You are on page 1of 87

Arabtec Construction L.L.C.

presents

Sep 2016
Arabtec Construction L.L.C.
1
COMPANY PROFILE

2
OVERVIEW

 Arabtec Construction, L.L.C., the leader in the UAE


Construction Industry, was established in 1975.
 Arabtec has undertaken a substantial program of
construction, including but not limited to:
 High Rise Developments (Residential,
Commercial, Mixed Use)
 Hotel and Hotel Interiors
 Residential Complexes and Communities
 Luxury Villas
 Major Airport Developments
(Terminals, Lounges, Hangers, Air Traffic
Control Towers, Cargo Buildings, Passenger
Buildings)
 Commercial and Industrial Projects
 Stadiums
 Hospitals
 Museums
 Malls, Cinemas
 Entertainment Facilities
 Infrastructure Works

Arabtec Construction L.L.C. 3


OVERVIEW
 With a current workforce of around 40,000 and a backlog in excess of USD
5.2 Billion(19 Billion UAE Dirham) in booked work, Arabtec is clearly the
leading contracting company in the UAE, and one of the top five in the GCC.

 In the past few years, Arabtec has diversified geographically and in


addition to the UAE, Arabtec started working in other countries such as:
Saudi Arabia, Qatar, Kuwait, Jordan, Russia, Kazakhstan, Egypt, Bahrain &
India.

 Arabtec is ranked amongst the top 150 Global Contractors as per ENR, the
Engineering News Record magazine published in the US by McGraw-Hill

 Arabtec follows stringent safety regimes and quality procedures, and


always strives to continuously improve its performance, approach and
relationships. (ISO 9001, 14001, 18001)

 Arabtec Construction, L.L.C. owns a huge array of plant and equipment, in


addition to the plant and equipment fleet of the Arabtec subsidiary
companies

Arabtec Construction L.L.C. 4


ARABTEC IN NUMBERS

 Total of 280 projects (completed and ongoing)

 20,000 Villas

 27 Towers (7 of the tallest 150 buildings in the world)

 12 Airport packages (2 Massive Airports)

 JBR (Jumeirah Beach Residence) 13 Towers having 585 total floors & 2,693

total apartments

Arabtec Construction L.L.C. 5


PROJECTS’ FACTS

1. Burj Khalifa – UAE : World’s Tallest Building

2. Nation Towers - UAE: Highest Link Bridge in the World

3. The Cayan Tower -UAE: Tallest twisting tower in the world

4. Jumeirah Beach Residence – UAE: 15,000 workers worked at peak

5. Louvre Abu Dhabi Museum: The first universal museum in the Arab world

6. 5,000 Villas - KSA: Completed substructure works for 3,800 villas within 1 year

7. 5,000 Villas – KSA: Super Structure Delivery Rate: 200 villas/month, 50 villas/week, 9

villas/day

8. Dubai International Airport, Terminal 2: Expansion of the terminal was conducted while the

existing terminal was operational throughout the entire duration of the project

Arabtec Construction L.L.C.


ASSOCIATED COMPANIES
 Arabtec Construction, L.L.C. is capable of executing different scopes of works
with minimal dependency on external subcontractors.
 Its sister companies are specialized in various works such as:

Arabtec Engineering Services (AES), L.L.C.: carry out infrastructure works including
sewerage, storm water and irrigation networks.
Arabtec Target Engineering Construction, L.L.C: executes a combination of marine
construction, civil, mechanical, electrical, and instrumentation works
Gulf Steel Industries (GSI), FZC: design, fabrication, supply and erection of structural
steel works.
Emirates Falcon Electromechanical Co. (EFECO), L.L.C.: EFECO (LLC) was

established to service the MEP requirements of the construction industry.


Austrian Arabian Ready Mix Concrete Co. (AAC), L.L.C.: concrete production and
delivery.

Arabtec Precast, L.L.C.: pre-cast manufacturer and supplier

House of Equipment (HOE), L.L.C.: specialized in managing, trading, servicing and


rental of construction equipment.
Arabtec Envirogreen Facility Management Services L.L.C. provides bespoke,
integrated Facilities Management solutions to Clients within the Middle East FM market
place.
Arabtec Construction L.L.C. 7
CERTIFICATES
 BS EN ISO 9001:2008 Quality Management System (QMS)
 ISO 14001:2004 Environmental Management System (EMS)
 OHSAS 18001:2007 Occupational Health & Safety Management System
(OHSAS)

Arabtec Construction L.L.C. 8


AWARDS
 World Finance Company of the Decade 2001 – 2010 by World Finance Magazine
March-April 2011

 Certificate of Exemplary Performance to Arabtec Qatar from Ministry of Labour –


National Committee for Health and Safety – Qatar – 2012

 The Big Project b-green Award 2011 Contractor of the Year

 The National Architecture Award for 2010

 Kingdom Expansion Congress Award for Construction Firm of the Year 2009 in Riyadh,
Saudi Arabia

 Mohammed Bin Rashid Al Maktoum (MRM) Business Award 2008

 UAE’s Top Contractor for 2008

 Construction World Gulf Awards 2008

 Company of the Year Award 2007

 Best Contracting Company 2007

Arabtec Construction L.L.C.


