You are on page 1of 4

24/3/2019 Apollo 11 Timeline

Apollo 11 Timeline
GET GMT GMT
Event (hhh:mm:ss) Time Date
Terminal countdown started. -028:00:00 21:00:00 14 Jul 1969
Scheduled 11-hour hold at T-9 hours. -009:00:00 16:00:00 15 Jul 1969
Countdown resumed at T-9 hours. -009:00:00 03:00:00 16 Jul 1969
Scheduled 1-hour 32-minute hold at T-3 hours 30 minutes. -003:30:00 08:30:00 16 Jul 1969
Countdown resumed at T-3 hours 30 minutes. -003:30:00 10:02:00 16 Jul 1969
Guidance reference release. -000:00:16.968 13:31:43 16 Jul 1969
S-IC engine start command. -000:00:08.9 13:31:51 16 Jul 1969
S-IC engine ignition (#5). -000:00:06.4 13:31:53 16 Jul 1969
All S-IC engines thrust OK. -000:00:01.6 13:31:58 16 Jul 1969
Range zero. 000:00:00.00 13:32:00 16 Jul 1969
All holddown arms released (1st motion). 000:00:00.3 13:32:00 16 Jul 1969
Liftoff (umbilical disconnected) (1.07 g). 000:00:00.63 13:32:00 16 Jul 1969
Tower clearance yaw maneuver started. 000:00:01.7 13:32:01 16 Jul 1969
Yaw maneuver ended. 000:00:09.7 13:32:09 16 Jul 1969
Pitch and roll maneuver started. 000:00:13.2 13:32:13 16 Jul 1969
Roll maneuver ended. 000:00:31.1 13:32:31 16 Jul 1969
Mach 1 achieved. 000:01:06.3 13:33:06 16 Jul 1969
Maximum dynamic pressure (735.17 lb/ft2). 000:01:23.0 13:33:23 16 Jul 1969
Maximum bending moment (33,200,000 lbf-in). 000:01:31.5 13:33:31 16 Jul 1969
S-IC center engine cutoff command. 000:02:15.2 13:34:15 16 Jul 1969
Pitch maneuver ended. 000:02:40.0 13:34:40 16 Jul 1969
S-IC outboard engine cutoff. 000:02:41.63 13:34:41 16 Jul 1969
S-IC maximum total inertial acceleration (3.94 g). 000:02:41.71 13:34:41 16 Jul 1969
S-IC maximum Earth-fixed velocity. S-IC/S-II separation command. 000:02:42.30 13:34:42 16 Jul 1969
S-II engine start command. 000:02:43.04 13:34:43 16 Jul 1969
S-II ignition. 000:02:44.0 13:34:44 16 Jul 1969
S-II aft interstage jettisoned. 000:03:12.3 13:35:12 16 Jul 1969
Launch escape tower jettisoned. 000:03:17.9 13:35:17 16 Jul 1969
Iterative guidance mode initiated. 000:03:24.1 13:35:24 16 Jul 1969
S-IC apex. 000:04:29.1 13:36:29 16 Jul 1969
S-II center engine cutoff. 000:07:40.62 13:39:40 16 Jul 1969
S-II maximum total inertial acceleration (1.82 g). 000:07:40.70 13:39:40 16 Jul 1969
S-IC impact (theoretical). 000:09:03.7 13:41:03 16 Jul 1969
S-II outboard engine cutoff. 000:09:08.22 13:41:08 16 Jul 1969
S-II maximum Earth-fixed velocity. S-II/S-IVB separation command. 000:09:09.00 13:41:09 16 Jul 1969
S-IVB 1st burn start command. 000:09:09.20 13:41:09 16 Jul 1969
S-IVB 1st burn ignition. 000:09:12.20 13:41:12 16 Jul 1969
S-IVB ullage case jettisoned. 000:09:21.0 13:41:21 16 Jul 1969
S-II apex. 000:09:47.0 13:41:47 16 Jul 1969
S-IVB 1st burn cutoff. 000:11:39.33 13:43:39 16 Jul 1969
S-IVB 1st burn maximum total inertial acceleration (0.69 g). 000:11:39.41 13:43:39 16 Jul 1969
Earth orbit insertion. S-IVB 1st burn maximum Earth-fixed velocity. 000:11:49.33 13:43:49 16 Jul 1969
