You are on page 1of 1

Checked: Checker Approved: Approver ISO A0 1189mm x 841mm CLIENT

MINISTRY OF
LEVEL 11 HEALTH
KINGDOM OF SAUDI ARABIA
(STAND-BY LOAD)
DB-T1/11-N4.1.1P DB-T1/11-N4.1.2P DB-T1/11-N4.1.3P DB-T1/11-N4.1.4L DB-T1/11-N4.1.5P DB-T1/11-N4.1.6P DB-T1/11-N4.1.7P DB-T1/11-N4.1.8P DB-T1/11-C5.1.1P DB-T1/11-C5.1.2P DB-T1/11-C5.1.3P DB-T1/11-C5.1.4L DB-T1/11-C5.1.5P DB-T1/11-C5.1.6P DB-T1/11-C5.1.7P PROJECT

KING KHALID
MEDICAL CITY
4C 50sq.mm CU/XLPE/SWA/LSF 4C 50sq.mm CU/XLPE/SWA/LSF DAMMAM, SAUDI ARABIA
+ 1C 25 sq.mm ECC + 1C 25 sq.mm ECC
CLIENT REPRESENTATIVE
SPARE SPARE
LEGENDS VANIR CONSTRUCTION MANAGEMENT LLC
PO Box 126735
CIRCUIT BREAKER
Jeddah 21352
AIR CIRCUIT BREAKER Kingdom of Saudi Arabia
Designer

11kV CIRCUT BREAKER


VANIR
Designer:

Construction Management, Inc.


HRC FUSE

VT (VOLTAGE TRANSFORMER) CONSULTANT


CT SS A CT SS A
5A 5A EARTHING SWITCH
Project Management Initials:

SS V SS V
MOTORISED LOAD
5A 5A
R Y B R Y B BREAK/EARTING SWITCH AECOM ARABIA
AL KHEREJI BUSINESS CENTER
SMDB-T1/11-N3.1 SMDB-T1/11-C5.1 KING FAISAL ROAD, PO BOX 172
TCL : 298.1 kW 630A TCL : 193.8 kW 400A 3x50/51 OVERCURRENT/EARTH FAULT RELAY
TP 50N/51N AL KHOBAR 31952, SAUDI ARABIA
TDL : 238.5 kW TP TDL : 155.0 kW
MCCB MCCB www.aecom.com
LOCATION : LEVEL11 TOWER 1 LOCATION : LEVEL 11 TOWER 1 MOTOR DRIVE WITH
ELECTRICAL RM : ELECTRICAL RM :
M CONSULTANTS
INTERLOCKING SYSTEM
FAULT EARTH INDICATOR
NOTES:
HAR HARMONIC FILTER
Last Plotted: 6/19/2013 5:52:27 PM

1. THE QUANTITY AND RATING OF THE BREAKERS AND CABLES


FED FROM FED FROM A AMMETER SHOWN ARE INDICATIVE ONLY. THE FINAL QUANTITIES AND
LV-T1/03-N4 LV-P1/03-C5 R Y B PHASE INDICATOR LAMPS RATINGS SHALL BE CONFIRMED.
FUSE AFTER FINALIZATION OF ELECTRICAL LOAD SCHEDULES.
MECHANICAL EQUIPMENT LOADS, ALL LOADS FROM OTHER
V VOLTMETER SPECIALIST DISCIPLINES LIKE KITCHEN EQUIPMENT,
CT CURRENT TRANSFORMER LAUNDRY EQUIPMENT, ELEVATOR EQUIPMENT ETC.
EF EARTH FAULT
SC SHORT-CIRCUIT 2.FOR THE PURPOSE OF TENDER, ALL PRICING ALLOW AS
FOLLOWS:
(STAND-BY LOAD) (STAND-BY LOAD) OC OVER-CURRENT * ALL DISTRIBUTION BOARDS (DB'S) TO BE WITH 125A TP
DB-T2/11-C12.1.1P DB-T2/11-C12.1.2P DB-T2/11-C12.1.3P DB-T2/11-C12.1.4L DB-T2/11-C12.1.5P DB-T2/11-C12.1.6P DB-T2/11-C12.1.7P DB-T3/11-N16.1.1 DB-T3/11-N16.1.2 DB-T3/11-N16.1.3 DB-T3/11-N16.1.4 DB-T3/11-N16.1.5 DB-T3/11-N16.1.6 DB-T3/11-N16.1.7 DB-T3/11-N16.1.8 DB-T2/11-N9.1.1P DB-T2/11-N9.1.2P DB-T2/11-N9.1.3P DB-T2/11-N9.1.4L DB-T2/11-N9.1.5P VSS VOLTAGE SELECTOR SWITCH ISOLATOR.
* ALL DB'S TO BE 14 WAYS TPN BOARDS (MCB'S PROVIDED).
PF POWER FACTOR INDICATOR
* ALL NORMAL DB'S SHALL HAVE A MINIMUM OF 4 NO. ELCB'S
OF 100mA OR 30mA RATING WHICHEVER IS APPROPRIATE
MDI MAXIMUM DEMAND INDICATOR
FOR A PARTICULAR DB.
KVAR REACTIVE POWER INDICATOR * ALL CRITICAL/ EMERGENCY/ LIFE SAFETY DB'S SHALL BE
PROVIDED WITH RCBO'S AS APPROPRIATE FOR A
4C 50sq.mm CU/XLPE/SWA/LSF 4C 50sq.mm CU/XLPE/SWA/LSF 4C 50sq.mm CU/XLPE/SWA/LSF KWH KILO WATT HOUR METER PARTICULAR DB.

