OBRA : MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.I. N° 269 DE LA COMUNDAD INDIGENA EBRON , DISTRITO
DE NIEVA - PROVINCIA DE CONDORCANQUI - AMAZONAS
METAS Y/O
COMPONENTES
PART INFRAESTRUCTURA
DESCRIPCION UND
MODULO DE
DIRECCION+SS.HH.+
Nº DEPOSITO
07.00.00 ALBAÑILERIA
07.01.00 Asentado de Muro de Ladrillo Soga M2 33.12
07.02.00 Asentado de Muro de Ladrillo Cabeza M2 86.80
07.03.00 Acero en Muros cada Tres Hiladas Kg 121.35
07.04.00 Fabricación de Ladrillo de Concreto 0.09x0.14x0.24 PZA 7,261.00
09.00.00 CIELORRASO
09.01.00 Cielo Raso Con Madera Machihembrada M2 220.74
13.00.00 TABIQUES
13.01.00 Tabiquería de Madera Machihembrada M2 27.30
14.00.00 CERRAJERIA
14.01.00 Chapa Exterior Sobreponer UND 3.00
14.02.00 Bisagra Capuchina Bronceada 4" UND 9.00
14.04.00 Picaporte Sobreponer 3" UND 36.00
15.00.00 VIDRIOS
15.01.00 Vidrio Incoloro semidoble P2 302.26
16.00.00 PINTURA
16.01.00 Pintura Latex en Cielo Raso M2 220.74
16.02.00 Pintura en Muros Exterior e Interiores,Vigas y Col. M2 446.24
18.00.00 VARIOS
18.01.00 Rotura de Probetas Concreto en Estructuras UND 8.00
Junta de dilatación en pisos y veredas con tecnopor y
18.02.00 ML 147.15
sellado con mezcla asfáltica E= 1",
18.03.00 Juntas de Construcción con Teknoport M2 3.78
COSTO DIRECTO
GASTOS GENERALES 0.1
UTILIDAD 0.1
SUBTOTAL
IMPUESTO (IGV) 0.18
TOTAL
OS
PRECIO PARCIAL
0.19 38.00
0.73 145.99
32.66 3,265.67
32.66 509.50
2.2 56.61
12.83 231.20
101.36 859.53
99.07 8,398.16
14.04 1,984.13
26.64 319.68
214.6 2,824.14
269.18 379.54
38.63 840.59
29.62 1,273.07
337.11 12,402.28
27.62 319.01
392.15 2,352.90
4.34 554.61
392.15 1,490.17
38.83 4,499.81
4.34 2,365.95
446.36 1,852.39
43.92 3,084.50
4.34 3,925.05
419.25 2,800.59
43.96 2,485.06
4.34 4,313.40
583.17 6,414.87
6.83 2,934.17
23.73 6,172.72
26.33 708.28
31.23 1,034.34
31.23 2,710.76
3.42 415.02
1.22 8,858.42
26.18 1,344.74
29.38 2,337.97
19.15 861.75
7.00 2,528.54
17.84 4,822.15
70.04 15,460.73
47.34 5,687.43
47.2 3,539.53
3.5 1,671.95
192.53 970.35
104.2 3,126.00
45.67 1,424.90
13.1 928.00
70 1,050.00
75.05 2,048.87
47.16 141.48
4.73 42.57
5.39 194.04
9.2 2,780.80
9.53 2,103.67
9.91 4,422.26
15.35 193.41
13.83 829.80
5.07 276.82
12.78 797.47
627.85 627.85
40 320.00
8.43
1,240.47
28.65 108.30
ICAS
65.06 910.84
58.18 814.52
59.58 238.32
17.52 35.04
35.59 676.21
45.58 2,825.96
7.65 474.30
439.65 439.65
RIAS
134.32 671.60
160 160.00
60 60.00
70 70.00
40 80.00
30 30.00
25.42 152.52
60.53 484.24
24 168.00
0.00
34.41 240.87
35.68 142.72
39.91 159.64
52.96 211.84
9.96 422.30
29.42 154.46
14.64 431.88
13.94 41.82
12.98 90.86
15.04 60.16
12.47 62.35
11.54 69.24
14.42 100.94
12.25 49.00
10.19 183.42
11.59 46.36
13.94 27.88
10.97 43.88
28.25 113.00
24.67 123.35
32.52 65.04
35.59 177.95
8.83 35.32
156.59 156.59
12.18 85.26
14.08 56.32
16.17 210.21
10.58 314.23