Maneuver to local horizontal attitude started. 000:11:59.3 13:43:59 16 Jul 1969
Orbital navigation started. 000:13:21.1 13:45:21 16 Jul 1969
S-II impact (theoretical). 000:20:13.7 13:52:13 16 Jul 1969
S-IVB 2nd burn restart preparation. 002:34:38.2 16:06:38 16 Jul 1969
S-IVB 2nd burn restart command. 002:44:08.2 16:16:08 16 Jul 1969
S-IVB 2nd burn ignition (STDV open). 002:44:16.2 16:16:16 16 Jul 1969
S-IVB 2nd burn cutoff. 002:50:03.03 16:22:03 16 Jul 1969
S-IVB 2nd burn maximum total inertial acceleration (1.45 g). 002:50:03.11 16:22:03 16 Jul 1969
S-IVB 2nd burn maximum Earth-fixed velocity. 002:50:03.5 16:22:03 16 Jul 1969
S-IVB safing procedures started. 002:50:03.8 16:22:03 16 Jul 1969
Translunar injection. 002:50:13.03 16:22:13 16 Jul 1969
Maneuver to local horizontal attitude started. 002:50:23.0 16:22:23 16 Jul 1969
Orbital navigation started. 002:50:23.9 16:22:23 16 Jul 1969
Maneuver to transposition and docking attitude started. 003:05:03.9 16:37:03 16 Jul 1969
CSM separated from S-IVB. 003:15:23.0 16:47:23 16 Jul 1969
CSM separation maneuver ignition. 003:17:04.6 16:49:04 16 Jul 1969
CSM separation maneuver cutoff. 003:17:11.7 16:49:11 16 Jul 1969
CSM docked with LM/S-IVB. 003:24:03.7 16:56:03 16 Jul 1969
CSM/LM ejected from S-IVB. 004:17:03.0 17:49:03 16 Jul 1969
CSM/LM evasive maneuver from S-IVB ignition. 004:40:01.72 18:12:01 16 Jul 1969
CSM/LM evasive maneuver from S-IVB cutoff. 004:40:04.65 18:12:04 16 Jul 1969
S-IVB maneuver to lunar slingshot attitude initiated. 004:41:07.6 18:13:07 16 Jul 1969
S-IVB lunar slingshot maneuver - LH2 tank CVS opened. 004:51:07.7 18:23:07 16 Jul 1969

https://history.nasa.gov/SP-4029/Apollo_11i_Timeline.htm 1/4
24/3/2019 Apollo 11 Timeline
S-IVB lunar slingshot maneuver - LOX dump started. 005:03:07.6 18:35:07 16 Jul 1969
S-IVB lunar slingshot maneuver - LOX dump ended. 005:04:55.8 18:36:55 16 Jul 1969
S-IVB lunar slingshot maneuver - APS ignition. 005:37:47.6 19:09:47 16 Jul 1969
S-IVB lunar slingshot maneuver - APS cutoff. 005:42:27.8 19:14:27 16 Jul 1969
S-IVB maneuver to communications attitude initiated. 005:42:48.8 19:14:48 16 Jul 1969
TV transmission started (recorded at Goldstone and transmitted to Houston at 011:26). 010:32 00:04 17 Jul 1969
TV transmission ended. 010:48 00:20 17 Jul 1969
Midcourse correction ignition. 026:44:58.64 16:16:58 17 Jul 1969
Midcourse correction cutoff. 026:45:01.77 16:17:01 17 Jul 1969
TV transmission started. 030:28 20:00 17 Jul 1969
TV transmission ended. 031:18 20:50 17 Jul 1969
TV transmission started. 033:59 23:31 17 Jul 1969
TV transmission ended. 034:35 00:07 18 Jul 1969
TV transmission started. 055:08 20:40 18 Jul 1969
CDR and LMP entered LM for initial inspection. 055:30 21:02 18 Jul 1969
TV transmission ended. 056:44 22:16 18 Jul 1969
CDR and LMP entered CM. 057:55 23:27 18 Jul 1969
Equigravisphere. 061:39:55 03:11:55 19 Jul 1969
