 0.0000017

Line10 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line11 459.3 0.0 1 75 0.116697 0.097184 0.0000017

Line12-1 1640.4 0.0 1 75 0.116671 0.096070 0.0000017

Line13 656.2 0.0 1 75 0.116697 0.097184 0.0000017

Line14 656.2 0.0 1 75 0.116671 0.096070 0.0000017

Line15 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line17 984.3 0.0 1 75 0.116697 0.097184 0.0000017

Line19 1640.4 0.0 1 75 0.116697 0.097184 0.0000017

Line21 459.3 0.0 1 75 0.116697 0.097184 0.0000017

Line22 459.3 0.0 1 75 0.116697 0.097184 0.0000017

Line24 984.3 0.0 1 75 0.116697 0.097184 0.0000017

Line25 1476.4 0.0 1 75 0.116697 0.097184 0.0000017

Line26 984.3 0.0 1 75 0.116697 0.097184 0.0000017


ETAP
Project: C.S.E RPLC Page: 24
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)


Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Line27 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line28 689.0 0.0 1 75 0.116697 0.097184 0.0000017

Line29 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line30 1312.3 0.0 1 75 0.116697 0.097184 0.0000017

Line31 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line32 656.2 0.0 1 75 0.116671 0.096070 0.0000017

Line34 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line35 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line36 459.3 0.0 1 75 0.116697 0.097184 0.0000017

Line37 459.3 0.0 1 75 0.116697 0.097184 0.0000017

Line39 3280.8 0.0 1 75 0.116697 0.097184 0.0000017

Line42 3608.9 0.0 1 75 0.116697 0.097184 0.0000017

Line43 459.3 0.0 1 75 0.116697 0.097184 0.0000017

Line45 328.1 0.0 1 75 0.116671 0.096070 0.0000017

Line47 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line48 229.7 0.0 1 75 0.116671 0.096070 0.0000017

Line49 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line51 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line53 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line55 459.3 0.0 1 75 0.116697 0.097184 0.0000017

Line57 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line58 459.3 0.0 1 75 0.116697 0.097184 0.0000017

Line59 984.3 0.0 1 75 0.116697 0.097184 0.0000017

Line61 918.6 0.0 1 75 0.116671 0.096070 0.0000017

Line63 459.3 0.0 1 75 0.116697 0.097184 0.0000017

Line66 4921.3 0.0 1 75 0.116685 0.096056 0.0000017

Line68 984.3 0.0 1 75 0.116685 0.096056 0.0000017

Line69 984.3 0.0 1 75 0.116671 0.096070 0.0000017

Line71 689.0 0.0 1 75 0.116671 0.096070 0.0000017

Line72 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line74 492.1 0.0 1 75 0.116685 0.096056 0.0000017

Line76 3937.0 0.0 1 75 0.116671 0.096070 0.0000017

Line77 14763.8 0.0 1 75 0.116685 0.096056 0.0000017

Line79 229.7 0.0 1 75 0.116671 0.096070 0.0000017

Line81 492.1 0.0 1 75 0.116697 0.097184 0.0000017

Line83 3280.8 0.0 1 75 0.116697 0.097184 0.0000017


ETAP
Project: C.S.E RPLC Page: 25
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)


Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Line84 459.3 0.0 1 75 0.116697 0.097184 0.0000017

Line85 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line87 3280.8 0.0 1 75 0.116697 0.097184 0.0000017

Line88 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line90 984.3 0.0 1 75 0.116697 0.097184 0.0000017

Line92 9842.5 0.0 1 75 0.116697 0.097184 0.0000017

Line93 984.3 0.0 1 75 0.116697 0.097184 0.0000017

Line95 98.4 0.0 1 75 0.116697 0.097184 0.0000017

Line98 98.4 0.0 1 75 0.116697 0.097184 0.0000017

Line100 459.3 0.0 1 75 0.116697 0.097184 0.0000017

Line101 984.3 0.0 1 75 0.116697 0.097184 0.0000017

Line102 689.0 0.0 1 75 0.116697 0.097184 0.0000017

Line106 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line108 689.0 0.0 1 75 0.116697 0.097184 0.0000017

Line109 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line111 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line112 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line113 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line114 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line115 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line116 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line117 328.1 0.0 1 75 0.014484 0.159959 0.0000010

Line120 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line121 984.3 0.0 1 75 0.014484 0.159959 0.0000010

Line122 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line124 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line125 1968.5 0.0 1 75 0.116697 0.097184 0.0000017

Line126 689.0 0.0 1 75 0.116697 0.097184 0.0000017

Line127 1476.4 0.0 1 75 0.116697 0.097184 0.0000017

Line130 3937.0 0.0 1 75 0.116697 0.097184 0.0000017

Line131 689.0 0.0 1 75 0.116697 0.097184 0.0000017

Line133 229.7 0.0 1 75 0.116697 0.097184 0.0000017

Line135 16.4 0.0 1 75 0.116697 0.097184 0.0000017

Line137 328.1 0.0 1 75 0.116697 0.097184 0.0000017

Line142 557.7 0.0 1 75 0.116685 0.096056 0.0000017

Line144 2788.7 0.0 1 75 0.116685 0.096056 0.0000017


ETAP
Project: C.S.E RPLC Page: 26
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)


Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Line146 5905.5 0.0 1 75 0.116697 0.097184 0.0000017

Line148 1968.5 0.0 1 75 0.116697 0.097184 0.0000017

Line20 1640.4 0.0 1 75 0.116671 0.096070 0.0000017

Line41 131.2 0.0 1 75 0.116671 0.096070 0.0000017

Line138 1968.5 0.0 1 75 0.116697 0.097184 0.0000017

Line140 1968.5 0.0 1 75 0.116697 0.097184 0.0000017

Line64 492.1 0.0 1 75 0.116697 0.097184 0.0000017

Line33 656.2 0.0 1 75 0.116697 0.097184 0.0000017

Line94 3280.8 0.0 1 75 0.116697 0.097184 0.0000017

Line / Cable resistances are listed at the specified temperatures.


ETAP
Project: C.S.E RPLC Page: 27
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

CAMPO NORTE 1.500 13.800 2.400 5.50 7.10 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

PAL 1-1 150.000 230.000 16.500 7.00 42.00 0 0 0 0 0 7.0000 Std Pos. Seq. 0.0

PM2 0.038 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PM6 0.075 13.800 0.208 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PM8 0.050 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PM18 0.150 13.800 0.208 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PM21 0.113 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PM23 0.150 13.800 0.208 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PM25 0.113 13.800 0.208 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PM-3 0.150 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PM-17 0.225 13.800 0.208 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PM_3 0.500 13.800 0.480 5.75 3.09 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0

PM_4 0.500 13.800 0.480 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PMC-1 0.225 13.800 0.240 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PMC-2 0.150 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PMC-7 0.113 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

PMC-8 0.075 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T1-1 1.500 13.800 0.480 5.90 7.10 0 0 0 0 0 5.9000 Std Pos. Seq. 0.0

T2-1 0.010 0.480 0.240 2.30 1.13 0 0 0 0 0 2.3000 Std Pos. Seq. 0.0

T3-2 1.500 13.800 0.480 5.90 7.10 0 0 0 0 0 5.9000 Std Pos. Seq. 0.0

T4-2 0.075 13.800 0.240 5.75 2.47 0 0 0 -5.000 0 5.7500 Std Pos. Seq. 0.0

T5-1 2.500 13.800 2.400 5.50 10.67 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T9-1 3.750 13.800 4.160 6.03 10.67 0 0 0 0 0 6.0300 Std Pos. Seq. 0.0

T10-1 0.100 13.800 0.220 5.75 2.47 0 0 0 -5.000 0 5.7500 Std Pos. Seq. 0.0

T11-1 1.500 13.800 0.480 6.09 7.10 0 0 0 0 0 6.0900 Std Pos. Seq. 0.0

T12-1 5.000 13.800 4.160 5.50 12.14 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T13-2 0.025 13.800 0.220 5.75 2.47 0 0 0 -2.500 0 5.7500 Std Pos. Seq. 0.0

T14-1 1.500 13.800 0.480 5.73 7.10 0 0 0 0 0 5.7300 Std Pos. Seq. 0.0

T15-1 0.015 0.480 0.240 2.30 1.13 0 0 0 0 0 2.3000 Std Pos. Seq. 0.0

T15-2 0.300 13.800 2.400 5.50 3.09 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T16-1 0.015 0.480 0.240 2.30 1.13 0 0 0 0 0 2.3000 Std Pos. Seq. 0.0

T16-2 0.030 13.800 0.220 5.75 2.47 0 0 0 -2.500 0 5.7500 Std Pos. Seq. 0.0

T18 3.000 13.800 2.400 5.50 10.67 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T19 1.500 13.800 0.480 5.74 7.10 0 0 0 0 0 5.7400 Std Pos. Seq. 0.0
ETAP
Project: C.S.E RPLC Page: 28
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T20-1 2.300 13.800 4.160 5.89 10.67 0 0 0 0 0 5.8900 Std Pos. Seq. 0.0

T21 0.150 2.400 0.220 4.00 3.45 0 0 0 -2.500 0 4.0000 Std Pos. Seq. 0.0

T22 1.500 13.800 0.480 5.54 7.10 0 0 0 0 0 5.5400 Std Pos. Seq. 0.0

T24 1.500 13.800 0.480 5.54 7.10 0 0 0 0 0 5.5400 Std Pos. Seq. 0.0

T25 0.300 13.800 0.220 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T26-1 2.300 13.800 4.160 5.89 10.67 0 0 0 0 0 5.8900 Std Pos. Seq. 0.0

T27 0.300 13.800 0.220 5.00 3.09 0 0 0 0 0 5.0000 Std Pos. Seq. 0.0

T28 1.500 13.800 0.480 5.73 7.10 0 0 0 0 0 5.7300 Std Pos. Seq. 0.0

T29 0.113 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T30 0.300 13.800 0.220 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T31 0.150 13.800 0.208 5.75 2.47 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0

T33-1 0.750 13.800 0.480 5.47 3.96 0 0 0 0 0 5.4700 Std Pos. Seq. 0.0

T34 0.113 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T35 1.500 13.800 2.400 5.50 7.10 0 0 0 -5.000 0 5.5000 Std Pos. Seq. 0.0

T36 1.500 13.800 2.400 5.50 7.10 0 0 0 -5.000 0 5.5000 Std Pos. Seq. 0.0

T41 0.045 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T43 0.300 2.400 0.480 5.59 4.70 0 0 0 0 0 5.5900 Std Pos. Seq. 0.0

T44 0.225 13.800 0.240 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T45 5.000 13.800 4.160 5.50 12.14 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T46-1 0.750 13.800 0.480 5.47 3.96 0 0 0 0 0 5.4700 Std Pos. Seq. 0.0

T47 3.000 13.800 2.400 5.50 10.67 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T48 0.030 2.400 0.220 2.60 1.69 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0

T49 0.300 13.800 0.480 5.75 2.47 0 0 0 -2.500 -2.500 5.7500 Std Pos. Seq. 0.0

T50 0.750 13.800 2.400 5.50 3.96 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T51-1 0.300 13.800 0.480 5.49 3.09 0 0 0 0 0 5.4900 Std Pos. Seq. 0.0

T52 0.030 2.400 0.220 2.60 1.69 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0

T53 0.500 13.800 0.240 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T54 0.750 13.800 2.400 5.50 3.96 0 0 0 -2.500 0 5.5000 Std Pos. Seq. 0.0

T55 0.300 13.800 0.480 5.00 2.47 0 0 0 0 0 5.0000 Std Pos. Seq. 0.0

T57 0.045 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T58-1 1.725 13.800 0.480 5.75 7.10 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T59 0.750 13.800 0.480 5.75 3.96 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0

T60 0.038 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T61 0.075 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T62-1 0.750 13.800 2.400 5.50 3.96 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T63 0.045 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
ETAP
Project: C.S.E RPLC Page: 29
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T64 1.500 13.800 4.160 5.50 7.10 0 0 0 5.000 0 5.5000 Std Pos. Seq. 0.0

T65 0.300 4.160 0.480 4.80 4.70 0 0 0 0 0 4.8000 Std Pos. Seq. 0.0

T66 0.045 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T67 0.750 13.800 0.480 5.75 3.96 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T68 1.000 2.400 0.480 3.70 5.79 0 0 0 0 0 3.7000 Std Pos. Seq. 0.0

T70 0.075 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T71-1 1.725 13.800 0.480 5.75 7.10 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T72 0.025 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T73 0.113 2.400 0.480 4.00 3.45 0 0 0 0 0 4.0000 Std Pos. Seq. 0.0

T75 0.075 2.400 0.480 2.60 1.92 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0

T77 0.030 2.400 0.240 2.60 1.69 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0

T81 0.150 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T84 0.300 13.800 0.240 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T86 0.045 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T88 0.075 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T92 0.010 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T94 0.150 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T95 1.000 13.800 2.400 5.50 5.79 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T96 0.150 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T100 0.045 0.480 0.240 2.60 1.69 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0

T101 0.750 13.800 0.480 5.75 3.96 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T102 0.045 0.480 0.240 2.60 1.69 0 0 0 0 0 2.6000 Std Pos. Seq. 0.0

T104 0.300 13.800 0.480 5.75 3.09 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0

T105 0.150 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T107 0.045 13.800 0.480 5.75 2.47 0 0 0 5.000 0 5.7500 Std Pos. Seq. 0.0

T108 0.500 13.800 0.480 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T109 0.300 13.800 2.400 5.68 3.09 0 0 0 0 0 5.6800 Std Pos. Seq. 0.0

T110 0.300 13.800 0.480 5.75 3.09 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0

T111 1.000 13.800 2.400 5.50 5.79 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T113 0.045 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T119 0.500 13.800 0.480 4.90 3.09 0 0 0 0 0 4.9000 Std Pos. Seq. 0.0

T124 0.113 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T126 0.150 13.800 0.240 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T128 0.300 13.800 0.480 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T130 0.300 13.800 0.480 5.75 3.09 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T137 0.750 13.800 0.480 5.75 3.96 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0
ETAP
Project: C.S.E RPLC Page: 30
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T138 0.750 13.800 0.480 5.75 3.96 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T140 1.500 13.800 2.400 5.50 7.10 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T142 0.150 2.400 0.240 4.00 3.45 0 0 0 0 0 4.0000 Std Pos. Seq. 0.0

T143 1.000 13.800 0.220 5.75 5.79 0 0 0 5.000 0 5.7500 Std Pos. Seq. 0.0

T148 0.075 13.800 0.208 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T153 0.038 13.800 0.480 5.75 2.47 0 0 0 -2.500 0 5.7500 Std Pos. Seq. 0.0

T156 0.025 13.800 0.240 5.75 2.47 0 0 0 -2.500 0 5.7500 Std Pos. Seq. 0.0

T158 0.150 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T160 0.113 13.800 0.480 5.75 2.47 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T-19-13/T1 1.500 13.800 2.400 5.75 7.10 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T-20-13/T1 1.500 13.800 2.400 5.75 7.10 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T-21-13/T1 0.750 13.800 0.480 5.50 3.96 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T-22-13/T1 0.750 13.800 0.480 5.50 3.96 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T-24-1 0.750 13.800 0.480 5.54 3.96 0 0 0 0 0 5.5400 Std Pos. Seq. 0.0

T-25-1 0.750 13.800 0.480 5.54 3.96 0 0 0 0 0 5.5400 Std Pos. Seq. 0.0

T-26-1-1 1.500 13.800 0.480 5.50 7.10 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T-27-1-1 1.500 13.800 0.480 5.50 7.10 0 0 0 0 0 5.5000 Std Pos. Seq. 0.0

T-36-13/T1 0.300 13.800 2.400 5.62 3.09 0 0 0 0 0 5.6200 Std Pos. Seq. 0.0

T-53-27/T1 0.500 13.800 0.480 5.44 3.09 0 0 0 0 0 5.4400 Std Pos. Seq. 0.0

T-57-27/T1 1.500 13.800 2.400 5.75 7.10 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T-66-15/T1 1.500 13.800 2.400 5.62 7.10 0 0 0 0 0 5.6200 Std Pos. Seq. 0.0

T-67 0.750 13.800 0.440 5.75 3.96 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0

T-68 0.750 13.800 0.440 5.75 3.96 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

T-69 0.500 13.800 0.480 4.92 3.09 0 0 0 0 0 4.9200 Std Pos. Seq. 0.0

T-71 0.750 13.800 0.480 5.24 3.96 0 0 0 -2.500 0 5.2400 Std Pos. Seq. 0.0

T-72 0.750 13.800 0.480 5.24 3.96 0 0 0 -2.500 0 5.2400 Std Pos. Seq. 0.0

T-74 7.500 13.800 4.160 5.60 14.23 0 0 0 5.000 0 5.6000 Std Pos. Seq. 0.0

T-75 0.300 13.800 0.480 5.75 3.09 0 0 0 5.000 0 5.7500 Std Pos. Seq. 0.0

T-76 0.300 13.800 0.480 5.75 3.09 0 0 0 5.000 0 5.7500 Std Pos. Seq. 0.0

T-77 7.500 13.800 4.160 5.60 14.23 0 0 0 0 0 5.6000 Std Pos. Seq. 0.0

T-78 2.500 13.800 2.400 5.63 10.67 0 0 0 0 0 5.6300 Std Pos. Seq. 0.0

T-79 2.500 13.800 2.400 5.77 10.67 0 0 0 0 0 5.7700 Std Pos. Seq. 0.0

T-80 1.500 13.800 2.400 7.00 7.10 0 0 0 0 0 7.0000 Std Pos. Seq. 0.0

T-82 1.500 13.800 2.400 6.30 7.10 0 0 0 0 0 6.3000 Std Pos. Seq. 0.0

TFB-3001 0.300 4.160 0.480 4.80 4.70 0 0 0 0 0 4.8000 Std Pos. Seq. 0.0

TFB-3002 0.300 4.160 0.480 5.99 4.70 0 0 0 0 0 5.9900 Std Pos. Seq. 0.0
ETAP
Project: C.S.E RPLC Page: 31
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

TFM-3001 1.500 13.800 4.160 5.53 7.10 0 0 0 0 0 5.5300 Std Pos. Seq. 0.0

TFM-3002 1.500 13.800 4.160 5.53 7.10 0 0 0 0 0 5.5300 Std Pos. Seq. 0.0

TPA-03 5.000 13.800 2.400 5.72 12.14 0 0 0 0 0 5.7200 Std Pos. Seq. 0.0

TPA-04 5.000 13.800 2.400 5.68 12.14 0 0 0 0 0 5.6800 Std Pos. Seq. 0.0

TX-BARRA A-1-1 1.000 13.800 4.160 5.63 5.79 0 0 0 0 0 5.6300 Std Pos. Seq. 0.0

TX-BARRA B-1-1 1.000 13.800 4.160 5.63 5.79 0 0 0 0 0 5.6300 Std Pos. Seq. 0.0

XFR53-4F01-1 1.500 13.800 0.480 6.06 7.10 0 0 0 0 0 6.0600 Std Pos. Seq. 0.0

XFR53-4F02-1 1.500 13.800 0.480 6.06 7.10 0 0 0 0 0 6.0600 Std Pos. Seq. 0.0

XFR-53-3B03 2.500 4.160 0.480 5.75 10.70 0 0 0 0 5.000 5.7500 Std Pos. Seq. 0.0

XFR-53-3B04 2.500 4.160 0.480 5.75 10.70 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

XFR-53-3D01 2.500 4.160 0.480 5.82 10.67 0 0 0 0 0 5.8200 Std Pos. Seq. 0.0

XFR-53-3D02 2.500 4.160 0.480 5.82 10.67 0 0 0 0 0 5.8200 Std Pos. Seq. 0.0

XFR-53-4B01 8.000 13.800 6.600 6.50 14.20 0 0 0 0 0 6.5000 Std Pos. Seq. 0.0

XFR-53-5A01 0.750 34.500 0.480 5.75 5.80 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

XFR-53-5A02 0.750 34.500 0.480 5.75 5.80 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

XFR-53-5B01 15.000 34.500 4.160 7.50 18.60 0 0 0 0 5.000 7.5000 Std Pos. Seq. 0.0

XFR-53-5B03 15.000 34.500 4.160 7.50 18.60 0 0 0 0 5.000 7.5000 Std Pos. Seq. 0.0

XFR-53-5B04 15.000 34.500 4.160 7.50 18.60 0 0 0 0 0 7.5000 Std Pos. Seq. 0.0

XFR-53-5B05 20.000 34.500 13.800 4.68 18.60 0 0 0 0 5.000 4.6800 Std Pos. Seq. 0.0

XFR-53-5B06 20.000 34.500 13.800 4.68 18.60 0 0 0 0 0 4.6800 Std Pos. Seq. 0.0

XFR-53-5B07 2.500 34.500 0.480 5.75 10.70 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

XFR-53-5B08 2.500 34.500 0.480 5.75 10.70 0 0 0 0 0 5.7500 Std Pos. Seq. 0.0

XFR-53-5D01 5.000 34.500 4.160 5.22 12.14 0 0 0 0 0 5.2200 Std Pos. Seq. 0.0

XFR-53-5D02 5.000 34.500 4.160 5.22 12.14 0 0 0 0 0 5.2200 Std Pos. Seq. 0.0

XFR-53-5X01 20.000 13.800 34.500 7.50 18.60 0 0 0 0 0 7.5000 Std Pos. Seq. 0.0

XFR-53-5X02 20.000 13.800 34.500 7.50 18.60 0 0 0 0 0 7.5000 Std Pos. Seq. 0.0

XFR-53-7A02 55.000 230.000 34.500 10.00 34.10 0 0 0 0 0 10.0000 Std Pos. Seq. 0.0

XFR--53-5B02 15.000 34.500 4.160 7.50 18.60 0 0 0 0 0 7.5000 Std Pos. Seq. 0.0

2-Winding Transformer Load Tap Changer (LTC) Settings

Transformer Load Tap Changer Setting


Transformer Connected Buses ("*" LTC Side) % Min. % Max.
ID Primary Bus ID Secondary Bus ID Tap Tap % Step Regulated Bus ID %V kV

PAL 1-1 * BARRA_A1-1 PAL_A-1 -10.00 10.00 0.625 BARRA_A1-1 100.00 230.000

T-80 * P2-7G (AGUA SALADA) n1 -10.00 10.00 0.625 P2-7G (AGUA SALADA) 100.00 13.800

XFR-53-5X01 * Bus22 Bus59 -10.00 10.00 0.625 PPE BARRA_A 100.00 13.800
ETAP
Project: C.S.E RPLC Page: 32
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

2-Winding Transformer Load Tap Changer (LTC) Settings

Transformer Load Tap Changer Setting


Transformer Connected Buses ("*" LTC Side) % Min. % Max.
ID Primary Bus ID Secondary Bus ID Tap Tap % Step Regulated Bus ID %V kV

XFR-53-5X02 * Bus119 Bus120 -10.00 10.00 0.625 PPE BARRA_B 100.00 13.800

XFR-53-7A02 * BP-XFR-53-7A02 PDC-53-5A01B -10.00 10.00 0.625 PDC-53-5A01B 100.00 34.500

Impedance Input Data

Impedance Positive Sequence Impedance


ID R X Y Unit

BD-19-2B11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-19-2B12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-20-2B11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-20-2B12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-20-2B13 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-20-2B14 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-45-2B11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-45-2B12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-45-2B13 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-45-2B14 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-46-2D11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-46-2D12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-47-2D11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-47-2D12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-48-2D11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-48-2D12 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-49-2D11 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-49-2D13 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-49-2D14 0.4340000 0.4340000 0.0000000 % in 0,480 kV base and 100,0 MVA base

BD-53-3B11 0.5800000 0.5800000 0.0000000 % in 4,160 kV base and 100,0 MVA base

BD-53-3B12 0.5800000 0.5800000 0.0000000 % in 4,160 kV base and 100,0 MVA base

BD-53-3B14 0.5800000 0.5800000 0.0000000 % in 4,160 kV base and 100,0 MVA base

BD-53-5B13 0.5800000 0.5800000 0.0000000 % in 4,160 kV base and 100,0 MVA base
ETAP
Project: C.S.E RPLC Page: 33
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

CAMPO NORTE 2W XFMR P19-6E Bus81-1 51.14 363.08 366.67

PAL 1-1 2W XFMR BARRA_A1-1 PAL_A-1 0.11 4.67 4.67

PM2 2W XFMR G35 Bus291 5754.13 14212.71 15333.33

PM6 2W XFMR G30 Bus280 2877.07 7106.35 7666.67

PM8 2W XFMR G10 Bus244 4315.60 10659.53 11500.00

PM18 2W XFMR Bus294 Bus293 1438.53 3553.18 3833.33

PM21 2W XFMR G12 Bus248 1909.56 4716.61 5088.50

PM23 2W XFMR G12 Bus271 1438.53 3553.18 3833.33

PM25 2W XFMR G12 Bus275 1909.56 4716.61 5088.50

PM-3 2W XFMR Bus71-1 Bus70-1 1438.53 3553.18 3833.33

PM-17 2W XFMR Bus41-3 Bus45-1 786.86 2431.40 2555.56

PM_3 2W XFMR Bus64-1 Bus74-1 371.79 1148.84 1207.50

PM_4 2W XFMR Bus73-1 Bus76-1 354.09 1094.13 1150.00

PMC-1 2W XFMR Bus67-1 n4 786.86 2431.40 2555.56

PMC-2 2W XFMR Bus68-1 n5 1438.53 3553.18 3833.33

PMC-7 2W XFMR TALLER MECANICO B16 1909.56 4716.61 5088.50

PMC-8 2W XFMR TALLER MECANICO Bus170 2877.07 7106.35 7666.67

T1-1 2W XFMR SISOR BARRA "1" Bus14-1 54.86 389.49 393.33

T2-1 2W XFMR Bus14-1 Bus65-1 15242.49 17224.01 23000.00

T3-2 2W XFMR SISOR BARRA "2" Bus16-1 54.86 389.49 393.33

T4-2 2W XFMR P25-6E Bus50-1 2733.21 6751.04 7283.33

T5-1 2W XFMR SISOR BARRA "1" Bus4-3 20.53 219.04 220.00

T9-1 2W XFMR GX JET-A1 15.00 160.10 160.80

T10-1 2W XFMR Bus53-1 Bus59-1-1 2049.91 5063.28 5462.50

T11-1 2W XFMR Bus17-1 BARRA A 480V 56.62 402.03 406.00

T12-1 2W XFMR G16 C.DE BOMBAS"F"(4,16) 9.03 109.63 110.00

T13-2 2W XFMR Bus77-1 Bus69-1 8415.42 20786.09 22425.00

T14-1 2W XFMR G26 barra a 480v STG 53.28 378.27 382.00

T15-1 2W XFMR BARRA A-1 Bus118-1 10161.66 11482.67 15333.33

T15-2 2W XFMR S/E TL 6G-4 n2 564.49 1744.27 1833.33

T16-1 2W XFMR BARRA B-1 Bus118-1 10161.66 11482.67 15333.33

T16-2 2W XFMR P14-6E Bus75-1 7012.85 17321.74 18687.50

T18 2W XFMR G16 C.DE BOMBAS"F" (2,4) 17.11 182.53 183.33

T19 2W XFMR Bus15-1 BARRA B 480V 53.37 378.93 382.67

T20-1 2W XFMR G28-1 BARRA"A"4,16-1 23.90 254.97 256.09

T21 2W XFMR Bus94-1 Bus91-1 723.83 2497.21 2600.00

T22 2W XFMR G15 C.DE BOMBAS"E"(480) 51.51 365.72 369.33


ETAP
Project: C.S.E RPLC Page: 34
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T24 2W XFMR G16 C.DE BOMBAS"F"(480) 51.51 365.72 369.33

T25 2W XFMR PMG1 Bus112-1 590.15 1823.55 1916.67

T26-1 2W XFMR G29-1 BARRA"B"4,16-1 23.90 254.97 256.09

T27 2W XFMR PMG2 Bus115-1 513.17 1585.70 1666.67

T28 2W XFMR G27 Bus31-3 53.28 378.27 382.00

T29 2W XFMR P3-7F Bus43-3 1909.56 4716.61 5088.50

T30 2W XFMR PMG3 Bus116-1 590.15 1823.55 1916.67

T31 2W XFMR Bus63-1 Bus72-1 1510.46 3730.84 4025.00

T33-1 2W XFMR G28-1 BARRA"A"480V-1 178.57 707.14 729.33

T34 2W XFMR S/E TL 6G-3 n3 1909.56 4716.61 5088.50

T35 2W XFMR Bus53-1 Bus120-1 48.58 344.93 348.33

T36 2W XFMR Bus53-1 Bus101-1 48.58 344.93 348.33

T41 2W XFMR P18-6E Bus51-1 4795.11 11843.92 12777.78

T43 2W XFMR B.DE TRASNF.BARRA"A" B/TRANS (480) 387.77 1822.54 1863.33

T44 2W XFMR S/E TLG-2 n6 786.86 2431.40 2555.56

T45 2W XFMR G15 C.DE BOMBAS"E"(4,16) 9.03 109.63 110.00

T46-1 2W XFMR G29-1 BARRA"B"480V-1 178.57 707.14 729.33

T47 2W XFMR G15 C.DE BOMBAS"E"(2,4) 17.11 182.53 183.33

T48 2W XFMR B.DE TRANSF.BARRA"B" Bus55-1 4413.45 7458.73 8666.67

T49 2W XFMR P16-4G B14 683.75 1688.87 1822.03

T50 2W XFMR P9-6H S/E TL6H-1 MANIFOLT 179.55 711.01 733.33


NORTE
T51-1 2W XFMR Bus29-3-1 Bus103-1-1 563.46 1741.10 1830.00

T52 2W XFMR B.DE TRANSF.BARRA"B" Bus57-1 4413.45 7458.73 8666.67

T53 2W XFMR Bus80-1 n7 354.09 1094.13 1150.00

T54 2W XFMR Bus169 Bus88-1 175.06 693.24 715.00

T55 2W XFMR CONTROL C DE BOMBAS Bus9-2 625.45 1544.86 1666.67

T57 2W XFMR P13-6H Bus138 4795.11 11843.92 12777.78

T58-1 2W XFMR G3-1 Bus106-1-1 46.49 330.08 333.33

T59 2W XFMR Bus125-1 Bus126-1 197.10 780.50 805.00

T60 2W XFMR P37-8H Bus144 5678.42 14025.70 15131.58

T61 2W XFMR P4-6G Bus66-1 2877.07 7106.35 7666.67

T62-1 2W XFMR Bus134-1 Bus119-1 179.55 711.01 733.33

T63 2W XFMR P30-6G Bus148 4795.11 11843.92 12777.78

T64 2W XFMR Bus11-2 Bus179 53.71 381.24 385.00

T65 2W XFMR Bus179 Bus190 332.97 1564.97 1600.00

T66 2W XFMR P12-6H n16 4795.11 11843.92 12777.78

T67 2W XFMR Bus137 Bus140 187.71 743.33 766.67

T68 2W XFMR B9 B4-2 62.97 364.60 370.00

T70 2W XFMR P9-8H Bus82-1 2877.07 7106.35 7666.67


ETAP
Project: C.S.E RPLC Page: 35
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T71-1 2W XFMR G4-1 Bus129-1 46.49 330.08 333.33

T72 2W XFMR P11-8H (S/E BOM DE CARGA) Bus84-1 8631.20 21319.06 23000.00

T73 2W XFMR TANQ AGUA SERV. EL Bus87-1 985.47 3399.88 3539.82


CHAURE
T75 2W XFMR PLANT AGUA SERV EL CCM A/SERV. 1601.37 3074.64 3466.67
CHAURE
T77 2W XFMR Bus93-1 Bus92-1 4413.45 7458.73 8666.67

T81 2W XFMR P33-7F Bus98-1 1438.53 3553.18 3833.33

T84 2W XFMR G/N Bus104-1 590.15 1823.55 1916.67

T86 2W XFMR P31-6H n19 4795.11 11843.92 12777.78

T88 2W XFMR Bus108-1 Bus107-1 2877.07 7106.35 7666.67

T92 2W XFMR P10-7F Bus114-1 21578.00 53297.66 57500.00

T94 2W XFMR P11-7F Bus118-2 1438.53 3553.18 3833.33

T95 2W XFMR Bus5-4 B/MEREY 93.61 541.98 550.00

T96 2W XFMR Bus6-4 Bus7-5 1438.53 3553.18 3833.33

T100 2W XFMR DA-3 BARRA H (480) n30 2942.30 4972.48 5777.78

T101 2W XFMR CASETA 1 n22 187.71 743.33 766.67

T102 2W XFMR DA-3 BARRA H (480) n31 2942.30 4972.48 5777.78

T104 2W XFMR P24-10A Bus196 619.65 1914.73 2012.50

T105 2W XFMR P8-7E Bus35-3 1438.53 3553.18 3833.33

T107 2W XFMR P9-7E Bus37-3 5034.87 12436.12 13416.67

T108 2W XFMR P16-7E (GLP) LPG.1 354.09 1094.13 1150.00

T109 2W XFMR Bus166 n37 582.96 1801.35 1893.33

T110 2W XFMR P17-10A Bus198 619.65 1914.73 2012.50

T111 2W XFMR P17-7E (GLP) LPG.2 93.61 541.98 550.00

T113 2W XFMR P17-3I Bus46-1 4795.11 11843.92 12777.78

T119 2W XFMR G39 Bus228 301.74 932.39 980.00

T124 2W XFMR Bus253 Bus256 1909.56 4716.61 5088.50

T126 2W XFMR Bus255 Bus257 1438.53 3553.18 3833.33

T128 2W XFMR Bus260 Bus259 590.15 1823.55 1916.67

T130 2W XFMR Bus263 Bus264 590.15 1823.55 1916.67

T137 2W XFMR CASETA 2 n23 187.71 743.33 766.67

T138 2W XFMR CASETA 3 n24 187.71 743.33 766.67

T140 2W XFMR Bus85-1 BC 51.14 363.08 366.67

T142 2W XFMR n38 n39 742.39 2561.24 2666.67

T143 2W XFMR G13 Bus278 102.75 594.94 603.75

T148 2W XFMR G5 Bus285 2877.07 7106.35 7666.67

T153 2W XFMR Bus296 Bus295 5610.28 13857.39 14950.00

T156 2W XFMR P20-10B Bus299 8415.42 20786.09 22425.00

T158 2W XFMR P26-10B Bus301 1438.53 3553.18 3833.33


ETAP
Project: C.S.E RPLC Page: 36
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T160 2W XFMR P27-10B Bus304 1909.56 4716.61 5088.50

T-19-13/T1 2W XFMR n41 DA-3 BARRA G (2.4) 53.46 379.59 383.33

T-20-13/T1 2W XFMR n42 DA-3 BARRA H (2.4) 53.46 379.59 383.33

T-21-13/T1 2W XFMR n32 DA-3 BARRA G (480) 179.55 711.01 733.33

T-22-13/T1 2W XFMR n33 DA-3 BARRA H (480) 179.55 711.01 733.33

T-24-1 2W XFMR G25-1 Bus48-1-1 180.85 716.18 738.67

T-25-1 2W XFMR G24-1 Bus49-1-1 180.85 716.18 738.67

T-26-1-1 2W XFMR G7-1 Bus157-1-1 51.15 363.08 366.67

T-27-1-1 2W XFMR G6-1 Bus154-1-1 51.15 363.08 366.67

T-36-13/T1 2W XFMR Bus168 n36 576.80 1782.32 1873.33

T-53-27/T1 2W XFMR G-8 (BOMBA DE TRANF.) B7 335.00 1035.14 1088.00

T-57-27/T1 2W XFMR G-8 (BOMBA DE TRANF.) B6 53.46 379.59 383.33

T-66-15/T1 2W XFMR PLT. DE ASFALTO B9 52.25 371.00 374.67

T-67 2W XFMR Bus229 Bus230 197.10 780.50 805.00

T-68 2W XFMR Bus234 Bus235 187.71 743.33 766.67

T-69 2W XFMR Bus267 Bus266 302.98 936.20 984.00

T-71 2W XFMR G34 Bus238 166.78 660.47 681.20

T-72 2W XFMR G11 Bus240 166.78 660.47 681.20

T-74 2W XFMR Bus181 Bus186 5.50 78.21 78.40

T-75 2W XFMR Bus182 Bus2-5 619.65 1914.73 2012.50

T-76 2W XFMR Bus181 Bus8-2 619.65 1914.73 2012.50

T-77 2W XFMR Bus182 Bus188 5.23 74.48 74.67

T-78 2W XFMR Bus79-1 B.DE TRASNF.BARRA"A" 21.01 224.22 225.20

T-79 2W XFMR Bus180 B.DE TRANSF.BARRA"B" 21.54 229.79 230.80

T-80 2W XFMR P2-7G (AGUA SALADA) n1 61.85 439.00 443.33

T-82 2W XFMR P14-7F B.DE TRANF 2,4KV 58.58 415.90 420.00

TFB-3001 2W XFMR BCI 4,16"A" Bus34-3 332.97 1564.97 1600.00

TFB-3002 2W XFMR BCI 4,16"B" Bus32-3 415.52 1952.95 1996.67

TFM-3001 2W XFMR BCI 13,8 "A" BCI 4,16"A" 51.42 365.06 368.67

TFM-3002 2W XFMR BCI 13,8 "B" BCI 4,16"B" 51.42 365.06 368.67

TPA-03 2W XFMR Bus17-1 S.A BARRA "A" 2.4KV 9.39 114.01 114.40

TPA-04 2W XFMR Bus15-1 S.A BARRA "B" 2.4KV 9.33 113.22 113.60

TX-BARRA A-1-1 2W XFMR G6-1 Bus149-1-1 95.82 554.79 563.00

TX-BARRA B-1-1 2W XFMR G7-1 Bus145-1-1 95.82 554.79 563.00

XFR53-4F01-1 2W XFMR G25-1 Bus56-1-1 56.35 400.05 404.00

XFR53-4F02-1 2W XFMR G24-1 Bus62-1-1 56.35 400.05 404.00

XFR-53-3B03 2W XFMR PDC-53-3B02A PDC-53-2B02A 22.47 240.45 241.50

XFR-53-3B04 2W XFMR PDC-53-3B02B PDC-53-2B02B 21.40 229.00 230.00

XFR-53-3D01 2W XFMR PDC-53-3D01 A PDC-53-2D01 A 21.72 231.78 232.80


ETAP
Project: C.S.E RPLC Page: 37
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

