WQ1 Work Order Details - Work Order : 20115


Location : IQD6-V976001 Asset : IQD6-PBA976005B

Work Order : 20115 DS6 TR C WCD - 3M PM - WASH WATER PUMP


PBA976005B
Priority :
Maint. ActType : 020 Preventive
Location : IQD6-V976001 FRESH & UTILITY WATER SYSTEM
Asset : IQD6-PBA976005B WASH WATER PUMP (B)
Asset Type : PUMPS
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group : PLANNER
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 30-Dec-2018 Basic Finish :28-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Perform the following: 30-Dec-2018
-Monitor operation of seal flush and/or
quench if applicable
-Monitor condit
20 Test operation of spare 30-Dec-2018

- Monitor and trend process fluid


temperatures
- Monitor and trend process

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Perform the following: -Monitor operation of seal flush and/or FOD MECH 1 1
quench if applicable -Monitor condition of barrier fluid and
ensure circulation if applicable -Note and report abnormal levels
or pressures in seal pot - Post a notification in the CMMS for
any corrective action as needed. Verify that the proper seal
flush plan is in place(proper Seal Pot height/distance & Pressure.
20 Test operation of spare - Monitor and trend process fluid FOD MECH 1 1
temperatures - Monitor and trend process fluid pressures -
Monitor and trend process fluid flow - Note and report external
leakage of process fluids - Note and report excessive noise -
Note and report excessive vibration - Note and report leakage
of lubricant Restart duty unit and shut down spare upon
completion of test Post a notification in the CMMS for any
corrective action as needed.

wq1_wo_details
alalzah PAGE: 1 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20115


Location : IQD6-V976001 Asset : IQD6-PBA976005B

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 2 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20115


Location : IQD6-V976001 Asset : IQD6-PBA976005B

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 3 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20117


Location : IQD6-941 Asset : IQD6-PBE941302B

Work Order : 20117 DS6 TR C WCD - 3M PM - HOT OIL CIRCULATION PUMP


PBE941302B
Priority :
Maint. ActType : 020 Preventive
Location : IQD6-941 Thermal Oil and Hot Oil
Asset : IQD6-PBE941302B HOT OIL CIRCULATION PUMP (B)
Asset Type : PUMPS
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group : PLANNER
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 30-Dec-2018 Basic Finish :28-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Perform the following: 30-Dec-2018
-Monitor operation of seal flush and/or
quench if applicable
-Monitor condit
20 Test operation of spare 30-Dec-2018

- Monitor and trend process fluid


temperatures
- Monitor and trend process

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Perform the following: -Monitor operation of seal flush and/or FOD MECH 1 1
quench if applicable -Monitor condition of barrier fluid and
ensure circulation if applicable -Note and report abnormal levels
or pressures in seal pot - Post a notification in the CMMS for
any corrective action as needed. Verify that the proper seal
flush plan is in place(proper Seal Pot height/distance & Pressure.
20 Test operation of spare - Monitor and trend process fluid FOD MECH 1 1
temperatures - Monitor and trend process fluid pressures -
Monitor and trend process fluid flow - Note and report external
leakage of process fluids - Note and report excessive noise -
Note and report excessive vibration - Note and report leakage
of lubricant Restart duty unit and shut down spare upon
completion of test Post a notification in the CMMS for any
corrective action as needed.

wq1_wo_details
alalzah PAGE: 4 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20117


Location : IQD6-941 Asset : IQD6-PBE941302B

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 5 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20117


Location : IQD6-941 Asset : IQD6-PBE941302B

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 6 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20121


Location : IQD6-976 Asset : IQD6-PBA976006B

Work Order : 20121 DS6 TR C WCD - 3M PM - FRESH WASH WATER PUMP


PBA976006B
Priority :
Maint. ActType : 020 Preventive
Location : IQD6-976 FRESH & UTILITY WATER SYSTEM
Asset : IQD6-PBA976006B FRESH WASH WATER PUMP (B)
Asset Type : PUMPS
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group : PLANNER
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 30-Dec-2018 Basic Finish :28-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Perform the following: 30-Dec-2018
-Monitor operation of seal flush and/or
quench if applicable
-Monitor condit
20 Test operation of spare 30-Dec-2018

