You are on page 1of 24

Project : AMTZ

Subject : ELECTRICAL
DESIGN CHECKLIST
SL.NO DESCRIPTION OPTION-1
A EXTERNAL
1 HT Yard South East Corner

2 HT Tapping Pole Structure

3 Fasade Lighting Required

4 Water body Lighting (If Provided) Required

5 Street lighting 9" from FFL

6 Landscape lighting Pole mounted light

7 Light Fixtures CFL

8 CCTV Required

9 DG Backup 10%

10 Solar external lighting Required

11 Common area metering LT

Metering for external ltg, PHE & Only one meter for all utility
12
common area, loads

B Basement
1 Light fixture in Driveway 2x28W FTL

2 Light fixture in Parking 1x28W FTL

3 Mounting Light fixture in Parking Ceiling Suspended

4 Location of Mounting Light fixture Either side of the Driveway


Project : AMTZ
Subject : ELECTRICAL
DESIGN CHECKLIST
SL.NO DESCRIPTION OPTION-1

5 Light fixture @ Ramp Corner Slab FTL

6 Lux 50

7 Signage light in Drive way Required

8 Column Light and wall washer Required

Ramp Light Fixuture mounting


9 9" from FFL
Height

10 Ramp Light Fixuture Incandescent

11 DG Backup 10%

12 UPS Backup 10%

13 6/16A Power Points At every 15Mtr.

14 Electric Car Charging points Required

15 CCTV Required

C COMMON AREA
1 Common Area lighting FTL

2 Light Fixture Mouting Surface Mounted

3 Common Area Power Point Required

4 Common Area CCTV Required

5 Staircase and Lift Lobby light fixture FTL


Project : AMTZ
Subject : ELECTRICAL
DESIGN CHECKLIST
SL.NO DESCRIPTION OPTION-1

10 UPS Backup for Lighting Required

13 UPS Backup for Lighting 10%

14 DG Backup 10%

D SHOPS

1 Load per Shop (Small Shop) 3kW

2 Type of Connection (Small Shop) Single Phase

3 Type of Connection (Big Shop) Single Phase

4 Distribution Only conduit Provision

Only 1 or 2 light points during


selling of shops and individuals
Should we consider minimum
5 who purchase the shops they
lighting ?
will do interiors as per their
requirements.

6 Lux Level (W.r.t. above point) 150

7 Light Fixture FTL

8 Power Points 1Power point / 100Sqft

9 Power Points 6A Socket

10 Fan Points Required

11 Split AC point 1No

12 TV Point 1 Point
Project : AMTZ
Subject : ELECTRICAL
DESIGN CHECKLIST
SL.NO DESCRIPTION OPTION-1

13 Telephone Point 1 Point

14 DG Backup Only Lighting

E MP ROOMS
1 Distribuition Board Only Conduit Provision

2 Type of Connection (Rooms Single Phase

3 Light Fixture FTL

4 Lux Level (W.r.t. above point) 150

6A Socket - left & right side of


5 Power Points
bed

6 Fan Points Required

7 Telephone Required

8 Split AC point 1No

9 TV Required

10 Data Points Required

11 Geyser point Required

Minibar , coffee maker and Shaver


12 Required
socket

DG Backup (Applicable w.r.t. Above


13 Only Lighting
point)

F FLATS
Project : AMTZ
Subject : ELECTRICAL
DESIGN CHECKLIST
SL.NO DESCRIPTION OPTION-1
1 Distribuition Board Only Conduit Provision

2 Type of Connection (Flats) Single Phase

3 Light Fixture FTL

Living
4 Wall light points -FTL 2Nos

5 Ceiling light points -FTL 1No

6 Fan points Required

7 Split AC point 1No

8 Telephone Required

9 TV Required

10 Data Points Required

Bed room
11 Wall light points -FTL 2Nos

12 Ceiling light points -FTL 1No

13 Fan points Required

14 Split AC point 1No

6A Socket - left & right side of


15 Power Points
bed

16 Telephone Required

17 TV Required
Project : AMTZ
Subject : ELECTRICAL
DESIGN CHECKLIST
SL.NO DESCRIPTION OPTION-1

18 Data Points Required

Common
19 Geyser point Required

20 Call Bell Point Required

Mixer, exhaust fan, fridge and


21 Required
aquagaurd -3nos x6A + 1Nox6/16A

DG Backup (Applicable w.r.t. Above


22 Required
point)

F WIRING METHOD

1 Light Points - Point wiring 2Run1.0Sqmm Cu. Flexi. Wire

2Run1.5 +1.0Sqmm Cu. Flexi.