+ 1C 25 sq.mm ECC + 1C 25 sq.mm ECC + 1C 25 sq.mm ECC * ALL MULTIFUNCTION METER AND RELAYS SHALL BE
THERMOSTATICALLY CONTROLLED HEATER COMMUNICABLE TYPE.
* BREAKER STATUS TO BE PROVISIONED FOR BMS.
SPARE SPARE SPARE ATS AUTO TRANSFER SWITCH *PROVISION FOR FIRE INTERLOCKING TO BE MADE.
EMP EMERGENCY MAIN PANEL
ESP EMERGENCY SUB PANEL
REGISTRATION
EARTH LEAKAGE PROTECTION
MCC MOTOR CONTROL CENTER
CP CONTROL PANEL
NC NORMALLY CLOSED
NO NORMALLY OPEN

SELECTION OF SURGE PROTECTION DEVICE Not to be used for


CT SS A CT SS A CT SS A Construction Purposes
5A
TYPE PANEL TYPE REF. NAME SURGE PROT. PART NO.
5A 5A
SS V SS V SS V TYPE-1 Main Distribution Boards LV-H_ _N_ ESP415/1/TNS, 25kA
5A 5A 5A TYPE-1 Emergency Main LV-H_ _C_
R Y B R Y B R Y B LV-H_ _L_ ESP415/D1, 25kA
Distribution Boards
SMDB-T3/11-N16.1 SMDB-T2/11-N16.1 MDB-
SMDB-T2/11-C12.1
TCL : 265.3 kW 630A TCL : 291.8 kW 630A TCL : 173.6 kW 400A TYPE-2 Sub Main SMDB-H_ _N_
TP TDL : 233.4 kW TP TDL : 138.0 kW TP SMDB-H_ _C_ ESP415/D1
TDL : 212.2 kW MCCB Distribution Boards
MCCB MCCB SMDB-H_ _L_
LOCATION : LEVEL11 TOWER 2 LOCATION : LEVEL 11 TOWER 3 LOCATION : LEVEL 11 TOWER 2
ELECTRICAL RM : ELECTRICAL RM : ELECTRICAL RM : TYPE-1 Motor Control Center MCC-H_ _N_ ESP415/1/TNS
TYPE-1 Emergency MCC-H_ _C_
Motor Control Center MCC-H_ _L_ ESP415/1/TNS

FED FROM FED FROM FED FROM TYPE-2 Final Distribution Boards DB-H_ _N_ ESP415/D1
LV-T2/03-C12 LV-T3/13-N16 LV-T3/13-N16 TYPE-2 Emergency DB-E.H_ _C_
Final Distribution Boards DB-E.H_ _L_ ESP415/D1

