Men Power status @GGNFC-07

Interior Total
Menpow HVAC Plumbing Men
S.No. Date Electrical Menpower er Menpower Menpower power Remark
1 1/1/2019 6 6
2 1/2/2019 6 6
3 1/3/2019 7 7
4 1/4/2019 7 7
5 1/5/2019 10 10
6 1/6/2019 9 9
7 1/7/2019 9 9
8 1/8/2019 10 10
9 1/9/2019 10 10
10 1/10/2019 11 11
11 1/11/2019 16 16
12 1/12/2019 17 17
13 1/13/2019 13 13
14 1/14/2019 21 21
15 1/15/2019 21 21
16 1/16/2019 21 21
17 1/17/2019 20 5 0 0 25
18 1/18/2019 19 4 0 0 23

Value of
Voltage
S.No. Earthing Pit No. Equipment used B/w N-E Date
1 Pit-1 LT Panel 1.1
2 Pit-2 LT Panel 1.1
3 Pit-3 Dynamic Profiler 1.8
4 Pit-4 Dynamic Profiler 1.8
5 Pit-5 UPS 1.3
6 Pit-6 UPS 1.3
7 Pit-7 Server 1.9
22.02.2019

8 Pit-8 Server 1.9


9 Pit-9 UPS Panel O/g & I/c 1.7
10 Pit-10 Sorter 1.7
11 Pit-11 Sorter 1.7
12 Pit-12 DG-1 Neutral 2.8
13 Pit-13 DG-1 Neutral 2.8
14 Pit-14 DG-2 Neutral 2.7
15 Pit-15 DG-2 Neutral 2.6
16 Pit-16 DG-1 Body 3.7
17 Pit-17 DG-2 Body 3.8
Name Date In out
15.01.2019 9:00AM 17:00PM
Rehan
16.01.2019 10:00AM 18:35PM
16.01.2019 9:00AM 16:00PM
Sanidal-1
31.01.2019 9:10AM 18:15PM
15.01.2019 9:45AM 18:00PM
Faridul
16.01.2019 12:30AM 18:15PM
Rashidul 07.01.2019 7:50AM 4:30PM
Alongir 07.01.2019 7:50AM 20:00PM
Sanjay 15.01.2019 6:00AM 14:30PM