XFR-53-3D02 2W XFMR PDC-53-3D01 B PDC-53-2D01 B 21.72 231.78 232.80

XFR-53-4B01 2W XFMR Bus69 Bus68 5.71 81.05 81.25

XFR-53-5A01 2W XFMR BP-XFR-53-5A01 PDC-53-2A01A 130.26 755.52 766.67

XFR-53-5A02 2W XFMR BP-XFR-53-5A02 PDC-53-2A01B 130.26 755.52 766.67

XFR-53-5B01 2W XFMR BP-XFR-53-5B01 PDC-53-3B01A 2.82 52.42 52.50

XFR-53-5B03 2W XFMR BP-XFR-53-5B03 PDC-53-3B02A 2.82 52.42 52.50

XFR-53-5B04 2W XFMR BP-XFR-53-5B04 PDC-53-3B02B 2.68 49.93 50.00

XFR-53-5B05 2W XFMR BP-XFR-53-5B05 PDC-53-4B01A 1.32 24.53 24.57

XFR-53-5B06 2W XFMR BP-XFR-53-5B06 PDC-53-4B01B 1.26 23.37 23.40

XFR-53-5B07 2W XFMR BP-XFR-53-5B07 PDC-53-2B01A 21.40 229.00 230.00

XFR-53-5B08 2W XFMR BP-XFR-53-5B08 PDC-53-2B01B 21.40 229.00 230.00

XFR-53-5D01 2W XFMR BXFR-53-5D01 PDC-53-3D01 A 8.57 104.05 104.40

XFR-53-5D02 2W XFMR BP-XFR-53-5D02 PDC-53-3D01 B 8.57 104.05 104.40

XFR-53-5X01 2W XFMR Bus22 Bus59 1.95 36.28 36.33

XFR-53-5X02 2W XFMR Bus119 Bus120 2.00 37.21 37.27

XFR-53-7A02 2W XFMR BP-XFR-53-7A02 PDC-53-5A01B 0.52 17.72 17.73

XFR--53-5B02 2W XFMR BP-XFR-53-5B02 PDC-53-3B01B 2.68 49.93 50.00

Cable1 Cable Gua. II 230 Bus6-3 0.12 0.76 0.77 2.5603600

Cable1-1-1 Cable PPE BARRA_A G33 0.70 1.14 1.34

Cable1-2 Cable BARRA "G" P2-7G (AGUA SALADA) 1.04 0.24 1.07

Cable2 Cable Gua. II 230 Bus7-4 0.12 0.76 0.77 2.5603600

Cable2-3 Cable PDC_RPLC BARRA "E" SISOR BARRA "1" 0.24 0.30 0.39

Cable3 Cable PDC-53-5A01A BP-XFR-53-5B01 0.05 0.16 0.17

Cable3-1-1-1 Cable PPE BARRA_A G21 0.70 1.14 1.34

Cable3-4 Cable Bus4-2 BARRA_A1-1 0.00 0.02 0.02

Cable4-5 Cable PDC_RPLC BARRA "F" SISOR BARRA "2" 0.24 0.30 0.39

Cable5 Cable PDC-53-5A01B BP-XFR-53-5B02 0.05 0.16 0.17

Cable5-2-1 Cable PPE BARRA_A G1-1 0.06 0.10 0.11

Cable5-3 Cable BARRA "G" G-5 1.22 1.51 1.94

Cable6-1-1-1 Cable PPE BARRA_A BARRA "G" 3.96 6.48 7.60

Cable6-3 Cable P39-6E (MEREY) Bus5-4 0.33 0.20 0.39

Cable7-3-1 Cable G28-1 G25-1 1.40 2.29 2.68

Cable8 Cable PDC-53-5A01A BP-XFR-53-5B03 0.05 0.16 0.17

Cable8-1-1-1 Cable PPE BARRA_A Bus17-1 0.06 0.10 0.11

Cable8-3 Cable G-5 G-6 2.45 3.02 3.89

Cable9-2-1 Cable PPE BARRA_A Bus128 1.52 2.48 2.91

Cable9-3 Cable n1 B3-2 460.23 104.12 471.86

Cable10 Cable PDC-53-5A01B BP-XFR-53-5B04 0.05 0.16 0.17

Cable10-2 Cable P2-7G (AGUA SALADA) G-8 (BOMBA DE TRANF.) 24.36 5.51 24.98
ETAP
Project: C.S.E RPLC Page: 38
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Cable11-2 Cable BARRA "H" TALLER MECANICO 6.96 1.57 7.14

Cable12 Cable PDC-53-5A01A BP-XFR-53-5B05 0.05 0.16 0.17

Cable12-2 Cable P39-6E (MEREY) Bus6-4 0.33 0.20 0.39

Cable13-2-1-1 Cable Bus145-1-1 BARRA B ALQUILACION 1.62 2.00 2.57

Cable14 Cable PDC-53-5A01B BP-XFR-53-5B06 0.05 0.16 0.17

Cable14-2 Cable P10-6E CRUZ DE LA PALOMA P4-6E 2.45 3.02 3.89

Cable15 Cable PDC-53-5A01A Bus10 0.16 0.24 0.29

Cable16-3 Cable P23-6E (PLANTA DE HIELO) GD 0.98 1.21 1.56

Cable17-2-1 Cable G29-1 G24-1 1.22 2.00 2.35

Cable18-4 Cable GD PMG1 0.49 0.60 0.78

Cable20 Cable PDC-53-5A01A BXFR-53-5D01 0.84 1.26 1.51

Cable20-2-1 Cable PPE BARRA_B Bus132 1.52 2.48 2.91

Cable20-3 Cable Bus4-3 Bus13-1 31.16 21.64 37.94

Cable21-2-1 Cable PPE BARRA_B Bus15-1 0.06 0.10 0.11

Cable21-3 Cable PMG1 PMG2 0.98 1.21 1.56

Cable22 Cable PDC-53-5A01B BP-XFR-53-5D02 0.84 1.26 1.51

Cable22-3 Cable Bus1-4 Bus13-1 31.16 21.64 37.94

Cable23-2-1 Cable PPE BARRA_B BARRA "H" 3.96 6.48 7.60

Cable23-3 Cable Bus10-2 Bus12-1 911.34 553.93 1066.48

Cable24 Cable PDC-53-5A01A BP-XFR-53-5A01 0.06 0.08 0.10

Cable25-2-1 Cable PPE BARRA_B G2-1 0.06 0.10 0.11

Cable25-3 Cable BARRA "H" G-4 3.10 4.07 5.12

Cable26 Cable PDC-53-5A01B BP-XFR-53-5A02 0.06 0.08 0.10

Cable26-3 Cable Bus18-1 Bus20-4 911.34 553.93 1066.48

Cable27 Cable PDC-53-5A01A Bus59 0.75 2.22 2.34

Cable27-2-1 Cable PPE BARRA_B G22 0.70 1.14 1.34

Cable27-3-1 Cable PMG2 PMG3 0.98 1.21 1.56

Cable28-2-1 Cable PPE BARRA_B G36 0.70 1.14 1.34

Cable29 Cable PDC-53-5A01B Bus120 0.75 2.22 2.34

Cable29-2-1 Cable G-4 G-7 2.58 3.39 4.27

Cable30 Cable PPE BARRA_A Bus22 1.07 3.19 3.36

Cable30-2-1 Cable BARRA "H" P1-8H 9.74 2.20 9.99

Cable31-2 Cable G-6 n41 1.81 2.38 2.99

Cable32 Cable PPE BARRA_B Bus119 0.33 0.97 1.02

Cable32-2-1 Cable JET-A1 Bus22-4 26.96 18.73 32.83

Cable33-2 Cable G-7 n42 1.81 2.38 2.99

Cable34-2 Cable DA-3 BARRA G (2.4) BARRA "G" DA-3 22.21 22.73 31.78

Cable35-2 Cable JET-A1 Bus23-3 26.96 18.73 32.83

Cable36-2 Cable DA-3 BARRA H (2.4) BARRA "H" DA-3 22.21 22.73 31.78
ETAP
Project: C.S.E RPLC Page: 39
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Cable37-2 Cable G-7 n33 1.81 2.38 2.99

Cable38-2 Cable G-6 n32 1.81 2.38 2.99

Cable39-2 Cable G21 G26 0.35 0.57 0.67

Cable40-2 Cable PDC_RPLC BARRA "F" G16 1.27 1.57 2.02

Cable42-2 Cable G-5 G-1 3.10 4.07 5.12

Cable43-2 Cable DA-3 BARRA G (480) BARRA "G" DA-3. 555.21 434.60 705.08

Cable44-2 Cable G-4 G-2 3.10 4.07 5.12

Cable45-2 Cable DA-3 BARRA H (480) BARRA "H" DA-3. 555.21 434.60 705.08

Cable46-2 Cable G22 G27 0.35 0.57 0.67

Cable47-2 Cable P13-7F P14-7F 0.10 0.12 0.16

Cable49-2 Cable DA-3 BARRA H (480) B21 793.15 620.85 1007.25

Cable50-1 Cable BARRA "G" P34-6G 26.10 5.90 26.76

Cable52-1 Cable BARRA "G" P1-4G 17.40 3.94 17.84

Cable53-1 Cable PDC_RPLC BARRA "E" G15 1.27 1.57 2.02

Cable54-1 Cable BARRA "H" P1-6H7G 1.39 0.31 1.43

Cable56-1 Cable PDC_RPLC BARRA "F" GX 0.94 0.65 1.15

Cable58 Cable MCC-53-3B01 Bus53 103.02 42.07 111.28

Cable58-1 Cable Bus19-1 n26 555.21 434.60 705.08

Cable59 Cable MCC-53-3B01 Bus54 163.58 43.85 169.35

Cable59-1 Cable C.DE BOMBAS"E"(4,16) CCM"E"(4,16) 15.56 10.81 18.94

Cable60 Cable MCC-53-3B01 Bus55 148.97 39.93 154.23

Cable60-1 Cable Bus19-1 n27 555.21 434.60 705.08

Cable61 Cable MCC-53-3B01 Bus56 8.46 29.04 30.24

Cable61-1 Cable Bus21-3 n28 555.21 434.60 705.08

Cable62 Cable MCC-53-3B01 Bus57 151.89 40.72 157.26

Cable62-1 Cable Bus21-3 n29 555.21 434.60 705.08

Cable63 Cable MCC-53-3B01 Bus58 22.50 39.57 45.52

Cable63-1 Cable Bus79-1 P15-6E 0.20 0.24 0.31

Cable64-1 Cable C.DE BOMBAS"F"(4,16) CCM"F"(4,16) 15.56 10.81 18.94

Cable65-1-1 Cable G1-1 G28-1 0.17 0.29 0.34

Cable66 Cable MCC-53-3B02 Bus64 163.58 24.11 165.34

Cable66-1 Cable Bus180 P15-7F 0.10 0.12 0.16

Cable67-1 Cable C.DE BOMBAS"E"(2,4) CCM"E"(2.4) 46.73 32.47 56.91

Cable68 Cable MCC-53-3B02 Bus65 10.99 15.86 19.29

Cable68-1 Cable C.DE BOMBAS"F" (2,4) CCM"F"(2,4) 46.73 32.47 56.91

Cable69 Cable MCC-53-3B02 Bus61 9.98 34.26 35.69

Cable69-1 Cable Bus31-3 BARRA B STG 86.72 141.83 166.24

Cable70-1 Cable C.DE BOMBAS"E"(480) CCM"E"(480) 1367.02 830.89 1599.72

Cable71-1 Cable PDC_RPLC BARRA "E" Bus181 5.38 6.65 8.56


ETAP
Project: C.S.E RPLC Page: 40
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Cable72-1-1 Cable G2-1 G29-1 0.17 0.29 0.34

Cable73-1 Cable PDC_RPLC BARRA "E" POSTE: 1-7E 0.15 0.18 0.23

Cable74-1 Cable C.DE BOMBAS"F"(480) CCM"F"(480) 1367.02 830.89 1599.72

Cable75-1 Cable barra a 480v STG BARRA A STG 86.72 141.83 166.24

Cable76 Cable Bus108 Bus70 2.35 1.70 2.90

Cable76-1 Cable PDC_RPLC BARRA "F" Bus182 5.38 6.65 8.56

Cable77 Cable PDC-53-4B01B Bus69 0.15 0.26 0.30

Cable78 Cable Bus68 Bus71 7.00 21.18 22.31

Cable84-1 Cable PDC_RPLC BARRA "F" P1-7F 0.24 0.30 0.39

Cable85-1-1 Cable BARRA"A"480V-1 BARRA A T.E# 2 480V 455.67 276.96 533.24

Cable86-1 Cable PDC_RPLC BARRA "E" P1-6E 0.24 0.30 0.39

Cable88-1-1 Cable BARRA"B"480V-1 BARRA B T.E # 2 480V 455.67 276.96 533.24

Cable89-1-1 Cable BARRA"A"4,16-1 BARRA A T.E# 2 2.69 3.33 4.28

Cable91-1 Cable P6-6G Bus67-1 1.04 0.24 1.07

Cable92-1 Cable G-6 Bus168 1.81 2.38 2.99

Cable93-1 Cable P6-6G Bus68-1 1.04 0.24 1.07

Cable94-1 Cable G-7 Bus166 1.81 2.38 2.99

Cable95-1 Cable P6-6G Bus71-1 1.04 0.24 1.07

Cable97-1-1 Cable BARRA"B"4,16-1 BARRA B T.E # 2 2.69 3.33 4.28

Cable98-1-1 Cable Bus56-1-1 BARRA A UNIDAD 51 Y 52 202.35 330.93 387.89

Cable99-1 Cable P13-4G Bus169 0.08 0.10 0.13

Cable101-1 Cable P22-6G S/E TLG-2 1.04 0.24 1.07

Cable102-1-1 Cable Bus62-1-1 BARRA B UNIDAD 51 Y 52 202.35 330.93 387.89

Cable103-1 Cable P22-6G Bus80-1 1.04 0.24 1.07

Cable104-1 Cable G26 Bus64-1 0.35 0.57 0.67

Cable105-1 Cable P11-8H (S/E BOM DE CARGA) Bus85-1 1.04 0.24 1.07

Cable106-1 Cable Bus25-3 Bus305 637.94 387.75 746.54

Cable107-1 Cable Bus73-1 G27 0.35 0.57 0.67

Cable109-1 Cable Bus3-2 Bus307 637.94 387.75 746.54

Cable110-1-1 Cable G1-1 G3-1 1.75 2.86 3.35

Cable112-1-1 Cable G2-1 G4-1 1.75 2.86 3.35

Cable113-1 Cable G33 G31 0.17 0.29 0.34

Cable114-1-1 Cable G3-1 G7-1 2.10 3.43 4.02

Cable116-1-1 Cable G4-1 G6-1 2.10 3.43 4.02

Cable117-1-1 Cable Bus106-1-1 BARRA A TE#1 455.67 276.96 533.24

Cable118-1 Cable G31 G18 1.05 1.72 2.01

Cable120-1-1 Cable Bus119-1 Bus117-1-1 11.32 13.99 18.00

Cable121-1 Cable TQ_1 G31 0.17 0.29 0.34

Cable122-1-1 Cable G3-1 Bus139-1 0.09 0.14 0.17


ETAP
Project: C.S.E RPLC Page: 41
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Cable124-1-1 Cable G4-1 Bus141-1 0.09 0.14 0.17

Cable125-1 Cable G18 G17 0.70 1.14 1.34

Cable126-1-1 Cable Bus129-1 BARRA B T.E# 1 455.67 276.96 533.24

Cable128-1 Cable G18 G37 0.87 1.43 1.68

Cable130-1 Cable G37 G32 0.87 1.43 1.68

Cable132-1 Cable G17 G14 0.35 0.57 0.67

Cable133-1-1-1 Cable Bus154-1-1 BARRA B-1 273.40 166.18 319.94

Cable136-1 Cable G32 P24-10A 0.07 0.11 0.13

Cable140-1-1-1 Cable Bus149-1-1 BARRA A ALQUILACION 1.62 2.00 2.57

Cable141-1 Cable G31 Bus41-3 0.03 0.06 0.07

Cable143-1 Cable Bus63-1 Bus41-3 0.03 0.06 0.07

Cable144-1-1 Cable G2-1 Bus29-3-1 0.52 0.86 1.01

Cable145-1 Cable TQ_1 Bus125-1 0.03 0.06 0.07

Cable146-1-1 Cable G1-1 Bus27-3-1 0.52 0.86 1.01

Cable152-1 Cable G21 G19 0.35 0.57 0.67

Cable153-1 Cable G38 G39 0.17 0.29 0.34

Cable154-1 Cable G22 G20 0.35 0.57 0.67

Cable156-1 Cable G31 TQ LABORATORIO 10A 3.50 5.72 6.70

Cable160-1 Cable TQ LABORATORIO 10A Bus229 0.17 0.29 0.34

Cable164-1 Cable TQ LABORATORIO 10B Bus234 0.17 0.29 0.34

Cable166-1-1 Cable Bus49-1-1 BARRA "B" 480V (FCC) 173.44 283.66 332.48

Cable167-1-1 Cable Bus48-1-1 BARRA "A" 480V (FCC) 173.44 283.66 332.48

Cable168-1 Cable Bus137 TQ LABORATORIO 10B 3.50 5.72 6.70

Cable170-1 Cable G34 TQ LABORATORIO 10B 0.35 0.57 0.67

Cable171 Cable MCC-53-3B03 Bus81 122.58 33.05 126.95

Cable172 Cable MCC-53-3B03 Bus82 73.07 22.75 76.53

Cable172-1 Cable G11 TQ LABORATORIO 10B 0.35 0.57 0.67

Cable173 Cable MCC-53-3B03 Bus83 106.07 33.02 111.10

Cable174-1 Cable G10 G11 0.35 0.57 0.67

Cable177 Cable MCC-53-3B03 Bus87 292.10 78.30 302.41

Cable178-1 Cable G11 G12 0.35 0.57 0.67

Cable180-1 Cable G11 P40-10B 0.14 0.23 0.27

Cable182-1 Cable G10 Bus260 0.14 0.23 0.27

Cable184-1 Cable G12 Bus267 0.14 0.23 0.27

Cable186-1 Cable Bus260 Bus263 3.50 5.72 6.70

Cable187 Cable MCC-53-3B04 Bus97 306.71 39.13 309.19

Cable188 Cable MCC-53-3B04 Bus98 169.42 24.97 171.25

Cable188-1 Cable G23 G13 0.87 1.43 1.68

Cable189 Cable MCC-53-3B04 Bus99 106.07 33.02 111.10


ETAP
Project: C.S.E RPLC Page: 42
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Cable190-1 Cable G30 G13 3.50 5.72 6.70

Cable191 Cable MCC-53-3B04 Bus101 108.43 29.24 112.30

Cable192-1 Cable G5 G30 1.75 2.86 3.35

Cable193 Cable MCC-53-3B04 Bus103 38.37 31.53 49.66

Cable194-1 Cable G36 G5 1.75 2.86 3.35

Cable196-1 Cable G30 G35 0.87 1.43 1.68

Cable198-1 Cable G23 Bus294 0.87 1.43 1.68

Cable200 Cable PDC-53-5A01A BP-XFR-53-5B07 0.18 0.53 0.56

Cable200-1 Cable G23 Bus296 0.87 1.43 1.68

Cable201 Cable PDC-53-5A01B BP-XFR-53-5B08 0.18 0.53 0.56

Cable202-1 Cable G35 P24-10B 0.87 1.43 1.68

Cable204-1 Cable G35 P26-10B 0.87 1.43 1.68

Cable207 Cable Bus25-2 BP-XFR-53-7A02 0.00 0.03 0.03 0.0931040

Cable208 Cable Bus26-2 BP-XFR-53-7A01 0.00 0.03 0.03 0.0931040

Cable303 Cable BARRA A-1 BARRA A ALQUILACION 283.09 349.87 450.05


480V
Cable306 Cable BARRA B-1 BARRA B ALQUILACION 283.09 349.87 450.05
480V
Cable308 Cable Bus157-1-1 BARRA A-1 273.40 166.18 319.94

BD-19-2B11 Impedance PDC-53-2B01A MCC-19-2B01, 0.43 0.43 0.61

BD-19-2B12 Impedance PDC-53-2B01B MCC-19-2B02 0.43 0.43 0.61

BD-20-2B11 Impedance PDC-53-2B01A MCC-20-2B01 0.43 0.43 0.61

BD-20-2B12 Impedance PDC-53-2B01B MCC-20-2B02 0.43 0.43 0.61

BD-20-2B13 Impedance PDC-53-2B01A MMC-20-2B03A 0.43 0.43 0.61

BD-20-2B14 Impedance PDC-53-2B01B MCC-20-2B03B 0.43 0.43 0.61

BD-45-2B11 Impedance PDC-53-2B02A MCC-45-2B01 0.43 0.43 0.61

BD-45-2B12 Impedance PDC-53-2B02B MCC-45-2B02 0.43 0.43 0.61

BD-45-2B13 Impedance PDC-53-2B02A MCC-45-2B03A 0.43 0.43 0.61

BD-45-2B14 Impedance PDC-53-2B02B MCC-45-2B03B 0.43 0.43 0.61

BD-46-2D11 Impedance PDC-53-2D01 A MCC-46-2D01 0.43 0.43 0.61

BD-46-2D12 Impedance PDC-53-2D01 B MCC-46-2D02. 0.43 0.43 0.61

BD-47-2D11 Impedance PDC-53-2D01 A MCC-47-2D01 0.43 0.43 0.61

BD-47-2D12 Impedance PDC-53-2D01 B MCC-47-2D02 0.43 0.43 0.61

BD-48-2D11 Impedance PDC-53-2D01 A MCC-48-2D01 0.43 0.43 0.61

BD-48-2D12 Impedance PDC-53-2D01 B MCC-48-2D02 0.43 0.43 0.61

BD-49-2D11 Impedance PDC-53-2D01 A MCC-49-2D01 0.43 0.43 0.61

BD-49-2D13 Impedance PDC-53-2D01 A MCC-49-2D03A 0.43 0.43 0.61

BD-49-2D14 Impedance PDC-53-2D01 B MCC-49-2D03B 0.43 0.43 0.61

BD-53-3B11 Impedance PDC-53-3B01A MCC-53-3B01 0.58 0.58 0.82

BD-53-3B12 Impedance PDC-53-3B01B MCC-53-3B02 0.58 0.58 0.82


ETAP
Project: C.S.E RPLC Page: 43
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

BD-53-3B14 Impedance PDC-53-3B02B MCC-53-3B04 0.58 0.58 0.82

BD-53-5B13 Impedance PDC-53-3B02A MCC-53-3B03 0.58 0.58 0.82

Line2 Line P1-7F CONTROL C DE BOMBAS 1.01 0.84 1.31 0.0000519

Line3 Line P4-6G P34-6G 4.02 3.31 5.21 0.0002101

Line5 Line P4-7E P8-7E 6.03 5.02 7.85 0.0003114

Line6-1 Line P24-10A P17-10A 10.05 8.28 13.02 0.0005254

Line7-2 Line P8-7E P9-7E 1.41 1.17 1.83 0.0000726

Line9 Line P9-7E P10-7E 10.05 8.37 13.08 0.0005189

Line10 Line P18-7E3I P17-3I 1.41 1.17 1.83 0.0000726

Line11 Line P13-6E BCI 13,8 "A" 2.81 2.34 3.66 0.0001453

Line12-1 Line P17-10A P9-10A 10.05 8.28 13.02 0.0005254

Line13 Line P15-7F P17-7F 4.02 3.35 5.23 0.0002076

Line14 Line P6-10A G38 4.02 3.31 5.21 0.0002101

Line15 Line P31-7F P30-7F 1.41 1.17 1.83 0.0000726

Line17 Line P30-7F P26-7F 6.03 5.02 7.85 0.0003114

Line19 Line P26-7F P17-7F 10.05 8.37 13.08 0.0005189

Line21 Line P15-7F BCI 13,8 "B" 2.81 2.34 3.66 0.0001453

Line22 Line P1-7F P3-7F 2.81 2.34 3.66 0.0001453

Line24 Line P3-7F P7-7F 6.03 5.02 7.85 0.0003114

Line25 Line P10-7E P16-7E (GLP) 9.05 7.53 11.77 0.0004670

Line26 Line S/E TL 6G-3 P4-6G 6.03 5.02 7.85 0.0003114

Line27 Line P11-7F P12-7F 1.41 1.17 1.83 0.0000726

Line28 Line P16-6E P19-6E 4.22 3.52 5.49 0.0002179

Line29 Line P12-6E P13-7F 1.41 1.17 1.83 0.0000726

Line30 Line S/E TL 6G-4 S/E TL 6G-3 8.04 6.70 10.47 0.0004151

Line31 Line P16-7E (GLP) P17-7E (GLP) 1.41 1.17 1.83 0.0000726

Line32 Line P9-10A P6-10A 4.02 3.31 5.21 0.0002101

Line34 Line P17-7E (GLP) P18-7E3I 1.41 1.17 1.83 0.0000726

Line35 Line P13-6E P15-6E 1.41 1.17 1.83 0.0000726

Line36 Line P4-6G P6-6G 2.81 2.34 3.66 0.0001453

Line37 Line P13-7F P15-7F 2.81 2.34 3.66 0.0001453

Line39 Line P6-6G P22-6G 20.10 16.74 26.16 0.0010378

Line42 Line P4-6E P13-6E 22.11 18.42 28.78 0.0011416

Line43 Line P15-6E P17-6E 2.81 2.34 3.66 0.0001453

Line45 Line P40-10B Bus253 2.01 1.66 2.60 0.0001051

Line47 Line P17-6E P18-6E 1.41 1.17 1.83 0.0000726

Line48 Line Bus253 Bus255 1.41 1.16 1.82 0.0000735

Line49 Line P11/6E P25-6E 2.01 1.67 2.62 0.0001038

Line51 Line P25-6E Bus53-1 2.01 1.67 2.62 0.0001038


ETAP
Project: C.S.E RPLC Page: 44
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Line53 Line P11/6E P14-6E 2.01 1.67 2.62 0.0001038

Line55 Line P14-6E P16-6E 2.81 2.34 3.66 0.0001453

Line57 Line P19-6E Bus77-1 2.01 1.67 2.62 0.0001038

Line58 Line P1-6E P3-6E 2.81 2.34 3.66 0.0001453

Line59 Line Bus81-1 Bus89-1 199.41 166.07 259.50 0.0000094

Line61 Line P34-6G P38-6G8H 5.63 4.63 7.29 0.0002942

Line63 Line Bus130 P11-8H (S/E BOM DE CARGA) 2.81 2.34 3.66 0.0001453

Line66 Line Bus88-1 TANQ AGUA SERV. EL 996.94 820.69 1291.28 0.0000477
CHAURE
Line68 Line P1-4G P2-4G 6.03 4.96 7.81 0.0003152

Line69 Line P24-10B P20-10B 6.03 4.97 7.81 0.0003152

Line71 Line P17-10B P20-10B 4.22 3.48 5.47 0.0002206

Line72 Line Bus77-1 P23-6E (PLANTA DE HIELO) 2.01 1.67 2.62 0.0001038

Line74 Line TANQ AGUA SERV. EL PLANT AGUA SERV EL 99.69 82.07 129.13 0.0000048
CHAURE CHAURE
Line76 Line P1-10B P17-10B 24.12 19.86 31.24 0.0012608

Line77 Line PLANT AGUA SERV EL Bus93-1 2990.81 2462.06 3873.85 0.0001430
CHAURE
Line79 Line P26-10B P27-10B 1.41 1.16 1.82 0.0000735

Line81 Line Bus99-1 Bus94-1 99.70 83.03 129.75 0.0000047

Line83 Line P13-4G P24-6H4G 20.10 16.74 26.16 0.0010378

Line84 Line P37-7F P39-6E (MEREY) 2.81 2.34 3.66 0.0001453

Line85 Line P7-7F P33-7F 2.01 1.67 2.62 0.0001038

Line87 Line P33-7F P48-7F 20.10 16.74 26.16 0.0010378

Line88 Line P10-6E CRUZ DE LA PALOMA P11/6E 2.01 1.67 2.62 0.0001038

Line90 Line P1-7E P4-7E 6.03 5.02 7.85 0.0003114

Line92 Line P1-4G CASETA 1-6H 60.31 50.23 78.49 0.0031135

Line93 Line P3-6E P7-6E 6.03 5.02 7.85 0.0003114

Line95 Line P7-7F G/N 0.60 0.50 0.78 0.0000311

Line98 Line G/N Bus108-1 0.60 0.50 0.78 0.0000311

Line100 Line P24-6H4G P3-6H 2.81 2.34 3.66 0.0001453

Line101 Line P38-6G8H P9-8H 6.03 5.02 7.85 0.0003114

Line102 Line P7-7F P10-7F 4.22 3.52 5.49 0.0002179

Line106 Line P3-6H P4-6H 1.41 1.17 1.83 0.0000726

Line108 Line P7-6E P10-6E 4.22 3.52 5.49 0.0002179

Line109 Line CASETA 1-6H CASETA 2-6H 2.01 1.67 2.62 0.0001038

Line111 Line P10-7F P11-7F 1.41 1.17 1.83 0.0000726

Line112 Line P4-6H P5-6H 1.41 1.17 1.83 0.0000726

Line113 Line RESP CASETA1-3I RESP CASETA2-3I 2.01 1.67 2.62 0.0001038

Line114 Line CASETA 2-6H CASETA 3-6H 2.01 1.67 2.62 0.0001038

Line115 Line RESP CASETA2-3I RESP CASETA3-3I 2.01 1.67 2.62 0.0001038
ETAP
Project: C.S.E RPLC Page: 45
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Line116 Line P10-6E P11-6E 1.41 1.17 1.83 0.0000726

Line117 Line RESPALDO.3I RESP CASETA1-3I 0.25 2.76 2.77 0.0000647

Line120 Line P11-6E P12-6E 1.41 1.17 1.83 0.0000726

Line121 Line BC n38 24.75 273.33 274.45 0.0000059

Line122 Line P5-6H P6-6H 1.41 1.17 1.83 0.0000726

Line124 Line P40-6E P39-6E (MEREY) 1.41 1.17 1.83 0.0000726

Line125 Line P1-8H Bus130 12.06 10.05 15.70 0.0006227

Line126 Line P6-6H P9-6H 4.22 3.52 5.49 0.0002179

Line127 Line P31-7F P37-7F 9.05 7.53 11.77 0.0004670

Line130 Line P48-7F P31-7F 24.13 20.09 31.40 0.0012454

Line131 Line P9-6H P12-6H 4.22 3.52 5.49 0.0002179

Line133 Line P12-6H P13-6H 1.41 1.17 1.83 0.0000726

Line135 Line P13-6H P31-6H 0.10 0.08 0.13 0.0000052

Line137 Line P1-6H7G P31-6H 2.01 1.67 2.62 0.0001038

Line142 Line P2-4G P4-4G 3.42 2.81 4.43 0.0001786

Line144 Line P4-4G P16-4G 17.09 14.07 22.13 0.0008931

Line146 Line P11-8H (S/E BOM DE CARGA) P37-8H 36.19 30.14 47.09 0.0018681

Line148 Line P22-6G P30-6G 12.06 10.05 15.70 0.0006227

Line20 Line P24-10A Line20~ 10.05 8.28 13.02 0.0005254

Line41 Line G39 Line41~ 0.80 0.66 1.04 0.0000420

Line138 Line Line138~ P13-4G 12.06 10.05 15.70 0.0006227

Line140 Line P16-4G Line140~ 12.06 10.05 15.70 0.0006227

Line64 Line Line64~ Bus94-1 99.70 83.03 129.75 0.0000047

Line33 Line P12-6E Line33~ 4.02 3.35 5.23 0.0002076

Line94 Line Line94~ P18-7E3I 20.10 16.74 26.16 0.0010378

1A-1 Tie Breakr Bus_G6 PPE BARRA_A

3E Tie Breakr Bus128 PDC_RPLC BARRA "E"

3I Tie Breakr Bus181 Bus185

6F Tie Breakr Bus132 PDC_RPLC BARRA "F"

14A-1 Tie Breakr Bus109 PPE BARRA_A

14B-1 Tie Breakr Bus118 PPE BARRA_B

52T Tie Breakr PDC-53-5A01B PDC-53-5A01A

CB1-3 Tie Breakr Bus1-3 Bus4-2

CB1-4 Tie Breakr Bus74-1 Bus25-3

CB7-2 Tie Breakr Bus1-3 Bus26-2

CB8-4 Tie Breakr Bus26-2 Bus25-2

CB9-3 Tie Breakr Bus25-2 Bus2-4-1

CB10-3 Tie Breakr Bus1-3 Bus6-3

CB11-3 Tie Breakr Bus6-3 Bus7-4


ETAP
Project: C.S.E RPLC Page: 46
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

CB12-3 Tie Breakr Bus7-4 Bus2-4-1

CB12-4 Tie Breakr Bus76-1 Bus3-2

CB31-3 Tie Breakr BCI 4,16"A" BCI 4,16"B"

CB40-2 Tie Breakr Bus34-3 Bus32-3

CB62-2 Tie Breakr PAL_A-1 BARRA__A-1

CB73-3-1 Tie Breakr Bus103-1-1 Bus313-1

CB78 Tie Breakr PDC-53-4B01A Bus108

CB82 Tie Breakr PDC-53-5A01B CDD "B"

CB83 Tie Breakr PDC-53-5A01A CDD "A"

CB154-2 Tie Breakr Bus14-1 Bus10-2

CB155-1 Tie Breakr Bus16-1 Bus18-1

CB169-2 Tie Breakr DA-3 BARRA G (480) Bus19-1

CB174-1 Tie Breakr DA-3 BARRA H (480) Bus21-3

CB178 Tie Breakr PDC-53-4B01B PDC-53-4B01A

CB187-3 Tie Breakr Bus185 Bus11-2

CB4505 Tie Breakr BARRA B-1 BARRA B1 ALQUILACION

CB-2D03T Tie Breakr MCC-49-2D03A MCC-49-2D03B

P1 - 7E Tie Breakr POSTE: 1-7E P1-7E

Fuse3-1 Tie Fuse G-1 PLT. DE ASFALTO

Fuse20 Tie Fuse Bus3-2 Bus177

2SW1-1 Tie Switch Bus134-1 Bus141-1

2SW2 Tie Switch G10 G23

SPST2 Tie Switch CASETA 1-6H CASETA 1

SPST4 Tie Switch RESP CASETA1-3I CASETA 1

SPST9 Tie Switch CASETA 3-6H CASETA 3

SPST11 Tie Switch RESP CASETA2-3I CASETA 2

SPST12 Tie Switch RESP CASETA3-3I CASETA 3

SPST14 Tie Switch CASETA 2-6H CASETA 2

SW11-2 Tie Switch BCI 13,8 "A" BCI 13,8 "B"

SW34 Tie Switch Bus120-1 Bus99-1


ETAP
Project: C.S.E RPLC Page: 47
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Equipment Cable Input Data

Ohms or Siemens/1000 ft per Conductor O/L Heater


Equipment Cable Equipment Length Resistance

ID ID Type Library Size Adj. (ft) % Tol #/ph T (°C) R X Y Adj.(ohm) % Tol

Cable100 EM-4603-1. Ind. Motor 0,6NCUN3 2 492.1 0.0 1 75 .20200 .03900 .0000000 .0000 0.0
Cable155 EM-4603-2. Ind. Motor 0,6NCUN3 2 492.1 0.0 1 75 .20200 .03900 .0000000 .0000 0.0
Cable106 EM-4604-1 Ind. Motor 0,6NCUS1 10 492.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable105 EM-4604-2. Ind. Motor 0,6NCUS1 10 492.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable114 EM-4702-1. Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
Cable115 EM-4702-2. Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
Cable159 EM-4704- 4 Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
Cable118 EM-4704-1. Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
Cable133 EM-4902-1. Ind. Motor 0,6NCUS1 10 328.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable18-2 G-2002 Ind. Motor 15MCUS3 500 656.2 0.0 3 75 .03000 .03940 .0000000 .0000 0.0
Cable104 GM-4601 Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
Cable101 GM-4602 A Ind. Motor 0,6NCUN3 8 492.1 0.0 1 75 .81100 .05030 .0000000 .0000 0.0
Cable103 GM-4603 Ind. Motor 0,6NCUN3 2 492.1 0.0 1 75 .20200 .03900 .0000000 .0000 0.0
Cable102 GM-4604. Ind. Motor 0,6NCUS1 12 492.1 0.0 1 75 2.06739 .89000 .0000000 .0000 0.0
Cable150 GM-4606. Ind. Motor 0,6NCUS1 10 492.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable162 GM-4701 Ind. Motor 0,6NCUN3 8 492.1 0.0 1 75 .81100 .05030 .0000000 .0000 0.0
Cable6-1 GM-4702B Ind. Motor 5,0NCUN1 4 492.1 0.0 1 75 .31379 .11000 .0000000 .0000 0.0
Cable116 GM-4706 A. Ind. Motor 0,6NCUN3 1/0 492.1 0.0 1 75 .12700 .03600 .0000000 .0000 0.0
Cable3-1 GM-4801A Ind. Motor 5,0NCUN1 4 492.1 0.0 1 75 .31379 .11000 .0000000 .0000 0.0
Cable122 GM-4802. Ind. Motor 0,6NCUS1 10 492.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable145 GM-4901-B Ind. Motor 0,6NCUN3 350 328.1 0.0 1 75 .03680 .03280 .0000000 .0000 0.0
Cable132 GM-4901-C Ind. Motor 0,6MCUN3 350 328.1 0.0 1 75 .03780 .03730 .0000000 .0000 0.0
Cable137 GM-4902A. Ind. Motor 0,6NCUS1 12 4921.3 0.0 1 75 2.06739 .89000 .0000000 .0000 0.0
Cable139 GM-4902B. Ind. Motor 0,6NCUS1 12 4921.3 0.0 1 75 2.06739 .89000 .0000000 .0000 0.0
Cable129 GM-4904. Ind. Motor 0,6NCUS1 10 328.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable130 GM-4905-A Ind. Motor 0,6NCUS1 10 328.1 0.0 1 75 1.15531 .55000 .0000000 .0000 0.0
Cable131 GM-4951 Ind. Motor 0,6NCUN3 2 328.1 0.0 1 75 .20200 .03900 .0000000 .0000 0.0
Cable125 GM-4951 B Ind. Motor 0,6NCUN3 2 328.1 0.0 1 75 .20200 .03900 .0000000 .0000 0.0
Cable120 Mtr51 Ind. Motor 0,6NCUN3 6 492.1 0.0 1 75 .51000 .04570 .0000000 .0000 0.0
ETAP
Project: C.S.E RPLC Page: 48
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