9
AWARD WINNING PROJECTS
 Burj Khalifa
 World’s Tallest Structure
 2010 Global Icon Award
 2010 Best Tall Building – Middle East and Africa Region
 AIA Chicago: Distinguished Building Award Citation of Merit- Burj Khalifa
 AIA Chicago: Interior Architecture Award Citation of Merit-Public Areas at the Residences of Burj
Khalifa

 The Address, Downtown Burj Dubai


 Best Hotel in the World in 2011 at Global Traveller Awards
 New Hotel 2008 at World Hotel Award

 Ocean Heights
 MEED GCC Building Project Of The Year 2012
 MEED UAE Building Project Of The Year 2012

 Cayan Tower (formerly Infinity Tower) Six World Class Design Awards

 Le Reve
 Best Luxury Development in the World - Gold Award by Homes Overseas Magazine Awards - UK
 Best Use of Technology by Homes Overseas Magazine Awards – UK

 Andalucia at Emirates Hills: Gold Award – Homes Overseas Magazine Awards – UK

 21st Century: Tallest All Residential Building in the World 2003-2005

 Sanctuary Falls – 95 Villas


 Best Golf Development by CNBC Arabian Property Award
 Best International Golf Development by CNBC International Property
 Best Golf Development, Best Development, Best Architecture, Best Interior Design, Best Property,
Best Property Marketing by CNBC Arabian Property Award

Arabtec Construction L.L.C. 10


Customer Satisfaction – Repeat Orders from the Same Client

Repeat Orders
35

31
30

25

20

15 14
13

10 9

5 4 4 4
3 3 3

0
EMAAR Majid Al AbuDhabi Dubai Civil AbuDhabi EPICO UAE Dubai Emirates Jebel Ali
Futtaim Oil Aviation Gas University Municipality Airlines Free Zone
(MAF)

28 November 2013 REEM – MIRA Townhouse – Dubai, U.AE.


11
PROJECTS’ PORTFOLIO
 High Rise
 Miscellaneous
 Mixed Use Development
 Hotel & Hotel Interiors
 Residential
 Commercial
 Stadiums
 Executive Living
 Airport Development
 Industrial
 Oil and Gas
 Infrastructure
12
HIGH RISE
 Burj Khalifa
 Tiara Towers
 Nation Towers
 DIFC Twin Towers At Central Park
 Al Fattan Towers
 Damac Heights Tower
 Sky Garden Towers
 Jumeirah Beach Residences 01 & 03
 Cayan Tower (The Infinity Tower)
 Ocean Heights Tower
 Raheja Revanta
 Secon Nile Towers, Cairo, Egypt
13 13
BURJ KHALIFA - UAE

Project Name Burj Khalifa


Duration 47 Months
Client EMAAR Properties PJSC
Project Manager Turner International
Supervision Cons. Hyder
Lead Architects SOM
Value USD 1.3 billion
Known Fact World’s Tallest Building

 828-meter high
 became the tallest building in the
world when it surpassed Taipei 101
in 2007
 later became the tallest man-made
structure in the world when it
passed a communication antenna in
Dakota, USA in March 2008.

Arabtec Construction L.L.C. HIGH RISE


14
Tiara Towers

Project Name Tiara Towers


Duration 30 Months
Client WASL
Consultant ADPI
Value USD 300 million

 Construction of Balance work ( 17 to 50


floors ) for the existing Tiara United
towers including parking buildings and
additional piling package

 Total BUA of this project is 228,000


sqm

Arabtec Construction, L.L.C. HIGH RISE 15


16
NATION TOWERS - UAE

Project Name Nation Towers


Location Abu Dhabi, UAE
Duration 30 Months
Client International Capital Trading, L.L.C.
Consultant Hill International
Contract Value USD 450 million

 Mixed-use development
 BUA: 315,000 sqm
 Winner of an international design
competition
 Two buildings: a 64–floors residential
tower, a 50–floors luxury hotel and office
tower and a retail podium
 A sky bridge (Highest Link Bridge in the
World) at the 48th level will connect the
two towers while an underground tunnel
will link the tower to a beach club.

Arabtec Construction L.L.C. HIGH RISE


16
TWIN TOWERS AT CP08 - UAE

Project Name Central Park 08 (CP08)


Location: DIFC
Client Dubai Properties
Client Representative Turner Construction
Architect Hopkins Architects
Consultants Hyder Consulting
Value USD 350 million

 With a value of AED 1.3 billion,


it is comprised of two towers,
of 50 floors each, one for
offices and one residential.

