Professional Documents
Culture Documents
5) = 1564 pcs of
CHB
Beam (300 mm x 500 mm)
Mortar for CHB Fill
V = (0.3)(0.5)(4)(6) +(0.3)(0.5)(3.5)(6) =
6.75 m3 Total Wall Area = 125.115 m2
Interior Walls = 2.85 (4) + 2.85 (3.5) + 2.85 # of CHB = 1654 pcs of CHB
(1.2) (2) + 2.85 (2) (2) = 39.615 m2
Exterior Walls = 2.85 (8) (2) + 2.85 (7) (2) = Using Table 3-5 (ESTIMATE by Max
85.5 m2 Fajardo):
Total Wall Area = 39.615 + 85.5 = 125.115
m2 (reinforcing every 3 layers at 60 cm vertical
spacing)
(using 10x20x40cm CHB)
Vertical Reinforcement = 1654 (0.171) =
282.834
Horizontal Reinforcement = 1654 (0.172) =
284.488 12.25
req’d steel = = 0.3 kg
Total = 282.834 + 284.488 = 567.322 53
Column Reinforcement
567.322
# of pcs = = 95 pcs of 6 m long
6 (use 6 m long steel bars)
steel bars
2.85 (9) = 25.65
CHB Tie Wire (#16 G.I. Wire)
25.65
= 5 pcs of 6 m long steel bars
(use 40 cm length ties) 6
1.75
= 0.1 kg
53
P = 2(a+b) + 0.2
P = 2(0.4+0.4) + 0.2 = 1.8 m
Total Length = (2.85)(9) = 25.65 m
Area = 25.65 (1.8) = 46.17 m2
(use 60 cm x 60 cm)
46.17
# of Pieces =
❑