B3-2 2.400 104.160 0.9 0 0 0.155 0.092 n1 -0.155 -0.092 41.7 86.0

B4-2 0.480 98.842 0.2 0 0 0.226 0.134 B9 -0.226 -0.134 319.9 86.0

B6 2.400 99.994 1.0 0 0 0.058 0.035 G-8 (BOMBA DE TRANF.) -0.058 -0.035 16.3 86.0

B7 0.480 100.157 1.1 0 0 0 0 G-8 (BOMBA DE TRANF.) 0.000 0.000 0.0 0.0

B9 2.400 99.484 0.6 0 0 0.020 0.007 B4-2 0.227 0.137 64.0 85.6

PLT. DE ASFALTO -0.246 -0.143 68.9 86.5

B14 0.480 100.005 1.0 0 0 0.009 0.005 P16-4G -0.009 -0.005 12.1 86.0 -2.500

B16 0.480 99.299 -0.7 0 0 0.014 0.007 TALLER MECANICO -0.014 -0.007 18.7 89.0

B21 0.480 98.717 -0.9 0 0 0.034 0.020 DA-3 BARRA H (480) -0.034 -0.020 48.4 86.0

B.DE TRANF 2,4KV 2.400 99.238 0.5 0 0 0.132 0.078 P14-7F -0.132 -0.078 37.2 86.0

B.DE TRANSF.BARRA"B" 2.400 99.243 0.4 0 0 0.207 0.123 Bus55-1 0.001 0.001 0.3 85.0

Bus57-1 0.001 0.001 0.3 85.0

Bus180 -0.209 -0.124 59.0 86.0

B.DE TRASNF.BARRA"A" 2.400 99.427 0.7 0 0 0 0 B/TRANS (480) 0.008 0.004 2.1 85.9

Bus79-1 -0.008 -0.004 2.1 85.9

B/MEREY 2.400 99.469 0.3 0 0 0.043 0.026 Bus5-4 -0.043 -0.026 12.1 86.0

B/TRANS (480) 0.480 99.316 0.6 0 0 0.008 0.004 B.DE TRASNF.BARRA"A" -0.008 -0.004 10.6 86.0

BARRA"A"4,16-1 4.160 99.531 0.5 0 0 0 0 BARRA A T.E# 2 0.403 0.239 65.3 86.0

G28-1 -0.403 -0.239 65.3 86.0

BARRA "A" 480V (FCC) 0.480 98.338 0.1 0 0 0.208 0.111 Bus48-1-1 -0.208 -0.111 288.7 88.2

BARRA"A"480V-1 0.480 99.861 0.9 0 0 0 0 BARRA A T.E# 2 480V 0.064 0.038 89.4 86.0

G28-1 -0.064 -0.038 89.4 86.0

BARRA"B"4,16-1 4.160 99.281 -0.9 0 0 0 0 BARRA B T.E # 2 0.410 0.243 66.6 86.0

G29-1 -0.410 -0.243 66.6 86.0

BARRA "B" 480V (FCC) 0.480 98.833 -1.0 0 0 0.137 0.067 Bus49-1-1 -0.137 -0.067 185.5 89.9

BARRA"B"480V-1 0.480 99.626 -0.6 0 0 0 0 BARRA B T.E # 2 480V 0.064 0.038 89.6 86.0

G29-1 -0.064 -0.038 89.6 86.0

BARRA "G" 13.800 100.175 1.1 0 0 0 0 P2-7G (AGUA SALADA) 0.215 0.129 10.5 85.8

G-5 0.497 0.293 24.1 86.1

PPE BARRA_A -0.959 -0.556 46.3 86.5

P34-6G 0.137 0.077 6.6 87.2

P1-4G 0.110 0.057 5.2 88.8

BARRA "G" DA-3 2.400 99.803 0.8 0 0 0.110 0.065 DA-3 BARRA G (2.4) -0.110 -0.065 30.9 86.0

BARRA "G" DA-3. 0.480 99.041 0.6 0 0 0.051 0.031 DA-3 BARRA G (480) -0.051 -0.031 72.6 86.0

BARRA "H" 13.800 99.902 -0.4 0 0 0 0 TALLER MECANICO 0.018 0.009 0.8 88.8

PPE BARRA_B -1.401 -0.861 68.8 85.2


ETAP
Project: C.S.E RPLC Page: 49
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

G-4 0.305 0.175 14.7 86.7

P1-8H 0.861 0.561 43.0 83.8

P1-6H7G 0.217 0.115 10.3 88.4

BARRA "H" DA-3 2.400 99.391 -0.7 0 0 0.150 0.089 DA-3 BARRA H (2.4) -0.150 -0.089 42.1 86.0

BARRA "H" DA-3. 0.480 98.782 -0.8 0 0 0.041 0.024 DA-3 BARRA H (480) -0.041 -0.024 58.0 86.0

BARRA__A-1 13.800 124.880 3.8 140.000 92.962 0 0 PAL_A-1 140.000 92.962 5630.1 83.3

BARRA_A1-1 230.000 100.332 0.2 0 0 0 0 Bus4-2 139.712 80.884 403.9 86.5

PAL_A-1 -139.712 -80.884 403.9 86.5

BARRA A 480V 0.480 99.816 0.7 0 0 0.164 0.084 Bus17-1 -0.164 -0.084 221.5 89.0

barra a 480v STG 0.480 100.139 1.0 0 0 0 0 BARRA A STG 0.039 0.023 55.0 86.0

G26 -0.039 -0.023 55.0 86.0

BARRA A-1 0.480 97.084 0.2 0 0 0 0 BARRA A ALQUILACION 0.470 0.290 683.8 85.1
480V
Bus157-1-1 -0.469 -0.282 678.1 85.7

Bus118-1 -0.001 -0.007 9.1 12.0

BARRA A ALQUILACION 4.160 99.692 -0.6 0 0 0.086 0.038 Bus149-1-1 -0.086 -0.038 13.0 91.6

BARRA A ALQUILACION 0.480 94.674 -0.4 0 0 0.461 0.278 BARRA A-1 -0.461 -0.278 683.8 85.6
480V
BARRA A STG 0.480 100.072 1.0 0 0 0.039 0.023 barra a 480v STG -0.039 -0.023 55.0 86.0

BARRA A T.E# 2 4.160 99.512 0.5 0 0 0.403 0.239 BARRA"A"4,16-1 -0.403 -0.239 65.3 86.0

BARRA A T.E# 2 480V 0.480 99.465 0.9 0 0 0.064 0.038 BARRA"A"480V-1 -0.064 -0.038 89.4 86.0

BARRA A TE#1 0.480 98.424 0.7 0 0 0.204 0.123 Bus106-1-1 -0.204 -0.123 290.8 85.6

BARRA A UNIDAD 51 Y 0.480 98.765 0.3 0 0 0.230 0.116 Bus56-1-1 -0.230 -0.116 313.1 89.3
52
BARRA B1 ALQUILACION 0.480 99.012 -0.6 0 0 0.006 0.003 BARRA B-1 -0.006 -0.003 8.0 85.6

BARRA B 480V 0.480 99.426 -0.8 0 0 0.247 0.118 Bus15-1 -0.247 -0.118 331.1 90.3

BARRA B-1 0.480 99.012 -0.6 0 0 0 0 Bus154-1-1 -0.145 -0.093 209.1 84.0

BARRA B ALQUILACION 0.138 0.083 195.3 85.8


480V
Bus118-1 0.001 0.007 9.1 13.3

BARRA B1 ALQUILACION 0.006 0.003 8.0 85.6

BARRA B ALQUILACION 4.160 100.203 1.1 0 0 0 0 Bus145-1-1 0.000 0.000 0.0 0.0

BARRA B ALQUILACION 0.480 98.327 -0.8 0 0 0.137 0.082 BARRA B-1 -0.137 -0.082 195.3 85.9
480V
BARRA B STG 0.480 99.748 -0.5 0 0 0.059 0.035 Bus31-3 -0.059 -0.035 82.2 86.0

BARRA B T.E# 1 0.480 98.079 -0.7 0 0 0.216 0.131 Bus129-1 -0.216 -0.131 309.8 85.6

BARRA B T.E # 2 4.160 99.262 -0.9 0 0 0.410 0.243 BARRA"B"4,16-1 -0.410 -0.243 66.6 86.0

BARRA B T.E # 2 480V 0.480 99.228 -0.6 0 0 0.064 0.038 BARRA"B"480V-1 -0.064 -0.038 89.6 86.0

BARRA B UNIDAD 51 Y 52 0.480 100.006 -0.3 0 0 0 0 Bus62-1-1 0.000 0.000 0.0 0.0

BC 2.400 97.166 -2.0 0 0 0.824 0.511 n38 0.019 0.010 5.3 88.8

Bus85-1 -0.843 -0.521 245.4 85.1

BCI 4,16"A" 4.160 99.508 0.7 0 0 0 0 Bus34-3 0.000 0.000 0.0 0.0
ETAP
Project: C.S.E RPLC Page: 50
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BCI 13,8 "A" 0.000 0.000 0.0 0.0

BCI 4,16"B" 0.000 0.000 0.0 0.0

BCI 4,16"B" 4.160 99.508 0.7 0 0 0 0 Bus32-3 0.000 0.000 0.0 0.0

BCI 13,8 "B" 0.000 0.000 0.0 0.0

BCI 4,16"A" 0.000 0.000 0.0 0.0

BCI 13,8 "A" 13.800 99.508 0.7 0 0 0 0 P13-6E 1.740 0.839 81.2 90.1

BCI 4,16"A" 0.000 0.000 0.0 0.0

BCI 13,8 "B" -1.740 -0.839 81.2 90.1

BCI 13,8 "B" 13.800 99.508 0.7 0 0 0 0 P15-7F -1.740 -0.839 81.2 90.1

BCI 4,16"B" 0.000 0.000 0.0 0.0

BCI 13,8 "A" 1.740 0.839 81.2 90.1

BP-XFR-53-5A01 34.500 99.741 -2.0 0 0 0 0 PDC-53-5A01A -0.030 -0.019 0.6 84.9

PDC-53-2A01A 0.030 0.019 0.6 84.9

BP-XFR-53-5A02 34.500 99.741 -2.0 0 0 0 0 PDC-53-5A01B -0.030 -0.019 0.6 84.9

PDC-53-2A01B 0.030 0.019 0.6 84.9

BP-XFR-53-5B01 34.500 99.736 -2.0 0 0 0 0 PDC-53-5A01A -3.418 -1.642 63.6 90.1

PDC-53-3B01A 3.418 1.642 63.6 90.1

BP-XFR-53-5B02 34.500 99.736 -2.0 0 0 0 0 PDC-53-5A01B -3.440 -1.740 64.7 89.2

PDC-53-3B01B 3.440 1.740 64.7 89.2

BP-XFR-53-5B03 34.500 99.738 -2.0 0 0 0 0 PDC-53-5A01A -1.866 -1.073 36.1 86.7

PDC-53-3B02A 1.866 1.073 36.1 86.7

BP-XFR-53-5B04 34.500 99.737 -2.0 0 0 0 0 PDC-53-5A01B -2.626 -1.582 51.4 85.7

PDC-53-3B02B 2.626 1.582 51.4 85.7

BP-XFR-53-5B05 34.500 99.717 -2.0 0 0 0 0 PDC-53-5A01A -4.827 -13.140 234.9 34.5

PDC-53-4B01A 4.827 13.140 234.9 34.5

BP-XFR-53-5B06 34.500 99.750 -2.1 0 0 0 0 PDC-53-5A01B -3.895 7.277 138.5 -47.2

PDC-53-4B01B 3.895 -7.277 138.5 -47.2

BP-XFR-53-5B07 34.500 99.736 -2.0 0 0 0 0 PDC-53-5A01A -0.947 -0.515 18.1 87.9

PDC-53-2B01A 0.947 0.515 18.1 87.9

BP-XFR-53-5B08 34.500 99.737 -2.0 0 0 0 0 PDC-53-5A01B -0.915 -0.494 17.4 88.0

PDC-53-2B01B 0.915 0.494 17.4 88.0

BP-XFR-53-5D02 34.500 99.733 -2.0 0 0 0 0 PDC-53-5A01B -0.544 -0.284 10.3 88.7

PDC-53-3D01 B 0.544 0.284 10.3 88.7

BP-XFR-53-7A01 230.000 100.318 0.2 0 0 0 0 Bus26-2 0.000 0.000 0.0 0.0

BP-XFR-53-7A02 230.000 100.312 0.2 0 0 0 0 Bus25-2 -22.909 -17.567 72.2 79.4

PDC-53-5A01B 22.909 17.567 72.2 79.4 -2.500

Bus1-3 230.000 100.318 0.2 0 0 0 0 Bus4-2 -139.709 -80.843 403.9 86.6

Bus26-2 69.855 40.421 201.9 86.6


ETAP
Project: C.S.E RPLC Page: 51
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus6-3 69.855 40.421 201.9 86.6

Bus1-4 2.400 98.695 0.2 0 0 0 0 Bus13-1 0.000 0.000 0.0 100.0

Bus2-4-1 230.000 100.318 0.2 0 0 0 0 Bus25-2 -46.945 -23.039 130.9 89.8

Bus7-4 46.945 23.039 130.9 89.8

Bus2-5 0.480 95.087 -0.3 0 0 0 0 Bus182 0.000 0.000 0.0 0.0

Bus3-2 0.480 100.012 -0.3 0 0 0 0 Bus307 0.000 0.000 0.0 0.0

Bus76-1 0.000 0.000 0.0 0.0

Bus177 0.000 0.000 0.0 0.0

Bus4-2 230.000 100.318 0.2 0 0 0 0 BARRA_A1-1 -139.709 -80.843 403.9 86.6

Bus1-3 139.709 80.843 403.9 86.6

Bus4-3 2.400 99.010 0.2 0 0 0 0 Bus13-1 0.709 0.421 200.2 86.0

SISOR BARRA "1" -0.709 -0.421 200.2 86.0

Bus5-4 13.800 99.650 0.4 0 0 0 0 P39-6E (MEREY) -0.043 -0.026 2.1 85.9

B/MEREY 0.043 0.026 2.1 85.9

Bus6-3 230.000 100.318 0.2 0 0 0 0 Gua. II 230 58.400 31.730 166.3 87.9

Bus1-3 -69.855 -40.421 201.9 86.6

Bus7-4 11.455 8.691 36.0 79.7

Bus6-4 13.800 99.650 0.4 0 0 0 0 P39-6E (MEREY) 0.000 0.000 0.0 100.0

Bus7-5 0.000 0.000 0.0 0.0

Bus7-4 230.000 100.318 0.2 0 0 0 0 Gua. II 230 58.400 31.730 166.3 87.9

Bus6-3 -11.455 -8.691 36.0 79.7

Bus2-4-1 -46.945 -23.039 130.9 89.8

Bus7-5 0.480 99.650 0.4 0 0 0 0 Bus6-4 0.000 0.000 0.0 0.0

Bus8-2 0.480 95.123 1.1 0 0 0 0 Bus181 0.000 0.000 0.0 0.0

Bus9-2 0.480 99.574 -0.5 0 0 0.025 0.012 CONTROL C DE BOMBAS -0.025 -0.012 33.7 91.0

Bus10 34.500 99.737 -2.0 0 0 1.109 0.688 PDC-53-5A01A -1.109 -0.688 21.9 85.0

Bus10-2 0.480 99.828 0.9 0 0 0 0 Bus12-1 0.093 0.055 130.9 86.0

Bus14-1 -0.093 -0.055 130.9 86.0

Bus11-2 13.800 99.879 1.1 0 0 0 0 Bus179 0.295 0.133 13.6 91.1 5.000

Bus185 -0.295 -0.133 13.6 91.1

Bus12-1 0.480 98.667 0.8 0 0 0.092 0.055 Bus10-2 -0.092 -0.055 130.9 86.0

Bus13-1 2.400 98.695 0.2 0 0 0.706 0.419 Bus4-3 -0.706 -0.419 200.2 86.0

Bus1-4 0.000 0.000 0.0 100.0

Bus14-1 0.480 99.828 0.9 0 0 0 0 SISOR BARRA "1" -0.094 -0.056 132.3 86.1

Bus65-1 0.001 0.000 1.4 91.0

Bus10-2 0.093 0.055 130.9 86.0

Bus15-1 13.800 100.011 -0.3 0 0 0 0 PPE BARRA_B -1.758 -0.860 81.9 89.8

BARRA B 480V 0.248 0.121 11.5 89.9


ETAP
Project: C.S.E RPLC Page: 52
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

S.A BARRA "B" 2.4KV 1.511 0.740 70.4 89.8

Bus16-1 0.480 99.409 -0.7 0 0 0 0 SISOR BARRA "2" -0.175 -0.104 246.4 86.0

Bus18-1 0.175 0.104 246.4 86.0

Bus17-1 13.800 100.248 1.1 0 0 0.324 0.157 PPE BARRA_A -1.172 -0.607 55.1 88.8

BARRA A 480V 0.164 0.085 7.7 88.7

S.A BARRA "A" 2.4KV 0.684 0.364 32.3 88.2

Bus18-1 0.480 99.409 -0.7 0 0 0 0 Bus20-4 0.175 0.104 246.4 86.0

Bus16-1 -0.175 -0.104 246.4 86.0

Bus19-1 0.480 99.464 0.7 0 0 0 0 n26 0.059 0.035 83.2 86.0

n27 0.002 0.001 3.3 86.0

DA-3 BARRA G (480) -0.061 -0.037 86.5 86.0

Bus20-4 0.480 97.224 -0.7 0 0 0.171 0.102 Bus18-1 -0.171 -0.102 246.4 86.0

Bus21-3 0.480 99.120 -0.8 0 0 0 0 n28 0.032 0.019 45.8 86.0

n29 0.002 0.001 3.3 86.0

DA-3 BARRA H (480) -0.035 -0.021 49.1 86.0

Bus22 13.800 99.845 0.9 0 0 0 0 PPE BARRA_A -13.848 -8.016 670.5 86.5

Bus59 13.848 8.016 670.5 86.5 -3.125

Bus22-4 4.160 99.470 -0.6 0 0 0.170 0.101 JET-A1 -0.170 -0.101 27.5 86.0

Bus23-3 4.160 99.470 -0.6 0 0 0.170 0.101 JET-A1 -0.170 -0.101 27.5 86.0

Bus25-2 230.000 100.318 0.2 0 0 0 0 BP-XFR-53-7A02 22.909 17.476 72.1 79.5

Bus26-2 -69.855 -40.515 202.1 86.5

Bus2-4-1 46.945 23.039 130.9 89.8

Bus25-3 0.480 105.261 1.1 0 0 0 0 Bus305 0.000 0.000 0.0 100.0

Bus74-1 0.000 0.000 0.0 100.0

Bus26-2 230.000 100.318 0.2 0 0 0 0 BP-XFR-53-7A01 0.000 -0.094 0.2 0.0

Bus1-3 -69.855 -40.421 201.9 86.6

Bus25-2 69.855 40.515 202.1 86.5

Bus27-3-1 13.800 100.248 1.1 0 0 0 0 G1-1 0.000 0.000 0.0 0.0

Bus29-3-1 13.800 100.011 -0.3 0 0 0 0 G2-1 -0.086 -0.054 4.2 84.4

Bus103-1-1 0.086 0.054 4.2 84.4

Bus31-3 0.480 99.848 -0.4 0 0 0 0 BARRA B STG 0.059 0.035 82.2 86.0

G27 -0.059 -0.035 82.2 86.0

Bus32-3 0.480 99.508 0.7 0 0 0 0 BCI 4,16"B" 0.000 0.000 0.0 0.0

Bus34-3 0.000 0.000 0.0 0.0

Bus34-3 0.480 99.508 0.7 0 0 0 0 BCI 4,16"A" 0.000 0.000 0.0 0.0

Bus32-3 0.000 0.000 0.0 0.0

Bus35-3 0.480 100.085 1.0 0 0 0 0 P8-7E 0.000 0.000 0.0 0.0

Bus37-3 0.480 95.317 1.0 0 0 0 0 P9-7E 0.000 0.000 0.0 0.0


ETAP
Project: C.S.E RPLC Page: 53
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus41-3 13.800 100.239 1.1 0 0 0 0 G31 -0.054 -0.026 2.5 90.3

Bus63-1 0.021 0.010 1.0 89.7

Bus45-1 0.034 0.016 1.6 90.7

Bus43-3 0.480 99.251 -0.6 0 0 0.015 0.007 P3-7F -0.015 -0.007 20.6 90.0

Bus45-1 0.208 99.594 0.7 0 0 0.034 0.015 Bus41-3 -0.034 -0.015 103.5 91.0

Bus46-1 0.480 99.189 0.6 0 0 0.008 0.004 P17-3I -0.008 -0.004 11.2 91.0

Bus48-1-1 0.480 99.027 0.3 0 0 0 0 BARRA "A" 480V (FCC) 0.209 0.113 288.7 88.0

G25-1 -0.209 -0.113 288.7 88.0

Bus49-1-1 0.480 99.266 -0.8 0 0 0 0 BARRA "B" 480V (FCC) 0.137 0.067 185.5 89.8

G24-1 -0.137 -0.067 185.5 89.8

Bus50-1 0.240 101.831 -0.5 0 0 0.035 0.016 P25-6E -0.035 -0.016 90.4 91.0

Bus51-1 0.480 99.439 0.7 0 0 0 0 P18-6E 0.000 0.000 0.0 0.0

Bus53 4.160 103.351 -3.0 0 0 0.341 0.144 MCC-53-3B01 -0.341 -0.144 49.7 92.1

Bus53-1 13.800 98.705 0.6 0 0 0 0 P25-6E -1.335 -0.644 62.8 90.1

Bus59-1-1 0.021 0.010 1.0 90.6 -5.000

Bus120-1 0.593 0.286 27.9 90.1 -5.000

Bus101-1 0.721 0.349 33.9 90.0 -5.000

Bus54 4.160 103.434 -3.0 0 0 0.179 0.077 MCC-53-3B01 -0.179 -0.077 26.2 91.9

Bus55 4.160 103.339 -3.0 0 0 0.256 0.109 MCC-53-3B01 -0.256 -0.109 37.4 92.0

Bus55-1 0.220 99.136 0.4 0 0 0.001 0.001 B.DE TRANSF.BARRA"B" -0.001 -0.001 3.7 85.0

Bus56 4.160 103.333 -3.3 0 0 1.911 0.925 MCC-53-3B01 -1.911 -0.925 285.1 90.0

Bus56-1-1 0.480 99.625 0.6 0 0 0 0 BARRA A UNIDAD 51 Y 52 0.231 0.118 313.1 89.1

G25-1 -0.231 -0.118 313.1 89.1

Bus57 4.160 103.562 -3.0 0 0 0.115 0.050 MCC-53-3B01 -0.115 -0.050 16.8 91.7

Bus57-1 0.220 99.136 0.4 0 0 0.001 0.001 B.DE TRANSF.BARRA"B" -0.001 -0.001 3.7 85.0

Bus58 4.160 103.524 -3.1 0 0 0.604 0.249 MCC-53-3B01 -0.604 -0.249 87.5 92.5

Bus59 34.500 100.001 -1.9 0 0 0 0 PDC-53-5A01A 13.800 7.114 259.8 88.9

Bus22 -13.800 -7.114 259.8 88.9

Bus59-1-1 0.220 102.971 0.1 0 0 0.021 0.009 Bus53-1 -0.021 -0.009 58.2 91.0

Bus61 4.160 98.395 -3.3 0 0 1.337 0.648 MCC-53-3B02 -1.337 -0.648 209.6 90.0

Bus62-1-1 0.480 100.006 -0.3 0 0 0 0 BARRA B UNIDAD 51 Y 52 0.000 0.000 0.0 0.0

G24-1 0.000 0.000 0.0 0.0

Bus63-1 13.800 100.239 1.1 0 0 0 0 Bus41-3 -0.021 -0.010 1.0 89.7

Bus72-1 0.021 0.010 1.0 89.7

Bus64 4.160 98.440 -3.0 0 0 0.179 0.076 MCC-53-3B02 -0.179 -0.076 27.5 92.0

Bus64-1 13.800 100.249 1.1 0 0 0 0 G26 0.000 0.000 0.0 100.0

Bus74-1 0.000 0.000 0.0 0.0

Bus65 4.160 98.394 -3.1 0 0 1.911 0.925 MCC-53-3B02 -1.911 -0.925 299.4 90.0
ETAP
Project: C.S.E RPLC Page: 54
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus65-1 0.240 99.576 0.8 0 0 0.001 0.000 Bus14-1 -0.001 0.000 2.9 91.0

Bus66-1 0.240 99.746 0.9 0 0 0.006 0.003 P4-6G -0.006 -0.003 16.5 91.0

Bus67-1 13.800 100.126 1.1 0 0 0 0 P6-6G -0.008 -0.004 0.4 90.9

n4 0.008 0.004 0.4 90.9

Bus68 6.600 99.787 -4.5 0 0 0 0 Bus71 4.111 1.634 387.8 92.9

Bus69 -4.111 -1.634 387.8 92.9

Bus68-1 13.800 100.126 1.1 0 0 0 0 P6-6G -0.008 -0.004 0.4 90.9

n5 0.008 0.004 0.4 90.9

Bus69 13.800 101.400 -2.6 0 0 0 0 PDC-53-4B01B -4.122 -1.793 185.5 91.7

Bus68 4.122 1.793 185.5 91.7

Bus69-1 0.220 100.491 0.2 0 0 0.004 0.002 Bus77-1 -0.004 -0.002 12.1 91.0

Bus70 13.800 101.247 -2.6 0 0 4.559 3.444 Bus108 -4.559 -3.444 236.1 79.8

Bus70-1 0.240 99.887 1.0 0 0 0.008 0.004 Bus71-1 -0.008 -0.004 20.6 91.0

Bus71 6.600 99.154 -4.9 0 0 4.097 1.592 Bus68 -4.097 -1.592 387.8 93.2

Bus71-1 13.800 100.126 1.1 0 0 0 0 P6-6G -0.008 -0.004 0.4 90.9

Bus70-1 0.008 0.004 0.4 90.9

Bus72-1 0.208 104.568 0.8 0 0 0.020 0.010 Bus63-1 -0.020 -0.010 60.4 90.0 5.000

Bus73-1 13.800 100.012 -0.3 0 0 0 0 G27 0.000 0.000 0.0 0.0

Bus76-1 0.000 0.000 0.0 0.0

Bus74-1 0.480 105.261 1.1 0 0 0 0 Bus64-1 0.000 0.000 0.0 0.0 5.000

Bus25-3 0.000 0.000 0.0 100.0

Bus75-1 0.220 99.993 -0.3 0 0 0.010 0.003 P14-6E -0.010 -0.003 27.6 95.0

Bus76-1 0.480 100.012 -0.3 0 0 0 0 Bus73-1 0.000 0.000 0.0 0.0

Bus3-2 0.000 0.000 0.0 0.0

Bus77-1 13.800 98.729 0.6 0 0 0 0 P19-6E -0.340 -0.163 16.0 90.2

P23-6E (PLANTA DE 0.336 0.161 15.8 90.2


HIELO)
Bus69-1 0.004 0.002 0.2 90.7 -2.500

Bus79-1 13.800 99.439 0.7 0 0 0 0 P15-6E -0.008 -0.004 0.4 85.9

B.DE TRASNF.BARRA"A" 0.008 0.004 0.4 85.9

Bus80-1 13.800 100.119 1.1 0 0 0 0 P22-6G -0.008 -0.004 0.4 91.0

n7 0.008 0.004 0.4 91.0

Bus81 4.160 103.456 -2.4 0 0 0.443 0.379 MCC-53-3B03 -0.443 -0.379 78.2 76.0

Bus81-1 2.400 98.739 0.6 0 0 0 0 Bus89-1 0.000 0.000 0.0 0.0

P19-6E 0.000 0.000 0.0 0.0

Bus82 4.160 103.781 -2.6 0 0 0.404 0.169 MCC-53-3B03 -0.404 -0.169 58.5 92.2

Bus82-1 0.240 99.472 0.8 0 0 0.010 0.005 P9-8H -0.010 -0.005 27.4 89.0

Bus83 4.160 103.902 -2.6 0 0 0.173 0.074 MCC-53-3B03 -0.173 -0.074 25.1 91.9

Bus84-1 0.240 98.924 -0.7 0 0 0.003 0.002 P11-8H (S/E BOM DE -0.003 -0.002 9.4 89.0
CARGA)
ETAP
Project: C.S.E RPLC Page: 55
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus85-1 13.800 99.597 -0.4 0 0 0 0 P11-8H (S/E BOM DE -0.849 -0.558 42.7 83.5
CARGA)
BC 0.849 0.558 42.7 83.5

Bus87 4.160 103.530 -2.5 0 0 0.182 0.078 MCC-53-3B03 -0.182 -0.078 26.5 91.9

Bus87-1 0.480 100.875 -1.0 0 0 0.014 0.009 TANQ AGUA SERV. EL -0.014 -0.009 19.6 85.0
CHAURE
Bus88-1 2.400 101.810 -0.8 0 0 0.075 0.034 TANQ AGUA SERV. EL 0.035 0.020 9.6 87.2
CHAURE
Bus169 -0.111 -0.054 29.1 89.8

Bus89-1 2.400 98.739 0.6 0 0 0 0 Bus81-1 0.000 0.000 0.0 0.0

Bus91-1 0.220 103.529 -1.5 0 0 0.086 0.039 Bus94-1 -0.086 -0.039 240.6 91.0

Bus92-1 0.240 100.535 -1.1 0 0 0.007 0.002 Bus93-1 -0.007 -0.002 17.6 95.0

Bus93-1 2.400 101.012 -0.9 0 0 0 0 PLANT AGUA SERV EL -0.007 -0.002 1.8 94.9
CHAURE
Bus92-1 0.007 0.002 1.8 94.9

Bus94-1 2.400 102.510 -0.5 0 0 0 0 Bus99-1 -0.087 -0.041 22.6 90.3

Line64~ 0.000 0.000 0.0 91.2

Bus91-1 0.087 0.042 22.6 90.3 -2.500

Bus97 4.160 98.101 -2.7 0 0 0.231 0.098 MCC-53-3B04 -0.231 -0.098 35.5 92.0

Bus98 4.160 98.649 -2.8 0 0 0.117 0.051 MCC-53-3B04 -0.117 -0.051 17.9 91.7

Bus98-1 0.480 99.858 -0.2 0 0 0 0 P33-7F 0.000 0.000 0.0 0.0

Bus99 4.160 98.652 -2.8 0 0 0.173 0.074 MCC-53-3B04 -0.173 -0.074 26.4 91.9

Bus99-1 2.400 102.628 -0.5 0 0 0 0 Bus94-1 0.087 0.042 22.6 90.2

Bus120-1 -0.087 -0.042 22.6 90.2

Bus101 4.160 97.650 -2.5 0 0 0.886 0.757 MCC-53-3B04 -0.886 -0.757 165.7 76.0

Bus101-1 2.400 102.355 -0.8 0 0 0.718 0.327 Bus53-1 -0.718 -0.327 185.4 91.0

Bus103 4.160 98.494 -2.9 0 0 0.710 0.286 MCC-53-3B04 -0.710 -0.286 107.9 92.7

Bus103-1-1 0.480 98.587 -1.0 0 0 0 0 Bus29-3-1 -0.085 -0.053 122.0 85.0

Bus313-1 0.085 0.053 122.0 85.0

Bus104-1 0.240 99.606 -0.4 0 0 0.018 0.008 G/N -0.018 -0.008 48.5 91.0

Bus106-1-1 0.480 99.713 0.7 0 0 0 0 BARRA A TE#1 0.206 0.125 290.8 85.6

G3-1 -0.206 -0.125 290.8 85.6

Bus107-1 0.240 99.419 -0.5 0 0 0.007 0.003 Bus108-1 -0.007 -0.003 19.4 91.0

Bus108 13.800 101.411 -2.6 0 0 0 0 Bus70 4.567 3.449 236.1 79.8

PDC-53-4B01A -4.567 -3.449 236.1 79.8

Bus108-1 13.800 99.868 -0.2 0 0 0 0 G/N -0.007 -0.003 0.3 90.8

Bus107-1 0.007 0.003 0.3 90.8

Bus109 13.800 100.250 1.1 16.900 8.500 0 0 PPE BARRA_A 16.900 8.500 789.5 89.3

Bus112-1 0.208 102.337 -0.7 0 0 0.132 0.060 PMG1 -0.132 -0.060 392.6 91.0

Bus114-1 0.240 98.780 -0.8 0 0 0.002 0.001 P10-7F -0.002 -0.001 6.2 91.0

Bus115-1 0.210 101.627 -0.5 0 0 0.132 0.060 PMG2 -0.132 -0.060 393.0 91.0
ETAP
Project: C.S.E RPLC Page: 56
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus116-1 0.208 103.327 -0.1 0 0 0.069 0.032 PMG3 -0.069 -0.032 205.0 91.0

Bus117-1-1 2.400 99.996 -0.3 0 0 0 0 Bus119-1 0.000 0.000 0.0 0.0

Bus118 13.800 100.013 -0.3 18.000 9.200 0 0 PPE BARRA_B 18.000 9.200 845.6 89.0

Bus118-1 0.240 98.046 -0.2 0 0 0 0 BARRA A-1 0.001 0.007 18.3 12.7

BARRA B-1 -0.001 -0.007 18.3 12.7

Bus118-2 0.240 99.868 -0.2 0 0 0 0 P11-7F 0.000 0.000 0.0 0.0

Bus119 13.800 99.971 -0.4 0 0 0 0 PPE BARRA_B -7.530 -1.764 323.6 97.4

Bus120 7.530 1.764 323.7 97.4 -0.625

Bus119-1 2.400 99.996 -0.3 0 0 0 0 Bus117-1-1 0.000 0.000 0.0 0.0

Bus134-1 0.000 0.000 0.0 0.0

Bus120 34.500 99.831 -2.0 0 0 0 0 PDC-53-5A01B 7.518 1.543 128.7 98.0

Bus119 -7.518 -1.543 128.7 98.0

Bus120-1 2.400 102.628 -0.5 0 0 0.504 0.230 Bus53-1 -0.591 -0.271 152.4 90.9

Bus99-1 0.087 0.042 22.6 90.2

Bus125-1 13.800 100.239 1.1 0 0 0 0 TQ_1 -0.111 -0.070 5.5 84.6

Bus126-1 0.111 0.070 5.5 84.6

Bus126-1 0.480 104.489 0.7 0 0 0.111 0.069 Bus125-1 -0.111 -0.069 150.3 85.0 5.000

Bus128 13.800 100.102 1.0 0 0 0 0 PPE BARRA_A -5.128 -2.832 244.8 87.5

PDC_RPLC BARRA "E" 5.128 2.832 244.8 87.5

Bus129-1 0.480 99.452 -0.7 0 0 0 0 BARRA B T.E# 1 0.219 0.132 309.8 85.6

G4-1 -0.219 -0.132 309.8 85.6

Bus130 13.800 99.645 -0.4 0 0 0 0 P11-8H (S/E BOM DE 0.859 0.561 43.1 83.7
CARGA)
P1-8H -0.859 -0.561 43.1 83.7

Bus132 13.800 99.916 -0.3 0 0 0 0 PPE BARRA_B -1.595 -2.928 139.6 47.9

PDC_RPLC BARRA "F" 1.595 2.928 139.6 47.9

Bus134-1 13.800 99.996 -0.3 0 0 0 0 Bus119-1 0.000 0.000 0.0 0.0

Bus141-1 0.000 0.000 0.0 0.0

Bus137 13.800 99.833 -0.4 0 0 0 0 TQ LABORATORIO 10B -0.144 -0.091 7.1 84.5

Bus140 0.144 0.091 7.1 84.5

Bus138 0.480 99.352 -0.6 0 0 0.005 0.003 P13-6H -0.005 -0.003 6.4 86.0

Bus139-1 13.800 100.224 1.1 0 0 0 0 G3-1 0.000 0.000 0.0 100.0

Bus140 0.480 98.889 -0.9 0 0 0.143 0.089 Bus137 -0.143 -0.089 205.0 85.0

Bus141-1 13.800 99.996 -0.3 0 0 0 0 G4-1 0.000 0.000 0.0 0.0

Bus134-1 0.000 0.000 0.0 0.0

Bus144 0.240 98.964 -0.8 0 0 0.006 0.002 P37-8H -0.006 -0.002 15.7 95.0

Bus145-1-1 4.160 100.203 1.1 0 0 0 0 BARRA B ALQUILACION 0.000 0.000 0.0 0.0

G7-1 0.000 0.000 0.0 0.0

Bus148 0.240 99.552 0.7 0 0 0.006 0.002 P30-6G -0.006 -0.002 16.4 95.0
ETAP
Project: C.S.E RPLC Page: 57
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus149-1-1 4.160 99.695 -0.6 0 0 0 0 BARRA A ALQUILACION 0.086 0.038 13.0 91.6

