No : /KON.01.

03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE

DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT


No. PLN REV CONTRACTOR REV STATUS TITLE
UTILITY FLOW DIAGRAM FOR
1. 11026B-2.3-00-M-51-GA-0002-01-2 2 T3139-NUN-ENG-PCS-PFD-0002-04 2 B
WATER TREATMENT SYSTEM

Comm’t Comm’t CONTRACTOR’S RESULT


PLN’S COMMENTS
No. No. RESPONSE
General Comment

1 Please correct PLN document number as comment sheet

2 Please complete stream line on RO Package with arrow

3 Please Show each vendor Package battery limit as describe on PID

Technical Comment
1 Please recheck and update the service, operating temperature,
operating pressure and flow rate for each stream on heat and mass
balance. Check its consistency with others document also. Note that
clarifier only installed on Nunukan-2
2 Please make sure the discharge pressure of raw water transfer pump.
Head 100 m at 10 m3/h
Recheck the calculation of pump head.
3 Please Show CIP for RO cleaning on WTP-BWRO Package. Confirm
the water source for RO Cleaning

4 Please Recheck and revise the recycle line from RO unit. Is it flow back
to upstream RO catridge or HP RO Feed Pump as shown on PID?

Reviewed by : Checked by :

-1/1-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE

DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT


No. PLN REV CONTRACTOR REV STATUS TITLE
PIPING & INSTRUMENT DIAGRAM
1. 11026B-2.3-00-M-52-GA-0003-01-2 2 T3139-NUN-ENG-PCS-PID-0007-01 2 B WATER TREATMENT SYSTEM –
SHEET 1

Comm’t Comm’t CONTRACTOR’S RESULT


PLN’S COMMENTS
No. No. RESPONSE
General Comment

1 Please revise the interlock signal from Raw Water Transfer


Pump to Raw Water Pond

2
Please revise flag direction from raw water pond to open ditch

3 Please show level settingon Raw Water Pond

4 Please avoid crossing line or Instrument signal with main


equipment

5 Please show hand hole on coagulant and flocculant dosing tank

6
Please revise the term “M” (Middle) to “N” (Normal)

Reviewed by : Checked by :

-1/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
Comm’t Comm’t CONTRACTOR’S RESULT
PLN’S COMMENTS
No. No. RESPONSE
Technical Comment

Please recheck and revise raw water transfer pump head. Make
1 sure pump can transfer raw water from deep well up to water
Head 100 m at flow 10 m3/h
pond with the worst case where the water level during dry
season

Reviewed by : Checked by :

-2/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE

DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT


No. PLN REV CONTRACTOR REV STATUS TITLE
PIPING & INSTRUMENT DIAGRAM
1. 11026B-2.3-00-M-52-GA-0003-02-2 2 T3139-NUN-ENG-PCS-PID-0007-02 2 B WATER TREATMENT SYSTEM –
SHEET 2

Comm’t Comm’t CONTRACTOR’S RESULT


PLN’S COMMENTS
No. No. RESPONSE
General Comment

1 Please revise the term “M” (Middle) to “N” (Normal)

2 Please make sure this symbol:

Technical Comment
1 Please make sure MMF Backwash Pump start stop function is
synchronize with MMF backwash requirement
2 Please make sure backwash tank can accommodate all reject
water from RO to avoid water release to environment
Reviewed by : Checked by :

-1/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
Comm’t Comm’t CONTRACTOR’S RESULT
PLN’S COMMENTS
No. No. RESPONSE
3 Please change NO and NC valve status for MMF. The drawing
shows two MMF operate simultaneously. Its hould be one
operating and one standby as its philosophy
4
Please recheck compressed air avaibility related to its
requirement for MMF valve (Pneumatic valve type)

Reviewed by : Checked by :

-2/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE

DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT


No. PLN REV CONTRACTOR REV STATUS TITLE
PIPING & INSTRUMENT DIAGRAM
1. 11026B-2.3-00-M-52-GA-0003-03-2 2 T3139-NUN-ENG-PCS-PID-0007-03 2 B WATER TREATMENT SYSTEM –
SHEET 3

Comm’t Comm’t CONTRACTOR’S RESULT


PLN’S COMMENTS
No. No. RESPONSE
General Comment

1 Please Make sure equipment identification. Some equipment


name is added with LT.

2 Please show chemical dosing pump with 2x100% configuration

3 Please connect line that located in one sheet, such as reject


water line to CIP tank

4 Please show RO package unit in one operate and one standby


configuration. The drawing shows two unit operate
simultaneously.

5 Please complete PS on upstream and downstream HP RO Feed


Pump wit its status, high or low

6 Please rearrange water discharge of RO unit for Better


understanding

Reviewed by : Checked by :

-1/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
Comm’t Comm’t CONTRACTOR’S RESULT
PLN’S COMMENTS
No. No. RESPONSE
Technical Comment
1 Please recheck and revise the recycle line from RO unit. Is it
flow back to upstream RO catridge or HP RO Feed Pump
2
Please show chemical dosage as vendor recommendation

3 Please recheck compressed air avaibility related to its


requirement for RO package unit (pneumatic valve type)

Reviewed by : Checked by :

-2/2-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE

DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT


No. PLN REV CONTRACTOR REV STATUS TITLE
PIPING & INSTRUMENT DIAGRAM
1. 11026B-2.3-00-M-52-GA-0003-04-2 2 T3139-NUN-ENG-PCS-PID-0007-04 2 B WATER TREATMENT SYSTEM –
SHEET 4

Comm’t Comm’t CONTRACTOR’S RESULT


PLN’S COMMENTS
No. No. RESPONSE
General Comment

1 Please revise term “M” (Middle) to “N” (Normal)

2 Please rearrange fresh water and service water pump start/stop


function

Technical Comment
1 Please recheck and revise pipe material. Confirm with piping
engineer
2 Please recheck and revise instrument signal from LIA
00GBL31EJ301. There are two function show on instrument
signal, LLL to stop/HLL to start and HLL to stop/LLL to start

Reviewed by : Checked by :

-1/1-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)
No : /KON.01.03/PUSENLIS/2018 Dated :
Your ref. Letter : Dated : Received date :
REVIEW FOR APPROVAL DRAWINGS/DOCUMENTS CCR OUT DATE

DRAWING/DOCUMENT NUMBER DRAWING/DOCUMENT


No. PLN REV CONTRACTOR REV STATUS TITLE
PIPING & INSTRUMENT DIAGRAM
1. 11026B-2.3-00-M-52-GA-0003-05-2 2 T3139-NUN-ENG-PCS-PID-0007-05 2 B WATER TREATMENT SYSTEM –
SHEET 5

Comm’t Comm’t CONTRACTOR’S RESULT


PLN’S COMMENTS
No. No. RESPONSE
General Comment

1 Please recheck and revise pipe material. Confirm with piping


engineer

Reviewed by : Checked by :

-1/1-
PT PLN (Persero) Pusat Enjiniring Ketenagalistrikan
PLTMG NUNUKAN-2 (10 MW)