Cuadro de Ambientes, Dotación y Volumenes Requeridos


Area (m2)
y/o Dotación Vol
Tipo de Modulo Ambiente N Alumnos (l/d.m2) requerido (l)

Direccion 18.22 6.00 109.30


Sala de profesores 13.99 6.00 83.97
Deposito educativo 9.09 0.50 4.55
topico 23.40 6.00 140.42
Deposito 28.05 0.50 14.02
area verde 102.98 2.00 205.96
patio 85.61 0.50 42.81
Personal Administrativo 4.00 50.00 200.00
Docentes y Auxiliares 4.00 50.00 200.00
Personal de Servicio 2.00 50.00 100.00
Alumnado 100.00 50.00 5,000.00
DOTACION REQUERIDA PARA CONSUMO DOMESTICO 6,101.02
VOLUMEN NECESARIO DE CISTERNA 4,575.76
VOLUMEN NECESARIO DE TANQUE ELEVADO 2,033.67
MEMORIA DE CALCULO
Proyecto:
"INSTALACION DEL SERVICIO EDUCATIVO ESCOLARIZADO EN LA I.E.I. N
10050, DISTRITO DE REQUE - CHICLAYO - LAMBAYEQUE"
Capitulo: Instalaciones de agua
Cálculo: Unidades de Gasto
Fecha: 1/11/2015

Tipo Ambiente Aparatos Cantidad UG UG Parcial UG Total
Ambientes
AULAS
Lavatorio 1 2 4
SSHH NIÑOS 2
Inodoro 1 4 8
Lavatorio 1 2 4
SSHH NIÑAS 2
Inodoro 1 4 8
Lavatorio 1 2 4
SSHH DISCAPACI. 2
Inodoro 1 4 8
COCINA
COCINA 1 Lavadero 1 3 3
AREA ADMINISTRATIVA
Lavatorio 1 2 2
SSHH DOC VAR. 1
Inodoro 1 4 4
Lavatorio 1 2 2
SSHH DOC. MUJ. 1
Inodoro 1 4 4
TOPICO 1 Lavatorio 1 2 2
Unidades de Gasto Total del Proyecto 53

TOTAL MAXIMA DEMANDA SIMULTANEA 1.166 LPS

50 1.13
53 X
60 1.25

10 0.12
3 x
x= 0.036
X= 1.166 L/s
CALCULOS DE TANQUE Y CISTERNA

1.- Dotación Diaria

DOTACION TOTAL= 6101.02 lts

2.- Almacenamiento y Regulacion

Almacenamiento

Dotacion 6101 litros


Cisterna 4575.76 litros 4.50 m3
3/4 Dotacion
Tanque elevado 2033.67 litros 2.50 m3

3.- Caudales de Diseño

Qp: 0.05 lps


Q anual 0.07
Qmd: 0.09
Qmh: 0.14

tiempo de llenado de la ciste2 horas


volumen de la cisterna 4.50 m3

Caudal de entrada

Q= 0.3178 lts/seg

4.- Diseño

De acuerdo al área disponible con la que se cuenta , asumiremos las siguientes medidas:

Diametro= 1.55 m

- Para un volumen de 2.5 m3 tendremos una altura de:


altura = 1.325 m
borde libre = 0.45 (R.N.E.: bl > 0.20m)

Altura total = 1.775 m

5.- Diámetro de tubería de rebose:

De acuerdo con el R.N.E. para un caudal de hasta 5m3 (según nuestro caso V = 5 m3 ), se
tendrá una tubería de Ø = 2"
s siguientes medidas:

uestro caso V = 5 m3 ), se
DIMENSIONAMIENTO DEL TANQUE Y CISTERNA

DIMENSIONAMIENTO DEL TANQUE ELEVADO


VOLUMEN TOTAL TANQUE ELEVADO 2034 lt

SE TRABAJARA PARA ESTE CASO CON UN TANQUE DE 2500 lt


2.50 m3
Diametro 1.55

ALTO 1.33
2.50 m3

VOLUMEN DETANQUE ELEVADO

V. tanque elevado = 1/3 dotacion


V. tanque elevado = 2.03 m3
Asumido= 2.5 m3
Asumiremos un volumen de : TE = 3.50 m3
Entonces: d^2*π/4 x h = 2.50 m3 o MÁS