G6-1 -0.086 -0.038 13.0 91.6

Bus154-1-1 0.480 99.568 -0.6 0 0 0 0 BARRA B-1 0.145 0.094 209.1 84.0

G6-1 -0.145 -0.094 209.1 84.0

Bus157-1-1 0.480 98.888 0.2 0 0 0 0 BARRA A-1 0.478 0.288 678.1 85.7

G7-1 -0.478 -0.288 678.1 85.7

Bus166 13.800 99.870 -0.4 0 0 0 0 G-7 -0.027 -0.012 1.2 90.8

n37 0.027 0.012 1.2 90.8

Bus168 13.800 100.154 1.1 0 0 0 0 G-6 -0.027 -0.012 1.2 90.8

n36 0.027 0.012 1.2 90.8

Bus169 13.800 99.826 -0.4 0 0 0 0 P13-4G -0.111 -0.055 5.2 89.5

Bus88-1 0.111 0.055 5.2 89.5 -2.500

Bus170 0.240 99.639 -0.5 0 0 0.004 0.002 TALLER MECANICO -0.004 -0.002 10.8 89.0

Bus177 0.480 100.012 -0.3 0 0 0 0 Bus3-2 0.000 0.000 0.0 0.0

Bus179 4.160 94.461 0.5 0 0 0.232 0.099 Bus11-2 -0.294 -0.129 47.2 91.6

Bus190 0.063 0.030 10.2 90.0

Bus180 13.800 99.577 0.7 0 0 0 0 P15-7F -0.209 -0.126 10.3 85.8

B.DE TRANSF.BARRA"B" 0.209 0.126 10.3 85.8

Bus181 13.800 99.879 1.1 0 0 0.020 2.219 PDC_RPLC BARRA "E" -0.912 -2.602 115.5 33.1

Bus186 0.597 0.249 27.1 92.3 5.000

Bus8-2 0.000 0.000 0.0 0.0 5.000

Bus185 0.295 0.133 13.6 91.1

Bus182 13.800 99.842 -0.3 0 0 0 0 PDC_RPLC BARRA "F" -0.886 -0.403 40.8 91.0

Bus2-5 0.000 0.000 0.0 0.0 5.000

Bus188 0.886 0.403 40.8 91.0

Bus185 13.800 99.879 1.1 0 0 0 0 Bus181 -0.295 -0.133 13.6 91.1

Bus11-2 0.295 0.133 13.6 91.1

Bus186 4.160 94.896 0.8 0 0 0.597 0.246 Bus181 -0.597 -0.246 94.4 92.5

Bus188 4.160 99.497 -0.7 0 0 0.886 0.396 Bus182 -0.886 -0.396 135.3 91.3

Bus190 0.480 93.741 -0.1 0 0 0.062 0.030 Bus179 -0.062 -0.030 88.6 90.4

Bus196 0.480 104.666 0.8 0 0 0.032 0.020 P24-10A -0.032 -0.020 42.9 85.0 5.000

Bus198 0.480 104.647 0.8 0 0 0.032 0.020 P17-10A -0.032 -0.020 42.9 85.0 5.000

Bus228 0.480 99.399 0.7 0 0 0.091 0.054 G39 -0.091 -0.054 128.5 86.0

Bus229 13.800 100.227 1.1 0 0 0 0 TQ LABORATORIO 10A -0.166 -0.105 8.2 84.4

Bus230 0.166 0.105 8.2 84.4

Bus230 0.440 104.096 0.5 0 0 0.165 0.103 Bus229 -0.165 -0.103 245.4 85.0 5.000

Bus234 13.800 99.843 -0.4 0 0 0 0 TQ LABORATORIO 10B 0.000 0.000 0.0 0.0

Bus235 0.000 0.000 0.0 0.0


ETAP
Project: C.S.E RPLC Page: 58
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus235 0.440 99.843 -0.4 0 0 0 0 Bus234 0.000 0.000 0.0 0.0

Bus238 0.480 100.538 -1.4 0 0 0.314 0.195 G34 -0.314 -0.195 442.4 85.0

Bus240 0.480 102.406 -0.4 0 0 0 0 G11 0.000 0.000 0.0 0.0

Bus244 0.480 98.706 -0.9 0 0 0.010 0.006 G10 -0.010 -0.006 14.8 85.0

Bus248 0.480 99.846 -0.4 0 0 0 0 G12 0.000 0.000 0.0 0.0

Bus253 13.800 99.844 -0.4 0 0 0 0 P40-10B -0.076 -0.035 3.5 90.8

Bus255 0.043 0.018 2.0 91.8

Bus256 0.033 0.017 1.6 89.4

Bus255 13.800 99.843 -0.4 0 0 0 0 Bus253 -0.043 -0.019 2.0 91.8

Bus257 0.043 0.019 2.0 91.8

Bus256 0.240 98.425 -1.1 0 0 0.033 0.016 Bus253 -0.033 -0.016 89.9 90.0

Bus257 0.240 98.573 -1.1 0 0 0.043 0.018 Bus255 -0.043 -0.018 112.5 92.3

Bus259 0.480 99.437 -0.6 0 0 0.028 0.013 Bus260 -0.028 -0.013 37.3 90.0

Bus260 13.800 99.850 -0.4 0 0 0 0 G10 -0.235 -0.126 11.2 88.2

Bus263 0.208 0.112 9.9 88.0

Bus259 0.028 0.014 1.3 89.8

Bus263 13.800 99.836 -0.4 0 0 0.139 0.083 Bus260 -0.208 -0.112 9.9 88.0

Bus264 0.068 0.029 3.1 91.8

Bus264 0.480 98.901 -1.0 0 0 0.068 0.028 Bus263 -0.068 -0.028 89.5 92.2

Bus266 0.480 99.846 -0.4 0 0 0 0 Bus267 0.000 0.000 0.0 0.0

Bus267 13.800 99.846 -0.4 0 0 0 0 G12 0.000 0.000 0.0 0.0

Bus266 0.000 0.000 0.0 0.0

Bus271 0.208 99.846 -0.4 0 0 0 0 G12 0.000 0.000 0.0 0.0

Bus275 0.208 98.802 -0.9 0 0 0.024 0.012 G12 -0.024 -0.012 76.5 90.0

Bus278 0.220 94.653 -0.7 0 0 0.109 0.057 G13 -0.109 -0.057 341.5 88.6

Bus280 0.208 98.881 -0.9 0 0 0.017 0.008 G30 -0.017 -0.008 52.8 91.6

Bus285 0.208 98.915 -0.9 0 0 0.017 0.008 G5 -0.017 -0.008 52.8 91.6

Bus291 0.480 98.623 -1.1 0 0 0.011 0.005 G35 -0.011 -0.005 14.2 91.6

Bus293 0.208 98.858 -0.9 0 0 0.033 0.014 Bus294 -0.033 -0.014 99.9 91.6

Bus294 13.800 99.850 -0.4 0 0 0 0 G23 -0.033 -0.015 1.5 91.2

Bus293 0.033 0.015 1.5 91.2

Bus295 0.480 101.071 -1.1 0 0 0.011 0.005 Bus296 -0.011 -0.005 14.6 91.6

Bus296 13.800 99.850 -0.4 0 0 0 0 G23 -0.011 -0.005 0.5 91.1

Bus295 0.011 0.005 0.5 91.1 -2.500

Bus299 0.240 100.951 -1.2 0 0 0.009 0.004 P20-10B -0.009 -0.004 22.7 92.3

Bus301 0.480 99.639 -0.5 0 0 0.010 0.004 P26-10B -0.010 -0.004 12.9 92.3

Bus304 0.480 99.640 -0.5 0 0 0.007 0.003 P27-10B -0.007 -0.003 9.7 92.3

Bus305 0.480 105.261 1.1 0 0 0 0 Bus25-3 0.000 0.000 0.0 100.0


ETAP
Project: C.S.E RPLC Page: 59
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus307 0.480 100.012 -0.3 0 0 0 0 Bus3-2 0.000 0.000 0.0 0.0

Bus313-1 0.480 98.587 -1.0 0 0 0.085 0.053 Bus103-1-1 -0.085 -0.053 122.0 85.0

Bus_G6 13.800 100.250 1.1 10.000 6.400 0 0 PPE BARRA_A 10.000 6.400 495.5 84.2

BXFR-53-5D01 34.500 99.733 -2.0 0 0 0 0 PDC-53-5A01A -0.546 -0.285 10.3 88.7

PDC-53-3D01 A 0.546 0.285 10.3 88.7

C.DE BOMBAS"E"(2,4) 2.400 100.013 1.0 0 0 0 0 CCM"E"(2.4) 0.066 0.039 18.4 86.0

G15 -0.066 -0.039 18.4 86.0

C.DE BOMBAS"E"(4,16) 4.160 99.944 0.9 0 0 0 0 CCM"E"(4,16) 0.204 0.121 32.9 86.0

G15 -0.204 -0.121 32.9 86.0

C.DE BOMBAS"E"(480) 0.480 100.045 1.0 0 0 0 0 CCM"E"(480) 0.019 0.011 26.4 86.0

G15 -0.019 -0.011 26.4 86.0

C.DE BOMBAS"F" (2,4) 2.400 99.546 -0.6 0 0 0 0 CCM"F"(2,4) 0.275 0.163 77.4 86.0

G16 -0.275 -0.163 77.4 86.0

C.DE BOMBAS"F"(4,16) 4.160 99.397 -0.7 0 0 0 0 CCM"F"(4,16) 0.664 0.394 107.8 86.0

G16 -0.664 -0.394 107.8 86.0

C.DE BOMBAS"F"(480) 0.480 99.783 -0.4 0 0 0 0 CCM"F"(480) 0.041 0.024 57.7 86.0

G16 -0.041 -0.024 57.7 86.0

CASETA 1 13.800 100.066 1.1 0 0 0 0 n22 0.015 0.011 0.8 80.9

CASETA 1-6H -0.058 -0.034 2.8 86.4

RESP CASETA1-3I 0.043 0.023 2.0 88.2

CASETA 1-6H 13.800 100.066 1.1 0 0 0 0 P1-4G -0.101 -0.057 4.9 87.2

CASETA 2-6H 0.043 0.023 2.0 88.2

CASETA 1 0.058 0.034 2.8 86.4

CASETA 2 13.800 100.064 1.1 0 0 0 0 n23 0.016 0.010 0.8 84.9

RESP CASETA2-3I -0.008 -0.005 0.4 84.9

CASETA 2-6H -0.008 -0.005 0.4 84.9

CASETA 2-6H 13.800 100.064 1.1 0 0 0 0 CASETA 1-6H -0.043 -0.023 2.0 88.1

CASETA 3-6H 0.035 0.018 1.7 88.8

CASETA 2 0.008 0.005 0.4 84.9

CASETA 3 13.800 100.063 1.1 0 0 0.047 0.023 n24 0.024 0.014 1.2 85.9

CASETA 3-6H -0.035 -0.018 1.7 88.7

RESP CASETA3-3I -0.035 -0.018 1.7 88.7

CASETA 3-6H 13.800 100.063 1.1 0 0 0 0 CASETA 2-6H -0.035 -0.018 1.7 88.7

CASETA 3 0.035 0.018 1.7 88.7

CCM"E"(2.4) 2.400 99.969 1.0 0 0 0.066 0.039 C.DE BOMBAS"E"(2,4) -0.066 -0.039 18.4 86.0

CCM"E"(4,16) 4.160 99.899 0.9 0 0 0.203 0.121 C.DE BOMBAS"E"(4,16) -0.203 -0.121 32.9 86.0

CCM"E"(480) 0.480 99.693 1.0 0 0 0.019 0.011 C.DE BOMBAS"E"(480) -0.019 -0.011 26.4 86.0

CCM"F"(2,4) 2.400 99.364 -0.6 0 0 0.275 0.163 C.DE BOMBAS"F" (2,4) -0.275 -0.163 77.4 86.0
ETAP
Project: C.S.E RPLC Page: 60
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

CCM"F"(4,16) 4.160 99.250 -0.7 0 0 0.663 0.393 C.DE BOMBAS"F"(4,16) -0.663 -0.393 107.8 86.0

CCM"F"(480) 0.480 99.016 -0.4 0 0 0.041 0.024 C.DE BOMBAS"F"(480) -0.041 -0.024 57.7 86.0

CCM A/SERV. 0.480 100.788 -1.0 0 0 0.014 0.009 PLANT AGUA SERV EL -0.014 -0.009 19.7 85.0
CHAURE
CDD "A" 34.500 99.741 -2.0 0 0 9.983 5.259 PDC-53-5A01A -9.983 -5.259 189.3 88.5

CDD "B" 34.500 99.741 -2.0 0 0 9.983 5.259 PDC-53-5A01B -9.983 -5.259 189.3 88.5

CONTROL C DE BOMBAS 13.800 99.913 -0.3 0 0 0 0 P1-7F -0.025 -0.012 1.2 90.9

Bus9-2 0.025 0.012 1.2 90.9

DA-3 BARRA G (2.4) 2.400 99.843 0.8 0 0 0 0 BARRA "G" DA-3 0.110 0.065 30.9 86.0

n41 -0.110 -0.065 30.9 86.0

DA-3 BARRA G (480) 0.480 99.464 0.7 0 0 0 0 BARRA "G" DA-3. 0.052 0.031 72.6 86.0

n32 -0.113 -0.067 159.1 86.0

Bus19-1 0.061 0.037 86.5 86.0

DA-3 BARRA H (2.4) 2.400 99.445 -0.7 0 0 0 0 BARRA "H" DA-3 0.150 0.089 42.1 86.0

n42 -0.150 -0.089 42.1 86.0

DA-3 BARRA H (480) 0.480 99.120 -0.8 0 0 0 0 BARRA "H" DA-3. 0.041 0.024 58.0 86.0

B21 0.034 0.020 48.4 86.0

n30 0.009 0.003 11.4 94.9

n31 0.009 0.003 11.4 94.9

n33 -0.128 -0.071 178.0 87.3

Bus21-3 0.035 0.021 49.1 86.0

G1-1 13.800 100.248 1.1 0 0 0 0 PPE BARRA_A -1.595 -0.947 77.4 86.0

G28-1 0.909 0.521 43.7 86.8

G3-1 0.686 0.426 33.7 85.0

Bus27-3-1 0.000 0.000 0.0 0.0

G2-1 13.800 100.012 -0.3 0 0 0 0 PPE BARRA_B -1.149 -0.679 55.8 86.1

G29-1 0.612 0.357 29.6 86.4

G4-1 0.451 0.268 21.9 86.0

Bus29-3-1 0.086 0.054 4.2 84.4

G3-1 13.800 100.224 1.1 0 0 0 0 G1-1 -0.686 -0.426 33.7 85.0

G7-1 0.479 0.299 23.6 84.8

Bus139-1 0.000 0.000 0.0 100.0

Bus106-1-1 0.207 0.127 10.1 85.3

G4-1 13.800 99.996 -0.3 0 0 0 0 G2-1 -0.451 -0.268 21.9 86.0

G6-1 0.231 0.133 11.2 86.7

Bus141-1 0.000 0.000 0.0 0.0

Bus129-1 0.220 0.135 10.8 85.3

G5 13.800 99.964 -0.3 0 0 0 0 G30 1.016 0.576 48.9 87.0

G36 -1.033 -0.584 49.6 87.1


ETAP
Project: C.S.E RPLC Page: 61
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus285 0.017 0.008 0.8 91.2

G6-1 13.800 99.987 -0.3 0 0 0 0 G4-1 -0.231 -0.133 11.2 86.7

Bus154-1-1 0.146 0.095 7.3 83.7

Bus149-1-1 0.086 0.038 3.9 91.4

G7-1 13.800 100.203 1.1 0 0 0 0 G3-1 -0.479 -0.299 23.6 84.8

Bus157-1-1 0.479 0.299 23.6 84.8

Bus145-1-1 0.000 0.000 0.0 0.0

G10 13.800 99.850 -0.4 0 0 0 0 G11 0.561 0.342 27.5 85.4

Bus260 0.235 0.126 11.2 88.2

Bus244 0.010 0.007 0.5 84.6

G23 -0.807 -0.475 39.2 86.2

G11 13.800 99.846 -0.4 0 0 0 0 TQ LABORATORIO 10B 0.460 0.295 22.9 84.2

G10 -0.561 -0.342 27.5 85.4

G12 0.025 0.012 1.2 89.6

P40-10B 0.076 0.035 3.5 90.8

Bus240 0.000 0.000 0.0 0.0 -2.500

G12 13.800 99.846 -0.4 0 0 0 0 G11 -0.025 -0.012 1.2 89.6

Bus267 0.000 0.000 0.0 0.0

Bus248 0.000 0.000 0.0 0.0

Bus271 0.000 0.000 0.0 0.0

Bus275 0.025 0.012 1.2 89.6

G13 13.800 99.865 -0.4 0 0 0 0 G23 0.851 0.495 41.2 86.5

G30 -0.961 -0.553 46.4 86.7

Bus278 0.109 0.058 5.2 88.3 5.000

G14 13.800 100.236 1.1 0 0 0 0 G17 0.000 0.000 0.0 100.0

G15 13.800 100.095 1.0 0 0 0 0 PDC_RPLC BARRA "E" -0.288 -0.172 14.0 85.9

C.DE BOMBAS"E"(480) 0.019 0.011 0.9 86.0

C.DE BOMBAS"E"(4,16) 0.204 0.121 9.9 85.9

C.DE BOMBAS"E"(2,4) 0.066 0.039 3.2 85.9

G16 13.800 99.894 -0.3 0 0 0 0 PDC_RPLC BARRA "F" -0.981 -0.591 48.0 85.7

C.DE BOMBAS"F"(4,16) 0.665 0.401 32.5 85.6

C.DE BOMBAS"F" (2,4) 0.275 0.165 13.5 85.7

C.DE BOMBAS"F"(480) 0.041 0.025 2.0 85.9

G17 13.800 100.236 1.1 0 0 0 0 G18 0.000 0.000 0.0 100.0

G14 0.000 0.000 0.0 100.0

G18 13.800 100.236 1.1 0 0 0 0 G31 -0.155 -0.093 7.6 85.7

G17 0.000 0.000 0.0 100.0

G37 0.155 0.093 7.6 85.7

G19 13.800 100.249 1.1 0 0 0 0 G21 0.000 0.000 0.0 100.0


ETAP
Project: C.S.E RPLC Page: 62
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

G20 13.800 100.012 -0.3 0 0 0 0 G22 0.000 0.000 0.0 0.0

G21 13.800 100.249 1.1 0 0 0 0 PPE BARRA_A -0.039 -0.023 1.9 85.9

G26 0.039 0.023 1.9 85.9

G19 0.000 0.000 0.0 100.0

G22 13.800 100.012 -0.3 0 0 0 0 PPE BARRA_B -0.059 -0.035 2.9 85.9

G27 0.059 0.035 2.9 85.9

G20 0.000 0.000 0.0 0.0

G23 13.800 99.850 -0.4 0 0 0 0 G13 -0.851 -0.494 41.2 86.5

Bus294 0.033 0.015 1.5 91.2

Bus296 0.011 0.005 0.5 91.1

G10 0.807 0.475 39.2 86.2

G24-1 13.800 100.006 -0.3 0 0 0 0 G29-1 -0.138 -0.069 6.5 89.4

Bus49-1-1 0.138 0.069 6.5 89.4

Bus62-1-1 0.000 0.000 0.0 0.0

G25-1 13.800 100.233 1.1 0 0 0 0 G28-1 -0.442 -0.238 20.9 88.1

Bus48-1-1 0.210 0.117 10.0 87.4

Bus56-1-1 0.231 0.121 10.9 88.7

G26 13.800 100.249 1.1 0 0 0 0 G21 -0.039 -0.023 1.9 85.9

Bus64-1 0.000 0.000 0.0 100.0

barra a 480v STG 0.039 0.023 1.9 85.9

G27 13.800 100.012 -0.3 0 0 0 0 G22 -0.059 -0.035 2.9 85.9

Bus73-1 0.000 0.000 0.0 0.0

Bus31-3 0.059 0.035 2.9 85.9

G28-1 13.800 100.245 1.1 0 0 0 0 G25-1 0.442 0.238 20.9 88.1

G1-1 -0.909 -0.521 43.7 86.8

BARRA"A"4,16-1 0.403 0.245 19.7 85.5

BARRA"A"480V-1 0.064 0.038 3.1 85.8

G29-1 13.800 100.010 -0.3 0 0 0 0 G24-1 0.138 0.069 6.5 89.4

G2-1 -0.612 -0.357 29.6 86.4

BARRA"B"4,16-1 0.411 0.249 20.1 85.5

BARRA"B"480V-1 0.064 0.038 3.1 85.8

G30 13.800 99.930 -0.4 0 0 0 0 G13 0.961 0.553 46.4 86.7

G5 -1.015 -0.575 48.9 87.0

G35 0.037 0.014 1.7 93.4

Bus280 0.017 0.008 0.8 91.2

G31 13.800 100.239 1.1 0 0 0 0 G33 -0.487 -0.294 23.8 85.6

G18 0.155 0.093 7.6 85.7

TQ_1 0.111 0.070 5.5 84.6

Bus41-3 0.054 0.026 2.5 90.3


ETAP
Project: C.S.E RPLC Page: 63
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

TQ LABORATORIO 10A 0.166 0.105 8.2 84.4

G32 13.800 100.231 1.1 0 0 0 0 G37 -0.155 -0.093 7.6 85.7

P24-10A 0.155 0.093 7.6 85.7

G33 13.800 100.241 1.1 0 0 0.160 0.053 PPE BARRA_A -0.647 -0.347 30.6 88.1

G31 0.487 0.294 23.8 85.6

G34 13.800 99.841 -0.4 0 0 0 0 TQ LABORATORIO 10B -0.317 -0.204 15.8 84.1

Bus238 0.317 0.204 15.8 84.1 -2.500

G35 13.800 99.930 -0.4 0 0 0 0 G30 -0.037 -0.014 1.7 93.4

P24-10B 0.009 0.002 0.4 97.4

P26-10B 0.017 0.007 0.8 92.3

Bus291 0.011 0.005 0.5 91.1

G36 13.800 99.999 -0.3 0 0 0 0 PPE BARRA_B -1.033 -0.584 49.6 87.1

G5 1.033 0.584 49.6 87.1

G37 13.800 100.233 1.1 0 0 0 0 G18 -0.155 -0.093 7.6 85.7

G32 0.155 0.093 7.6 85.7

G38 13.800 100.187 1.1 0 0 0 0 G39 0.092 0.055 4.5 85.6

P6-10A -0.091 -0.055 4.5 85.6

G39 13.800 100.187 1.1 0 0 0 0 G38 -0.092 -0.055 4.5 85.6

Line41~ 0.000 0.000 0.0 -0.3

Bus228 0.092 0.055 4.5 85.6

G-1 13.800 100.151 1.1 0 0 0 0 G-5 -0.247 -0.146 12.0 86.0

PLT. DE ASFALTO 0.247 0.146 12.0 86.0

G-2 13.800 99.885 -0.4 0 0 0 0 G-4 0.000 0.000 0.0 0.0

G-4 13.800 99.885 -0.4 0 0 0 0 BARRA "H" -0.305 -0.175 14.7 86.7

G-7 0.305 0.175 14.7 86.7

G-2 0.000 0.000 0.0 0.0

G-5 13.800 100.165 1.1 0 0 0 0 BARRA "G" -0.497 -0.293 24.1 86.1

G-6 0.250 0.147 12.1 86.3

G-1 0.247 0.146 12.0 86.0

G-6 13.800 100.155 1.1 0 0 0 0 G-5 -0.250 -0.147 12.1 86.3

n41 0.110 0.066 5.4 85.8

n32 0.113 0.068 5.5 85.6

Bus168 0.027 0.012 1.2 90.8

G-7 13.800 99.871 -0.4 0 0 0 0 G-4 -0.305 -0.175 14.7 86.7

n42 0.150 0.090 7.3 85.7

n33 0.129 0.073 6.2 87.0

Bus166 0.027 0.012 1.2 90.8

G-8 (BOMBA DE TRANF.) 13.800 100.157 1.1 0 0 0 0 P2-7G (AGUA SALADA) -0.058 -0.035 2.8 85.9

B7 0.000 0.000 0.0 0.0


ETAP
Project: C.S.E RPLC Page: 64
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

B6 0.058 0.035 2.8 85.9

G/N 13.800 99.868 -0.2 0 0 0 0 P7-7F -0.026 -0.012 1.2 90.9

Bus108-1 0.007 0.003 0.3 91.0

Bus104-1 0.018 0.008 0.8 90.9

GD 13.800 98.714 0.6 0 0 0 0 P23-6E (PLANTA DE -0.336 -0.161 15.8 90.2


HIELO)
PMG1 0.336 0.161 15.8 90.2

* Gua. II 230 230.000 100.000 0.0 -116.692 -67.922 0 0 Bus6-3 -58.346 -33.961 169.5 86.4

Bus7-4 -58.346 -33.961 169.5 86.4

GX 13.800 99.912 -0.3 0 0 0 0 PDC_RPLC BARRA "F" -0.340 -0.204 16.6 85.7

JET-A1 0.340 0.204 16.6 85.7

JET-A1 4.160 99.535 -0.6 0 0 0 0 Bus22-4 0.170 0.101 27.5 86.0

Bus23-3 0.170 0.101 27.5 86.0

GX -0.339 -0.201 55.0 86.0

LPG.1 0.480 99.920 1.0 0 0 0.014 0.008 P16-7E (GLP) -0.014 -0.008 19.2 86.0

LPG.2 2.400 99.761 0.8 0 0 0.071 0.042 P17-7E (GLP) -0.071 -0.042 19.8 86.0

MCC-19-2B01, 0.480 98.371 -3.3 0 0 0.093 0.047 PDC-53-2B01A -0.093 -0.047 126.8 89.4

MCC-19-2B02 0.480 98.426 -3.2 0 0 0.093 0.047 PDC-53-2B01B -0.093 -0.047 127.1 89.4

MCC-20-2B01 0.480 98.368 -3.3 0 0 0.621 0.315 PDC-53-2B01A -0.621 -0.315 851.4 89.2

MCC-20-2B02 0.480 98.422 -3.2 0 0 0.637 0.339 PDC-53-2B01B -0.637 -0.339 882.0 88.3

MCC-20-2B03B 0.480 98.425 -3.2 0 0 0.182 0.084 PDC-53-2B01B -0.182 -0.084 245.3 90.9

MCC-45-2B01 0.480 108.381 -3.3 0 0 0.517 0.249 PDC-53-2B02A -0.517 -0.249 636.6 90.1

MCC-45-2B02 0.480 98.175 -3.4 0 0 0.357 0.174 PDC-53-2B02B -0.357 -0.174 486.3 89.8

MCC-45-2B03A 0.480 108.383 -3.3 0 0 0.139 0.086 PDC-53-2B02A -0.139 -0.086 181.8 85.0

MCC-45-2B03B 0.480 98.177 -3.4 0 0 0.129 0.080 PDC-53-2B02B -0.129 -0.080 185.4 85.0

MCC-46-2D01 0.480 98.803 -2.9 0 0 0.097 0.048 PDC-53-2D01 A -0.097 -0.048 132.2 89.7

MCC-46-2D02. 0.480 98.805 -2.9 0 0 0.052 0.026 PDC-53-2D01 B -0.052 -0.026 71.2 89.2

MCC-47-2D01 0.480 98.802 -2.9 0 0 0.133 0.063 PDC-53-2D01 A -0.133 -0.063 179.1 90.3

MCC-47-2D02 0.480 98.805 -2.9 0 0 0.027 0.014 PDC-53-2D01 B -0.027 -0.014 37.6 88.8

MCC-48-2D01 0.480 98.803 -2.9 0 0 0.038 0.018 PDC-53-2D01 A -0.038 -0.018 51.2 90.0

MCC-48-2D02 0.480 98.805 -2.9 0 0 0 0 PDC-53-2D01 B 0.000 0.000 0.0 0.0

MCC-49-2D01 0.480 98.802 -2.9 0 0 0.143 0.071 PDC-53-2D01 A -0.143 -0.071 195.0 89.5

MCC-49-2D03A 0.480 98.803 -2.9 0 0 0.087 0.054 PDC-53-2D01 A 0.017 -0.010 23.9 -84.9

MCC-49-2D03B -0.104 -0.044 137.4 92.2

MCC-49-2D03B 0.480 98.803 -2.9 0 0 0.212 0.127 PDC-53-2D01 B -0.316 -0.170 436.8 88.0

MCC-49-2D03A 0.104 0.044 137.4 92.2

MCC-53-3B01 4.160 103.750 -3.0 0 0 0 0 Bus53 0.342 0.145 49.7 92.1

Bus54 0.180 0.077 26.2 91.9

Bus55 0.257 0.109 37.4 92.1


ETAP
Project: C.S.E RPLC Page: 65
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus56 1.914 0.938 285.1 89.8

Bus57 0.115 0.050 16.8 91.7

Bus58 0.605 0.250 87.5 92.4

PDC-53-3B01A -3.413 -1.569 502.5 90.9

MCC-53-3B02 4.160 98.757 -3.0 0 0 0 0 Bus64 0.180 0.076 27.5 92.0

Bus65 1.916 0.933 299.4 89.9

Bus61 1.340 0.656 209.6 89.8

PDC-53-3B01B -3.435 -1.665 536.5 90.0

MCC-53-3B03 4.160 104.102 -2.6 0 0 0 0 Bus81 0.447 0.380 78.2 76.2

Bus82 0.405 0.170 58.5 92.2

Bus83 0.173 0.074 25.1 91.9

Bus87 0.183 0.078 26.5 91.9

PDC-53-3B02A -1.207 -0.702 186.2 86.5

MCC-53-3B04 4.160 98.862 -2.8 0 0 0 0 Bus97 0.233 0.099 35.5 92.1

Bus98 0.117 0.051 17.9 91.7

Bus99 0.173 0.074 26.4 91.9

Bus101 0.902 0.761 165.7 76.4

Bus103 0.713 0.288 107.9 92.7

PDC-53-3B02B -2.137 -1.273 349.3 85.9

MMC-20-2B03A 0.480 98.370 -3.3 0 0 0.231 0.127 PDC-53-2B01A -0.231 -0.127 322.5 87.7

n1 2.400 104.939 0.7 0 0 0 0 B3-2 0.157 0.093 41.7 86.1

P2-7G (AGUA SALADA) -0.157 -0.093 41.7 86.1

n2 2.400 99.126 0.7 0 0 0.053 0.039 S/E TL 6G-4 -0.053 -0.039 16.0 81.0

n3 0.480 99.259 0.8 0 0 0.016 0.012 S/E TL 6G-3 -0.016 -0.012 24.0 81.0

n4 0.240 99.978 1.0 0 0 0.008 0.004 Bus67-1 -0.008 -0.004 20.6 91.0

n5 0.240 99.887 1.0 0 0 0.008 0.004 Bus68-1 -0.008 -0.004 20.6 91.0

n6 0.240 99.912 0.9 0 0 0.013 0.004 S/E TLG-2 -0.013 -0.004 33.0 95.0

n7 0.240 100.052 1.0 0 0 0.008 0.004 Bus80-1 -0.008 -0.004 20.6 91.0

n16 0.480 99.379 -0.7 0 0 0.006 0.002 P12-6H -0.006 -0.002 7.4 95.0

n19 0.480 99.352 -0.6 0 0 0.005 0.003 P31-6H -0.005 -0.003 6.4 86.0

n22 0.480 99.958 1.0 0 0 0.015 0.011 CASETA 1 -0.015 -0.011 22.0 81.0

n23 0.480 99.963 1.0 0 0 0.016 0.010 CASETA 2 -0.016 -0.010 22.0 85.0

n24 0.480 99.914 1.0 0 0 0.024 0.014 CASETA 3 -0.024 -0.014 33.1 86.0

n26 0.480 98.980 0.6 0 0 0.059 0.035 Bus19-1 -0.059 -0.035 83.2 86.0

n27 0.480 99.445 0.7 0 0 0.002 0.001 Bus19-1 -0.002 -0.001 3.3 86.0

n28 0.480 98.853 -0.8 0 0 0.032 0.019 Bus21-3 -0.032 -0.019 45.8 86.0

n29 0.480 99.100 -0.8 0 0 0.002 0.001 Bus21-3 -0.002 -0.001 3.3 86.0

n30 0.240 98.706 -1.0 0 0 0.009 0.003 DA-3 BARRA H (480) -0.009 -0.003 22.9 95.0
ETAP
Project: C.S.E RPLC Page: 66
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

n31 0.240 98.706 -1.0 0 0 0.009 0.003 DA-3 BARRA H (480) -0.009 -0.003 22.9 95.0

n32 13.800 100.151 1.1 0 0 0 0 G-6 -0.113 -0.068 5.5 85.6

DA-3 BARRA G (480) 0.113 0.068 5.5 85.6

n33 13.800 99.867 -0.4 0 0 0 0 G-7 -0.129 -0.073 6.2 87.0

DA-3 BARRA H (480) 0.129 0.073 6.2 87.0

n36 2.400 99.782 0.8 0 0 0.027 0.012 Bus168 -0.027 -0.012 7.1 91.0

n37 2.400 99.494 -0.6 0 0 0.027 0.012 Bus166 -0.027 -0.012 7.1 91.0

n38 2.400 97.133 -2.0 0 0 0 0 BC -0.019 -0.010 5.3 88.8

n39 0.019 0.010 5.3 88.8

n39 0.240 96.728 -2.3 0 0 0.019 0.010 n38 -0.019 -0.010 53.2 89.0

n41 13.800 100.151 1.1 0 0 0 0 G-6 -0.110 -0.066 5.4 85.8

DA-3 BARRA G (2.4) 0.110 0.066 5.4 85.8

n42 13.800 99.866 -0.4 0 0 0 0 G-7 -0.150 -0.090 7.3 85.7

DA-3 BARRA H (2.4) 0.150 0.090 7.3 85.7

P1-10B 13.800 99.929 -0.4 0 0 0 0 P17-10B 0.000 0.000 0.0 0.0

P1-4G 13.800 100.154 1.1 0 0 0 0 BARRA "G" -0.110 -0.057 5.2 88.8

P2-4G 0.009 0.003 0.4 94.0

CASETA 1-6H 0.101 0.054 4.8 88.3

P1-6E 13.800 100.096 1.0 0 0 0 0 PDC_RPLC BARRA "E" -3.026 0.491 128.1 -98.7

P3-6E 3.026 -0.491 128.1 -98.7

P1-6H7G 13.800 99.898 -0.4 0 0 0 0 BARRA "H" -0.217 -0.115 10.3 88.4

P31-6H 0.217 0.115 10.3 88.4

P1-7E 13.800 100.101 1.0 0 0 0 0 P4-7E 0.093 0.051 4.4 87.5

POSTE: 1-7E -0.093 -0.051 4.4 87.5

P1-7F 13.800 99.913 -0.3 0 0 0 0 PDC_RPLC BARRA "F" 0.788 -1.624 75.6 -43.6

CONTROL C DE BOMBAS 0.025 0.012 1.2 90.9

P3-7F -0.813 1.612 75.6 -45.0

P1-8H 13.800 99.805 -0.3 0 0 0 0 BARRA "H" -0.860 -0.561 43.0 83.8

Bus130 0.860 0.561 43.0 83.8

P2-4G 13.800 100.154 1.1 0 0 0 0 P1-4G -0.009 -0.003 0.4 92.9

P4-4G 0.009 0.003 0.4 92.9

P2-7G (AGUA SALADA) 13.800 100.173 1.1 0 0 0 0 BARRA "G" -0.215 -0.129 10.5 85.8

G-8 (BOMBA DE TRANF.) 0.058 0.035 2.8 85.9

n1 0.157 0.094 7.6 85.8 -5.000

P3-6E 13.800 100.022 1.0 0 0 0 0 P1-6E -3.023 0.493 128.1 -98.7

P7-6E 3.024 -0.493 128.1 -98.7

P3-6H 13.800 99.862 -0.4 0 0 0 0 P24-6H4G 0.111 0.053 5.2 90.1

P4-6H -0.111 -0.053 5.2 90.1


ETAP
Project: C.S.E RPLC Page: 67
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

