Professional Documents
Culture Documents
mechanical ventilation
to engineers. detail expanded metal grille 300 x 300
fixed to opening internally
200 x 200 natural ventilation opening 200 x 200 natural ventilation opening 75 mm thick r.c. slab (with conforce 86)
installed at a slant within fume cupboard
to create chimney effect 0.8 mm thick G.I. capping; 660 mm wide,
factory colour coated ,COLOMET
ab ab ab ab ab ab
Broad flute serrated metal closers ( G.I. 22g)
1000mm long cranked Y16 welded to bottom of upper 350
bars of both apex spider trusses @ 600 c/c for the support up turn at appex
R.C LINTOL of Y16 bar at apex 330
200
polybutton closure
15
G.L. for broad flutes Spider truss set in
concrete padstone
4 mm clear glass
sliding sash with
Standard G.I. ets 2
2 ga
serrated eaves closer
100 mm wall
uge
2800
22 gauge
1055
4 pairs of air-bricks for room ventilation Industrial sisalation 420 as insulation
(Reinforced Aluminum foil insulation)
sliding sash
Well tensioned 14-16 grams galvanised straining wires
top to plaster
4 full tiles tied between Y16 bar at apex and external spider truss nearest to
rem. rem.
2000
2 full tiles external wall at 600 c/c one way
900
ROOF / CEILING DETAIL
G.L. Scale 1:20
HW- skirting
95
d.p.c
30
ELEVATION 2
ELEVATION OF FUME CUPBOARD
20 mm thick & 225 wide plastered fillet Allow for 75 mm thick r.c. slab (with conforce 86)
SECTION THROUGH FUME CUPBOARD Scale 1:20
each pair from 1 intern. 350
350 installed at a slant within fume cupboard to create Work bench
ts Scale 1:20
and 1 external type ng shee 5 168 chimney effect (apart from mechnical ventilation, finishes in 200mm
0 lo 168 5
585 allow also 200 x 200 opening with expanded metal Petracom external
168
5 168
5
grille in wall for natural ventilation, just below the
DETAIL TO FUME CUPBOARD Support walls in blockwork
worktops
1 685
168
5 350 mechnical ventilation opening) fair face
350 brickwork
3 pairs ab
400
200
ab ab ab Teachers'
200
Worktop 600
900
1200
black board Fume on raised students' 600 students'
2800
2800
2800
90
worktops worktops
2200
900
against wall
1000
conc. apron D.P.C. LABORATORY D.P.C.
G.L. G.L. 1100
100
150
150
40mm screed on
850
compacted 100mm conc.
ELEVATION 1
180
225
slab
200
hardcore
600 600
SECTION A-A 20
ROOF CONSTRUCTION WALL CONSTRUCTION 350 TEACHER'S LAB. BENCH FREE STANDING WALL FACING
- External walls to be from 200 mm thick Sc. 1:20
350
STUDENT'S LAB. BENCH LAB. BENCH
- embossed COLOMET colour coated hollow concrete blockwork; 350 585
- Internal walls to be from hollow concrete 168 0 lo
IBR 686 galvanised sheeting (gauge 22) on 1 685 5 ng shee DETAIL PLASTERED FILLET AT GABLES
ts
ST250/16 spider trusses on cranked roof blockwork - thickness as shown; 5 168
168 5 Sc. 1:20
universal beam spaced as shown in section a-a - All walls to be reinforced every third course
2010
5 168
with brickforce 168 ab 5 350
- Industrial 420 Sisalation insulation laid on 350
straining wires across trusses - Walls to receive one coat sand cement
ab ab
plaster;
200
shelving
2800
2545
shelving 22
FLOOR CONSTRUCTION 3800
1000
130
conc. apron d.p.c. G.L. 20 mm thick formica faced particle board
100
hardcore
1200
painted with green black board paint
65
base
70
1500 and to manufacturer's instructions
600 600 600 450
1900 above FFL.
SECTION B-B
ELEV. 4 equ. 600 equ.
A B A position of 600 mm long chalk rail
200 200 200 200 22 x 45 SW- bearer Smooth finished sand cement plaster,
11300 6600 11300
at ends and at corners painted with green black board paint
200
5550
200
5550
200
6600
200
5550
200
5550
200 ELEVATION ; BLACK BOARD to manufacturer's instructions
Scale 1:50
200
2100 750 2100
300 300
2100 750 2100
300
825 2100 750 2100 825
300
2100 750 2100
300 300
2100 750 2100
200 Readily available pressed steel
300 200 300 angle bracket 400 x 350;
fixed to wall at 600 c/c max.
70 x 22 HW- frame all round, varnished
W10 W10 W10 W10 W10 W10 500 W10 W10 500 W10 W10
700
700
200
12 12
D D D D E 1000 STORE ROOM SHELVING
1100
E
face brick support walls sc. 1:10
1300
1130 2260 2260 2260 2260 1130 3225 3225 SCIENCE LAB.
2950
900
D8
D8
1 air-brick
SCIENCE LAB. 1 air-brick 150 above door
4100
PREPARATION PREPARATION
waste water
c.w. supply
above door
300
ROOM ROOM
50
Removable steel grating in Chalk rail;
70
shelving
shelving
880
63
Floor channel drain to detail fixed frame to engineers' 600 mm long cut from
Cranked UB as Roof Beam
specification
6600
120 x 63 HW
90
3800 black board
max. 300
ELEV. 1
C C Floor finish
1135
13
200 100
250
Conc. slab
10800
9000
5000
3070
5000
5000
7500
200
90
gas
1230
D20
D20
1135
1835
100
560 Conforce 86 120 22
1275
90
1250
VERTICAL CROSS SECTION A-A
250
900
800
880
F A F
fume cupbd. ab ab ab ab 600 Scale 1:2
400
300
200
200
D11
1300
E D D D D E
1700
ab ab ab ab ab ab ab ab
200