Como el material del Tanque Elevado es de Concreto Armado entonces las


dimensiones de la sección Deben de ser cuadrada.

d^2*π/4 x h = 2.50m3
axaxa= 2.5m3
a3= 2.5m3
a= 1.36m

Estas medidas corresponden a


dimensiones interiores (dimensiones
útiles)
altura util
1.33m altura total
1.70m
1.55m
DIMENSIONAMIENTO DE LA CISTERNA

Tenemos las siguientes relaciones

siempre que ASUMIMOS UN VOLUMEN DE: 4.5 M3

4.50= a x l x h
4.50= 2/3L x L x 1/2L
4.50= �^3/3
13.5 �^3
entonces L= 2.38 m 2.38
Medidas probables a emplear!
h= 1.191 m 1.19
remplazando a= 1.587 m 1.59
en a y h

VOLUMEN DE CISTERNA dotacion = 6101 lts


dotacion = 6.10102 m3
V. cisterna = 3/4 dotacion
Según Cálculo: Vol. Tanque Proyectado:
V. cisterna = 4.576 m3 4.50 m3

1.500
altura util
Asumiremos una
1.500 cisterna de 4.5 m3
2.00 L= 2.00 M
A= 1.50
H= 1.50
CALCULO DE LAS TUBERIAS

CALCULOS DE LA TUBERIA DE MEDIDOR


1. DATOS

Presion en la red publica = 15 lb/pulg2


Presion mínima de agua a la salida de la cisterna = 2,00 m
Desnivel entre la red pública y el punto de entrega a la cisterna = 1,00 m
Longitud de la línea de servicio = 35
El T.E debe llenarse un período de 2 horas = 7200 seg
La cisterna debe llenarse un período de 4 horas = 14400 seg
Volumen de la cisterna en m3 = 4.50 4500 lts
Accesorios a utilizar: 1 valvula de paso
1 valvula de compuerta
2 codos de 90⁰
1 codo de 45⁰

Solución:

Calculo del gasto de entrada

Volumen 4500 lts


Q= = = 0.313 lts/seg = 4.941 G.P.M.
Tiempo 14400

Cálculo de la carga disponible: 1.125

H = PR - PS - HT

H = Carga disponible
PR = Presion de red PR = 14 lb/pulg2
PS = Presion de salida PS = 2m= 2.84 lb/pulg2
HT = Altura de red a cisterna HT = 1m= 1.42 lb/pulg2

H= 9.74 lb/pulg2

Selección del medidor

Siendo la máxima pérdida de carga del medidor es 50% de la carga disponible, se tiene:

H= 0,5 x 9.74 = 4.87 lb/pulg2

Medidor
En el ábaco de medidores se tiene:

Diámetro Pérdida de carga


3/4" 3.24 lb/pulg2 = 2.25 m 1.440

Por lo tanto seleccionamos el medidor de 3/4"

Por lo tanto la ALTURA DISPONIBLE SERA:


HDisponible= 9.74 – 2.25 7.49 m
HDisponible= 7.49 m

CALCULO DEL DIAMETRO LA TUBERÍA DE ALIMENTACIÓN


Ø(mm) codo tee reduc valvulas
Asumimos un diámetro de 1 ” 1/2" 15.8 0.532 1.064 0.030 0.112
Accesorios: Cantidad Long Equi Long 3/4" 20.1 0.777 1.554 0.043 0.164
1 válvula de paso. 1 0.276 0.276 1" 25.8 1.023 2.045 0.057 0.216
1 válvula de compuerta. 1 0.276 0.276 1 1/4" 38 1.309 2.618 0.727 0.276
2 codos de 90 2 1.31 2.62 1 1/2" 43.4 1.554 3.109 0.085 0.328
1 codo de 45 1 0.51 0.51 2" 46.4 2.045 4.091 1.136 0.432
TOTAL 3.682 2 1/2" 65 2.577 5.154 1.432 0.544
3" 76.2 3.068 6.136 0.170 0.648
Longitud total = 38.682 m 4" 100 4.091 8.182 0.227 0.864
6" 152.4 6.136 12.273 0.341 1.295

