JURONG INTERGRATED STRUCTURE

(A subsidiary of SembCorp Marine Ltd.)


Singapore
Senior Operation Manager
( Edmund Chiow )
Engineer SOP - EYE PIECE FOR BLOCK LIFTING
( Ngiaw Choon Ping)
DATE ISSUED 14 / 01 / 2010

* Doubler added if deck thickness is below the min. thickness for the selected eye piece
EYE PIECE SWL MIN. DECK THICKNESS DOUBLER THICKNESS
10 T 8 mm 14 ~ 16 mm
20 T 10 mm 16 ~ 19 mm
30 T 13 mm 20 ~ 22 mm
40 T 15 mm 25 ~ 28 mm

# Leg length and backing bar thickness required for selected eye piece

EYE PIECE SWL WELDING LEG LENGTH BACKING BAR THICKNESS


15 / 25 T 14 mm 20 mm
30 T 17 mm 25 mm
40 T 19 mm 25 mm
* Refer to Appendix I and Appendix II for detailed dimensions of eye piece and doubler.
SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

From production to
transportation/transverser/st Swinging
Panel Line 5T/10T Direct on plate No No Assembly
orage (WT<20T) (Panel Hazard
Size < 12mx9m)

Eye-pieces must have


the backing of T-bars

Direct on plate ( With stiffeners Swinging


Panel Line Panel shifting 10T No No Assembly
as backing) Hazard

Panels with T-bars (WT<40T)

Falling item
from high Assembly/
Sub-assembly T-bars shifting 3T Direct on Face plate No No
ground Erection
hazard

T-bars ( Length < 3m) (WT<5)

PREPARED BY JIS Page 1/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

Direct on Face plate Swinging Assembly/


Sub-assembly T-bars shifting 3T/5T No No
(2 x eye-pieces) Hazard Erection

T-bars ( Length > 3m) (WT<5)

Falling item
Flange Brackets direct for on-
Single eye-piece to centre of from high Assembly/
Sub-assembly boards ( Eg. U16 brackets) 3T/5T No No
Face plate ground Erection
(WT<5T)
hazard

For overturning eye-pieces


for I-Beams. ( thickness> Direct on Face plate Swinging Assembly/
Sub-assembly 3T/5T No No
40mm) (2 x eye-pieces) Hazard Erection
(WT<10T)

PREPARED BY JIS Page 2/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

Sub-panels for transporting;


for overturning for welding/
fairing Direct on base panels ( Swinging Assembly /
Sub-assembly 3T/5T No No
( e.g. Pontoons bulkheads - < 5 ton) Hazard Erection
Webs on panels)
(WT<5T)

2/3 1/3

Combined Box - Overturning


for welding/fairing/
Swinging Assembly /
Sub-assembly transportation (e.g. Booby 3T/5T Direct on box exterior No No
Hazard Erection
hatches/ fan houses )
(WT<5T)

Crane

No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting Using one crane c.g No (Yes, If block > Erection
30T,40T 30° - 45° Hazard
150 ton)

x = 3 - 6.5 m

PREPARED BY JIS Page 3/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

a
Crane 1 or Crane 2

Crane 1
View A
30° - 45°
b c.g
No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting Using two cranes No (Yes, If block > Erection
30T,40T Hazard
150 ton)
Crane 2 b

Note :
a>9m
b = 4 - 8 m (depend on the block)
Normal usage length of wire ----> 6 , 10 m

No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting / Overturning U-shape blocks No (Yes, If block > Erection
30T,40T Hazard
150 ton)

No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting / Overturning Double bottom blocks No (Yes, If block > Erection
30T,40T Hazard
150 ton)

PREPARED BY JIS Page 4/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting / Overturning L-shape blocks No (Yes, If block > Erection
30T,40T Hazard
150 ton)

No
Assembly / 10T,15T,25T Open-hull blocks Swinging
Erection
Block shifting / Overturning No (Yes, If block > Erection
30T,40T (with 3 side bulkheads) Hazard
150 ton)

No
Assembly / 10T,15T,25T Open-hull blocks Swinging
Erection
Block shifting / Overturning No (Yes, If block > Erection
30T,40T (with 4 side bulkheads) Hazard
150 ton)

PREPARED BY JIS Page 5/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

Assembly / Swinging
Erection
Block shifting / Overturning 10T,15T Panel blocks No No Erection
Hazard

Special structure blocks


(E.g. Catwalk structure, Lifeboat
Assembly / 10T,15T,25T platform, Helideck etc.) Swinging
Erection
Block shifting / Overturning Yes Yes Erection
30T,40T The positions of eye pieces are Hazard
to be calculated from
engineering.