- Monitor and trend process fluid


temperatures
- Monitor and trend process

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Perform the following: -Monitor operation of seal flush and/or FOD MECH 1 1
quench if applicable -Monitor condition of barrier fluid and
ensure circulation if applicable -Note and report abnormal levels
or pressures in seal pot - Post a notification in the CMMS for
any corrective action as needed. Verify that the proper seal
flush plan is in place(proper Seal Pot height/distance & Pressure.
20 Test operation of spare - Monitor and trend process fluid FOD MECH 1 1
temperatures - Monitor and trend process fluid pressures -
Monitor and trend process fluid flow - Note and report external
leakage of process fluids - Note and report excessive noise -
Note and report excessive vibration - Note and report leakage
of lubricant Restart duty unit and shut down spare upon
completion of test Post a notification in the CMMS for any
corrective action as needed.

wq1_wo_details
alalzah PAGE: 7 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20121


Location : IQD6-976 Asset : IQD6-PBA976006B

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 8 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20121


Location : IQD6-976 Asset : IQD6-PBA976006B

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 9 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20143


Location : IQD6-624 Asset : IQD6-PBA624359B

Work Order : 20143 DS6 TR C WCD - 3M PM - EFFLUENT WATER PUMP


PBA624359B
Priority :
Maint. ActType : 020 Preventive
Location : IQD6-624 Crude Coalescers, Desalters
Asset : IQD6-PBA624359B TRAIN C EFFLUENT WATER PUMP
Asset Type : PUMPS
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group : PLANNER
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 30-Dec-2018 Basic Finish :28-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Perform the following: 30-Dec-2018
-Monitor operation of seal flush and/or
quench if applicable
-Monitor condit
20 Test operation of spare 30-Dec-2018

- Monitor and trend process fluid


temperatures
- Monitor and trend process

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Perform the following: -Monitor operation of seal flush and/or FOD MECH 1 1
quench if applicable -Monitor condition of barrier fluid and
ensure circulation if applicable -Note and report abnormal levels
or pressures in seal pot - Post a notification in the CMMS for
any corrective action as needed. Verify that the proper seal
flush plan is in place(proper Seal Pot height/distance & Pressure.
20 Test operation of spare - Monitor and trend process fluid FOD MECH 1 1
temperatures - Monitor and trend process fluid pressures -
Monitor and trend process fluid flow - Note and report external
leakage of process fluids - Note and report excessive noise -
Note and report excessive vibration - Note and report leakage
of lubricant Restart duty unit and shut down spare upon
completion of test Post a notification in the CMMS for any
corrective action as needed.

wq1_wo_details
alalzah PAGE: 10 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20143


Location : IQD6-624 Asset : IQD6-PBA624359B

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 11 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20143


Location : IQD6-624 Asset : IQD6-PBA624359B

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 12 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20144


Location : IQD6-624 Asset : IQD6-PBA624360B

Work Order : 20144 DS6 TR C WCD - 3M PM - PRODUCT PUMP PBA624360B


Priority :
Maint. ActType : 020 Preventive
Location : IQD6-624 Crude Coalescers, Desalters
Asset : IQD6-PBA624360B TRAIN C PRODUCT PUMP
Asset Type : PUMPS
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group : PLANNER
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 30-Dec-2018 Basic Finish :28-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Perform the following: 30-Dec-2018
-Monitor operation of seal flush and/or
quench if applicable
-Monitor condit
20 Test operation of spare 30-Dec-2018

- Monitor and trend process fluid


temperatures
- Monitor and trend process

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Perform the following: -Monitor operation of seal flush and/or FOD MECH 1 1
quench if applicable -Monitor condition of barrier fluid and
ensure circulation if applicable -Note and report abnormal levels
or pressures in seal pot - Post a notification in the CMMS for
any corrective action as needed. Verify that the proper seal
flush plan is in place(proper Seal Pot height/distance & Pressure.
20 Test operation of spare - Monitor and trend process fluid FOD MECH 1 1
temperatures - Monitor and trend process fluid pressures -
Monitor and trend process fluid flow - Note and report external
leakage of process fluids - Note and report excessive noise -
Note and report excessive vibration - Note and report leakage
of lubricant Restart duty unit and shut down spare upon
completion of test Post a notification in the CMMS for any
corrective action as needed.

wq1_wo_details
alalzah PAGE: 13 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20144


