GECPL-SPSCPL-JV Request for Inspection

Structure
Sr No. RFI Location Activity Details
/Highway

1 JV/EL/NH-95/STR/1231 Structure P176-P177 Segment Casting S4-LDH-3000mmm


2 JV/EL/NH-95/STR/1232 Structure Cheema Chowk RE Wall Panel Casting BTD-1,BTC-1
Hand Railing Bottom & Footpath
3 JV/EL/NH-95/STR/1233 Structure Cheema Chowk Hand Railing Bottom & Footpath kerb kerb( RP8-RP12)
Layout, leveling, Reinforcement,
3 JV/EL/NH-95/HW/205 Highway Ch. 1+295 to 1+282 Drain Wall - LHS shuttering & Concreting
Layout, leveling, Reinforcement,
4 JV/EL/NH-95/HW/206 Highway Ch. 1+240 to 1+260 Drain Slab - LHS shuttering & Concreting

Sr No. Activity Detail Grade GECPL SPSCPL


1 Cube Test 7 days M60 1 3
7 days M50 3
7 days M45
7 days M35 3
7 days M25 3
7 days M15
28 days M15
28 days M25 3
28 days M30
28 days M35 3
28 days M40
28 days M45 12
28 days M50
2 Grading (No's)
3 Moisture Content (No's) 1 3
4 Silt Content (No's) 1 1
5 Elongation
6 Flakiness
7 Slump (No's) As Per TM
8 Trial
9 impact 1
10 Sand 1 1
11 10mm 1 1
12 20mm 1 1
13 All in 1
14 Flyash
15 Combine 1 1
16 Admixture
Cement Cube 28days 1
17
Cement OPC 53 Physical Test 1
18 Steel Sampling
19 CBR Calibration
20 CTM Celebration Test
21 OGL Soil Sampling , MDD, CBR, Omc Cheema Chowk
ETWEEN SAMRALA CHOWK (DESIGN CHAINAGE KM 0+000) TO
HROUGH LUDHIANA CITY) IN THE STATE OF PUNJAB ON EPC
'

Date 10.03.2019

Inspection
Raised By Inspection Time Remarks
Date

Vinod Sharma 11.03.2019 07.00 PM


Rounak 11.03.2019 05.00 PM

Nathi Ram 11.03.2019 11.00 PM

Himanshu 11.03.2019 04.00 PM

Himanshu 11.03.2019 05.00 PM