You are on page 1of 7

TOWER CRANE

BASE

19
7'-
0"

TOWER CRANE
RADIUS = 197'-0"
2010 E 6TH STREET - EXHIBIT "W" Red circle indicates approximate
tower crane radius.
Site Logistics Plan

60'-8"
Orange indicates property line.

41'-4"
30 t
'-4
"
ELECTRICAL
112

Opening in facade for


loading / trash removal.

23'-10" Center of
Tower Crane
75'-11" 24'-8"
LOBBY

RE: LANDSCAPE

24'-1"
PROPERTY LINE
Existing entrance to site to
Dumpster Gate remain open for traffic flow.
Portable Toilets
Ope rable
Operable Gate

EAST 6TH STREET

Proposed barricades /

160'-11"
extent of street rental.

Tower Crane Diagram: 2010 East 6th


4 2
SSK-001
13' - 0"
8' - 6" 3' - 0" 7' - 0" 3' - 0" 13' - 0"
T.O. PIER
FOUNDATION DATUM ELEV = 465.083
ANCHOR PER CRANE
SUPPLIER TYP. SEE PLAN FOR TOP OF PIER

ESTIMATED AVERAGE DEPTH TO BEARING STRATUM


P30T, EL.= 76' - 0" P30T, EL.= 76' - 0" SK 415 TOWER CRANE
HH = 130'-11" (7)-TS212 ELEVATION AND DETAIL REFERENCE.
MIDDLE MAT(12)-#9 E.W.

28 FT. FOR ESTIMATING PURPOSES


Level U2
FOUNDATION
3' - 0"

1' - 8"
82' - 0"
ANCHOR PER
CRANE 61" CONC. PIER CAP INCREASE SHAFT DIAMETER

3"
1' - 8"
SUPPLIER TYP. REINF. W/ (14)-#9 AS REQUIRED FOR CASED

LAP LENGTH
E.W. TOP & BOT. HOLES TO ALLOW FOR CASING

3' - 0"
BECK GROUP

3' - 9"
5' - 1"
HOOKED AT ENDS 1807 ROSS AVE
(3)ADD'L #6 EA. F. (f'c= 5000 psi) SUITE 500
13' - 0"
7' - 0"

8 DALLAS, TX 75201
SPIRAL OR TIES AS SCHEDULED.
PH: 214-303-6200
S3.13 PROVIDE ONE COMPLETE FLAT

9"
30"Ø CONC. FAX: 214-303-6300
TURN TOP AND BOTTOM. WWW.BECKGROUP.COM
PIER

PITCH
PIER CAP REINF.
69" CONC. BEARING STRATUM

6' - 0"
PROVIDE SHIM PACKS & W/(14)-#9 E.W. TOP &
PIER CAP (SEE DRILLED PIER NOTES)
CONC. LEVELING PADS PER BOT.
TEREX PEINER
3' - 0"

(9)#9 DWLS TYP.

BOTTOM OF CASING
30" CONC. PIER REINF. W/
P30T, EL.= 76' - 0" P30T, EL.= 76' - 0"

FOR CASED PIERS


(9)#9 LONG. BARS, #3
7' - 0" SPIRALS @ 12" O.C. TYP.
(f'c=4000 psi w/ W/C= 0.45
MAX.)

18 FT.
Level U2 - CRANE FOUNDATION PLAN CRANE FOUNDATION SECTION 3" C

.
1 SCALE: 1/4" = 1'-0" 2 SCALE: 1/4" = 1'-0"
L R.