Support

No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting U-shape blocks No (Yes, If block > Erection
30T,40T Hazard
150 ton)

PREPARED BY JIS Page 6/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

No
Assembly / 10T,15T,25T Swinging
Erection
Block shifting L-shape blocks No (Yes, If block > Erection
30T,40T Hazard
150 ton)

Support

# Please refer to front cover for welding leg length

For block <40T


Assembly / Swinging
Erection
Block shifting 10T (Eye piece welded on deck and No No Erection
Hazard
adjacent to T-bar)

# Please refer to front cover for welding leg length

For block <40T


Assembly / Swinging
Erection
Block shifting 10T (Eye piece welded on deck and No No Erection
Hazard
adjacent to bulkhead)

PREPARED BY JIS Page 7/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

For block <40T


Assembly / Swinging
Erection
Block shifting 10T (Eye piece welded adjacent to No No Erection
Hazard
bulkhead and on top of stiffener)

# Please refer to front cover for welding leg length

For block <40T


Assembly / Swinging
Erection
Block shifting 10T (Eye piece welded on top of T- No No Erection
Hazard
bar with reinforcement)

# Please refer to front cover for welding leg length

For block <40T


Assembly / Swinging
Erection
Block shifting 10T (Eye piece welded in-line with No No Erection
Hazard
stiffener with size >120 mm)

# Please refer to front cover for welding leg length and backing bar detail

PREPARED BY JIS Page 8/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

For block <40T


Assembly / (Eye piece welded in-line with Swinging
Erection
Block shifting 10T No No Erection
stiffener of size <120 mm with Hazard
reinforcement)

# Please refer to front cover for welding leg length and backing bar detail

For block >40T


No
Assembly / (Eye piece welded on top of T- Swinging
Erection
Block shifting 15/25/30/40T No (Yes, If block > Erection
bar of height <300 mm with Hazard
150 ton)
reinforcement)

# Please refer to front cover for welding leg length and backing bar detail

For block >40T


No
Assembly / (Eye piece welded on top of T- Swinging
Erection
Block shifting 15/25/30/40T No (Yes, If block > Erection
bar of height >300 mm with Hazard
150 ton)
reinforcement)

# Please refer to front cover for welding leg length and backing bar detail

PREPARED BY JIS Page 9/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

For block >40T


No
Assembly / 10/15/25/30/ (Lapping eye-piece adjacent to Swinging
Erection
Block shifting No (Yes, If block > Erection
40T bulkhead with bracket Hazard
150 ton)
reinforcement)

For block >40T


No
Assembly / (Eye piece welded not in-line with Swinging
Erection
Block shifting 25/30/40T No (Yes, If block > Erection
additional stiffener with Hazard
150 ton)
reinforcement at both sides)

# Please refer to front cover for welding leg length and backing bar detail

For block >40T


No
Assembly / (Eye piece welded adjacent to T- Swinging
Erection
Block shifting 15/25/30/40T No (Yes, If block > Erection
bar with reinforcement at one Hazard
150 ton)
side)

# Please refer to front cover for welding leg length and backing bar detail

PREPARED BY JIS Page 10/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

For block >40T


No
Assembly / (Eye piece welded in between of Swinging
Erection
Block shifting 15/25/30/40T No (Yes, If block > Erection
stiffener with reinforcement Hazard
150 ton)
added at one side)

# Please refer to front cover for welding leg length and backing bar detail

* Please refer to front cover for doubler detail


# Please refer to front cover for welding leg length and backing bar detail

For block >40T


No
Assembly / (Eye piece welded on stiffener Swinging
Erection
Block shifting 15/25/30/40T No (Yes, If block > Erection
with reinforcement in between Hazard
150 ton)
stiffener)