P3-7F 13.800 99.898 -0.3 0 0 0 0 P1-7F 0.814 -1.612 75.6 -45.1

P7-7F -0.829 1.604 75.6 -45.9

Bus43-3 0.015 0.008 0.7 89.7

P4-4G 13.800 100.153 1.1 0 0 0 0 P2-4G -0.009 -0.004 0.4 92.2

P16-4G 0.009 0.004 0.4 92.2

P4-6E 13.800 98.900 0.6 0 0 0 0 P10-6E CRUZ DE LA 1.723 0.829 80.9 90.1
PALOMA
P13-6E -1.723 -0.829 80.9 90.1

P4-6G 13.800 100.128 1.1 0 0 0 0 P34-6G -0.127 -0.072 6.1 86.8

S/E TL 6G-3 0.070 0.051 3.6 81.0

P6-6G 0.051 0.019 2.3 93.7

Bus66-1 0.006 0.003 0.3 90.8

P4-6H 13.800 99.864 -0.4 0 0 0 0 P3-6H 0.111 0.053 5.2 90.1

P5-6H -0.111 -0.053 5.2 90.1

P4-7E 13.800 100.093 1.0 0 0 0 0 P8-7E 0.093 0.052 4.4 87.3

P1-7E -0.093 -0.052 4.4 87.3

P5-6H 13.800 99.866 -0.4 0 0 0 0 P4-6H 0.111 0.053 5.2 90.1

P6-6H -0.111 -0.053 5.2 90.1

P6-10A 13.800 100.193 1.1 0 0 0 0 G38 0.091 0.055 4.5 85.7

P9-10A -0.091 -0.055 4.5 85.7

P6-6G 13.800 100.126 1.1 0 0 0 0 Bus67-1 0.008 0.004 0.4 90.9

Bus68-1 0.008 0.004 0.4 90.9

Bus71-1 0.008 0.004 0.4 90.9

P4-6G -0.051 -0.019 2.3 93.6

P22-6G 0.027 0.008 1.2 95.6

P6-6H 13.800 99.869 -0.4 0 0 0 0 P5-6H 0.111 0.053 5.2 90.2

P9-6H -0.111 -0.053 5.2 90.2

P7-6E 13.800 99.865 0.9 0 0 0 0 P3-6E -3.018 0.498 128.1 -98.7

P10-6E 3.018 -0.498 128.2 -98.7

P7-7F 13.800 99.868 -0.2 0 0 0 0 P3-7F 0.831 -1.603 75.6 -46.0

P33-7F -0.859 1.590 75.7 -47.5

G/N 0.026 0.012 1.2 90.9

P10-7F 0.002 0.001 0.1 95.4

P8-7E 13.800 100.085 1.0 0 0 0 0 P4-7E -0.093 -0.052 4.4 87.2

P9-7E 0.093 0.052 4.4 87.2

Bus35-3 0.000 0.000 0.0 0.0

P9-10A 13.800 100.198 1.1 0 0 0 0 P17-10A -0.091 -0.055 4.4 85.7

P6-10A 0.091 0.055 4.4 85.7

P9-6H 13.800 99.875 -0.4 0 0 0 0 P6-6H 0.111 0.053 5.2 90.2


ETAP
Project: C.S.E RPLC Page: 68
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

P12-6H -0.202 -0.108 9.6 88.2

S/E TL6H-1 MANIFOLT 0.091 0.055 4.4 85.7


NORTE
P9-7E 13.800 100.083 1.0 0 0 0 0 P8-7E -0.093 -0.052 4.5 87.2

P10-7E 0.093 0.052 4.5 87.2

Bus37-3 0.000 0.000 0.0 0.0 5.000

P9-8H 13.800 100.134 1.1 0 0 0 0 P38-6G8H -0.010 -0.005 0.5 88.7

Bus82-1 0.010 0.005 0.5 88.7

P10-6E 13.800 99.755 0.8 0 0 0 0 P7-6E -3.014 0.501 128.2 -98.6

P11-6E 3.015 -0.501 128.2 -98.6

P10-6E CRUZ DE LA 13.800 98.832 0.6 0 0 0 0 P4-6E -1.722 -0.828 80.9 90.1
PALOMA
P11/6E 1.722 0.828 80.9 90.1

P10-7E 13.800 100.069 1.0 0 0 0 0 P9-7E -0.093 -0.053 4.5 87.0

P16-7E (GLP) 0.093 0.053 4.5 87.0

P10-7F 13.800 99.868 -0.2 0 0 0 0 P7-7F -0.002 -0.001 0.1 92.6

P11-7F 0.000 0.000 0.0 0.0

Bus114-1 0.002 0.001 0.1 90.6

P11/6E 13.800 98.783 0.6 0 0 0 0 P25-6E 1.371 0.662 64.5 90.1

P14-6E 0.351 0.166 16.4 90.4

P10-6E CRUZ DE LA -1.722 -0.827 80.9 90.1


PALOMA
P11-6E 13.800 99.718 0.8 0 0 0 0 P10-6E -3.013 0.502 128.2 -98.6

P12-6E 3.013 -0.502 128.2 -98.6

P11-7F 13.800 99.868 -0.2 0 0 0 0 P12-7F 0.000 0.000 0.0 0.0

P10-7F 0.000 0.000 0.0 0.0

Bus118-2 0.000 0.000 0.0 0.0

P11-8H (S/E BOM DE 13.800 99.607 -0.4 0 0 0 0 Bus85-1 0.849 0.558 42.7 83.5
CARGA)
Bus130 -0.858 -0.560 43.1 83.7

P37-8H 0.006 0.000 0.3 99.9

Bus84-1 0.003 0.002 0.2 88.7

P12-6E 13.800 99.682 0.8 0 0 0 0 P13-7F 3.012 -0.502 128.2 -98.6

P11-6E -3.012 0.503 128.2 -98.6

Line33~ 0.000 0.000 0.0 0.0

P12-6H 13.800 99.887 -0.4 0 0 0 0 P9-6H 0.202 0.107 9.6 88.3

P13-6H -0.208 -0.109 9.8 88.5

n16 0.006 0.002 0.3 94.8

P12-7F 13.800 99.868 -0.2 0 0 0 0 P11-7F 0.000 0.000 0.0 0.0

P13-4G 13.800 99.826 -0.4 0 0 0 0 Bus169 0.111 0.055 5.2 89.5

P24-6H4G -0.111 -0.055 5.2 89.7


ETAP
Project: C.S.E RPLC Page: 69
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Line138~ 0.000 -0.001 0.0 0.0

P13-6E 13.800 99.439 0.7 0 0 0 0 BCI 13,8 "A" -1.739 -0.839 81.2 90.1

P15-6E 0.008 0.004 0.4 87.3

P4-6E 1.732 0.835 80.9 90.1

P13-6H 13.800 99.892 -0.4 0 0 0 0 P12-6H 0.208 0.109 9.8 88.5

P31-6H -0.212 -0.112 10.1 88.4

Bus138 0.005 0.003 0.2 85.8

P13-7F 13.800 99.645 0.7 0 0 0 0 P14-7F 0.132 0.079 6.5 85.7

P12-6E -3.011 0.504 128.2 -98.6

P15-7F 2.878 -0.583 123.3 -98.0

P14-6E 13.800 98.773 0.6 0 0 0 0 P11/6E -0.351 -0.166 16.4 90.4

P16-6E 0.341 0.162 16.0 90.3

Bus75-1 0.010 0.003 0.5 94.5 -2.500

P14-7F 13.800 99.645 0.7 0 0 0 0 P13-7F -0.132 -0.079 6.5 85.7

B.DE TRANF 2,4KV 0.132 0.079 6.5 85.7

P15-6E 13.800 99.439 0.7 0 0 0 0 Bus79-1 0.008 0.004 0.4 85.9

P13-6E -0.008 -0.004 0.4 87.0

P17-6E 0.000 0.000 0.0 0.2

P15-7F 13.800 99.577 0.7 0 0 0 0 Bus180 0.209 0.126 10.3 85.8

P17-7F 0.925 -1.550 75.9 -51.2

BCI 13,8 "B" 1.741 0.840 81.2 90.1

P13-7F -2.876 0.585 123.3 -98.0

P16-4G 13.800 100.151 1.1 0 0 0 0 P4-4G -0.009 -0.005 0.4 88.6

Line140~ 0.000 -0.001 0.0 0.0

B14 0.009 0.005 0.4 85.9 -2.500

P16-6E 13.800 98.759 0.6 0 0 0 0 P19-6E 0.341 0.162 16.0 90.3

P14-6E -0.341 -0.162 16.0 90.3

P16-7E (GLP) 13.800 100.057 1.0 0 0 0 0 P10-7E -0.093 -0.053 4.5 86.8

P17-7E (GLP) 0.079 0.045 3.8 86.9

LPG.1 0.014 0.008 0.7 85.9

P17-10A 13.800 100.212 1.1 0 0 0 0 P24-10A -0.123 -0.074 6.0 85.6

P9-10A 0.091 0.054 4.4 86.0

Bus198 0.032 0.020 1.6 84.8

P17-10B 13.800 99.929 -0.4 0 0 0 0 P20-10B 0.000 0.001 0.1 0.0

P1-10B 0.000 -0.001 0.1 0.0

P17-3I 13.800 100.055 1.0 0 0 0 0 P18-7E3I -0.008 -0.004 0.4 90.7

Bus46-1 0.008 0.004 0.4 90.7

P17-6E 13.800 99.439 0.7 0 0 0 0 P15-6E 0.000 0.000 0.0 0.5

P18-6E 0.000 0.000 0.0 -0.8


ETAP
Project: C.S.E RPLC Page: 70
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

P17-7E (GLP) 13.800 100.055 1.0 0 0 0 0 P16-7E (GLP) -0.079 -0.045 3.8 86.9

P18-7E3I 0.008 0.003 0.4 95.1

LPG.2 0.071 0.042 3.4 85.8

P17-7F 13.800 99.592 0.6 0 0 0 0 P15-7F -0.924 1.551 75.8 -51.2

P26-7F 0.924 -1.551 75.8 -51.2

P18-6E 13.800 99.439 0.7 0 0 0 0 P17-6E 0.000 0.000 0.0 100.0

Bus51-1 0.000 0.000 0.0 0.0

P18-7E3I 13.800 100.055 1.0 0 0 0 0 P17-3I 0.008 0.004 0.4 91.0

P17-7E (GLP) -0.008 -0.003 0.4 94.9

Line94~ 0.000 -0.001 0.0 0.0

P19-6E 13.800 98.739 0.6 0 0 0 0 P16-6E -0.340 -0.162 16.0 90.3

Bus77-1 0.340 0.162 16.0 90.3

Bus81-1 0.000 0.000 0.0 0.0

P20-10B 13.800 99.929 -0.4 0 0 0 0 P24-10B -0.009 -0.002 0.4 96.6

P17-10B 0.000 -0.001 0.1 0.0

Bus299 0.009 0.004 0.4 91.7 -2.500

P22-6G 13.800 100.119 1.1 0 0 0 0 S/E TLG-2 0.013 0.004 0.6 94.9

Bus80-1 0.008 0.004 0.4 91.0

P6-6G -0.027 -0.009 1.2 94.5

P30-6G 0.006 0.002 0.3 97.2

P23-6E (PLANTA DE 13.800 98.720 0.6 0 0 0 0 GD 0.336 0.161 15.8 90.2


HIELO)
Bus77-1 -0.336 -0.161 15.8 90.2

P24-10A 13.800 100.230 1.1 0 0 0 0 G32 -0.155 -0.093 7.6 85.7

P17-10A 0.123 0.074 6.0 85.8

Line20~ 0.000 -0.001 0.0 0.0

Bus196 0.032 0.020 1.6 84.8

P24-10B 13.800 99.929 -0.4 0 0 0 0 G35 -0.009 -0.002 0.4 97.4

P20-10B 0.009 0.002 0.4 97.4

P24-6H4G 13.800 99.858 -0.4 0 0 0 0 P13-4G 0.111 0.054 5.2 90.1

P3-6H -0.111 -0.054 5.2 90.1

P25-6E 13.800 98.744 0.6 0 0 0 0 P11/6E -1.370 -0.661 64.5 90.1

Bus53-1 1.335 0.644 62.8 90.1

Bus50-1 0.035 0.017 1.7 90.2 -5.000

P26-10B 13.800 99.929 -0.4 0 0 0 0 G35 -0.017 -0.007 0.8 92.3

P27-10B 0.007 0.003 0.3 92.5

Bus301 0.010 0.004 0.4 92.1

P26-7F 13.800 99.630 0.5 0 0 0 0 P30-7F 0.920 -1.553 75.8 -51.0

P17-7F -0.920 1.553 75.8 -51.0


ETAP
Project: C.S.E RPLC Page: 71
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

P27-10B 13.800 99.929 -0.4 0 0 0 0 P26-10B -0.007 -0.003 0.3 92.1

Bus304 0.007 0.003 0.3 92.1

P30-6G 13.800 100.118 1.1 0 0 0 0 P22-6G -0.006 -0.002 0.3 94.8

Bus148 0.006 0.002 0.3 94.8

P30-7F 13.800 99.652 0.4 0 0 0 0 P31-7F 0.918 -1.555 75.8 -50.8

P26-7F -0.918 1.555 75.8 -50.9

P31-6H 13.800 99.892 -0.4 0 0 0 0 P13-6H 0.212 0.112 10.1 88.4

P1-6H7G -0.217 -0.115 10.3 88.4

n19 0.005 0.003 0.2 85.8

P31-7F 13.800 99.658 0.4 0 0 0 0 P30-7F -0.918 1.555 75.8 -50.8

P37-7F 0.043 0.025 2.1 86.5

P48-7F 0.874 -1.580 75.8 -48.4

P33-7F 13.800 99.858 -0.2 0 0 0 0 P7-7F 0.860 -1.590 75.7 -47.6

P48-7F -0.860 1.590 75.7 -47.6

Bus98-1 0.000 0.000 0.0 0.0

P34-6G 13.800 100.135 1.1 0 0 0 0 BARRA "G" -0.137 -0.077 6.6 87.2

P4-6G 0.127 0.072 6.1 86.9

P38-6G8H 0.010 0.005 0.5 90.9

P37-7F 13.800 99.652 0.4 0 0 0 0 P39-6E (MEREY) 0.043 0.026 2.1 86.1

P31-7F -0.043 -0.026 2.1 86.1

P37-8H 13.800 99.605 -0.4 0 0 0 0 P11-8H (S/E BOM DE -0.006 -0.002 0.3 94.8
CARGA)
Bus144 0.006 0.002 0.3 94.8

P38-6G8H 13.800 100.135 1.1 0 0 0 0 P34-6G -0.010 -0.005 0.5 89.8

P9-8H 0.010 0.005 0.5 89.8

P39-6E (MEREY) 13.800 99.650 0.4 0 0 0 0 Bus5-4 0.043 0.026 2.1 85.9

Bus6-4 0.000 0.000 0.0 100.0

P37-7F -0.043 -0.026 2.1 86.0

P40-6E 0.000 0.000 0.0 0.0

P40-10B 13.800 99.846 -0.4 0 0 0 0 G11 -0.076 -0.035 3.5 90.8

Bus253 0.076 0.035 3.5 90.8

P40-6E 13.800 99.650 0.4 0 0 0 0 P39-6E (MEREY) 0.000 0.000 0.0 0.0

P48-7F 13.800 99.766 0.1 0 0 0 0 P33-7F 0.866 -1.586 75.8 -48.0

P31-7F -0.867 1.586 75.8 -48.0

PAL_A-1 16.500 104.445 3.8 0 0 0 0 BARRA_A1-1 140.000 92.962 5630.1 83.3

BARRA__A-1 -140.000 -92.962 5630.1 83.3

PDC-53-2A01A 0.480 99.561 -2.2 0 0 0.030 0.019 BP-XFR-53-5A01 -0.030 -0.019 42.5 85.0

PDC-53-2A01B 0.480 99.562 -2.2 0 0 0.030 0.018 BP-XFR-53-5A02 -0.030 -0.018 42.3 85.0

PDC-53-2B01A 0.480 98.372 -3.3 0 0 0 0 MCC-19-2B01, 0.093 0.047 126.8 89.4


ETAP
Project: C.S.E RPLC Page: 72
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

MCC-20-2B01 0.621 0.315 851.4 89.2

MMC-20-2B03A 0.231 0.127 322.5 87.7

BP-XFR-53-5B07 -0.945 -0.488 1300.5 88.8

PDC-53-2B01B 0.480 98.427 -3.2 0 0 0 0 MCC-19-2B02 0.093 0.047 127.1 89.4

MCC-20-2B02 0.637 0.339 882.0 88.3

MCC-20-2B03B 0.182 0.084 245.3 90.9

BP-XFR-53-5B08 -0.913 -0.469 1254.1 88.9

PDC-53-2B02A 0.480 108.384 -3.3 0 0 0 0 MCC-45-2B01 0.517 0.249 636.6 90.1

MCC-45-2B03A 0.139 0.086 181.8 85.0

PDC-53-3B02A -0.656 -0.336 817.7 89.0 5.000

PDC-53-2B02B 0.480 98.178 -3.4 0 0 0 0 MCC-45-2B02 0.357 0.174 486.3 89.8

MCC-45-2B03B 0.129 0.080 185.4 85.0

PDC-53-3B02B -0.485 -0.254 671.0 88.6

PDC-53-2D01 A 0.480 98.803 -2.9 0 0 0 0 MCC-46-2D01 0.097 0.048 132.2 89.7

MCC-47-2D01 0.133 0.063 179.1 90.3

MCC-48-2D01 0.038 0.018 51.2 90.0

MCC-49-2D01 0.143 0.071 195.0 89.5

MCC-49-2D03A -0.017 0.010 23.9 -84.9

PDC-53-3D01 A -0.395 -0.211 545.3 88.2

PDC-53-2D01 B 0.480 98.805 -2.9 0 0 0 0 MCC-46-2D02. 0.052 0.026 71.2 89.2

MCC-47-2D02 0.027 0.014 37.6 88.8

MCC-48-2D02 0.000 0.000 0.0 0.0

MCC-49-2D03B 0.316 0.170 436.8 88.0

PDC-53-3D01 B -0.395 -0.211 545.6 88.2

PDC-53-3B01A 4.160 103.778 -3.0 0 0 0 0 MCC-53-3B01 3.414 1.570 502.5 90.9

BP-XFR-53-5B01 -3.414 -1.570 502.5 90.9 5.000

PDC-53-3B01B 4.160 98.787 -3.0 0 0 0 0 MCC-53-3B02 3.436 1.666 536.5 90.0

BP-XFR-53-5B02 -3.436 -1.666 536.5 90.0

PDC-53-3B02A 4.160 104.113 -2.6 0 0 0 0 MCC-53-3B03 1.208 0.702 186.2 86.4

PDC-53-2B02A 0.657 0.347 99.1 88.4

BP-XFR-53-5B03 -1.865 -1.050 285.2 87.1 5.000

PDC-53-3B02B 4.160 98.882 -2.8 0 0 0 0 MCC-53-3B04 2.138 1.274 349.3 85.9

PDC-53-2B02B 0.486 0.261 77.4 88.1

BP-XFR-53-5B04 -2.623 -1.535 426.6 86.3

PDC-53-3D01 A 4.160 99.390 -2.4 0 0 0.151 0.065 PDC-53-2D01 A 0.395 0.216 62.9 87.8

BXFR-53-5D01 -0.546 -0.281 85.8 88.9

PDC-53-3D01 B 4.160 99.391 -2.4 0 0 0.148 0.064 PDC-53-2D01 B 0.396 0.216 63.0 87.8

BP-XFR-53-5D02 -0.544 -0.280 85.4 88.9

PDC-53-4B01A 13.800 101.411 -2.6 0 0 0 0 BP-XFR-53-5B05 -4.802 -12.679 559.3 35.4 5.000
ETAP
Project: C.S.E RPLC Page: 73
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus108 4.567 3.449 236.1 79.8

PDC-53-4B01B 0.235 9.230 380.9 2.6

PDC-53-4B01B 13.800 101.411 -2.6 0 0 0 0 Bus69 4.122 1.793 185.5 91.7

BP-XFR-53-5B06 -3.887 7.437 346.2 -46.3

PDC-53-4B01A -0.235 -9.230 380.9 2.6

PDC-53-5A01A 34.500 99.741 -2.0 0 0 0 0 BP-XFR-53-5B01 3.418 1.642 63.6 90.1

BP-XFR-53-5B03 1.866 1.073 36.1 86.7

BP-XFR-53-5B05 4.828 13.143 234.9 34.5

Bus10 1.109 0.688 21.9 85.0

BXFR-53-5D01 0.546 0.285 10.3 88.7

BP-XFR-53-5A01 0.030 0.019 0.6 84.9

Bus59 -13.782 -7.060 259.8 89.0

BP-XFR-53-5B07 0.947 0.515 18.1 87.8

PDC-53-5A01B -8.946 -15.563 301.2 49.8

CDD "A" 9.983 5.259 189.3 88.5

PDC-53-5A01B 34.500 99.741 -2.0 0 0 0 0 BP-XFR-53-5B02 3.440 1.741 64.7 89.2

BP-XFR-53-5B04 2.626 1.582 51.4 85.7

BP-XFR-53-5B06 3.896 -7.276 138.5 -47.2

BP-XFR-53-5D02 0.544 0.284 10.3 88.7

BP-XFR-53-5A02 0.030 0.019 0.6 84.9

Bus120 -7.514 -1.530 128.7 98.0

BP-XFR-53-5B08 0.915 0.494 17.4 88.0

BP-XFR-53-7A02 -22.867 -16.136 469.6 81.7

PDC-53-5A01A 8.946 15.563 301.2 49.8

CDD "B" 9.983 5.259 189.3 88.5

PDC_RPLC BARRA "E" 13.800 100.102 1.0 0 0 0 0 SISOR BARRA "1" 0.805 0.492 39.4 85.3

G15 0.288 0.172 14.0 85.9

Bus181 0.916 2.607 115.5 33.2

POSTE: 1-7E 0.093 0.051 4.4 87.5

P1-6E 3.026 -0.491 128.1 -98.7

Bus128 -5.128 -2.832 244.8 87.5

PDC_RPLC BARRA "F" 13.800 99.916 -0.3 0 0 0 0 SISOR BARRA "2" 0.175 0.106 8.6 85.7

G16 0.981 0.591 48.0 85.7

GX 0.340 0.204 16.6 85.7

Bus182 0.887 0.403 40.8 91.0

P1-7F -0.788 1.624 75.6 -43.6

Bus132 -1.595 -2.928 139.6 47.9

PLANT AGUA SERV EL 2.400 101.275 -0.8 0 0 0 0 TANQ AGUA SERV. EL -0.021 -0.011 5.6 88.7
CHAURE CHAURE
ETAP
Project: C.S.E RPLC Page: 74
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

Bus93-1 0.007 0.002 1.7 95.4

CCM A/SERV. 0.014 0.009 3.9 84.8

PLT. DE ASFALTO 13.800 100.151 1.1 0 0 0 0 B9 0.247 0.146 12.0 86.0

G-1 -0.247 -0.146 12.0 86.0

PMG1 13.800 98.712 0.6 0 0 0 0 GD -0.336 -0.161 15.8 90.2

PMG2 0.203 0.097 9.5 90.3

Bus112-1 0.133 0.064 6.3 90.1

PMG2 13.800 98.708 0.6 0 0 0 0 PMG1 -0.203 -0.097 9.5 90.3

PMG3 0.070 0.033 3.3 90.5

Bus115-1 0.133 0.064 6.3 90.2

PMG3 13.800 98.707 0.6 0 0 0 0 PMG2 -0.070 -0.033 3.3 90.5

Bus116-1 0.070 0.033 3.3 90.5

POSTE: 1-7E 13.800 100.101 1.0 0 0 0 0 PDC_RPLC BARRA "E" -0.093 -0.051 4.4 87.5

P1-7E 0.093 0.051 4.4 87.5

PPE BARRA_A 13.800 100.250 1.1 0 0 3.478 1.481 G33 0.647 0.347 30.6 88.1

G21 0.039 0.023 1.9 85.9

G1-1 1.595 0.947 77.4 86.0

BARRA "G" 0.960 0.556 46.3 86.5

Bus17-1 1.172 0.607 55.1 88.8

Bus128 5.133 2.840 244.8 87.5

Bus22 13.876 8.098 670.5 86.4

Bus_G6 -10.000 -6.400 495.5 84.2

Bus109 -16.900 -8.500 789.5 89.3

PPE BARRA_B 13.800 100.013 -0.3 0 0 3.470 1.479 Bus132 1.597 2.931 139.6 47.9

Bus15-1 1.758 0.860 81.9 89.8

BARRA "H" 1.402 0.862 68.8 85.2

G2-1 1.149 0.679 55.8 86.1

G22 0.059 0.035 2.9 85.9

G36 1.033 0.584 49.6 87.1

Bus119 7.532 1.770 323.6 97.3

Bus118 -18.000 -9.200 845.6 89.0

RESPALDO.3I 13.800 100.066 1.1 0 0 0 0 RESP CASETA1-3I 0.000 0.000 0.0 0.0

RESP CASETA1-3I 13.800 100.066 1.1 0 0 0 0 RESP CASETA2-3I 0.043 0.023 2.0 88.2

RESPALDO.3I 0.000 0.000 0.0 0.0

CASETA 1 -0.043 -0.023 2.0 88.2

RESP CASETA2-3I 13.800 100.064 1.1 0 0 0 0 RESP CASETA1-3I -0.043 -0.023 2.0 88.1

RESP CASETA3-3I 0.035 0.018 1.7 88.8

CASETA 2 0.008 0.005 0.4 84.9

RESP CASETA3-3I 13.800 100.063 1.1 0 0 0 0 RESP CASETA2-3I -0.035 -0.018 1.7 88.7
ETAP
Project: C.S.E RPLC Page: 75
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

CASETA 3 0.035 0.018 1.7 88.7

S.A BARRA "A" 2.4KV 2.400 99.772 0.7 0 0 0.683 0.358 Bus17-1 -0.683 -0.358 185.9 88.6

S.A BARRA "B" 2.4KV 2.400 99.046 -1.3 0 0 1.508 0.708 Bus15-1 -1.508 -0.708 404.6 90.5

S/E TL 6G-3 13.800 100.121 1.1 0 0 0 0 P4-6G -0.070 -0.051 3.6 80.9

S/E TL 6G-4 0.054 0.039 2.8 80.9

n3 0.016 0.012 0.8 80.7

S/E TL 6G-4 13.800 100.114 1.1 0 0 0 0 S/E TL 6G-3 -0.054 -0.039 2.8 80.6

n2 0.054 0.039 2.8 80.6

S/E TL6H-1 MANIFOLT 2.400 99.325 -0.7 0 0 0.091 0.054 P9-6H -0.091 -0.054 25.5 86.0
NORTE
S/E TLG-2 13.800 100.119 1.1 0 0 0 0 P22-6G -0.013 -0.004 0.6 94.9

n6 0.013 0.004 0.6 94.9

SISOR BARRA "1" 13.800 100.098 1.0 0 0 0 0 PDC_RPLC BARRA "E" -0.805 -0.492 39.4 85.3

Bus14-1 0.095 0.056 4.6 85.9

Bus4-3 0.710 0.436 34.8 85.2

SISOR BARRA "2" 13.800 99.915 -0.3 0 0 0 0 PDC_RPLC BARRA "F" -0.175 -0.106 8.6 85.7

Bus16-1 0.175 0.106 8.6 85.7

TALLER MECANICO 13.800 99.900 -0.4 0 0 0 0 BARRA "H" -0.018 -0.009 0.8 88.8

B16 0.014 0.007 0.7 88.8

Bus170 0.004 0.002 0.2 88.9

TANQ AGUA SERV. EL 2.400 101.305 -0.8 0 0 0 0 Bus88-1 -0.035 -0.020 9.6 87.2
CHAURE
PLANT AGUA SERV EL 0.021 0.011 5.6 88.7
CHAURE
Bus87-1 0.014 0.009 3.9 84.8

TQ_1 13.800 100.239 1.1 0 0 0 0 G31 -0.111 -0.070 5.5 84.6

Bus125-1 0.111 0.070 5.5 84.6

TQ LABORATORIO 10A 13.800 100.228 1.1 0 0 0 0 G31 -0.166 -0.105 8.2 84.4

Bus229 0.166 0.105 8.2 84.4

TQ LABORATORIO 10B 13.800 99.843 -0.4 0 0 0 0 Bus234 0.000 0.000 0.0 0.0

Bus137 0.144 0.091 7.1 84.5

G34 0.317 0.204 15.8 84.1

G11 -0.460 -0.295 22.9 84.2

Line20~ 13.800 100.230 1.1 0 0 0 0 P24-10A 0.000 0.000 0.0 100.0

Line41~ 13.800 100.187 1.1 0 0 0 0 G39 0.000 0.000 0.0 100.0

Line138~ 13.800 99.826 -0.4 0 0 0 0 P13-4G 0.000 0.000 0.0 0.0

Line140~ 13.800 100.151 1.1 0 0 0 0 P16-4G 0.000 0.000 0.0 100.0

Line64~ 2.400 102.510 -0.5 0 0 0 0 Bus94-1 0.000 0.000 0.0 100.0

Line33~ 13.800 99.682 0.8 0 0 0 0 P12-6E 0.000 0.000 0.0 0.0

Line94~ 13.800 100.055 1.0 0 0 0 0 P18-7E3I 0.000 0.000 0.0 100.0


ETAP
Project: C.S.E RPLC Page: 76
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

# Indicates a bus with a load mismatch of more than 0.1 MVA


ETAP
Project: C.S.E RPLC Page: 77
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

B3-2 2.400 0.155 0.092 0 0 0 0 0 0 0.181 86.0 41.7

B4-2 0.480 0.226 0.134 0 0 0 0 0 0 0.263 86.0 319.9

B6 2.400 0.058 0.035 0 0 0 0 0 0 0.068 86.0 16.3

B7 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

B9 2.400 0.003 0.001 0.017 0.006 0 0 0 0 0.285 86.5 68.9

B14 0.480 0.009 0.005 0 0 0 0 0 0 0.010 86.0 12.1

B16 0.480 0.010 0.005 0.004 0.002 0 0 0 0 0.015 89.0 18.7

B21 0.480 0.034 0.020 0 0 0 0 0 0 0.040 86.0 48.4

B.DE TRANF 2,4KV 2.400 0.132 0.078 0 0 0 0 0 0 0.153 86.0 37.2

B.DE TRANSF.BARRA"B" 2.400 0.207 0.123 0 0 0 0 0 0 0.243 86.0 59.0

B.DE TRASNF.BARRA"A" 2.400 0 0 0 0 0 0 0 0 0.009 85.9 2.1

B/MEREY 2.400 0.043 0.026 0 0 0 0 0 0 0.050 86.0 12.1

B/TRANS (480) 0.480 0.008 0.004 0 0 0 0 0 0 0.009 86.0 10.6

BARRA"A"4,16-1 4.160 0 0 0 0 0 0 0 0 0.468 86.0 65.3

BARRA "A" 480V (FCC) 0.480 0.208 0.111 0 0 0 0 0 0 0.236 88.2 288.7

BARRA"A"480V-1 0.480 0 0 0 0 0 0 0 0 0.074 86.0 89.4

BARRA"B"4,16-1 4.160 0 0 0 0 0 0 0 0 0.477 86.0 66.6

BARRA "B" 480V (FCC) 0.480 0.137 0.067 0 0 0 0 0 0 0.152 89.9 185.5

BARRA"B"480V-1 0.480 0 0 0 0 0 0 0 0 0.074 86.0 89.6

BARRA "G" 13.800 0 0 0 0 0 0 0 0 1.109 86.5 46.3

BARRA "G" DA-3 2.400 0.110 0.065 0 0 0 0 0 0 0.128 86.0 30.9

BARRA "G" DA-3. 0.480 0.051 0.031 0 0 0 0 0 0 0.060 86.0 72.6

BARRA "H" 13.800 0 0 0 0 0 0 0 0 1.644 85.2 68.8

BARRA "H" DA-3 2.400 0.150 0.089 0 0 0 0 0 0 0.174 86.0 42.1

BARRA "H" DA-3. 0.480 0.041 0.024 0 0 0 0 0 0 0.048 86.0 58.0

BARRA__A-1 13.800 0 0 0 0 0 0 0 0 168.053 83.3 5630.1

BARRA_A1-1 230.000 0 0 0 0 0 0 0 0 161.436 86.5 403.9

BARRA A 480V 0.480 0.164 0.084 0 0 0 0 0 0 0.184 89.0 221.5

barra a 480v STG 0.480 0 0 0 0 0 0 0 0 0.046 86.0 55.0

BARRA A-1 0.480 0 0 0 0 0 0 0 0 0.552 85.1 683.8

BARRA A ALQUILACION 4.160 0.086 0.038 0 0 0 0 0 0 0.093 91.6 13.0

BARRA A ALQUILACION 0.480 0.461 0.278 0 0 0 0 0 0 0.538 85.6 683.8


480V
BARRA A STG 0.480 0.039 0.023 0 0 0 0 0 0 0.046 86.0 55.0

BARRA A T.E# 2 4.160 0.403 0.239 0 0 0 0 0 0 0.468 86.0 65.3

BARRA A T.E# 2 480V 0.480 0.064 0.038 0 0 0 0 0 0 0.074 86.0 89.4


ETAP
Project: C.S.E RPLC Page: 78
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

BARRA A TE#1 0.480 0.204 0.123 0 0 0 0 0 0 0.238 85.6 290.8

BARRA A UNIDAD 51 Y 52 0.480 0.211 0.104 0.019 0.012 0 0 0 0 0.257 89.3 313.1

BARRA B1 ALQUILACION 0.480 0.006 0.003 0 0 0 0 0 0 0.007 85.6 8.0

BARRA B 480V 0.480 0.247 0.118 0 0 0 0 0 0 0.274 90.3 331.1

BARRA B-1 0.480 0 0 0 0 0 0 0 0 0.172 84.0 209.1

BARRA B ALQUILACION 4.160 0 0 0 0 0 0 0 0 0 0.0 0.0

BARRA B ALQUILACION 0.480 0.137 0.082 0 0 0 0 0 0 0.160 85.9 195.3


480V
BARRA B STG 0.480 0.059 0.035 0 0 0 0 0 0 0.068 86.0 82.2

BARRA B T.E# 1 0.480 0.216 0.131 0 0 0 0 0 0 0.253 85.6 309.8

BARRA B T.E # 2 4.160 0.410 0.243 0 0 0 0 0 0 0.477 86.0 66.6

BARRA B T.E # 2 480V 0.480 0.064 0.038 0 0 0 0 0 0 0.074 86.0 89.6

BARRA B UNIDAD 51 Y 52 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

BC 2.400 0.824 0.511 0 0 0 0 0 0 0.991 85.1 245.4

BCI 4,16"A" 4.160 0 0 0 0 0 0 0 0 0 0.0 0.0

BCI 4,16"B" 4.160 0 0 0 0 0 0 0 0 0 0.0 0.0

BCI 13,8 "A" 13.800 0 0 0 0 0 0 0 0 1.932 90.1 81.2

BCI 13,8 "B" 13.800 0 0 0 0 0 0 0 0 1.932 90.1 81.2

BP-XFR-53-5A01 34.500 0 0 0 0 0 0 0 0 0.035 84.9 0.6

BP-XFR-53-5A02 34.500 0 0 0 0 0 0 0 0 0.035 84.9 0.6

BP-XFR-53-5B01 34.500 0 0 0 0 0 0 0 0 3.792 90.1 63.6

BP-XFR-53-5B02 34.500 0 0 0 0 0 0 0 0 3.855 89.2 64.7

BP-XFR-53-5B03 34.500 0 0 0 0 0 0 0 0 2.152 86.7 36.1

BP-XFR-53-5B04 34.500 0 0 0 0 0 0 0 0 3.066 85.7 51.4

BP-XFR-53-5B05 34.500 0 0 0 0 0 0 0 0 13.998 34.5 234.9

BP-XFR-53-5B06 34.500 0 0 0 0 0 0 0 0 8.254 47.2 138.5

BP-XFR-53-5B07 34.500 0 0 0 0 0 0 0 0 1.078 87.9 18.1

BP-XFR-53-5B08 34.500 0 0 0 0 0 0 0 0 1.040 88.0 17.4

BP-XFR-53-5D02 34.500 0 0 0 0 0 0 0 0 0.614 88.7 10.3

BP-XFR-53-7A01 230.000 0 0 0 0 0 0 0 0 0 0.0 0.0

BP-XFR-53-7A02 230.000 0 0 0 0 0 0 0 0 28.869 79.4 72.2

Bus1-3 230.000 0 0 0 0 0 0 0 0 161.413 86.6 403.9

Bus1-4 2.400 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus2-4-1 230.000 0 0 0 0 0 0 0 0 52.294 89.8 130.9

Bus2-5 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus3-2 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus4-2 230.000 0 0 0 0 0 0 0 0 161.413 86.6 403.9

Bus4-3 2.400 0 0 0 0 0 0 0 0 0.824 86.0 200.2

Bus5-4 13.800 0 0 0 0 0 0 0 0 0.050 85.9 2.1


ETAP
Project: C.S.E RPLC Page: 79
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus6-3 230.000 0 0 0 0 0 0 0 0 80.707 86.6 201.9

Bus6-4 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus7-4 230.000 0 0 0 0 0 0 0 0 66.463 87.9 166.3

Bus7-5 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus8-2 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus9-2 0.480 0 0 0.025 0.012 0 0 0 0 0.028 91.0 33.7