6.53 161.94
10.63 356.11
52.47 209.88
60.79 243.16
74.59 74.59
11.96 35.88
16.87 33.74
17.87 53.61
18.36 91.80
10.09 60.54
10.59 10.59
9.58 316.14
9.83 216.26
20.81 41.62
9.77 78.16
10.07 80.56
12.15 24.30
24.68 197.44
25.58 204.64
28.58 57.16
25 125.00
42.91 214.55
61.35 61.35
20.94 41.88
1.54 135.52
70.25 70.25
19.14 231.59
29.42 711.96
11.59 139.08
337.11 101.13
43.92 171.29
4.34 41.66
171,463.42
171,463.42 213,125.61
223,857.63
231,937.83
840,384.50
84,038.45
84,038.45
1,008,461.40
181,523.05
1,189,984.45
RESUMEN GENERAL DE METRADOS
OBRA : MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.I. N° 269 DE LA COMUNDAD INDIGENA EBRON , DISTRI
MARIA DE NIEVA - PROVINCIA DE CONDORCANQUI - AMAZONAS
METAS Y/O
COMPONENTES
PART DESCRIPCION UND INFRAESTRUCTURA
AULA 01 +COCINA
Nº
01.- FORMULA ESTRUCTURAS
02.00.00 TRABAJOS PRELIMINARES
02.01.00 Limpieza Manual de Terreno M2 213.00
02.02.00 Trazo y Replanteo sin Equipo M2 213.00
07.00.00 ALBAÑILERIA
07.01.00 Asentado de Muro de Ladrillo Soga M2 33.12
07.02.00 Asentado de Muro de Ladrillo Cabeza M2 86.80
07.03.00 Acero en Muros cada Tres Hiladas Kg 121.35
07.04.00 Fabricación de Ladrillo de Concreto 0.09x0.14x0.24 PZA 7,261.00
09.00.00 CIELORRASO
09.01.00 Cielo Raso Con Madera Machihembrada M2 220.74
13.00.00 TABIQUES
13.01.00 Tabiquería de Madera Machihembrada M2 27.30
14.00.00 CERRAJERIA
14.01.00 Chapa Exterior Sobreponer UND 3.00
14.02.00 Bisagra Capuchina Bronceada 4" UND 9.00
14.04.00 Picaporte Sobreponer 3" UND 36.00
15.00.00 VIDRIOS
15.01.00 Vidrio Incoloro semidoble P2 302.26
16.00.00 PINTURA
16.01.00 Pintura Latex en Cielo Raso M2 220.74
16.02.00 Pintura en Muros Exterior e Interiores,Vigas y Col. M2 449.84
16.03.00 Pintura Barniz en Puertas - Aulas M2 12.60
16.04.00 Pintura en Ventanas M2 60.00
16.05.00 Pintura en Tabiquería de Madera M2 54.60
16.06.00 Pintura en Ventana Alta Con Malla Mosquitera M2 62.40
18.00.00 VARIOS
18.01.00 Rotura de Probetas Concreto en Estructuras UND 8.00
Junta de dilatación en pisos y veredas con tecnopor y
18.02.00 ML 163.65
sellado con mezcla asfáltica E= 1",
18.03.00 Juntas de Construcción con Teknoport M2 3.78
PRECIO PARCIAL
0.19 40.47
0.73 155.49
32.66 3,478.29
32.66 864.18
2.20 101.02
12.83 381.05
101.36 1,853.87
99.07 18,119.90
14.04 4,006.88
26.64 542.12
214.60 4,204.01
269.18 716.02
38.63 1,295.65
29.62 3,666.07
337.11 17,034.17
27.62 445.51
392.15 3,690.13
4.34 875.90
392.15 2,568.58
38.83 4,324.50
4.34 4,815.97
446.36 4,548.41
43.92 4,116.62
4.34 6,260.41
419.25 4,133.81
43.96 3,495.26
4.34 6,078.17
583.17 6,414.87
6.83 2,934.17
23.73 6,172.72
26.33 708.28
31.23 1,034.34
31.23 2,710.76
3.42 415.02
1.22 8,858.42
26.18 1,344.74
29.38 2,337.97
19.15 930.69
7.00 2,528.54
17.84 4,822.15
70.04 15,460.73
47.34 7,392.61
47.20 3,539.53
3.50 1,671.95
192.53 1,212.94
104.20 3,126.00
