SAP PS PROCESS MANUAL

PROJECT STRUCTURE CREATION

Contents:-

1. Project Definition creation

2. WBS creation

3. Network creation

4. Activity creation

5. Material Component Creation

6. Activity Element creation

7. User Status

8. System Status

9. Network Release

10. Calculate Costs, Update Costs & Costs Itemization

11. Open Existing Project

12. Related Reports

Page 1
SAP PS PROCESS MANUAL

1. Project Definition creation

To Create New Project then Click on Create  Project

Page 2
SAP PS PROCESS MANUAL

Page 3
SAP PS PROCESS MANUAL

Page 4
SAP PS PROCESS MANUAL

2. WBS Creation:

Page 5
SAP PS PROCESS MANUAL

Note: - Project Definition & Higher Level WBS Element coding mask & Description should be
same (As shown in the Screenshot)

Page 6
SAP PS PROCESS MANUAL

Select Operative Indicators (For higher level WBS all the 3 Operative Indicators must be
selected)

 Planning Element
 Account Assignment Element
 Billing Element

Page 7
SAP PS PROCESS MANUAL

3. Network Creation:

Page 8
SAP PS PROCESS MANUAL

Page 9
SAP PS PROCESS MANUAL

4. Activity Creation:

Page 10
SAP PS PROCESS MANUAL

5. Material Component Creation :

Page 11
SAP PS PROCESS MANUAL

Page 12
SAP PS PROCESS MANUAL

6. Activity Element Creation:

6.1 Create Activity Element (Work):

Page 13
SAP PS PROCESS MANUAL

Page 14
SAP PS PROCESS MANUAL

Once All the Field Value is entered then Click On ENTER key.

6.2 Create Activity Element (Costs):

Page 15
SAP PS PROCESS MANUAL

Page 16
SAP PS PROCESS MANUAL

Page 17
SAP PS PROCESS MANUAL

List of Cost Elements

Select Correct Cost Element

Once All the Field Value is entered then Click On ENTER key.

Page 18
SAP PS PROCESS MANUAL

7. Change User Status of the WBS:

Select the WBS for which the User Status needs to be changed

Page 19
SAP PS PROCESS MANUAL

Go to EDIT  USER STATUS  SET & PASS ON

Page 20
SAP PS PROCESS MANUAL

First while creating WBS User Status of the WBS will be in INITIATE (INT),
Change it one by one (Sequentially) till CONS (CONSTRUCTION)

Note: - To Raise PR against any WBS the User status of that WBS must be set to
Construction (CONS) & System Status must be set to Release (REL)

Page 21
SAP PS PROCESS MANUAL

8. System Status:

Select PROJECT DEFINITION EDIT  Status  RELEASE (as shown below)

Page 22
SAP PS PROCESS MANUAL

9. Network Release:

Select NETWORK  EDIT  STATUS  RELEASE

Page 23
SAP PS PROCESS MANUAL

Page 24
SAP PS PROCESS MANUAL

10 Calculate Costs, Update Costs & Costs Itemization:

10.1 Calculate Costs:

Page 25
SAP PS PROCESS MANUAL

Page 26
SAP PS PROCESS MANUAL

10.2 Update Costs:

Page 27
SAP PS PROCESS MANUAL

To check the quantity and cost of the material, labors & equipment’s that are
used in structure

10.3 Cost Itemization:

Page 28
SAP PS PROCESS MANUAL

Page 29
SAP PS PROCESS MANUAL

Save the Structure, so that Network Number is generated

Page 30
SAP PS PROCESS MANUAL

11. OPEN EXISTING PROJECT:

Page 31
SAP PS PROCESS MANUAL

To open an existing Project then Click on Open  Enter the Project Definition Enter

Page 32
SAP PS PROCESS MANUAL

Existing Project is opened.

12. Related Reports:

Enter the Project Definition or WBS element in all the reports

 S_ALR_87013543 Act/plan/variance abs. / % var.

 CN52N - Material Components

 CJI3 – Project Actual Cost Line Items Report

 CJI5 – Project Commitment Line Report

 CN43N – WBS Elements Overview Report

 CN47N – Project Activities Report

 CN48N – Confirmations Report

S_ALR_87013543 Act/plan/variance abs. / % var. Report

Page 33
SAP PS PROCESS MANUAL

Page 34
SAP PS PROCESS MANUAL

CN52N - Material Components

Page 35
SAP PS PROCESS MANUAL

CJI3 – Project Actual Cost Line Items Report

Page 36
SAP PS PROCESS MANUAL

CJI5 – Project Commitment Line Item Report

CN43N – WBS Elements Overview Report

Page 37
SAP PS PROCESS MANUAL

CN47N - Project Activities Report

CN48N – Confirmations Overview Report

Page 38