Arabtec Construction L.L.C. HIGH RISE


17
DAMAC HEIGHTS TOWER - UAE

Project Name Damac Heights Tower

Duration 36 Months

Client DAMAC Properties

Value USD 150 million

Floors 85

 Residential Development with


one, two and three bedroom
apartments

 Super tall towers with a height


of 370m

 Facing the palm Jumeirah

Arabtec Construction L.L.C. HIGH RISE


18
SKY GARDENS - UAE

Project Name Sky Gardens

Client First Dubai

Project Managers Projacs International

Duration 21 Months

Value USD 100 million

 47-floors

 575 Apartment-Residential tower

 BUA in excess of 93,000 sqm

 contract value of AED 370 million

Arabtec Construction L.L.C. HIGH RISE


19
JUMEIRAH BEACH RESIDENCES 1&3 - UAE

Project Name

Jumeirah Beach Residences JBR 01 & 03

Client Tecom

Consultants Hyder & Arenco

Lead Architects SOM

Value USD 550 million

 The project consisted of 13


high-rise residential towers
in the Dubai Marina area
which comprised
apartments, luxurious
penthouses, retail shopping
areas and car parks.

Arabtec Construction L.L.C. HIGH RISE


20
AL FATTAN TOWERS - UAE

Project Al Fattan Towers


Client Al Fattan Properties
Duration 33 Months
Consultant Norr Group Consultant
Value USD 100 million

 When completed in 2006,


the Al Fattan Towers were
the 7th tallest buildings in
the UAE

 Arabtec carried out two


phases of construction
works on the towers with
about 15 months
difference in between..

Arabtec Construction L.L.C. HIGH RISE


21
CAYAN TOWER (INFINITY TOWER) - UAE

Project Name Cayan Tower (Infinity)


Duration 35 Months
Client Cayan Investment & Dev.
Project Manager Currie & Brown
Consultant Khatib & Alami
Value USD 225 million
Known Facts Unique Spiral Twisting Shape
Award-winning Design

 Cayan Tower comprises 73 floors,


66 Apartment-Residential tower

 Has a dynamic, 90۫ twisting shape,

 This project won 6 International


Awards

Arabtec Construction, L.L.C. HIGH RISE


22
OCEAN HEIGHTS - UAE

Project Ocean Heights

Duration 36 Months

Client DAMAC Properties

Consultants ECG

Value USD 175 million

Floors 84

 Residential Development with 564 apartments


 Ranks among the top luxury developments in Dubai

Arabtec Construction L.L.C. HIGH RISE


23
RAHEJA REVANTA - India

Project Name:
Raheja Revanta
Duration:
48 Months
Client:
Raheja Developers
Ltd
Value:
AED 335 million
(USD 90 million)
Floors:
55
Height:
195 m
Units
1,000

 The Raheja Revanta Project is located in Gurgaon, Haryana INDIA, and


includes a high-rise apartment tower and low-rise buildings comprising a total of
1,000 units.

Arabtec Construction L.L.C. HIGH RISE


24
SECON NILE TOWERS - UAE
Project Name
Secon Nile Towers
Client
Saudi Egyptian Construction
Company SECON
Consultant
Space Consultants
Duration:
36 months
Location:
Maadi Nile Cornich - Next to Al-
Salam Hospital, Cairo, Egypt
Type
Mixed use (Residential + Hotel Tower)
Floors
24
Built Up Area
Approx. 110,000 m²
Structural Engineers
CDEC
MEP Engineer
Crown Home
Value
EGY 930 million (USD 150
million)

Arabtec Construction L.L.C. HIGH RISE


25
MISCELLANEOUS
 Louvre Abu Dhabi Museum
 Al Ain Hospital
 Al Jadaf Mosque

26
LOUVRE ABU DHABI MUSEUM - UAE

Project Name
Louvre Museum, Abu Dhabi, UAE
Client
TDIC / Agence France JV
Consultant
Parsons Corporation
EC Harris
Buro Happold
Ateliers Jean Nouvel
Duration:
36 months
Location:
Saadiyat Island, Abu Dhabi, UAE
Type
Museum
Built Up Area
Approx. 64,000 m²
Value
Appox. AED 2.5 billion (USD 675
million)

Arabtec Construction L.L.C. 27


AL AIN HOSPITAL - UAE

Project Name
Al Ain Hospital - JV  Under the AED 3.3 billion contract, Al Ain hospital will replace the existing
Client hospital in the Al Jimi area of Al Ain
Musanada
Consultant  BUA: 358,000 sqm
Allen & Shariff
Duration  713 Beds, 104 advanced specialized clinics, 17 radiology rooms, and 22 rooms
72 months for endoscopy procedures.
Value
 Other support facilities include a centre for logistics services, a 60 MW power
USD 900 million
station, a mosque, and a 1,500-car underground parking lot.

Arabtec Construction L.L.C. 28


AL JADAF MOSQUE - UAE

Project Name
Al Jadaf Mosque
Duration
12 Months
Client
Islamic Affairs and Charitable
Activities Department
Value
AED 20 million (USD 6 million)

 The Al Jadaf Mosque follows the


Andalusia type, Moroccan
architecture, which is evident in
the types of arches and columns,
domes and also minaret.