TYPE-1 Street Lighting Feeder FP-H_ _N_


Pillars ESP415/1/TNS

TYPE-1 Main Distribution Frame MDF ESP 30H

EQUIPMENT NOMENCLATURE

(STAND-BY LOAD) DB-T4/11- DB-T4/11- DB-T4/11- DB-UI-T2/11- DB-UI-T3/11- DB-UI-T4/11- SMDB.UM-T1/04-C21.1


DB-T4/11- DB-T4/11- DB-T4/11- DB-T4/11-
DB-T4/11-N16.1.1P DB-T4/11-N16.1.2P DB-T4/11-N16.1.3P DB-T4/11-N16.1.4L DB-T4/11-N16.1.5P DB-T4/11-N16.1.6P DB-T4/11-N16.1.7P DB-T4/11-N16.1.8P C19.1.1P C19.1.2P C19.1.3P C20.1.1.1 C20.1.1.1 C20.1.1.1
C19.1.4L C19.1.5P C19.1.6P C19.1.7P Panel / Equipment Number
Transformer Number
Load Classification
N - Normal
C - Critical MINISTRY OF HEALTH APPROVAL
L - Life Safety
NE - Normal Equipment
4C 50sq.mm CU/XLPE/SWA/LSF 4C 50sq.mm CU/XLPE/SWA/LSF 4C 50sq.mm CU/XLPE/SWA/LSF EE - Emergency Equipment
+ 1C 25 sq.mm ECC + 1C 25 sq.mm ECC + 1C 25 sq.mm ECC Equipment Location
04 - Floor Number
Areas
R:\003 PROJECT RECORDS\60247633.00_KKMC\8 CADD\8.7 MEP\08. MH\CADD\Electrical\220-Power\++MH-TENDER DRAWINGS\02. SCHEMATICS\02. SHE KKMC-MH-AEC-EEP-DG-14202-015.dwg

SPARE SPARE SPARE T1 - Tower 1


T2 - Tower 2
T3 - Tower 3
T4 - Tower 4 KKMC PMO APPROVAL
P1 - Podium 1
P2 - Podium 2
P3 - Podium 3
P4 - Podium 4
Panel for
UM- UPS for Medical Services
UI - UPS for IT Services
E - Emergency Life Safety Services
Equipment
CT SS A CT SS A CT SS A TX - Transformer
MV - Medium Voltage Panel Mohammed Sager, Executive Director
5A 5A 5A
PFC - Power Factor Control Panel KING KHALID MEDICAL CITY
SS V SS V SS V
LV - LV Panel PROJECT MANAGEMENT ORGANIZATION
5A 5A 5A MDB - Main Distribution Board
R Y B R Y B R Y B SMDB - Sub Main Distribution Board
SMDB-T4/11-N16.1 SMDB-T4/11-C19.1 DB - Distribution Board DESIGNER/QA-QC APPROVAL
SMDB-UI-T4/11-C20.1.1
TCL : 294.1 kW 630A TCL : 200.1 kW 400A TCL : 146.70 kW 630A
TDL : 235.3 kW TP TDL : 160.1 kW TP TP
TDL : 117.30 kW Drawn Checked Inter-Disp Check Verified Approved
MCCB MCCB MCCB
LOCATION : LEVEL 11 TOWER 5 LOCATION : LEVEL 11 TOWER 4 LOCATION : LEVEL 11 TOWER 4 RJ / TS MJ MJ DW GB
ELECTRICAL RM : ELECTRICAL RM : ELECTRICAL RM :

KEYPLAN
FED FROM FED FROM FED FROM
LV-T3/13-N16 LV-T4/03-C19 LV-T3/04-C20

TOWER-2 TOWER-4
(T2) (T4)
TOWER-3
TOWER-1
(T3)
(T1)

DB-UM-T2/11- DB-UM-T2/11- DB-UM-T2/11-


C21.1.1.1 C21.1.1.2 C21.1.1.3 DB-T3/11-C22.1.1P DB-T3/11-C22.1.2P DB-T3/11-C22.1.3P DB-T3/11-C22.1.4L DB-T3/11-C22.1.5P DB-T3/11-C22.1.6P DB-T3/11-C22.1.7P
PODIUM 1 PODIUM 2 PODIUM 4 ISSUE/REVISION
(P1) (P2) (P4)
PODIUM 3
LEVEL 04 LEVEL 04

(P3)

4C 50sq.mm CU/XLPE/SWA/LSF 4C 50sq.mm CU/XLPE/SWA/LSF


+ 1C 25 sq.mm ECC + 1C 25 sq.mm ECC

SPARE SPARE C 30/06/2013 ISSUED FOR TENDER


B 30/04/2013 ISSUED FOR TENDER
A 02/03/2013 ISSUED FOR TENDER

I/R DATE DESCRIPTION

KEY PLAN

CT SS A CT SS A
5A 5A
SS V SS V
5A 5A
R Y B R Y B
SMDB-UM-T3/11-C21.1.1 SMDB-T3/11-C22.1
TCL : 226.2 kW 630A TCL : 200.1 kW 400A
TP TDL : 160.1 kW TP
TDL : 181.0 kW PROJECT NUMBER
MCCB MCCB
LOCATION : LEVEL 11 TOWER 3 LOCATION : LEVEL 11 TOWER 3
ELECTRICAL RM : ELECTRICAL RM : 60247633
SHEET TITLE
FED FROM FED FROM MAIN HOSPITAL
LV-T3/04-C21 LV-T3/04-C22
ELECTRICAL SUB MAIN DISTRIBUTION
BOARD SCHEMATIC DIAGRAM
SHEET 15
SHEET NUMBER

Printed on ___% Post-Consumer


Recycled Content Paper