6"
BUILDING CODES & REFERENCES STANDARDS CONCRETE REINFORCING

3"
1. All work shall be performed in accordance with the applicable sections of the governing 1. Reinforcing steel shall be deformed new billet steel bars in accordance with ASTM A615
building code, all local amendments, and all referenced standards listed below. Grade 60. SHAFT DIA.
2. Building Code: International Building Code (IBC) 2012 Edition, as adopted and amended 2. Detailing of reinforcing steel shall conform to the American Concrete Institute Detailing
by City of Austin Ordinance No. 20130606-089. Manual. ELEVATION
3. Structural Concrete: Building Code Requirementes for Reinforced Concrete, American 3. All hooks and bends in reinforcing bars shall conform to ACI detailing standards unless
Concrete Institute, ACI 318-11 shown otherwise.
4. Structural Steel: Manual of Steel Construction, 14th Edition. 4. Provide reinforcing bars in accordance with the bar bending diagram if bar types are
TYPICAL DETAIL
5. Light Gauge Steel: Specification for the Design of Cold Formed Steel Structural specified. In unscheduled beams, slabs, columns and walls detail reinforcing as follows: PIER
Members, American Iron and Steel Institute, Latest Edition. a. Lap top reinforcing bars at mid span. 3 SCALE: 3/4" = 1'-0"
6. Concrete Masonry: Building Code Requirements for Masonry Structures, Masonry b. Lap bottom reinforcing bars at the supports.
Standard Joint Committee, ACI 530-11/ASCE 5-11/TMS 402-11 c. Lap vertical bars in columns and walls only at floor lines, unless noted otherwise.
d. Refer to lap splice schedule for splice length requirement.
DRILLED PIERS
e. Reinforcement labeled as continuous shall be lap spliced 38 bar diameters as a
1. Pier design is based on an allowable loading of 40,000 psf in end bearing and 5,000 psf minimum, unless otherwise noted
in side friction beyond the 5 feet embedment into Stratum VI Pilot Knob Tuff, in f. Provide standard hooks in top bars at cantilever and discontinuous ends of beams,
accordance with the geotechnical report dated August 10, 2016 and Addendum letter walls and slabs.
dated January 6th, 2017 by Terracon. g. Provide corner bars for all horizontal bars at the inside and outside faces of
2. Bearing stratum shown on the pier details is Stratum VI Pilot Knob Tuff. intersecting beams or walls. Corner bars are not required if top, bottom, or horizontal
3. Piers not specifically located on the plan shall be located on centerline of column bars are hooked.
above. Where no column occurs, locate on centerline of wall or beam. 5. Welding of reinforcing steel will not be permitted.
4. Provide dowels from piers into concrete above using same bar size and number as 6. Heat shall not be used in the fabrication or installation of reinforcement
shown for pilaster above. Where no pilaster occurs, use dowels of same size and 7. Reinforcing steel clear cover shall be as follows:
number as pier reinforcing steel. Extend dowels 30 bar diameters into pier and beam,
a. Grade Beams: 1 ½” top, 3" bottom, 2" side (formed), 3" side (placed agains earth)
wall, pilaster or column u.n.o.
b. Footings: 1 ½” top, 3" bottom, 2" side (formed), 3" side (placed agains earth)
5. Elevation of top of piers, unless noted otherwise on the drawings is at the bottom of
the deepest intersecting beam or wall supported by the pier. c. Walls: ¾"
6. Reinforcing cage shall be held securely away from earth at sides and bottom by sets of 3 d. Columns: 1 ½"
spacers at a maximum spacing of 8-ft. along the length of the cage and 1'-0" from the e. Slabs above grade: ¾"
bottom. f. Beams above grade: 1 ½"
7. Pier reinforcing and concrete shall be placed immediately after drilling operations are g.Girders above grade: 2 1/2" for top cover, 1 1/2" for remainder 12.20.17
complete; in no case shall a pier be drilled that cannot be poured by the end of the h. Drilled Piers: 3" bottom, 3" side OF TE
workday. The top 5 feet of pier shall be properly vibrated. TE X
A
j. Concrete joists: 1"

A
ST

S
8. See plans for pier sizes, reinforcing and depth.
9. The contractor shall verify depths of piers before pier steel is cut. Pier steel may be TAK S. CHU
delivered to the jobsite in standard lengths and cut as required. Provide 64 bar

PR

ER
86892
diameter laps in all vertical pier reinforcing.

OF

NE
LI
E
SS CENSED I
10. Reinforcing steel shop drawings shall include placing drawings for templates to set I ON L E NG
A
dowels in piers.
11. Top of pier shall be of the specified diameter. Form top of pier if required to maintain
the specified diameter. Any concrete extending beyond the specified diameter shall be
removed.
12. Temporary steel casing and/or slurry may be required during pier drilling operations.
Prior to the placement of concrete, any seepage water shall be removed from the pier
holes. Special construction procedures in accordance with ACI 336.1-01 and
specifications shall be followed during extraction of the casing and during concrete
placement. If the water infiltrates after casing is more than 1/4 inch per minute, the
concrete should be tremied to the full depth of the excavation to remove the water. CURRENT SUBMISSION: REV. 0
13. Contractor shall include in bid documents, unit-costs for casing if required and unit-cost
for greater and lesser depth of drilling for each pier size. Base bids shall be for cased # DATE SUBMISSION
piers.
0 12/20/2017 REV. 0
14. All piers shall be inspected by a representative of Terracon in order to ensure that the
proposed bearing material has been reached in accordance with the recommendations
given in the geotechnical report.
15. The contractor shall make and maintain accurate records of the drilled pier depths,
bearing stratum, depth of penetration into bearing stratum, diameter and location
(including off center eccentricities), and shall submit this information to the Engineer.