Arabtec Construction L.L.C. MOSQUE


29
MIXED USE DEVELOPMENTS
 Abu Dhabi Astana
 Musheireb Downtown Doha
 Twin Towers
 Tiara Palm Dubai Hotel and
Residences
 Saraya Al Aqaba
 St. Regis Amman Hotel &
Residneces

30
ABU DHABI PLAZA, ASTANA, KAZAKHSTAN
Project Name
Abu Dhabi Plaza, Kazakhstan
Client
Aldar Properties
Duration
36 months
Location
Astana, Kazakhstan
Project Manager
Mott Macdonald
Type
Mixed-used Development
Height
The Tallest 320 m
Built Up Area
Approx. 500,000 m²
Value
Approx. AED 4 billion (USD 1.1 billion)
Details
556 luxury apartments
107,000m² of office space
five-star hotel with serviced apartments
50,000m² retail podium
4 large basements for car park

Arabtec Construction L.L.C. HIGH RISE


31
MSHEIREB DOWNTOWN DOHA, QATAR

Name of Project Consultants


Phase 2 of Downtown Regeneration Project, Mossessian & Partners, Gensler & Associates & Buro
Msheireb Downtown Doha, Qatar Happold
Duration Project Details:
38 months 10 buildings ranging from 2 to 19 storeys, with 4 to 5
Client basement levels below.
Msheireb Properties
Contract Value
USD 650 million

32
Arabtec Construction L.L.C. MIXED DEVELOPMENT
TWIN TOWERS – DOHA, QATAR

Name of Project
Twin Towers
Location
West Bay, Doha, Qatar
Duration
30 months
Client
Sheik Khaled Bin Hamad Al Thani
Project Manager
Hamilton Project Management
Consultant
Architectural Consulting Group
Contract Value
USD 200 million

 The project comprises of two buildings,


with two basement levels, a ground
level, three podium levels and 45 floors
office tower and 45 floors (five star)
hotel tower.

 Twin Towers Project’s BUA is 168,000 sqm


with a total height of 208m

Arabtec Construction L.L.C. 33


MIXED DEVELOPMENT
TIARA PALM DUBAI HOTEL & RESIDENCES

Project Name
Tiara Palm Hotel &
Residences
Duration
20 Months
Client
Zabeel Investments
Project Manager
EC Harris
Consultants
Dar Al Handasah
Value
USD 400 million

 7 buildings of 15-floors each for residential use having 644 apartments

 Hotel of 18-floors built in a V shape, comprising 243 rooms

 The total built-up area is around 302,000 sqm

Arabtec Construction L.L.C. RESIDENTIAL


34
SARAYA AL AQABA

Client Project Manager


Eagle Hills Turner

Consultant Duration
Consolidated Consultant 54 Months

Value BUA
USD 600 million 332,000 sqm

Arabtec Construction L.L.C. RESIDENTIAL


35
ST. REGIS AMMAN HOTEL & RESIDENCES

Project Name
St. Regis Amman
Hotel & Residences

Client
Al MAABAR

Project Manager
Turner

Duration
33 months

Value
USD 200million

Arabtec Construction L.L.C. RESIDENTIAL


36
HOTELS AND HOTEL INTERIORS

 Fairmont Hotel Abu Dhabi


 The Address
 PPM Conrad Hotel
 Emirates Palace Hotel
 Fairmont Hotel
 Palazzo Versace
 Burj Al Arab

37
FAIRMONT HOTEL AND SERVICED
APARTMENTS, ABU DHABI, UAE
Project Name Fairmont Hotel and Serviced
Apartments
Duration 30 Months
Client National Investment Corporation
Consultants Confluence
Value USD 300 million

 The Fairmont Hotel and Serviced Apartments of


Abu Dhabi Breakwater occupies an overall area of
approximately 175,000 sq.m and is comprised of 5
stars hotel and serviced apartments tower

 Project specifics include:


 563 Hotel keys with a golden lounge
 144 long term serviced apartments
 105 residential apartments

Arabtec Construction L.L.C. HOTEL AND HOTEL INTERIOS


38
THE ADDRESS – DOWNTOWN BURJ KHALIFA

Project Name The Address – Downtown Burj


Khalifa
Duration 32 Months
Client EMAAR
Consultants WS Atkins
Value USD 250 million
Floors 64

Arabtec Construction L.L.C. HOTEL AND HOTEL INTERIOS


39
CONRAD HOTEL, DUBAI,UAE

Project Name
Conrad Hotel
Duration
915 days
Client
Private Property Management
(PPM)
Designer
SRSS Consultancy
Local Consultant
WS Atkins & Partners Overseas
Project Mangers
International Project Management
(IPM)
Value
USD 325 million
Floors
58

 The Conrad Hotel consists of 58-floors tower


 The hotel is linked to a 13-level automated car
park building, being the first fully Automated Car
Parking system in the region and accommodates
1,056 cars
Arabtec Construction L.L.C. HOTEL AND HOTEL INTERIOS
40
EMIRATES PALACE, ABU DHABI,UAE

 With an contract value of USD 150 million, MEP, Finishes and Fit out packages
were separately awarded

 The hotel is owned by the Abu Dhabi government

 Comprises 302 rooms and 92 suites

Arabtec Construction L.L.C. HOTEL AND HOTEL INTERIOS


41
FAIRMONT, DUBAI,UAE

Project Name Fairmont Hotel  The multi-purpose hotel, residential


Client Shk. Sultan Bin Khalifa Al Nahyan and office complex stands 35 floors
high, opened in early 2002, and has
Consultant Khatib & Alami
an eleven-level car park building
Value USD 175 million accommodating over 750 cars.
Floors 35

Arabtec Construction L.L.C. HOTEL AND HOTEL INTERIOS


42
BURJ AL ARAB, DUBAI,UAE

 Arabtec and DEPA (previously Arabtec Interiors) were responsible for the
7-star interiors and fit out to the public areas, restaurants, reception, ballroom
and recreational facility.

