Arabtec Construction L.L.C.
1
COMPANY PROFILE
2
OVERVIEW
Arabtec is ranked amongst the top 150 Global Contractors as per ENR, the
Engineering News Record magazine published in the US by McGraw-Hill
20,000 Villas
JBR (Jumeirah Beach Residence) 13 Towers having 585 total floors & 2,693
total apartments
5. Louvre Abu Dhabi Museum: The first universal museum in the Arab world
6. 5,000 Villas - KSA: Completed substructure works for 3,800 villas within 1 year
7. 5,000 Villas – KSA: Super Structure Delivery Rate: 200 villas/month, 50 villas/week, 9
villas/day
8. Dubai International Airport, Terminal 2: Expansion of the terminal was conducted while the
existing terminal was operational throughout the entire duration of the project
Arabtec Engineering Services (AES), L.L.C.: carry out infrastructure works including
sewerage, storm water and irrigation networks.
Arabtec Target Engineering Construction, L.L.C: executes a combination of marine
construction, civil, mechanical, electrical, and instrumentation works
Gulf Steel Industries (GSI), FZC: design, fabrication, supply and erection of structural
steel works.
Emirates Falcon Electromechanical Co. (EFECO), L.L.C.: EFECO (LLC) was
Kingdom Expansion Congress Award for Construction Firm of the Year 2009 in Riyadh,
Saudi Arabia
Ocean Heights
MEED GCC Building Project Of The Year 2012
MEED UAE Building Project Of The Year 2012
Cayan Tower (formerly Infinity Tower) Six World Class Design Awards
Le Reve
Best Luxury Development in the World - Gold Award by Homes Overseas Magazine Awards - UK
Best Use of Technology by Homes Overseas Magazine Awards – UK
Repeat Orders
35
31
30
25
20
15 14
13
10 9
5 4 4 4
3 3 3
0
EMAAR Majid Al AbuDhabi Dubai Civil AbuDhabi EPICO UAE Dubai Emirates Jebel Ali
Futtaim Oil Aviation Gas University Municipality Airlines Free Zone
(MAF)
828-meter high
became the tallest building in the
world when it surpassed Taipei 101
in 2007
later became the tallest man-made
structure in the world when it
passed a communication antenna in
Dakota, USA in March 2008.
Mixed-use development
BUA: 315,000 sqm
Winner of an international design
competition
Two buildings: a 64–floors residential
tower, a 50–floors luxury hotel and office
tower and a retail podium
A sky bridge (Highest Link Bridge in the
World) at the 48th level will connect the
two towers while an underground tunnel
will link the tower to a beach club.
Duration 36 Months
Floors 85
Duration 21 Months
47-floors
Project Name
Client Tecom
Duration 36 Months
Consultants ECG
Floors 84
Project Name:
Raheja Revanta
Duration:
48 Months
Client:
Raheja Developers
Ltd
Value:
AED 335 million
(USD 90 million)
Floors:
55
Height:
195 m
Units
1,000
26
LOUVRE ABU DHABI MUSEUM - UAE
Project Name
Louvre Museum, Abu Dhabi, UAE
Client
TDIC / Agence France JV
Consultant
Parsons Corporation
EC Harris
Buro Happold
Ateliers Jean Nouvel
Duration:
36 months
Location:
Saadiyat Island, Abu Dhabi, UAE
Type
Museum
Built Up Area
Approx. 64,000 m²
Value
Appox. AED 2.5 billion (USD 675
million)
Project Name
Al Ain Hospital - JV Under the AED 3.3 billion contract, Al Ain hospital will replace the existing
Client hospital in the Al Jimi area of Al Ain
Musanada
Consultant BUA: 358,000 sqm
Allen & Shariff
Duration 713 Beds, 104 advanced specialized clinics, 17 radiology rooms, and 22 rooms
72 months for endoscopy procedures.
Value
Other support facilities include a centre for logistics services, a 60 MW power
USD 900 million
station, a mosque, and a 1,500-car underground parking lot.
