ITEM DESCRIPTION UNIT QUANTITY

1 PRELIMINARIES
1.1 Mobilization/Demobilization
1.3 Bonds and Insurance
1.4 Hauling & Disposals of Debris
1.5 Cleaning & Housekeeping
1.6 Safety Requirements
Sub Total Item 1

2 SALES OFFICE
2.1 Repainting of all white walls (Permacoat Latex Semi-Gloss)
2.2 Panting of accent wall (Permacoat Latex Semi-Gloss; Red Color)
2.3 Supply and installation of additional modular partitions
2.4 Replacement of LED fluorescent bulb 32 watts
2.5 Replacement of ceiling board including hangers
2.6 Restoration of T-runner

3 HALLWAY TO PANTRY
3.1 Repainting of all walls
3.2 Supply and installation of flush type door 0.9 x 2.1m
3.3 Supply and installation of door lockset
Supply and installation of door hinges
3.4 Replacement of ceiling board including hangers
3.5 Replacement of LED fluorescent bulb 32 watts

4 EXISTING MALE RESTROOM


4.1 Removal of existing vinyl wall tiles
4.2 Removal of existing pipe
4.3 Chipping of existing concrete wall
4.4 Installation of 30x30cm wall tiles; 1.2m high
4.5 Painting of remaining interior upper walls
4.6 Repainting of ceiling
4.7 Checking of electrical wiring and switch
4.8 Replacement of lighting fixture-1 gang switch
4.9 Replacement of mirror 0.70 x 0.70m
4.1 Provision of handheld bidet
4.11 Provision of tissue holder

6 EXISTING FEMALE RESTROOM


6.1 Removal of existing wall tiles & wall paper
6.2 Installation of 30x30cm wall tiles; 1.2m high
6.3 Painting of remaining interior walls
6.4 Repainting of ceiling
6.5 Checking of electrical wiring and switch
6.6 Replacement of lighting fixture-1 gang switch
6.7 Replacement of mirror 0.70 x 0.70m
6.8 Provision of handheld bidet
6.9 Provision of tissue holder
7 PANTRY & CONFERENCE ROOM
Installation of partition wall 1/4" thk ficem board on metal furring
7.1 between pantry & conference room
7.2 Demolition of existing wall at storage area
7.3 Replacement of ceiling board incl hangers
7.3.1 Pantry Area
7.3.2 Conference Room
7.4 Restoration of T-runner
7.5 Replacement of LED fluorescent bulb 32 watts

7.6 Repainting of walls including accent walls (Permacoat Latex Semi-Gloss)

8 EXECUTIVE RESTROOM AT CONFERENCE ROOM


8.1 Plumbing & water supply investigation
8.2 Removal of existing floor and wall tiles
8.3 Installation of new floor tiles 60 x 60cm textured tiles
8.4 Installation of new wall tiles 60 x 60cm light brown glossy w/ grain
8.5 Supply and installation of lavatory
8.6 Supply and installation of lavatory faucet
8.7 Repainting of ceiling
8.8 Replacement of lighting fixture-1 gang swicth
8.9 Supply and installation of mirror 0.30x0.40
8.1 Provision of handheld bidet
8.11 Provision of tissue holder