 The Burj Al Arab is a luxury hotel in Dubai, United Arab Emirates (UAE) which
is the tallest building used exclusively as a hotel at 321 meters (1,053 feet).

Arabtec Construction L.L.C. HOTEL AND HOTEL INTERIOS


43
RESIDENTIAL

 Silverene Twin Towers


 Le Rêve
 21st Century
 Princess Noora University

44
SILVERENE TWIN TOWERS, DUBAI,UAE

Project Name
Silverene Twin Towers Residential Dev.
Duration
24 Months
Location
Dubai Marina, Dubai, UAE
Client
CAYAN
Project Consultants
Robert Matthew / Johnson-Marshall
Project Manager
Handscomb Consultants, Inc.
Contract Value
USD 175 million

 Silverene’s first tower has 35 floors while the second tower has 26 floors

Arabtec Construction L.L.C. RESIDENTIAL


45
LE RÊVE, DUBAI,UAE
Project Name
Le Rêve
Designer
WS Atkins
Contract Value
USD 75 million
Floors
46

 Completed in 2004, this seven-star 46 floors residential tower comprises


apartments of either a whole floor (approximately 13,000 sq ft.) or half-a-floor
(6,500 sq ft.).
 Many of the apartments were individually designed and finished to owner’s
requirements.
 An award-winning project named by Homes Overseas Magazine Awards, UK in
2006: “Best Use of Technology”
“Best Luxury Development in the World”
“Gold Award”
Arabtec Construction L.L.C. RESIDENTIAL
46
21st CENTURY TOWER, DUBAI, UAE

Project Name
21st Century Tower & Car Park
Duration
20 Months
Location
Dubai, UAE
Client
Abdullah & Abdul Wahid Al Rostamani
Project Consultants
WS Atkins
Contract Value
USD 50 million

 On its completion in 2003, 21st Century Tower took the title of the World’s
Tallest Fully Residential Building

 The development consisted of 55 floors, 269m tall skyscraper, located on


Dubai’s Sheikh Zayed Road.

 The total built-up area of 86,000 sqm housing 400 apartments

Arabtec Construction L.L.C. RESIDENTIAL


47
PRINCESS NORA UNIVERSITY – RIYADH, KSA
Project Name
Princess Nora Bint Abdul Rahman Univ.
(Married Junior Staff Housing - 50 Bldgs)
Duration
18 Months
Location
King Khalid Airport Road, Riyadh, Saudi
Arabia
Client
Saudi Binladin Group
Project Consultants
Dar Al - Handasah Shair and Partners
Contract Value
USD 350 million
BUA
200,000 sqm

 The project comprised of 50


buildings:
 12 buildings featured 4 bedroom
apartment
 26 buildings were designed for 3
bedroom apartment
 12 buildings comprised 2 bedroom
apartments.
 Each building consists of G+5
floors
Arabtec Construction L.L.C. RESIDENTIAL
48
COMMERCIAL
 World Trade Center
 College of Arts and College of Education
 ADIA
 ADNEC
 DIFC Gate Village
 Dubai Maritime City
 Dubai Pearl

49
WORLD TRADE CENTRE – DOHA, QATAR

Cigar Bar Project Name


World Trade Centre
Height
 The commercial building stands 231 meters, which 300m
features 42 levels office space, 5 floors of executive Floors
offices, four floors car park space of 1,169 cars, podium 50
Client
of four floors, multi-purpose auditorium, with a capacity Qatar General Insurance &
of 523 fixed seats; multi-purpose hall and conference Reinsurance Company
rooms of 1,775 square meters. The top most level is a Consultant
M.Z. & Partners
business club overlooking the city of Doha. Value USD 150 million

Arabtec Construction L.L.C. COMMERCIAL


50
COLLEGE OF ARTS AND COLLEGE OF EDUCATION, SABAH AL
SALEM, UNIVERSITY CITY - KUWAIT

Project Name
College of Arts and College
of Education, Sabah Al
Salem, University City,
Kuwait
Duration
42 months
Client
Kuwait University
Value
Approx. AED 1.6 billion
(USD 450 million)
Built Up Area
Approx. 230,000 m²
Floors
6
Details
The project scope includes
the construction and
external works of four
buildings for the College of
Arts and College of
Education

Arabtec Construction L.L.C. COMMERCIAL


51
ADIA HQ , AUH, UAE
Project Name
ADIA New HQ
Client
Abu Dhabi Investment
Authority
Consultants
CRSS International
Value
USD 225 million
Location
Abu Dhabi, UAE

 The core building includes two underground levels, 32 typical floors and four
management levels.
 The 73,000 square meters of office space are arranged in two curved wings on
each side of a 17–floors atrium, as well as a 300–seat auditorium.
 The project has a detached parking structure of nine typical parking as well as
three underground levels for exclusive use by ADIA staff.