Project Name
Al Jadaf Mosque
Duration
12 Months
Client
Islamic Affairs and Charitable
Activities Department
Value
AED 20 million (USD 6 million)
30
ABU DHABI PLAZA, ASTANA, KAZAKHSTAN
Project Name
Abu Dhabi Plaza, Kazakhstan
Client
Aldar Properties
Duration
36 months
Location
Astana, Kazakhstan
Project Manager
Mott Macdonald
Type
Mixed-used Development
Height
The Tallest 320 m
Built Up Area
Approx. 500,000 m²
Value
Approx. AED 4 billion (USD 1.1 billion)
Details
556 luxury apartments
107,000m² of office space
five-star hotel with serviced apartments
50,000m² retail podium
4 large basements for car park
32
Arabtec Construction L.L.C. MIXED DEVELOPMENT
TWIN TOWERS – DOHA, QATAR
Name of Project
Twin Towers
Location
West Bay, Doha, Qatar
Duration
30 months
Client
Sheik Khaled Bin Hamad Al Thani
Project Manager
Hamilton Project Management
Consultant
Architectural Consulting Group
Contract Value
USD 200 million
Project Name
Tiara Palm Hotel &
Residences
Duration
20 Months
Client
Zabeel Investments
Project Manager
EC Harris
Consultants
Dar Al Handasah
Value
USD 400 million
Consultant Duration
Consolidated Consultant 54 Months
Value BUA
USD 600 million 332,000 sqm
Project Name
St. Regis Amman
Hotel & Residences
Client
Al MAABAR
Project Manager
Turner
Duration
33 months
Value
USD 200million
37
FAIRMONT HOTEL AND SERVICED
APARTMENTS, ABU DHABI, UAE
Project Name Fairmont Hotel and Serviced
Apartments
Duration 30 Months
Client National Investment Corporation
Consultants Confluence
Value USD 300 million
Project Name
Conrad Hotel
Duration
915 days
Client
Private Property Management
(PPM)
Designer
SRSS Consultancy
Local Consultant
WS Atkins & Partners Overseas
Project Mangers
International Project Management
(IPM)
Value
USD 325 million
Floors
58
With an contract value of USD 150 million, MEP, Finishes and Fit out packages
were separately awarded
Arabtec and DEPA (previously Arabtec Interiors) were responsible for the
7-star interiors and fit out to the public areas, restaurants, reception, ballroom
and recreational facility.
The Burj Al Arab is a luxury hotel in Dubai, United Arab Emirates (UAE) which
is the tallest building used exclusively as a hotel at 321 meters (1,053 feet).
44
SILVERENE TWIN TOWERS, DUBAI,UAE
Project Name
Silverene Twin Towers Residential Dev.
Duration
24 Months
Location
Dubai Marina, Dubai, UAE
Client
CAYAN
Project Consultants
Robert Matthew / Johnson-Marshall
Project Manager
Handscomb Consultants, Inc.
Contract Value
USD 175 million
Silverene’s first tower has 35 floors while the second tower has 26 floors
Project Name
21st Century Tower & Car Park
Duration
20 Months
Location
Dubai, UAE
Client
Abdullah & Abdul Wahid Al Rostamani
Project Consultants
WS Atkins
Contract Value
USD 50 million
On its completion in 2003, 21st Century Tower took the title of the World’s
Tallest Fully Residential Building
49
WORLD TRADE CENTRE – DOHA, QATAR
Project Name
College of Arts and College
of Education, Sabah Al
Salem, University City,
Kuwait
Duration
42 months
Client
Kuwait University
Value
Approx. AED 1.6 billion
(USD 450 million)
Built Up Area
Approx. 230,000 m²
Floors
6
Details
The project scope includes
the construction and
external works of four
buildings for the College of
Arts and College of
Education
The core building includes two underground levels, 32 typical floors and four
management levels.
The 73,000 square meters of office space are arranged in two curved wings on
each side of a 17–floors atrium, as well as a 300–seat auditorium.
The project has a detached parking structure of nine typical parking as well as
three underground levels for exclusive use by ADIA staff.
Project Name
ADNEC (Phase 2)
Duration
28 months
Client
ADNEC
Consultants
RMJM
Value
USD 325 million
Location
Abu Dhabi, UAE
The project includes the construction of four additional exhibition halls, plus a
multi-purpose hall with a seating capacity of more than 5,000 people, two
multi-storey car parks with space for more than 8,000 vehicles.
Project Name
Dubai International Financial
Centre Gate Village
Duration
27 Months
Client
DIFC
Consultants
Hopkins
Value
USD 150 million
With a contract value of AED 525 million, the Gate Village incorporates 10
towers: nine of which are commercial, whilst the tenth is residential.
Designed by Hopkins Architects, each tower has four penthouses within the top
two floors.
Project Name
Dubai Pearl
Duration
32 Months
Client
Mango & Partners
Consultants
Khatib and Alami
Value
AED 35 million (USD 10 million)
Floors
17
Project :
1,582 Townhouses –
Mira Community
Client:
Emaar Properties
Consultant:
BH. NS Engineering
Consultant
Value:
AED 1.037 Billion
(USD 282 Million)
Client:
Dubai Silicon Oasis Authority
64
Arabtec Construction L.L.C. EXECUTIVE LIVING
SANCTUARY FALLS
Sanctuary Falls
95 Villas
Project Brief
Design, Procure, Supply, Testing, Pre
commissioning, Commissioning
Assistance, Startup Assistance And
Construct Villas Within Package 5
Boundary Limits ( 380 Villas ) including
Civil, structural, MEP, Finishing,
Landscaping & Road works.