Lunar orbit insertion ignition. 075:49:50.37 17:21:50 19 Jul 1969
Lunar orbit insertion cutoff. 075:55:47.90 17:27:47 19 Jul 1969
Sighting of an illumination in the Aristarchus region. 1st time, a lunar transient event sighted by an observer
in space. 077:13 18:45 19 Jul 1969
TV transmission started. 078:20 19:52 19 Jul 1969
S-IVB closest approach to lunar surface. 078:42 20:14 19 Jul 1969
TV transmission ended. 079:00 20:32 19 Jul 1969
Lunar orbit circularization ignition. 080:11:36.75 21:43:36 19 Jul 1969
Lunar orbit circularization cutoff. 080:11:53.63 21:43:53 19 Jul 1969
LMP entered CM for initial power-up and system checks. 081:10 22:42 19 Jul 1969
LMP entered CM. 083:35 01:07 20 Jul 1969
CDR and LMP entered LM for final preparations for descent. 095:20 12:52 20 Jul 1969
LMP entered CM. 097:00 14:32 20 Jul 1969
LMP entered LM. 097:30 15:02 20 Jul 1969
LM system checks started. 097:45 15:17 20 Jul 1969
LM system checks ended. 100:00 17:32 20 Jul 1969
CSM/LM undocked. 100:12:00.0 17:44:00 20 Jul 1969
CSM/LM separation maneuver ignition. 100:39:52.9 18:11:52 20 Jul 1969
CSM/LM separation maneuver cutoff. 100:40:01.9 18:12:01 20 Jul 1969
LM descent orbit insertion ignition (LM SPS). 101:36:14 19:08:14 20 Jul 1969
LM descent orbit insertion cutoff. 101:36:44 19:08:44 20 Jul 1969
LM acquisition of data. 102:17:17 19:49:17 20 Jul 1969
LM landing radar on. 102:20:53 19:52:53 20 Jul 1969
LM abort guidance aligned to primary guidance. 102:24:40 19:56:40 20 Jul 1969
LM yaw maneuver to obtain improved communications. 102:27:32 19:59:32 20 Jul 1969
LM altitude 50,000 feet. 102:32:55 20:04:55 20 Jul 1969
LM propellant settling firing started. 102:32:58 20:04:58 20 Jul 1969
LM powered descent engine ignition. 102:33:05.01 20:05:05 20 Jul 1969
LM fixed throttle position. 102:33:31 20:05:31 20 Jul 1969
LM face-up maneuver completed. 102:37:59 20:09:59 20 Jul 1969
LM 1202 alarm. 102:38:22 20:10:22 20 Jul 1969
LM radar updates enabled. 102:38:45 20:10:45 20 Jul 1969
LM altitude less than 30,000 feet and velocity less than 2,000 feet per second (landing radar velocity update
started). 102:38:50 20:10:50 20 Jul 1969
LM 1202 alarm. 102:39:02 20:11:02 20 Jul 1969
LM throttle recovery. 102:39:31 20:11:31 20 Jul 1969
LM approach phase entered. 102:41:32 20:13:32 20 Jul 1969
LM landing radar antenna to position 2. 102:41:37 20:13:37 20 Jul 1969
LM attitude hold mode selected (check of LM handling qualities). 102:41:53 20:13:53 20 Jul 1969
LM automatic guidance enabled. 102:42:03 20:14:03 20 Jul 1969
LM 1201 alarm. 102:42:18 20:14:18 20 Jul 1969
LM landing radar switched to low scale. 102:42:19 20:14:19 20 Jul 1969
LM 1202 alarm. 102:42:43 20:14:43 20 Jul 1969
LM 1202 alarm. 102:42:58 20:14:58 20 Jul 1969
LM landing point redesignation. 102:43:09 20:15:09 20 Jul 1969
LM altitude hold. 102:43:13 20:15:13 20 Jul 1969
LM abort guidance attitude updated. 102:43:20 20:15:20 20 Jul 1969