Arabtec Construction L.L.C. COMMERCIAL


52
ADNEC

Project Name
ADNEC (Phase 2)
Duration
28 months
Client
ADNEC
Consultants
RMJM
Value
USD 325 million
Location
Abu Dhabi, UAE

 The project includes the construction of four additional exhibition halls, plus a
multi-purpose hall with a seating capacity of more than 5,000 people, two
multi-storey car parks with space for more than 8,000 vehicles.

Arabtec Construction L.L.C. COMMERCIAL


53
DIFC GATE VILLAGE

Project Name
Dubai International Financial
Centre Gate Village
Duration
27 Months
Client
DIFC
Consultants
Hopkins
Value
USD 150 million

 With a contract value of AED 525 million, the Gate Village incorporates 10
towers: nine of which are commercial, whilst the tenth is residential.
 Designed by Hopkins Architects, each tower has four penthouses within the top
two floors.

Arabtec Construction L.L.C. COMMERCIAL


54
DUBAI PEARL

Project Name
Dubai Pearl
Duration
32 Months
Client
Mango & Partners
Consultants
Khatib and Alami
Value
AED 35 million (USD 10 million)
Floors
17

 This was Arabtec’s first


high–rise building project
in 1978. At that time, it
was the tallest building in
Dubai with an innovative
curtain wall system of
aluminium and baked
enamel panels.

Arabtec Construction L.L.C. COMMERCIAL


55
EXECUTIVE LIVING &
RESIDENTIAL COMMUNITIES
 1,100 UAE National Housing – Fujairah
 Emirates Hills
 1,582 TOWNHOUSES – MIRA COMMUNITY
 Arabian Ranches – Emaar
 940 + 544 + 277 Villas – Emaar
 Moh. Bin Rashid Housing Est. Villas
 Dubai Silicon Oasis 1,047 + 560 Villas
 Other Developers
 Sanctuary Falls
 Expand Dhahran Residential Community: Residential
Villas - Package 5
 Al Hasa National Guard Housing SANG (5,000 Villas)
 Al Marassi - Egypt 56
1,100 UAE Nationals Housing, Phase I
 The project comprises
the construction of 1100
villas for UAE nationals in
Al Fujairah

 The villas are of 5 types


ranging between 274
sqm and 414 sqm

 The total BUA f this


project is around
430,000 sqm

Project Name 1,100 UAE Nationals Housing, Phase I


Duration 31 Months
Client Ministry of Infrastructure Development (formerly MOPW)
Consultant AECOM
Value USD 500 million

Arabtec Construction, L.L.C. HIGH RISE 57


EMIRATES HILLS – MEADOWS + SPRINGS + LAKES

Emirates Hills Villas


2,564

Client: Emaar Properties

Arabtec Construction L.L.C. 58


EXECUTIVE LIVING
1,582 TOWNHOUSES – MIRA COMMUNITY

Project :
1,582 Townhouses –
Mira Community

Client:
Emaar Properties

Consultant:
BH. NS Engineering
Consultant

Value:
AED 1.037 Billion
(USD 282 Million)

Arabtec Construction L.L.C. 59


EXECUTIVE LIVING
ARABIAN RANCHES - EMAAR

Arabian Ranches – Completed


Villas 2,661

Arabian Ranches – Ongoing


Villas
348

Client: EMAAR Properties

Arabtec Construction L.L.C. 60


EXECUTIVE LIVING
940 + 544 + 277 VILLAS - EMAAR

940 Villas - Oud Al Muteena

544 Villas - Al Warqa'a

277 Villas – Umm Al Quwain

Client: Emaar Properties

Arabtec Construction L.L.C. 61 61


EXECUTIVE LIVING
MOH. BIN RASHID HOUSING EST. VILLAS

1,240 Villas - Al Barsha

509 Villas - Al Warqah

252 Villas – Al Barsha

Arabtec Construction L.L.C. 62


EXECUTIVE LIVING
DUBAI SILICON OASIS 1,047+560 VILLAS

DSO – 1,047 Villas

DSO – 560 Villas

Client:
Dubai Silicon Oasis Authority

Arabtec Construction L.L.C. 63


EXECUTIVE LIVING
OTHER DEVELOPERS

523 Villas at Al Furjan -


Nakheel

523 Villas at JVC - Nakheel

558 Villas at Dubailand –


Dubai Properties

64
Arabtec Construction L.L.C. EXECUTIVE LIVING
SANCTUARY FALLS

Sanctuary Falls
95 Villas

Client: Shaikh Holdings

Arabtec Construction L.L.C. 65


EXECUTIVE LIVING
Expand Dhahran Residential Community: Residential Villas - Package 5