2 Light Circuits
Wire

2Run1.5 +1.0Sqmm Cu. Flexi.


3 Power Circuit (6A)
Wire

2Run4.0 +2.5Sqmm Cu. Flexi.


4 Power Circuit (16A)
Wire

G DG POWER

1 PHE 50%

2 Lift and stretcher's lift 50%

3 ELV like CCTV, PA, Access 50%


Date
DESIGN CHECKLIST Building name :
OPTION-2 OPTION-3 OBSERVATIONS

Easy acess for


As per site feasibility Please Specify
maintanance

Ring main unit Please Specify RMU

Not Required Please Specify Reuired

Not Required Please Specify Reuired

3' from FFL As per Architect As per architect

Path light (recessed in Bollard/Recessed path


Bollard
floor) light

LED As Required CFL

Not Required Please Specify Required

50% Please Specify 100%

Not Required Please Specify Required

HT Please Specify LT

Individual metering Please Specify Individual Metering

CFL LED FTL

CFL LED FTL

Fixed to Ceiling Please Specify Fixed to ceiling

Centre of the Driveway Please Specify Centre of the drive way


Date
DESIGN CHECKLIST Building name :
OPTION-2 OPTION-3 OBSERVATIONS

CFL LED CFL

75 100 75

Not requried Please Specify Required

Not Required Please specify

18" from FFL 30" from FFL 2' from FFL

CFL LED CFL

50% 100% Emergency lighing only

Not Required Please specify For Electrical room

At every 30Mtr. Please specify Every 10 mtrs

Not Required Please Specify Required

Not Required Please Specify Required

CFL LED CFL

Recessed Please Specify Surface Mounted

Not Required Please Specify Required

Not Required Please Specify Required

CFL LED CFL


Date
DESIGN CHECKLIST Building name :
OPTION-2 OPTION-3 OBSERVATIONS

Not Required Please specify Required

50% 100% 10%

50% 100% 50%

As per shop keeper design


4kW 6kW
load

Three Phase Please specify Single phase

Three Phase Please specify Three phase

Please specify Distribution Board Distribution boards

Complete lighting as per lux


Only wiring As per shopkeeper design
level.

300 500-600 300

CFL LED CFL

1Power point / 100Sqft Please Specify

16A Socket 6/16A Sockets 6/16 A Sockets

Not Required Please Specify Fan point

2Nos Please Specify If requires AC no need

Not Required Conduit Provision Conduit provision


Date
DESIGN CHECKLIST Building name :
OPTION-2 OPTION-3 OBSERVATIONS

Not Required Conduit Provision Conduit provision

Lighting and Small Power Please Specify For emergency only

MCB in Enclosure Box Distribution Board Distribution boards

Three Phase Please Specify Single phase

CFL LED CFL

200 250-300 250

16A Socket 6/16A Sockets Both sides of the bed

Not Required Please Specify Required

Not Required Only Conduit Provision conduit provision

2Nos Please Specify

Not Required Only Conduit Provision conduit provision

Not Required Only Conduit Provision conduit provision

Not Required Please Specify

Not Required Please Specify

Lighting and Small Power Please Specify Lighting only


Date
DESIGN CHECKLIST Building name :
OPTION-2 OPTION-3 OBSERVATIONS
MCB in Enclosure Box Distribution Board Distribution boards

Three Phase Please Specify Single phase

Both (low power


CFL Combination of both
consumption)

3Nos Please Specify 02 nos

2No Please Specify

Not Required Please Specify Required

2Nos Please Specify

Not Required Only Conduit Provision conduit provision

Not Required Only Conduit Provision conduit provision

Not Required Only Conduit Provision Required

3Nos Please Specify 02 nos

2No Please Specify

Not Required Please Specify Required

2Nos Please Specify

16A Socket 6/16A Sockets Both sides of the bed

Not Required Please Specify Required

Not Required Please Specify Required


Date
DESIGN CHECKLIST Building name :
OPTION-2 OPTION-3 OBSERVATIONS

Not Required Please Specify Required

Not Required Please Specify

Not Required Please Specify Required

Not Required Please Specify Required

Not Required Please Specify For emergency lighing

2Run1.5+1.0Sqmm Cu. Flexi. 2Run1.5+1.0Sqmm Cu.


