PROJECT:
ITEM:
LOCATION:
DESIGN CALCULATION
171-1076 01 05/04/2019
Page 2 of 9
Job No. 171-1076 Building No. 01 Rev. No. 01
Project name MARUBENI KRAFT LINERBOARD Date 05/04/2019
Designed By TMT
Description FACTORY
Checked By TCS
Introduction
This Design Calculations has been prepared using the applicable American codes and
standards and the developments in engineering practices. A design engineer prepared the
calculations and another competent engineer checked his work. The initials of both engineers
are shown on most pages.
Computer programs, verified and tested by ATAD Steel, have been used where applicable to
determine structural requirements. The output of these programs has been incorporated in this
package together with explanation text where possible. The whole package has been prepared
using an advanced computer text processor.
For your easy reference, all pages have been numbered and a table of contents has been
provided. We have divided the package into two sections as follows:
1. Design Information: This section contains the description of the building designed,
design codes and material specifications used, design assumptions, loads and design
sketches showing building components layouts and members sizes, the design sheets.
2. Computer Design Printouts: ATAD Steel use specialized software to design steel
structures for buildings. This section includes the output of computer programs used in
the design along with explanations for the output where possible.
For any questions regarding this package please do not hesitate to contact us. ATAD Steel
keeps records of reference on design calculations for each building designed as a part of our
total quality system.
Engineering Department
ATAD Steel
Page 3 of 9
Job No. 171-1076 Building No. 01 Rev. No. 01
Project name MARUBENI KRAFT LINERBOARD Date 05/04/2019
Designed By TMT
Description FACTORY
Checked By TCS
INDEX
1. Expansion joint consider: ................................................................................................... 5
Page 4 of 9
Job No. 171-1076 Building No. 01 Rev. No. 01
Project name MARUBENI KRAFT LINERBOARD Date 05/04/2019
Designed By TMT
Description FACTORY
Checked By TCS
For Factory building, Crane beam expansion joint detail , purlin expansion joint is determined
as per drawing above
Page 5 of 9
Job No. 171-1076 Building No. 01 Rev. No. 01
Project name MARUBENI KRAFT LINERBOARD Date 05/04/2019
Designed By TMT
Description FACTORY
Checked By TCS
Page 6 of 9
Job No. 171-1076 Building No. 01 Rev. No. 01
Project name MARUBENI KRAFT LINERBOARD Date 05/04/2019
Designed By TMT
Description FACTORY
Checked By TCS
Page 7 of 9
Job No. 171-1076 Building No. 01 Rev. No. 01
Project name MARUBENI KRAFT LINERBOARD Date 05/04/2019
Designed By TMT
Description FACTORY
Checked By TCS
For Y direction, design temperature range is 11.52oF, building shape is rectangular, expansion
joint spacing is 600 ft (182.88m) (AISC Design Guide 7: Industrial Building – Roofs to
Anchor Rods, Fig.4.4.1, Page 6)
Get value of expansion joint is 120m, it meets the requirement (smaller than 182.88m)
Page 8 of 9
Job No. 171-1076 Building No. 01 Rev. No. 01
Project name MARUBENI KRAFT LINERBOARD Date 05/04/2019
Designed By TMT
Description FACTORY
Checked By TCS
Reference:
+ AISC Design Guide 7: Industrial Building – Roofs to Anchor Rods.
+ Erection for Crane beam bolt:
Page 9 of 9