* Please refer to front cover for doubler detail


# Please refer to front cover for welding leg length and backing bar detail

For block T > 40T t < 15mm No


Assembly / (Eye piece welded not in-line with Swinging
Erection
Block shifting 15/25/30/40T No (Yes, If block > Erection
stiffener with reinforcement in Hazard
150 ton)
between stiffener)

PREPARED BY JIS Page 11/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

* Please refer to front cover for doubler detail


# Please refer to front cover for welding leg length and backing bar detail

For block >40T


(Eye piece welded below the No
Assembly / Block overturning from bottom Swinging
Erection shell
15/25/30/40T block with reinforcement in No (Yes, If block > Erection
Hazard
between stiffener and bulkhead. 150 ton)
Additional doubler welded)

t < 15mm

* Please refer to front cover for doubler detail


# Please refer to front cover for welding leg length and
backing bar detail

For block >40T


(Eye piece welded beside the No
Assembly / Swinging
Erection
Block overturning from side shell 15/25/30/40T block in-line with deck with No (Yes, If block > Erection
Hazard
reinforcement in between stiffner 150 ton)
and bulkhead.

15 mm

# Please refer to front cover for welding leg length


and backing bar detail

For block >40T


(Eye piece welded beside the No
Assembly / Swinging
Erection
Block overturning from side shell 15/25/30/40T block not in-line with stiffener with No (Yes, If block > Erection
Hazard
reinforcement in between two 150 ton)
stiffeners.)

DOUBLER ADDED IF
DECK t < 15 mm

PREPARED BY JIS Page 12/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

*Reinforcement not needed if eye


piece < 25T *Doubler added if
thickness < 15 mm

For block >40T


No
Assembly / Block overturning from bottom (Eye piece welded below the Swinging
Erection shell
15/25/30/40T No (Yes, If block > Erection
block in-line with T-bar with Hazard
150 ton)
reinforcement below T-bar)

* Please refer to front cover for doubler detail


t < 15mm
# Please refer to front cover for welding leg length and backing bar detail

* Please refer to front cover for doubler detail


# Please refer to front cover for welding leg length and backing bar detail

For block >40T


No
Assembly / Block overturning from bottom (Eye piece welded below the Swinging
Erection shell
15/25/30/40T No (Yes, If block > Erection
block in-line with stiffener with Hazard
150 ton)
reinforcement below T-bar)

For block > 40T No


Assembly / Swinging
Erection
Block overturning from side shell 15/25/30/40T (Eye piece welded beside the No (Yes, If block > Erection
Hazard
block in-line with bulkhead) 150 ton)

* Please refer to front cover for doubler detail


# Please refer to front cover for welding leg length
t < 15mm
and backing bar detail

PREPARED BY JIS Page 13/14


SOP - EYE PIECE FOR BLOCK LIFTING

Structure
Eye Piece Eye Piece
Production Lifting Eye Piece Usage Common Eye Piece Position on Integrity
Visual Example Calculation Hazards Removal At
Stage Description Size Structure Calculation
(Y/N) Stage
(Y/N)

For block > 40 T


No
Assembly / Block overturning from bottom (Eye piece welded below the Swinging
Erection shell
15/25/30/40T No (Yes, If block > Erection
block in-line with bulkhead or T- Hazard
150 ton)
bar)

* Please refer to front cover for doubler detail


# Please refer to front cover for welding leg length
and backing bar detail

For block <40T


(Eye piece welded below the No
Assembly / Block overturning from bottom Swinging
Erection shell
15/25T block with reinforcement in No (Yes, If block > Erection
Hazard
between stiffener and additional 150 ton)
doubler.)

* Please refer to front cover for doubler detail


# Please refer to front cover for welding leg length and backing bar detail

Assembly / Swinging
Erection
Block shifting > 50T For heavy lifting blocks Yes Yes Erection
Hazard

PREPARED BY JIS Page 14/14


APPENDIX 1
SOP - EYE PEICE FOR BLOCK LIFTING

APPENDIX II :

EYE PIECE SWL 10 & 15 T EYE PIECE SWL 20 & 25 T

EYE PIECE SWL 30 & 35 T EYE PIECE SWL 40 T

PREPARED BY JIS Page 1/1