Location : IQD6-624 Asset : IQD6-PBA624360B

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 14 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20144


Location : IQD6-624 Asset : IQD6-PBA624360B

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 15 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20725


Location : IQD6-838 Asset : IQD6-TAN838112

Work Order : 20725 DS6 1M PM - BACK UP GENERATOR (HT)


Priority :
Maint. ActType :
Location : IQD6-838 Aux Generators (incl. Drilling Gen)
Asset : IQD6-TAN838112 DIESEL GENERATOR (HT)
Asset Type : GENERATOR
ABC Indicator : B BUSINESS CRITICAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 10-Jan-2019 Basic Finish :09-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Battery FOD ELECrolyte Level - Check 10-Jan-2019
20 Belts - Inspect/Adjust/Replace 10-Jan-2019
30 Cooling System Supplemental Coolant 10-Jan-2019
Additive (SCA) - Test/Add
40 Inspect/clean/tighten cylinder head 10-Jan-2019
grounding stud
50 Engine Protective Devices - Check 10-Jan-2019
60 Fan Drive Bearing - Lubricate 10-Jan-2019
70 Heat Shield - Inspect/Replace 10-Jan-2019
80 Hoses and Clamps - Inspect/Replace 10-Jan-2019
90 Radiator - Clean 10-Jan-2019
100 Engine Crankcase Breather (Clean) 10-Jan-2019

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD ELEC 1 0.5
20 FOD MECH 1 1
30 FOD MECH 1 1
40 FOD MECH 1 1
50 FOD MECH 1 1
60 FOD MECH 1 1
70 FOD MECH 1 1
80 FOD MECH 1 1
90 FOD MECH 1 1

wq1_wo_details
alalzah PAGE: 16 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20725


Location : IQD6-838 Asset : IQD6-TAN838112

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 17 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20725


Location : IQD6-838 Asset : IQD6-TAN838112

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 18 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20726


Location : IQD6-838 Asset : IQD6-TAN838121

Work Order : 20726 DS6 1M PM - BACK UP GENERATOR (HT)


Priority :
Maint. ActType :
Location : IQD6-838 Aux Generators (incl. Drilling Gen)
Asset : IQD6-TAN838121 DIESEL GENERATOR (HT)
Asset Type : GENERATOR
ABC Indicator : B BUSINESS CRITICAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 10-Jan-2019 Basic Finish :09-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Battery FOD ELECrolyte Level - Check 10-Jan-2019
20 Belts - Inspect/Adjust/Replace 10-Jan-2019
30 Cooling System Supplemental Coolant 10-Jan-2019
Additive (SCA) - Test/Add
40 Inspect/clean/tighten cylinder head 10-Jan-2019
grounding stud
50 Engine Protective Devices - Check 10-Jan-2019
60 Fan Drive Bearing - Lubricate 10-Jan-2019
70 Heat Shield - Inspect/Replace 10-Jan-2019
80 Hoses and Clamps - Inspect/Replace 10-Jan-2019
90 Radiator - Clean 10-Jan-2019
100 Engine Crankcase Breather (Clean) 10-Jan-2019

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD ELEC 1 0.5
20 FOD MECH 1 1
30 FOD MECH 1 1
40 FOD MECH 1 1
50 FOD MECH 1 1
60 FOD MECH 1 1
70 FOD MECH 1 1
80 FOD MECH 1 1
90 FOD MECH 1 1

wq1_wo_details
alalzah PAGE: 19 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20726


Location : IQD6-838 Asset : IQD6-TAN838121

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 20 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20726


Location : IQD6-838 Asset : IQD6-TAN838121

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 21 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20984


Location : IQD6-601 Asset : IQD6-PAX601011A

Work Order : 20984 DS6 1M PM MECH BOOSTER PUMP A


DS6 1M PM MECH BOOSTER PUMP A
Priority : 2 Routine
Maint. ActType : 017 Business Critical Check
Location : IQD6-601 Crude Handling
Asset : IQD6-PAX601011A CRUDE OIL BOOSTER PUMP (A)
Asset Type : PUMPS
ABC Indicator : B BUSINESS CRITICAL
Sys Condition :
Planner Group : PLANNER
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 08-Feb-2019 Basic Finish :23-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Mechanical Seal Surveillance and spare 08-Feb-2019
pump test

wq1_wo_details
alalzah PAGE: 22 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20984