LM rate of descent landing phase entered. 102:43:22 20:15:22 20 Jul 1969
LM landing radar data not good. 102:44:11 20:16:11 20 Jul 1969
LM landing data good. 102:44:21 20:16:21 20 Jul 1969
LM fuel low-level quantity light. 102:44:28 20:16:28 20 Jul 1969
LM landing radar data not good. 102:44:59 20:16:59 20 Jul 1969
LM landing radar data good. 102:45:03 20:17:03 20 Jul 1969
1st evidence of surface dust disturbed by descent engine. 102:44:35 20:16:35 20 Jul 1969

https://history.nasa.gov/SP-4029/Apollo_11i_Timeline.htm 2/4
24/3/2019 Apollo 11 Timeline
LM lunar landing. 102:45:39.9 20:17:39 20 Jul 1969
LM powered descent engine cutoff. 102:45:41.40 20:17:41 20 Jul 1969
Decision made to proceed with EVA prior to first rest period. 104:40:00 22:12:00 20 Jul 1969
Preparation for EVA started. 106:11:00 23:43:00 20 Jul 1969
EVA started (hatch open). 109:07:33 02:39:33 21 Jul 1969
CDR completely outside LM on porch. 109:19:16 02:51:16 21 Jul 1969
Modular equipment stowage assembly deployed (CDR). 109:21:18 02:53:18 21 Jul 1969
First clear TV picture received. 109:22:00 02:54:00 21 Jul 1969
CDR at foot of ladder (starts to report, then pauses to listen). 109:23:28 02:55:28 21 Jul 1969
CDR at foot of ladder and described surface as “almost like a powder.” 109:23:38 02:55:38 21 Jul 1969
1st step taken lunar surface (CDR). “That’s one small step for a man…one giant leap for mankind.” 109:24:15 02:56:15 21 Jul 1969
CDR started surface examination and description, assessed mobility and described effects of LM descent 109:24:48 02:56:48 21 Jul 1969
engine.
CDR ended surface examination. LMP started to send down camera. 109:26:54 02:58:54 21 Jul 1969
Camera installed on RCU bracket, LEC stored on secondary strut of LM landing gear. 109:30:23 03:02:23 21 Jul 1969
Surface photography (CDR). 109:30:53 03:02:53 21 Jul 1969
Contingency sample collection started (CDR). 109:33:58 03:05:58 21 Jul 1969
Contingency sample collection ended (CDR). 109:37:08 03:09:08 21 Jul 1969
LMP started egress from LM. 109:39:57 03:11:57 21 Jul 1969
LMP at top of ladder. Descent photographed by CDR. 109:41:56 03:13:56 21 Jul 1969
LMP on lunar surface. 109:43:16 03:15:16 21 Jul 1969
Surface examination and examination of landing effects on surface and on LM started (CDR, LMP). 109:43:47 03:15:47 21 Jul 1969
Insulation removed from modular equipment stowage assembly (CDR). 109:49:06 03:21:06 21 Jul 1969
TV camera focal distance adjusted (CDR). 109:51:35 03:23:35 21 Jul 1969
Plaque unveiled (CDR). 109:52:19 03:24:19 21 Jul 1969
Plaque read (CDR). 109:52:40 03:24:40 21 Jul 1969
TV camera redeployed. Panoramic TV view started (CDR). 109:59:28 03:31:28 21 Jul 1969
TV camera placed in final deployment position (CDR). 110:02:53 03:34:53 21 Jul 1969
Solar wind composition experiment deployed (LMP). 110:03:20 03:35:20 21 Jul 1969
United States flag deployed (CDR, LMP). 110:09:43 03:41:43 21 Jul 1969