2010 E. 6th STREET

CRANE FOUNDATION

16027 SSK-001
JOB NO. SHEET
3.5
A B
9
8"
3' - 11 3/8" 6 1/4"
6" 6' - 6 5/8"
FACADE, REF. ARCH 8"

CONC. WALL, REF.


CONC. WALL REF. 1/S3.13 1/S3.13 FOR INFO
CONC. WALL REINF. w/ #
5@12" O.C. VERT. & #4@
12 O.C. HORZ. 1 1/4"x3/16" SGW
3' - 8"

METAL GRATING FACADE, REF. ARCH BECK GROUP


WASH LINE 1807 ROSS AVE
SUITE 500
DALLAS, TX 75201
PH: 214-303-6200
DWL A @ 12" O.C. FAX: 214-303-6300
3/4" REVEAL WWW.BECKGROUP.COM
2' - 1"
Level P2 Level P2 Level P2 Level P2
2"

111' - 0" 111' - 0" 111' - 0" 111' - 0"

5"
SCHD. BM DEPTH

8"

8"
#4 @ 12" T&B.
#4 @ 12" T&B.

F
CONC. BEAM PER
SCHEDULE

SECTION SECTION SECTION SECTION


1 SCALE: 3/4" = 1'-0" 2 SCALE: 3/4" = 1'-0" 3 SCALE: 3/4" = 1'-0"
8 4 SCALE: 3/4" = 1'-0"

E E

6"

2X6 CONT. VERT. SHEAR


KEY, TYP. AT LEAVE-OUT
REF. 1/S3.13 FOR REF. PLAN FOR

VARIES
WALL REINF. REINFORCEMENT
(3)-#6 TOP & BOT, REF.
PLAN FOR LENGTH
LEVEL
REF. PLAN

3' - 6"

1' - 6"
6" 6"

9"
BOTTOM BARS TO BE CLASS
Level P2 B SPLICE
111' - 0"
3' - 8"

3' - 8"

PT NOT SHOWN
FORM SAVERS COUPLERS
(2) - 3/8"Ø x 2 3/4" HILTI KWIK BOLT TZ (2) - 3/8"Ø x 2 3/4" HILTI KWIK BOLT TZ FOR CLARITY
1' - 6"

1' - 6"

SLOPE DOWN SLOPE DOWN CONC. BEAM PER


SCHED. 12.20.17
6"

6"

Level P2 Level P2 OF
2"

TE
TE X
111' - 0" 111' - 0" A

A
ST
SECTION DETAIL AT LEAVE-OUT FOR TOWER CRANE

S
7 SCALE: 3/4" = 1'-0" 8 SCALE: 3/4" = 1'-0" TAK S. CHU

PR

ER
86892

OF

NE
LI
E
SS CENSED I
I ON L E NG
A

Level 2 3
120' - 6"

1' - 9"
CURRENT SUBMISSION: REV. 0

SECTION SECTION # DATE SUBMISSION


5 SCALE: 3/4" = 1'-0" 6 SCALE: 3/4" = 1'-0"
3/8" PL
B 01/27/2017 DESIGN DEVELOPMENT
2" 5' - 4 7/8" C 06/07/2017 ISSUE FOR PERMIT
REF. 10/S304
5' - 10" D 07/31/2017 95% CONSTRUCTION
FOR EMBED.
DOCUMENTS
B
E 09/18/2017 ISSUE FOR CONSTRUCTION
1' - 8 1/4" (2)L4x4x1/4 W/ 1"Ø THRU Level P2
BOLT OVER LSH HOLE HSS4x4x1/4 F 09/21/2017 PERMIT RESPONSE
111' - 0"
MTL GRATING 0 12/20/2017 REV. 0

Level P2
111' - 0"