45.67 1,424.90
13.10 928.00
70 1,050.00
75.05 2,048.87
47.16 141.48
4.73 42.57
5.39 194.04
9.20 2,780.80
9.53 2,103.67
9.91 4,457.93
15.35 193.41
13.83 829.80
5.07 276.82
12.78 797.47
40.00 320.00
8.43 1,379.57
28.65 108.30
65.06 1,171.08
58.18 1,221.78
59.58 178.74
17.52 17.52
35.59 640.62
45.58 2,598.06
7.65 436.05
439.65 1,318.95
134.32 671.60
160.00 160.00
60.00 60.00
70.00 70.00
40.00 80.00
30.00 30.00
25.42 152.52
60.53 484.24
24.00 168.00
34.41 240.87
35.68 142.72
39.91 159.64
52.96 211.84
9.96 422.30
29.42 154.46
14.64 431.88
13.94 41.82
12.98 90.86
15.04 60.16
12.47 62.35
11.54 69.24
14.42 100.94
12.25 49.00
10.19 183.42
11.59 46.36
13.94 27.88
10.97 43.88
28.25 113.00
24.67 123.35
32.52 65.04
35.59 177.95
8.83 35.32
156.59 156.59
12.18 85.26
14.08 56.32
16.17 210.21
10.58 314.23
6.53 161.94
10.63 356.11
52.47 209.88
60.79 243.16
74.59 74.59
11.96 35.88
16.87 33.74
17.87 53.61
18.36 91.80
10.09 60.54
10.59 10.59
9.58 316.14
9.83 216.26
20.81 41.62
9.77 78.16
10.07 80.56
12.15 24.30
24.68 197.44
25.58 204.64
28.58 57.16
25.00 125.00
42.91 214.55
61.35 61.35
20.94 41.88
1.54 135.52
70.25 70.25
689.65 689.65
19.14 231.59
29.42 711.96
11.59 139.08
337.11 101.13
43.92 171.29
4.34 41.66
213,125.61
RESUMEN GENERAL DE METRADOS
OBRA : MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.I. N° 269 DE LA COMUNDAD
INDIGENA EBRON , DISTRITO DE S. MARIA DE NIEVA - PROVINCIA DE CONDORCANQUI -
AMAZONAS
METAS Y/O
COMPONENTES
PART DESCRIPCION UND INFRAESTRUCTURA PRECIO
Nº AULAS 02 Y 03
01.- FORMULA ESTRUCTURAS
02.00.00 TRABAJOS PRELIMINARES
02.01.00 Limpieza Manual de Terreno M2 266.27 0.19
02.02.00 Trazo y Replanteo sin Equipo M2 266.27 0.73
07.00.00 ALBAÑILERIA
07.01.00 Asentado de Muro de Ladrillo Soga M2 33.12 31.23
07.02.00 Asentado de Muro de Ladrillo Cabeza M2 86.80 31.23
07.03.00 Acero en Muros cada Tres Hiladas Kg 121.35 3.42
07.04.00 Fabricación de Ladrillo de Concreto 0.09x0.14x0.24 PZA 7,261.00 1.22
09.00.00 CIELORRASO
09.01.00 Cielo Raso Con Madera Machihembrada M2 220.74 70.04
13.00.00 TABIQUES
13.01.00 Tabiquería de Madera Machihembrada M2 27.30 75.05
14.00.00 CERRAJERIA
14.01.00 Chapa Exterior Sobreponer UND 3.00 47.16
14.02.00 Bisagra Capuchina Bronceada 4" UND 9.00 4.73
14.04.00 Picaporte Sobreponer 3" UND 36.00 5.39
15.00.00 VIDRIOS
15.01.00 Vidrio Incoloro semidoble P2 302.26 9.20
16.00.00 PINTURA
16.01.00 Pintura Latex en Cielo Raso M2 220.74 9.53
16.02.00 Pintura en Muros Exterior e Interiores,Vigas y Col. M2 446.24 9.91
16.03.00 Pintura Barniz en Puertas - Aulas M2 12.60 15.35
16.04.00 Pintura en Ventanas M2 60.00 13.83
16.05.00 Pintura en Tabiquería de Madera M2 54.60 5.07
16.06.00 Pintura en Ventana Alta Con Malla Mosquitera M2 62.40 12.78
18.00.00 VARIOS
18.01.00 Rotura de Probetas Concreto en Estructuras UND 8.00 40.00