Bus10 34.500 0.960 0.595 0.149 0.092 0 0 0 0 1.305 85.0 21.9

Bus10-2 0.480 0 0 0 0 0 0 0 0 0.109 86.0 130.9

Bus11-2 13.800 0 0 0 0 0 0 0 0 0.324 91.1 13.6

Bus12-1 0.480 0.092 0.055 0 0 0 0 0 0 0.107 86.0 130.9

Bus13-1 2.400 0.706 0.419 0 0 0 0 0 0 0.821 86.0 200.2

Bus14-1 0.480 0 0 0 0 0 0 0 0 0.110 86.1 132.3

Bus15-1 13.800 0 0 0 0 0 0 0 0 1.958 89.8 81.9

Bus16-1 0.480 0 0 0 0 0 0 0 0 0.204 86.0 246.4

Bus17-1 13.800 0 0 0.324 0.157 0 0 0 0 1.320 88.8 55.1

Bus18-1 0.480 0 0 0 0 0 0 0 0 0.204 86.0 246.4

Bus19-1 0.480 0 0 0 0 0 0 0 0 0.072 86.0 86.5

Bus20-4 0.480 0.171 0.102 0 0 0 0 0 0 0.199 86.0 246.4

Bus21-3 0.480 0 0 0 0 0 0 0 0 0.040 86.0 49.1

Bus22 13.800 0 0 0 0 0 0 0 0 16.001 86.5 670.5

Bus22-4 4.160 0.170 0.101 0 0 0 0 0 0 0.197 86.0 27.5

Bus23-3 4.160 0.170 0.101 0 0 0 0 0 0 0.197 86.0 27.5

Bus25-2 230.000 0 0 0 0 0 0 0 0 80.754 86.5 202.1

Bus25-3 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus26-2 230.000 0 0 0 0 0 0 0 0 80.754 86.5 202.1

Bus27-3-1 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus29-3-1 13.800 0 0 0 0 0 0 0 0 0.101 84.4 4.2

Bus31-3 0.480 0 0 0 0 0 0 0 0 0.068 86.0 82.2

Bus32-3 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus34-3 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus35-3 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus37-3 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus41-3 13.800 0 0 0 0 0 0 0 0 0.060 90.3 2.5

Bus43-3 0.480 0.009 0.005 0.006 0.003 0 0 0 0 0.017 90.0 20.6

Bus45-1 0.208 0 0 0.034 0.015 0 0 0 0 0.037 91.0 103.5

Bus46-1 0.480 0 0 0.008 0.004 0 0 0 0 0.009 91.0 11.2

Bus48-1-1 0.480 0 0 0 0 0 0 0 0 0.238 88.0 288.7

Bus49-1-1 0.480 0 0 0 0 0 0 0 0 0.153 89.8 185.5


ETAP
Project: C.S.E RPLC Page: 80
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus50-1 0.240 0.005 0.002 0.030 0.014 0 0 0 0 0.038 91.0 90.4

Bus51-1 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus53 4.160 0.341 0.144 0 0 0 0 0 0 0.370 92.1 49.7

Bus53-1 13.800 0 0 0 0 0 0 0 0 1.482 90.1 62.8

Bus54 4.160 0.179 0.077 0 0 0 0 0 0 0.195 91.9 26.2

Bus55 4.160 0.256 0.109 0 0 0 0 0 0 0.278 92.0 37.4

Bus55-1 0.220 0 0 0.001 0.001 0 0 0 0 0.001 85.0 3.7

Bus56 4.160 1.911 0.925 0 0 0 0 0 0 2.123 90.0 285.1

Bus56-1-1 0.480 0 0 0 0 0 0 0 0 0.259 89.1 313.1

Bus57 4.160 0.115 0.050 0 0 0 0 0 0 0.125 91.7 16.8

Bus57-1 0.220 0 0 0.001 0.001 0 0 0 0 0.001 85.0 3.7

Bus58 4.160 0.604 0.249 0 0 0 0 0 0 0.653 92.5 87.5

Bus59 34.500 0 0 0 0 0 0 0 0 15.525 88.9 259.8

Bus59-1-1 0.220 0.003 0.002 0.017 0.008 0 0 0 0 0.023 91.0 58.2

Bus61 4.160 1.337 0.648 0 0 0 0 0 0 1.486 90.0 209.6

Bus62-1-1 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus63-1 13.800 0 0 0 0 0 0 0 0 0.023 89.7 1.0

Bus64 4.160 0.179 0.076 0 0 0 0 0 0 0.195 92.0 27.5

Bus64-1 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus65 4.160 1.911 0.925 0 0 0 0 0 0 2.123 90.0 299.4

Bus65-1 0.240 0 0 0.001 0 0 0 0 0 0.001 91.0 2.9

Bus66-1 0.240 0 0 0.006 0.003 0 0 0 0 0.007 91.0 16.5

Bus67-1 13.800 0 0 0 0 0 0 0 0 0.009 90.9 0.4

Bus68 6.600 0 0 0 0 0 0 0 0 4.423 92.9 387.8

Bus68-1 13.800 0 0 0 0 0 0 0 0 0.009 90.9 0.4

Bus69 13.800 0 0 0 0 0 0 0 0 4.495 91.7 185.5

Bus69-1 0.220 0.001 0 0.003 0.002 0 0 0 0 0.005 91.0 12.1

Bus70 13.800 4.559 3.444 0 0 0 0 0 0 5.714 79.8 236.1

Bus70-1 0.240 0 0 0.008 0.004 0 0 0 0 0.009 91.0 20.6

Bus71 6.600 4.097 1.592 0 0 0 0 0 0 4.395 93.2 387.8

Bus71-1 13.800 0 0 0 0 0 0 0 0 0.009 90.9 0.4

Bus72-1 0.208 0 0 0.020 0.010 0 0 0 0 0.023 90.0 60.4

Bus73-1 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus74-1 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus75-1 0.220 0 0 0.010 0.003 0 0 0 0 0.011 95.0 27.6

Bus76-1 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus77-1 13.800 0 0 0 0 0 0 0 0 0.377 90.2 16.0

Bus79-1 13.800 0 0 0 0 0 0 0 0 0.009 85.9 0.4


ETAP
Project: C.S.E RPLC Page: 81
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus80-1 13.800 0 0 0 0 0 0 0 0 0.009 91.0 0.4

Bus81 4.160 0.443 0.379 0 0 0 0 0 0 0.583 76.0 78.2

Bus81-1 2.400 0 0 0 0 0 0 0 0 0 0.1 0.0

Bus82 4.160 0.404 0.169 0 0 0 0 0 0 0.438 92.2 58.5

Bus82-1 0.240 0 0 0.010 0.005 0 0 0 0 0.011 89.0 27.4

Bus83 4.160 0.173 0.074 0 0 0 0 0 0 0.188 91.9 25.1

Bus84-1 0.240 0 0 0.003 0.002 0 0 0 0 0.004 89.0 9.4

Bus85-1 13.800 0 0 0 0 0 0 0 0 1.016 83.5 42.7

Bus87 4.160 0.182 0.078 0 0 0 0 0 0 0.198 91.9 26.5

Bus87-1 0.480 0.014 0.009 0 0 0 0 0 0 0.016 85.0 19.6

Bus88-1 2.400 0 0 0.075 0.034 0 0 0 0 0.123 89.8 29.1

Bus89-1 2.400 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus91-1 0.220 0.076 0.034 0.011 0.005 0 0 0 0 0.095 91.0 240.6

Bus92-1 0.240 0 0 0.007 0.002 0 0 0 0 0.007 95.0 17.6

Bus93-1 2.400 0 0 0 0 0 0 0 0 0.007 94.9 1.8

Bus94-1 2.400 0 0 0 0 0 0 0 0 0.096 90.3 22.6

Bus97 4.160 0.231 0.098 0 0 0 0 0 0 0.251 92.0 35.5

Bus98 4.160 0.117 0.051 0 0 0 0 0 0 0.127 91.7 17.9

Bus98-1 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus99 4.160 0.173 0.074 0 0 0 0 0 0 0.188 91.9 26.4

Bus99-1 2.400 0 0 0 0 0 0 0 0 0.097 90.2 22.6

Bus101 4.160 0.886 0.757 0 0 0 0 0 0 1.166 76.0 165.7

Bus101-1 2.400 0.284 0.129 0.434 0.198 0 0 0 0 0.789 91.0 185.4

Bus103 4.160 0.710 0.286 0 0 0 0 0 0 0.766 92.7 107.9

Bus103-1-1 0.480 0 0 0 0 0 0 0 0 0.100 85.0 122.0

Bus104-1 0.240 0 0 0.018 0.008 0 0 0 0 0.020 91.0 48.5

Bus106-1-1 0.480 0 0 0 0 0 0 0 0 0.241 85.6 290.8

Bus107-1 0.240 0 0 0.007 0.003 0 0 0 0 0.008 91.0 19.4

Bus108 13.800 0 0 0 0 0 0 0 0 5.723 79.8 236.1

Bus108-1 13.800 0 0 0 0 0 0 0 0 0.008 90.8 0.3

Bus109 13.800 0 0 0 0 0 0 0 0 18.917 89.3 789.5

Bus112-1 0.208 0.036 0.017 0.095 0.043 0 0 0 0 0.145 91.0 392.6

Bus114-1 0.240 0 0 0.002 0.001 0 0 0 0 0.003 91.0 6.2

Bus115-1 0.210 0.036 0.017 0.096 0.044 0 0 0 0 0.145 91.0 393.0

Bus116-1 0.208 0.019 0.009 0.051 0.023 0 0 0 0 0.076 91.0 205.0

Bus117-1-1 2.400 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus118 13.800 0 0 0 0 0 0 0 0 20.215 89.0 845.6

Bus118-1 0.240 0 0 0 0 0 0 0 0 0.007 12.7 18.3


ETAP
Project: C.S.E RPLC Page: 82
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus118-2 0.240 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus119 13.800 0 0 0 0 0 0 0 0 7.734 97.4 323.7

Bus119-1 2.400 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus120 34.500 0 0 0 0 0 0 0 0 7.675 98.0 128.7

Bus120-1 2.400 0.199 0.091 0.305 0.139 0 0 0 0 0.650 90.9 152.4

Bus125-1 13.800 0 0 0 0 0 0 0 0 0.132 84.6 5.5

Bus126-1 0.480 0.076 0.047 0.035 0.022 0 0 0 0 0.131 85.0 150.3

Bus128 13.800 0 0 0 0 0 0 0 0 5.858 87.5 244.8

Bus129-1 0.480 0 0 0 0 0 0 0 0 0.256 85.6 309.8

Bus130 13.800 0 0 0 0 0 0 0 0 1.025 83.7 43.1

Bus132 13.800 0 0 0 0 0 0 0 0 3.334 47.9 139.6

Bus134-1 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus137 13.800 0 0 0 0 0 0 0 0 0.170 84.5 7.1

Bus138 0.480 0.004 0.003 0 0 0 0 0 0 0.005 86.0 6.4

Bus139-1 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus140 0.480 0.102 0.063 0.041 0.026 0 0 0 0 0.169 85.0 205.0

Bus141-1 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus144 0.240 0 0 0.006 0.002 0 0 0 0 0.006 95.0 15.7

Bus145-1-1 4.160 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus148 0.240 0 0 0.006 0.002 0 0 0 0 0.007 95.0 16.4

Bus149-1-1 4.160 0 0 0 0 0 0 0 0 0.093 91.6 13.0

Bus154-1-1 0.480 0 0 0 0 0 0 0 0 0.173 84.0 209.1

Bus157-1-1 0.480 0 0 0 0 0 0 0 0 0.558 85.7 678.1

Bus166 13.800 0 0 0 0 0 0 0 0 0.029 90.8 1.2

Bus168 13.800 0 0 0 0 0 0 0 0 0.029 90.8 1.2

Bus169 13.800 0 0 0 0 0 0 0 0 0.124 89.5 5.2

Bus170 0.240 0.003 0.001 0.001 0.001 0 0 0 0 0.004 89.0 10.8

Bus177 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus179 4.160 0.232 0.099 0 0 0 0 0 0 0.321 91.6 47.2

Bus180 13.800 0 0 0 0 0 0 0 0 0.244 85.8 10.3

Bus181 13.800 0.017 1.920 0.003 0.299 0 0 0 0 2.757 33.1 115.5

Bus182 13.800 0 0 0 0 0 0 0 0 0.974 91.0 40.8

Bus185 13.800 0 0 0 0 0 0 0 0 0.324 91.1 13.6

Bus186 4.160 0.597 0.246 0 0 0 0 0 0 0.646 92.5 94.4

Bus188 4.160 0.886 0.396 0 0 0 0 0 0 0.970 91.3 135.3

Bus190 0.480 0.062 0.030 0 0 0 0 0 0 0.069 90.4 88.6

Bus196 0.480 0.027 0.017 0.005 0.003 0 0 0 0 0.037 85.0 42.9

Bus198 0.480 0.027 0.017 0.005 0.003 0 0 0 0 0.037 85.0 42.9


ETAP
Project: C.S.E RPLC Page: 83
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus228 0.480 0.091 0.054 0 0 0 0 0 0 0.106 86.0 128.5

Bus229 13.800 0 0 0 0 0 0 0 0 0.197 84.4 8.2

Bus230 0.440 0.023 0.014 0.142 0.088 0 0 0 0 0.195 85.0 245.4

Bus234 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus235 0.440 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus238 0.480 0.271 0.168 0.043 0.027 0 0 0 0 0.370 85.0 442.4

Bus240 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus244 0.480 0 0 0.010 0.006 0 0 0 0 0.012 85.0 14.8

Bus248 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus253 13.800 0 0 0 0 0 0 0 0 0.084 90.8 3.5

Bus255 13.800 0 0 0 0 0 0 0 0 0.047 91.8 2.0

Bus256 0.240 0.010 0.005 0.023 0.011 0 0 0 0 0.037 90.0 89.9

Bus257 0.240 0.012 0.005 0.030 0.013 0 0 0 0 0.046 92.3 112.5

Bus259 0.480 0 0 0.028 0.013 0 0 0 0 0.031 90.0 37.3

Bus260 13.800 0 0 0 0 0 0 0 0 0.267 88.2 11.2

Bus263 13.800 0 0 0.139 0.083 0 0 0 0 0.236 88.0 9.9

Bus264 0.480 0.035 0.015 0.032 0.014 0 0 0 0 0.074 92.3 89.5

Bus266 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus267 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus271 0.208 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus275 0.208 0.010 0.005 0.014 0.007 0 0 0 0 0.027 90.0 76.5

Bus278 0.220 0 0 0.109 0.057 0 0 0 0 0.123 88.6 341.5

Bus280 0.208 0.002 0.001 0.015 0.007 0 0 0 0 0.019 91.6 52.8

Bus285 0.208 0.002 0.001 0.015 0.007 0 0 0 0 0.019 91.6 52.8

Bus291 0.480 0 0 0.011 0.005 0 0 0 0 0.012 91.6 14.2

Bus293 0.208 0 0 0.033 0.014 0 0 0 0 0.036 91.6 99.9

Bus294 13.800 0 0 0 0 0 0 0 0 0.036 91.2 1.5

Bus295 0.480 0 0 0.011 0.005 0 0 0 0 0.012 91.6 14.6

Bus296 13.800 0 0 0 0 0 0 0 0 0.012 91.1 0.5

Bus299 0.240 0 0 0.009 0.004 0 0 0 0 0.010 92.3 22.7

Bus301 0.480 0.003 0.001 0.007 0.003 0 0 0 0 0.011 92.3 12.9

Bus304 0.480 0.002 0.001 0.005 0.002 0 0 0 0 0.008 92.3 9.7

Bus305 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus307 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus313-1 0.480 0.085 0.053 0 0 0 0 0 0 0.100 85.0 122.0

Bus_G6 13.800 2000.0 0 0 0 0 0 0 0 0 11.873 84.2 495.5 24.8

BXFR-53-5D01 34.500 0 0 0 0 0 0 0 0 0.616 88.7 10.3

C.DE BOMBAS"E"(2,4) 2.400 0 0 0 0 0 0 0 0 0.077 86.0 18.4


ETAP
Project: C.S.E RPLC Page: 84
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

C.DE BOMBAS"E"(4,16) 4.160 0 0 0 0 0 0 0 0 0.237 86.0 32.9

C.DE BOMBAS"E"(480) 0.480 0 0 0 0 0 0 0 0 0.022 86.0 26.4

C.DE BOMBAS"F" (2,4) 2.400 0 0 0 0 0 0 0 0 0.320 86.0 77.4

C.DE BOMBAS"F"(4,16) 4.160 0 0 0 0 0 0 0 0 0.772 86.0 107.8

C.DE BOMBAS"F"(480) 0.480 0 0 0 0 0 0 0 0 0.048 86.0 57.7

CASETA 1 13.800 0 0 0 0 0 0 0 0 0.067 86.4 2.8

CASETA 1-6H 13.800 0 0 0 0 0 0 0 0 0.116 87.2 4.9

CASETA 2 13.800 0 0 0 0 0 0 0 0 0.018 84.9 0.8

CASETA 2-6H 13.800 0 0 0 0 0 0 0 0 0.049 88.1 2.0

CASETA 3 13.800 0.033 0.016 0.014 0.007 0 0 0 0 0.080 88.7 3.3

CASETA 3-6H 13.800 0 0 0 0 0 0 0 0 0.040 88.7 1.7

CCM"E"(2.4) 2.400 0.066 0.039 0 0 0 0 0 0 0.077 86.0 18.4

CCM"E"(4,16) 4.160 0.203 0.121 0 0 0 0 0 0 0.237 86.0 32.9

CCM"E"(480) 0.480 0.019 0.011 0 0 0 0 0 0 0.022 86.0 26.4

CCM"F"(2,4) 2.400 0.275 0.163 0 0 0 0 0 0 0.320 86.0 77.4

CCM"F"(4,16) 4.160 0.663 0.393 0 0 0 0 0 0 0.771 86.0 107.8

CCM"F"(480) 0.480 0.041 0.024 0 0 0 0 0 0 0.048 86.0 57.7

CCM A/SERV. 0.480 0.014 0.009 0 0 0 0 0 0 0.016 85.0 19.7

CDD "A" 34.500 8.640 4.551 1.343 0.707 0 0 0 0 11.283 88.5 189.3

CDD "B" 34.500 8.640 4.551 1.343 0.707 0 0 0 0 11.283 88.5 189.3

CONTROL C DE BOMBAS 13.800 0 0 0 0 0 0 0 0 0.028 90.9 1.2

DA-3 BARRA G (2.4) 2.400 0 0 0 0 0 0 0 0 0.128 86.0 30.9

DA-3 BARRA G (480) 0.480 0 0 0 0 0 0 0 0 0.132 86.0 159.1

DA-3 BARRA H (2.4) 2.400 0 0 0 0 0 0 0 0 0.174 86.0 42.1

DA-3 BARRA H (480) 0.480 0 0 0 0 0 0 0 0 0.147 87.3 178.0

G1-1 13.800 0 0 0 0 0 0 0 0 1.855 86.0 77.4

G2-1 13.800 0 0 0 0 0 0 0 0 1.334 86.1 55.8

G3-1 13.800 0 0 0 0 0 0 0 0 0.807 85.0 33.7

G4-1 13.800 0 0 0 0 0 0 0 0 0.524 86.0 21.9

G5 13.800 0 0 0 0 0 0 0 0 1.186 87.1 49.6

G6-1 13.800 0 0 0 0 0 0 0 0 0.267 86.7 11.2

G7-1 13.800 0 0 0 0 0 0 0 0 0.565 84.8 23.6

G10 13.800 0 0 0 0 0 0 0 0 0.936 86.2 39.2

G11 13.800 0 0 0 0 0 0 0 0 0.657 85.4 27.5

G12 13.800 0 0 0 0 0 0 0 0 0.028 89.6 1.2

G13 13.800 0 0 0 0 0 0 0 0 1.108 86.7 46.4

G14 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

G15 13.800 0 0 0 0 0 0 0 0 0.336 85.9 14.0


ETAP
Project: C.S.E RPLC Page: 85
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

G16 13.800 0 0 0 0 0 0 0 0 1.145 85.7 48.0

G17 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

G18 13.800 0 0 0 0 0 0 0 0 0.181 85.7 7.6

G19 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

G20 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

G21 13.800 0 0 0 0 0 0 0 0 0.046 85.9 1.9

G22 13.800 0 0 0 0 0 0 0 0 0.068 85.9 2.9

G23 13.800 0 0 0 0 0 0 0 0 0.984 86.5 41.2

G24-1 13.800 0 0 0 0 0 0 0 0 0.154 89.4 6.5

G25-1 13.800 0 0 0 0 0 0 0 0 0.501 88.1 20.9

G26 13.800 0 0 0 0 0 0 0 0 0.046 85.9 1.9

G27 13.800 0 0 0 0 0 0 0 0 0.068 85.9 2.9

G28-1 13.800 0 0 0 0 0 0 0 0 1.047 86.8 43.7

G29-1 13.800 0 0 0 0 0 0 0 0 0.709 86.4 29.6

G30 13.800 0 0 0 0 0 0 0 0 1.167 87.0 48.9

G31 13.800 0 0 0 0 0 0 0 0 0.569 85.6 23.8

G32 13.800 0 0 0 0 0 0 0 0 0.181 85.7 7.6

G33 13.800 0 0 0.160 0.053 0 0 0 0 0.734 88.1 30.6

G34 13.800 0 0 0 0 0 0 0 0 0.377 84.1 15.8

G35 13.800 0 0 0 0 0 0 0 0 0.040 93.4 1.7

G36 13.800 0 0 0 0 0 0 0 0 1.187 87.1 49.6

G37 13.800 0 0 0 0 0 0 0 0 0.181 85.7 7.6

G38 13.800 0 0 0 0 0 0 0 0 0.107 85.6 4.5

G39 13.800 0 0 0 0 0 0 0 0 0.107 85.6 4.5

G-1 13.800 0 0 0 0 0 0 0 0 0.287 86.0 12.0

G-2 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

G-4 13.800 0 0 0 0 0 0 0 0 0.352 86.7 14.7

G-5 13.800 0 0 0 0 0 0 0 0 0.577 86.1 24.1

G-6 13.800 0 0 0 0 0 0 0 0 0.290 86.3 12.1

G-7 13.800 0 0 0 0 0 0 0 0 0.352 86.7 14.7

G-8 (BOMBA DE TRANF.) 13.800 0 0 0 0 0 0 0 0 0.068 85.9 2.8

G/N 13.800 0 0 0 0 0 0 0 0 0.028 90.9 1.2

GD 13.800 0 0 0 0 0 0 0 0 0.373 90.2 15.8

Gua. II 230 230.000 0 0 0 0 0 0 0 0 135.020 86.4 338.9

GX 13.800 0 0 0 0 0 0 0 0 0.396 85.7 16.6

JET-A1 4.160 0 0 0 0 0 0 0 0 0.395 86.0 55.0

LPG.1 0.480 0.014 0.008 0 0 0 0 0 0 0.016 86.0 19.2

LPG.2 2.400 0.071 0.042 0 0 0 0 0 0 0.082 86.0 19.8


ETAP
Project: C.S.E RPLC Page: 86
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

MCC-19-2B01, 0.480 0.093 0.047 0 0 0 0 0 0 0.104 89.4 126.8

MCC-19-2B02 0.480 0.093 0.047 0 0 0 0 0 0 0.104 89.4 127.1

MCC-20-2B01 0.480 0.491 0.235 0.130 0.081 0 0 0 0 0.696 89.2 851.4

MCC-20-2B02 0.480 0.606 0.319 0.032 0.020 0 0 0 0 0.722 88.3 882.0

MCC-20-2B03B 0.480 0.175 0.079 0.007 0.005 0 0 0 0 0.201 90.9 245.3

MCC-45-2B01 0.480 0.516 0.249 0.001 0 0 0 0 0 0.574 90.1 636.6

MCC-45-2B02 0.480 0.355 0.173 0.002 0.001 0 0 0 0 0.397 89.8 486.3

MCC-45-2B03A 0.480 0.054 0.034 0.085 0.053 0 0 0 0 0.164 85.0 181.8

MCC-45-2B03B 0.480 0.108 0.067 0.020 0.013 0 0 0 0 0.151 85.0 185.4

MCC-46-2D01 0.480 0.097 0.048 0 0 0 0 0 0 0.109 89.7 132.2

MCC-46-2D02. 0.480 0.052 0.026 0 0 0 0 0 0 0.058 89.2 71.2

MCC-47-2D01 0.480 0.133 0.063 0 0 0 0 0 0 0.147 90.3 179.1

MCC-47-2D02 0.480 0.027 0.014 0 0 0 0 0 0 0.031 88.8 37.6

MCC-48-2D01 0.480 0.038 0.018 0 0 0 0 0 0 0.042 90.0 51.2

MCC-48-2D02 0.480 0 0 0 0 0 0 0 0 0 0.0 0.0

MCC-49-2D01 0.480 0.138 0.068 0.005 0.003 0 0 0 0 0.160 89.5 195.0

MCC-49-2D03A 0.480 1600.0 0.033 0.020 0.055 0.034 0 0 0 0 0.117 88.7 142.8 8.9

MCC-49-2D03B 0.480 0.085 0.048 0.126 0.078 0 0 0 0 0.359 88.0 436.8

MCC-53-3B01 4.160 0 0 0 0 0 0 0 0 3.757 90.9 502.5

MCC-53-3B02 4.160 0 0 0 0 0 0 0 0 3.817 90.0 536.5

MCC-53-3B03 4.160 0 0 0 0 0 0 0 0 1.397 86.5 186.2

MCC-53-3B04 4.160 0 0 0 0 0 0 0 0 2.488 85.9 349.3

MMC-20-2B03A 0.480 0.210 0.113 0.021 0.013 0 0 0 0 0.264 87.7 322.5

n1 2.400 0 0 0 0 0 0 0 0 0.182 86.1 41.7

n2 2.400 0.053 0.039 0 0 0 0 0 0 0.066 81.0 16.0

n3 0.480 0.016 0.012 0 0 0 0 0 0 0.020 81.0 24.0

n4 0.240 0 0 0.008 0.004 0 0 0 0 0.009 91.0 20.6

n5 0.240 0 0 0.008 0.004 0 0 0 0 0.009 91.0 20.6

n6 0.240 0 0 0.013 0.004 0 0 0 0 0.014 95.0 33.0

n7 0.240 0 0 0.008 0.004 0 0 0 0 0.009 91.0 20.6

n16 0.480 0 0 0.006 0.002 0 0 0 0 0.006 95.0 7.4

n19 0.480 0.004 0.003 0 0 0 0 0 0 0.005 86.0 6.4

n22 0.480 0.015 0.011 0 0 0 0 0 0 0.018 81.0 22.0

n23 0.480 0.016 0.010 0 0 0 0 0 0 0.018 85.0 22.0

n24 0.480 0.024 0.014 0 0 0 0 0 0 0.027 86.0 33.1

n26 0.480 0.059 0.035 0 0 0 0 0 0 0.068 86.0 83.2

n27 0.480 0.002 0.001 0 0 0 0 0 0 0.003 86.0 3.3

n28 0.480 0.032 0.019 0 0 0 0 0 0 0.038 86.0 45.8


ETAP
Project: C.S.E RPLC Page: 87
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

n29 0.480 0.002 0.001 0 0 0 0 0 0 0.003 86.0 3.3

n30 0.240 0 0 0.009 0.003 0 0 0 0 0.009 95.0 22.9

n31 0.240 0 0 0.009 0.003 0 0 0 0 0.009 95.0 22.9

n32 13.800 0 0 0 0 0 0 0 0 0.133 85.6 5.5

n33 13.800 0 0 0 0 0 0 0 0 0.148 87.0 6.2

n36 2.400 0.027 0.012 0 0 0 0 0 0 0.029 91.0 7.1

n37 2.400 0.027 0.012 0 0 0 0 0 0 0.029 91.0 7.1

n38 2.400 0 0 0 0 0 0 0 0 0.021 88.8 5.3

n39 0.240 0 0 0.019 0.010 0 0 0 0 0.021 89.0 53.2

n41 13.800 0 0 0 0 0 0 0 0 0.128 85.8 5.4

n42 13.800 0 0 0 0 0 0 0 0 0.175 85.7 7.3

P1-10B 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

P1-4G 13.800 0 0 0 0 0 0 0 0 0.124 88.8 5.2

P1-6E 13.800 0 0 0 0 0 0 0 0 3.066 98.7 128.1

P1-6H7G 13.800 0 0 0 0 0 0 0 0 0.245 88.4 10.3

P1-7E 13.800 0 0 0 0 0 0 0 0 0.106 87.5 4.4

P1-7F 13.800 0 0 0 0 0 0 0 0 1.816 44.8 76.1

P1-8H 13.800 0 0 0 0 0 0 0 0 1.027 83.8 43.0

P2-4G 13.800 0 0 0 0 0 0 0 0 0.009 92.9 0.4

P2-7G (AGUA SALADA) 13.800 0 0 0 0 0 0 0 0 0.251 85.8 10.5

P3-6E 13.800 0 0 0 0 0 0 0 0 3.064 98.7 128.1

P3-6H 13.800 0 0 0 0 0 0 0 0 0.123 90.1 5.2

P3-7F 13.800 0 0 0 0 0 0 0 0 1.813 45.7 75.9

P4-4G 13.800 0 0 0 0 0 0 0 0 0.009 92.2 0.4

P4-6E 13.800 0 0 0 0 0 0 0 0 1.912 90.1 80.9

P4-6G 13.800 0 0 0 0 0 0 0 0 0.146 86.8 6.1

P4-6H 13.800 0 0 0 0 0 0 0 0 0.123 90.1 5.2

P4-7E 13.800 0 0 0 0 0 0 0 0 0.106 87.3 4.4

P5-6H 13.800 0 0 0 0 0 0 0 0 0.123 90.1 5.2

P6-10A 13.800 0 0 0 0 0 0 0 0 0.107 85.7 4.5

P6-6G 13.800 0 0 0 0 0 0 0 0 0.054 93.6 2.3

P6-6H 13.800 0 0 0 0 0 0 0 0 0.123 90.2 5.2

P7-6E 13.800 0 0 0 0 0 0 0 0 3.059 98.7 128.2

P7-7F 13.800 0 0 0 0 0 0 0 0 1.819 47.2 76.2

P8-7E 13.800 0 0 0 0 0 0 0 0 0.106 87.2 4.4

P9-10A 13.800 0 0 0 0 0 0 0 0 0.107 85.7 4.4

P9-6H 13.800 0 0 0 0 0 0 0 0 0.229 88.2 9.6

P9-7E 13.800 0 0 0 0 0 0 0 0 0.106 87.2 4.5


ETAP
Project: C.S.E RPLC Page: 88
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

P9-8H 13.800 0 0 0 0 0 0 0 0 0.011 88.7 0.5

P10-6E 13.800 0 0 0 0 0 0 0 0 3.056 98.6 128.2

P10-6E CRUZ DE LA PALOMA 13.800 0 0 0 0 0 0 0 0 1.911 90.1 80.9

P10-7E 13.800 0 0 0 0 0 0 0 0 0.107 87.0 4.5

P10-7F 13.800 0 0 0 0 0 0 0 0 0.003 90.6 0.1

P11/6E 13.800 0 0 0 0 0 0 0 0 1.910 90.1 80.9

P11-6E 13.800 0 0 0 0 0 0 0 0 3.055 98.6 128.2

P11-7F 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

P11-8H (S/E BOM DE CARGA) 13.800 0 0 0 0 0 0 0 0 1.025 83.7 43.1

P12-6E 13.800 0 0 0 0 0 0 0 0 3.054 98.6 128.2

P12-6H 13.800 0 0 0 0 0 0 0 0 0.235 88.5 9.8

P12-7F 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

P13-4G 13.800 0 0 0 0 0 0 0 0 0.124 89.5 5.2

P13-6E 13.800 0 0 0 0 0 0 0 0 1.931 90.1 81.2

P13-6H 13.800 0 0 0 0 0 0 0 0 0.240 88.4 10.1

P13-7F 13.800 0 0 0 0 0 0 0 0 3.067 98.2 128.8

P14-6E 13.800 0 0 0 0 0 0 0 0 0.388 90.4 16.4

P14-7F 13.800 0 0 0 0 0 0 0 0 0.154 85.7 6.5

P15-6E 13.800 0 0 0 0 0 0 0 0 0.009 85.9 0.4

P15-7F 13.800 0 0 0 0 0 0 0 0 3.267 88.0 137.3

P16-4G 13.800 0 0 0 0 0 0 0 0 0.010 85.9 0.4

P16-6E 13.800 0 0 0 0 0 0 0 0 0.377 90.3 16.0

P16-7E (GLP) 13.800 0 0 0 0 0 0 0 0 0.107 86.8 4.5

P17-10A 13.800 0 0 0 0 0 0 0 0 0.144 85.6 6.0

P17-10B 13.800 0 0 0 0 0 0 0 0 0.001 0.0 0.1

P17-3I 13.800 0 0 0 0 0 0 0 0 0.009 90.7 0.4

P17-6E 13.800 0 0 0 0 0 0 0 0 0 1.3 0.0

P17-7E (GLP) 13.800 0 0 0 0 0 0 0 0 0.091 86.9 3.8

P17-7F 13.800 0 0 0 0 0 0 0 0 1.806 51.2 75.8

P18-6E 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

P18-7E3I 13.800 0 0 0 0 0 0 0 0 0.009 91.0 0.4

P19-6E 13.800 0 0 0 0 0 0 0 0 0.377 90.3 16.0

P20-10B 13.800 0 0 0 0 0 0 0 0 0.010 91.7 0.4

P22-6G 13.800 0 0 0 0 0 0 0 0 0.029 94.5 1.2

P23-6E (PLANTA DE HIELO) 13.800 0 0 0 0 0 0 0 0 0.373 90.2 15.8

P24-10A 13.800 0 0 0 0 0 0 0 0 0.181 85.6 7.6

P24-10B 13.800 0 0 0 0 0 0 0 0 0.009 97.4 0.4

P24-6H4G 13.800 0 0 0 0 0 0 0 0 0.123 90.1 5.2


ETAP
Project: C.S.E RPLC Page: 89
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

P25-6E 13.800 0 0 0 0 0 0 0 0 1.522 90.1 64.5

P26-10B 13.800 0 0 0 0 0 0 0 0 0.019 92.3 0.8

P26-7F 13.800 0 0 0 0 0 0 0 0 1.806 51.0 75.8

P27-10B 13.800 0 0 0 0 0 0 0 0 0.008 92.1 0.3

P30-6G 13.800 0 0 0 0 0 0 0 0 0.007 94.8 0.3

P30-7F 13.800 0 0 0 0 0 0 0 0 1.806 50.9 75.8

P31-6H 13.800 0 0 0 0 0 0 0 0 0.245 88.4 10.3

P31-7F 13.800 0 0 0 0 0 0 0 0 1.827 50.2 76.7

P33-7F 13.800 0 0 0 0 0 0 0 0 1.808 47.6 75.7

P34-6G 13.800 0 0 0 0 0 0 0 0 0.157 87.2 6.6

P37-7F 13.800 0 0 0 0 0 0 0 0 0.050 86.1 2.1

P37-8H 13.800 0 0 0 0 0 0 0 0 0.007 94.8 0.3

P38-6G8H 13.800 0 0 0 0 0 0 0 0 0.011 89.8 0.5

P39-6E (MEREY) 13.800 0 0 0 0 0 0 0 0 0.050 85.9 2.1

P40-10B 13.800 0 0 0 0 0 0 0 0 0.084 90.8 3.5

P40-6E 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

P48-7F 13.800 0 0 0 0 0 0 0 0 1.807 48.0 75.8

PAL_A-1 16.500 0 0 0 0 0 0 0 0 168.053 83.3 5630.1

PDC-53-2A01A 0.480 0.026 0.016 0.004 0.002 0 0 0 0 0.035 85.0 42.5

PDC-53-2A01B 0.480 0 0 0.030 0.018 0 0 0 0 0.035 85.0 42.3

PDC-53-2B01A 0.480 0 0 0 0 0 0 0 0 1.064 88.8 1300.5

PDC-53-2B01B 0.480 0 0 0 0 0 0 0 0 1.026 88.9 1254.1

PDC-53-2B02A 0.480 0 0 0 0 0 0 0 0 0.737 89.0 817.7

PDC-53-2B02B 0.480 0 0 0 0 0 0 0 0 0.548 88.6 671.0

PDC-53-2D01 A 0.480 0 0 0 0 0 0 0 0 0.463 89.0 563.2

PDC-53-2D01 B 0.480 0 0 0 0 0 0 0 0 0.448 88.2 545.6

PDC-53-3B01A 4.160 0 0 0 0 0 0 0 0 3.758 90.9 502.5

PDC-53-3B01B 4.160 0 0 0 0 0 0 0 0 3.819 90.0 536.5

PDC-53-3B02A 4.160 0 0 0 0 0 0 0 0 2.140 87.1 285.2

PDC-53-3B02B 4.160 0 0 0 0 0 0 0 0 3.040 86.3 426.6

PDC-53-3D01 A 4.160 0.151 0.065 0 0 0 0 0 0 0.614 88.9 85.8

PDC-53-3D01 B 4.160 0.148 0.064 0 0 0 0 0 0 0.612 88.9 85.4

PDC-53-4B01A 13.800 0 0 0 0 0 0 0 0 13.558 35.4 559.3

PDC-53-4B01B 13.800 0 0 0 0 0 0 0 0 10.109 40.8 417.0

PDC-53-5A01A 34.500 0 0 0 0 0 0 0 0 32.069 70.9 538.1

PDC-53-5A01B 34.500 0 0 0 0 0 0 0 0 39.307 77.3 659.5

PDC_RPLC BARRA "E" 13.800 0 0 0 0 0 0 0 0 6.111 83.9 255.4

PDC_RPLC BARRA "F" 13.800 0 0 0 0 0 0 0 0 3.775 63.1 158.1


ETAP
Project: C.S.E RPLC Page: 90
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Directly Connected Load Total Bus Load


Bus Constant kVA Constant Z Constant I Generic
Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

