3.30 M2 269.20
REPOSICION CAPA GRANULAR ESTABILIZADO CON CEMENTO
3.40 IMPRIMACION M2 210.40
3.50 MICROPAVIMENTO DE APERTURA RAPIDA M2 420.00
4.00 OBRAS DE ARTE Y DRENAJE
4.10 EXCAVACION PARA ESTRUCTURAS M3 1055.53
4.20 RELLENO PARA ESTRUCTURAS M3 181.83
4.30 ENCOFRADO Y DESENCOFRADO M2 328.86
4.40 ACERO DE REFUERZO FY=4200 KG/CM2 KG 6823.12
4.50 CONCRETO F'C=100KG/CM2 M3 8.69
4.60 CONCRETO F'C=280 KG/CM2 M3 89.39
4.70 LOSA DE PROTECCION 1.50 x 1.00 x 0.15 UNID 9.00
5.00 SEÑALIZACION
5.10 SEÑALIZACION HORIZONTAL M2 20.00
6.00 VARIOS
6.10 SOPORTE TUBERIA ONP UNID 2.00
6.20 PORTON METALICO UNID 2.00
6.30 PROTECCION AMBIENTAL GBL 1.00
6.40 RETIRO DEL ENTIBADO EXISTENTE GBL 1.00
PARTIDA
1 OBRAS PRELIMINARES
1.1 MOVILIZACION Y DESMOVILIZACION
UNIDAD : MES
Total 2.00
PARTIDA
1 OBRAS PRELIMINARES
1.2 TRAZO
UNIDAD : GBL
Total 1.00
PARTIDA
1 OBRAS PRELIMINARES
1.3 MANTENIMINETO DE TRANSITO Y SEGURIDAD VIAL
UNIDAD : GBL
Total 1.00
PARTIDA
2.00 MOVIMIENTO DE TIERRAS
2.10 EXCAVACION PARA ACCESOS
UNIDAD : M3
00+000.00 0.00
00+010.00 10.00 1.00 5.00
00+020.00 10.00 1.62 13.10
00+030.00 10.00 1.96 17.90
00+040.00 10.00 4.91 34.35
00+050.00 10.00 4.87 48.90
00+060.00 10.00 4.81 48.40
00+070.00 10.00 3.38 40.95
00+080.00 10.00 3.54 34.60
00+090.00 10.00 0.81 21.75
00+100.00 10.00 3.07 19.40
00+110.00 10.00 0.00 15.35
Total 299.70
PARTIDA
2.00 MOVIMIENTO DE TIERRAS
2.20 AFIRMADO PARA ACCESO
UNIDAD : M3
00+000.00 0.00
00+010.00 10.00 1.07 5.35
00+020.00 10.00 1.08 10.75
00+030.00 10.00 1.09 10.85
00+040.00 10.00 1.27 11.80
00+050.00 10.00 1.42 13.45
00+060.00 10.00 1.44 14.30
00+070.00 10.00 1.37 14.05
00+080.00 10.00 1.20 12.85
00+090.00 10.00 1.07 11.35
00+100.00 10.00 1.08 10.75
00+110.00 10.00 0.00 5.40
Total 120.90
PARTIDA
3.00 PAVIMENTOS
3.10 EXCAVACION ZONA DE EMPALME
UNIDAD : M2
239+690.00
239+700.00 39.77
239+705.00
239+715.00 23.71
Total 63.48
PARTIDA
3.00 PAVIMENTOS
3.20 REPOSICION MATERIAL DE RELLENO
UNIDAD : M2
239+680.00 5.87
239+690.00 10.00 5.87 58.70
239+700.00 10.00 8.00 69.35
239+710.00 10.00 8.00 80.00
239+720.00 10.00 5.87 69.35
Total 277.40
PARTIDA
3.00 PAVIMENTOS
3.3 REPOSICION CAPA GRANULAR ESTABILIZADO CON CEMENTO
UNIDAD : M2
Total 269.20
PARTIDA
3.00 PAVIMENTOS
3.4 IMPRIMACION
UNIDAD : M2
239+680.00 5.26
239+690.00 10.00 5.26 52.60