Evaluation of surface mobility started (LMP). 110:13:15 03:45:15 21 Jul 1969
Evaluation of surface mobility end (LMP). 110:16:02 03:48:02 21 Jul 1969
Presidential message from White House and response from CDR. 110:16:30 03:48:30 21 Jul 1969
Presidential message and CDR response ended. 110:18:21 03:50:21 21 Jul 1969
Evaluation of trajectory of lunar soil when kicked (LMP) and bulk sample collection started (CDR). 110:20:06 03:52:06 21 Jul 1969
Evaluation of visibility in lunar sunlight (LMP). 110:10:24 03:42:24 21 Jul 1969
Evaluation of thermal effects of sun and shadow inside the suit (LMP). 110:25:09 03:57:09 21 Jul 1969
Evaluation of surface shadows and colors (LMP). 110:28:22 04:00:22 21 Jul 1969
LM landing gear inspection and photography (LMP). 110:34:13 04:06:13 21 Jul 1969
Bulk sample completed (CDR). 110:35:36 04:07:36 21 Jul 1969
LM landing gear inspection and photography (CDR, LMP). 110:46:36 04:18:36 21 Jul 1969
Scientific equipment bay doors opened. 110:53:38 04:25:38 21 Jul 1969
Passive seismometer deployed. 110:55:42 04:27:42 21 Jul 1969
Lunar ranging retroreflector deployed (CDR). 111:03:57 04:35:57 21 Jul 1969
1st passive seismic experiment data received on Earth. 111:08:39 04:40:39 21 Jul 1969
Collection of documented samples started (CDR/LMP). 111:11 04:43 21 Jul 1969
Solar wind composition experiment retrieved (LMP) . 111:20 04:52 21 Jul 1969
LMP inside LM. 111:29:39 05:01:39 21 Jul 1969
Transfer of sample containers reported complete. 111:35:51 05:07:51 21 Jul 1969
CDR inside LM, assisted and monitored by LMP. 111:37:32 05:09:32 21 Jul 1969
EVA ended (hatch closed). 111:39:13 05:11:13 21 Jul 1969
LM equipment jettisoned. 114:05 07:37 21 Jul 1969
LM lunar liftoff ignition (LM APS). 124:22:00.79 17:54:00 21 Jul 1969
LM orbit insertion cutoff. 124:29:15.67 18:01:15 21 Jul 1969
Coelliptic sequence initiation ignition. 125:19:35 18:51:35 21 Jul 1969
Coelliptic sequence initiation cutoff. 125:20:22 18:52:22 21 Jul 1969
Constant differential height maneuver ignition. 126:17:49.6 19:49:49 21 Jul 1969
Constant differential height maneuver cutoff. 126:18:29.2 19:50:29 21 Jul 1969
Terminal phase initiation ignition. 127:03:51.8 20:35:51 21 Jul 1969
Terminal phase initiation cutoff. 127:04:14.5 20:36:14 21 Jul 1969
LM 1st midcourse correction. 127:18:30.8 20:50:30 21 Jul 1969
LM 2nd midcourse correction. 127:33:30.8 21:05:30 21 Jul 1969
Braking started. 127:36:57.3 21:08:57 21 Jul 1969
Terminal phase finalize ignition. 127:46:09.8 21:18:09 21 Jul 1969
Terminal phase finalize cutoff. 127:46:38.2 21:18:38 21 Jul 1969
Stationkeeping started. 127:52:05.3 21:24:05 21 Jul 1969
CSM/LM docked. 128:03:00 21:35:00 21 Jul 1969
CDR entered CM. 129:20 22:52 21 Jul 1969
LMP entered CM. 129:45 23:17 21 Jul 1969
LM ascent stage jettisoned. 130:09:31.2 23:41:31 21 Jul 1969
CSM/LM final separation ignition. 130:30:01.0 00:02:01 22 Jul 1969

https://history.nasa.gov/SP-4029/Apollo_11i_Timeline.htm 3/4