Please Specify
Wire Flexi. Wire

2Run2.5+1.5Sqmm Cu. Flexi. 2Run2.5+1.5Sqmm Cu.


Please Specify
Wire Flexi. Wire

2Run2.5+1.5Sqmm Cu. Flexi. 2Run2.5+1.5Sqmm Cu.


Please Specify
Wire Flexi. Wire

2Run2.5+1.5Sqmm Cu. Flexi. 2Run4.0 +2.5Sqmm Cu.


Please Specify
Wire Flexi. Wire

100% Not Required 100%

100% Not Required 100%

100% Not Required 100%


Project : AMTZ
Subject : PHE
DESIGN CHECKLIST
SL.NO DESCRIPTION OPTION-1
BIS (NBC)
1 System Design
Indian Standards

2 Water Supply System Single plumbing

3 Piping System Two stack system

4 Venting System Fixture Venting

5 Water Supply System piping GI C Class pipe

6 External Sewerage System Stoneware Pipes

7 Ground level Sump with Pump Required

8 Over Head Tank Required

9 Water Distribution system Distribution by Gravity

Best Indian Make


10 Sanitary wares
50% colour

11 European Water Closet Wall Hung with flush valve

Oval / Circular
12
Wash Basin Single Lever Mixer (Hot Water)

Large Flat Back


13 Urinals
Flush Valve

14 CP Fittings Jaquar - Continental Range

15 Internal Sanitary System Poly Vinyl Chloride (SWR) pipes

16 Rain Water Piping Poly Vinyl Chloride (SWR) pipes

17 Storm water disposal R.C.C box drains

Rain water harvesting (collection


18 Rainwater Harvesting
& re-using for landscaping)

19 Hot Water Supply Solar System

20 Water Treatment Scheme Conventional Treatment


Project : AMTZ
Subject : PHE
DESIGN CHECKLIST
SL.NO DESCRIPTION OPTION-1
21 Water Treatment Operation Manual operation

Activated Sludge Process with


22 Sewage Treatment Plant
Engineered Bacteria

23 Sewage Treatment Plant Placing Underground

Flushing
24 Usage
Re-cycling for landscaping
NOTE :
1 Return Air & Air Mixture of Rooms shall be consider specifically or normally
2 Near each in-door unit, the access door to be provided for maintanence.
3
4
5
Date
DESIGN CHECKLIST Building name :
OPTION-2 OPTION-3 OBSERVATIONS
International Building Code Uniform Plumbing Code

Dual plumbing

Single stack system

Stack Venting

CPVC pipes SDR 11, SCH 40 Copper Pipes

Poly Vinyl Chloride (SWR) pipes Cast Iron LA class pipe

Not Required Specifications (if any)

Not Required Specifications (if any)

Distribution by Hydropneumatic
sch 80
System

American Standard Toto


100% colour White

Floor Mounted with Cistern

Below / Above Counter Any other


Single Lever tap (Cold Water)

Wash Broke Small Ideal


Water Less Urinal Auto Flush

American Standard Any other

Cast Iron (Centri) pipes.

Cast Iron pipes

Masonry drains

Rain water recharging system

Geyser Solar through Geyser

RO
Date
DESIGN CHECKLIST Building name :
OPTION-2 OPTION-3 OBSERVATIONS
Auto operation

Sequence Batch Reactor Mixed Bed Reactor

Partly above and partly below

Air conditioning. All the above

mally
ce.
Project : AMTZ
Subject : HVAC
DESIGN CHECKLIST
SL.NO DESCRIPTION OPTION-1 OPTION-2
A AIR CONDITIONING WORKS
HIGH SIDE WORKS
1 Type of Airconditioning system Centralized Chilled water system Variable Refrigerant Volume system