S= 0.012 m
Sf= 0.453 < 7.49 m

Entonces el diámetro es de 3/4 ”


CALCULOS DE LOS DIAMETROS DE LA TUBERÍA DE IMPULSIÓN Y SUCCION

Datos:
Tiempo de llenado: 2h
Volumen del T.E: 3.5 m3
Sección del T.E: 1.60 x 1.60x 1.40 (medidas útiles)
Sección del T.C: 2.80 x1.50 x 1.45

Gasto de Bombeo:

Qb = 0.000 m3/seg
Qb = 0.347 lts/seg

Diámetro Económico:

D= 0.01302 m
D= 13.01568 mm
D= 0.5 "

Entonces asumimos el valor de 25 mm. (1 ”), por lo que se aproxima al valor


de la tabla de diámetros de impulsión.

Diámetro de impulsión: 25 mm. (1 ”)


Diámetro de medidor : 32 mm (3/4”)

Como el valor del diámetro de succión es un valor inmediato superior que el de


impulsión entonces:
Diámetro de succión: 32 mm (1 1/4”)

DIÁMETRO DE LA TUBERÍA DE ADUCCIÓN

Datos:
Tiempo de llenado: 4h
Volumen del T.C.: 4.5 m3
Sección del T.C: 2.0 x1.50x 1.50

Qb= Vol. T.C / tiempo de llenado Qb = 0.000313 m3/seg


Qb = 0.3125 lts/seg

Diámetro Económico:

D= 0.01468 m
D= 14.68353 mm
D= 0.6 pulg

Entonces asumimos el valor de 15 mm. (3/4”).


CALCULO DE RED DE AGUA POTABLE
longitudes equivalentes por accesorio

Ø(mm) codo tee reduc valvulas


h f  S  lo
1/2" 15.8 0.532 1.064 0.030 0.112
3/4" 20.1 0.777 1.554 0.043 0.164
1" 25.8 1.023 2.045 0.057 0.216
 Q
1 1/4" 38 1.309
1.554
2.618
3.109
0.727
0.085
0.276
0.328
S  
 0 .2785
1 1/2" 43.4
2" 46.4 2.045 4.091 1.136 0.432
2 1/2" 65 2.577 5.154 1.432 0.544
3" 76.2 3.068 6.136 0.170 0.648
4" 100 4.091 8.182 0.227 0.864 C=
6" 152.4 6.136 12.273 0.341 1.295

perdida de cargas localizadas


TRAMO UG Demanda Diametro V Long Accesorios Long Equiva por accs
Q(l/s) interior(mm) comercial (m/s) (m) Codo Tee Reduc Valv Codo Tee
1--2 108.650 1.738 46.4 2" 1.028 28.92 0 21 0 0.00 85.91
2--3 27.20 0.690 46.4 2" 0.408 15.53 22 1 44.99 0.00
3--4 22.16 0.580 46.4 2" 0.343 12.8 17 34.77 0.00
4--5 18.94 0.515 46.4 2" 0.305 1.39 16 32.72 0.00
5--6 18.94 0.515 46.4 2" 0.305 3.45 16 32.72 0.00
6--7 18.94 0.515 46.4 2" 0.305 1.09 16 32.72 0.00
7--8 14.91 0.435 46.4 2" 0.257 1.02 14 28.63 0.00
7--9 37.21 0.865 46.4 2" 0.512 6.53 2 1 4.09 0.00
9--10 22.25 0.584 46.4 2" 0.345 4.5 17 34.77 0.00
10--TE 12.654 0.390 46.4 2" 0.231 6.2 1 0.00 4.09
9--11 24.6 0.625 46.4 2" 0.370 16.23 4 1 8.18 4.09
11--12 26.82 0.685 46.4 2" 0.405 4.02 5 3 10.23 12.27
11--13 32.03 0.790 46.4 2" 0.467 0.94 1 0.00 4.09
13--14 44.3354 1.004 46.4 2" 0.594 15.77 9 11 18.41 45.00
h f  S  longitud total

1 / 0 .54
 Q (m 3 / s) 
S   
 0 .2785  C  D
2 .63
(m ) 