239+700.00 10.00 5.26 52.60
239+710.00 10.00 5.26 52.60
239+720.00 10.00 5.26 52.60
Total 210.40
PARTIDA
3.00 PAVIMENTOS
3.5 MICROPAVIMENTO DE APERTURA RAPIDA
UNIDAD : M2
ANCHO METRADO
PROGRESIVA LONGITUD (M)
(M) (M2)
239+660.00 5.25
239+680.00 20.00 5.25 105.00
239+690.00 10.00 5.25 52.50
239+700.00 10.00 5.25 52.50
239+710.00 10.00 5.25 52.50
239+720.00 10.00 5.25 52.50
239+760.00 5.25
239+780.00 20.00 5.25 105.00
Total 420.00
PARTIDA
4.00 OBRAS DE ARTE Y DRENAJE
4.10 EXCAVACION PARA ESTRUCTURAS
UNIDAD : M3
Total 181.83
PARTIDA
4.00 OBRAS DE ARTE Y DRENAJE
4.30 ENCOFRADO Y DESENCOFRADO
UNIDAD : M2
AREA METRADO
ITEM
(M2) (M2)
Total 328.86
PARTIDA
4.00 OBRAS DE ARTE Y DRENAJE
4.40 ACERO DE REFUERZO FY=4200 KG/CM2
UNIDAD KG
AREA METRADO
ITEM
(M2) (M2)
Total 6823.12
PARTIDA
4.00 OBRAS DE ARTE Y DRENAJE
4.50 CONCRETO F'C=100KG/CM2
UNIDAD M3
VOLUMEN METRADO
ITEM
(M3) (M3)
Total 8.69
PARTIDA
4.00 OBRAS DE ARTE Y DRENAJE
4.60 CONCRETO F'C=280 KG/CM2
UNIDAD M3
VOLUMEN METRADO
ITEM
(M3) (M3)
Total 89.39
PARTIDA
4.00 OBRAS DE ARTE Y DRENAJE
4.70 LOSA DE PROTECCION 1.50 x 1.00 x 0.15
UNIDAD UNID
METRADO
ITEM CANTIDAD
(UND)
Total 9.00
PARTIDA
5.00 SEÑALIZACION
5.10 SEÑALIZACION HORIZONTAL
UNIDAD : M2
239+660.00 0.2
239+670.00 10.00 0.2 2.00
239+680.00 10.00 0.2 2.00
239+690.00 10.00 0.2 2.00
239+700.00 10.00 0.2 2.00
239+710.00 10.00 0.2 2.00
239+720.00 10.00 0.2 2.00
239+730.00 10.00 0.2 2.00
239+740.00 10.00 0.2 2.00
239+760.00 20.00 0.2 4.00
239+780.00 20.00 0.2 4.00
Total 20.00
PARTIDA
6.00 VARIOS
6.10 SOPORTE TUBERIA ONP
UNIDAD : UNID
Total 1.00
Total 2.00
PARTIDA
6.00 VARIOS
6.20 PORTON METALICO
UNIDAD : UNID
Total 1.00
Total 2.00
PARTIDA
6.00 VARIOS
6.30 PROTECCION AMBIENTAL
UNIDAD : GBL
Total 1.00
Total 2.00
PARTIDA
6 VARIOS
6.40 RETIRO DEL ENTIBADO EXISTENTE
UNIDAD : GBL
Total 1.00
TAG Empalme DIAM LONG. # Veces. 3/8"
P1
7 5/8" 2.74 26 0
8 5/8" 2.74 26 0
11 5/8" 5.00 51 0
12 5/8" 5.00 51 0
T1
13 5/8" 2.71 27 0
14 5/8" 2.71 27 0
15 5/8" 2.74 26 0
16 5/8" 2.74 26 0
17 5/8" 4.80 85 0
18 1/2" 4.00 85 0
M1
21 5/8" 4.80 77 0
22 1/2" 4.00 77 0
M2
29 1/2" 3.74 9 0
31 1/2" 2.82 2 0
32 3/8" 2.68 9 24.12
36 1/2" 3.74 9 0
38 1/2" 2.86 2 0
45 1/2" 2.00 2 0
50 1/2" 3.74 9 0
52 1/2" 2.26 2 0
58 3/8" 1.50 26 39
59 1/2" 7.12 6 0
U-1
61 1/2" 7.27 6 0
U-2