Project Brief
Design, Procure, Supply, Testing, Pre
commissioning, Commissioning
Assistance, Startup Assistance And
Construct Villas Within Package 5
Boundary Limits ( 380 Villas ) including
Civil, structural, MEP, Finishing,
Landscaping & Road works.
7-Types of Villas
Average BUA of 440 m2 / unit
Total BUA 167,000 m2

Project Name
Expand Dhahran Residential Community – Residential
Villas-380 Villas (Package # 5), Dhahran Camp
Duration
31 months
Client
Saudi Arabian Oil Company ( Aramco)
Consultant
Saudi Arabian Oil Company ( Aramco)
Value
USD 272 Million

Arabtec Construction L.L.C. 66 66


EXECUTIVE LIVING
Expand Dhahran Residential Community: Residential Villas - Package 5

Arabtec Construction L.L.C. 67


EXECUTIVE LIVING
5,000 VILLAS – AL HASA - KSA

Project Name
5,000 Villas – Al Hasa
Duration
48 Months
Client
National Guard
Consultant
Dar Al Handasah
Value
SAR 5.3 billion
(USD 1.43 billion)

• This project constitutes of construction of 5,000 Villas, site preparation and related facilities in a new
housing project in the Eastern Province of Saudi Arabia.

• With an value of USD 1.43 billion, the construction of the 5,000 villas will last for 30 months, with the villas
being delivered in phases all through the construction period of 48 months.

• The project has two type of villas; 4,600 Soldier villas, each covering 295 m2 and 400 Officer villas, each
covering 539 m2.

• The total built-up area is over 1,500,000 m2 on a site area covering over 5 Km2 with associated
infrastructure.
68
Arabtec Construction L.L.C. EXECUTIVE LIVING
5,000 VILLAS – AL HASA - KSA

5,000 Villas
Al Hasa - KSA

Arabtec Construction L.L.C. 69


EXECUTIVE LIVING
AL MARASSI – NORTH COAST, EGYPT

Project Name:
Al Marassi - Egypt
Duration :
20 Months
Client:
Emaar MISR
Consultant:
Turner International
Value:
USD 40 million

 The project will take 20 months to complete.


 It consists of 74 luxury Villas and 30 town homes as part of Al Marassi project in
Sidi Abdul Rahman in North Coast – Arab Republic of Egypt
 The work includes the construction and the finishes of the villas and town homes
at Village L.

Arabtec Construction L.L.C. 70


EXECUTIVE LIVING
AIRPORT DEVELOPMENTS
 Abu Dhabi International Airport Midfield Terminal
Building
 Bahrian International Airport
 King Abdul Aziz International Airport, Jeddah, KSA
 Dubai International Airport Terminal 2 – Expansion
 Al Maktoum International Airport – Dubai World Central

71
ABU DHABI INTERNATIONAL AIRPORT
MIDFIELD TERMINAL BUILDING

Project Name Midfield Terminal Building (MTB) at Abu Dhabi International Airport
Duration 49 months
Client Abu Dhabi Airports Company (ADAC)
Value USD 3 Billion
Project Scope
• Midfield terminal complex (built-up area of 700,000 m²)
• Concrete laying (300,000 m²)
• Flexible pavement with taxiway connections to the existing and future taxiways (600,000 m²)
• Utilities, Jet fuel system, Traffic tunnel (340 m), Apron services such as pre-conditioned air and 400
HZ power pits, Catering Building Facility, Retail, food and beverage outlet (27,000 m²), Contact gates
(65 nos.)

Arabtec Construction L.L.C. AIRPORT DEVELOPMENTS


72
BAHRAIN INTERNATIONAL AIRPORT

Project Name Bahrain International Airport - Airport Modernization Program


Duration 50 Months
Client Ministry of Transportation and Telecommunications
Consultant Aeroports De Paris Ingenierie (ADPi- France)
Project Manager Hill International
Value USD 1.1 billion
Brief Passenger Terminal Building = 219,573.m2, Central Utility Complex = 8,847 m2,
Car Park- East = 111,247 m2, Car Park- West =111,123 m2,
Total BUA 450,790 M2

Arabtec Construction, L.L.C. HIGH RISE 73


KING ABDUL AZIZ INTERNATIONAL AIRPORT, JEDDAH, KSA

Project KAIA Development (Phase 1 Zone


A,B,C & H) - Passenger Terminal Building
(F 100) at Jeddah
Duration 36 Months
Client General Authority of Civil Aviation
Consultant Dar Al Handasah & ADPI JV
Main Contractor Saudi Bin Laden Group
Value USD 175 Million

Arabtec Construction L.L.C. 74


DUBAI INTERNATIONAL AIRPORT
TERMINAL – 2 EXPANSION

 The project involved


about 30,000 sqm of
new build and 25,000
sqm of refurbishment

 The scope of work


includes Terminal
Building, Check-in
Hall, Departure Area,
Immigration Hall,
Extension connecting
the existing facility to
the new building,
Management Office,
Refurbishment of the
Existing Terminal

Project Name Dubai International Airport Terminal 2 – Expansion


Duration 25 Months
Client Dubai Aviation engineering projects (DAEP)
Consultants Dar Al Handash (Shair & Partners)/ ADPI JV
Value USD 175 million