2 Type of chiller Water cooled chiller Air cooled chiller

3 Type of pumping system Primary pumping system Primary & secondary system

4 Type of cooling tower Induced draft type Forced draft type

5 Location for chillers & pumps Basement floor Terrace floor

6 Location for cooling towers Basement floor Terrace floor

7 AHU Rooms Basement floor Terrace floor

B LOW SIDE HVAC WORKS

1 Inside conditions
ROOM NAME
a Temp 23 ±1 deg C 24 ± 1 deg C
b Humidity Not Exceeding 60% Not Exceeding 50%
c Occupancy Nos
d Occupancy Rate 35 sq.ft/person 50 Sq.ft/person
e Fresh air / person 15 cfm/person As per ASHRAE 62.1-2007
Computers(150 W/computer,600
f Heat dissipation Systems Machinery
Btuh / PC)

2 Type of Indoor Units By Air handling unit (AHU) By ceiling suspended unit (CSAHU)
By ceiling suspended unit (FCU) Standard split unit

3 Return Air System Ducting Above False Ceiling

Dedicated de-humidified unit kept


De-humidified air supply for From the common area Air-
4 at terrace level & distributing de-
retail shops (TFA) conditioning unit
humidified air by ducting

5 Glazing parameters (glass)


a U-value 1.13 (Single pane) 0.65 (Double pane)
b Shading co-efficient 0.56 (Single pane) 0.34 (Double pane)

5 Method Of Air Distribuiton Constant Air volume system Variable Air Volume system

C VENTILATION
1 Areas to be Ventilated
Store Room Required Not required
Electrical Room Required Not required
Basement Ventilation Required Not required
Project : AMTZ
Subject : HVAC
DESIGN CHECKLIST
SL.NO DESCRIPTION OPTION-1 OPTION-2

2 Type of ventilation system Natural ventilation system Mechanical ventilation system

Type of Mechanical ventilation


3 Ductless ventilation system Ducted ventilation system
system

30ACPH & 8 ACPH (as per 12 ACPH & 6 ACPH ( BIS


4 No of Air changes
NBC) Standards )

5 General Ventilation
a Toilet exhaust system 6-10 ACH as per NBC 15 ACH

b Type of Toilet exhaust system Centralized Individual

c Staircase pressurisation system Required Not required

d Lift lobby pressurisation system Required Not required

NOTE :
1 Return Air & Air Mixture of Rooms shall be consider specifically or normally
2 Near each in-door unit, the access door to be provided for maintanence.
3
4
Date
Building name :
OPTION-3 OBSERVATIONS

Standard split unit

Hybrid chiller

Specify

Specify

Specify

Specify

Specify

Specify
Specify

Specify
Specify

Xerox Machine

Specify

Specify

Specify

Specify
Specify

Specify

Specify
Specify
Specify
Date
Building name :
OPTION-3 OBSERVATIONS

Specify

Specify

Specify

Specify

Specify

Specify

Specify
Project : AMTZ
Subject : Fire Alarm & Fighting
DESIGN CHECKLIST
SL.NO DESCRIPTION OPTION-1 OPTION-2
A FIRE FIGHTING - HYDRANT SYSTEM
NBC-2016-Part-iv International Building Code
1 System Design
Indian Standards

2 Yard Hydrant Required Not Required

3 Building Hazard Condition Low Medium

4 Occupancy People Machinery


Specify intensity

5 Ground Level Storage Tank Required Not Required

6 Over Head Static Storage Tank Required Not Required

7 Landing Valves Required Not Required

8 Hose Reel & Hose Box Required Not Required

9 Fire Service Inlet Required Not Required

10 Lighting Protection System Required Not Required

11 Hydraulic Platform moment All Around Building Partly

12 Transformer Protection system 45 Ltrs. Foam Trolley Fencing

B INTERNAL FIRE FIGHING/ALARM SYSTEM


1 Areas to be Equiped
Store Room
a Hazard Type Low Medium
b Detector System Smoke Heat
c Num of Occupants
d Fire Fighting system Water Sprinkler co2

HVAC Ducting in the room with


e Available Not Available
detectors

2 Exit Doors, Escape Routes Internal Staircase External Staircase

3 First Aid Box Applicable Not Applicable

4 Escape Route Map Applicable Not Applicable


NOTE :
1
2
3
4
Date
ST Building name :
OPTION-3 OBSERVATIONS

Uniform Plumbing Code

Any Specification

High

Fluids

Any Specification

Any Specification

Any Specification

Any Specification

Any Specification

Any Specification

Not Possible

Soak Pit

High
Gas
Specify
Foam / DCP

Not Required

Ramp system