63 1/2" 2.37 30 0
64 1/2" 2.37 30 0
65 1/2" 1.36 7 0
P1-A
66 1/2" 1.36 7 0
67 1/2" 7.10 8 0
68 1/2" 7.10 8 0
69 1/2" 2.19 13 0
70 1/2" 2.19 13 0
71 1/2" 2.44 4 0
P1-B
72 1/2" 2.44 4 0
73 1/2" 3.24 4 0
74 1/2" 3.24 4 0
75 1/2" 1.75 10 0
76 1/2" 1.75 10 0
P1-C
77 1/2" 2.17 7 0
78 1/2" 2.17 7 0
79 1/2" 2.37 28 0
80 1/2" 2.37 28 0
81 1/2" 1.75 10 0
82 1/2" 1.75 10 0
P2-A
83 1/2" 7.52 8 0
84 1/2" 7.52 8 0
85 1/2" 1.44 9 0
86 1/2" 1.44 9 0
87 1/2" 3.35 4 0
88 1/2" 3.35 4 0
89 1/2" 1.86 4 0
P2-B
90 1/2" 1.86 4 0
91 1/2" 1.81 13 0
92 1/2" 1.81 13 0
93 1/2" 2.37 4 0
94 1/2" 2.37 4 0
95 1/2" 2.76 4 0
P2-C
P2-C
96 1/2" 2.76 4 0
97 1/2" 1.63 10 0
98 1/2" 1.63 10 0
0 0 141.57
0 0 141.57
0 255 395.76
0 255 395.76
0 73.98 114.82
0 73.98 114.82
0 71.24 110.56
0 71.24 110.56
0 0 141.57
0 0 141.57
0 255 395.76
0 255 395.76
0 73.17 113.56
0 73.17 113.56
0 71.24 110.56
0 71.24 110.56
0 408 633.22
340 0 337.96
0 0 107.27
0 0 107.27
0 369.6 573.62
308 0 306.15
0 0 107.77
0 0 107.77
0 0 17.24
0 0 17.24
0 0 3.56
0 0 3.56
33.66 0 33.46
0 0 16.76
5.64 0 5.61
0 0 13.51
0 0 13.51
0 0 4.39
0 0 4.39
33.66 0 33.46
0 0 16.76
5.72 0 5.69
0 0 16.33
0 0 17.24
0 0 3.56
0 0 3.56
0 0 18.85
0 0 16.76
4 0 3.98
0 0 12.85
0 0 13.51
0 0 4.39
0 0 4.39
33.66 0 33.46
0 0 16.76
4.52 0 4.49
0 0 7.11
12.7 0 12.62
0 0 21.00
0 0 7.39
13.2 0 13.12
0 0 21.84
42.72 0 42.46
0 0 25.66
43.62 0 43.36
0 0 26.54
71.1 0 70.67
71.1 0 70.67
9.52 0 9.46
9.52 0 9.46
56.8 0 56.46
56.8 0 56.46
28.47 0 28.30
28.47 0 28.30
9.76 0 9.70
9.76 0 9.70
12.96 0 12.88
12.96 0 12.88
17.5 0 17.40
17.5 0 17.40
15.19 0 15.10
15.19 0 15.10
66.36 0 65.96
66.36 0 65.96
17.5 0 17.40
17.5 0 17.40
60.16 0 59.80
60.16 0 59.80
12.96 0 12.88
12.96 0 12.88
13.4 0 13.32
13.4 0 13.32
7.44 0 7.40
7.44 0 7.40
23.53 0 23.39
23.53 0 23.39
9.48 0 9.42
9.48 0 9.42
11.04 0 10.97
11.04 0 10.97
16.3 0 16.20
16.3 0 16.20
CANTARILLAS TIPO MC
ADO x METRO LINEAL DE ALCANTARILLA
CANTARILLAS TIPO MC
EZAL DE ALCANTARILLA
SUSTENTO DE A
CONCRETO - CA
CARACTERISTICAS GEOMETRICAS C
LCANTARILLAS TIPO MC
FRADO - CABEZAL DE ALCANTARILLA
6.19 1.17 0.20 3.00 7.49 0.100 12.16 1.00 0.04 29.05
3.82 1.17 0.20 3.00 7.49 0.100 15.34 1.00 0.04 31.72
3.65 1.13 0.20 2.99 7.21 0.100 12.09 1.00 0.04 25.66
6.55 1.13 0.20 2.99 7.21 0.100 15.97 1.00 0.04 34.57
121.01