2x6 CONT. VERT. SHEAR TOP BARS TO BE LAPPED AT MID


BOND BEAM W/
KEY, TYP. AT LEAVE-OUT SPAN, PROVIDE CLASS A SPLICE
(2)-#5 PL6x6X1/2 W/
(2)-1/2”Øx4” H.S.
TOP BAR TO EXTEND 8" THCK. INFILL SLAB REINF.
3'-0" FROM JOINT w/#4@12" O.C. T&B EA. WAY
HSS3x3x1/4 FOR 3/16
LEVEL
STAIR LANDING
REF. PLAN SUPPORT L4x4x3/8 W/ VERTICALLY
SLOTTED HOLES W/ 5/8ӯ J-
BOLT@ 48” O.C.
0
SECTION
BOTTOM BARS TO LAPPED AT 12 SCALE: 3/4" = 1'-0"
JOINT, PROVIDE CLASS B SPLICE

BM. SCHED. FORM SAVERS COUPLERS


2010 E. 6th STREET
T.O.S.C. EL. = 110'-6"
REF. 10/S304

Level 1
100' - 0"

0
1' - 4 3/4" GARAGE LEVEL
0
C.5
SECTIONS
DETAIL AT LEAVE-OUT FOR TOWER CRANE SECTION AT STAIR 3 STAIR 2 SECTION
0
9 SCALE: 3/4" = 1'-0" 10 SCALE: 3/4" = 1'-0" 11 SCALE: 3/4" = 1'-0"

16027 S3.13
JOB NO. SHEET
1 2 3 3.5 4 5 6 7 8 9 10 11
287' - 6"
15' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 20' - 0" 30' - 0" 12' - 6"
1' - 0" BECK GROUP
1807 ROSS AVE
S2.81 SUITE 500
4' - 6" DALLAS, TX 75201
PH: 214-303-6200
2
FAX: 214-303-6300
2 3 WWW.BECKGROUP.COM
2' - 6"

F C1,

3' - 0"
S3.10 S3.10
P48B, EL.= 78' - 0"
A
[0"]
B

2' - 0"
P24,

[0"]
EL.= 78' - 0"
C1, C1, C1, 3

15' - 0"
21' - 0"

P48B, P48B, EL.= 78' - 0" P48B, EL.= 78' - 0"


EL.= 78' - 0" S3.10

20' - 0"
4 B.2
C1, S3.10

40' - 0"
P48B, EL.= 78' - 3"
RAMP UP REFERENCE FLOOR
P24,
fsdfd

ELEV. = 82'-0"
EL.= 78' - 0"
21' - 6"

20' - 0"
C2, C2, C2, C2, C2, C1,
P48A,EL.= 77' - 0" P48A, EL.= 77' - 0" P48B, EL.= 80' - 9" P48B, EL.= 78' - 9" P48A,EL.= 77' - 9" P48A,EL.= 77' - 9"

[-9"] C
[-9"]
P18, EL.= 74' - 9" P24,

15' - 0"
5 P18, EL.= 81' - 6" 8 6 EL.= 78' - 0"
S3.10 S3.10 S3.10
5' - 0"
10"

[-8"]

119' - 6"
7
S3.02 C.5
[-8"] [-6"] [-8"] [-6"]
P24, [-8"] W8X15 P24,
T.O.S.C EL= 81'-6" EL.= 77' - 0" C3, C3, C3, C3, C3, C3,
EL.= 77' - 0" P24, P24, P30,EL.= 77' - 0" P30, EL.= 77' - 0" P30,EL.= 77' - 0" P30, EL.= 77' - 0" P30, EL.= 77' - 0" P30, EL.= 77' - 0" 1 S2.81
15' - 4"

15' - 0"
EL.= 77' - 0" EL.= 77' - 0"
0 8' - 8 1/2"
C2, C2, C2, C2, C2, C2, C2, C2, C2, C1,
2' - 0"

P48A,EL.= 77' - 9" P48A, EL.= 77' - 9" P48A, EL.= 73' - 3" P48A,EL.= 77' - 9" P48A, EL.= 77' - 9" P48A, EL.= 77' - 9" P48A, EL.= 77' - 9" P48A, EL.= 77' - 9" P48A, EL.= 77' - 9" P48A,EL.= 77' - 9"
0
5' - 0"

[-6"] [-6"] [-6"] D


4 [-6"] [-6"] [-6"] [-6"] [-6"] [-6"]
P18,
2' - 0"

S3.10 EL.= 74' - 9"


5' - 0" 8' - 8 1/2" 1 0
HSS 5x5x1/4 @ EA. LEVEL 2 SSK-001 P24,
7 7
P24,EL.= 77' - 0" (6) PER FLOOR EL.= 78' - 0"
SSK-001

20' - 9"
21' - 0"

S3.10 S3.10
P30T, EL.= 76' - 0"
P30T,
EL.= 76' - 0"
P24, EL.= 77' - 0" P24,
2' - 0"