150

cargas localizadas
Long equ Long S Perdida presion
Reduc Valv total (m) Total m/m carga hf(m) (m)
0.00 0.00 85.911 114.83 0.0241 2.77 5.49
0.00 0.43 45.422 60.95 0.0044 0.27 5.76
0.00 0.00 34.765 47.57 0.0032 0.15 5.91
0.00 0.00 32.72 34.11 0.0025 0.09 6.00
0.00 0.00 32.72 36.17 0.0025 0.09 6.09
0.00 0.00 32.72 33.81 0.0025 0.09 6.17
0.00 0.00 28.63 29.65 0.0019 0.05 6.23
0.00 0.43 4.522 11.05 0.0066 0.07 6.30
0.00 0.00 34.765 39.27 0.0032 0.13 6.37
0.00 0.00 4.091 10.29 0.0015 0.02 6.50
0.00 0.00 12.271 28.50 0.0036 0.10 6.27
0.00 0.00 22.498 26.52 0.0043 0.11 6.16
0.00 0.00 4.091 5.03 0.0056 0.03 6.04
0.00 0.00 63.406 79.18 0.0087 0.69 5.35
ESQUEMA DE CISTERNA TANQUE ELEVADO caudal de bombeo 1.738 l/s
Y TANQUE ELEVADO
1.7 CALCULO DE LA LINEA DE IMPULSION Y SUCCION
m
IMPULSION 11¨
SUCCION 1.5 1 1/4¨
CALCULO DE LA ALTURA DINAMICA TOTAL

5m HDT= Hg + hf + v^2/2g

Hg= 9.5 m

PERDIDA DE CARGA:

SUCCION 1 1/4¨ IMPULSION 1¨

1 canastilla 13.841 1 valv. check 3.263


1 codo 2.045 valv compue. 0.328
L tuberia 4.5 3 codos 90 3.114
bomba L tuberia 8.7
2 20.386 15.405 m
m
HAZEM WILLIAM

1 . 85
 L(m )   Q (l / s ) 
hf ( m )   1741 x   
 D 4 .87 ( pu lg)   C 

succion impulsion
4.5 m 1.467 m 7.984 m

CISTERNA perdida de carga total 9.451 m

CALCULO DE LA V^2/2g EN TUBERIA DE IMPULSION


CALCULO DEL CAUDAL DE BOMBEO
V= 4Q = 3.4299788488 m/s
3.1416X D^2
RESULTA EL MAYOR ENTRE EL CAUDAL DE MAXIMA DEMANDA SIMULTANEA Y EL CAUDAL DE LLENADO
CAUDAL DE MAXIMA DEMANDA SIMULTANEA = 1.738 l/s entonces : V^2/2g = 0.599630729 m

CALCULO DE HDT HDT= Hg + hf + V^2/2g

9.5
9.450544386
tiempo de llenado 4 horas HDT= 0.599630729

Qllenado: 6101 19.55017512 m


4x 60 x 60
CALCULO DE LA POTENCIA DE LA BOMBA
Qllenado: 0.4236817604 l/s
g x Q B x HD n=0.65
Luego caudal de bombeo sera 1.738 l/s 75 n
0.697 HP POR LO TANTO: USAR 01 BOMBAS DE 1 HP
longitudes equivalentes por accesorio

Ø(mm) codo tee reduc valvulas


h f  S  longitud
1/2" 15.8 0.532 1.064 0.030 0.112
3/4" 20.1 0.777 1.554 0.043 0.164
1" 25.8 1.023 2.045 0.057 0.216
 Q (m 3 / s
1 1/4" 38 1.309 2.618 0.727 0.276
S  
 0 .2785  C  D
1 1/2" 43.4 1.554 3.109 0.085 0.328
2" 46.4 2.045 4.091 1.136 0.432
2 1/2" 65 2.577 5.154 1.432 0.544
3" 76.2 3.068 6.136 0.170 0.648
4" 100 4.091 8.182 0.227 0.864 C= 150
6" 152.4 6.136 12.273 0.341 1.295

DOTACION 180 lt(hab/dia)