Junta de dilatación en pisos y veredas con tecnopor y
18.02.00 ML 147.15
sellado con mezcla asfáltica E= 1", 8.43
18.03.00 Juntas de Construcción con Teknoport M2 3.78 28.65
50.59
194.38
4,348.03
1,080.07
126.28
476.38
2,317.09
22,650.37
5,008.63
677.72
5,255.55
896.37
1,619.37
4,582.51
21,295.24
556.82
15,460.73
5,687.43
3,539.53
1,671.95
970.35
3,126.00
1,424.90
928.00
1,050.00
2,048.87
141.48
42.57
194.04
2,780.80
2,103.67
4,422.26
193.41
829.80
276.82
797.47
320.00
1,240.47
108.30
780.72
698.16
119.16
17.52
640.62
2,598.06
436.05
439.65
671.60
160.00
60.00
70.00
80.00
30.00
152.52
484.24
168.00
240.87
142.72
159.64
211.84
422.30
154.46
431.88
41.82
90.86
60.16
62.35
69.24
100.94
49.00
183.42
46.36
27.88
43.88
113.00
123.35
65.04
177.95
35.32
156.59
85.26
56.32
210.21
314.23
161.94
356.11
209.88
243.16
74.59
35.88
33.74
53.61
91.80
60.54
10.59
316.14
216.26
41.62
78.16
80.56
24.30
197.44
204.64
57.16
125.00
214.55
61.35
41.88
135.52
70.25
689.65
231.59
711.96
139.08
101.13
171.29
41.66
223,857.63
RESUMEN GENERAL DE METRADOS
OBRA : MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.I. N° 269 DE LA COMUNDAD
INDIGENA EBRON , DISTRITO DE S. MARIA DE NIEVA - PROVINCIA DE CONDORCANQUI -
AMAZONAS METAS Y/O
COMPONEN
TES
INFRAESTRU
PART DESCRIPCION UND CTURA
OBRAS
Nº EXTERIORES
01.- FORMULA ESTRUCTURAS
01.00.00 OBRAS PROVISIONALES
01.01.00 Cartel de Identificacion de Obra UND 1.00
01.02.00 Agua para la Construcción GLOB 1.00
01.03.00 Movilización y desmovilización de personal y equipos GLOB 1.00
01.04.00 Transporte de Materiales a Obra (Terrestre, Fluvial y Rural) GLOB 1.00
Elaboración, implementación y administración del plan
01.05.00 GLOB 1.00
de seguridad y salud en el trabajo
01.06.00 Equipos de protección individual GLOB 1.00
01.07.00 Equipos de protección colectiva GLOB 1.00
01.08.00 Señalización temporal de seguridad GLOB 1.00
01.09.00 Capacitación en Seguridad y Salud GLOB 1.00
Implementación de recursos para emergencias en
01.10.00 seguridad y salud GLOB 1.00
07.00.00 ALBAÑILERIA
07.02.00 Asentado de Muro de Ladrillo Cabeza M2 26.73
18.00.00 VARIOS
18.01.00 Rotura de Probetas Concreto en Estructuras UND 2.00
1035.01 1,035.01
1200 1,200.00
500 500.00
55759.03 55,759.03
2000 2,000.00
1025 1,025.00
412.51 412.51
890.00 890.00
1000 1,000.00
630 630.00
0.19 95.00
0.73 365.00
32.66 12,409.95
32.66 6,238.35
2.2 2,683.41
101.36 9,814.64
99.07 596.88
14.04 8,822.17
26.64 172.09
337.11 20,942.96
27.62 11,439.10
274.86 397.21
43.92 99.34
383.58 2,470.20
43.92 1,489.33
4.34 695.34
383.58 829.01
43.92 440.08
4.34 3,623.90
31.23 834.93
28.69 972.88
87.53 52,518.00
40 80.00
38.08 666.40
16.01 200.13
9.2 230.00
47.26 1,181.50
475.77 951.54
933.38 933.38
8785.33 8,785.33
800.00 800.00
0.00
33.14 1,193.04
42.33 126.99
0.00
29.42 4,018.48
143.45 143.45
2750 2,750.00
7476.27 7,476.27
231,937.83