5" THICK SLAB ON GRADE EL.= 78' - 0"

40' - 0"
BM STEP 8 REFERENCE FLOOR
REINF. W/ #4@15” O.C. E.W.
S3.13 ELEV. = 82'-0"
OVER SUBGRADE PREP. PER
4
2' - 0"

GEOTECHNICAL REPORT
S3.10
P30T,

19' - 3"
EL.= 76' - 0" P30T, EL.= 76' - 0"
21' - 0"

3 3' - 0" 3' - 0" 12.20.17


OF TE
S3.10 C4 C4 C1 C1 C1 C1 C1 C1 C1 TE X
C1 A
P48A, EL.= 78' - 0"

A
[0"]
P48A, EL.= 78' - 0" P48A, EL.= 78' - 0" P48A, EL.= 78' - 0" P48A,EL.= 78' - 0" P48A, EL.= 78' - 0" P48A, EL.= 78' - 0" P48A, EL.= 78' - 0"

ST
P48A, EL.= 78' - 0"

2' - 0"

S
P48A,EL.= 78' - 0"
1 1 TAK S. CHU
S3.10 [0"] [0"] E
S3.10

PR

ER
86892

OF

NE
LI
E
SS CENSED I
I ON L E NG
2' - 6"

2' - 6"
P24,EL.= 78' - 0" 3 2 P24, 78' - 0"
S3.10 S3.10

2' - 6"

2' - 6"

CURRENT SUBMISSION: REV. 0


S2.80

# DATE SUBMISSION
B 01/27/2017 DESIGN DEVELOPMENT
C 06/07/2017 ISSUE FOR PERMIT
D 07/31/2017 95% CONSTRUCTION
DOCUMENTS
Level U2 E 09/18/2017 ISSUE FOR CONSTRUCTION
1 SCALE: 3/32" = 1'-0" F 09/21/2017 PERMIT RESPONSE
0 12/20/2017 REV. 0

PLAN NOTES:

1. FINISH FLOOR ELEVATION (F.F. EL.) = T.O.S.C. EL. UNLESS OTHERWISE


NOTED. T.O.S.C. EL. = 100'-0" EQUALS DATUM ELEVATION = 478'- 8 "

2. FOR T.O.S.C. ELEVATIONS, REFER TO ARCHITECTURAL DRAWINGS.


ELEVATIONS NOTED ON PLAN ARE FOR REFERENCE ONLY. REFER TO
AND VERIFY ALL DIMENSIONS AND ELEVATIONS w/ ARCHITECTURAL
DRAWINGS.

3. REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF


FLOOR RECESSES, DROPS AND SLOPES NOT DIMENSIONED ON PLAN. FOUNDATION PLAN LEGEND:

4. REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR INDICATES CONCRETE PANEL WALL OR COLUMN IN
LOCATIONS AND DIMENSIONS OF PENETRATIONS NOT SHOWN OR SECTION
DIMENSIONED ON PLAN.

5. TOP OF STRUCTURAL CONCRETE ELEVATION IS DENOTED AS FOLLOWS


UNLESS OTHERWISE NOTED:
INDICATES TOPPING CONCRETE SLAB SLOPE CHANGE 2010 E. 6th STREET
T.O.S.C. EL.=XXX'-XX" SPOT ELEVATION INDICATES CONCRETE SLAB AND SPAN DIRECTION

6. TOP OF FINISHED CONCRETE ELEVATION DENOTED AS FOLLOWS:


INDICATES STRUCTURAL CONCRETE SLOPE EXTENTS
T.O.F.C. EL.=XXX'-XX" SPOT ELEVATION

A INDICATES CONCRETE FOOTING, SEE FOOTING


7. REFER TO S- XXX 's FOR TYPICAL COLUMN DETAILS & COLUMN SCHEDULE ON SXXX
SCHEDULE.

8. [X] DENOTES TOP OF CONCRETE ELEVATION RELATIVE TO REFERENCED


PARKING LEVEL U2
FLOOR.

16027 S2.U20
JOB NO. SHEET
01213425 3424789
 9  

67872@2A4B2C4

/01230402567892:;;<=> 6772?42

67872@2A4B2C4
DEF4GHI2JK2L9L76

:M>NB;EH3O2PEF2C4;1
QR72 2S8T
PEF2U;V10HN2W267872@2A4B2C4

99111113424789
 99!"#5#431$043845852 %##322#252#&1'9()*+)0*)24,58**-+-82'30304,. 213

You might also like