POBLACION 600 hab.
K1 1.3
K2 2.5

 pobl.(hab.) xdotacion( L / habxdia 


Qprom.   
 86400 
Qprom. = 1.250 l/s 0.18243
caudal maximo diario 1.625 l/s 0.6429
caudal maximo horario 3.125 l/s 0.75209
0.21572
Qdiseño 3.125 l/s 1.33187

perdida de cargas localizadas


TRAMO Demanda Diametro V Long Accesorios Long Equiva por accs
Q(l/s) interior(mm) comercial (m/s) (m) Codo Tee Reduc Valv Codo Tee Reduc
2-.6 0.45 1.321 15.8 1/2" 2.291 48.70 1 0.00 1.06 0.00
A-2 1.77 0.209 46.4 2" 1.047 7.24 1 1 0.00 4.09 0.00
h'-A 1.98 1.048 46.4 2" 1.171 28.24 1 0.00 4.09 0.00
1-h' 3.03 1.341 46.4 2" 1.791 24 1 0.00 4.09 0.00
tanque-1 4.37 0.449 46.4 2" 2.584 7.00 1 0.00 0.00 1.14
4.369
A-B 0.000 46.4 2" 0.000 1 0.00 4.09 0.00
B-C 0.000 46.4 2" 0.000 0.00 0.00 0.00
C-D 0.000 46.4 2" 0.000 1 1 0.00 4.09 1.14
C-E 0.000 46.4 2" 0.000 0.00 0.00 0.00
E-F 0.000 46.4 2" 0.000 1 2.05 0.00 0.00
F-G 0.000 46.4 2" 0.000 1 2.05 0.00 0.00
G-H 0.000 46.4 2" 0.000 0.00 0.00 0.00
H-I 0.000 46.4 2" 0.000 1 0.00 4.09 0.00
I-J 0.000 46.4 2" 0.000 1 2.05 0.00 0.00
J-K 0.000 46.4 2" 0.000 1 0.00 4.09 0.00
K-L 0.000 20.1 3/4" 0.000 2 1 0.00 3.11 0.04
K-3 0.000 20.1 3/4" 0.000 2 1 0.00 3.11 0.04
3-M 0.000 20.1 3/4" 0.000 1 0.78 0.00 0.00
M-N 0.000 20.1 3/4" 0.000 3 2.33 0.00 0.00
N-O 0.000 20.1 3/4" 0.000 1 0.78 0.00 0.00
O-P 0.000 20.1 3/4" 0.000 2 1 1.55 0.00 0.00
3-Q 0.000 20.1 3/4" 0.000 3 2.33 0.00 0.00
Q-R 0.000 20.1 3/4" 0.000 1 0.00 1.55 0.00
R-S 0.000 20.1 3/4" 0.000 1 1 0.78 0.00 0.00
2-.5 0.000 46.4 2" 0.000 1 0.00 4.09 0.00
5-.7 0.000 20.1 3/4" 0.000 1 1 1 0.78 1.55 0.00
5-.4 0.000 46.4 2" 0.000 1 0.00 4.09 0.00
4-.8 0.000 20.1 3/4" 0.000 2 0.00 3.11 0.00
8-.9 0.000 20.1 3/4" 0.000 1 0.78 0.00 0.00
9-T 0.000 20.1 3/4" 0.000 1 1 0.78 0.00 0.00
1-I' 0.000 25.8 1" 0.000 1 1 1.02 0.00 0.00
I'-J' 0.000 25.8 1" 0.000 0.00 0.00 0.00
J'-K' 0.000 25.8 1" 0.000 0.00 0.00 0.00
K'-L' 0.000 25.8 1" 0.000 1 1 0.00 2.05 0.00
L'-M' 0.000 20.1 3/4" 0.000 0.00 0.00 0.00
M'-N' 0.000 20.1 3/4" 0.000 0.00 0.00 0.00
N'-O' 0.000 20.1 3/4" 0.000 0.00 0.00 0.00
O'-P' 0.000 20.1 3/4" 0.000 0.00 0.00 0.00
P'Q' 0.000 20.1 3/4" 0.000 1 0.00 0.00 0.00
Q'R' 0.000 20.1 3/4" 0.000 1 0.00 0.00 0.00
L'-T' 0.000 20.1 3/4" 0.000 1 2 0.78 3.11 0.00
T'-S' 0.000 20.1 3/4" 0.000 1 1 0.78 0.00 0.00
T'-U' 0.000 20.1 3/4" 0.000 1 0.00 1.55 0.00
U'-V' 0.000 20.1 3/4" 0.000 2 1.55 0.00 0.00
U'-W' 0.000 20.1 3/4" 0.000 0.00 0.00 0.00
W'-X' 0.000 20.1 3/4" 0.000 1 1 0.78 0.00 0.00
0.000 76.2 3" 0.000 1 0.00 0.00 0.00
8.737 TOTAL 115.18
CALCULO DE LINEA DE GRADIENTE DEL PUNTO MAS DESFABORABLE