Arabtec Construction L.L.C. AIRPORT DEVELOPMENTS


75
PASSENGER/CARGO TERMINALS &AIR TRAFFIC
CONTROL AT DUBAI CENTRAL AIRPORT

Project Name Passenger Terminal + Cargo Terminal + Air Traffic Control Tower at Al Maktoum
International Airport (Dubai World Central)
Client Dubai Civil Aviation
Consultants Al Handasah & ADPI JV
Value USD 150 million

Arabtec Construction L.L.C. AIRPORT DEVELOPMENTS


76
STADIUMS

 Dubai Sports City (Stadium 4)


 Dubai Sports City (Stadium 1)

77
DUBAI SPORT CITY (STADIUM S4)

Project Name
Dubai Sport City (Stadium S4)
Duration
1,041 Days
Client
Dubai Sport City
Consultant
Schuster Pechtold
No. of Seats
60,000
Value
USD 163 million

 Dubai Sports City Stadium (S4) is a design–and–build project which started in


joint venture with Max Boegl (from Germany).

Arabtec Construction L.L.C. STADIUMS


78
DUBAI SPORT CITY (STADIUM S1)

Project Name
Dubai Sport City (Stadium S1)
Client
Dubai Sport City
Consultant
Sinclair Knights Merz (SKM)
No. of Seats
10,000
Value
USD 62 million

 Also known as the Multi-purpose Indoor Stadium, Dubai Sports City Stadium S1
is located in Dubai Sports City, which is part of Dubailand. The project features
a free spanning, domed roof that will house major components of the sporting
facilities. It is set to meet international standards capable of hosting
international events for a variety of sports, concerts and shows.

Arabtec Construction L.L.C. STADIUMS


79
Malls

 Deira City Centre


 Ajman City Centre
 Marina Mall, Abu Dhabi
 Mirdif City Centre

80
DEIRA CITY CENTRE, DUBAI, UAE

Project Name: Deira City Centre


- Triangle Main Building
- Cineplex Fitout
- Multi-Storey Car Park & Retail Extension
- Magic Planet Upgrade

Client:
MAF Properties
 Project Description
Deira City Centre, Dubai, UAE, first opened its doors in Consultant:
November 1995, it virtually redefined the concept of MACE International Ltd.
"malls" for the region. As the first large-scale, mixed-use
shopping destination, complete with retail outlets, Value:
restaurants, entertainment facilities and a hotel
AED 209 million (USD 57 million)

Arabtec Construction L.L.C. MALLS 81


AJMAN CITY CENTRE, AJMAN, UAE

Project :
Ajman City Centre
- Cinestar 6 Screen Cineplex
Fitout
- Cinema Halls
- Continent Hypermarket Fitout

Client
MAF Greater Union

Consultant
MACE International Ltd.

Value
USD 31 million

 Project Description
Ajman City Centre is the largest shopping mall in Ajman developed by Majid Al Futtaim
Properties.
It originally opened in December 1998 with 46 stores and has since added a further 22
stores, and increased its total retail area to over 37,000 sqm.

Arabtec Construction L.L.C. MALLS 82


MARINA MALL, ABU DHABI, UAE

Project Name: Marina Mall


- Food Court Fitout
- Cinestar
- Carrefour
Client:
National Investment
Corporation
Consultant:
David Kaye Design
Value:
AED 45 million (USD 12 million)

 Project Description
• Marina Mall is one of the largest malls
of the Abu Dhabi Emirate and is owned by
National Investment Corporation.

• It houses over 400 stores, including


a hypermarket and Cineplex.

Arabtec Construction L.L.C. MALLS 83


MIRDIF CITY CENTRE, DUBAI, UAE

Project Name: Mirdif City Centre

- Enabling Works & service

Client:

Majid Al Futtaim Investment

Consultant:

MACE International Ltd.

Value:

AED 16.6 million (USD 4.5 million)

 Project Description
 Mirdif City Centre is a super regional shopping mall offering over 430 stores with easy
throiugh 3 dedicated bridges and 12 entry and exit points at different levels of its 7,000
vehicle car parks.

 The shopping mall is the first in the region to follow ecologically friendly and sustainability
compliant construction techniques from its early design stages and is in the process of
acquiring a LEED certification.

Arabtec Construction L.L.C. MALLS 84


INFRASTRUCTURE

 DIFC Truck Tunnel

85
DIFC TRUCK TUNNEL

Project Name
Dubai International Financial
Centre Truck Tunnel
Duration
20 months
Client
DIFC
Consultants
Cansult Maunsell
Value
USD 105 million

 Truck & Service Tunnel is an underground structure running approximately 1.5


kilometers
 The tunnel structure is an independent piled multilevel box, comprising
reinforced and pre-stressed concrete elements enclosed by reinforced walls
extending to level +2.5 DMD and completely separated from surrounding
developments.

Arabtec Construction L.L.C. COMMERCIAL


86
THANK YOU

Arabtec Construction L.L.C. 87

You might also like