GUIDELINES

FOR CROSSING PIPELINES, GAS TRANSMISSION LINES, MAINS AND SERVICE


CONNECTIONS ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

OPTIONAL
WARNING TAPE

25 FEET

CATHODIC PROTECTION BONDS


AND POTENTIAL LEADS AT ALL
DOT APPROVED CROSSINGS TERMINATED AT
PIPELINE ABOVEGROUND LOCATIONS
MARKERS OR
IDENTIFYING
MARKERS

CROSSING ANGLE
AS CLOSE TO 90°
AS POSSIBLE OPTIONAL
WARNING TAPE

24" CLEARANCE UNDER


PETROLEUM PIPELINE

OPTIONAL
WARNING TAPE

4
GUIDELINES
FOR AGRICULTURE: FIELD TILE DITCHING AND DEEP PLOWING
ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

FIELD TILE

MINIMUM
24" CLEARANCE CROSSING ANGLE
AS CLOSE TO 90°
AS POSSIBLE

PIPELINE OPERATOR’S
REPRESENTATIVE SHOULD
MONITOR THE ACTIVITY

DEEP PLOWING AND


LAND CONTOUR
MODIFICATIONS

PLAN AHEAD WORK SAFE


NOTIFY PIPELINE PROJECT PLANNING IS
OPERATOR WELL THE KEY TO SAFETY
IN ADVANCE

WHEN PLANNING YOUR PROJECT


CALL THE PIPELINE OPERATOR
PIPELINE OPERATOR’S
REPRESENTATIVE SHOULD
MONITOR THE ACTIVITY WHEN
YOU’RE WORKING WITHIN 50 FEET PIPELINE EXPERTS CAN HELP WITH THE
EITHER SIDE OF THE PIPELINE PLANNING PROCESS AND PIPELINE SAFETY

6
GUIDELINES
FOR BORING, DRILLING, AND TUNNELING
ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

RESPECT THE NEED FOR SAFETY

PIPELINE OPERATOR’S
REPRESENTATIVE SHOULD
MONITOR THE ACTIVITY
WHEN BORING, DRILLING,
OR TUNNELING IN CLOSE
PROXIMITY TO THE PIPELINE

CROSSING ANGLE AS CLOSE


TO 90°AS POSSIBLE

8
GUIDELINES
FOR OVERHEAD AND BURIED POWER AND COMMUNICATION CABLES INCLUDING
FIBER OPTICS ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

20 FEET

25 FEET
OPTIONAL
WARNING TAPE
CROSSING ANGLE
AS CLOSE TO 90°
AS POSSIBLE
25 FEET OPTIONAL
WARNING TAPE

24" CLEARANCE UNDER


PETROLEUM PIPELINE

10 FEET

CABLES INSTALLED
IN PVC WITH 6"
RED COLORED
CONCRETE ABOVE
THE BURIED CABLE
TRACER WIRE

10
GUIDELINES
FOR ROADS, RAILROADS, PAVED LOTS, AND HEAVY EQUIPMENT VEHICLES
ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

TEMPORARY (15,000
LBS. OR LESS)

RECOMMENDED 72" 36" 48" 72" 48"


DISTANCES:

STUDY THE LOCATION EVALUATE CAREFULLY

12
GUIDELINES
FOR NON-EXPLOSIVE SEISMIC TESTING AND BLASTING OPERATIONS
ON OR NEAR PIPELINES, FACILITIES AND RIGHTS-OF-WAY

150 FEET STEADY STATE VIBRATOR


OR THUMPER SOURCE

600 FEET

OTHER NON-EXPLOSIVE
TESTING DEVICES

P
E
T
R
O
L
E
U
M

1,320 FEET

BLASTING OPERATIONS
16
PIPELINE SAFETY AWARENESS
MARKER SIGNS ARE IMPORTANT!

Pipelines are marked with aboveground signs Pipeline markers are located at varying intervals Remember, as the job site develops, the
(markers) within the right-of-way (ROW), as along the ROW and typically on both sides of topography changes. Points of reference
required by federal/state regulations, to alert most road crossings. All pipeline markers list become unclear. New workers arrive. The
the public, landowners and potential excavators a telephone number for reporting pipeline pipeline marker becomes more critical when
to the existence and approximate location of a emergencies and will indicate the product activity increases in the area. As people come
pipeline. Removal or tampering with marker being transported in that pipeline. The to live and work near the pipeline system, the
signs is unsafe and violates federal law. The placement of these markers indicates the awareness and the respect for these markers
permanent pipeline signs and markers also general position of the buried pipeline and must be maintained.
help keep workers safe by keeping their focus should never be used as a reference for the
on the High Pressure Pipeline System. exact location of the pipeline.

SIGNS LOCATED NEAR ROADS, RAILROADS,


AND ALONG PIPELINE RIGHT-OF-WAYS

PAINTED METAL OR TEST PIPELINE CASING VENTS MARKER FOR PIPELINE PATROL PLANE
PLASTIC POSTS STATION

18