7-Types of Villas
Average BUA of 440 m2 / unit
Total BUA 167,000 m2
Project Name
Expand Dhahran Residential Community – Residential
Villas-380 Villas (Package # 5), Dhahran Camp
Duration
31 months
Client
Saudi Arabian Oil Company ( Aramco)
Consultant
Saudi Arabian Oil Company ( Aramco)
Value
USD 272 Million
Project Name
5,000 Villas – Al Hasa
Duration
48 Months
Client
National Guard
Consultant
Dar Al Handasah
Value
SAR 5.3 billion
(USD 1.43 billion)
• This project constitutes of construction of 5,000 Villas, site preparation and related facilities in a new
housing project in the Eastern Province of Saudi Arabia.
• With an value of USD 1.43 billion, the construction of the 5,000 villas will last for 30 months, with the villas
being delivered in phases all through the construction period of 48 months.
• The project has two type of villas; 4,600 Soldier villas, each covering 295 m2 and 400 Officer villas, each
covering 539 m2.
• The total built-up area is over 1,500,000 m2 on a site area covering over 5 Km2 with associated
infrastructure.
68
Arabtec Construction L.L.C. EXECUTIVE LIVING
5,000 VILLAS – AL HASA - KSA
5,000 Villas
Al Hasa - KSA
Project Name:
Al Marassi - Egypt
Duration :
20 Months
Client:
Emaar MISR
Consultant:
Turner International
Value:
USD 40 million
71
ABU DHABI INTERNATIONAL AIRPORT
MIDFIELD TERMINAL BUILDING
Project Name Midfield Terminal Building (MTB) at Abu Dhabi International Airport
Duration 49 months
Client Abu Dhabi Airports Company (ADAC)
Value USD 3 Billion
Project Scope
• Midfield terminal complex (built-up area of 700,000 m²)
• Concrete laying (300,000 m²)
• Flexible pavement with taxiway connections to the existing and future taxiways (600,000 m²)
• Utilities, Jet fuel system, Traffic tunnel (340 m), Apron services such as pre-conditioned air and 400
HZ power pits, Catering Building Facility, Retail, food and beverage outlet (27,000 m²), Contact gates
(65 nos.)
Project Name Passenger Terminal + Cargo Terminal + Air Traffic Control Tower at Al Maktoum
International Airport (Dubai World Central)
Client Dubai Civil Aviation
Consultants Al Handasah & ADPI JV
Value USD 150 million
77
DUBAI SPORT CITY (STADIUM S4)
Project Name
Dubai Sport City (Stadium S4)
Duration
1,041 Days
Client
Dubai Sport City
Consultant
Schuster Pechtold
No. of Seats
60,000
Value
USD 163 million
Project Name
Dubai Sport City (Stadium S1)
Client
Dubai Sport City
Consultant
Sinclair Knights Merz (SKM)
No. of Seats
10,000
Value
USD 62 million
Also known as the Multi-purpose Indoor Stadium, Dubai Sports City Stadium S1
is located in Dubai Sports City, which is part of Dubailand. The project features
a free spanning, domed roof that will house major components of the sporting
facilities. It is set to meet international standards capable of hosting
international events for a variety of sports, concerts and shows.
80
DEIRA CITY CENTRE, DUBAI, UAE
Client:
MAF Properties
Project Description
Deira City Centre, Dubai, UAE, first opened its doors in Consultant:
November 1995, it virtually redefined the concept of MACE International Ltd.
"malls" for the region. As the first large-scale, mixed-use
shopping destination, complete with retail outlets, Value:
restaurants, entertainment facilities and a hotel
AED 209 million (USD 57 million)
Project :
Ajman City Centre
- Cinestar 6 Screen Cineplex
Fitout
- Cinema Halls
- Continent Hypermarket Fitout
Client
MAF Greater Union
Consultant
MACE International Ltd.
Value
USD 31 million
Project Description
Ajman City Centre is the largest shopping mall in Ajman developed by Majid Al Futtaim
Properties.
It originally opened in December 1998 with 46 stores and has since added a further 22
stores, and increased its total retail area to over 37,000 sqm.
Project Description
• Marina Mall is one of the largest malls
of the Abu Dhabi Emirate and is owned by
National Investment Corporation.
Client:
Consultant:
Value:
Project Description
Mirdif City Centre is a super regional shopping mall offering over 430 stores with easy
throiugh 3 dedicated bridges and 12 entry and exit points at different levels of its 7,000
vehicle car parks.
The shopping mall is the first in the region to follow ecologically friendly and sustainability
compliant construction techniques from its early design stages and is in the process of
acquiring a LEED certification.
85
DIFC TRUCK TUNNEL
Project Name
Dubai International Financial
Centre Truck Tunnel
Duration
20 months
Client
DIFC
Consultants
Cansult Maunsell
Value
USD 105 million