Cota de Altura Presion perdida Linea


nivel Piso aparato (m) de carga gradiente
5.75 1.60 2.00 9.35
0.00 0.00 0.00 9.35
0.00 0.00 0.00 9.35
0.00 0.00 0.00 9.35
0.00 0.00 0.00 9.35
0.00 0.00 0.00 9.35
0.00 0.00 0.00 9.35
0.00 0.00 0.00 9.35
0.00 -0.50 0.00 9.85
0.00 0.50 0.00 9.35

Cálculo de la presión necesaria en el ingreso a la vivienda


Presion necesaria= Presión en el punto F
Q= 0.2785 x C x D 2.63 x S 0.54
V=Q/A

9.35 9.35 m
13.36 psi
2

 S  longitud total

1 / 0 .54
 Q (m 3 / s) 
 
 0 .2785  C  D
2 .63
(m) 

Long equ Long S Perdida


Valv total (m) Total m/m carga hf(m)
0.00 1.064 49.76 0.3735 18.59
0.43 4.523 11.76 0.0005 0.01
0.00 4.091 32.33 0.0094 0.31
0.00 4.091 28.09 0.0149 0.42
0.00 1.136 8.14 0.0020 0.02

0.00 4.091 4.09 0.0000 0.00


0.00 0 0.00 0.0000 0.00
0.00 5.227 5.23 0.0000 0.00
0.00 0 0.00 0.0000 0.00
0.00 2.045 2.05 0.0000 0.00
0.00 2.045 2.05 0.0000 0.00
0.00 0 0.00 0.0000 0.00
0.00 4.09 4.09 0.0000 0.00
0.00 2.045 2.05 0.0000 0.00
0.00 4.091 4.09 0.0000 0.00
0.00 3.151 3.15 0.0000 0.00
0.00 3.151 3.15 0.0000 0.00
0.00 0.777 0.78 0.0000 0.00
0.00 2.331 2.33 0.0000 0.00
0.00 0.777 0.78 0.0000 0.00
0.16 1.718 1.72 0.0000 0.00
0.00 2.331 2.33 0.0000 0.00
0.00 1.554 1.55 0.0000 0.00
0.16 0.941 0.94 0.0000 0.00
0.00 4.091 4.09 0.0000 0.00
0.16 2.495 2.50 0.0000 0.00
0.00 4.091 4.09 0.0000 0.00
0.00 3.108 3.11 0.0000 0.00
0.00 0.777 0.78 0.0000 0.00
0.16 0.941 0.94 0.0000 0.00
0.22 1.239 1.24 0.0000 0.00
0.00 0 0.00 0.0000 0.00
0.00 0 0.00 0.0000 0.00
0.22 2.261 2.26 0.0000 0.00
0.00 0 0.00 0.0000 0.00
0.00 0 0.00 0.0000 0.00
0.00 0 0.00 0.0000 0.00
0.00 0 0.00 0.0000 0.00
0.16 0.164 0.16 0.0000 0.00
0.16 0.164 0.16 0.0000 0.00
0.00 3.885 3.89 0.0000 0.00
0.16 0.941 0.94 0.0000 0.00
0.00 1.554 1.55 0.0000 0.00
0.00 1.554 1.55 0.0000 0.00
0.00 0 0.00 0.0000 0.00
0.16 0.941 0.94 0.0000 0.00
0.65 0.648 0.65 0.0000 0.00

You might also like