24/3/2019 Apollo 11 Timeline
CSM/LM final separation cutoff. 130:30:08.2 00:02:08 22 Jul 1969
Transearth injection ignition (SPS). 135:23:42.28 04:55:42 22 Jul 1969
Transearth injection cutoff. 135:26:13.69 04:58:13 22 Jul 1969
Midcourse correction ignition. 150:29:57.4 20:01:57 22 Jul 1969
Midcourse correction cutoff. 150:30:07.4 20:02:07 22 Jul 1969
TV transmission started. 155:36 01:08 23 Jul 1969
TV transmission ended. 155:54 01:26 23 Jul 1969
TV transmission started. 177:10 22:42 23 Jul 1969
TV transmission ended. 177:13 22:45 23 Jul 1969
TV transmission started. 177:32 23:04 23 Jul 1969
TV transmission ended. 177:44 23:16 23 Jul 1969
CM/SM separation. 194:49:12.7 16:21:12 24 Jul 1969
Entry. 195:03:05.7 16:35:05 24 Jul 1969
Drogue parachute deployed 195:12:06.9 16:44:06 24 Jul 1969
Visual contact with CM established by aircraft. 195:07 16:39 24 Jul 1969
Radar contact with CM established by recovery ship. 195:08 16:40 24 Jul 1969
VHF voice contact and recovery beacon contact established. 195:14 16:46 24 Jul 1969
Splashdown (went to apex-down). 195:18:35 16:50:35 24 Jul 1969
CM returned to apex-up position. 195:26:15 16:58:15 24 Jul 1969
Flotation collar inflated. 195:32 17:04 24 Jul 1969
Hatch opened for crew egress. 195:49 17:21 24 Jul 1969
Crew egress. 195:57 17:29 24 Jul 1969
Crew aboard recovery ship. 196:21 17:53 24 Jul 1969
Crew entered mobile quarantine facility. 196:26 17:58 24 Jul 1969
CM lifted from water. 198:18 19:50 24 Jul 1969
CM secured to quarantine facility. 198:26 19:58 24 Jul 1969
CM hatch reopened. 198:33 20:05 24 Jul 1969
Sample return containers 1 and 2 removed from CM. 200:28 22:00 24 Jul 1969
Container 1 removed from mobile quarantine facility. 202:00 23:32 24 Jul 1969
Container 2 removed from mobile quarantine facility. 202:33 00:05 25 Jul 1969
Container 2 and film flown to Johnston Island. 207:43 05:15 25 Jul 1969
Container 1 flown to Hickam Air Force Base, Hawaii. 214:13 11:45 25 Jul 1969
Container 2 and film arrived in Houston, TX. 218:43 16:15 25 Jul 1969
Container 1, film, and biological samples arrived in Houston. 225:41 23:13 25 Jul 1969
CM decontaminated and hatch secured. 229:28 03:00 26 Jul 1969
Mobile quarantine facility secured. 231:03 04:35 26 Jul 1969
Mobile quarantine facility and CM offloaded. 250:43 00:15 27 Jul 1969
Safing of CM pyrotechnics completed. 252:33 02:05 27 Jul 1969
Mobile quarantine facility arrived at Ellington AFB, Houston. 280:28 06:00 28 Jul 1969
Crew in Lunar Receiving Laboratory, Houston 284:28 10:00 28 Jul 1969
CM delivered to Lunar Receiving Laboratory. 345:45 23:17 30 Jul 1969
Passive seismic experiment turned off. 430:26:46 11:58:46 03 Aug
1969
Crew released from quarantine. 10 Aug
1969
CM delivered to contractor’s facility in Downey, CA. 14 Aug
1969
EASEP turned off by ground command. 27 Aug
1969

BACK NEXT

https://history.nasa.gov/SP-4029/Apollo_11i_Timeline.htm 4/4

You might also like