PLANT AGUA SERV EL 2.400 0 0 0 0 0 0 0 0 0.024 88.7 5.6


CHAURE
PLT. DE ASFALTO 13.800 0 0 0 0 0 0 0 0 0.287 86.0 12.0

PMG1 13.800 0 0 0 0 0 0 0 0 0.373 90.2 15.8

PMG2 13.800 0 0 0 0 0 0 0 0 0.225 90.3 9.5

PMG3 13.800 0 0 0 0 0 0 0 0 0.077 90.5 3.3

POSTE: 1-7E 13.800 0 0 0 0 0 0 0 0 0.106 87.5 4.4

PPE BARRA_A 13.800 2000.0 1.920 0.996 1.558 0.485 0 0 0 0 30.751 87.5 1283.3 64.2

PPE BARRA_B 13.800 2000.0 1.920 0.996 1.550 0.483 0 0 0 0 20.215 89.0 845.6 42.3

RESPALDO.3I 13.800 0 0 0 0 0 0 0 0 0 0.0 0.0

RESP CASETA1-3I 13.800 0 0 0 0 0 0 0 0 0.049 88.2 2.0

RESP CASETA2-3I 13.800 0 0 0 0 0 0 0 0 0.049 88.1 2.0

RESP CASETA3-3I 13.800 0 0 0 0 0 0 0 0 0.040 88.7 1.7

S.A BARRA "A" 2.4KV 2.400 0.683 0.358 0 0 0 0 0 0 0.771 88.6 185.9

S.A BARRA "B" 2.4KV 2.400 1.508 0.708 0 0 0 0 0 0 1.666 90.5 404.6

S/E TL 6G-3 13.800 0 0 0 0 0 0 0 0 0.086 80.9 3.6

S/E TL 6G-4 13.800 0 0 0 0 0 0 0 0 0.067 80.6 2.8

S/E TL6H-1 MANIFOLT 2.400 0.091 0.054 0 0 0 0 0 0 0.105 86.0 25.5


NORTE
S/E TLG-2 13.800 0 0 0 0 0 0 0 0 0.014 94.9 0.6

SISOR BARRA "1" 13.800 0 0 0 0 0 0 0 0 0.943 85.3 39.4

SISOR BARRA "2" 13.800 0 0 0 0 0 0 0 0 0.205 85.7 8.6

TALLER MECANICO 13.800 0 0 0 0 0 0 0 0 0.020 88.8 0.8

TANQ AGUA SERV. EL 2.400 0 0 0 0 0 0 0 0 0.040 87.2 9.6


CHAURE
TQ_1 13.800 0 0 0 0 0 0 0 0 0.132 84.6 5.5

TQ LABORATORIO 10A 13.800 0 0 0 0 0 0 0 0 0.197 84.4 8.2

TQ LABORATORIO 10B 13.800 0 0 0 0 0 0 0 0 0.547 84.2 22.9

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: C.S.E RPLC Page: 91
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

Line6-1 Line 190.63 6.00 3.15

CAMPO NORTE Transformer 1.500 0.000 0.0 0.000 0.0

PAL 1-1 Transformer 380.000 168.053 44.2 161.436 42.5

PM2 Transformer 0.038 0.012 31.5 0.012 31.1

PM6 Transformer 0.075 0.019 25.4 0.019 25.1

PM8 Transformer 0.050 0.012 24.5 0.012 24.3

PM18 Transformer 0.150 0.036 24.0 0.036 23.7

PM21 Transformer 0.113

PM23 Transformer 0.150

PM25 Transformer 0.113 0.028 24.3 0.027 24.1

PM-3 Transformer 0.150 0.009 5.7 0.009 5.7

PM-17 Transformer 0.225 0.037 16.6 0.037 16.5

PM_3 Transformer 0.500

PM_4 Transformer 0.500

PMC-1 Transformer 0.228 0.009 3.8 0.009 3.8

PMC-2 Transformer 0.150 0.009 5.7 0.009 5.7

PMC-7 Transformer 0.113 0.016 13.8 0.015 13.7

PMC-8 Transformer 0.075 0.004 6.0 0.004 6.0

T1-1 Transformer 1.500 0.110 7.3 0.110 7.3

T2-1 Transformer 0.010 0.001 11.9 0.001 11.9

T3-2 Transformer 1.500 0.205 13.6 0.204 13.6

T4-2 Transformer 0.075 0.039 52.1 0.038 51.0

T5-1 Transformer 3.125 0.833 26.7 0.824 26.4

T9-1 Transformer 3.750 0.396 10.6 0.395 10.5

T10-1 Transformer 0.100 0.023 23.1 0.023 22.8

T11-1 Transformer 1.500 0.185 12.3 0.184 12.3

T12-1 Transformer 5.000 0.776 15.5 0.772 15.4

T13-2 Transformer 0.025 0.005 18.6 0.005 18.5

T14-1 Transformer 1.500 0.046 3.1 0.046 3.1

T15-1 Transformer 15.000 0.007 0.0 0.007 0.0

T15-2 Transformer 0.300 0.067 22.2 0.066 22.0

T16-1 Transformer 0.015 0.008 50.2 0.007 49.7

T16-2 Transformer 0.030 0.011 35.5 0.011 35.0

T18 Transformer 3.000 0.321 10.7 0.320 10.7


ETAP
Project: C.S.E RPLC Page: 92
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

T19 Transformer 1.500 0.275 18.4 0.274 18.2

T20-1 Transformer 2.300 0.472 20.5 0.468 20.4

T21 Transformer 0.150 0.096 64.3 0.095 63.3

T22 Transformer 1.500 0.022 1.5 0.022 1.5

T24 Transformer 1.500 0.048 3.2 0.048 3.2

T25 Transformer 0.300 0.148 49.2 0.145 48.2

T26-1 Transformer 2.300 0.480 20.9 0.477 20.7

T27 Transformer 0.300 0.148 49.3 0.145 48.4

T28 Transformer 1.500 0.068 4.6 0.068 4.5

T29 Transformer 0.113 0.017 15.1 0.017 15.0

T30 Transformer 0.300 0.077 25.7 0.076 25.4

T31 Transformer 0.225 0.023 10.2 0.023 10.1

T33-1 Transformer 0.750 0.075 9.9 0.074 9.9

T34 Transformer 0.113 0.020 17.7 0.020 17.5

T35 Transformer 1.500 0.658 43.9 0.650 43.4

T36 Transformer 1.500 0.801 53.4 0.789 52.6

T41 Transformer 0.045

T43 Transformer 0.300 0.009 2.9 0.009 2.9

T44 Transformer 0.225 0.014 6.1 0.014 6.1

T45 Transformer 5.000 0.237 4.7 0.237 4.7

T46-1 Transformer 0.750 0.075 9.9 0.074 9.9

T47 Transformer 3.000 0.077 2.6 0.077 2.6

T48 Transformer 0.300 0.001 0.5 0.001 0.5

T49 Transformer 0.300 0.010 3.4 0.010 3.3

T50 Transformer 0.750 0.106 14.1 0.105 14.1

T51-1 Transformer 0.300 0.101 33.8 0.100 33.3

T52 Transformer 0.030 0.001 4.6 0.001 4.6

T53 Transformer 0.500 0.009 1.7 0.009 1.7

T54 Transformer 0.750 0.124 16.5 0.123 16.4

T55 Transformer 0.300 0.028 9.3 0.028 9.3

T57 Transformer 0.045 0.005 11.8 0.005 11.7

T58-1 Transformer 1.725 0.242 14.0 0.241 14.0

T59 Transformer 0.225 0.132 58.5 0.131 58.0

T60 Transformer 0.038 0.007 17.1 0.006 17.0

T61 Transformer 0.075 0.007 9.1 0.007 9.1

T62-1 Transformer 0.750


ETAP
Project: C.S.E RPLC Page: 93
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

T63 Transformer 0.045 0.007 15.2 0.007 15.1

T64 Transformer 1.500 0.324 21.6 0.321 21.4

T65 Transformer 0.300 0.070 23.2 0.069 23.0

T66 Transformer 0.045 0.006 13.6 0.006 13.5

T67 Transformer 0.525 0.170 32.4 0.169 32.1

T68 Transformer 1.000 0.265 26.5 0.263 26.3

T70 Transformer 0.075 0.011 15.2 0.011 15.1

T71-1 Transformer 1.725 0.258 14.9 0.256 14.8

T72 Transformer 0.025 0.004 15.6 0.004 15.5

T73 Transformer 0.113 0.017 14.6 0.016 14.6

T75 Transformer 0.075 0.017 22.1 0.016 22.0

T77 Transformer 0.030 0.007 24.6 0.007 24.5

T81 Transformer 0.150

T84 Transformer 0.300 0.020 6.7 0.020 6.7

T86 Transformer 0.045 0.005 11.8 0.005 11.7

T88 Transformer 0.075 0.008 10.7 0.008 10.7

T92 Transformer 0.010 0.003 25.9 0.003 25.6

T94 Transformer 0.150

T95 Transformer 1.000 0.050 5.0 0.050 5.0

T96 Transformer 0.150

T100 Transformer 0.045 0.009 20.9 0.009 20.8

T101 Transformer 0.750 0.018 2.4 0.018 2.4

T102 Transformer 0.045 0.009 20.9 0.009 20.8

T104 Transformer 0.300 0.038 12.5 0.037 12.4

T105 Transformer 0.150

T107 Transformer 0.045

T108 Transformer 0.500 0.016 3.2 0.016 3.2

T109 Transformer 0.300 0.029 9.8 0.029 9.8

T110 Transformer 0.300 0.038 12.5 0.037 12.4

T111 Transformer 1.000 0.082 8.2 0.082 8.2

T113 Transformer 0.045 0.009 20.7 0.009 20.5

T119 Transformer 0.500 0.107 21.4 0.106 21.2

T124 Transformer 0.113 0.037 33.0 0.037 32.6

T126 Transformer 0.150 0.047 31.1 0.046 30.7

T128 Transformer 0.300 0.031 10.3 0.031 10.3

T130 Transformer 0.300 0.074 24.8 0.074 24.5


ETAP
Project: C.S.E RPLC Page: 94
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

T137 Transformer 0.750 0.018 2.4 0.018 2.4

T138 Transformer 0.750 0.028 3.7 0.027 3.7

T140 Transformer 1.500 1.016 67.7 0.991 66.1

T142 Transformer 0.150 0.021 14.3 0.021 14.3

T143 Transformer 1.000 0.124 12.4 0.123 12.3

T148 Transformer 0.075 0.019 25.4 0.019 25.1

T153 Transformer 0.038 0.012 33.1 0.012 32.7

T156 Transformer 0.025 0.010 38.7 0.010 38.1

T158 Transformer 0.150 0.011 7.2 0.011 7.1

T160 Transformer 0.113 0.008 7.1 0.008 7.1

T-19-13/T1 Transformer 1.500 0.128 8.6 0.128 8.5

T-20-13/T1 Transformer 1.500 0.175 11.7 0.174 11.6

T-21-13/T1 Transformer 0.750 0.133 17.7 0.132 17.5

T-22-13/T1 Transformer 0.750 0.148 19.7 0.147 19.6

T-24-1 Transformer 0.750 0.241 32.1 0.238 31.7

T-25-1 Transformer 0.750 0.154 20.6 0.153 20.4

T-26-1-1 Transformer 1.500 0.565 37.7 0.558 37.2

T-27-1-1 Transformer 1.500 0.174 11.6 0.173 11.5

T-36-13/T1 Transformer 0.300 0.029 9.8 0.029 9.8

T-53-27/T1 Transformer 0.500

T-57-27/T1 Transformer 1.500 0.068 4.5 0.068 4.5

T-66-15/T1 Transformer 1.500 0.287 19.1 0.285 19.0

T-67 Transformer 0.750 0.197 26.2 0.195 26.0

T-68 Transformer 0.750

T-69 Transformer 0.500

T-71 Transformer 0.750 0.377 50.2 0.370 49.3

T-72 Transformer 0.750

T-74 Transformer 7.500 0.647 8.6 0.646 8.6

T-75 Transformer 0.300

T-76 Transformer 0.300

T-77 Transformer 7.500 0.974 13.0 0.970 12.9

T-78 Transformer 2.500 0.009 0.4 0.009 0.4

T-79 Transformer 2.500 0.244 9.8 0.243 9.7

T-80 Transformer 1.500 0.183 12.2 0.182 12.1

T-82 Transformer 1.500 0.154 10.3 0.153 10.2

TFB-3001 Transformer 0.300


ETAP
Project: C.S.E RPLC Page: 95
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

TFB-3002 Transformer 0.300

TFM-3001 Transformer 1.500

TFM-3002 Transformer 1.500

TPA-03 Transformer 5.000 0.775 15.5 0.771 15.4

TPA-04 Transformer 5.000 1.682 33.6 1.666 33.3

TX-BARRA A-1-1 Transformer 1.000 0.094 9.4 0.093 9.3

TX-BARRA B-1-1 Transformer 1.000

XFR53-4F01-1 Transformer 1.932 0.261 13.5 0.259 13.4

XFR53-4F02-1 Transformer 1.932

XFR-53-3B03 Transformer 2.500 0.743 29.7 0.737 29.5

XFR-53-3B04 Transformer 2.500 0.552 22.1 0.548 21.9

XFR-53-3D01 Transformer 2.500 0.451 18.0 0.448 17.9

XFR-53-3D02 Transformer 2.500 0.451 18.0 0.448 17.9

XFR-53-4B01 Transformer 8.000 4.495 56.2 4.423 55.3

XFR-53-5A01 Transformer 0.750 0.035 4.7 0.035 4.7

XFR-53-5A02 Transformer 0.750 0.035 4.7 0.035 4.7

XFR-53-5B01 Transformer 15.000 3.792 25.3 3.758 25.1

XFR-53-5B03 Transformer 15.000 2.152 14.3 2.140 14.3

XFR-53-5B04 Transformer 15.000 3.066 20.4 3.040 20.3

XFR-53-5B05 Transformer 20.000 13.998 70.0 13.558 67.8

XFR-53-5B06 Transformer 20.000 8.391 42.0 8.254 41.3

XFR-53-5B07 Transformer 2.500 1.078 43.1 1.064 42.5

XFR-53-5B08 Transformer 2.500 1.040 41.6 1.026 41.0

XFR-53-5D01 Transformer 5.000 0.616 12.3 0.614 12.3

XFR-53-5D02 Transformer 5.000 0.614 12.3 0.612 12.2

XFR-53-5X01 Transformer 20.000 16.001 80.0 15.525 77.6

XFR-53-5X02 Transformer 20.000 7.734 38.7 7.675 38.4

XFR-53-7A02 Transformer 55.000 28.869 52.5 27.987 50.9

XFR--53-5B02 Transformer 15.000 3.855 25.7 3.819 25.5

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: C.S.E RPLC Page: 96
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable9-3 -0.155 -0.092 0.157 0.093 1.4 0.3 104.2 104.9 0.78

T68 -0.226 -0.134 0.227 0.137 0.4 2.6 98.8 99.5 0.64

T-57-27/T1 -0.058 -0.035 0.058 0.035 0.0 0.2 100.0 100.2 0.16

T-53-27/T1 100.2 100.2 0.00

T-66-15/T1 -0.246 -0.143 0.247 0.146 0.4 3.0 99.5 100.2 0.67

T49 -0.009 -0.005 0.009 0.005 0.0 0.0 100.0 100.2 0.15

PMC-7 -0.014 -0.007 0.014 0.007 0.0 0.1 99.3 99.9 0.60

Cable49-2 -0.034 -0.020 0.034 0.020 0.1 0.1 98.7 99.1 0.40

T-82 -0.132 -0.078 0.132 0.079 0.1 1.0 99.2 99.6 0.41

T48 0.001 0.001 -0.001 -0.001 0.0 0.0 99.2 99.1 0.11

T52 0.001 0.001 -0.001 -0.001 0.0 0.0 99.2 99.1 0.11

T-79 -0.209 -0.124 0.209 0.126 0.1 1.4 99.2 99.6 0.33

T43 0.008 0.004 -0.008 -0.004 0.0 0.0 99.4 99.3 0.11

T-78 -0.008 -0.004 0.008 0.004 0.0 0.0 99.4 99.4 0.01

T95 -0.043 -0.026 0.043 0.026 0.0 0.1 99.5 99.6 0.18

Cable89-1-1 0.403 0.239 -0.403 -0.239 0.1 0.1 99.5 99.5 0.02

T20-1 -0.403 -0.239 0.403 0.245 0.5 5.6 99.5 100.2 0.71

Cable167-1-1 -0.208 -0.111 0.209 0.113 1.0 1.6 98.3 99.0 0.69

Cable85-1-1 0.064 0.038 -0.064 -0.038 0.3 0.2 99.9 99.5 0.40

T33-1 -0.064 -0.038 0.064 0.038 0.1 0.4 99.9 100.2 0.38

Cable97-1-1 0.410 0.243 -0.410 -0.243 0.1 0.1 99.3 99.3 0.02

T26-1 -0.410 -0.243 0.411 0.249 0.6 5.9 99.3 100.0 0.73

Cable166-1-1 -0.137 -0.067 0.137 0.067 0.4 0.7 98.8 99.3 0.43

Cable88-1-1 0.064 0.038 -0.064 -0.038 0.3 0.2 99.6 99.2 0.40

T46-1 -0.064 -0.038 0.064 0.038 0.1 0.4 99.6 100.0 0.38

Cable1-2 0.215 0.129 -0.215 -0.129 0.0 0.0 100.2 100.2 0.00

Cable5-3 0.497 0.293 -0.497 -0.293 0.0 0.1 100.2 100.2 0.01

Cable6-1-1-1 -0.959 -0.556 0.960 0.556 0.5 0.8 100.2 100.2 0.07

Cable50-1 0.137 0.077 -0.137 -0.077 0.1 0.0 100.2 100.1 0.04

Cable52-1 0.110 0.057 -0.110 -0.057 0.0 0.0 100.2 100.2 0.02

Cable34-2 -0.110 -0.065 0.110 0.065 0.0 0.0 99.8 99.8 0.04

Cable43-2 -0.051 -0.031 0.052 0.031 0.2 0.2 99.0 99.5 0.42

Cable11-2 0.018 0.009 -0.018 -0.009 0.0 0.0 99.9 99.9 0.00

Cable23-2-1 -1.401 -0.861 1.402 0.862 1.1 1.8 99.9 100.0 0.11

Cable25-3 0.305 0.175 -0.305 -0.175 0.0 0.1 99.9 99.9 0.02
ETAP
Project: C.S.E RPLC Page: 97
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable30-2-1 0.861 0.561 -0.860 -0.561 1.0 0.2 99.9 99.8 0.10

Cable54-1 0.217 0.115 -0.217 -0.115 0.0 0.0 99.9 99.9 0.00

Cable36-2 -0.150 -0.089 0.150 0.089 0.1 0.1 99.4 99.4 0.05

Cable45-2 -0.041 -0.024 0.041 0.024 0.1 0.1 98.8 99.1 0.34

Cable3-4 139.712 80.884 -139.709 -80.843 3.3 40.8 100.3 100.3 0.01

PAL 1-1 -139.712 -80.884 140.000 92.962 287.6 12078.3 100.3 104.4 4.11

T11-1 -0.164 -0.084 0.164 0.085 0.2 1.4 99.8 100.2 0.43

Cable75-1 0.039 0.023 -0.039 -0.023 0.0 0.0 100.1 100.1 0.07

T14-1 -0.039 -0.023 0.039 0.023 0.0 0.1 100.1 100.2 0.11

Cable303 0.470 0.290 -0.461 -0.278 9.1 11.3 97.1 94.7 2.41

Cable308 -0.469 -0.282 0.478 0.288 8.7 5.3 97.1 98.9 1.80

T15-1 -0.001 -0.007 0.001 0.007 0.1 0.1 97.1 98.0 0.96

Cable140-1-1-1 -0.086 -0.038 0.086 0.038 0.0 0.0 99.7 99.7 0.00

Cable117-1-1 -0.204 -0.123 0.206 0.125 2.7 1.6 98.4 99.7 1.29

Cable98-1-1 -0.230 -0.116 0.231 0.118 1.4 2.2 98.8 99.6 0.86

T19 -0.247 -0.118 0.248 0.121 0.4 2.9 99.4 100.0 0.59

Cable133-1-1-1 -0.145 -0.093 0.145 0.094 0.8 0.5 99.0 99.6 0.56

Cable306 0.138 0.083 -0.137 -0.082 0.7 0.9 99.0 98.3 0.69

T16-1 0.001 0.007 -0.001 -0.007 0.1 0.1 99.0 98.0 0.97

Cable13-2-1-1 100.2 100.2 0.00

Cable69-1 -0.059 -0.035 0.059 0.035 0.0 0.1 99.7 99.8 0.10

Cable126-1-1 -0.216 -0.131 0.219 0.132 3.0 1.8 98.1 99.5 1.37

Cable102-1-1 100.0 100.0

Line121 0.019 0.010 -0.019 -0.010 0.0 0.0 97.2 97.1 0.03

T140 -0.843 -0.521 0.849 0.558 5.3 37.8 97.2 99.6 2.43

TFB-3001 99.5 99.5 0.00

TFM-3001 99.5 99.5 0.00

TFB-3002 99.5 99.5 0.00

TFM-3002 99.5 99.5 0.00

Line11 1.740 0.839 -1.739 -0.839 1.1 0.7 99.5 99.4 0.07

Line21 -1.740 -0.839 1.741 0.840 1.1 0.7 99.5 99.6 0.07

Cable24 -0.030 -0.019 0.030 0.019 0.0 0.0 99.7 99.7 0.00

XFR-53-5A01 0.030 0.019 -0.030 -0.019 0.0 0.1 99.7 99.6 0.18

Cable26 -0.030 -0.019 0.030 0.019 0.0 0.0 99.7 99.7 0.00

XFR-53-5A02 0.030 0.019 -0.030 -0.018 0.0 0.1 99.7 99.6 0.18

Cable3 -3.418 -1.642 3.418 1.642 0.1 0.2 99.7 99.7 0.00

XFR-53-5B01 3.418 1.642 -3.414 -1.570 3.9 72.2 99.7 103.8 4.04
ETAP
Project: C.S.E RPLC Page: 98
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable5 -3.440 -1.740 3.440 1.741 0.1 0.2 99.7 99.7 0.00

XFR--53-5B02 3.440 1.740 -3.436 -1.666 4.0 74.6 99.7 98.8 0.95

Cable8 -1.866 -1.073 1.866 1.073 0.0 0.1 99.7 99.7 0.00

XFR-53-5B03 1.866 1.073 -1.865 -1.050 1.2 23.2 99.7 104.1 4.37

Cable10 -2.626 -1.582 2.626 1.582 0.1 0.2 99.7 99.7 0.00

XFR-53-5B04 2.626 1.582 -2.623 -1.535 2.5 47.2 99.7 98.9 0.85

Cable12 -4.827 -13.140 4.828 13.143 1.1 3.2 99.7 99.7 0.02

XFR-53-5B05 4.827 13.140 -4.802 -12.679 24.8 460.5 99.7 101.4 1.69

Cable14 -3.895 7.277 3.896 -7.276 0.4 1.1 99.8 99.7 0.01

XFR-53-5B06 3.895 -7.277 -3.887 7.437 8.6 160.0 99.8 101.4 1.66

Cable200 -0.947 -0.515 0.947 0.515 0.0 0.1 99.7 99.7 0.00

XFR-53-5B07 0.947 0.515 -0.945 -0.488 2.5 26.8 99.7 98.4 1.36

Cable201 -0.915 -0.494 0.915 0.494 0.0 0.1 99.7 99.7 0.00

XFR-53-5B08 0.915 0.494 -0.913 -0.469 2.3 24.9 99.7 98.4 1.31

Cable22 -0.544 -0.284 0.544 0.284 0.0 0.0 99.7 99.7 0.01

XFR-53-5D02 0.544 0.284 -0.544 -0.280 0.3 3.9 99.7 99.4 0.34

Cable208 0.000 -0.094 0.0 -93.7 100.3 100.3 0.00

Cable207 -22.909 -17.567 22.909 17.476 0.4 -91.4 100.3 100.3 0.01

XFR-53-7A02 22.909 17.567 -22.867 -16.136 42.0 1430.9 100.3 99.7 0.57

Cable22-3 0.000 0.000 0.000 0.000 0.0 0.0 98.7 98.7 0.00

T-75 95.1 99.8 4.75

Cable109-1 100.0 100.0 0.00

Cable20-3 0.709 0.421 -0.706 -0.419 2.2 1.5 99.0 98.7 0.31

T5-1 -0.709 -0.421 0.710 0.436 1.4 15.2 99.0 100.1 1.09

Cable6-3 -0.043 -0.026 0.043 0.026 0.0 0.0 99.6 99.6 0.00

Cable1 58.400 31.730 -58.346 -33.961 53.7 -2230.6 100.3 100.0 0.32

Cable12-2 0.000 0.000 0.000 0.000 0.0 0.0 99.6 99.6 0.00

T96 99.6 99.6 0.00

Cable2 58.400 31.730 -58.346 -33.961 53.7 -2230.6 100.3 100.0 0.32

T-76 95.1 99.9 4.76

T55 -0.025 -0.012 0.025 0.012 0.0 0.1 99.6 99.9 0.34

Cable15 -1.109 -0.688 1.109 0.688 0.0 0.0 99.7 99.7 0.00

Cable23-3 0.093 0.055 -0.092 -0.055 1.1 0.7 99.8 98.7 1.16

T64 0.295 0.133 -0.294 -0.129 0.6 4.2 99.9 94.5 5.42

T1-1 -0.094 -0.056 0.095 0.056 0.1 0.5 99.8 100.1 0.27

T2-1 0.001 0.000 -0.001 0.000 0.0 0.0 99.8 99.6 0.25

Cable21-2-1 -1.758 -0.860 1.758 0.860 0.0 0.0 100.0 100.0 0.00
ETAP
Project: C.S.E RPLC Page: 99
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

TPA-04 1.511 0.740 -1.508 -0.708 2.6 32.0 100.0 99.0 0.96

T3-2 -0.175 -0.104 0.175 0.106 0.2 1.6 99.4 99.9 0.51

Cable8-1-1-1 -1.172 -0.607 1.172 0.607 0.0 0.0 100.2 100.2 0.00

TPA-03 0.684 0.364 -0.683 -0.358 0.6 6.8 100.2 99.8 0.48

Cable26-3 0.175 0.104 -0.171 -0.102 3.8 2.3 99.4 97.2 2.18

Cable58-1 0.059 0.035 -0.059 -0.035 0.3 0.2 99.5 99.0 0.48

Cable60-1 0.002 0.001 -0.002 -0.001 0.0 0.0 99.5 99.4 0.02

Cable61-1 0.032 0.019 -0.032 -0.019 0.1 0.1 99.1 98.9 0.27

Cable62-1 0.002 0.001 -0.002 -0.001 0.0 0.0 99.1 99.1 0.02

Cable30 -13.848 -8.016 13.876 8.098 27.4 81.9 99.8 100.2 0.40

XFR-53-5X01 13.848 8.016 -13.800 -7.114 48.5 902.5 99.8 100.0 0.16

Cable32-2-1 -0.170 -0.101 0.170 0.101 0.1 0.1 99.5 99.5 0.06

Cable35-2 -0.170 -0.101 0.170 0.101 0.1 0.1 99.5 99.5 0.06

Cable106-1 0.000 0.000 0.000 0.000 0.0 0.0 105.3 105.3 0.00

Cable146-1-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00

Cable144-1-1 -0.086 -0.054 0.086 0.054 0.0 0.0 100.0 100.0 0.00

T51-1 0.086 0.054 -0.085 -0.053 0.6 1.8 100.0 98.6 1.42

T28 -0.059 -0.035 0.059 0.035 0.0 0.2 99.8 100.0 0.16

T105 100.1 100.1 0.00

T107 95.3 100.1 4.77

Cable141-1 -0.054 -0.026 0.054 0.026 0.0 0.0 100.2 100.2 0.00

Cable143-1 0.021 0.010 -0.021 -0.010 0.0 0.0 100.2 100.2 0.00

PM-17 0.034 0.016 -0.034 -0.015 0.1 0.3 100.2 99.6 0.65

T29 -0.015 -0.007 0.015 0.008 0.1 0.1 99.3 99.9 0.65

T113 -0.008 -0.004 0.008 0.004 0.0 0.1 99.2 100.1 0.87

T-24-1 -0.209 -0.113 0.210 0.117 1.0 4.1 99.0 100.2 1.21

T-25-1 -0.137 -0.067 0.138 0.069 0.4 1.7 99.3 100.0 0.74

T4-2 -0.035 -0.016 0.035 0.017 0.4 1.0 101.8 98.7 3.09

T41 99.4 99.4 0.00

Cable58 -0.341 -0.144 0.342 0.145 1.3 0.5 103.4 103.8 0.40

Line51 -1.335 -0.644 1.335 0.644 0.5 0.3 98.7 98.7 0.04

T10-1 0.021 0.010 -0.021 -0.009 0.1 0.3 98.7 103.0 4.27

T35 0.593 0.286 -0.591 -0.271 2.1 14.6 98.7 102.6 3.92

T36 0.721 0.349 -0.718 -0.327 3.0 21.6 98.7 102.4 3.65

Cable59 -0.179 -0.077 0.180 0.077 0.6 0.2 103.4 103.8 0.32

Cable60 -0.256 -0.109 0.257 0.109 1.1 0.3 103.3 103.8 0.41

Cable61 -1.911 -0.925 1.914 0.938 3.6 12.3 103.3 103.8 0.42
ETAP
Project: C.S.E RPLC Page: 100
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

XFR53-4F01-1 -0.231 -0.118 0.231 0.121 0.4 2.7 99.6 100.2 0.61

Cable62 -0.115 -0.050 0.115 0.050 0.2 0.1 103.6 103.8 0.19

Cable63 -0.604 -0.249 0.605 0.250 0.9 1.6 103.5 103.8 0.23

Cable27 13.800 7.114 -13.782 -7.060 18.0 53.6 100.0 99.7 0.26

Cable69 -1.337 -0.648 1.340 0.656 2.3 7.8 98.4 98.8 0.36

XFR53-4F02-1 100.0 100.0 0.00

T31 0.021 0.010 -0.020 -0.010 0.1 0.2 100.2 104.6 4.33

Cable66 -0.179 -0.076 0.180 0.076 0.6 0.1 98.4 98.8 0.32

Cable104-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00

PM_3 100.2 105.3 5.01

Cable68 -1.911 -0.925 1.916 0.933 5.1 7.4 98.4 98.8 0.36

T61 -0.006 -0.003 0.006 0.003 0.0 0.0 99.7 100.1 0.38

Cable91-1 -0.008 -0.004 0.008 0.004 0.0 0.0 100.1 100.1 0.00

PMC-1 0.008 0.004 -0.008 -0.004 0.0 0.0 100.1 100.0 0.15

Cable78 4.111 1.634 -4.097 -1.592 13.8 41.6 99.8 99.2 0.63

XFR-53-4B01 -4.111 -1.634 4.122 1.793 11.2 159.3 99.8 101.4 1.61

Cable93-1 -0.008 -0.004 0.008 0.004 0.0 0.0 100.1 100.1 0.00

PMC-2 0.008 0.004 -0.008 -0.004 0.0 0.0 100.1 99.9 0.24

Cable77 -4.122 -1.793 4.122 1.793 0.3 0.5 101.4 101.4 0.01

T13-2 -0.004 -0.002 0.004 0.002 0.0 0.0 100.5 98.7 1.76

Cable76 -4.559 -3.444 4.567 3.449 7.5 5.4 101.2 101.4 0.16

PM-3 -0.008 -0.004 0.008 0.004 0.0 0.0 99.9 100.1 0.24

Cable95-1 -0.008 -0.004 0.008 0.004 0.0 0.0 100.1 100.1 0.00

Cable107-1 100.0 100.0

PM_4 100.0 100.0 0.00

T16-2 -0.010 -0.003 0.010 0.003 0.1 0.2 100.0 98.8 1.22

Line57 -0.340 -0.163 0.340 0.162 0.0 -0.1 98.7 98.7 0.01

Line72 0.336 0.161 -0.336 -0.161 0.0 -0.1 98.7 98.7 0.01

Cable63-1 -0.008 -0.004 0.008 0.004 0.0 0.0 99.4 99.4 0.00

Cable103-1 -0.008 -0.004 0.008 0.004 0.0 0.0 100.1 100.1 0.00

T53 0.008 0.004 -0.008 -0.004 0.0 0.0 100.1 100.1 0.07

Cable171 -0.443 -0.379 0.447 0.380 3.9 1.0 103.5 104.1 0.65

Line59 0.000 0.000 0.0 0.0 98.7 98.7 0.00

CAMPO NORTE 0.000 0.000 0.000 0.000 0.0 0.0 98.7 98.7 0.00

Cable172 -0.404 -0.169 0.405 0.170 1.3 0.4 103.8 104.1 0.32

T70 -0.010 -0.005 0.010 0.005 0.0 0.1 99.5 100.1 0.66

Cable173 -0.173 -0.074 0.173 0.074 0.3 0.1 103.9 104.1 0.20
ETAP
Project: C.S.E RPLC Page: 101
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

T72 -0.003 -0.002 0.003 0.002 0.0 0.0 98.9 99.6 0.68

Cable105-1 -0.849 -0.558 0.849 0.558 0.1 0.0 99.6 99.6 0.01

Cable177 -0.182 -0.078 0.183 0.078 1.1 0.3 103.5 104.1 0.57

T73 -0.014 -0.009 0.014 0.009 0.0 0.1 100.9 101.3 0.43

Line66 0.035 0.020 -0.035 -0.020 0.2 0.1 101.8 101.3 0.50

T54 -0.111 -0.054 0.111 0.055 0.3 1.0 101.8 99.8 1.98

T21 -0.086 -0.039 0.087 0.042 0.6 2.2 103.5 102.5 1.02

T77 -0.007 -0.002 0.007 0.002 0.0 0.0 100.5 101.0 0.48

Line77 -0.007 -0.002 0.007 0.002 0.0 -0.1 101.0 101.3 0.26

Line81 -0.087 -0.041 0.087 0.042 0.1 0.1 102.5 102.6 0.12

Line64 0.000 0.000 0.000 0.000 0.0 0.0 102.5 102.5 0.00

Cable187 -0.231 -0.098 0.233 0.099 2.0 0.3 98.1 98.9 0.76

Cable188 -0.117 -0.051 0.117 0.051 0.3 0.0 98.6 98.9 0.21

T81 99.9 99.9 0.00

Cable189 -0.173 -0.074 0.173 0.074 0.4 0.1 98.7 98.9 0.21

Cable191 -0.886 -0.757 0.902 0.761 15.4 4.2 97.6 98.9 1.21

Cable193 -0.710 -0.286 0.713 0.288 2.3 1.9 98.5 98.9 0.37

T84 -0.018 -0.008 0.018 0.008 0.0 0.1 99.6 99.9 0.26

T58-1 -0.206 -0.125 0.207 0.127 0.3 1.9 99.7 100.2 0.51

T88 -0.007 -0.003 0.007 0.003 0.0 0.0 99.4 99.9 0.45

Line98 -0.007 -0.003 0.007 0.003 0.0 0.0 99.9 99.9 0.00

T25 -0.132 -0.060 0.133 0.064 1.3 4.1 102.3 98.7 2.07

T92 -0.002 -0.001 0.002 0.001 0.0 0.0 98.8 99.9 1.09

T27 -0.132 -0.060 0.133 0.064 1.2 3.6 101.6 98.7 1.78

T30 -0.069 -0.032 0.070 0.033 0.4 1.1 103.3 98.7 1.08

Cable120-1-1 100.0 100.0 0.00

T94 99.9 99.9 0.00

Cable32 -7.530 -1.764 7.532 1.770 1.9 5.8 100.0 100.0 0.04

XFR-53-5X02 7.530 1.764 -7.518 -1.543 11.9 221.3 100.0 99.8 0.14

T62-1 100.0 100.0 0.00

Cable29 7.518 1.543 -7.514 -1.530 4.4 13.1 99.8 99.7 0.09

Cable145-1 -0.111 -0.070 0.111 0.070 0.0 0.0 100.2 100.2 0.00

T59 0.111 0.070 -0.111 -0.069 0.3 1.3 100.2 104.5 4.25

Cable9-2-1 -5.128 -2.832 5.133 2.840 5.2 8.5 100.1 100.2 0.15

T71-1 -0.219 -0.132 0.220 0.135 0.3 2.2 99.5 100.0 0.54

Line63 0.859 0.561 -0.858 -0.560 0.3 0.1 99.6 99.6 0.04

Line125 -0.859 -0.561 0.860 0.561 1.3 0.4 99.6 99.8 0.16
ETAP
Project: C.S.E RPLC Page: 102
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable20-2-1 -1.595 -2.928 1.597 2.931 1.7 2.8 99.9 100.0 0.10