Location : IQD6-601 Asset : IQD6-PAX601011A

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD MECH 1 1
Monitor operation of seal flush and/or quench if applicable

Monitor condition of barrier fluid and ensure circulation if


applicable

Note and report abnormal levels or pressures in seal pot

Test operation of spare pump

Monitor and trend process fluid temperatures & Pressure

Monitor and trend process fluid flow

Note and report external leakage of process fluids

Note and report excessive Noise or Vibration

Restart duty unit and shut down spare upon completion of test

NOTE: Raise Service request if any corrective work is


required

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

wq1_wo_details
alalzah PAGE: 23 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20984


Location : IQD6-601 Asset : IQD6-PAX601011A

WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 24 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20984


Location : IQD6-601 Asset : IQD6-PAX601011A

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 25 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20991


Location : IQD6-838 Asset : IQD6-TAN838112

Work Order : 20991 DS6 1M PM - BACK UP GENERATOR (HT)


Priority :
Maint. ActType :
Location : IQD6-838 Aux Generators (incl. Drilling Gen)
Asset : IQD6-TAN838112 DIESEL GENERATOR (HT)
Asset Type : GENERATOR
ABC Indicator : B BUSINESS CRITICAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 11-Jan-2019 Basic Finish :10-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Battery FOD ELECrolyte Level - Check 11-Jan-2019
20 Belts - Inspect/Adjust/Replace 11-Jan-2019
30 Cooling System Supplemental Coolant 11-Jan-2019
Additive (SCA) - Test/Add
40 Clean/Inspect Engine Crankcase breather 11-Jan-2019
50 Engine Protective Devices - Check 11-Jan-2019
60 Fan Drive Bearing - Lubricate 11-Jan-2019
70 Heat Shield - Inspect/Replace 11-Jan-2019
80 Hoses and Clamps - Inspect/Replace 11-Jan-2019
90 Radiator - Clean 11-Jan-2019
100 Engine Crankcase Breather (Clean) 11-Jan-2019
110 Engine Mounts (Check) 11-Jan-2019
120 Fuel Injector(Inspect/Adjust) 11-Jan-2019
130 Generator Lead (Round Cable - Check) 11-Jan-2019
140 Generator Set Vibration (Test / Record) 11-Jan-2019
150 Insulation (Test) 11-Jan-2019
160 Stator Lead (Check) 11-Jan-2019

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD ELEC 1 0.5
20 FOD MECH 1 1
30 FOD MECH 1 1
40 FOD MECH 1 1
50 FOD ELEC 1 1
60 FOD MECH 1 1
70 FOD MECH 1 1
80 FOD MECH 1 1
90 FOD MECH 1 1

wq1_wo_details
alalzah PAGE: 26 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20991


Location : IQD6-838 Asset : IQD6-TAN838112

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
100 FOD MECH 1 1
110 FOD MECH 1 0.5
120 FOD ELEC 1 1
130 FOD ELEC 1 1
140 FOD ELEC 1 1
150 FOD ELEC 1 0.5
160 FOD ELEC 1 0.5

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

wq1_wo_details
alalzah PAGE: 27 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20991


Location : IQD6-838 Asset : IQD6-TAN838112

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 28 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20991


Location : IQD6-838 Asset : IQD6-TAN838112

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 29 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20992


Location : IQD6-838 Asset : IQD6-TAN838121

Work Order : 20992 DS6 1M PM - BACK UP GENERATOR (HT)


Priority :
Maint. ActType :
Location : IQD6-838 Aux Generators (incl. Drilling Gen)
Asset : IQD6-TAN838121 DIESEL GENERATOR (HT)
Asset Type : GENERATOR
ABC Indicator : B BUSINESS CRITICAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 11-Jan-2019 Basic Finish :10-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Battery FOD ELECrolyte Level - Check 11-Jan-2019
20 Belts - Inspect/Adjust/Replace 11-Jan-2019
30 Cooling System Supplemental Coolant 11-Jan-2019
Additive (SCA) - Test/Add
40 Clean/Inspect Engine Crankcase breather 11-Jan-2019
50 Engine Protective Devices - Check 11-Jan-2019
60 Fan Drive Bearing - Lubricate 11-Jan-2019
70 Heat Shield - Inspect/Replace 11-Jan-2019
80 Hoses and Clamps - Inspect/Replace 11-Jan-2019
90 Radiator - Clean 11-Jan-2019
100 Engine Crankcase Breather (Clean) 11-Jan-2019
110 Engine Mounts (Check) 11-Jan-2019
120 Fuel Injector(Inspect/Adjust) 11-Jan-2019
130 Generator Lead (Round Cable - Check) 11-Jan-2019
140 Generator Set Vibration (Test / Record) 11-Jan-2019
150 Insulation (Test) 11-Jan-2019
160 Stator Lead (Check) 11-Jan-2019

