Professional Documents
Culture Documents
Local Representative
SCAAI V1
Pictures in this brochure are computer generated; real product may differ.
Specification and designs are subject to change without prior notice.
Vertical Dreams
XJ SIEMENS
Vertispace Cargo Elevator
English
Deutsch
中文
Français
Heavy-load vertical transportation solution
To meet the current industrial transportation needs, Vertispace provides a sophisticated cargo vertical
transportation solution, providing complete upgrading in system performance and effciency.
Superior system
Traction machine
Vertispace adopts big capacity PM synchronous gearless machine, which brings many "green" advantages in
energy saving, easy maintenance and overall performance.
Inverter
Different with traditional AC or VVVF inverter, Vertispace is driven by the vector controlled inverter, which greatly
increases system efficiency.
Main board
The main board is powered by XJ's super dual-core CPU structure and 64MB memory, the calculation capability
is 32MIPS.
Mild steel chequer plate Fluorescent light Heavy-duty mild steel sill
Rubber bumper (optional) Car panel rubber protection (optional) Folk-lift stop blocker (optional)
Vertispace hydralic elevator
Vertispace hydralic elevator adopts high-grade hydralic driving system, provides a more reliable and durable
system. The new hydralic solution uses better oil seal technolgy and equipments to avoid oil leakage
problems.
Vertispace hydralic elevator can be widely applied in ports, airports, industrial buildings where the space is
not enough for a convientional installation.
Model: THX01
Entrance
HoistingHook,3000kg, By others
Hoistway Widht(AH)
2500
500
GuidRail ≤5000 50
Hoistway Plan
Rail 5000 X n=
Ventilation Aperture
(by others)
Storey Height≥2700
R1 R2
5000
Pit Depth(PP)
A
A
Control Panel
Rail Bracket Span
R3 R4
MR Pit Overhead
Speed Load Door Opening Cage Size Hoistway Szie MR Size
Model Height Depth Height
(m/s) (Kg) JJ×HH AS×BS AH×BH AM×BM
(HM) (PP) (OH)
Door Opening(JJ)
400
Overhead Height (OH)
400
400
Hoistway Plan
Elevation Plan
Hoistway Overhead
Speed Load Door Width Cage Size MR Size
Model Szie MR Pit Height
(m/s) (kg) JJ×HH AS×BS AM×BM
AH×BH (OH)
8000-QT-30-05 0.5 3000 2400×2200 2600×6000 4000×6300 4000×6300 2500 1600 4600
9000-QT-30-05 0.5 3000 2400×2200 2600×6000 4000×6300 4000×6300 2500 1600 4600
Functions
●- Standard function; ○ - Optional function; ◎# –Standard function but rely on an optional function numbered with #.
40 Hall lantern Hall lanterns can be provided instead of hall indicators. (for group control, hall lanterns
will be provided as basic feature) ◎2
Vacuum fluorescent display (VFD) indicator to show the elevator status with maximally
41 VFD indicator ○
visual satisfaction.
Indicator with face plate is separately and horizontally placed at the top of entrance or
42 Horizontal Indicator ○
transom instead of incorporated into hall call or COP.
Additional floor selection and door open/close buttons are located on the car left hand
43 Sub COP ○
panel or left entrance panel.
44 Through type entrance There are two doors inside the car, make the landing at different direction. ○
When elevator moving by, it stops at the compulsory-stop-floor and open door even
45 Compulsory stop floor ○
without call registered for this floor.
Specific ser vice floors can be locked out as non-stop floor through system
46 Floor lock out operation ○
configuration.
Convert the 3 phase power supply to the system acceptable range (AC380V-415V/
47 Power supply converter ○
50Hz),
Steadize the power supply voltage fluctuation if the local voltage fluctuation greater
48 Automatic voltage regulator ○
than required value.
A floor can be accessed within pre-set time period; if other than the period, the floor
49 Scheduled non-serving floor ○
cannot be selected from car neither made any hall call.
50 Parking Operation The elevator can be parked at the designated floor with a key switch ○
There are two parking switches at different floor, each switch can be used to excise
51 Dual parking switches ○
parking operation
Scheduled startup /
52 Elevator automatically starts up and shuts down on the preset scheduled time. ○
shutdown service
For group control system, two standby position schemes can be set. Once activated,
53 Standby position scheme ◎2
elevators will be dispatched to the landing specified in the standby scheme.
Emergency operation for In the event of building power failure, the elevator can be operated by building standby
54 ○
power failure by generator generator to move it to the designated floor.
Automatic rescue device for In the event of power failure, the system automatically changes over to battery power
55 ○
power failure to bring the elevator to the nearest floor.
Earthquake emergency
56 When an earthquake is detected, the elevator will stop at the nearest floor. ○
operation
Car rear and side walls are covered with 1m high rubber protection plate to avoid
57 Rubber protection plate ○
cargo scratch or damage
58 Forklift stop blocker Stop blockers are mounted on the car flooring to position the folklift safely ○
59 CWT safety protection The elevator equips with CWT overspeed protection components ○
For monitoring of movement inside the car by the security personnel. (camera,
60 Closed-circuit TV ○
recorder cabling by others)
Various supervisory operations, communication, and status monitoring can be
61 Supervisory Panel ○
provided through either the conventional LED. (Cabling done by others)
Computer is used to monitor various supervisory operations, communication, and
62 PC Monitoring System status information with comprehensive and handy operations. (Computer supplied by ○
others; cabling done by others)