Cable168-1 -0.144 -0.091 0.144 0.091 0.0 0.0 99.8 99.8 0.01

T67 0.144 0.091 -0.143 -0.089 0.5 2.2 99.8 98.9 0.94

T57 -0.005 -0.003 0.005 0.003 0.0 0.0 99.4 99.9 0.54

Cable122-1-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00

Cable124-1-1 100.0 100.0

T60 -0.006 -0.002 0.006 0.002 0.0 0.1 99.0 99.6 0.64

TX-BARRA B-1-1 100.2 100.2 0.00

T63 -0.006 -0.002 0.006 0.002 0.0 0.1 99.6 100.1 0.57

TX-BARRA A-1-1 -0.086 -0.038 0.086 0.038 0.1 0.5 99.7 100.0 0.29

T-27-1-1 -0.145 -0.094 0.146 0.095 0.2 1.1 99.6 100.0 0.42

T-26-1-1 -0.478 -0.288 0.479 0.299 1.6 11.5 98.9 100.2 1.32

Cable94-1 -0.027 -0.012 0.027 0.012 0.0 0.0 99.9 99.9 0.00

T109 0.027 0.012 -0.027 -0.012 0.1 0.2 99.9 99.5 0.38

Cable92-1 -0.027 -0.012 0.027 0.012 0.0 0.0 100.2 100.2 0.00

T-36-13/T1 0.027 0.012 -0.027 -0.012 0.0 0.2 100.2 99.8 0.37

Cable99-1 -0.111 -0.055 0.111 0.055 0.0 0.0 99.8 99.8 0.00

PMC-8 -0.004 -0.002 0.004 0.002 0.0 0.0 99.6 99.9 0.26

T65 0.063 0.030 -0.062 -0.030 0.2 0.8 94.5 93.7 0.72

Cable66-1 -0.209 -0.126 0.209 0.126 0.0 0.0 99.6 99.6 0.00

Cable71-1 -0.912 -2.602 0.916 2.607 4.1 5.1 99.9 100.1 0.22

T-74 0.597 0.249 -0.597 -0.246 0.2 3.4 99.9 94.9 4.98

Cable76-1 -0.886 -0.403 0.887 0.403 0.5 0.6 99.8 99.9 0.07

T-77 0.886 0.403 -0.886 -0.396 0.5 7.1 99.8 99.5 0.34

T104 -0.032 -0.020 0.032 0.020 0.1 0.3 104.7 100.2 4.44

T110 -0.032 -0.020 0.032 0.020 0.1 0.3 104.6 100.2 4.43

T119 -0.091 -0.054 0.092 0.055 0.3 1.1 99.4 100.2 0.79

Cable160-1 -0.166 -0.105 0.166 0.105 0.0 0.0 100.2 100.2 0.00

T-67 0.166 0.105 -0.165 -0.103 0.7 2.9 100.2 104.1 3.87

Cable164-1 99.8 99.8 0.00

T-68 99.8 99.8 0.00

T-71 -0.314 -0.195 0.317 0.204 2.3 9.2 100.5 99.8 0.70

T-72 102.4 99.8 2.56

PM8 -0.010 -0.006 0.010 0.007 0.1 0.2 98.7 99.9 1.14

PM21 99.8 99.8 0.00

Line45 -0.076 -0.035 0.076 0.035 0.0 -0.1 99.8 99.8 0.00

Line48 0.043 0.018 -0.043 -0.019 0.0 -0.1 99.8 99.8 0.00
ETAP
Project: C.S.E RPLC Page: 103
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

T124 0.033 0.017 -0.033 -0.016 0.3 0.7 99.8 98.4 1.42

T126 0.043 0.019 -0.043 -0.018 0.3 0.8 99.8 98.6 1.27

T128 -0.028 -0.013 0.028 0.014 0.1 0.2 99.4 99.8 0.41

Cable182-1 -0.235 -0.126 0.235 0.126 0.0 0.0 99.8 99.9 0.00

Cable186-1 0.208 0.112 -0.208 -0.112 0.0 0.0 99.8 99.8 0.01

T130 0.068 0.029 -0.068 -0.028 0.3 1.0 99.8 98.9 0.93

T-69 99.8 99.8 0.00

Cable184-1 99.8 99.8 0.00

PM23 99.8 99.8 0.00

PM25 -0.024 -0.012 0.025 0.012 0.1 0.4 98.8 99.8 1.04

T143 -0.109 -0.057 0.109 0.058 0.2 1.0 94.7 99.9 5.21

PM6 -0.017 -0.008 0.017 0.008 0.1 0.3 98.9 99.9 1.05

T148 -0.017 -0.008 0.017 0.008 0.1 0.3 98.9 100.0 1.05

PM2 -0.011 -0.005 0.011 0.005 0.1 0.2 98.6 99.9 1.31

PM18 -0.033 -0.014 0.033 0.015 0.2 0.5 98.9 99.8 0.99

Cable198-1 -0.033 -0.015 0.033 0.015 0.0 0.0 99.8 99.9 0.00

T153 -0.011 -0.005 0.011 0.005 0.1 0.2 101.1 99.9 1.22

Cable200-1 -0.011 -0.005 0.011 0.005 0.0 0.0 99.9 99.9 0.00

T156 -0.009 -0.004 0.009 0.004 0.1 0.2 101.0 99.9 1.02

T158 -0.010 -0.004 0.010 0.004 0.0 0.0 99.6 99.9 0.29

T160 -0.007 -0.003 0.007 0.003 0.0 0.0 99.6 99.9 0.29

Cable20 -0.546 -0.285 0.546 0.285 0.0 0.0 99.7 99.7 0.01

XFR-53-5D01 0.546 0.285 -0.546 -0.281 0.3 4.0 99.7 99.4 0.34

Cable67-1 0.066 0.039 -0.066 -0.039 0.0 0.0 100.0 100.0 0.04

T47 -0.066 -0.039 0.066 0.039 0.0 0.1 100.0 100.1 0.08

Cable59-1 0.204 0.121 -0.203 -0.121 0.1 0.1 99.9 99.9 0.04

T45 -0.204 -0.121 0.204 0.121 0.1 0.6 99.9 100.1 0.15

Cable70-1 0.019 0.011 -0.019 -0.011 0.1 0.0 100.0 99.7 0.35

T22 -0.019 -0.011 0.019 0.011 0.0 0.0 100.0 100.1 0.05

Cable68-1 0.275 0.163 -0.275 -0.163 0.5 0.3 99.5 99.4 0.18

T18 -0.275 -0.163 0.275 0.165 0.2 1.9 99.5 99.9 0.35

Cable64-1 0.664 0.394 -0.663 -0.393 0.9 0.7 99.4 99.3 0.15

T12-1 -0.664 -0.394 0.665 0.401 0.5 6.6 99.4 99.9 0.50

Cable74-1 0.041 0.024 -0.041 -0.024 0.3 0.2 99.8 99.0 0.77

T24 -0.041 -0.024 0.041 0.025 0.0 0.1 99.8 99.9 0.11

T101 0.015 0.011 -0.015 -0.011 0.0 0.0 100.1 100.0 0.11

Line92 -0.101 -0.057 0.101 0.054 0.1 -3.1 100.1 100.2 0.09
ETAP
Project: C.S.E RPLC Page: 104
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Line109 0.043 0.023 -0.043 -0.023 0.0 -0.1 100.1 100.1 0.00

T137 0.016 0.010 -0.016 -0.010 0.0 0.0 100.1 100.0 0.10

Line114 0.035 0.018 -0.035 -0.018 0.0 -0.1 100.1 100.1 0.00

T138 0.024 0.014 -0.024 -0.014 0.0 0.1 100.1 99.9 0.15

T75 -0.014 -0.009 0.014 0.009 0.0 0.1 100.8 101.3 0.49

Line2 -0.025 -0.012 0.025 0.012 0.0 -0.1 99.9 99.9 0.00

T-19-13/T1 -0.110 -0.065 0.110 0.066 0.1 0.6 99.8 100.2 0.31

T-21-13/T1 -0.113 -0.067 0.113 0.068 0.3 1.2 99.5 100.2 0.69

T-20-13/T1 -0.150 -0.089 0.150 0.090 0.2 1.2 99.4 99.9 0.42

T100 0.009 0.003 -0.009 -0.003 0.0 0.0 99.1 98.7 0.41

T102 0.009 0.003 -0.009 -0.003 0.0 0.0 99.1 98.7 0.41

T-22-13/T1 -0.128 -0.071 0.129 0.073 0.4 1.6 99.1 99.9 0.75

Cable5-2-1 -1.595 -0.947 1.595 0.947 0.0 0.0 100.2 100.2 0.00

Cable65-1-1 0.909 0.521 -0.909 -0.521 0.0 0.0 100.2 100.2 0.00

Cable110-1-1 0.686 0.426 -0.686 -0.426 0.1 0.2 100.2 100.2 0.02

Cable25-2-1 -1.149 -0.679 1.149 0.679 0.0 0.0 100.0 100.0 0.00

Cable72-1-1 0.612 0.357 -0.612 -0.357 0.0 0.0 100.0 100.0 0.00

Cable112-1-1 0.451 0.268 -0.451 -0.268 0.0 0.1 100.0 100.0 0.02

Cable114-1-1 0.479 0.299 -0.479 -0.299 0.1 0.1 100.2 100.2 0.02

Cable116-1-1 0.231 0.133 -0.231 -0.133 0.0 0.0 100.0 100.0 0.01

Cable192-1 1.016 0.576 -1.015 -0.575 0.2 0.4 100.0 99.9 0.03

Cable194-1 -1.033 -0.584 1.033 0.584 0.2 0.4 100.0 100.0 0.03

Cable174-1 0.561 0.342 -0.561 -0.342 0.0 0.0 99.9 99.8 0.00

Cable172-1 0.460 0.295 -0.460 -0.295 0.0 0.0 99.8 99.8 0.00

Cable178-1 0.025 0.012 -0.025 -0.012 0.0 0.0 99.8 99.8 0.00

Cable180-1 0.076 0.035 -0.076 -0.035 0.0 0.0 99.8 99.8 0.00

Cable188-1 0.851 0.495 -0.851 -0.494 0.1 0.1 99.9 99.9 0.01

Cable190-1 -0.961 -0.553 0.961 0.553 0.4 0.7 99.9 99.9 0.07

Cable132-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00

Cable53-1 -0.288 -0.172 0.288 0.172 0.0 0.0 100.1 100.1 0.01

Cable40-2 -0.981 -0.591 0.981 0.591 0.2 0.2 99.9 99.9 0.02

Cable125-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00

Cable118-1 -0.155 -0.093 0.155 0.093 0.0 0.0 100.2 100.2 0.00

Cable128-1 0.155 0.093 -0.155 -0.093 0.0 0.0 100.2 100.2 0.00

Cable152-1 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00

Cable154-1 100.0 100.0

Cable3-1-1-1 -0.039 -0.023 0.039 0.023 0.0 0.0 100.2 100.2 0.00
ETAP
Project: C.S.E RPLC Page: 105
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable39-2 0.039 0.023 -0.039 -0.023 0.0 0.0 100.2 100.2 0.00

Cable27-2-1 -0.059 -0.035 0.059 0.035 0.0 0.0 100.0 100.0 0.00

Cable46-2 0.059 0.035 -0.059 -0.035 0.0 0.0 100.0 100.0 0.00

Cable17-2-1 -0.138 -0.069 0.138 0.069 0.0 0.0 100.0 100.0 0.00

Cable7-3-1 -0.442 -0.238 0.442 0.238 0.0 0.1 100.2 100.2 0.01

Cable196-1 0.037 0.014 -0.037 -0.014 0.0 0.0 99.9 99.9 0.00

Cable113-1 -0.487 -0.294 0.487 0.294 0.0 0.0 100.2 100.2 0.00

Cable121-1 0.111 0.070 -0.111 -0.070 0.0 0.0 100.2 100.2 0.00

Cable156-1 0.166 0.105 -0.166 -0.105 0.0 0.0 100.2 100.2 0.01

Cable130-1 -0.155 -0.093 0.155 0.093 0.0 0.0 100.2 100.2 0.00

Cable136-1 0.155 0.093 -0.155 -0.093 0.0 0.0 100.2 100.2 0.00

Cable1-1-1 -0.647 -0.347 0.647 0.347 0.0 0.1 100.2 100.2 0.01

Cable170-1 -0.317 -0.204 0.317 0.204 0.0 0.0 99.8 99.8 0.00

Cable202-1 0.009 0.002 -0.009 -0.002 0.0 0.0 99.9 99.9 0.00

Cable204-1 0.017 0.007 -0.017 -0.007 0.0 0.0 99.9 99.9 0.00

Cable28-2-1 -1.033 -0.584 1.033 0.584 0.1 0.2 100.0 100.0 0.01

Cable153-1 0.092 0.055 -0.092 -0.055 0.0 0.0 100.2 100.2 0.00

Line14 -0.091 -0.055 0.091 0.055 0.0 -0.2 100.2 100.2 0.01

Line41 0.000 0.000 0.000 0.000 0.0 0.0 100.2 100.2 0.00

Cable42-2 -0.247 -0.146 0.247 0.146 0.0 0.0 100.2 100.2 0.01

Cable44-2 99.9 99.9 0.00

Cable29-2-1 0.305 0.175 -0.305 -0.175 0.0 0.0 99.9 99.9 0.01

Cable8-3 0.250 0.147 -0.250 -0.147 0.0 0.0 100.2 100.2 0.01

Cable31-2 0.110 0.066 -0.110 -0.066 0.0 0.0 100.2 100.2 0.00

Cable38-2 0.113 0.068 -0.113 -0.068 0.0 0.0 100.2 100.2 0.00

Cable33-2 0.150 0.090 -0.150 -0.090 0.0 0.0 99.9 99.9 0.00

Cable37-2 0.129 0.073 -0.129 -0.073 0.0 0.0 99.9 99.9 0.00

Cable10-2 -0.058 -0.035 0.058 0.035 0.0 0.0 100.2 100.2 0.02

Line95 -0.026 -0.012 0.026 0.012 0.0 0.0 99.9 99.9 0.00

Cable16-3 -0.336 -0.161 0.336 0.161 0.0 0.0 98.7 98.7 0.01

Cable18-4 0.336 0.161 -0.336 -0.161 0.0 0.0 98.7 98.7 0.00

Cable56-1 -0.340 -0.204 0.340 0.204 0.0 0.0 99.9 99.9 0.00

T9-1 0.340 0.204 -0.339 -0.201 0.2 2.5 99.9 99.5 0.38

T108 -0.014 -0.008 0.014 0.008 0.0 0.0 99.9 100.1 0.14

T111 -0.071 -0.042 0.071 0.042 0.1 0.4 99.8 100.1 0.29

BD-19-2B11 -0.093 -0.047 0.093 0.047 0.0 0.0 98.4 98.4 0.00

BD-19-2B12 -0.093 -0.047 0.093 0.047 0.0 0.0 98.4 98.4 0.00
ETAP
Project: C.S.E RPLC Page: 106
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

BD-20-2B11 -0.621 -0.315 0.621 0.315 0.0 0.0 98.4 98.4 0.00

BD-20-2B12 -0.637 -0.339 0.637 0.339 0.0 0.0 98.4 98.4 0.00

BD-20-2B14 -0.182 -0.084 0.182 0.084 0.0 0.0 98.4 98.4 0.00

BD-45-2B11 -0.517 -0.249 0.517 0.249 0.0 0.0 108.4 108.4 0.00

BD-45-2B12 -0.357 -0.174 0.357 0.174 0.0 0.0 98.2 98.2 0.00

BD-45-2B13 -0.139 -0.086 0.139 0.086 0.0 0.0 108.4 108.4 0.00

BD-45-2B14 -0.129 -0.080 0.129 0.080 0.0 0.0 98.2 98.2 0.00

BD-46-2D11 -0.097 -0.048 0.097 0.048 0.0 0.0 98.8 98.8 0.00

BD-46-2D12 -0.052 -0.026 0.052 0.026 0.0 0.0 98.8 98.8 0.00

BD-47-2D11 -0.133 -0.063 0.133 0.063 0.0 0.0 98.8 98.8 0.00

BD-47-2D12 -0.027 -0.014 0.027 0.014 0.0 0.0 98.8 98.8 0.00

BD-48-2D11 -0.038 -0.018 0.038 0.018 0.0 0.0 98.8 98.8 0.00

BD-48-2D12 98.8 98.8 0.00

BD-49-2D11 -0.143 -0.071 0.143 0.071 0.0 0.0 98.8 98.8 0.00

BD-49-2D13 0.017 -0.010 -0.017 0.010 0.0 0.0 98.8 98.8 0.00

BD-49-2D14 -0.316 -0.170 0.316 0.170 0.0 0.0 98.8 98.8 0.00

BD-53-3B11 -3.413 -1.569 3.414 1.570 0.8 0.8 103.8 103.8 0.03

BD-53-3B12 -3.435 -1.665 3.436 1.666 0.9 0.9 98.8 98.8 0.03

BD-53-5B13 -1.207 -0.702 1.208 0.702 0.1 0.1 104.1 104.1 0.01

BD-53-3B14 -2.137 -1.273 2.138 1.274 0.4 0.4 98.9 98.9 0.02

BD-20-2B13 -0.231 -0.127 0.231 0.127 0.0 0.0 98.4 98.4 0.00

T-80 -0.157 -0.093 0.157 0.094 0.2 1.4 104.9 100.2 4.77

T15-2 -0.053 -0.039 0.054 0.039 0.3 0.8 99.1 100.1 0.99

T34 -0.016 -0.012 0.016 0.012 0.1 0.2 99.3 100.1 0.86

T44 -0.013 -0.004 0.013 0.004 0.0 0.0 99.9 100.1 0.21

T66 -0.006 -0.002 0.006 0.002 0.0 0.0 99.4 99.9 0.51

T86 -0.005 -0.003 0.005 0.003 0.0 0.0 99.4 99.9 0.54

T142 0.019 0.010 -0.019 -0.010 0.0 0.1 97.1 96.7 0.41

Line76 0.000 -0.001 0.0 -1.3 99.9 99.9 0.00

Line68 0.009 0.003 -0.009 -0.003 0.0 -0.3 100.2 100.2 0.00

Cable86-1 -3.026 0.491 3.026 -0.491 0.2 0.3 100.1 100.1 0.01

Line58 3.026 -0.491 -3.023 0.493 2.6 2.1 100.1 100.0 0.07

Line137 0.217 0.115 -0.217 -0.115 0.0 -0.1 99.9 99.9 0.01

Line90 0.093 0.051 -0.093 -0.052 0.0 -0.3 100.1 100.1 0.01

Cable84-1 0.788 -1.624 -0.788 1.624 0.1 0.1 99.9 99.9 0.00

Line22 -0.813 1.612 0.814 -1.612 0.9 0.6 99.9 99.9 0.01

Line142 0.009 0.003 -0.009 -0.004 0.0 -0.2 100.2 100.2 0.00
ETAP
Project: C.S.E RPLC Page: 107
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Line93 3.024 -0.493 -3.018 0.498 5.7 4.4 100.0 99.9 0.16

Line100 0.111 0.053 -0.111 -0.054 0.0 -0.1 99.9 99.9 0.00

Line106 -0.111 -0.053 0.111 0.053 0.0 -0.1 99.9 99.9 0.00

Line24 -0.829 1.604 0.831 -1.603 2.0 1.3 99.9 99.9 0.03

Line144 0.009 0.004 -0.009 -0.005 0.0 -0.9 100.2 100.2 0.00

Cable14-2 1.723 0.829 -1.722 -0.828 0.9 1.1 98.9 98.8 0.07

Line42 -1.723 -0.829 1.732 0.835 8.3 5.8 98.9 99.4 0.54

Line3 -0.127 -0.072 0.127 0.072 0.0 -0.2 100.1 100.1 0.01

Line26 0.070 0.051 -0.070 -0.051 0.0 -0.3 100.1 100.1 0.01

Line36 0.051 0.019 -0.051 -0.019 0.0 -0.1 100.1 100.1 0.00

Line112 -0.111 -0.053 0.111 0.053 0.0 -0.1 99.9 99.9 0.00

Line5 0.093 0.052 -0.093 -0.052 0.0 -0.3 100.1 100.1 0.01

Line122 -0.111 -0.053 0.111 0.053 0.0 -0.1 99.9 99.9 0.00

Line32 -0.091 -0.055 0.091 0.055 0.0 -0.2 100.2 100.2 0.01

Line39 0.027 0.008 -0.027 -0.009 0.0 -1.0 100.1 100.1 0.01

Line126 -0.111 -0.053 0.111 0.053 0.0 -0.2 99.9 99.9 0.01

Line108 3.018 -0.498 -3.014 0.501 4.0 3.1 99.9 99.8 0.11

Line85 -0.859 1.590 0.860 -1.590 0.7 0.4 99.9 99.9 0.01

Line102 0.002 0.001 -0.002 -0.001 0.0 -0.2 99.9 99.9 0.00

Line7-2 0.093 0.052 -0.093 -0.052 0.0 -0.1 100.1 100.1 0.00

Line12-1 -0.091 -0.055 0.091 0.054 0.0 -0.5 100.2 100.2 0.01

Line131 -0.202 -0.108 0.202 0.107 0.0 -0.2 99.9 99.9 0.01

T50 0.091 0.055 -0.091 -0.054 0.2 0.8 99.9 99.3 0.55

Line9 0.093 0.052 -0.093 -0.053 0.0 -0.5 100.1 100.1 0.01

Line101 -0.010 -0.005 0.010 0.005 0.0 -0.3 100.1 100.1 0.00

Line116 3.015 -0.501 -3.013 0.502 1.3 1.0 99.8 99.7 0.04

Line88 1.722 0.828 -1.722 -0.827 0.8 0.5 98.8 98.8 0.05

Line25 0.093 0.053 -0.093 -0.053 0.0 -0.5 100.1 100.1 0.01

Line111 0.000 0.000 0.000 0.000 0.0 -0.1 99.9 99.9 0.00

Line49 1.371 0.662 -1.370 -0.661 0.5 0.3 98.8 98.7 0.04

Line53 0.351 0.166 -0.351 -0.166 0.0 -0.1 98.8 98.8 0.01

Line120 3.013 -0.502 -3.012 0.503 1.3 1.0 99.7 99.7 0.04

Line27 0.000 0.000 0.0 -0.1 99.9 99.9 0.00

Line146 0.006 0.000 -0.006 -0.002 0.0 -1.9 99.6 99.6 0.00

Line29 3.012 -0.502 -3.011 0.504 1.3 1.0 99.7 99.6 0.04

Line33 0.000 0.000 0.000 0.000 0.0 -0.2 99.7 99.7 0.00

Line133 -0.208 -0.109 0.208 0.109 0.0 -0.1 99.9 99.9 0.00
ETAP
Project: C.S.E RPLC Page: 108
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Line83 -0.111 -0.055 0.111 0.054 0.0 -1.0 99.8 99.9 0.03

Line138 0.000 -0.001 0.000 0.000 0.0 -0.6 99.8 99.8 0.00

Line35 0.008 0.004 -0.008 -0.004 0.0 -0.1 99.4 99.4 0.00

Line135 -0.212 -0.112 0.212 0.112 0.0 0.0 99.9 99.9 0.00

Cable47-2 0.132 0.079 -0.132 -0.079 0.0 0.0 99.6 99.6 0.00

Line37 2.878 -0.583 -2.876 0.585 2.4 1.9 99.6 99.6 0.07

Line55 0.341 0.162 -0.341 -0.162 0.0 -0.1 98.8 98.8 0.01

Line43 0.000 0.000 0.000 0.000 0.0 -0.1 99.4 99.4 0.00

Line13 0.925 -1.550 -0.924 1.551 1.3 0.9 99.6 99.6 0.01

Line140 0.000 -0.001 0.000 0.000 0.0 -0.6 100.2 100.2 0.00

Line28 0.341 0.162 -0.340 -0.162 0.1 -0.2 98.8 98.7 0.02

Line31 0.079 0.045 -0.079 -0.045 0.0 -0.1 100.1 100.1 0.00

Line6-1 -0.123 -0.074 0.123 0.074 0.0 -0.5 100.2 100.2 0.02

Line71 0.000 0.001 0.000 -0.001 0.0 -0.2 99.9 99.9 0.00

Line10 -0.008 -0.004 0.008 0.004 0.0 -0.1 100.1 100.1 0.00

Line47 0.000 0.000 0.000 0.000 0.0 -0.1 99.4 99.4 0.00

Line34 0.008 0.003 -0.008 -0.003 0.0 -0.1 100.1 100.1 0.00

Line19 0.924 -1.551 -0.920 1.553 3.3 2.2 99.6 99.6 0.04

Line94 0.000 -0.001 0.000 0.000 0.0 -1.0 100.1 100.1 0.00

Line69 -0.009 -0.002 0.009 0.002 0.0 -0.3 99.9 99.9 0.00

Cable101-1 0.013 0.004 -0.013 -0.004 0.0 0.0 100.1 100.1 0.00

Line148 0.006 0.002 -0.006 -0.002 0.0 -0.6 100.1 100.1 0.00

Line20 0.000 -0.001 0.000 0.000 0.0 -0.5 100.2 100.2 0.00

Line79 0.007 0.003 -0.007 -0.003 0.0 -0.1 99.9 99.9 0.00

Line17 0.920 -1.553 -0.918 1.555 2.0 1.3 99.6 99.7 0.02

Line15 0.918 -1.555 -0.918 1.555 0.5 0.3 99.7 99.7 0.01

Line127 0.043 0.025 -0.043 -0.026 0.0 -0.5 99.7 99.7 0.01

Line130 0.874 -1.580 -0.867 1.586 7.9 5.4 99.7 99.8 0.11

Line87 -0.860 1.590 0.866 -1.586 6.6 4.5 99.9 99.8 0.09

Line61 0.010 0.005 -0.010 -0.005 0.0 -0.3 100.1 100.1 0.00

Line84 0.043 0.026 -0.043 -0.026 0.0 -0.1 99.7 99.6 0.00

Line124 0.000 0.000 0.000 0.000 0.0 -0.1 99.6 99.6 0.00

XFR-53-3B03 -0.656 -0.336 0.657 0.347 1.1 11.7 108.4 104.1 4.27

XFR-53-3B04 -0.485 -0.254 0.486 0.261 0.7 7.1 98.2 98.9 0.70

XFR-53-3D01 -0.395 -0.211 0.395 0.216 0.4 4.8 98.8 99.4 0.59

XFR-53-3D02 -0.395 -0.211 0.396 0.216 0.4 4.8 98.8 99.4 0.59

Cable2-3 0.805 0.492 -0.805 -0.492 0.0 0.0 100.1 100.1 0.00
ETAP
Project: C.S.E RPLC Page: 109
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable73-1 0.093 0.051 -0.093 -0.051 0.0 0.0 100.1 100.1 0.00

Cable4-5 0.175 0.106 -0.175 -0.106 0.0 0.0 99.9 99.9 0.00

Line74 -0.021 -0.011 0.021 0.011 0.0 0.0 101.3 101.3 0.03

Cable21-3 0.203 0.097 -0.203 -0.097 0.0 0.0 98.7 98.7 0.00

Cable27-3-1 0.070 0.033 -0.070 -0.033 0.0 0.0 98.7 98.7 0.00

Line117 0.000 0.000 0.0 -0.1 100.1 100.1 0.00

Line113 0.043 0.023 -0.043 -0.023 0.0 -0.1 100.1 100.1 0.00

Line115 0.035 0.018 -0.035 -0.018 0.0 -0.1 100.1 100.1 0.00

Line30 0.054 0.039 -0.054 -0.039 0.0 -0.4 100.1 100.1 0.01

840.7 11693.7
ETAP
Project: C.S.E RPLC Page: 110
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Equipment Cable and Heater Losses Summary Report

% Voltage
Connected Load Cable/Heater Losses Terminal on
% Vd % Vst
ID Type ID Library kW kvar Bus Bus kV Load kV Operating Starting

G-2002 Ind. Motor Cable18-2 15MCUS3 1.7 2.3 101.25 101.21 105.81 0.04 101.02

GM-4801A Ind. Motor Cable3-1 5,0NCUN1 0.4 0.1 99.39 99.19 99.19 0.19 98.61

GM-4702B Ind. Motor Cable6-1 5,0NCUN1 0.4 0.1 99.39 99.20 99.20 0.19 98.63

EM-4604-1 Ind. Motor Cable106 0,6NCUS1 98.80 98.80 103.10 0.00 0.00

EM-4604-2. Ind. Motor Cable105 0,6NCUS1 0.1 0.0 98.80 97.46 101.70 1.34 91.53

GM-4601 Ind. Motor Cable104 0,6NCUN3 0.7 0.1 98.80 96.20 100.38 2.61 88.98

GM-4603 Ind. Motor Cable103 0,6NCUN3 1.0 0.2 98.80 96.75 100.96 2.05 90.83

GM-4604. Ind. Motor Cable102 0,6NCUS1 0.0 0.0 98.80 98.46 102.74 0.34 96.42

GM-4602 A Ind. Motor Cable101 0,6NCUN3 0.7 0.0 98.80 95.59 99.75 3.21 86.19

EM-4603-1. Ind. Motor Cable100 0,6NCUN3 0.6 0.1 98.80 97.17 101.40 1.63 92.21

GM-4606. Ind. Motor Cable150 0,6NCUS1 0.1 0.1 98.81 96.72 100.93 2.08 87.41

EM-4603-2. Ind. Motor Cable155 0,6NCUN3 0.6 0.1 98.81 97.18 101.40 1.63 92.22

EM-4702-1. Ind. Motor Cable114 0,6NCUN3 0.9 0.1 98.80 95.85 100.02 2.95 87.56

EM-4702-2. Ind. Motor Cable115 0,6NCUN3 0.9 0.1 98.80 95.85 100.02 2.95 87.56

GM-4706 A. Ind. Motor Cable116 0,6NCUN3 1.4 0.4 98.80 96.82 101.03 1.98 90.88

EM-4704-1. Ind. Motor Cable118 0,6NCUN3 0.9 0.1 98.80 95.85 100.02 2.95 87.56

Mtr51 Ind. Motor Cable120 0,6NCUN3 0.9 0.1 98.80 95.85 100.02 2.95 87.56

GM-4701 Ind. Motor Cable162 0,6NCUN3 0.2 0.0 98.81 97.20 101.42 1.61 91.52

EM-4704- 4 Ind. Motor Cable159 0,6NCUN3 0.9 0.1 98.81 95.85 100.02 2.95 87.56

GM-4802. Ind. Motor Cable122 0,6NCUS1 0.1 0.0 98.80 97.28 101.51 1.52 90.01

GM-4951 B Ind. Motor Cable125 0,6NCUN3 0.7 0.1 98.80 97.45 101.68 1.36 93.48

GM-4902A. Ind. Motor Cable137 0,6NCUS1 98.80 98.80 103.10 0.00 0.00

GM-4902B. Ind. Motor Cable139 0,6NCUS1 98.80 98.80 103.10 0.00 0.00

GM-4901-B Ind. Motor Cable145 0,6NCUN3 1.0 0.9 98.80 97.89 102.15 0.91 93.43

EM-4902-1. Ind. Motor Cable133 0,6NCUS1 0.1 0.0 98.80 97.79 102.04 1.01 92.78

GM-4904. Ind. Motor Cable129 0,6NCUS1 98.80 98.80 103.10 0.00 0.00

GM-4905-A Ind. Motor Cable130 0,6NCUS1 0.1 0.0 98.80 97.79 102.04 1.01 92.78

GM-4951 Ind. Motor Cable131 0,6NCUN3 98.80 98.80 103.10 0.00 0.00

GM-4901-C Ind. Motor Cable132 0,6MCUN3 98.80 98.80 103.10 0.00 0.00
ETAP
Project: C.S.E RPLC Page: 111
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

BARRA A ALQUILACION Bus Under Voltage 0.480 kV 0.454 94.7 3-Phase


480V
BARRA__A-1 Bus Over Voltage 13.800 kV 17.233 124.9 3-Phase

Bus179 Bus Under Voltage 4.160 kV 3.930 94.5 3-Phase

Bus186 Bus Under Voltage 4.160 kV 3.948 94.9 3-Phase

Bus190 Bus Under Voltage 0.480 kV 0.450 93.7 3-Phase

Bus25-3 Bus Over Voltage 0.480 kV 0.505 105.3 3-Phase

Bus278 Bus Under Voltage 0.220 kV 0.208 94.7 3-Phase

Bus305 Bus Over Voltage 0.480 kV 0.505 105.3 3-Phase

Bus74-1 Bus Over Voltage 0.480 kV 0.505 105.3 3-Phase

CB1135 LV CB Overload 10.000 Amp 11.928 119.3 3-Phase

CB1136 LV CB Overload 10.000 Amp 11.928 119.3 3-Phase

CB1142 LV CB Overload 10.000 Amp 11.928 119.3 3-Phase

CB1144 LV CB Overload 10.000 Amp 11.928 119.3 3-Phase

CB1159 LV CB Overload 15.000 Amp 15.905 106.0 3-Phase

CB1161 LV CB Overload 15.000 Amp 15.905 106.0 3-Phase


ETAP
Project: C.S.E RPLC Page: 112
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

CB1163 LV CB Overload 10.000 Amp 25.164 251.6 3-Phase

CB3-1-2 HV CB Overload 3000.000 Amp 5630.102 187.7

CB-P11 LV CB Overload 10.000 Amp 24.394 243.9 3-Phase

CB-P29A LV CB Overload 10.000 Amp 81.847 818.5 3-Phase

Cont109 Contactor Overload 10.000 Amp 11.928 119.3 3-Phase

Cont112 Contactor Overload 10.000 Amp 11.928 119.3 3-Phase

Cont120 Contactor Overload 10.000 Amp 11.928 119.3 3-Phase

MCC-45-2B01 Bus Over Voltage 0.480 kV 0.520 108.4 3-Phase

MCC-45-2B03A Bus Over Voltage 0.480 kV 0.520 108.4 3-Phase

PDC-53-2B02A Bus Over Voltage 0.480 kV 0.520 108.4 3-Phase

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

B3-2 Bus Over Voltage 2.400 kV 2.500 104.2 3-Phase

BARRA A-1 Bus Under Voltage 0.480 kV 0.466 97.1 3-Phase

BC Bus Under Voltage 2.400 kV 2.332 97.2 3-Phase

Bus101 Bus Under Voltage 4.160 kV 4.062 97.6 3-Phase

Bus101-1 Bus Over Voltage 2.400 kV 2.457 102.4 3-Phase

Bus112-1 Bus Over Voltage 0.208 kV 0.213 102.3 3-Phase

Bus116-1 Bus Over Voltage 0.208 kV 0.215 103.3 3-Phase

Bus120-1 Bus Over Voltage 2.400 kV 2.463 102.6 3-Phase

Bus126-1 Bus Over Voltage 0.480 kV 0.502 104.5 3-Phase

Bus196 Bus Over Voltage 0.480 kV 0.502 104.7 3-Phase

Bus198 Bus Over Voltage 0.480 kV 0.502 104.6 3-Phase

Bus20-4 Bus Under Voltage 0.480 kV 0.467 97.2 3-Phase

Bus230 Bus Over Voltage 0.440 kV 0.458 104.1 3-Phase

Bus240 Bus Over Voltage 0.480 kV 0.492 102.4 3-Phase

Bus2-5 Bus Under Voltage 0.480 kV 0.456 95.1 3-Phase

Bus37-3 Bus Under Voltage 0.480 kV 0.458 95.3 3-Phase

Bus53 Bus Over Voltage 4.160 kV 4.299 103.4 3-Phase

Bus54 Bus Over Voltage 4.160 kV 4.303 103.4 3-Phase

Bus55 Bus Over Voltage 4.160 kV 4.299 103.3 3-Phase

Bus56 Bus Over Voltage 4.160 kV 4.299 103.3 3-Phase

Bus57 Bus Over Voltage 4.160 kV 4.308 103.6 3-Phase

Bus58 Bus Over Voltage 4.160 kV 4.307 103.5 3-Phase

Bus59-1-1 Bus Over Voltage 0.220 kV 0.227 103.0 3-Phase


ETAP
Project: C.S.E RPLC Page: 113
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus72-1 Bus Over Voltage 0.208 kV 0.218 104.6 3-Phase

Bus81 Bus Over Voltage 4.160 kV 4.304 103.5 3-Phase

Bus82 Bus Over Voltage 4.160 kV 4.317 103.8 3-Phase

Bus8-2 Bus Under Voltage 0.480 kV 0.457 95.1 3-Phase

Bus83 Bus Over Voltage 4.160 kV 4.322 103.9 3-Phase

Bus87 Bus Over Voltage 4.160 kV 4.307 103.5 3-Phase

Bus91-1 Bus Over Voltage 0.220 kV 0.228 103.5 3-Phase

Bus94-1 Bus Over Voltage 2.400 kV 2.460 102.5 3-Phase

Bus99-1 Bus Over Voltage 2.400 kV 2.463 102.6 3-Phase

MCC-53-3B01 Bus Over Voltage 4.160 kV 4.316 103.8 3-Phase

MCC-53-3B03 Bus Over Voltage 4.160 kV 4.331 104.1 3-Phase

n1 Bus Over Voltage 2.400 kV 2.519 104.9 3-Phase

n38 Bus Under Voltage 2.400 kV 2.331 97.1 3-Phase

n39 Bus Under Voltage 0.240 kV 0.232 96.7 3-Phase

PAL_A-1 Bus Over Voltage 16.500 kV 17.233 104.4 3-Phase

PDC-53-3B01A Bus Over Voltage 4.160 kV 4.317 103.8 3-Phase

PDC-53-3B02A Bus Over Voltage 4.160 kV 4.331 104.1 3-Phase


ETAP
Project: C.S.E RPLC Page: 114
5.5.5C
Location: Refineria Puerto la Cruz Date: 03-31-2011
Contract: PDVSA SN: PDVSACORP3
Engineer: Daniel De Oliveira Revision: Base
Study Case: LF
Filename: SIMULACION CP Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): -116.692 -67.922 135.020 86.43 Lagging

Source (Non-Swing Buses): 184.900 117.062 218.841 84.49 Lagging

Total Demand: 68.208 49.140 84.066 81.14 Lagging

Total Motor Load: 58.223 33.074 66.961 86.95 Lagging

Total Static Load: 9.144 4.372 10.136 90.22 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.841 11.694

System Mismatch: 0.005 0.000

Number of Iterations: 3

You might also like