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD ELEC 1 0.5
20 FOD MECH 1 1
30 FOD MECH 1 1
40 FOD MECH 1 1
50 FOD ELEC 1 1
60 FOD MECH 1 1
70 FOD MECH 1 1
80 FOD MECH 1 1
90 FOD MECH 1 1

wq1_wo_details
alalzah PAGE: 30 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20992


Location : IQD6-838 Asset : IQD6-TAN838121

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
100 FOD MECH 1 1
110 FOD MECH 1 0.5
120 FOD ELEC 1 1
130 FOD ELEC 1 1
140 FOD ELEC 1 1
150 FOD ELEC 1 0.5
160 FOD ELEC 1 0.5

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

wq1_wo_details
alalzah PAGE: 31 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20992


Location : IQD6-838 Asset : IQD6-TAN838121

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 32 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 20992


Location : IQD6-838 Asset : IQD6-TAN838121

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 33 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 21733


Location : IQD6-624 Asset : IQD6-PBA624352A

Work Order : 21733 Fix the high vibration on the wash water pump A train C

Fix the high vibration on the wash water pump A train C.


Priority : 1 Urgent
Maint. ActType : 001 Corrective
Location : IQD6-624 Crude Coalescers, Desalters
Asset : IQD6-PBA624352A TRAIN C RECYCLE WASH WATER PUMP (A)
Asset Type : PUMPS
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 07-Feb-2019 Basic Finish :14-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Fix the vibration in the wash water pump 07-Feb-2019
A train C

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD MECH 3 3

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

wq1_wo_details
alalzah PAGE: 34 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 21733


Location : IQD6-624 Asset : IQD6-PBA624352A

WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 35 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 21733


Location : IQD6-624 Asset : IQD6-PBA624352A

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 36 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 21962


Location : IQD6-976 Asset : IQD6-HS976005B-01A

Work Order : 21962 DS6 Fix the high vibration on the wash water pump B
train C

Fix the high vibration on the wash water pump B train C.


Priority : 1 Urgent
Maint. ActType :
Location : IQD6-976 FRESH & UTILITY WATER SYSTEM
Asset : IQD6-HS976005B-01A WASH WATER PUMP B
Asset Type : INSTRUMENT
ABC Indicator : D NON CRITICAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 12-Feb-2019 Basic Finish :19-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Fix the high vibration on the wash water 12-Feb-2019
pump B train C.

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD MECH 3 3

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

wq1_wo_details
alalzah PAGE: 37 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 21962


Location : IQD6-976 Asset : IQD6-HS976005B-01A

WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 38 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 21962


Location : IQD6-976 Asset : IQD6-HS976005B-01A

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 39 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 21965


Location : IQD6-V976001 Asset : IQD6-PBA976005B

Work Order : 21965 DS6- Train C Wash water pump B vibration


Train C wash water pump B (IQD6-PBA976005B) has high vibration which required check and
repair.
Priority : 1 Urgent
Maint. ActType :
Location : IQD6-V976001 FRESH & UTILITY WATER SYSTEM
Asset : IQD6-PBA976005B WASH WATER PUMP (B)
Asset Type : PUMPS
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 12-Feb-2019 Basic Finish :19-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 DS6- Train C Wash water pump B vibration 12-Feb-2019

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD MECH 3 3

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

wq1_wo_details
alalzah PAGE: 40 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 21965


Location : IQD6-V976001 Asset : IQD6-PBA976005B

WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 41 Of 42
13-Feb-2019
8:47 AM

WQ1 Work Order Details - Work Order : 21965


Location : IQD6-V976001 Asset : IQD6-PBA976005B

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

--- End of Report ---